JP2560184B2 - Equipment for automatic storage and transportation of materials and equipment for the shield construction method - Google Patents
Equipment for automatic storage and transportation of materials and equipment for the shield construction methodInfo
- Publication number
- JP2560184B2 JP2560184B2 JP4300509A JP30050992A JP2560184B2 JP 2560184 B2 JP2560184 B2 JP 2560184B2 JP 4300509 A JP4300509 A JP 4300509A JP 30050992 A JP30050992 A JP 30050992A JP 2560184 B2 JP2560184 B2 JP 2560184B2
- Authority
- JP
- Japan
- Prior art keywords
- segment
- materials
- equipment
- loading
- lifter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Lining And Supports For Tunnels (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、シールド工法における
セグメント等の工事用資機材を自動的に保管搬送するシ
ールド工法用資機材の自動保管搬送装置に関するもので
ある。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to an automatic storage and transportation device for materials and equipment for shield construction method for automatically storing and conveying construction materials and equipment such as segments in the shield construction method.
【0002】[0002]
【従来の技術】従来のシールド工法においては、セグメ
ント等の工事用資機材は、地上ストックヤードに平積み
または段積みして保管され、必要に応じて作業員がこれ
らの資機材の玉掛けを行い、門型クレーン等にて手動操
作によりストックヤードおよび立坑内を水平鉛直搬送さ
れ、立坑底部にある軌道式搬送台車へ荷降ろしされ、こ
の搬送台車が有人式軌道台車で牽引され、シールド掘削
機本体へ資機材が搬送されていた。2. Description of the Related Art In the conventional shield method, construction materials and equipment such as segments are stored in a stock yard on the ground in a flat or stacked manner, and a worker slings these materials and equipment as necessary. , Manually transported vertically through the stock yard and the shaft using a portal crane, etc. Equipment was being transported to
【0003】[0003]
【発明が解決しようとする課題】しかしながら、このよ
うな従来の資機材の搬送方法を用いると、以下のような
問題がある。However, the use of such a conventional method for transporting materials and equipment has the following problems.
【0004】第1に、地上ストックヤードおよび立坑底
部では、作業員の頭上を門型クレーン等がセグメント等
の工事用資機材を搬送するので、資機材が落下したり、
資機材が作業員と接触したりする危険がある。First, at the ground stock yard and the bottom of the shaft, since a portal crane or the like transports construction materials such as segments above the workers, the materials may fall or fall.
There is a risk that equipment and materials may come into contact with workers.
【0005】第2に、クレーン操作員、玉掛け作業員、
クレーン誘導員、軌道台車操作員等、多くの人員を必要
とする。[0005] Second, crane operators, slingers,
It requires a large number of personnel such as crane guides and track truck operators.
【0006】第3に、地上ストックヤードおよび立坑内
の水平鉛直搬送、地下坑内の水平搬送において、それぞ
れ目視による手動操作を行うので作業に熟練を要し、人
為的なミスが起こりやすく作業効率が悪い。Third, in the vertical vertical transfer in the above-ground stock yard and the vertical shaft, and in the horizontal transfer in the underground pit, manual operations are performed visually, so that the work requires skill and human error easily occurs, and the work efficiency is reduced. bad.
【0007】本発明は、このような問題に鑑みてなされ
たもので、その目的とするところは、安全かつ効率的で
あり、また省力化、省人化を図ることのできるシールド
工法用資機材の自動保管搬送装置を提供することにあ
る。The present invention has been made in view of the above problems, and its object is to provide a material for a shield construction method which is safe and efficient, and which can save labor and manpower. The present invention is to provide an automatic storage and transportation device.
【0008】[0008]
【課題を解決するための手段】前述した目的を達成する
ために本発明は、資機材を保管する複数の荷受け台と、
資機材を搬送して走行可能であり、前記荷受け台に資機
材を自動的に搬入、搬出する走行台車と、を具備するシ
ールド工法用資機材の自動保管搬送装置である。In order to achieve the above-mentioned object, the present invention provides a plurality of receiving trays for storing materials and equipment,
An automatic storage / transportation device for shielded materials and equipment, comprising: a traveling carriage capable of transporting and traveling the materials and equipment and automatically loading and unloading the materials and equipment into and from the receiving tray.
【0009】[0009]
【作用】本発明では、走行台車が、荷受け台に資機材を
自動的に搬入、搬出する。In the present invention, the traveling vehicle automatically carries in and out the materials and equipment to and from the cargo receiving table.
【0010】[0010]
【実施例】以下、図面に基づいて本発明の実施例を詳細
に説明する。Embodiments of the present invention will now be described in detail with reference to the drawings.
【0011】図1は、地上ストックヤード全体の平面図
である。同図の大略を説明する。1はセグメント等の資
機材を搬入するトラックである。以下、資機材としてセ
グメントを例として取り上げる。搬入用移載装置4は、
トラック1にあるセグメントを搬入用荷受け台33aに
移載する。リフタ付き移動台車39が、搬入用荷受け台
33aに載置されたセグメントを搬入専用ライン34a
の各荷受け台33に搬送する。荷受け台33は搬入専用
ライン34aと搬出専用ライン34bの2列が並列して
設けられる。FIG. 1 is a plan view of the entire ground stock yard. The outline of FIG. Reference numeral 1 denotes a truck for carrying materials such as segments. In the following, segments are taken as examples of equipment. The loading transfer device 4
The segments on the truck 1 are transferred to the loading receiving tray 33a. A lift truck with a lifter 39 moves the segment placed on the loading receiving tray 33a to the loading dedicated line 34a.
To each receiving table 33. The loading tray 33 is provided with two lines, a dedicated line 34a for loading and a dedicated line 34b for unloading, arranged in parallel.
【0012】セグメント移載装置61は、搬出専用ライ
ン34bの搬出用荷受け台33bにあるセグメント3を
移載台車83に移載する。移載台車83は、セグメント
を垂直搬送装置86に搬送する。The segment transfer device 61 transfers the segment 3 on the unloading receiving tray 33b of the unloading dedicated line 34b to the transfer truck 83. The transfer carriage 83 transports the segments to the vertical transport device 86.
