JP2608253B2 - Open channel installation method - Google Patents

Open channel installation method

Info

Publication number
JP2608253B2
JP2608253B2 JP6246032A JP24603294A JP2608253B2 JP 2608253 B2 JP2608253 B2 JP 2608253B2 JP 6246032 A JP6246032 A JP 6246032A JP 24603294 A JP24603294 A JP 24603294A JP 2608253 B2 JP2608253 B2 JP 2608253B2
Authority
JP
Japan
Prior art keywords
concrete
open channel
bottom slab
cast
semi
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP6246032A
Other languages
Japanese (ja)
Other versions
JPH08109623A (en
Inventor
昌 仙波
Original Assignee
羽田コンクリート工業株式会社
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 羽田コンクリート工業株式会社 filed Critical 羽田コンクリート工業株式会社
Priority to JP6246032A priority Critical patent/JP2608253B2/en
Publication of JPH08109623A publication Critical patent/JPH08109623A/en
Application granted granted Critical
Publication of JP2608253B2 publication Critical patent/JP2608253B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、軟弱地盤上に設置する
開渠の設置方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for installing an open channel on soft ground.

【0002】[0002]

【従来の技術】プレキャスト鉄筋コンクリート製品であ
る開渠は、最近は軟弱地盤上にも設置されることが多く
なってきており、その際には地耐力が不足するため、開
渠を既製のコンクリート基礎杭で支持するのが一般的で
ある。開渠をコンクリート基礎杭で支持する方法として
は、(1)打ち込んだコンクリート基礎杭の頭部のコン
クリートをはつり取り、鉄筋を露出させる。(2)複数
の基礎杭の頭部に跨がるように配筋した鉄筋に基礎杭の
頭部の鉄筋を連結し、コンクリートを打設して基礎杭の
頭部に基礎版を構築する。(3)基礎版の上にモルタル
を敷き開渠を載置してレベルを調整しながら両者を一体
化する。方法が専ら採用されている。
2. Description of the Related Art Recently, open culverts, which are precast reinforced concrete products, are often installed on soft ground. It is common to support with piles. As a method of supporting the open channel with the concrete foundation pile, (1) the concrete at the head of the driven concrete foundation pile is scraped off to expose the reinforcing steel. (2) Connect the reinforcing bar of the head of the foundation pile to the reinforcing bar arranged so as to straddle the heads of the plurality of foundation piles, cast concrete, and construct a foundation plate on the head of the foundation pile. (3) Mortar is laid on the basic slab, the open channel is placed, and the two are integrated while adjusting the level. The method is exclusively adopted.

【0003】[0003]

【発明が解決しようとする課題】従来のコンクリート基
礎杭上への開渠の設置方法は、本来基礎版として製造さ
れている開渠底版の下に更に改めて二重に基礎版を構築
することとなり、不経済な基礎構造であり、折角のプレ
キャスト鉄筋コンクリート製品の効果を減じている。
According to the conventional method of installing an open channel on a concrete foundation pile, it is necessary to construct a double foundation layer again below an open channel bottom plate which is originally manufactured as a basic version. It is an uneconomical foundation structure and reduces the effectiveness of precast reinforced concrete products.

【0004】[0004]

【課題を解決するための手段】本発明は、プレキャスト
鉄筋コンクリート製品である開渠として底版までは完成
していない半完成品を使用し、底版の完成と同時に開渠
を基礎杭頭部に一体化することによって、従来法の無駄
を省き、プレキャスト化本来の効果を発揮することを目
的とするものである。
SUMMARY OF THE INVENTION The present invention uses a semi-finished product that has not been completed up to the bottom slab as a precast reinforced concrete product, and integrates the culvert into the foundation pile head simultaneously with the completion of the bottom slab. By doing so, the purpose of the present invention is to eliminate the waste of the conventional method and to exhibit the original effect of precasting.

【0005】即ち、本発明は、地盤に打ち込まれたコン
クリート基礎杭の頭部をはつり取って鉄筋を露出させ、
その上に底版にコンクリート未打設部を持つ半完成開渠
を載置し、基礎杭頭部より露出している鉄筋を水平に曲
げて開渠底版の鉄筋と連結した後、コンクリート未打設
部に現場打ちコンクリートを打設して開渠と基礎杭とを
一体化しながら開渠底版を完成することを特徴とする開
渠の設置方法である。
That is, according to the present invention, the head of a concrete foundation pile driven into the ground is scraped off to expose a reinforcing bar,
A semi-finished open channel with a non-concrete part on the bottom slab is placed on top of it, and the steel bar exposed from the foundation pile head is bent horizontally and connected with the reinforcing steel of the open channel bottom slab. This is a method of installing an open channel, characterized in that cast-in-place concrete is poured into the section to complete the open channel bottom slab while integrating the open channel with the foundation pile.

