Earth covering method using lightweight materialInfo
- Publication number
- JP2571931B2 JP2571931B2 JP62136349A JP13634987A JP2571931B2 JP 2571931 B2 JP2571931 B2 JP 2571931B2 JP 62136349 A JP62136349 A JP 62136349A JP 13634987 A JP13634987 A JP 13634987A JP 2571931 B2 JP2571931 B2 JP 2571931B2
- Authority
- JP
- Japan
- Prior art keywords
- landfill
- block
- construction
- temporary
- ground
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Description
【発明の詳細な説明】 イ、 発明の目的 <産業上の利用分野> 本発明工法は、浚渫土などで埋立てられたような超軟
弱地盤上に覆土施工を行う技術に関する。DETAILED DESCRIPTION OF THE INVENTION a. Object of the Invention <Field of Industrial Application> The method of the present invention relates to a technique for performing soil covering on an extremely soft ground such as one buried with dredged soil.
<従来の技術> 従来、その種超軟弱地盤上への覆土工法は、前記地盤
中に表層固化処理機をフロートにより浮べ、セメント系
土壌固化剤を攪拌翼付近に吐出させ、または吐出させつ
つ処理機の前記攪拌翼を回転かつ上、下して該地盤を攪
拌し、混合処理して地盤表層数m程度の固化層を形成
し、この固化層の上に砂などを撒き出して覆土施工を行
う技術がある。<Conventional technology> Conventionally, a method of covering soil on such an ultra-soft ground is a method in which a surface solidification treatment machine is floated in the ground by a float, and a cement-based soil solidifying agent is discharged to a vicinity of a stirring blade or treated while being discharged. The ground is agitated by rotating and raising and lowering the stirring blades of the machine to form a solidified layer of about several meters in the surface layer of the ground by mixing and mixing, and scatter sand and the like on the solidified layer to perform soil covering work. There are techniques to do.
<発明が解決しようとする問題点> ところで、上述方法によるときは、次に述べるような
問題点がある。すなわち、 (1)攪拌翼の回転によって埋立て地盤中に形成され
る、それぞれの円柱固化パイルを相互にラップさせ連続
固化層を造成する場合は、既設のパイルと施工中のパイ
ルとのラップが、困難であるし、連続的に水平方向に移
動させながら固化層を造成する場合は、規準深さからの
規定層厚の管理が困難である。<Problems to be solved by the invention> By the way, the above-described method has the following problems. That is, (1) In the case of forming a continuous solidified layer by wrapping the respective solidified piles formed in the landfill ground by the rotation of the stirring blades, the wrap between the existing pile and the pile under construction is made. When the solidified layer is formed while moving continuously in the horizontal direction, it is difficult to control the specified layer thickness from the reference depth.
(2)造成された固化層にクラックが生じ易い。これ
は、固化層形成後の時間経過によっても生じ得るし、砂
などの撒き出しによる偏荷重などによっても生じる。(2) Cracks are easily generated in the formed solidified layer. This can occur due to the passage of time after the formation of the solidified layer, and also due to an uneven load due to the ejection of sand or the like.
(3)埋立て地盤中に有害物質を含んでいるような場合
には、土壌の攪拌によって沈静化した有害物質を捲き上
げてしまうおそれがあり、このような地盤は表面に水の
層が存在する場合が多く、環境汚染の心配もある。(3) When harmful substances are contained in the landfill ground, there is a risk that harmful substances that have calmed down due to agitation of the soil may be lifted up. Such a ground has a water layer on the surface. In many cases, and there is concern about environmental pollution.
そこで本発明工法は、上述した問題点がなく、また、
荷重分散効果もあわせ有する施工方法を提供することを
目的とする。Therefore, the method of the present invention does not have the above-mentioned problems,
An object of the present invention is to provide a construction method having a load distribution effect.
ロ、 発明の構成 <問題点を解決するための手段> 本発明工法は前記目的を達成するため、以下に述べる
ような構成要件を具備する。B. Configuration of the Invention <Means for Solving the Problems> The method of the present invention has the following constituent requirements in order to achieve the above object.