【0013】なお、図1において、Bは立坑を、Cはロ
ーディングステーションを表す。In FIG. 1, B indicates a shaft and C indicates a loading station.
【0014】図2は、図1のF1矢視図、図3は、図1
のF2矢視図である。FIG. 2 is a view taken in the direction of arrow F1 in FIG. 1, and FIG.
FIG. 2 is a view as viewed from the arrow F2.
【0015】図2、図3に示されるように、トラック1
はセグメント3を搭載している。As shown in FIG. 2 and FIG.
Is equipped with segment 3.
【0016】ここで、搬入用移載装置4の構成について
説明する。Here, the configuration of the loading transfer device 4 will be described.
【0017】地上に立設された架台5上に走行レール7
が設けられる。この走行レール7上に車輪11によって
走行する走行台車9が設けられる。この走行台車9上に
は横行レール13が設けられ、この横行レール13上を
車輪17で横行可能な横行台車15が設けられる。走行
レール7と横行レール13とは直交するように配設され
る。横行台車15には把持装置19が設けられる。把持
装置19は、横行台車15に旋回可能に設けられた旋回
台21と、この旋回台21を旋回させる旋回装置(図示
せず)と、この旋回台21に設けられたアーム状の爪2
3および旋回台21を昇降させる昇降装置25からな
る。爪23は、図3に示すように旋回台21を支点とし
て、G1方向に開閉可能である。この搬入用移載装置4
は自動的に運転が行われる。A traveling rail 7 is mounted on a stand 5 erected on the ground.
Is provided. A traveling vehicle 9 traveling on wheels 11 is provided on the traveling rail 7. A traverse rail 13 is provided on the traveling carriage 9, and a traverse carriage 15 capable of traversing the traverse rail 13 with wheels 17 is provided. The running rail 7 and the traversing rail 13 are disposed so as to be orthogonal to each other. The trolley 15 is provided with a gripping device 19. The gripping device 19 includes a revolving base 21 that is rotatably provided on the traversing carriage 15, a revolving device (not shown) for revolving the revolving base 21, and an arm-shaped claw 2 provided on the revolving base 21.
3 and a lifting device 25 for raising and lowering the swivel table 21. As shown in FIG. 3, the claw 23 can be opened and closed in the G1 direction with the swivel base 21 as a fulcrum. This loading transfer device 4
Is automatically operated.
【0018】図4は、荷受け台33およびリフタ付き移
動台車39の正面図である。すなわち、図1におけるF
3矢視図である。荷受け台33は、セグメントを2ヵ所
で支える一対の脚35からなり、1台の荷受け台で1リ
ング(6ピース)分のセグメントを保管する。FIG. 4 is a front view of the carriage 33 and the movable carriage 39 with a lifter. That is, F in FIG.
It is a 3 arrow view. The loading tray 33 includes a pair of legs 35 that support the segment at two locations, and one loading tray stores one ring (6 pieces) of segments.
【0019】図1において、荷受け台33は搬入専用ラ
イン34aと、搬出専用ライン34bの2列の構成とな
っており、1列あたりの荷受け台33の台数、すなわち
セグメントのストレッジ量は、1日分のセグメント施工
量である。搬入専用ライン34a、搬出専用ライン34
bの、各々のラインは1日おきに搬入搬出の用途を交代
して運用される。ここで、搬入専用ライン34aとは、
後述するリフタ付き移動台車39により、搬入用荷受け
台33aからセグメント3を受取り、このセグメント3
を保管する荷受け台のラインである。搬出専用ライン3
4bとは、リフタ付き移動台車39により、各荷受け台
33からセグメント移載装置61下の荷受け台33bに
セグメント3が搬出される荷受け台のラインである。In FIG. 1, the receiving tray 33 has a two-row configuration consisting of a loading line 34a and an unloading line 34b. The number of loading trays 33 per row, that is, the storage amount of a segment is one day. It is the amount of segment construction per minute. Loading-only line 34a, Unloading-only line 34
Each line of b) is operated alternately every other day for loading and unloading. Here, the import-only line 34a is
The segment 3 is received from the carry-in receiving tray 33a by a movable truck 39 with a lifter described later.
This is the line of the loading platform for storing Unloading line 3
Reference numeral 4b denotes a line of the load receiving platform on which the segments 3 are unloaded from each of the load receiving platforms 33 to the load receiving platform 33b below the segment transfer device 61 by the lift trucks 39.
【0020】図5は、リフタ付き移動台車39の側面図
である。図4、図5に示すように、荷受け台底部には走
行レール37が設けられる。リフタ付き移動台車39
は、本体41に車輪43が設けられ、この車輪43は電
動機45により駆動される。本体41には、セグメント
3を搭載するリフタ49が設けられ、このリフタ49は
油圧ジャッキ47によりリフトアップ、リフトダウンが
なされる。本体41には、ケーブルリール51が搭載さ
れ、外部電源(図示せず)からの給電および地上制御盤
(図示せず)からの制御信号の授受は、このケーブルリ
ール51およびケーブルを通して行われる。FIG. 5 is a side view of the movable carriage 39 with a lifter. As shown in FIGS. 4 and 5, a traveling rail 37 is provided at the bottom of the loading tray. Mobile cart 39 with lifter
Is provided with wheels 43 on a main body 41, and the wheels 43 are driven by an electric motor 45. The main body 41 is provided with a lifter 49 for mounting the segment 3, and the lifter 49 is lifted up and down by the hydraulic jack 47. A cable reel 51 is mounted on the main body 41, and power supply from an external power supply (not shown) and transmission and reception of control signals from a ground control panel (not shown) are performed through the cable reel 51 and a cable.
