JP2650512B2 - PC beam formwork and beam construction method using PC beam formwork - Google Patents
PC beam formwork and beam construction method using PC beam formworkInfo
- Publication number
- JP2650512B2 JP2650512B2 JP14931291A JP14931291A JP2650512B2 JP 2650512 B2 JP2650512 B2 JP 2650512B2 JP 14931291 A JP14931291 A JP 14931291A JP 14931291 A JP14931291 A JP 14931291A JP 2650512 B2 JP2650512 B2 JP 2650512B2
- Authority
- JP
- Japan
- Prior art keywords
- formwork
- board
- beam formwork
- longitudinal direction
- scaffold
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、PC梁型枠およびPC
梁型枠を用いた梁の構築方法に関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a PC beam formwork and a PC
The present invention relates to a method for constructing a beam using a beam formwork.
【0002】[0002]
【従来の技術】従来、RC梁やSRC梁を構築するに、
通常、型枠を用いてその中にコンクリートを打設するよ
うになっている。ところで、従来はかかる型枠として合
板パネル等を用い、その中にコンクリートを打設する。
そして、コンクリートが硬化した後に合板パネルからな
る型枠を脱型した後、表面仕上げを行う。従って、かか
る型枠を用いて梁を構築する際、型枠の取り付け,取り
外しを行うための足場を必要とし、またこの足場の組み
立てに多大な時間および労力を費やしてしまう。2. Description of the Related Art Conventionally, when constructing RC beams and SRC beams,
Usually, concrete is cast into the inside using a formwork. Conventionally, a plywood panel or the like is used as such a formwork, and concrete is cast therein.
Then, after the concrete is cured, the mold formed of the plywood panel is released, and then the surface is finished. Therefore, when constructing a beam using such a formwork, a scaffold for attaching and detaching the formwork is required, and a great deal of time and labor is required for assembling the scaffold.
【0003】そこで、従来では図7に示すような梁型枠
の支保工を兼ねた吊足場が提案されている。即ち、この
梁型枠支保工兼吊足場は、型枠1の内部に配置する鉄骨
梁2の下側フランジ2aに吊ボルト3を介して足場4を
吊持する構造となっている。In view of the above, conventionally, there has been proposed a suspension scaffold which also serves as a support for a beam form as shown in FIG. That is, this beam form support and suspension scaffold has a structure in which the scaffold 4 is suspended via the suspension bolts 3 on the lower flange 2 a of the steel beam 2 disposed inside the form 1.
【0004】[0004]
【発明が解決しようとする課題】かかる従来の梁型枠支
保工兼吊足場は、足場4を含めた構成を簡単化すること
ができるのであるが、足場4の支持を鉄骨梁2に頼らざ
るを得ず、必然的に対象となる梁構造がSRC梁とな
り、これ以外の梁構造、例えば、RC梁にはその適用が
できなくなってしまう。In such a conventional beam form support and suspension scaffold, the structure including the scaffold 4 can be simplified, but the support of the scaffold 4 does not depend on the steel beam 2. Inevitably, the target beam structure is necessarily an SRC beam, and it cannot be applied to other beam structures, for example, RC beams.
【0005】また、前記梁型枠支保工兼吊足場では、梁
型枠として合板プレートを用いて行うため、これの取り
付け,取り外しに多大な労力を要し、工期の長期化を来
してしまうという各種課題があった。Further, in the above-mentioned beam formwork supporting and hanging scaffold, since a plywood plate is used as a beam formwork, a great deal of labor is required for mounting and removing the beam formwork, and the construction period is lengthened. There were various issues.
【0006】そこで、本発明はかかる従来の課題に鑑み
て、梁型枠をPC製として脱型の手間を省略すると共
に、このPC梁型枠自体を足場として用いることによ
り、構成を著しく簡単化し、かつ、SRC梁以外の梁構
造においても適用することができるPC梁型枠およびこ
のPC梁型枠を用いた梁の構築方法を提供する。In view of the above-mentioned problems, the present invention eliminates the trouble of removing the beam by using a beam formwork made of PC, and greatly simplifies the configuration by using the PC beam formwork itself as a scaffold. The present invention also provides a PC beam formwork that can be applied to a beam structure other than the SRC beam, and a method for constructing a beam using the PC beam formwork.