【0006】本発明では下記のように種々の底版の完成
度の半完成開渠が使用され、地盤の状態、基礎杭の打ち
込み密度、施工環境などに応じて適宜選択される。
In the present invention, semi-finished culverts of various types of bottom slabs are used as described below, and are appropriately selected according to the condition of the ground, the driving density of the foundation pile, the construction environment and the like.

【0007】(1)底版補強用の配筋のみが行われてお
り、底版全面にわたってコンクリートは全く打設されて
いないもの。
(1) Only reinforcement for reinforcing the bottom plate is provided, and concrete is not poured at all over the entire bottom plate.

【0008】(2)底版補強用の配筋が行われ、底版に
部分的にコンクリートが打設されているもの。
(2) Reinforcing reinforcement for the bottom slab, and concrete is partially cast on the bottom slab.

【0009】(3)底版補強用の配筋が行われ、下の基
礎杭群頭部に対応する底版中央部にはコンクリートが打
設されず、それ以外の周縁部にはコンクリートが打設さ
れているもの。
(3) Reinforcing reinforcement for the bottom slab is performed, and concrete is not cast in the center of the bottom slab corresponding to the lower pile group head, and concrete is cast in the other peripheral portions. What you have.

【0010】(4)底版補強用の配筋が行われ、下の複
数の基礎杭個々の頭部に対応する複数箇所にはコンクリ
ートが打設されず、それ以外の部分にはコンクリートが
打設されているもの。
(4) Reinforcing reinforcement for the bottom slab is performed, and concrete is not poured into a plurality of locations corresponding to the heads of a plurality of foundation piles below, and concrete is poured into other portions. What is being done.

【0011】(5)(3)または(4)の変形で底版補
強用の配筋が、コンクリート未打設箇所で途切れ、鉄筋
の端部が未打設箇所に水平方向に突出しているもの。
(5) A reinforcing plate for reinforcing the bottom slab is interrupted at the place where the concrete is not placed due to the deformation of (3) or (4), and the end of the reinforcing bar projects horizontally to the place where the concrete is not placed.

【0012】(1)の形式の半完成開渠は汎用形であ
り、各種の既施工基礎杭に対応可能である。(2)の形
式の半完成開渠も同じく汎用形であり、底版に部分的、
特に周縁にコンクリートを打設しておくことによって、
重心を下げ、施工時の半完成開渠の安定性を高めたもの
である。(3)〜(5)の半完成開渠は(1)、(2)
に比して完成度が大きいもので、基礎杭群頭部に対応す
る中央部または個々の基礎杭頭部に対応する複数箇所の
みを未完成とし、できるだけ開渠のプレキャスト化を進
めておくことによって、現場作業をできるだけ少なくし
ようとするものである。(5)の形式は(3)、(4)
の形式では基礎杭鉄筋と底版鉄筋との連結部の納まりが
悪い場合に採用するものである。なお、(5)の形式に
おいて、底版補強用の鉄筋を複数のコンクリート未打設
箇所で途切れさせて鉄筋の端部を未打設箇所に水平方向
に突出させる代わりに、取付金具(例えばナット)を底
版コンクリートに埋設しておき、その取付金具に鉄筋を
取付けて突出させてもよい。
The semi-completed open channel of the type (1) is of a general-purpose type, and can be applied to various types of already-constructed foundation piles. The semi-completed open channel of the form (2) is also a general-purpose type, and is partially
In particular, by placing concrete around the edge,
The center of gravity has been lowered to increase the stability of the semi-completed open channel during construction. Semi-completed open channel of (3)-(5) is (1), (2)
The degree of completion is larger than that of, and only the central part corresponding to the foundation pile group head or multiple places corresponding to individual foundation pile heads are unfinished, and precasting of open drainage is promoted as much as possible Therefore, the on-site work is to be reduced as much as possible. The format of (5) is (3), (4)
Is adopted when the connection between the foundation pile reinforcing bar and the bottom slab reinforcing bar is not properly accommodated. In the form of (5), instead of the reinforcing bar for reinforcing the bottom plate being interrupted at a plurality of places where the concrete has not been placed, the ends of the reinforcing bars are projected horizontally to the places where the concrete has not been placed, instead of mounting metal fittings (for example, nuts). May be buried in the bottom slab concrete, and a reinforcing bar may be attached to the mounting bracket and protruded.