【0021】図7は、図1のセグメント移載装置61お
よび立坑B付近の詳細図である。図8は、図7のF4矢
視図、図9は、図7のF5矢視図である。このセグメン
ト移載装置61は、荷受け台33bにあるセグメント3
を把持装置75で把持して、移載台車83に搭載するも
のである。ここで、セグメント移載装置61の構成につ
いて、図7から図9を用いて説明する。FIG. 7 is a detailed view of the segment transfer device 61 and the vertical shaft B shown in FIG. 8 is a view taken along arrow F4 of FIG. 7, and FIG. 9 is a view taken along arrow F5 of FIG. The segment transfer device 61 is used to move the segment 3
Is gripped by the gripping device 75 and mounted on the transfer carriage 83. Here, the configuration of the segment transfer device 61 will be described with reference to FIGS. 7 to 9.
【0022】地上に立設された架台63上に走行レール
65が設けられる。この走行レール65上に車輪69に
よって走行する走行台車67が設けられる。この走行台
車67上には横行レール70が設けられ、この横行レー
ル70上を車輪73で横行可能な横行台車71が設けら
れる。走行レール65と横行レール70とは直交するよ
うに配設される。横行台車71には把持装置75が設け
られる。把持装置75は、アーム状の爪81および爪8
1を昇降させる昇降装置79とからなる。爪81は、図
9に示すように水平軸回り、すなわちG2方向に開閉可
能である。このセグメント移載装置61は、自動的に運
転が行われる。A traveling rail 65 is provided on a stand 63 erected on the ground. A traveling carriage 67 traveling on wheels 69 is provided on the traveling rail 65. A traversing rail 70 is provided on the traveling trolley 67, and a traversing trolley 71 that can traverse on the traversing rail 70 with wheels 73 is provided. The running rail 65 and the traversing rail 70 are disposed orthogonally. The trolley 71 is provided with a gripping device 75. The gripping device 75 includes an arm-shaped claw 81 and a claw 8
And an elevating device 79 for elevating the device 1. As shown in FIG. 9, the claw 81 can be opened and closed around the horizontal axis, that is, in the G2 direction. The segment transfer device 61 is automatically operated.
【0023】図10は、立坑Bおよびセグメント移載装
置61の側面模式図である。図7および図10に示すよ
うに、セグメント移載装置61下方にはレール85が設
けられ、このレール85上に移載台車83が走行可能に
設けられる。この移載台車83は、セグメント移載装置
61によって移載されたセグメントを垂直搬送装置86
に搬送するものである。また、移載台車83は2両連結
となっており、移載台車1両につき半リング分のセグメ
ントが積載でき、2両連結で1リング分(6ピース)の
セグメントが積載できる。また、2両連結とすることで
仮設配管等の長尺物も搭載可能である。この移載台車8
3も自動的に運転が行われる。FIG. 10 is a schematic side view of the vertical shaft B and the segment transfer device 61. As shown in FIGS. 7 and 10, a rail 85 is provided below the segment transfer device 61, and a transfer carriage 83 is movably provided on the rail 85. The transfer carriage 83 vertically conveys the segments transferred by the segment transfer device 61.
It is to be transported to. Further, the transfer carriages 83 are connected to each other by two cars, so that one transfer carriage can carry a half ring segment and two transfer cars can carry one ring segment (6 pieces). In addition, a long object such as a temporary pipe can be mounted by connecting two cars. This transfer cart 8
3 also operates automatically.
【0024】次に、垂直搬送装置86について説明す
る。立坑内部に鉛直方向にガイドフレーム87が立設さ
れる。このガイドフレーム87に沿って昇降可能に搬器
89が設けられる。この搬器89上にはレール91が設
けられている。この搬器89に把持装置93が設けられ
る。この把持装置93は、セグメントを両側から掴むア
ーム状の爪95と、この爪95を昇降させてセグメント
の昇降を行う昇降装置97からなる。本実施例では、把
持装置93が2台併設されており、各把持装置93がそ
れぞれ半リング分(3ピース)のセグメントを把持で
き、仮設配管等の長尺物も把持できる。搬器89は昇降
駆動装置によって昇降され、この昇降駆動装置は、ガイ
ドフレーム87の頂部に設けられた昇降ウィンチ99
と、この昇降ウィンチ99と搬器89とを結合するワイ
ヤロープ(図示せず)からなる。Next, the vertical transport device 86 will be described. A guide frame 87 is erected vertically in the shaft. A transporter 89 is provided along the guide frame 87 so as to be able to move up and down. A rail 91 is provided on the transporter 89. The carrying device 89 is provided with a gripping device 93. The gripping device 93 includes an arm-shaped claw 95 for grasping the segment from both sides, and a lifting device 97 for moving the claw 95 up and down to move the segment up and down. In this embodiment, two gripping devices 93 are provided in parallel, and each gripping device 93 can grip a half-ring (three-piece) segment, and can also grip a long object such as a temporary pipe. The carrying device 89 is moved up and down by an elevating and lowering drive device, which is an elevating and lowering winch 99 provided on the top of the guide frame 87.
And a wire rope (not shown) connecting the lifting winch 99 and the transporter 89.
【0025】垂直搬送装置86は、図10のH1にある
状態で移載台車83からセグメントを受取り、把持装置
93でセグメントを把持する。そして、この状態で昇降
ウィンチ99が駆動されると、搬器89が下降して、搬
器89が図10のH2の位置に到達する。この垂直搬送
装置86も自動的に運転が行なわれる。The vertical transport device 86 receives the segment from the transfer carriage 83 in the state of H1 in FIG. 10, and grips the segment by the gripping device 93. Then, when the raising / lowering winch 99 is driven in this state, the carrying device 89 descends and the carrying device 89 reaches the position H2 in FIG. The vertical transport device 86 is also automatically operated.