(1)分厚な独立気泡性発泡樹脂成形板の上、下面に、
それぞれ補強部材を積層して形成した単位の床材ブロッ
クを埋立て地盤に連続して敷設し、各隣接する床材ブロ
ックと、その補強部材を介して結合した後、その上面に
所要量の盛土を施すことより成る軽量材を利用した覆土
工法。(1) On the upper and lower surfaces of a thick closed-cell foamed resin molded plate,
A floor material block of a unit formed by laminating reinforcing members is continuously laid on the landfill ground, and connected to each adjacent floor material block via the reinforcing member, and a required amount of embankment is formed on the upper surface thereof. Earth covering method using lightweight materials.
<作用> 浚渫泥等を利用した埋立てにより広範な土地造成工事
で、表面に水が漂っているような支持力のない超軟弱地
盤、すなわち、施工条件として、 (a)浚渫土は含水比が高い。<Effect> In a wide range of land reclamation work by landfilling using dredging mud, etc., ultra-soft ground with no bearing capacity such as water floating on the surface, that is, as construction conditions, (a) The dredged soil has a water content of Is high.
(b)浚渫泥面より漂水厚さが0.5m以上ある。(B) The thickness of the drift water is more than 0.5m from the dredging mud surface.
埋立て地盤の覆土工法において、 (i)浚渫土の泥面が大気中に曝露してはならない。 In the method of covering the landfill, (i) the mud surface of the dredged soil shall not be exposed to the atmosphere.
(ii)排水は余水処理施設を通じて行う。(Ii) Wastewater is discharged through sewage treatment facilities.
(iii)埋立て面積が大きいため上述(i)、(ii)の
条件が完全に満たされ、かつ、施工が容易で、経済的で
あること。(Iii) Since the landfill area is large, the above conditions (i) and (ii) are completely satisfied, and the construction is easy and economical.
が要求される施工フロートとして、 浚渫→余水処理→仲仕切り堤造成→シート敷設
→撒出し土→覆土作業 のような工法が提案されている。The following construction methods have been proposed as construction floats requiring dredging → sewage treatment → intermediate partitioning dike → sheet laying → scattered soil → earth covering work.
本発明工法は、そのうちの主として新規な仲仕切り堤
造成技術に関するものである。The construction method of the present invention mainly relates to a new intermediate partition embankment construction technology.
すなわち、本発明工法は軽量で浮力を有し、比較的強
固で柔軟性のある単位の床材ブロックを仮設ヤードで組
立てて水上に運搬、着水させ、これを相互に連結・延長
し、前記ブロックを基底にして盛土した水上に中仕切り
堤またはダンプカーが通行できる程度の仮設道路を造成
することによって覆土の搬入を陸送により行い超軟弱地
盤上に覆土施工を効率的に推進しようとするものであ
る。That is, the method of the present invention is lightweight and buoyant, assembles flooring blocks of relatively strong and flexible units in a temporary yard, transports them on the water, makes them land, connects and extends them to each other, The purpose of this project is to create a temporary partitioning road or a temporary road that can pass through a dump truck on the water embanked on the basis of the block, to carry in the soil by land transportation, and to efficiently promote the earth covering on the super soft ground. is there.
埋立て地に近接し、かつ資材の運搬・集積に便利な、
足場の良い場所を選んで仮設ヤードを設定し、同ヤード
において、下層から順に、竹材、木材またはプラスチッ
ク材のような材質から成る細長材を縦横格子状に並べて
針金止めし組立てて単位大きさの可撓性を有する下層ネ
ットを形成し、その上面に略々同形、同大、かつ均等に
合板を重ね、その上にシート材、分厚い発泡スチロール
のような独立気泡性の発泡合成樹脂材、その上面に前述
下層ネットと同構造の下層可撓性格子状ネットを積層し
て、上、下層ネットの四辺を相互に緊定して床材ブロッ
クのユニットを組立てる。Close to landfill and convenient for transporting and collecting materials
Select a place with good scaffolding and set up a temporary yard.In the same yard, in the order from the bottom, slender materials made of materials such as bamboo, wood, or plastic are arranged in a vertical and horizontal lattice, wire-clamped, assembled and unit-sized. A flexible lower net is formed, a plywood of substantially the same shape, same size, and evenness is overlaid on the upper surface, and a sheet material, a thick foamed polystyrene foam-like closed-cell foam synthetic resin material, and an upper surface thereof Then, a lower layer flexible grid net having the same structure as the lower layer net is laminated, and the four sides of the upper and lower layer nets are mutually tightened to assemble the unit of the flooring block.
