JP2543644B2 - Connecting pin for scaffolding frame - Google Patents
Connecting pin for scaffolding frameInfo
- Publication number
- JP2543644B2 JP2543644B2 JP4059490A JP5949092A JP2543644B2 JP 2543644 B2 JP2543644 B2 JP 2543644B2 JP 4059490 A JP4059490 A JP 4059490A JP 5949092 A JP5949092 A JP 5949092A JP 2543644 B2 JP2543644 B2 JP 2543644B2
- Authority
- JP
- Japan
- Prior art keywords
- engaging
- pin body
- projection
- pin
- scaffolding
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Description
【0001】[0001]
【産業上の利用分野】本発明は、順次上方に連結してい
くのに適した仮設用足場建枠の連結ピンに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a connecting pin for a scaffolding construction frame for temporary construction, which is suitable for sequentially connecting upwards.
【0002】[0002]
【従来の技術】建物の建築現場において、足場建枠を順
次上方に組み立てていくには、当然に上下に対抗する足
場建枠を互いに連結するための連結手段を必要とする。2. Description of the Related Art In a construction site of a building, in order to sequentially assemble the scaffold building frames upward, it is naturally necessary to provide a connecting means for connecting the scaffold building frames facing each other vertically.
【0003】従来では、この連結手段として下方側の足
場建枠左右上端部に連結ピンを突設し、これに上方側の
足場建枠の左右下端部を差し込み、しかる後、両者間に
わたって略弓状の抜け止め用ロックアームをその側面よ
り係止して両者を互いに連結するタイプのものや、例え
ば実開平1ー131753号公報に示すように上下の足
場建枠間に連結ピンを遊嵌し、連結ピンを所要角度回転
させることによって足場建枠と連結ピンとに設けた凹凸
部を互いに係合させて上下の足場建枠を連結ピンの回転
操作によって互いに連結するタイプのものが提案されて
いる。Conventionally, as this connecting means, connecting pins are provided at the upper and lower ends of the scaffolding building frame on the lower side, and the left and right lower end parts of the upper side scaffolding frame are inserted into the connecting pins. Of a type in which a locking arm for preventing slipping is locked from the side surface to connect the both, or, for example, a connecting pin is loosely fitted between upper and lower scaffolding building frames as shown in Japanese Utility Model Laid-Open No. 1-131753. , A type has been proposed in which the scaffolding building frame and the connecting and recessing portions provided on the connecting pin are engaged with each other by rotating the connecting pin by a required angle, and the upper and lower scaffolding building frames are connected to each other by rotating the connecting pin. .
【0004】[0004]
【発明が解決しようとする課題】上記従来技術にあって
は、何れも下方側の足場建枠の連結ピンに上方側の足場
建枠を差し込む作業とは別個に、これらの上下の足場建
枠を保持しながら両者間の左右にロックアームを係止す
る作業や、両者間の左右の連結ピンを回転操作する作業
が必要であり、連結作業を行うために少なくとも二人の
作業者を必要としたり、連結作業が面倒で能率的でない
という問題があった。In each of the above-mentioned prior arts, in addition to the work of inserting the upper scaffolding frame into the connecting pins of the lower scaffolding frame, these upper and lower scaffolding frames are separately provided. It is necessary to lock the lock arm to the left and right between the two while holding, and to rotate the left and right connecting pins between them, and at least two workers are required to perform the connecting work. However, there is a problem that the connecting work is troublesome and inefficient.
【0005】本発明は、これらの難点を払拭することを
解決課題とする。The present invention has an object to solve these problems.
