JP2657180B2 - Concrete sheet pile having water guide holes and driving method of the sheet pile - Google Patents

Concrete sheet pile having water guide holes and driving method of the sheet pile

Info

Publication number
JP2657180B2
JP2657180B2 JP6078551A JP7855194A JP2657180B2 JP 2657180 B2 JP2657180 B2 JP 2657180B2 JP 6078551 A JP6078551 A JP 6078551A JP 7855194 A JP7855194 A JP 7855194A JP 2657180 B2 JP2657180 B2 JP 2657180B2
Authority
JP
Japan
Prior art keywords
sheet pile
water
concrete
water guide
pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP6078551A
Other languages
Japanese (ja)
Other versions
JPH07238544A (en
Inventor
久兒之 北垣
権作 水田
治樹 安田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
FUJI PII ESU KK
NISHITETSU KENKI KK
TOOMEN KENKI KK
Original Assignee
FUJI PII ESU KK
NISHITETSU KENKI KK
TOOMEN KENKI KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by FUJI PII ESU KK, NISHITETSU KENKI KK, TOOMEN KENKI KK filed Critical FUJI PII ESU KK
Priority to JP6078551A priority Critical patent/JP2657180B2/en
Publication of JPH07238544A publication Critical patent/JPH07238544A/en
Application granted granted Critical
Publication of JP2657180B2 publication Critical patent/JP2657180B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)
  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、導水孔を有するコンク
リート製矢板及び同矢板の打込み方法に関するものであ
る。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a concrete sheet pile having water holes and a method of driving the sheet pile.

【0002】[0002]

【従来の技術】従来、護岸や擁壁等の土木工事において
使用される矢板には、コンクリート製のものと鋼製のと
があり、かかる矢板は振動杭打機等により地中に押込ま
れている。
2. Description of the Related Art Conventionally, sheet piles used in civil engineering works such as seawalls and retaining walls are made of concrete or steel. These sheet piles are pushed into the ground by a vibrating pile driver or the like. I have.

【0003】そして、地盤の硬さによっては、あらかじ
め先行杭(いわゆるダミー杭、パイロット杭)を打込ん
で地中に穴を開け、同穴の中に矢板を打込んだり、又矢
板の外側壁に長手方向に沿って導水管を配管し、同導水
管より高圧力水を噴出させて、地盤を切削しながら、矢
板を打込むという方法が採られている。
Depending on the hardness of the ground, a leading pile (so-called dummy pile, pilot pile) is previously driven to make a hole in the ground, and a sheet pile is driven into the hole, or an outer wall of the sheet pile is formed. In this method, a water pipe is piped along the longitudinal direction, high-pressure water is jetted from the water pipe, and a sheet pile is driven while cutting the ground.

【0004】[0004]

【発明が解決しようとする課題】ところが、コンクリー
ト製矢板の場合、壁圧に耐えうるものとするために断面
積が大きくなり、そのためにあらかじめ先行杭を打込ん
だり、導水管を利用して地盤を切削しても、地中深く押
込むことができず、振動杭打機等を使用すると、同矢板
の上端部が破損したり、座屈を起こす等の問題があっ
た。
However, in the case of concrete sheet piles, the cross-sectional area becomes large in order to be able to withstand wall pressure. Cannot be pushed deep into the ground even if it is cut, and when a vibratory pile driver is used, the upper end of the sheet pile is damaged or buckled.

【0005】また、鋼製の場合は、例えば護岸用に使用
すると、海水に含まれる塩分により腐食されて、その機
能を果さなくなるという問題があり、腐食防止処理をす
るとコスト高になることもあって、腐食される虞れのあ
る場所での使用は避けられていた。
[0005] In the case of steel, for example, when used for revetment, there is a problem that it is corroded by salt contained in seawater and its function cannot be performed. Therefore, use in places where there is a risk of corrosion was avoided.

【0006】従って、塩分により腐食されやすい場所
で、かつ、日本工業規格による標準貫入試験方法におけ
るN値が50を越えるような硬質地盤中に、深く矢板を
打込む必要のある場合には、上記いずれの矢板も使用で
きないという問題があった。
Accordingly, when it is necessary to drive a sheet pile deeply into a hard ground where the N value exceeds 50 in a standard penetration test method according to Japanese Industrial Standards in a place where corrosion is likely to be caused by salt, and There was a problem that neither sheet pile could be used.