上記床材ブロックの組立ては資材の運搬に便利で足場
の良い場所を利用して行うから作業が能率的であり、所
要の大きさのものを容易に組立てることができる。The assembling of the flooring block is carried out using a place that is convenient for transporting the material and has a good footing, so that the work is efficient, and the required size can be easily assembled.
ここに用いられる発泡合成樹脂材は、それ自体で保形
性があって吸水性を有しないものであり、型内発泡法に
よる既成形のものでも、また現地における押出し成形法
によるものであっても良い。仮設ヤードで組立てられた
前記床材ブロックは着水地点への運搬および着水時にお
けるたわみ等による素材の荷崩れ、変形を防ぐため全体
を吊り金具に取付けて、吊上げ運搬することが好まし
い。The foamed synthetic resin material used here has a shape retention property by itself and does not have water absorption, and may be a preformed one by an in-mold foaming method, or may be one by an on-site extrusion molding method. Is also good. It is preferable that the floor material block assembled in the temporary yard is entirely attached to a hanging fitting and lifted and transported in order to prevent the material from being collapsed or deformed due to bending or the like at the time of landing and transporting to the landing point.
仮設ヤードから順次トラッククレーン等によって吊上
げ運搬した床材ブロックは、埋立て地の水面上に降し、
既設ブロックに連結、延長する。その際、あらかじめ設
計された埋立て地の区画割りに沿って地盤中に打設して
ある杭に床材ブロックの側縁を締結することによって覆
土施工時における発泡合成樹脂材の側方移動、偏荷重に
よる離合、分散を防止する。The floor material blocks lifted and transported by a truck crane etc. sequentially from the temporary yard descend on the water surface of the landfill,
Connect to and extend existing blocks. At that time, the lateral movement of the foam synthetic resin material at the time of soil covering by fastening the side edge of the floor material block to the pile that has been driven into the ground along the pre-designed landfill division, Prevents separation and dispersion due to uneven load.
上述床材ブロック組立て単位は一定の大きさ以上では
ないから、広巾または広い面積が必要な中仕切り堤兼仮
設道路の幹線部または離合部等のための床材ブロック
は、単位の組立てブロックを、それぞれ運搬・着水後、
相互に縦横に継ぎ合わせて一ユニットとして形成すれば
良い。The above-mentioned floor material block assembling unit is not more than a certain size, so a floor material block for a trunk part or a separation part of a temporary partition and a temporary road that requires a wide width or a large area is composed of a unit assembling block, After each transportation and landing,
What is necessary is just to join together vertically and horizontally and to form one unit.
なお、さきの説明では床材ブロックを仮設ヤードから
陸送して所定位置まで運搬するかのように述べたが、必
要に応じクレーン船で吊上げて運搬することもできる
し、また組立てた単位のブロックを台船に載せて所要位
置迄運搬することは自由である。In the description above, the flooring blocks were described as if they were transported from the temporary yard by land and transported to a predetermined position.However, if necessary, the blocks can be lifted and transported by a crane ship, or the blocks in assembled units can be transported. It is free to carry on a barge to the required position.
かくして、埋立て地盤内で少なくとも略々並行する一
対の中仕切り堤基床部の施工が進行する一方、同基床材
ブロックの表面に堤兼仮設道路用の盛土を撒き出す前
に、両基床材ブロックの間を結び埋立て地域水面を跨い
で長大な長さのシートを張り渡し、同シートのそれぞれ
の端部を床材ブロックの上面に重ね合わせる。Thus, while the construction of at least a pair of substantially parallel partitioning embankments in the landfill ground progresses, before the embankment for the embankment and temporary road is laid on the surface of the basement material block, A long sheet is stretched over the surface of the landfill area by tying between flooring blocks, and each end of the sheet is overlapped on the upper surface of the flooring block.
仮設道路造成用盛土は、そのシート上に施され、これ
によって前記シートの両端を押えるようにし、覆土作業
に基きシートに掛る張力のアンカーとして中仕切り堤を
利用することができるものとなる。なおシートを、より
効果的にアンカーするため、シートの端に止め杭を施す
ことも行われる。The embankment for temporary road development is applied on the sheet, so that both ends of the sheet can be pressed, and the partition wall can be used as an anchor for tension applied to the sheet based on the soil covering operation. In order to anchor the sheet more effectively, a stake is also provided at the end of the sheet.