【0013】何れの底版の完成度の半完成開渠であって
も、開渠の側壁は鉄筋コンクリート造りとして完成して
おり、底版のみが未完成である。
Regardless of the semi-finished open channel of any bottom plate, the side wall of the open channel is completed as a reinforced concrete structure, and only the bottom plate is not completed.

【0014】本発明においては、先ず、地盤に打ち込ま
れたコンクリート基礎杭の頭部をはつり取って鉄筋を露
出させておく。この操作は従来法と特に異なることはな
い。
In the present invention, first, the head of a concrete foundation pile driven into the ground is scraped off to expose the reinforcing bar. This operation is not particularly different from the conventional method.

【0015】次いで、その上に底版にコンクリート未打
設部を持つ上記(1)〜(4)の形式の半完成開渠を載
置し、基礎杭頭部より露出している鉄筋を水平に曲げて
開渠底版の鉄筋と連結した後、半完成開渠のコンクリー
ト未打設部に現場打ちコンクリートを打設して開渠と基
礎杭とを一体化しながら開渠底版を完成する。従って、
開渠底版と基礎杭上の基礎版との二重の基礎版を構築す
ることはなくなり、開渠と基礎杭との連結工事が効率化
される。そして、設置地盤の状況に応じた完成度の半完
成開渠を選定することによって、工場生産と現場施工の
最適の作業バランスを得ることが可能となり、なお一層
の効率化が図られる。
Next, a semi-finished open channel of the above-mentioned type (1) to (4) having a concrete non-placed portion on the bottom slab is placed thereon, and the rebar exposed from the foundation pile head is horizontally placed. After being bent and connected with the reinforcing steel of the open channel bottom plate, cast-in-place concrete is poured into the semi-finished open channel unconcreted portion to integrate the open channel and the foundation pile to complete the open channel bottom plate. Therefore,
There is no need to construct a double base plate of the open bottom plate and the foundation plate on the foundation pile, and the efficiency of the connection between the open channel and the foundation pile is improved. Then, by selecting a semi-completed open channel with a degree of perfection according to the condition of the installation ground, it is possible to obtain an optimal work balance between factory production and on-site construction, thereby further improving efficiency.

【0016】[0016]

【実施例】以下図面を参照しながら本発明を説明する。DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below with reference to the drawings.

【0017】図1は側壁は鉄筋コンクリート造りであ
り、底版は所定の配筋を行ったのみでコンクリートを打
設していない半完成開渠を基礎杭上に載置した例を示
し、(a)は縦断面図、(b)は横断面図である。
FIG. 1 shows an example in which a side wall is made of reinforced concrete, and a bottom slab is a semi-finished open culvert in which only a predetermined reinforcing arrangement is made and no concrete is cast, and is placed on a foundation pile. Is a longitudinal sectional view, and (b) is a transverse sectional view.

【0018】打ち込まれたコンクリート基礎杭1の頭部
のコンクリートははつり取られ基礎杭鉄筋2が露出して
いる。この上に側壁3は鉄筋コンクリート造りとして完
成しており底版は底版鉄筋5を配筋しただけの半完成開
渠を載置する。基礎杭鉄筋2を水平に曲げて底版鉄筋5
に連結する。底版のコンクリート未打設部6にコンクリ
ートを打設して開渠と基礎杭1とを一体化しながら開渠
底版を完成する。
The concrete at the head of the concrete foundation pile 1 that has been driven in is scraped off to expose the foundation pile reinforcement 2. On this, the side wall 3 is completed as a reinforced concrete construction, and as the bottom plate, a semi-finished open channel having only the bottom plate reinforcing bar 5 arranged thereon is placed. The foundation pile reinforcement 2 is bent horizontally and the bottom plate reinforcement 5
Connect to Concrete is poured into the concrete uncasted portion 6 of the bottom slab, and the culvert and the foundation pile 1 are integrated to complete the culvert bottom slab.

【0019】図2は側壁は鉄筋コンクリート造りであ
り、底版には所定の配筋を行ない、周縁にコンクリート
を打設した安定性のよい半完成開渠を基礎杭上に載置し
た例を示し(a)は縦断面図、(b)は横断面図、
(c)は別例の横断面図である。
FIG. 2 shows an example in which the side walls are made of reinforced concrete, the bottom slab is provided with predetermined reinforcing bars, and a semi-finished open channel with good stability is placed on the foundation pile with concrete poured around the periphery. a) is a longitudinal sectional view, (b) is a transverse sectional view,
(C) is a cross-sectional view of another example.