【0007】[0007]

【課題を解決するための手段】そこで、本発明では、上
下方向に伸延する平板状の矢板基部と、同矢板基部の両
端部に突出させた矢板突出部とにより断面略コ字状の矢
板本体をコンクリートにより成形し、上記矢板突出部中
に上下方向に伸延する導水孔を設けると共に、各導水孔
の上端開口部を、矢板基部と矢板突出部とにより形成さ
れる凹状空間中に突出させ、各上端開口部より高圧力水
又はグラウトを注入して、各導水孔の下端開口部より高
圧力水又はグラウトを直下方へ向けて噴出可能としてな
る導水孔を有するコンクリート製矢板を提供せんとする
ものである。
Therefore, in the present invention, a sheet pile body having a substantially U-shaped cross section is provided by a flat sheet pile base extending vertically and sheet pile projections protruding from both ends of the sheet pile base. Molded with concrete, while providing water guide holes extending in the vertical direction in the sheet pile protrusion, the upper end opening of each water guide hole, projecting into the concave space formed by sheet pile base and sheet pile protrusion, A high-pressure water or grout is injected from each upper end opening, and a concrete sheet pile having a water guide hole capable of jetting the high-pressure water or grout directly downward from the lower end opening of each water guide hole is provided. Things.

【0008】また、本発明では、上記コンクリート製矢
板を、以下の施工手順により打込むコンクリート製矢板
の打込み方法を提供せんとするものであり、内込み方法
は、 イ) 矢板突出部にそれぞれ設けた導水孔の上端開口部
に、高圧力水供給用のパイプを接続する ロ) 上記コンクリート製矢板を吊上げ機により吊込む
と共に、矢板打込み場所に建込む ハ) 振動式杭打機を吊込み、同杭打機を同矢板の上端
部にチャッキングする ニ) 地層の特性に応じて、高圧力水の圧力及び流量を
調整しながら各導水孔に注入し、下端開口部より直下方
へ向けて噴出させると共に、地層の特性に応じて振動式
杭打機の振動打込み力を調整しながら、同杭打機により
コンクリート製矢板を打込む ホ) 各導水孔中にグラウトを注入し、下端開口部より
噴出させて、コンクリート製矢板の下端部の廻りに漏出
させて固化させるからなるものである。
Further, the present invention provides a method for driving a concrete sheet pile into which the above-mentioned concrete sheet pile is driven by the following construction procedure. A pipe for supplying high-pressure water is connected to the opening at the upper end of the water guide hole. B) The concrete sheet pile is suspended by a lifting machine, and it is built at the place where the sheet pile is driven. C) A vibratory pile driver is suspended. The pile driver is chucked to the upper end of the sheet pile. D) According to the characteristics of the stratum, the high pressure water is injected into each water hole while adjusting the pressure and flow rate. The concrete pile is driven by the vibratory pile driver while adjusting the vibratory driving force of the vibratory pile driver according to the characteristics of the stratum, and grout is injected into each water hole and the lower end opening is formed. More spurts Then, it leaks around the lower end of the concrete sheet pile and solidifies.

【0009】[0009]

【実施例】本発明の実施例を図面にもとづき詳説すれ
ば、第1図、第2図に示す(A) は、本発明に係るプレス
トレストコンクリート製矢板(以下PC矢板という)で
あり、同PC矢板(A) は、第3図、第4図に示すよう
に、上下方向に伸延する平板状の矢板基部(1e)と、同矢
板基部(1e)の両端部に突出させた矢板突出部(1f)(1f)と
により断面コ字状で、全長が14m前後の長手状の矢板
本体(1) をプレストレストコンクリートにより製造する
と共に、各矢板突出部(1f)(1f)中に、上端部から下端に
わたって長手方向に導水孔(2)(2') を設け、同導水孔
(2)(2') の上端開口部(3)(3') より高圧力水又はグラウ
トを注入して、同導水孔(2)(2') の下端開口部(4)(4')
より高圧力水又はグラウトを噴出可能としてなるもので
ある。
DESCRIPTION OF THE PREFERRED EMBODIMENTS An embodiment of the present invention will be described in detail with reference to the drawings. FIG. 1A and FIG. 2A show a prestressed concrete sheet pile (hereinafter referred to as PC sheet pile) according to the present invention. As shown in FIGS. 3 and 4, the sheet pile (A) has a flat sheet pile base (1e) extending in the vertical direction, and sheet pile projecting portions (1e) protruding from both ends of the sheet pile base (1e). 1f) and (1f), a longitudinal sheet pile body (1) having a U-shaped cross section and a total length of about 14 m is manufactured from prestressed concrete, and each sheet pile projecting portion (1f) (1f) is inserted from the upper end. Water supply holes (2) and (2 ') are provided in the longitudinal direction over the lower end.
(2) Inject high-pressure water or grout from the upper end opening (3) (3 ') of (2') and open the lower end opening (4) (4 ') of the water introduction hole (2) (2').
High pressure water or grout can be ejected.

【0010】第1図中、(1a)は矢板本体(1) の右側下端
部に形成したテーパー面であり、同テーパー面(1a)によ
りPC矢板(A) を土中に打込んでいく過程で、同PC矢
板(A) に常時左側方へ押圧する土圧力が作用するように
している。これは隣接するPC矢板(A) を接続状態で土
中に打込むためである。
In FIG. 1, (1a) is a tapered surface formed at the lower right end of the sheet pile body (1), and the process of driving the PC sheet pile (A) into the soil by the tapered surface (1a). Thus, an earth pressure is constantly applied to the PC sheet pile (A) so as to press it to the left. This is for driving the adjacent PC sheet pile (A) into the ground in a connected state.