中仕切り堤兼仮設道路を通り運搬車輌を通行させて覆
土用軟砂土を搬入し前記展張シート上の撒き出し土(砂
または砂類似の粒状材料)、余水処理をして、その後か
らシート上薄層盛土作業を、一段、二段または三段等、
施して超軟弱地盤の埋立て地全域の覆土を行うようにす
る。The vehicle is passed through the intermediary embankment / temporary road and passed through the transport vehicle, and the soft sand for covering is carried in, and the spread soil (sand or a granular material similar to sand) on the spread sheet is treated with sewage. Top-layer embankment work can be performed in one, two or three steps
To cover the entire landfill of ultra-soft ground.
本発明工法は、上述、造成工事のうち、もっぱら軽量
床材ブロックを組立てて、これを埋立て地水域中に定着
せしめて、これを以て仕切り堤兼仮設道路造成用基底部
を形成する工程について技術的開発を行ったものであ
る。The method of the present invention relates to the above-mentioned construction method, in which a lightweight flooring block is exclusively assembled and fixed in landfill waters, thereby forming a partition and a temporary road construction base. It is a development that has been carried out.
<実施例> 第1図は、本発明工法のフローチャートの一例を示す
もので、作業は陸上の仮設ヤードと水上と並行して進め
られる。<Example> FIG. 1 shows an example of a flowchart of the method of the present invention, and the work proceeds in parallel with a temporary yard on land and on water.
第2図(a)〜(e)は、主として、そのうちの床材
ブロックの組立て順序を具体的に示すもので、下層か
ら、 (a)10φcmx9mの真竹160本を分けて縦横に格子状に並
べて一辺16.4m四方の格子状部材を組立て、各素材のク
ロスする個所を、それぞれ番線止めして可撓性の高い下
段バンブーネット1を形成する。FIGS. 2 (a) to 2 (e) mainly show the assembling order of the floor material blocks, in which, from the lower layer, (a) 160 bamboo bales of 10φcm × 9m are divided and arranged in a grid pattern vertically and horizontally. A lattice member having a square of 16.4 m on a side is assembled, and the crossing points of the respective materials are fixed to the respective lines to form the lower flexible bamboo net 1 with high flexibility.
(b)相互にホッチキス止めして一枚板に構成した同形
同大の合板2を下段バンブーネット1の上面に重ねる。(B) The plywoods 2 of the same shape and the same size, which are stapled with each other and formed into a single plate, are stacked on the upper surface of the lower bamboo net 1.
(c)その上面に同形同大のシート3を載せる。(C) A sheet 3 of the same shape and size is placed on the upper surface.
(d)発泡スチロール樹脂3x6で42cm厚の素材(規格
材)4を、隙間無く、その上面に敷き並べる。(D) A material (standard material) 4 made of styrene foam resin 3x6 and having a thickness of 42 cm is laid on the upper surface without any gap.
同樹脂の一般的特性は、 (i)密度 20kg/m3 (ii)圧縮強度 1kg/cm2 (iii)曲げ強さ 3kg/cm2 (iv)引張り強さ 4kg/cm2 (v)摩擦係数 0.5 程度のものであることが好適である。The general properties of the resin are: (i) density 20 kg / m 3 (ii) compressive strength 1 kg / cm 2 (iii) bending strength 3 kg / cm 2 (iv) tensile strength 4 kg / cm 2 (v) friction coefficient It is preferably about 0.5.
ただし、現場において押出し発泡成形により一体成形
したものを使用することもできる。However, it is also possible to use one integrally molded by extrusion foam molding on site.
(e)(a)に述べたと同構造の上段バンブーネット5
を発泡樹脂材4の上面に重ね、上、下段のバンブーネッ
トの四辺を相互に番線止めして、組立て床材ブロックを
一体化する。(E) Upper bamboo net 5 having the same structure as described in (a).
Is stacked on the upper surface of the foamed resin material 4, and the four sides of the upper and lower bamboo nets are fixed to each other by a wire, so that the floor material block is assembled.
ところを示している。It shows the place.