【0026】図10の107は地下坑を表す。地下坑1
07内にはレール101が設けられ、このレール101
上を走行する軌道式無人搬送台車103が設けられる。
図11は、軌道式無人搬送台車103の側面図である。
軌道式無人搬送台車103は、バッテリー駆動台車10
5と従動台車107からなる。バッテリー駆動台車10
5および従動台車107はそれぞれセグメントを半リン
グ(3ピース)分ずつ搭載可能であり、誘導無線を使用
した走行全域通信により自動運転がなされる。次に、本
実施例におけるセグメントの搬送手順を説明する。図1
に示すように、セグメントを積載したトラック1は、ス
トックヤードの所定位置で停止する。搬入用移載装置4
の走行台車9および横行台車15は、走行レール7と横
行レール13上を移動し、横行台車15が、トラック1
に積載されたセグメントの真上の位置まで来ると停止す
る。把持装置19の旋回装置(図示せず)により、爪2
3がセグメントに対して直角方向になるように旋回した
後、昇降装置25により爪23をセグメント3の下端ま
で下降させ、予め「開」の状態となっている爪23を
「閉」にしてセグメント3を掴む。前述の位置決めにつ
いては、光学的センサ等により自動的に位置決めを行っ
たり、遠隔操作により人為的に位置決めを行ったりす
る。この位置決め以外の制御は、すべて自動的に行われ
る。Reference numeral 107 in FIG. 10 represents an underground pit. Underground mine 1
A rail 101 is provided in 07, and the rail 101
An orbital unmanned transport vehicle 103 that travels above is provided.
FIG. 11 is a side view of the orbit type automatic guided vehicle 103.
The orbit type automatic guided vehicle 103 is a battery-driven vehicle 10.
5 and the driven carriage 107. Battery powered trolley 10
5 and the driven dolly 107 can each be mounted with a segment for each half ring (3 pieces), and are automatically driven by the traveling whole area communication using the induction radio. Next, the procedure of transporting the segments in this embodiment will be described. FIG.
As shown in, the truck 1 loaded with the segments stops at a predetermined position in the stockyard. Transfer device 4 for loading
Traveling trolley 9 and traverse trolley 15 move on traveling rail 7 and traverse rail 13, and traverse trolley 15 moves to truck 1
It stops when it reaches the position just above the segment loaded in the. By the turning device (not shown) of the gripping device 19, the claw 2
3 is rotated so as to be perpendicular to the segment, the pawl 23 is lowered to the lower end of the segment 3 by the lifting device 25, and the pawl 23 which is in the “open” state in advance is “closed”. Grab 3 Regarding the above-mentioned positioning, positioning is automatically performed by an optical sensor or the like, or positioning is performed artificially by remote control. All controls other than the positioning are automatically performed.
【0027】爪23でセグメントを把持すると、昇降装
置25により爪23を上昇させ定位置で停止し、また旋
回装置(図示せず)を旋回させて爪23を定位置に戻
す。そして、横行台車15および走行台車9は、横行レ
ール13、走行レール7上を移動し、横行台車15がロ
ーディングステーションCの真上の位置まで来ると移動
を停止する。そして、昇降装置25により爪23を下降
させて定位置で停止した後、爪23を「開」にしてセグ
メント3を搬入用荷受け台33aに搭載する。When the segment is gripped by the claw 23, the lifting device 25 raises the claw 23 and stops it at a fixed position, and a swivel device (not shown) is swung to return the claw 23 to the fixed position. Then, the trolley 15 and the traveling trolley 9 move on the traversing rail 13 and the traveling rail 7, and stop moving when the traversing trolley 15 reaches a position immediately above the loading station C. Then, after the claw 23 is lowered by the elevating device 25 and stopped at a fixed position, the claw 23 is opened and the segment 3 is mounted on the loading receiving tray 33a.
【0028】このように、搬入用移載装置4により、自
動的にトラック1から搬入用荷受け台33aにセグメン
ト3が搬送される。In this way, the loading transfer device 4 automatically transfers the segment 3 from the truck 1 to the loading load receiver 33a.
【0029】ローディングステーションCへセグメント
3が載荷されると、リフタ付き移動台車39は、入出荷
作業中であればその作業を終了後、空荷で待機中であれ
ば、ただちにローディングステーションCまで走行し、
定位置で停止し、搭載したリフタ49により荷受け台3
3a上のセグメント3をリフトアップする。When the segment 3 is loaded onto the loading station C, the movable carriage 39 with lifter immediately travels to the loading station C after the completion of the loading / unloading work or if the empty loading waits. Then
Stopped at a fixed position, and the lifter 49 mounted on the cargo tray 3
Lift up segment 3 on 3a.
【0030】リフタ付き移動台車39は、セグメント3
をリフトアップした状態で、同列の進行方向寄り(セグ
メント移載装置61側)の最も遠い空の荷受台へ走行
し、停止位置で停止してリフタ49をリフトダウンし、
セグメント3を荷受け台33に移載する。以下、同様の
手順を繰り返してローディングステーションCにあるセ
グメントが、セグメント移載装置61側の荷受け台33
から順次移載されていく。このようにして、搬入専用ラ
イン34aにセグメントが移載されていく。前述したよ
うに、リフタ付き移動台車39は自動的に運転が行われ
る。The movable carriage 39 with lifter is segment 3
In a state of being lifted up, travel to the farthest empty load receiving platform on the same line in the traveling direction (segment transfer device 61 side), stop at the stop position and lift down the lifter 49,
The segment 3 is transferred to the receiving tray 33. Hereinafter, the same procedure is repeated, and the segment at the loading station C is moved to the loading tray 33 on the side of the segment transfer device 61.
It will be transferred sequentially from. In this way, the segments are transferred to the carry-in line 34a. As described above, the movable carriage 39 with the lifter is automatically driven.