【0011】また、(1b)は接続嵌合用凸部、(1c)は接続
嵌合用凹部、(1d)は吊り孔である。
[0011] Further, (1b) is a connection fitting projection, (1c) is a connection fitting recess, and (1d) is a suspension hole.

【0012】第3図はPC矢板(A) の上端部の断面図で
あり、また、第4図は同PC矢板(A) の中央部の断面図
で、図中、(5) はピアノ線等のPC用鋼材、(6)(7)は配
鉄筋、(8) は上部補強プレートである。
FIG. 3 is a cross-sectional view of the upper end of the PC sheet pile (A), and FIG. 4 is a cross-sectional view of the central part of the PC sheet pile (A). And (6) and (7) are the reinforcing bars, and (8) is the upper reinforcing plate.

【0013】また、上記した導水孔(2)(2') は、第5図
に示す導水管(9) を矢板本体(1) 中に埋設することによ
り、同導水管(9) 中に形成されるものである。
Further, the above-mentioned water guide holes (2) and (2 ') are formed in the water guide pipe (9) by embedding the water guide pipe (9) shown in FIG. 5 in the sheet pile body (1). Is what is done.

【0014】そして、かかる導水管(9) は、第5図に示
すように、一端が矢板本体(1) の凹状外側壁の上部より
外方へ突出する横管(10)と、同横管(10)の外方へ突出し
た一端に連通連結するソケット(11)と、横管(10)の他端
に連通連結するエルボ(12)と、同エルボ(12)の下端に上
端を連通連結する第1縦管(13)と、同第1縦管(13)の下
端に第1ソケット(14)を介して上端を連通連結する第2
縦管(15)と、同第2縦管(15)の下端に第2ソケット(16)
を介して上端を連通連結する第3縦管(17)と、同第3縦
管(17)の下端に第3ソケット(18)を介して取付けるノズ
ル(19)と、同ノズル(19)に連結する噴出ガイド用スリー
ブ(20)とからなる。
As shown in FIG. 5, the water pipe (9) comprises a horizontal pipe (10), one end of which protrudes outward from the upper part of the concave outer wall of the sheet pile body (1); A socket (11) connected to one end protruding outward of (10), an elbow (12) connected to the other end of the horizontal pipe (10), and an upper end connected to the lower end of the elbow (12). A first vertical pipe (13) to be connected to a lower end of the first vertical pipe (13) via a first socket (14).
A vertical pipe (15) and a second socket (16) at the lower end of the second vertical pipe (15)
A third vertical pipe (17) having an upper end communicating therewith via a nozzle, a nozzle (19) attached to a lower end of the third vertical pipe (17) through a third socket (18), and a nozzle (19). And a spouting guide sleeve (20) to be connected.

【0015】しかも、上記ソケット(11)には、高圧力水
を供給するパイプが接続され、同高圧力水が矢板本体
(1) の下部に位置するノズル(19)より、噴出ガイド用ス
リーブ(20)を介して矢板本体(1) の下方へ噴出されるよ
うにしている。
A pipe for supplying high-pressure water is connected to the socket (11), and the high-pressure water is supplied to the sheet pile body.
The nozzle (19) located at the lower part of (1) is ejected downward from the sheet pile body (1) via an ejection guide sleeve (20).

【0016】導水管(9) の配設位置は、PC矢板(A) の
下端面が打込み時に地盤等から大きな抵抗を受ける左右
側矢板突出部(1f)(1f)中としている。
The water pipe (9) is disposed in the left and right sheet pile protruding portions (1f) (1f) where the lower end face of the PC sheet pile (A) receives great resistance from the ground or the like at the time of driving.

【0017】ここで、上記のように構成したPC矢板
(A) の製造手順を説明すると、以下の通りである。
Here, the PC sheet pile constructed as described above is used.
The manufacturing procedure of (A) will be described below.

【0018】PC用鋼材(5) を配置し、緊張する。The steel material for PC (5) is placed and tensioned.

【0019】配鉄筋(6)(7)を配置する。The reinforcing bars (6) and (7) are arranged.

【0020】導水管(9) を配置する。A water pipe (9) is arranged.

【0021】型枠を組立てる。Assemble the formwork.

【0022】コンクリートを形枠中に打設する。The concrete is cast into the formwork.

【0023】コンクリートを養生する。Curing the concrete.

【0024】PC用鋼材(5) の緊張を緩めることによ
り、矢板本体(1) にプレストレスを導入する。
Prestress is introduced into the sheet pile body (1) by relaxing the tension of the steel material for PC (5).

【0025】強度等を検査試験する。The strength and the like are inspected and tested.

【0026】また、第6図、第7図は、他の実施例とし
ての導水管(21)の配設状態を示しており、同導水管(21)
は下端部に四又状の分岐管(21a) を設け、同分岐管(21
a) の先端に4個のノズル(22)を取付け可能としてい
る。
FIGS. 6 and 7 show the arrangement of a water pipe (21) as another embodiment.
Is provided with a four-pronged branch pipe (21a) at the lower end.
Four nozzles (22) can be attached to the tip of a).