第3図は、仮設ヤードで組立て、ストックされている
床材ブロックを、吊り金具6によって四点吊りしてトラ
ッククレーンにより、仮設ヤードから埋立て地水面まで
運搬し、水面に降して、既設ブロックに接続する工程を
示す。床材ブロックの接続は第4図に要部断面を示すよ
うに、上、下段のバンブーネット1、5部分に補強用の
真竹7を取付け相互に番線止めする。水上の床材ブロッ
クはユニット台船よりロープを巻取り、位置の調整を行
う。FIG. 3 shows that floor materials blocks assembled and stocked at a temporary yard are suspended at four points by a lifting bracket 6 and transported from a temporary yard to a landfill surface by a truck crane, and then dropped to the surface of the water. The process of connecting to a block is shown. As for the connection of the flooring blocks, as shown in the cross section of the main part in FIG. 4, bamboo nets 1 and 5 at the upper and lower stages are attached with reinforcing bamboos 7 and fastened to each other. The floor material block above the water is wound around the rope from the unit barge and the position is adjusted.
仮設ヤードから運搬して着水場所へ着水させるとき、
撓みなどによって床材ブロック素材の荷崩れおよび変形
が生じないよう吊り金具6を用いて均等に吊り上げ搬送
すると共に、埋立て地盤の覆土施工時に発泡樹脂材4の
側方移動とか偏荷重による離合、分散を防止するため、
上、下段をバンブーネットで押え、側方に松杭8を設け
てストッパー効果を奏するようにしている。When transporting from the temporary yard and landing on the landing site,
The floor block material is lifted and transported evenly using the hanging metal fittings 6 so that the floor material block material does not collapse or deform due to bending or the like, and the foamed resin material 4 moves laterally or separates due to unbalanced load at the time of soil covering of the landfill. To prevent dispersion,
The upper and lower tiers are held by bamboo nets, and pine piles 8 are provided on the sides to provide a stopper effect.
このようにして超軟弱な埋立て地盤上に連結した床材
ブロックの上に所定断面を備えた盛土を施して、たとえ
ば上面巾がダンプカー二車線の中仕切り堤兼仮設道路を
構築する。In this way, the embankment having a predetermined cross section is applied on the floor material block connected to the super soft landfill ground to construct, for example, a partition road and a temporary road having an upper surface width of two lanes of a dump truck.
第5図は、その典形的な断面構造を示すものである。 FIG. 5 shows a typical sectional structure.
第6図(a)〜(e)は、本発明工法が実施される土
地造成工事の施工フローを示すもので (a)浚渫して水深0.5m程度の超軟弱地盤より成る埋立
て地を造成する。6 (a) to 6 (e) show the construction flow of land preparation work in which the method of the present invention is carried out. (A) Dredging to create a landfill consisting of an ultra-soft ground with a water depth of about 0.5m I do.
(b)本発明工法を実施して中仕切り堤を形成する。(B) The method of the present invention is performed to form an intermediate partition embankment.
(c)一対の中仕切り堤の間に埋立て地盤を跨いでシー
トを敷設して、中仕切り堤をそのアンカーとして利用す
る。(C) A sheet is laid across the landfill between a pair of partition walls, and the partition walls are used as anchors.
(d)シート上のシラス水搬工法を施す。(D) Shirasu water carrying method on the sheet is applied.
(e)覆土作業 の順序で工事が行われることを説明している。(E) It explains that construction work is performed in the order of earth covering work.
ハ、 発明の効果 以上のとおりであるから本発明工法によれば、柔構造
の組立式軽量床板ブロックを基盤にした仕切り堤兼仮設
道路を施工するので、もっぱら足場の良い場所で作業を
進めることができて能率的、容易に行え、また浮力のあ
る基盤に集中荷重が掛かって割れ目が生じる事なく半永
久的に効果が持続し、従来工法に内在するような前述問
題点を、すべて解消することができる新規な覆土工法を
提供することができる。C. Effects of the Invention As described above, according to the method of the present invention, since the partitioning dike and the temporary road are constructed based on the flexible light-weight floor panel block of the flexible structure, the work is carried out only in a place with good scaffolding. To be able to perform efficiently and easily, and to apply a concentrated load to a buoyant base, to maintain the effect semi-permanently without causing cracks, and to eliminate all the above-mentioned problems inherent in the conventional method It is possible to provide a new earth covering method capable of performing the method.
第1図は、本発明覆土工法における仕切り堤兼仮設道路
基部の施工工程を、第2図は軽量床材ブロックの組立て
工程図、第3図は、前記床材ブロック施工要領図、第4
図は床材ブロック相互の接続部断面図、第5図は施工後
の仕切り堤の断面構造図、第6図は、埋立て地盤覆土施
工工程略図を示すものである。 1、5……バンブーネット、 2……合板、3……シート、 4……発泡合成樹脂、6……吊り金具、 7……補強用真竹、8……杭。1 is a construction process of a partition and a temporary road base in the earth covering method according to the present invention, FIG. 2 is an assembly process diagram of a lightweight flooring block, FIG. 3 is a construction diagram of the flooring block, FIG.