【0031】セグメント移載装置61では、横行台車7
1、走行台車67が、横行レール70、走行レール65
上を移動して、横行台車71が搬出専用ライン34bの
荷受け台33bの上部に来ると停止する。そして、昇降
装置79により爪81を下降させ、定位置まで下降する
と、予め「開」の状態となっている爪81を「閉」にし
て荷受け台33b上のセグメント3を半リング分(3ピ
ース分)掴む。そして、爪81を上昇させ、所定位置ま
で来ると停止した後、横行台車71、走行台車67が移
動し、横行台車71が先頭の移載台車83aの上部まで
来ると停止する。この状態で爪81を下降させ、定位置
まで来ると爪81を「開」にし、掴んだセグメント3を
解放して移載台車83aにセグメントを移載する。その
後、爪81を上昇させ、再度、横行台車71が荷受け台
33bまで移動して、同様の手順で残りのセグメント3
の半リング分を把持し、後続の移載台車83bへセグメ
ント3を移載する。一方、セグメント3の無くなった荷
受け台33bには、後方の荷受け台からリフタ付き移動
台車39により、自動的にセグメント3が供給される。
セグメント移載装置61によりセグメント3が出荷さ
れ、荷受け台33bに在荷がなくなると、リフタ付き移
動台車39が出荷用荷受け台33bに一番近く、かつ在
荷している荷受け台33まで走行し、定位置で停止した
後、リフタ49をリフトアップし、セグメント3を持ち
上げ、その状態で出荷用荷受け台33bまで走行移動
し、定位置で停止した後、リフトダウンし、出荷用荷受
け台33bにセグメント3を載荷する。荷受け台33に
セグメント3が載荷されているか否かの判別は、リフタ
付き移動台車39の制御盤に入出荷を行った荷受け台位
置情報を記憶させておいたり、各荷受け台33に在荷検
知センサを設置したりして行う。 出荷用荷受け台33
bが空になる都度に前述した動作を繰り返し、在荷中の
荷受け台33から出荷用荷受け台33bへセグメント3
を連続的に自動搬送する。 ここでリフタ付き移動台車
39が出荷用荷受け台33bへセグメント3を搬送する
方式について説明する。このセグメント搬送方式として
は、シャトル方式、順送り方式、混合方式等がある。In the segment transfer device 61, the trolley 7
1. The traveling carriage 67 is composed of a traversing rail 70 and a traveling rail 65.
It moves upward and stops when the traversing carriage 71 comes to the upper part of the loading tray 33b of the unloading line 34b. Then, when the claw 81 is lowered by the elevating device 79 and lowered to the home position, the claw 81 which has been in the “open” state is set to “closed”, so that the segment 3 on the load receiving table 33b is a half ring (3 pieces). Min) grab it. Then, the pawl 81 is raised and stopped when it reaches a predetermined position. Then, the traversing carriage 71 and the traveling trolley 67 move, and stop when the traversing carriage 71 reaches the upper part of the first transfer carriage 83a. In this state, the claw 81 is lowered, and when it reaches the home position, the claw 81 is opened, the grasped segment 3 is released, and the segment is transferred to the transfer carriage 83a. After that, the claw 81 is raised, the traverse carriage 71 is moved to the load receiving tray 33b again, and the remaining segment 3 is subjected to the same procedure.
, And the segment 3 is transferred to the subsequent transfer carriage 83b. On the other hand, segment 3 is automatically supplied from the rear cargo receiving table to the cargo receiving table 33b where segment 3 has disappeared by the movable carriage 39 with lifter.
When the segment 3 is shipped by the segment transfer device 61 and there is no more load on the load receiving table 33b, the lift truck 30 moves to the load receiving table 33 which is closest to the load receiving table 33b. After stopping at a fixed position, the lifter 49 is lifted up, the segment 3 is lifted, and in that state, it travels to the shipping cradle 33b, and after stopping at a fixed position, it is lifted down to the shipping cradle 33b. Load segment 3. Whether or not the segment 3 is loaded on the loading tray 33 is determined by storing the loading tray position information of the loaded / shipped loading tray in the control panel of the lifter-equipped moving carriage 39, or detecting the presence of each loading tray 33. This is done by installing a sensor. Shipping platform 33
The above-mentioned operation is repeated every time when b is emptied, and the segment 3 is transferred from the currently loaded cargo receiving tray 33 to the shipping cargo receiving tray 33b.
Are automatically conveyed continuously. Here, a method in which the lifter-equipped moving carriage 39 conveys the segment 3 to the shipping container 33b will be described. The segment transfer method includes a shuttle method, a progressive method, a mixing method, and the like.
【0032】図6は荷受け台33−1、……33−nを
示すものである。ここで出荷用荷受け台33−nは荷受
け台33bのことである。FIG. 6 shows the receiving trays 33-1 ... 33-n. Here, the shipping receiving table 33-n is the receiving table 33b.
【0033】シャトル方式では、リフタ付き移動台車3
9は、出荷用荷受け台33−nと、在荷荷受け台間を (33−(n−1))→(33−n)→(33−(n−2))→(33−n) →(33−(n−3))→(33−n)→(33−(n−4))→(33−n) ……… (33−2)→(33−n)→(33−1)→(33−n) のように移動して、セグメントの搬送を行う。In the shuttle system, a movable carriage 3 with a lifter
Reference numeral 9 indicates a distance between the shipping cradle 33-n and the existing cargo cradle (33- (n-1)) → (33-n) → (33- (n-2)) → (33-n) → (33- (n-3)) → (33-n) → (33- (n-4)) → (33-n) ... (33-2) → (33-n) → (33-1) ) → (33-n) to move the segment.
【0034】このシャトル方式では、在荷荷受け台から
出荷用荷受け台33bへセグメントを搬送した後の荷受
け台は、すべての搬送が終了するまで空荷のままであ
る。In this shuttle system, after the segments are transported from the existing cargo receiving tray to the shipping cargo receiving tray 33b, the cargo receiving tray remains empty until all the transportation is completed.
【0035】順送り方式では、リフタ付き移動台車39
は、出荷用荷受け台33bと在荷荷受け台の間を (33−(n−1))→(33−n)→(33−(n−2))→ (33−(n−1))→(33−(n−3))→(33−(n−2))→ (33−(n−4))→(33−(n−3))……… (33−2)→(33−3)→(33−1)→ (33−2)→(33−(n−1))……… のように移動して、セグメントの搬送を行う。In the progressive feeding method, the movable carriage 39 with a lifter is used.