【0027】また、第8図、第9図は、必要に応じて現
場で取付ける外装用導水管(23)の取付状態を示してお
り、同導水管(23)は、矢板本体(1) の凹状外側壁に沿っ
て取付けている。
FIG. 8 and FIG. 9 show the mounting state of the exterior water pipe (23), which is installed on site as necessary. The water pipe (23) is attached to the sheet pile body (1). Mounted along the concave outer wall.

【0028】また、第10図〜第12図は、上記のよう
に構成したPC矢板(A) の下端部を補強するために取付
けた下端部補強用キャップ(24)の取付状態を示してお
り、同キャップ(24)は、日本工業規格による標準貫入試
験方法におけるN値が50を越える砂礫、岩盤への打込
みにも耐え得る強度を有する合金等により、PC矢板
(A) の下端部の形状に合わせて成形し、同PC矢板(A)
の製造過程で下端部に嵌合させて一体化するようにして
いる。
FIGS. 10 to 12 show the mounting state of the lower end reinforcing cap (24) mounted to reinforce the lower end of the PC sheet pile (A) constructed as described above. The cap (24) is made of a PC sheet pile made of a gravel having an N value exceeding 50 in a standard penetration test method according to Japanese Industrial Standards, an alloy having a strength capable of withstanding driving into rock, or the like.
(A) is shaped according to the shape of the lower end of the PC sheet pile (A)
In the manufacturing process, the lower end is fitted and integrated.

【0029】そして、かかるキャップ(24)は、第12図
に示すように、導水管(9) の配設位置においては、矢板
本体(1) の下端開口部(4) より内方へ折返し伸延部(24
a) を形成して、導水管(9) の噴出ガイド用スリーブ(2
0)を兼用させている。
Then, as shown in FIG. 12, the cap (24) is folded and extended inward from the lower end opening (4) of the sheet pile main body (1) at the position where the water pipe (9) is disposed. Department (24
a) to form a spout guide sleeve (2
0) is also used.

【0030】また、第13図は、他の実施例としての矢
板本体(1')の下部を示しており、矢板本体(1')の下端を
先細り状に形成して、下端部に補強用キャップ(24') を
取付けている。
FIG. 13 shows a lower portion of a sheet pile main body (1 ') as another embodiment. The lower end of the sheet pile main body (1') is formed into a tapered shape. The cap (24 ') is attached.

【0031】なお、ノズル(19)は、矢板打込み現場にお
いて、導水管(9) の噴射テストを行なった後取付けるこ
とにより、事前に導水管(9) 中のごみを排除し、ノズル
(19)の目詰りを防止するようにしている。
In addition, the nozzle (19) is attached after performing the injection test of the water pipe (9) at the sheet pile driving site, thereby eliminating dust in the water pipe (9) in advance, and installing the nozzle (19). To prevent clogging.

【0032】また、第14図、第15図は、他の実施例
としてのPC矢板(B)(C)を示しており、上記PC
矢板(A) と同様にPC矢板(B)(C)の断面形状によって、
導水管(25)(26)の数及び配設位置を決定している。
FIGS. 14 and 15 show PC sheet piles (B) and (C) as another embodiment.
Like the sheet pile (A), depending on the cross-sectional shape of the PC sheet pile (B) (C),
The number of water pipes (25) and (26) and their locations are determined.

【0033】すなわち、PC矢板(A)(B)(C) の下端面に
おいて、打込み時に大きく地盤等の抵抗を受ける箇所よ
り高圧力水を噴出させることができるように、導水管
(9)(25)(26) の数や配設位置、さらには、ノズル(19)の
数や配設位置を決定するものである。
That is, a water pipe is provided on the lower end surface of the PC sheet piles (A), (B), and (C) so that high-pressure water can be blown out from a location such as the ground which is greatly subjected to resistance during driving.
(9) The number and arrangement positions of (25) and (26), and the number and arrangement positions of the nozzles (19) are determined.

【0034】次に、上記のように構成したPC矢板(A)
を打込む施工手順を説明すると、以下の通りである。
Next, the PC sheet pile (A) constructed as described above
The following is a description of the construction procedure for driving the above.

【0035】イ) PC矢板の上部に突出させた導水管
(9) のソケット(11)に高圧力水供給用のパイプを接続す
る。
B) A water pipe protruding above the PC sheet pile
Connect the high pressure water supply pipe to the socket (11) of (9).

【0036】ロ) 導水管(9) の噴射テストを行ない、
ノズル(19)を取付ける。
B) An injection test of the water pipe (9) is performed.
Install the nozzle (19).

【0037】ハ) PC矢板(A) を吊上げ機により吊込
む。
C) The PC sheet pile (A) is suspended by a lifting machine.

【0038】ニ) PC矢板(A) を所定場所に建込む。D) The PC sheet pile (A) is erected at a predetermined place.