【0007】[0007]
【課題を解決するための手段】かかる目的を達成するた
めに本発明のPC梁型枠は、平板状PC板の長手方向両
端部を、伸縮可能に折り返し自在に形成すると共に、こ
れら長手方向両端部間で、該PC板の幅方向両側片部
を、水平足場兼型枠の側板と成すべく折り返し自在に形
成したことを特徴とする。In order to achieve the above object, a PC beam form according to the present invention is formed by forming both ends in the longitudinal direction of a flat PC board so as to be capable of being folded back and forth so as to be extendable and contractible. The PC board is characterized in that both side portions in the width direction of the PC board are formed so as to be folded back so as to form side plates of the horizontal scaffolding and formwork.
【0008】また、上記PC板の長手方向両端部が、水
平足場兼型枠の底と成すべく折り返されることを特徴と
する。[0008] Further, the invention is characterized in that both ends in the longitudinal direction of the PC board are folded back so as to form the bottom of the horizontal scaffolding / form frame.
【0009】また、かかる目的を達成するために本発明
のPC梁型枠を用いた梁の構築方法は、水平足場兼型枠
の側板と成すべく幅方向両側片部が折り返し自在であっ
て且つ伸縮可能に長手方向両端部が折り返し自在な平板
状PC板を製作し、まず、幅方向両側片部を水平方向に
折り戻すと共に、長手方向両端部を下方に折り返した状
態で上記PC板を所定位置に配置し、次に該PC板上面
を水平足場として作業を行ない、次いで長手方向両端部
を水平方向に折り戻すと共に、幅方向両側片部を上方に
折り返してPC梁型枠を構成し、最後に該PC梁型枠内
にコンクリートを打設するようにしたことを特徴とす
る。In order to achieve the above object, a method of constructing a beam using a PC beam formwork according to the present invention is characterized in that both side parts in the width direction can be folded back to form a side plate of a horizontal scaffolding and formwork; A flat-plate PC board whose both ends in the longitudinal direction are freely foldable so as to be expandable and contractible is prepared. First, both side parts in the width direction are folded back in the horizontal direction, and the PC board is folded in a state where both ends in the longitudinal direction are folded downward. Position, and then work with the PC board top surface as a horizontal scaffold, and then fold back both ends in the longitudinal direction in the horizontal direction, and fold both side pieces in the width direction upward to form a PC beam formwork, Finally, concrete is poured into the PC beam formwork.
【0010】[0010]
【作用】以上の構成により本発明のPC梁型枠およびこ
のPC梁型枠を用いた梁の構築方法にあっては、平板状
PC板の長手方向両端部を下方へ折り返すことにより、
その長さを短くすることができて、このPC梁型枠を自
由に配設することができ、所定位置に簡単に配置するこ
とができる。また、前記PC板の幅方向両側片部を水平
に折り戻すことにより、PC板上面を幅広い水平足場と
して利用することができる。さらに、前記PC板の長手
方向両端部を水平に折り戻すことにより、これら長手方
向両端部も水平足場として利用することができる。According to the PC beam form of the present invention and the method of constructing a beam using the PC beam form according to the above construction, the longitudinal ends of the flat PC plate are folded downward.
Since the length can be shortened, the PC beam formwork can be freely arranged, and can be easily arranged at a predetermined position. In addition, the PC board upper surface can be used as a wide horizontal scaffold by folding back the both side portions in the width direction of the PC board horizontally. Furthermore, by folding back both ends in the longitudinal direction of the PC board horizontally, both ends in the longitudinal direction can also be used as a horizontal scaffold.