Between the shipping cradle 33b and the existing cargo cradle (33- (n-1)) → (33-n) → (33- (n-2)) → (33- (n-1)). → (33- (n-3)) → (33- (n-2)) → (33- (n-4)) → (33- (n-3)) ……… (33-2) → ( 33-3) → (33-1) → (33-2) → (33- (n-1)) ... The segment is transported.
【0036】この順送り方式では、出荷用荷受け台33
b側へ常にセグメント3を詰めて保管していくため、出
荷用荷受け台33bとは反対の荷受け台(荷受け台33
−1)側から順々に空荷の状態となる。したがって、一
列の荷受け台で入出荷を同時に行う場合に適している。
ただし、サイクルタイムはシャトル方式より長くなる。
混合方式とは、シャトル方式と順送り方式を適宜組み
合わせて運用するものである。In this progressive feeding method, the shipping receiving tray 33
Since the segment 3 is always packed and stored on the b side, the cargo receiving tray 33b (the cargo receiving tray 33b) opposite to the shipping cargo receiving tray 33b is stored.
-1) The items become empty one by one from the side. Therefore, it is suitable when receiving and shipping at the same time in one row of the receiving tray.
However, the cycle time is longer than that of the shuttle system.
The mixed method is an operation in which the shuttle method and the progressive method are appropriately combined.
【0037】前述したようにセグメント移載装置61に
より、搬出専用ライン34bの荷受け台33bからセグ
メント3を移載台車83まで搬送し移載する。このセグ
メント移載装置61も自動的に運転が行われる。As described above, the segment transfer device 61 transfers and transfers the segment 3 from the cargo receiving table 33b of the unloading line 34b to the transfer vehicle 83. The segment transfer device 61 is also automatically operated.
【0038】一方、垂直搬送装置86の搬器89は、図
10のH1の位置にあり、搬器89上のレール91と、
レール85とが連続した状態になっている。移載台車8
3は、セグメントを移載してレール85、レール91上
を自動的に走行し、把持装置93下方まで来ると停止す
る。On the other hand, the carrying device 89 of the vertical carrying device 86 is located at the position H1 in FIG.
The rail 85 is in a continuous state. Transfer cart 8
In No. 3, the segment is transferred, the segment automatically travels on the rails 85 and 91, and stops when it reaches the lower side of the gripping device 93.
【0039】この状態で爪95が下降し、定位置まで来
ると予め「開」の状態となっている爪95が「閉」とな
り、爪95により移載台車83上のセグメント3を掴
む。そして、爪95を上昇させる。一方、移載台車83
は、セグメント83が爪95によって把持されると、再
びセグメント移載装置61側に移動し、セグメント移載
装置61により次のセグメントが搬送されるまで待機す
る。In this state, when the claw 95 descends and reaches a fixed position, the claw 95 which is in the "open" state in advance becomes "closed" and the claw 95 grips the segment 3 on the transfer carriage 83. Then, the nail 95 is raised. On the other hand, the transfer cart 83
When the segment 83 is gripped by the claw 95, moves to the segment transfer device 61 side again and waits until the next segment is transferred by the segment transfer device 61.
【0040】搬器89は、昇降ウィンチ99によりガイ
ドフレーム87に沿って下降し、立坑Bの底部で停止
し、軌道式無人搬送台車103がセグメント3を取りに
来るまで待機する。The carrier 89 descends along the guide frame 87 by the elevating winch 99, stops at the bottom of the vertical shaft B, and waits until the track-type automatic guided vehicle 103 comes to pick up the segment 3.
【0041】空荷の軌道式無人搬送台車103は、レー
ル101および搬器89上のレール91を乗り継いで走
行し、搬器89内定位置で停止する。搬器89に搭載さ
れた把持装置93の爪95は、セグメント3を把持した
まま下降し、定位置で爪95を「開」にして掴んだセグ
メント3を解放し、軌道式無人搬送台車103にセグメ
ント3を移載する。その後爪95は上昇し、定位置で停
止する。この垂直搬送装置86の運転も自動的に行われ
る。The empty orbit type automatic guided vehicle 103 transits the rail 101 and the rail 91 on the carrier 89, travels, and stops at a fixed position in the carrier 89. The claws 95 of the gripping device 93 mounted on the transporter 89 descend while holding the segments 3, open the claws 95 in a fixed position to release the grasped segments 3, and move the segment 3 to the track type unmanned carrier 103. Transfer 3 Thereafter, the claws 95 rise and stop at the fixed position. The operation of the vertical transfer device 86 is also automatically performed.
【0042】軌道式無人搬送台車103は、搬器89上
のレール91および地下坑107内のレール101を乗
り継いで、シールド掘削機近傍まで誘導無線を使用した
走行全域通信による自動運転で走行し、セグメント3を
搬送する。The orbit type automatic guided vehicle 103 transits the rail 91 on the carrier 89 and the rail 101 in the underground mine 107, and travels to the vicinity of the shield excavator in an automatic operation by communication over the entire area using guided radio to make a segment. 3 is conveyed.
【0043】一方、空荷となった垂直搬送装置86は、
昇降ウィンチ99によりガイドフレーム87に沿って上
昇し、地上部において前述したのと同様の手順でセグメ
ント3を移載し、立坑B底部まで搬送する。On the other hand, the empty vertical transport device 86
The segment 3 is moved up along the guide frame 87 by the lifting winch 99, and the segment 3 is transferred and transported to the bottom of the shaft B on the ground portion in the same procedure as described above.
【0044】シールド掘削機近傍で軌道式無人搬送台車
103からセグメント3が荷降ろしされると、軌道式無
人搬送台車103は再び立坑Bの底部へ戻り、前述の動
作を繰り返す。When the segment 3 is unloaded from the orbit-type unmanned carrier truck 103 in the vicinity of the shield excavator, the orbit-type unmanned carrier truck 103 returns to the bottom of the shaft B again and repeats the above-mentioned operation.
【0045】このように本実施例においては、地上部か
ら地下坑内のシールド掘削機近辺までセグメント3を自
動的に搬送することができる。As described above, in this embodiment, the segment 3 can be automatically conveyed from the above-ground portion to the vicinity of the shield excavator in the underground mine.