【0020】(a)、(b)で示される例は底版7の中
央部はコンクリート未打設で底版鉄筋5が露出しており
周縁にコンクリートが打設されている半完成開渠を基礎
杭1の上に載置したものである。図1の場合と同様に基
礎杭鉄筋2を水平に曲げて底版鉄筋5に連結し、底版の
コンクリート未打設部6にコンクリートを打設して開渠
と基礎杭1とを一体化しながら開渠底版を完成する。
In the examples shown in FIGS. 3A and 3B, a semi-finished open channel in which the center of the bottom slab 7 is not cast and the bottom slab reinforcing bar 5 is exposed and concrete is cast on the periphery is used as a foundation pile. 1. As in the case of FIG. 1, the foundation pile reinforcing bar 2 is bent horizontally and connected to the bottom slab reinforcing bar 5, and concrete is poured into the concrete uncasted portion 6 of the bottom slab to open the open channel and the foundation pile 1 integrally. Complete the culvert version.

【0021】(c)は底版7のコンクリート打設部の形
状が(a)、(b)と異なるものの例である。
(C) is an example in which the shape of the concrete casting portion of the bottom slab 7 is different from those of (a) and (b).

【0022】図3は側壁は鉄筋コンクリート造りであ
り、底版には所定の配筋を行ない、複数のコンクリート
未打設部を設けながらコンクリートを打設して製造した
半完成開渠を基礎杭上に載置した例を示し、(a)は縦
断面図、(b)は横断面図、(c)は別の例の横断面図
である。
FIG. 3 shows that the side wall is made of reinforced concrete, the bottom slab is provided with a predetermined arrangement of reinforcing bars, and a semi-finished open channel manufactured by casting concrete while providing a plurality of uncast concrete portions is placed on a foundation pile. The example which mounted is shown, (a) is a longitudinal cross-sectional view, (b) is a cross-sectional view, (c) is a cross-sectional view of another example.

【0023】図3の例は底版7のコンクリート未打設部
6の面積をできるだけ小さくして基礎杭1の頭部に対応
する複数の箇所のみをコンクリート未打設部6とした半
完成開渠を基礎杭1の上に載置したものである。
(a)、(b)で示される例では、コンクリート未打設
部6に底版鉄筋5が露出しているので、前図の場合と同
様に基礎杭鉄筋2を水平に曲げて底版鉄筋5に連結し、
底版のコンクリート未打設部6にコンクリートを打設し
て開渠と基礎杭1とを一体化しながら開渠底版を完成す
る。
In the example shown in FIG. 3, the semi-finished open channel is set so that the area of the uncasted portion 6 of the bottom slab 7 is made as small as possible and only a plurality of portions corresponding to the head of the foundation pile 1 are uncasted portion 6. Is placed on the foundation pile 1.
In the examples shown in (a) and (b), since the bottom slab reinforcing bar 5 is exposed at the uncasted portion 6 of the concrete, the foundation pile reinforcing bar 2 is bent horizontally as in the case of the previous figure to form the bottom slab reinforcing bar 5. Concatenate,
Concrete is poured into the concrete uncasted portion 6 of the bottom slab, and the culvert and the foundation pile 1 are integrated to complete the culvert bottom slab.

【0024】(c)の例では底版鉄筋5はコンクリート
未打設部6で途切れていて、その端部8がコンクリート
未打設部6に突出しているだけであるので、新たな短鉄
筋(図示せず)を介して基礎杭鉄筋2と端部8とを連結
する。その後コンクリート未打設部6にコンクリートを
打設して開渠と基礎杭1とを一体化しながら開渠底版を
完成する。
In the example of (c), the bottom slab reinforcing bar 5 is interrupted at the concrete non-placed portion 6 and its end 8 only projects into the concrete non-placed portion 6, so that a new short reinforcing bar (see FIG. (Not shown) to connect the foundation pile reinforcing bar 2 and the end 8. After that, concrete is poured into the concrete non-placed portion 6 to integrate the open channel and the foundation pile 1 to complete the open channel bottom plate.

【0025】[0025]

【発明の効果】本発明の設置方法の採用により、次のよ
うな効果が奏せられる。
According to the installation method of the present invention, the following effects can be obtained.