【0011】他方、PC板の長手方向両端部を水平方向
に折り戻すと共に、幅方向両側片部を上方へ折り返すこ
とで断面U字状のPC梁型枠とすることができ、その中
にコンクリートを打設することにより、PC梁型枠はこ
の打設したコンクリートと一体化して梁を構築すること
ができる。従って、梁の構築完了後に梁型枠を脱型する
必要を無くすことができる。On the other hand, the PC beam formwork having a U-shaped cross section can be formed by folding back both ends in the longitudinal direction of the PC board in the horizontal direction and folding back both side portions in the width direction upward. By casting, the PC beam formwork can be integrated with the cast concrete to form a beam. Therefore, it is not necessary to remove the beam formwork after the completion of the construction of the beam.
【0012】従って、本発明では足場を、PC梁型枠自
体を用いて構成できるため、別途吊足場を設ける必要が
無く、その構成を著しく簡単にして、省力化を推進する
ことができる。また、PC梁型枠自体は最終的には打設
したコンクリートと一体化して、その脱型が不要となる
ため、この点からも省力化および工期の短縮化を達成す
ることができる。Therefore, according to the present invention, since the scaffold can be formed by using the PC beam form itself, there is no need to provide a separate hanging scaffold, and the structure can be remarkably simplified to promote labor saving. In addition, since the PC beam formwork is finally integrated with the cast concrete and its demolding is not required, labor saving and shortening of the construction period can be achieved from this point as well.
【0013】[0013]
【実施例】以下、本発明の実施例を図に基づいて詳細に
説明する。図1から図6は本発明の一実施例を示すPC
梁型枠10およびこのPC梁型枠10を用いた梁の構築
方法を示し、図1はPC梁型枠10の平面図、図2から
図6は構築方法を順を追って示す説明図である。DESCRIPTION OF THE PREFERRED EMBODIMENTS Embodiments of the present invention will be described below in detail with reference to the drawings. 1 to 6 show a PC according to an embodiment of the present invention.
FIG. 1 shows a beam formwork 10 and a method of constructing a beam using the PC beam formwork 10. FIG. 1 is a plan view of the PC beam formwork 10, and FIGS. 2 to 6 are explanatory diagrams sequentially showing the construction method. .
【0014】即ち、本実施例のPC梁型枠10は、高強
度コンクリート又は補強繊維入りコンクリート、モルタ
ル、高強度モルタルを用いて、その平面形状が矩形状と
なる薄肉平坦板に形成し、この平板状PC梁型枠10を
断面U字状に折曲することにより、目的の梁型枠が構成
される。That is, the PC beam formwork 10 of the present embodiment is formed into a thin flat plate having a rectangular planar shape using high-strength concrete or concrete containing reinforcing fibers, mortar, or high-strength mortar. By bending the flat PC beam form 10 into a U-shaped cross section, a target beam form is formed.
【0015】前記PC梁型枠10は、図4に示したよう
に隣接する柱12,12間に建て込むようになってい
る。前記柱12,12の水平方向には接続鉄骨梁14,
14を突設してあり、この接続鉄骨梁14,14は柱鉄
骨16,16に予め固設してある。また、前記柱鉄骨1
6,16の外周は、PC柱型枠18,18で囲繞してお
く。The PC beam formwork 10 is built between adjacent columns 12, 12 as shown in FIG. In the horizontal direction of the columns 12, 12, connecting steel beams 14,
The connecting steel beams 14, 14 are fixed to the column steel frames 16, 16 in advance. The column steel frame 1
The outer circumferences of 6 and 16 are surrounded by PC column forms 18 and 18.
【0016】ここで、前記PC梁型枠10は、矩形状平
坦板として形成したその長さLを、前記柱12,12間
の距離L0 とほぼ等しい長さに設定し、かつ、このPC
梁型枠10の幅Wを、構築しようとする梁の底部幅W1
と両側の高さhとをそれぞれ合わせた寸法に設定してあ
る。[0016] Here, the PC beam formwork 10, the length L which is formed as a rectangular flat plate, and set to approximately equal length as the distance L 0 between the posts 12 and 12, and the PC
The width W of the beam form 10 is set to the bottom width W 1 of the beam to be constructed.
And the height h on both sides are set to dimensions that are respectively combined.