【0039】ホ) 振動式杭打機を吊込み、同杭打機を
PC矢板(A) の上端部にチャッキングする。
E) A vibratory pile driver is suspended, and the pile driver is chucked to the upper end of the PC sheet pile (A).

【0040】ヘ) 高圧力水を導水管(9) に注入し、ノ
ズル(19)より噴出させると共に、振動式杭打機を作動さ
せて、PC矢板(A) を打込む。
(F) High-pressure water is injected into the water pipe (9) and spouted from the nozzle (19), and the vibratory pile driver is operated to drive the PC sheet pile (A).

【0041】この際、高圧力水の圧力、流量及び振動式
杭打機の振動打込み力を、地層の特性に応じて調整す
る。
At this time, the pressure and flow rate of the high-pressure water and the vibration driving force of the vibratory pile driver are adjusted according to the characteristics of the formation.

【0042】ト) PC矢板(A) を所定深さ打込んだ
後、高圧力水の供給を停止すると共に、振動式杭打機の
作動を停止する。
G) After driving the PC sheet pile (A) to a predetermined depth, the supply of high-pressure water is stopped, and the operation of the vibratory pile driver is stopped.

【0043】チ) 高圧力水供給用のホースをソケット
(11)から取外す。
H) A hose for supplying high-pressure water to a socket
Remove from (11).

【0044】以上がPC矢板(A) の打込み施工手順であ
るが、地盤の硬さによっては、下端部補強用キャップ(2
4)を取付けたPC矢板を使用したり、また、外装用導水
管(23)を取付けたり、さらには、あらかじめ先行杭を打
設するとことにより、PC矢板の打込みを容易にするこ
とができる。
The above is the procedure for driving the PC sheet pile (A). Depending on the hardness of the ground, the lower end reinforcing cap (2) may be used.
By using a PC sheet pile to which 4) is attached, by attaching an exterior water pipe (23), or by previously setting a leading pile, the driving of the PC sheet pile can be facilitated.

【0045】さらに、導水管(9) を利用してPC矢板
(A) の下端部にグラウトを注入し、補強のための根固め
を行なう。
Further, using a water pipe (9), a PC sheet pile is used.
Grout is injected into the lower end of (A), and the foundation is reinforced.

【0046】すなわち、上記打込み施工手順に連続し
て、以下の施工手順で行なう。
That is, following the above-described driving procedure, the following procedure is performed.

【0047】リ) ソケット(11)にグラウト供給ホース
を接続する。
(G) Connect the grout supply hose to the socket (11).

【0048】ヌ) グラウトポンプを作動させ、グラウ
ト供給用ホースを介して導水管(9)中にグラウトを注入
し、ノズル(19)より噴出させる。
(G) The grout pump is operated, grout is injected into the water pipe (9) through the grout supply hose, and is spouted from the nozzle (19).

【0049】この際、ノズル(19)はチェックバルブ付ノ
ズルを使用する。
At this time, a nozzle with a check valve is used as the nozzle (19).

【0050】ル) グラウトを所定量注入した後、グラ
ウトポンプを停止させ、グラウト供給用ホースを取外
す。
After the grout is injected in a predetermined amount, the grout pump is stopped, and the grout supply hose is removed.

【0051】かかる打込み施工方法により、PC矢板
(A) を、前記した標準貫入試験方法におけるN値が50
以上の硬質地盤へも10m以上打込むことができるもの
である。
According to such a driving method, a PC sheet pile is used.
(A) was compared with an N value of 50 in the standard penetration test method described above.
It can be driven into the above hard ground for 10 m or more.

【0052】なお、本実施例は、プレストレストコンク
リート製の矢板について説明したが、かかるプレストレ
ストコンクリート製に限らず、鉄筋コンクリート製等の
矢板でもよい。
In this embodiment, the sheet pile made of prestressed concrete has been described. However, the sheet pile is not limited to such prestressed concrete but may be made of reinforced concrete.

【0053】[0053]

【効果】本発明によれば、以下のような作用効果が生起
される。
According to the present invention, the following functions and effects are produced.

【0054】すなわち、コンクリート製矢板の矢板突出
部中に導水孔を設け、同導水孔の上端開口部より高圧力
水を注入して、同高圧力水を下端開口部より噴出させる
ことができるために、同高圧力水により矢板の下端面に
位置する地盤を切削しながら、同矢板を地中深くスムー
ズに押込むことができる。
That is, since a water guide hole is provided in the projecting portion of the sheet pile made of concrete, high-pressure water can be injected from the upper end opening of the water guide hole, and the high-pressure water can be ejected from the lower end opening. In addition, while cutting the ground located on the lower end face of the sheet pile with the high-pressure water, the sheet pile can be pushed deeply and smoothly into the ground.