【0026】開渠底版と基礎杭上の基礎版との二重の基
礎版を構築することはなくなり、開渠と基礎杭との連結
工事が効率化される。そして、設置地盤の状況に応じた
完成度の半完成開渠を選定することによって、工場生産
と現場施工の最適の作業バランスを得ることが可能とな
り、なお一層の効率化が図られる。
There is no need to construct a double base plate consisting of an open bottom plate and a base plate on a base pile, and the efficiency of the connection between the open channel and the base pile is improved. Then, by selecting a semi-completed open channel with a degree of perfection according to the condition of the installation ground, it is possible to obtain an optimal work balance between factory production and on-site construction, thereby further improving efficiency.

【図面の簡単な説明】[Brief description of the drawings]

【図1】側壁は鉄筋コンクリート造りであり、底版は所
定の配筋を行ったのみでコンクリートを打設していない
半完成開渠を基礎杭上に載置した例を示し、(a)は縦
断面図、(b)は横断面図である。
FIG. 1 shows an example in which a side wall is made of reinforced concrete, and a bottom slab is an example in which a semi-finished open channel where only concrete is laid and no concrete is cast is placed on a foundation pile. (B) is a cross-sectional view.

【図2】側壁は鉄筋コンクリート造りであり、底版には
所定の配筋を行ない、周縁にコンクリートを打設した安
定性のよい半完成開渠を基礎杭上に載置した例を示し、
(a)は縦断面図、(b)は横断面図、(c)は別の例
の横断面図である。
FIG. 2 shows an example in which a side wall is made of reinforced concrete, a predetermined slab is provided on a bottom slab, and a semi-finished open channel with good stability, in which concrete is cast on the periphery, is placed on a foundation pile.
(A) is a longitudinal sectional view, (b) is a transverse sectional view, and (c) is a transverse sectional view of another example.

【図3】側壁は鉄筋コンクリート造りであり、底版には
所定の配筋を行ない、複数のコンクリート未打設部を設
けながらコンクリートを打設して製造した安定性のよい
半完成開渠を基礎杭上に載置した例を示し、(a)は縦
断面図、(b)は横断面図、(c)は別の例の横断面図
である。
FIG. 3 The side walls are made of reinforced concrete, the bottom slab is provided with a predetermined arrangement of reinforcing bars, and a stable semi-finished open channel manufactured by casting concrete while providing a plurality of uncasted portions is used as a foundation pile. The example mounted on the top is shown, (a) is a longitudinal sectional view, (b) is a transverse sectional view, and (c) is a transverse sectional view of another example.

【符号の説明】[Explanation of symbols]

1・・基礎杭、2・・基礎杭鉄筋、3・・側壁、4・・
側壁鉄筋、5・・底版鉄筋、6・・コンクリート未打設
部、7・・底版、8・・底版鉄筋端部。
1 ・ ・ Foundation pile, 2 ・ ・ ・ ・ Reinforcement of foundation pile, 3 ・ ・ Side wall, 4 ・ ・
Side wall rebar, 5 ... bottom slab, 6 ... concrete unplaced part, 7 ... bottom slab, 8 ... bottom slab end.