【0017】そして、前記PC梁型枠10には、長さ方
向両端部10a,10aに端面から所定距離L1 をもっ
て山折り可能な第1折曲部20,20(図1中一点鎖線
で示す)を形成すると共に、底22と側壁24,24と
の境界部分に谷折り可能な第2折曲部26,26(図1
中2点鎖線で示す)を形成する。ここで、前記第1折曲
部20,20間の寸法L2 は、前記接続鉄骨梁14,1
4間の距離L3 より短い長さに設定する。[0017] Then, the PC beam formwork 10 are shown in both longitudinal ends 10a, first bent part 20, 20 can be folded mountain with a predetermined distance L 1 from the end face in 10a (FIG. 1 in a dashed line ) And the second bent portions 26, 26 (FIG. 1) that can be valley-folded at the boundary between the bottom 22 and the side walls 24, 24.
(Shown by a chain double-dashed line). Here, the dimension L 2 between the first bent portion 20 and 20, the connecting steel beam 14,1
Set to a length shorter than the distance L 3 between 4.
【0018】以上の構成になる本実施例のPC梁型枠1
0は、以下に示す方法をもって梁の構築を行う。まず、
前記PC梁型枠10は、図2に示したように第1折曲部
20,20からPC梁型枠10の両端部10a,10a
を直角方向に山折り、つまり、下方に折曲すると共に、
側壁24を水平に折り戻した状態で一対の架台30,3
0の上に載置する。The PC beam formwork 1 according to the present embodiment having the above configuration.
0 constructs the beam by the following method. First,
As shown in FIG. 2, the PC beam form 10 is moved from the first bent portions 20, 20 to both ends 10 a, 10 a of the PC beam form 10.
At right angles, that is, bend downward,
With the side wall 24 folded back horizontally, a pair of gantry 30
Place on top of 0.
【0019】次に、図3に示したように前記PC梁型枠
10の幅方向中央部に、これの長さ方向に沿って梁鉄骨
32をセットし、また、これと合わせて梁主筋34およ
びスターラップ36を仮り組する。更に、この段階で型
枠用大引38を取り付けると共に、PC梁型枠10の幅
方向両端部に手摺40を取り付ける。Next, as shown in FIG. 3, a beam steel frame 32 is set at the center in the width direction of the PC beam form 10 along the longitudinal direction thereof, and the beam main reinforcement 34 is also put together. Then, the stirrup 36 is temporarily assembled. Further, at this stage, the form puller 38 is attached, and the handrails 40 are attached to both ends of the PC beam form 10 in the width direction.
【0020】そして、前梁鉄骨32,梁主筋34,スタ
ーラップ36,大引38および手摺40等を取り付けた
状態で、前記PC梁型枠10を図4,図5に示したよう
に、柱12,12から突設した接続鉄骨梁14,14の
間に吊持して配置する。尚、前記PC梁型枠10の吊持
は図外の揚重機を介して行われるが、前記梁鉄骨32の
上側両端部に吊下部42,42を突設して、この吊下部
42,42にワイヤーを掛止する等して吊持する。Then, with the front beam steel beam 32, beam main reinforcement 34, stirrup 36, large pulley 38, handrail 40 and the like attached, the PC beam formwork 10 is mounted on a column as shown in FIGS. It is suspended and arranged between the connecting steel beams 14, 14 protruding from 12, 12. The PC beam form 10 is suspended via a lifting machine (not shown). Hanging portions 42, 42 are protruded from upper ends of the beam steel frame 32, and the hanging portions 42, 42 are provided. Hang it by hanging a wire on it.
【0021】次に、前記接続鉄骨梁14,14間に配置
した前記PC梁型枠10は、第1折曲部20から山折り
した両端部10a,10aを、再度折り戻して水平に配
置する。尚、前記PC梁型枠10は、両端部10a,1
0aを水平に配置した状態では、柱12,12間のほぼ
全長に亘って配置されることになる。ところで、前記両
端部10a,10aを折り返した際、この両端部10
a,10aの端部をPC柱型枠18,18の上端に係止
して固定する。尚、この両端部10a,10aの固定
は、PC柱型枠18,18を利用することなく、Uボル
ト47または他の係止金具又は支保工等を用いて柱1
2,12側に固定することもできる。Next, the PC beam formwork 10 disposed between the connecting steel beams 14, 14, both ends 10a, 10a of which the mountain is folded from the first bent portion 20, is folded back again and arranged horizontally. . The PC beam form 10 has both ends 10a, 1a.