【0055】この際、地中に埋込まれる矢板は、地盤よ
り受ける押込み抵抗を少なくするために、矢板基部と矢
板突出部とにより断面略コ字状に形成し、しかも、比較
的押込み抵抗の大きい矢板突出部の下端面に導水孔の下
端開口部を配置して、同下端開口部より直下方へ向けて
高圧力水を噴出可能としているために、同高圧力の水に
より地盤等を切削して押込み抵抗を可及的に小さくし
て、矢板を円滑に地中深く押込むことができる。
At this time, the sheet pile buried in the ground is formed into a substantially U-shaped cross section by a sheet pile base and a sheet pile projecting part in order to reduce the pushing resistance received from the ground. The lower end opening of the water guide hole is located on the lower end surface of the large sheet pile projection, and high-pressure water can be ejected directly downward from the lower end opening. As a result, the pushing resistance can be made as small as possible, and the sheet pile can be smoothly pushed deep into the ground.

【0056】そして、導水孔の上端開口部は、矢板基部
と矢板突出部とにより形成される凹状空間中に突出させ
ているために、矢板本体の上端部に振動杭打機をチャッ
キングした場合にも、各上端開口部への高圧力水供給用
のパイプの接続を確実に行なうことができると共に、各
上端開口部が他の障害物に当って損傷等されるのを防止
することができる。
When the vibratory pile driving machine is chucked at the upper end of the sheet pile main body, since the upper end opening of the water guide hole is projected into the concave space formed by the sheet pile base and the sheet pile projecting portion. In addition, it is possible to reliably connect the pipe for supplying high-pressure water to each upper opening, and to prevent each upper opening from being damaged by hitting another obstacle. .

【0057】また、高圧力水の圧力、流量、及び振動式
杭打機の振動打込み力を、地層の特性に応じて調整する
ことにより、上記矢板を低騒音公害、高能力、高能率で
打込むことができると共に、地盤の安全性と矢板の自立
性を確保することができる。
Further, by adjusting the pressure and flow rate of the high-pressure water and the vibration driving force of the vibratory pile driving machine according to the characteristics of the stratum, the above-described sheet pile can be driven with low noise pollution, high performance and high efficiency. The ground safety and the independence of the sheet pile can be ensured.

【0058】しかも、矢板自体がコンクリート製である
ために、鋼製矢板のように腐食されるという心配がな
い。
Moreover, since the sheet pile itself is made of concrete, there is no fear that the sheet pile will be corroded like steel sheet piles.

【0059】さらには、矢板の外側壁に導水管を配管す
る従来のものに比べて、導水管の配管作業の手間が省け
ると共に、高圧力水の噴出位置を矢板突出部の下端面に
することができるために、同矢板が最も打込み抵抗を受
ける矢板突出部の直下方に位置する地盤を切削して、同
矢板の打込み作業を円滑に行なうことができる。
Further, as compared with the prior art in which a water guide pipe is provided on the outer wall of the sheet pile, the work of piping the water guide pipe can be omitted, and the jetting position of the high-pressure water is located at the lower end face of the sheet pile projecting portion. Therefore, it is possible to cut the ground located immediately below the sheet pile protruding part where the sheet pile receives the most driving resistance, and to perform the sheet pile driving operation smoothly.

【0060】また、かかる矢板を打込んだ後に、導水孔
中を通してグラウトを注入し、同グラウトを、下端開口
部より同矢板の下端部の廻り、いわゆる根廻りに漏出さ
せて固化させることにより、同矢板の根廻りの強度を高
めることができる。
After the sheet pile is driven, grout is injected through the water introduction hole, and the grout is leaked around the lower end of the sheet pile from the opening at the lower end, that is, around the root, and solidified. The strength around the root of the sheet pile can be increased.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明によるPC矢板の正面図。FIG. 1 is a front view of a PC sheet pile according to the present invention.

【図2】図1のI−I線断面図。FIG. 2 is a sectional view taken along line II of FIG. 1;

【図3】PC矢板の上部の断面図。FIG. 3 is a sectional view of an upper part of a PC sheet pile.

【図4】同PC矢板の中央部断面図。FIG. 4 is a central sectional view of the PC sheet pile.

【図5】導水管の分解説明図。FIG. 5 is an exploded view of the water pipe.

【図6】他の実施例としての導水管の正面取付状態説明
図。
FIG. 6 is an explanatory view showing a front installation state of a water pipe as another embodiment.

【図7】同導水管の底面取付状態説明図。FIG. 7 is an explanatory view of a state where the water pipe is attached to the bottom surface.

【図8】外装用導水管の正面取付状態説明図。FIG. 8 is an explanatory view of a front mounting state of the exterior water pipe.

【図9】図8のII-II 線断面図。9 is a sectional view taken along the line II-II in FIG.

【図10】下端部補強用キャップを取付けたPC矢板の
正面図。
FIG. 10 is a front view of a PC sheet pile to which a lower end reinforcing cap is attached.

【図11】同PC矢板の要部断面図。FIG. 11 is a sectional view of a main part of the PC sheet pile.

【図12】同PC矢板の要部断面図。FIG. 12 is an essential part cross-sectional view of the PC sheet pile.