Claims (6)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 地盤に打ち込まれたコンクリート基礎杭
の頭部をはつり取って鉄筋を露出させ、その上に底版に
コンクリート未打設部を持つ半完成開渠を載置し、基礎
杭頭部より露出している鉄筋を水平に曲げて開渠底版の
鉄筋と連結した後、コンクリート未打設部に現場打ちコ
ンクリートを打設して開渠と基礎杭とを一体化しながら
開渠底版を完成することを特徴とする開渠の設置方法。
Claims 1. A concrete foundation pile driven into the ground is scraped off to expose a reinforcing bar, and a semi-finished open channel having a non-concrete part on a bottom slab is placed thereon. After bending the more exposed rebar horizontally and connecting it to the rebar of the open channel bottom slab, cast cast-in-place concrete in the non-concrete casting area and complete the open channel bottom slab while integrating the open channel with the foundation pile The installation method of the open channel characterized by doing.
【請求項2】 半完成開渠底版は全面にわたってコンク
リート未打設である請求項1記載の開渠の設置方法。
2. The method according to claim 1, wherein the semi-finished open bottom plate is not cast over the entire surface.
【請求項3】 半完成開渠底版は部分的にコンクリート
未打設である請求項1記載の開渠の設置方法。
3. The method according to claim 1, wherein the semi-finished open channel bottom plate is partially not cast in concrete.
【請求項4】 半完成開渠底版は中央部がコンクリート
未打設であり、外周部にコンクリートが打設されている
請求項3記載の開渠の設置方法。
4. The method according to claim 3, wherein the semi-finished open channel bottom slab has no concrete cast in the center portion and concrete is cast on the outer peripheral portion.
【請求項5】 半完成開渠底版は複数の基礎杭頭部に対
応する複数箇所がコンクリート未打設であり、他の部分
にはコンクリートが打設されている請求項3記載の開渠
の設置方法。
5. The semi-finished open channel bottom slab according to claim 3, wherein a plurality of locations corresponding to a plurality of foundation pile heads are not cast concrete, and the other portions are cast concrete. Installation method.
【請求項6】 半完成開渠底版のコンクリート未打設箇
所には水平方向に貫通する形ではなく、既打設部に埋設
された端部が未打設箇所に水平に突出する形で底版鉄筋
が配筋されており、新たに配筋する短鉄筋を介して底版
鉄筋と基礎杭鉄筋とを連結する請求項4または請求項5
記載の開渠の設置方法。
6. The bottom slab of the semi-finished open bottom slab not in the form where it penetrates in the horizontal direction, but in the form where the end buried in the already laid part projects horizontally in the unplaced place. The reinforcing bar is arranged, and the bottom slab reinforcing bar and the foundation pile reinforcing bar are connected to each other via the short reinforcing bar to be newly arranged.
How to install the open channel described.
JP6246032A 1994-10-12 1994-10-12 Open channel installation method Expired - Lifetime JP2608253B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP6246032A JP2608253B2 (en) 1994-10-12 1994-10-12 Open channel installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP6246032A JP2608253B2 (en) 1994-10-12 1994-10-12 Open channel installation method

Publications (2)

Publication Number Publication Date
JPH08109623A JPH08109623A (en) 1996-04-30
JP2608253B2 true JP2608253B2 (en) 1997-05-07

Family

ID=17142443

Family Applications (1)

Application Number Title Priority Date Filing Date
JP6246032A Expired - Lifetime JP2608253B2 (en) 1994-10-12 1994-10-12 Open channel installation method

Country Status (1)

Country Link
JP (1) JP2608253B2 (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102614249B1 (en) * 2022-01-10 2023-12-15 콘비젼스 주식회사 PC box with cast-in-place rigid girder structure
CN115492063B (en) * 2022-11-02 2023-06-20 广东景翔建设工程有限公司 Quick installation construction method for high-standard farmland water-saving irrigation water drain stilling pool

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS6040694A (en) * 1983-08-12 1985-03-04 Kobe Steel Ltd Kneading and compounding method of flux for coated arc welding rod

Also Published As

Publication number Publication date
JPH08109623A (en) 1996-04-30

Similar Documents

Publication Publication Date Title
JP2002256573A (en) Foundation for existing foundation reinforcing steel tower and construction method for it
JP4108219B2 (en) How to build a culvert
JP2004232328A (en) Structure of half precast type arch culvert and its construction method
JP2608253B2 (en) Open channel installation method
JP2552435B2 (en) Installation method of retaining wall
JP3778392B2 (en) Basic block
JP3889497B2 (en) Molding method for concrete basement
JP7269197B2 (en) ROAD STRUCTURE AND METHOD FOR MANUFACTURING ROAD STRUCTURE
JP3824242B2 (en) Viaduct-free support construction method
JP2606448B2 (en) Concrete overhang structure
JP3729890B2 (en) Single-sided precast concrete underground beam and its components
JP4045623B2 (en) Construction method of reinforced concrete underground floor and underground structure constructed by this method
JP2890182B2 (en) Construction method of natural slab formwork block
JP2950393B2 (en) Side groove
JPH07286332A (en) Execution method of precast concrete foundation and installation spacer used therefor
JPH0716764Y2 (en) Retaining wall block
JPH03228921A (en) Execution method for concrete foundation work
JPH0517955A (en) Execution method for direct foundation and form panel for direct foundation
JPH06330529A (en) Mounting method of cast-in-place concrete strip footing and precast concrete wall slab
JP3602170B2 (en) Precast concrete connecting members
KR100380621B1 (en) Precast Block for Trench and Method of Constructing Trench Thereby
JP3061724U (en) Foundation blocks and building foundations
JPS59177445A (en) Semi-pc slab construction method and semi-pc panel used therein
JPH04281920A (en) Construction beam
JP3487934B2 (en) Trench for laying piping and method of construction