In a state where 0a is arranged horizontally, it is arranged over almost the entire length between the columns 12, 12. By the way, when the both ends 10a, 10a are folded back,
The ends of a and 10a are locked and fixed to the upper ends of the PC column forms 18 and 18, respectively. The ends 10a, 10a can be fixed by using the U-bolt 47 or other locking metal fittings or supports without using the PC column forms 18, 18.
It can also be fixed to the 2 and 12 sides.
【0022】従って、長さ方向両端部10a,10a及
び両側壁24,24を含む前記PC梁型枠10全体を足
場として用いることにより、このPC梁型枠10の上に
作業員が乗って前記梁鉄骨32を接続鉄骨梁14,14
に接合する作業を行う。この接合作業は、梁鉄骨32と
接続鉄骨梁14,14との間に跨がってボルト又はリベ
ット止めされる接続板44,46を介して行う。そし
て、前記梁鉄骨32の接合作業を完了した後、前記梁主
筋34およびスターラップ36を所定位置に配筋して固
定する。Accordingly, by using the entire PC beam form 10 including the both ends 10a, 10a in the longitudinal direction and the side walls 24, 24 as a scaffold, an operator rides on the PC beam form 10 and Connect steel beams 32, 14
Work to join. This joining operation is performed via connecting plates 44 and 46 that are bolted or riveted over the steel beam 32 and the connecting steel beams 14 and 14. Then, after the joining operation of the beam steel frames 32 is completed, the beam main reinforcement 34 and the stirrup 36 are arranged and fixed at predetermined positions.
【0023】次に、前記PC梁型枠10は、前記手摺4
0を取り外した後、図6に示したように第2折曲部2
6,26から谷折りして両側壁24,24を立ち上げ、
この両側壁24,24および底22を断面U字状に組み
立てる。従って、このように断面U字状に組み立てたP
C梁型枠10の内側には、梁鉄骨32,接続鉄骨梁1
4,14および梁主筋34,スターラップ36が配置さ
れた状態になり、この状態でPC梁型枠10内にコンク
リートを打設する。そして、この打設したコンクリート
が硬化することにより、前記PC梁型枠10はコンクリ
ートと一体化した状態で梁を構築する。尚、前記PC梁
型枠10と同時にPC柱型枠18内にもコンクリートが
打設され、梁と柱とは一体構造として結合する。Next, the PC beam form 10 is attached to the handrail 4
After removing the second bent portion 2 as shown in FIG.
Fold the valley from 6, 26 and raise both side walls 24, 24,
The side walls 24, 24 and the bottom 22 are assembled into a U-shaped cross section. Therefore, the P thus assembled in a U-shaped cross section is
Inside the C beam formwork 10, the beam steel beam 32 and the connecting steel beam 1
4 and 14, the beam main reinforcement 34, and the stirrup 36 are arranged. In this state, concrete is poured into the PC beam formwork 10. When the poured concrete is hardened, the PC beam formwork 10 forms a beam in a state of being integrated with the concrete. In addition, concrete is poured into the PC column formwork 18 simultaneously with the PC beam formwork 10, and the beam and the column are combined as an integral structure.
【0024】以上の構成により本実施例のPC梁型枠1
0およびこのPC梁型枠10を用いた梁の構築方法にあ
っては、PC梁型枠10の両端部10a,10aに第1
折曲部20,20を形成し、これら第1折曲部20,2
0間の長さL2 を接続鉄骨梁14,14先端間の距離L
3 より少なく設定したので、前記両端部10a,10a
を第1折曲部20,20から下方に山折りした状態で
は、このPC梁型枠10を前記接続鉄骨梁14,14間
に自由に通過させることができる。従って、PC梁型枠
10は、その全長Lを一対の柱12,12間の距離とほ
ぼ等しくした状態で、前記接続鉄骨梁14,14間を容
易に通過させ、所定位置への配置を簡単に行うことがで
きる。With the above configuration, the PC beam formwork 1 of this embodiment is constructed.