【0046】なお、本発明は種々の変形が可能である。The present invention can be variously modified.
【0047】たとえば、前述した本実施例では、セグメ
ントの搬送について述べたが、仮設配管等の他の資材に
ついても本発明を応用できる。For example, in the above-mentioned embodiment, the transportation of the segment has been described, but the present invention can be applied to other materials such as temporary piping.
【0048】また、前述した実施例では、1台の荷受け
台33が1リング分のセグメントを載荷できるが、この
数値に限定されるものではない。また、メンテナンス等
を考慮して荷受け台33は、1台1台独立して設置され
ているが、連続して(間隔を開けずに)設置することも
できる。作業効率を上げるために、搬入専用ライン34
aと搬出専用ライン34bの2つのラインを設けている
が、単列または2列以上の複数列とすることもできる。
リフタ付き移動台車39は、1列につき1台設置されて
いるが、1列につき複数台または複数列につき1台設置
するようにしてもよい。リフタ付き移動台車39は、油
圧ジャッキ47によりリフタ49が昇降する構造となっ
ているが、カム等を用いた昇降機構を用いて装置自体の
コンパクト化を図ることもできる。Further, in the above-mentioned embodiment, one load receiving table 33 can load one ring of segment, but the number is not limited to this value. Further, although the load receiving bases 33 are individually installed one by one in consideration of maintenance and the like, they can be installed continuously (without a gap). In order to improve work efficiency, a dedicated line 34 for loading
Although two lines, a and the exclusive line 34b for unloading, are provided, the line may be a single line or a plurality of lines of two or more lines.
Although one lifter-equipped moving carriage 39 is installed for each row, a plurality of lifter-equipped moving carriages 39 may be installed for each row or one for each row. Although the lifter-equipped moving carriage 39 has a structure in which the lifter 49 is moved up and down by the hydraulic jack 47, the device itself can be made compact by using an elevating mechanism using a cam or the like.
【0049】前述した実施例では、地上ストックヤード
におけるセグメントの自動保管搬送装置について説明し
たが、地下坑内でセグメントを自動保管搬送することも
できる。In the above-mentioned embodiment, the automatic storage / transportation device for the segment in the above-ground stockyard has been described, but the segment may be automatically stored / transported in the underground pit.
【0050】図12は、この時の地下坑150を示す
図、図13は、図12のD−Dによる断面図である。す
なわち、地下坑150内に荷受け台151が設けられ、
この荷受け台151の下方をリフタ付き移動台車153
が走行可能に設けられる。そして、地下坑150の途中
で架台155が設けられ、架台155上を走行可能なセ
グメント移載装置157が設けられる。一方、セグメン
ト移載装置157から切羽方向に向けて、軌道式無人搬
送台車159が設けられる。FIG. 12 is a view showing the underground pit 150 at this time, and FIG. 13 is a sectional view taken along line DD of FIG. That is, the cargo receiving platform 151 is provided in the underground mine 150,
A movable truck 153 with a lifter is provided below the cargo receiving table 151.
Is provided so that it can travel. A gantry 155 is provided midway in the underground mine 150, and a segment transfer device 157 capable of traveling on the gantry 155 is provided. On the other hand, a track-type unmanned carrier 159 is provided from the segment transfer device 157 in the direction of the cutting face.
【0051】地上ストックヤードと同様の手順で、リフ
タ付き移動台車153によって荷受け台151にセグメ
ント3が載荷される。セグメント移載装置157は、出
荷用荷受け台151bにあるセグメント3を把持して、
これを軌道式無人搬送台車159に載荷する。そして、
軌道式無人搬送台車159は、載荷されたセグメントを
シールド掘削機近傍まで搬送する。The segment 3 is loaded on the load receiving base 151 by the movable carriage 153 with lifter in the same procedure as that of the above-ground stockyard. The segment transfer device 157 holds the segment 3 on the shipping cradle 151b,
This is loaded on the track-type automatic guided vehicle 159. And
The orbit type unmanned transporting vehicle 159 transports the loaded segment to the vicinity of the shield excavator.
【0052】この方式では、地上ストックヤードが不要
で、地上部でのスペースセービングが可能となる。ま
た、セグメントが屋内で保管されるので、セグメントシ
ール部の養生のための上家設備等が不要となる。In this system, the above-ground stockyard is unnecessary, and the space can be saved on the above-ground portion. In addition, since the segments are stored indoors, it is not necessary to have a home facility for curing the segment seal portion.
【0053】なお、架台155、セグメント移載装置1
57および軌道式無人搬送台車159を省略し、リフタ
付き移動台車153で直接シールド掘削機近傍までセグ
メントを搬送することもできる。The frame 155 and the segment transfer device 1
It is also possible to omit the 57 and the orbit type automatic guided vehicle 159, and transport the segment directly to the vicinity of the shield excavator by the movable cart 153 with a lifter.
【0054】[0054]
【発明の効果】以上、詳細に説明したように本発明によ
れば、安全かつ効率的であり、また省力化、省人化を図
ることのできるシールド工法用資機材の自動保管搬送装
置を提供することができる。As described above in detail, according to the present invention, there is provided an automatic storage / transporting apparatus for materials and equipment for the shield construction method, which is safe and efficient, and can save labor and manpower. can do.
【図1】 地上ストックヤード全体の平面図[Fig. 1] Floor plan of the entire ground stock yard
【図2】 図1のF1矢視図FIG. 2 is a view taken in the direction of arrow F1 in FIG. 1;
【図3】 図2のF2矢視図FIG. 3 is a view taken in the direction of arrow F2 in FIG. 2;
【図4】 図1のF3矢視図FIG. 4 is a view taken in the direction of arrow F3 in FIG. 1;
【図5】 リフタ付き移動台車39の側面図FIG. 5 is a side view of the movable cart 39 with a lifter.