【図13】他の実施例としてのPC矢板の下部断面図。FIG. 13 is a lower sectional view of a PC sheet pile as another embodiment.

【図14】他の実施例としてのPC矢板の平面説明図。FIG. 14 is an explanatory plan view of a PC sheet pile as another embodiment.

【図15】他の実施例としてのPC矢板の平面説明図。FIG. 15 is an explanatory plan view of a PC sheet pile as another embodiment.

【符号の説明】[Explanation of symbols]

(A) プレストレストコンクリート製矢板 (1) 矢板本体 (2) 導水孔 (3) 上端開口部 (4) 下端開口部 (A) Prestressed concrete sheet pile (1) Sheet pile body (2) Water hole (3) Upper opening (4) Lower opening

───────────────────────────────────────────────────── フロントページの続き (72)発明者 水田 権作 福岡県筑紫野市大字塔ノ原86−5 (72)発明者 安田 治樹 福岡県福岡市博多区麦野3−17−24 三 城ハイツ306 (56)参考文献 特開 昭58−178724(JP,A) ──────────────────────────────────────────────────続 き Continuing on the front page (72) Gonaku Mizuta, Inventor 86-5, Otonohara, Chikushino-shi, Fukuoka (72) Inventor Haruki Yasuda 56) References JP-A-58-178724 (JP, A)

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 上下方向に伸延する平板状の矢板基部(1
e)と、同矢板基部(1e)の両端部に突出させた矢板突出部
(1f)(1f)とにより断面略コ字状の矢板本体(1)をコンク
リートにより成形し、上記矢板突出部(1f)(1f)中に上下
方向に伸延する導水孔(2)(2')を設けると共に、各導水
孔(2)(2') の上端開口部(3)(3') を、矢板基部(1e)と矢
板突出部(1f)(1f)とにより形成される凹状空間(S) 中に
突出させ、各上端開口部(3)(3') より高圧力水又はグラ
ウトを注入して、各導水孔(2)(2') の下端開口部(4)
(4')より高圧力水又はグラウトを直下方へ向けて噴出
可能としてなる導水孔を有するコンクリート製矢板。
A flat sheet pile base (1) extending vertically.
e) and the sheet pile projections protruding from both ends of the sheet pile base (1e)
(1f) (1f) is used to form a sheet pile main body (1) having a substantially U-shaped cross section from concrete, and into the sheet pile protrusions (1f) (1f), water guide holes (2) (2 ′) extending vertically. ), And the upper end openings (3) (3 ′) of the water guide holes (2) (2 ′) are formed in a concave space formed by the sheet pile base (1e) and the sheet pile protrusions (1f) (1f). (S), and inject high-pressure water or grout from the upper end openings (3) (3 ') to lower end openings (4) of the water guide holes (2) (2').
(4 ′) A concrete sheet pile having a water guide hole through which high-pressure water or grout can be jetted downward.
【請求項2】 上下方向に伸延する平板状の矢板基部(1
e)と、同矢板基部(1e)の両端部に突出させた矢板突出部
(1f)(1f)とにより断面略コ字状の矢板本体(1)をコンク
リートにより成形し、上記矢板突出部(1f)(1f)中に上下
方向に伸延する導水孔(2)(2')を設けると共に、各導水
孔(2)(2') の上端開口部(3)(3') を、矢板基部(1e)と矢
板突出部(1f)(1f)とにより形成される凹状空間(S) 中に
突出させ、各上端開口部(3)(3') より高圧力水を注入し
て、各導水孔(2)(2') の下端開口部(4)(4')より高圧力
水を直下方へ向けて噴出可能としてなる導水孔を有する
コンクリート製矢板(A) を、以下の施工手順により打込
むコンクリート製矢板の打込み方法。 イ) 矢板突出部(1f)(1f)にそれぞれ設けた導水孔(2)
(2') の上端開口部(3)(3') に、高圧力水供給用のパイ
プを接続する ロ) 上記コンクリート製矢板(A) を吊上げ機により吊
込むと共に、矢板打込み場所に建込む ハ) 振動式杭打機を吊込み、同杭打機を同矢板(A) の
上端部にチャッキングする ニ) 地層の特性に応じて、高圧力水の圧力及び流量を
調整しながら各導水孔(2)(2') に注入し、下端開口部
(4)(4') より直下方へ向けて噴出させると共に、地層の
特性に応じて振動式杭打機の振動打込み力を調整しなが
ら、同杭打機によりコンクリート製矢板を打込む ホ) 各導水孔(2)(2') 中にグラウトを注入し、下端開
口部(4)(4') より噴出させて、コンクリート製矢板(A)
の下端部の廻りに漏出させて固化させる
2. A flat sheet pile base (1) extending vertically.
e) and the sheet pile projections protruding from both ends of the sheet pile base (1e)
(1f) (1f) is used to form a sheet pile main body (1) having a substantially U-shaped cross section from concrete, and into the sheet pile protrusions (1f) (1f), water guide holes (2) (2 ′) extending vertically. ), And the upper end openings (3) (3 ′) of the water guide holes (2) (2 ′) are formed in a concave space formed by the sheet pile base (1e) and the sheet pile protrusions (1f) (1f). (S), and inject high-pressure water from the upper end openings (3) (3 ') to the lower end openings (4) (4') of the water guide holes (2) (2 '). A method for driving a concrete sheet pile (A) having a water guide hole through which high-pressure water can be ejected directly downward by the following construction procedure. B) Water introduction holes (2) provided in the sheet pile protrusions (1f) (1f)
Connect a pipe for supplying high-pressure water to the upper opening (3) (3 ') of (2'). B) Hang the above concrete sheet pile (A) with a lifting machine and build it at the place where the sheet pile will be driven. C) Hang the vibratory pile driver and chuck the pile driver on the upper end of the sheet pile (A) d) Adjust the pressure and flow rate of the high-pressure water according to the characteristics of the stratum, Inject into holes (2) and (2 ')
(4) (4 ') Driving a concrete sheet pile with a vibratory pile driver while adjusting the vibratory driving force of the vibratory pile driver according to the characteristics of the stratum while causing it to erupt directly downward. Grout is injected into each of the water introduction holes (2) and (2 '), and is spouted from the lower end openings (4) and (4').
Around the lower end of the
JP6078551A 1994-04-18 1994-04-18 Concrete sheet pile having water guide holes and driving method of the sheet pile Expired - Fee Related JP2657180B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6078551A JP2657180B2 (en) 1994-04-18 1994-04-18 Concrete sheet pile having water guide holes and driving method of the sheet pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6078551A JP2657180B2 (en) 1994-04-18 1994-04-18 Concrete sheet pile having water guide holes and driving method of the sheet pile