0 and the method of constructing a beam using the PC beam formwork 10, the first and second ends 10 a, 10 a of the PC beam formwork 10
The first bent portions 20 and 2 are formed by forming the bent portions 20 and 20.
The length L 2 between 0 and the distance L between the connecting steel beams 14, 14
Since the number is set to be less than 3 , both ends 10a, 10a
Can be freely passed between the connecting steel beams 14, 14 in a state in which is folded downward from the first bent portions 20, 20. Therefore, the PC beam formwork 10 can easily pass between the connecting steel beams 14, 14 with the total length L substantially equal to the distance between the pair of columns 12, 12, and can be easily arranged at a predetermined position. Can be done.
【0025】また、前記PC梁型枠10を所定位置に設
置した後、両端部10a,10aを水平方向に折り戻し
て固定することにより、このPC梁型枠10を隣接する
一対の柱12,12間に渡って広げることができる。従
って、足場として兼用させた前記PC梁型枠10の足場
面積を、梁鉄骨32を接合するのに十分な広さで確保す
ることができ、この接合作業を安全に行うことができ
る。更に、このようにPC梁型枠10自体を足場として
用いるため、別途吊足場を設ける必要が無く、その構成
を著しく簡単にして、省力化を推進することができる。After the PC beam form 10 is set in a predetermined position, the both ends 10a, 10a are folded back in the horizontal direction and fixed, so that the PC beam form 10 is brought into a pair of adjacent columns 12, Can be spread over twelve. Accordingly, the scaffold area of the PC beam formwork 10, which is also used as a scaffold, can be secured with a sufficient area for joining the beam steel frames 32, and this joining operation can be performed safely. Furthermore, since the PC beam formwork 10 itself is used as a scaffold as described above, it is not necessary to separately provide a hanging scaffold, and the configuration can be significantly simplified, and labor saving can be promoted.
【0026】次に、前記PC梁型枠10は前記梁鉄骨3
2の接合終了後、第2折曲部26,26から谷折りして
断面U字状に構成し、その中にコンクリートを打設した
ので、このPC梁型枠10をこの打設したコンクリート
と一体化して梁を構築することができる。従って、梁の
構築完了後に前記PC梁型枠10を脱型する必要が無
く、この点からも省力化を図ることができる。Next, the PC beam form 10 is connected to the beam steel frame 3.
After the joining of 2, the PC beam formwork 10 is formed into a U-shaped section by valley folding from the second bent portions 26, 26, and concrete is cast therein. The beam can be constructed integrally. Therefore, there is no need to remove the PC beam formwork 10 after the completion of the construction of the beam, and it is possible to save labor from this point as well.
【0027】尚、以上述べた本実施例のPC梁型枠10
は、梁鉄骨32および接続鉄骨梁14を用いたSRC梁
に適用した場合を開示したが、その他の梁構造、例えば
RC梁にあっても本発明を適用できることは勿論であ
る。Incidentally, the PC beam formwork 10 of the present embodiment described above.
Has disclosed a case in which the present invention is applied to an SRC beam using the beam steel frame 32 and the connecting steel beam 14, but it goes without saying that the present invention can be applied to other beam structures, for example, RC beams.
【0028】[0028]
【発明の効果】以上説明したように本発明にあっては、
平板状PC板の長手方向両端部を下方へ折り返すことに
より、その長さを短くすることができて、このPC梁型
枠を自由に配設することができ、所定位置に簡単に配置
することができる。As described above, in the present invention,
By folding back both ends in the longitudinal direction of the flat PC board, the length can be shortened, and the PC beam formwork can be freely arranged and easily arranged at a predetermined position. Can be.