【図6】 荷受け台33−1……33−nを示す図FIG. 6 is a diagram showing the receiving trays 33-1 ... 33-n.
【図7】 図1のセグメント移載装置61および立坑B
付近の拡大図7 is a segment transfer device 61 and a shaft B of FIG.
Enlarged view around
【図8】 図6のF4矢視図FIG. 8 is a view on arrow F4 of FIG.
【図9】 図6のF5矢視図FIG. 9 is a view on arrow F5 of FIG.
【図10】 立坑Bの側面図FIG. 10 Side view of shaft B
【図11】 軌道式無人搬送台車103の側面図FIG. 11 is a side view of the orbit type automatic guided vehicle 103.
【図12】 地下坑150を示す図FIG. 12 is a diagram showing an underground pit 150.
【図13】 図12のD−Dによる断面図13 is a sectional view taken along line DD of FIG.
33、151………荷受け台 39、153………リフタ付き移動台車 45………電動機 47………油圧ジャッキ 49………リフタ 33, 151 ..... Receiving stand 39, 153 ..... Mobile truck with lifter 45 ..... Electric motor 47 ..... Hydraulic jack 49 ..... Lifter
───────────────────────────────────────────────────── フロントページの続き (72)発明者 今川 勉 東京都港区元赤坂一丁目3番8号 鹿島 建設株式会社 東京支店内 (72)発明者 橋本 研一 東京都港区元赤坂一丁目2番7号 鹿島 建設株式会社内 (56)参考文献 特開 平4−265400(JP,A) ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Tsutomu Imakawa Tsutomu Imagawa 1-3-8 Moto-Akasaka, Minato-ku, Tokyo Kashima Construction Co., Ltd. Tokyo Branch (72) Kenichi Hashimoto 1-2-2 Moto-Akasaka, Minato-ku, Tokyo No. 7 within Kashima Construction Co., Ltd. (56) Reference JP-A-4-265400 (JP, A)
Claims (3)
材を自動的に搬入、搬出する走行台車と、 を具備するシールド工法用資機材の自動保管搬送装置。1. A shield construction method comprising: a plurality of loading trays for storing materials and equipment; and a traveling carriage capable of transporting the materials and equipment and traveling, and automatically loading and unloading the materials and equipment into and from the loading tray. Automatic storage and transportation device for materials and equipment.
脚を有し、前記一対の脚の上端で前記資機材を支持して
保管する請求項1記載のシールド工法用資機材の自動保
管搬送装置。2. The automatic equipment for shield construction method according to claim 1, wherein the cargo receiving stand has a pair of legs erected on the ground, and the upper ends of the pair of legs support and store the materials and equipment. Storage and transportation device.
資機材を搬入搬出する請求項1記載のシールド工法用資
機材の自動保管搬送装置。3. The cart has a lifter for loading materials and materials, and an elevating means for raising and lowering the lifters, and carries in and out the materials and materials from the lower side of the cargo receiving table to the cargo receiving table. An automatic storage and transportation device for the materials and equipment for the shield construction method described in 1.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4300509A JP2560184B2 (en) | 1992-10-13 | 1992-10-13 | Equipment for automatic storage and transportation of materials and equipment for the shield construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4300509A JP2560184B2 (en) | 1992-10-13 | 1992-10-13 | Equipment for automatic storage and transportation of materials and equipment for the shield construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH06129196A JPH06129196A (en) | 1994-05-10 |
JP2560184B2 true JP2560184B2 (en) | 1996-12-04 |
Family
ID=17885676
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP4300509A Expired - Fee Related JP2560184B2 (en) | 1992-10-13 | 1992-10-13 | Equipment for automatic storage and transportation of materials and equipment for the shield construction method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2560184B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111779513B (en) * | 2020-08-25 | 2022-01-07 | 中国铁建大桥工程局集团有限公司 | Duct piece conveying device for subway shield tunnel construction |
-
1992
- 1992-10-13 JP JP4300509A patent/JP2560184B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH06129196A (en) | 1994-05-10 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS6040304A (en) | Housing system | |
CN204917301U (en) | Load handling device is deposited to goods railway carriage or compartment intelligence | |
JP2592199B2 (en) | Automatic transfer equipment for materials and equipment for shield method | |
JP2560184B2 (en) | Equipment for automatic storage and transportation of materials and equipment for the shield construction method | |
JP2644150B2 (en) | Automatic transfer equipment for materials and equipment for shield method | |
JP2592200B2 (en) | Vertical transport equipment for materials for shield method in shafts | |
JP3029076B2 (en) | Automatic transfer storage equipment for shield construction materials | |
JPH06129198A (en) | In-shaft vertical conveying device for shield construction material and equipment | |
JPH02194297A (en) | Method for automatically carrying material in shielded processing method | |
JP2015193435A (en) | Container terminal and employment method of it | |
JPH02122014A (en) | High efficient degassing apparatus | |
CN221093475U (en) | Goods lift by crane transport transfer chain | |
JPH0818648B2 (en) | Temporary storage / import facility for tunnel segment | |
JP3765128B2 (en) | Segment transport device | |
JP3210604B2 (en) | Transport trolley operating device | |
JPS5831827A (en) | Conveying apparatus for articles loaded on conveying trucks | |
JPH09217600A (en) | Method for conveying material for work inside tunnel shaft, and device for alternate passage of conveying truck inside tunnel shaft | |
JPS5811794Y2 (en) | Container loading/unloading bridge | |
JPH1136796A (en) | Handling device for work and storage and transportation system therefor | |
JPH0733379A (en) | Long material shifting device | |
CN116395426A (en) | Automatic discharging and stacking system for associated radioactive waste residue bags | |
JPH06179506A (en) | Conveying/floor placing storage device | |
JPS63189325A (en) | Unloading conveying device | |
JP2926104B2 (en) | Storage facilities for materials for shielding work | |
JP2571510Y2 (en) | Transport yard for slit coil |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080919 Year of fee payment: 12 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110919 Year of fee payment: 15 |
|
LAPS | Cancellation because of no payment of annual fees |