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP62176444A Division JPH07103561B2 (en) 1987-07-14 1987-07-14 Concrete sheet pile with water holes and method of driving the sheet pile

Publications (2)

Publication Number Publication Date
JPH07238544A JPH07238544A (en) 1995-09-12
JP2657180B2 true JP2657180B2 (en) 1997-09-24

Family

ID=13665061

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6078551A Expired - Fee Related JP2657180B2 (en) 1994-04-18 1994-04-18 Concrete sheet pile having water guide holes and driving method of the sheet pile

Country Status (1)

Country Link
JP (1) JP2657180B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109778857A (en) * 2018-11-30 2019-05-21 北京荣创岩土工程股份有限公司 A kind of prefabricated pile is from pilot hole device and prefabricated pile from pilot hole pile making method
NL1043441B1 (en) * 2019-10-31 2021-07-19 Gebr De Koning Method for inserting a concrete pile into the earth.

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS58178724A (en) * 1982-04-12 1983-10-19 Nippon Press Concrete Kk Driving of concrete sheet pile

Also Published As

Publication number Publication date
JPH07238544A (en) 1995-09-12

Similar Documents

Publication Publication Date Title
KR101696916B1 (en) Construction method of permanent wall with retaining wall combined PHC pile and steel pipe
KR100652558B1 (en) Guide pipe for sheet pile and construction method using the same
JP3733533B2 (en) Foundation reinforcement method under pressure of existing structures
JP4727718B2 (en) Retaining method for retaining wall
JP2657180B2 (en) Concrete sheet pile having water guide holes and driving method of the sheet pile
JP2543968B2 (en) Concrete sheet pile
KR102113291B1 (en) Soil retaining wall using phc pile and construction method thererof
JP4897985B2 (en) Hardener injection pipe for earth retaining work and earth retaining method
JP4440497B2 (en) Construction method of underground continuous wall and construction method of underground structure
KR101404007B1 (en) Reinforced concrete pile construction method for which steel pipe casing structure for steel pipe casing recovery this were used
KR200403694Y1 (en) Guide pipe for sheet pile
JP2692711B2 (en) Concrete sheet pile and press fitting method of the sheet pile
KR102070912B1 (en) Phc pile for soil retaining wall, mold assembly and manufacturing method thereof
JPH07103561B2 (en) Concrete sheet pile with water holes and method of driving the sheet pile
JP3673158B2 (en) Pile embedding method and jig
JP4633273B2 (en) Earth retaining method and equipment
JP3841679B2 (en) Ground improvement method
JPH10252064A (en) Method for constructing cast-in-site pile
JP6837364B2 (en) How to repair the culvert drainage pipe confluence drainage mass
JP4916395B2 (en) Drainage pipe set and drainage method
KR20030091836A (en) A Continuous and Cut Off wall And Foundation Method By Overlap Casing
JP3564497B2 (en) Pile driving method to fragile soil layer
KR20020085104A (en) A method of construction for earth-protection walls of building
JPH10325141A (en) Crusher for pile head of cast-in-plate concrete pile and crushing method thereof
JPH0347313A (en) Pc concrete sheet pile and its driving

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

LAPS Cancellation because of no payment of annual fees