FIG. 5 is a cross-sectional view of a connecting portion between floor material blocks, FIG. 5 is a cross-sectional structural view of a partition embankment after construction, and FIG. 6 is a schematic diagram of a landfill ground covering construction process. 1, 5 ... bamboo net, 2 ... plywood, 3 ... sheet, 4 ... foam synthetic resin, 6 ... hanging metal fittings, 7 ... bamboo for reinforcement, 8 ... pile.
Claims (1)
面に、それぞれ補強部材を積層して形成した単位の床材
ブロックを埋立て地盤に連続して敷設し、各隣接する床
材ブロックと、その補強部材を介して結合した後、その
上面に所要量の盛土を施すことより成る軽量材を利用し
た覆土工法。1. A floor material block of a unit formed by laminating a reinforcing member on each of upper and lower surfaces of a thick closed-cell foamed resin molded plate is continuously laid on a landfill ground. A soil covering method using a lightweight material, which comprises applying a required amount of embankment to the upper surface after being connected to a block and its reinforcing member.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP62136349A JP2571931B2 (en) | 1987-05-30 | 1987-05-30 | Earth covering method using lightweight material |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP62136349A JP2571931B2 (en) | 1987-05-30 | 1987-05-30 | Earth covering method using lightweight material |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS63300114A JPS63300114A (en) | 1988-12-07 |
JP2571931B2 true JP2571931B2 (en) | 1997-01-16 |
Family
ID=15173113
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP62136349A Expired - Fee Related JP2571931B2 (en) | 1987-05-30 | 1987-05-30 | Earth covering method using lightweight material |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2571931B2 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0649964B2 (en) * | 1989-08-23 | 1994-06-29 | 日特建設株式会社 | Lock shade protection structure |
JP5128831B2 (en) * | 2007-03-02 | 2013-01-23 | 株式会社ジェイエスピー | Foam resin block with surface material and lightweight embankment structure |
CN102912784A (en) * | 2012-11-08 | 2013-02-06 | 沈阳建筑大学 | Geotechnical cloth, twig and mountain stone combined treatment soft soil foundation |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6127227A (en) * | 1984-07-19 | 1986-02-06 | Toshiba Mach Co Ltd | Method of controlling injection molding machine |
-
1987
- 1987-05-30 JP JP62136349A patent/JP2571931B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPS63300114A (en) | 1988-12-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3091481B2 (en) | Cage structure | |
US6796098B2 (en) | Building block, system and method | |
US4365451A (en) | Poured adobe building construction and method of forming same | |
CN205576955U (en) | Raft foundation's reinforced structure is displaced into to strip footing | |
US9869068B2 (en) | Structure including interlocking containers | |
WO1997036057A1 (en) | Reinforcement frame for structures and method of constructing building structures utilizing the same reinforcement frame | |
CN207110214U (en) | A kind of prefabricated interior fill concrete wallboard | |
Rajapakse | Construction engineering design calculations and rules of thumb | |
US3289366A (en) | Structural members and structures | |
JP2571931B2 (en) | Earth covering method using lightweight material | |
US7073304B2 (en) | Corner building block, system and method | |
US5106424A (en) | Decontamination method and use of contaminant | |
JPH08209704A (en) | Construction of banking | |
JPH02176008A (en) | Construction of revetment | |
JP2802815B2 (en) | Embankment structure | |
JPS5941235Y2 (en) | Sheet material for foundation construction | |
JPH0528286B2 (en) | ||
JPH04203023A (en) | Light banking and banking construction method | |
JP2004052348A (en) | Structure using foamed resin block, and construction method therefor | |
JP3926027B2 (en) | Caisson construction method | |
Futehally | Ferrocement well mounting rings for shallow surface wells. | |
JP2506050B2 (en) | Construction method of asphalt mastic layer | |
JPH0538101Y2 (en) | ||
JP2003184111A (en) | Retaining wall construction method | |
WO2014200361A1 (en) | Bridge construction kit set and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
LAPS | Cancellation because of no payment of annual fees |