【0029】また、前記PC板の長手方向両端部及び幅
方向両側片部を水平に折り戻すことにより、PC板上面
を幅広い水平足場として利用することができる。そし
て、このようにPC梁型枠自体を足場として用いること
により、別途吊足場を設ける必要が無く、構成を著しく
簡単にできると共に、構成部品点数を大幅に削減して、
その組み立て,据付等に関して著しい省力化を達成する
ことができる。Further, by folding back both ends of the PC board in the longitudinal direction and both side parts in the width direction, the upper surface of the PC board can be used as a wide horizontal scaffold. By using the PC beam form itself as a scaffold, there is no need to separately provide a hanging scaffold, and the configuration can be significantly simplified, and the number of components can be greatly reduced.
Significant labor savings can be achieved for the assembly and installation.
【0030】更に、PC板の長手方向両端部を水平方向
に折り戻すと共に、幅方向両側片部を上方へ折り返すこ
とで断面U字状のPC梁型枠とすることができ、その中
にコンクリートを打設することにより、PC梁型枠はこ
の打設したコンクリートと一体化して梁を構築すること
ができるため、梁の構築完了後に梁型枠を脱型する必要
を無くして、この点からも大幅な省力化および工期の短
縮化を達成することができるという各種優れた効果を奏
する。Further, the PC beam formwork having a U-shaped cross section can be formed by folding back both ends in the longitudinal direction of the PC board in the horizontal direction and folding back both side portions in the width direction upward. By casting the beam, the PC beam formwork can be integrated with the cast concrete to form the beam, so there is no need to remove the beam formwork after the completion of the beam construction. Also, various excellent effects such as significant labor saving and shortening of the construction period can be achieved.
【図1】本発明にかかるPC梁型枠の一実施例を示す展
開状態での平面図である。FIG. 1 is a plan view showing a PC beam form according to an embodiment of the present invention in an unfolded state.
【図2】本発明にかかるPC梁型枠の長手方向両端部を
山折りした状態を示す正面図である。FIG. 2 is a front view showing a state where both longitudinal ends of the PC beam formwork according to the present invention are mountain-folded.
【図3】本発明にかかるPC梁型枠を、梁鉄骨にその長
手方向両端部を山折りして取り付けた状態を示す正面図
である。FIG. 3 is a front view showing a state in which the PC beam formwork according to the present invention is attached to a beam steel frame by bending both ends in the longitudinal direction of the beam frame.
【図4】本発明にかかるPC梁型枠を柱間に設置した状
態を示す正面図である。FIG. 4 is a front view showing a state in which a PC beam formwork according to the present invention is installed between columns.
【図5】本発明にかかるPC梁型枠を柱間に設置した状
態を示す平面図である。FIG. 5 is a plan view showing a state in which a PC beam formwork according to the present invention is installed between columns.
【図6】本発明にかかるPC梁型枠を断面U字状に組み
立てた状態を示す断面図である。FIG. 6 is a sectional view showing a state in which the PC beam formwork according to the present invention is assembled in a U-shaped section.
【図7】従来の構築方法を示す断面図である。FIG. 7 is a cross-sectional view showing a conventional construction method.
10 PC梁型枠 10a 長手方向
端部 12 柱 14 接続鉄骨梁 16 柱鉄骨 18 PC柱型枠 20 第1折曲部 22 底 24 側壁 26 第2折曲部 30 架台 32 梁鉄骨 34 梁主筋 36 スターラッ
プ 40 手摺DESCRIPTION OF SYMBOLS 10 PC beam form 10a Longitudinal end 12 Column 14 Connection steel beam 16 Column steel 18 PC column form 20 First bent part 22 Bottom 24 Side wall 26 Second bent part 30 Mount 32 Beam steel 34 Main beam 36 Star Wrap 40 Handrail
Claims (3)
可能に折り返し自在に形成すると共に、これら長手方向
両端部間で、該PC板の幅方向両側片部を、水平足場兼
型枠の側板と成すべく折り返し自在に形成したことを特
徴とするPC梁型枠。1. A flat PC board having both ends in the longitudinal direction formed so as to be able to be folded back and forth so as to be able to expand and contract, and between the both ends in the longitudinal direction, both side parts in the width direction of the PC board are connected to a horizontal scaffolding and formwork. A PC beam formwork characterized by being formed so as to be able to be folded back to form a side plate.
場兼型枠の底と成すべく折り返されることを特徴とする
請求項1記載のPC梁型枠。2. The PC beam formwork according to claim 1, wherein both ends of the PC board in the longitudinal direction are turned back so as to form a bottom of the horizontal scaffolding and formwork.
両側片部が折り返し自在であって且つ伸縮可能に長手方
向両端部が折り返し自在な平板状PC板を製作し、ま
ず、幅方向両側片部を水平方向に折り戻すと共に、長手
方向両端部を下方に折り返した状態で上記PC板を所定
位置に配置し、次に該PC板上面を水平足場として作業
を行ない、次いで長手方向両端部を水平方向に折り戻す
と共に、幅方向両側片部を上方に折り返してPC梁型枠
を構成し、最後に該PC梁型枠内にコンクリートを打設
するようにしたことを特徴とするPC梁型枠を用いた梁
の構築方法。3. A flat PC board is manufactured in which both side portions in the width direction can be folded back and both ends in the longitudinal direction can be folded back and forth so as to form a side plate of the horizontal scaffolding / form frame. The PC board is placed at a predetermined position in a state where both side pieces are folded back in the horizontal direction, and both ends in the longitudinal direction are folded down, and then the work is performed using the upper surface of the PC board as a horizontal scaffold. The PC is characterized in that the PC part is folded back in the horizontal direction and the side parts in the width direction are folded upward to form a PC beam formwork, and finally concrete is poured into the PC beam formwork. Construction method of beam using beam formwork.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14931291A JP2650512B2 (en) | 1991-05-27 | 1991-05-27 | PC beam formwork and beam construction method using PC beam formwork |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP14931291A JP2650512B2 (en) | 1991-05-27 | 1991-05-27 | PC beam formwork and beam construction method using PC beam formwork |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH04347232A JPH04347232A (en) | 1992-12-02 |
JP2650512B2 true JP2650512B2 (en) | 1997-09-03 |
Family
ID=15472373
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP14931291A Expired - Lifetime JP2650512B2 (en) | 1991-05-27 | 1991-05-27 | PC beam formwork and beam construction method using PC beam formwork |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2650512B2 (en) |
-
1991
- 1991-05-27 JP JP14931291A patent/JP2650512B2/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
JPH04347232A (en) | 1992-12-02 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPH10280669A (en) | Scaffolding unit | |
EP1016766A1 (en) | Frames and structures assembled by same | |
JP2650512B2 (en) | PC beam formwork and beam construction method using PC beam formwork | |
KR100816493B1 (en) | Slip form for forming concrete wall of vertical tunnel and method for construction of the concrete wall | |
JP3839921B2 (en) | Scaffolding plate support frame, method for attaching and removing the same, and method for constructing a reinforced concrete wall body using the same | |
JPH05287901A (en) | Construction of stairs | |
JP3137448B2 (en) | Construction method of concrete main tower | |
JP2867141B2 (en) | Mounting and dismantling method of work scaffold in step-up method | |
JP3878546B2 (en) | Construction method of cross girder integrated concrete slab | |
KR20210004289A (en) | Transfer Structure Construction Method Using U-shaped Steel Girder | |
JP2807858B2 (en) | Mountable work stage | |
KR100636409B1 (en) | Scaffold | |
JP3281421B2 (en) | Construction method of horizontal beam erected on tower | |
JP2575796Y2 (en) | External curing frame | |
JP3691806B2 (en) | Chimney support tower and its support unit frame and division unit frame | |
KR20050076059A (en) | Form for using construction of a pier | |
JPH0740029Y2 (en) | Work scaffold mounting jig to steel column | |
KR200355444Y1 (en) | Scaffold | |
JP2792831B2 (en) | Shoring | |
JPS6046219B2 (en) | Construction method of concrete retaining wall | |
JP3087196B2 (en) | How to build stairs | |
JP3116135B2 (en) | Preceding construction method of PC stairs | |
JPS6137426B2 (en) | ||
JP2629496B2 (en) | Construction method of structure | |
JPS638260B2 (en) |