【0006】[0006]
【課題を解決するための手段】本発明は上記の難点を解
決するために、実施例に示す参照符号を付して示せば、
請求項1にあっては、管状等の中空状のピン本体1に、
その側面より突出すると共にその側面からピン本体1の
内部に退入自在な係合突起2と、該突起2をピン本体1
の側面より突出付勢するばね3とを内蔵し、係合突起2
には、該突起2をばね3の付勢力に抗してピン本体1の
内部に退入力を負荷するための滑り面4と、該滑り面4
の途上に形成され、前記係合突起2をピン本体1の内部
方向の退 入位置に係合するための係合段部8と、前記係
合突起2がピン本体1の側面より突出する時には足場建
枠に係合すると共に該係合突起2をばね3の付勢力に抗
して押圧操作することによって足場建枠に対する係合を
解除する係合面5とを設けてなる構成を採用するもので
ある。In order to solve the above-mentioned problems, the present invention is provided with the reference numerals shown in the embodiments,
According to claim 1, the hollow pin body 1 such as a tubular body is provided with
An engaging projection 2 protruding from the side surface and capable of retracting from the side surface into the inside of the pin body 1, and the projection 2 on the pin body 1
And a spring 3 for urging and projecting from the side surface of the
The sliding surface 4 for loading the retraction force inside the pin body 1 against the urging force of the spring 3 by the protrusion 2, and the sliding surface 4
Formed on the way to the inside of the pin body 1
The engaging step portion 8 for engaging with the retracted position in the direction, and when the engaging projection 2 projects from the side surface of the pin body 1, the engaging projection 2 engages with the scaffolding frame and the engaging projection 2 of the spring 3 is engaged. A structure is provided in which an engagement surface 5 that releases the engagement with the scaffolding construction frame by pressing it against the urging force is adopted.
【0007】また請求項2にあっては、前記係合突起2
には、ピン本体1に常時係合して係合突起2の軸方向に
直交する横方向への変位を阻止するガイド突起6を一体
形成してなる請求項1記載の構成を採用するものであ
る。Further, in the present invention, the engaging projection 2
The guide protrusion 6 integrally formed with the pin body 1 for preventing displacement of the engagement protrusion 2 in the lateral direction orthogonal to the axial direction is integrally formed with the pin body 1. is there.
【0008】また請求項3にあっては、前記ガイド突起
6は、ピン本体1の内壁に沿って軸方向に延びる連杆部
7を介して前記係合突起2に一体形成されてなる請求項
2記載の構成を採用するものである。According to a third aspect of the present invention, the guide projection 6 is formed integrally with the engagement projection 2 via a connecting rod portion 7 extending in the axial direction along the inner wall of the pin body 1. The configuration described in 2 is adopted.
【0009】また請求項4にあっては、前記係合突起2
の上記滑り面4の後端部に連続して、係合突起2の突出
時にピン本体1に係止して係合突起2の軸方向の負荷を
受け止める係止面部19を設けてなる請求項1〜3のい
ずれか記載の足場建枠用連結ピン。Further, according to a fourth aspect, the engaging projection 2
7. A locking surface portion 19 is provided continuously with the rear end of the sliding surface 4 for locking the pin body 1 when the engaging projection 2 is projected to receive the axial load of the engaging projection 2. The scaffolding frame connecting pin according to any one of 1 to 3.
【0010】また請求項5にあっては、前記係合突起2
の上記係合面5の先端部に連続して、該突起2をばね3
の付勢力に抗してピン本体1の内部に退入力を負荷する
ための副滑り面9を設けてなる請求項1〜4のいずれか
記載の構成を採用するものである。Further, in the present invention, the engaging projection 2
Continuing on from the tip of the engaging surface 5 of the
The sub-sliding surface 9 for loading the retraction force is provided inside the pin body 1 against the biasing force of the above.
【0011】[0011]
【作用】本発明の請求項1によれば、下方側足場建枠b
の竪パイプ10にその下端側を連結したピン本体1に、
上方側足場建枠aの竪パイプ10の下端部を差し込むこ
とによって、その差し込み途上で、係合突起3の滑り面
4に竪パイプ10の下端部が当接して該当接力によって
滑り面4に該突起2をばね3の付勢力に抗してピン本体
1の内部に退入力を負荷し、係合突起2はピン本体1の
内部に退入することになるから、竪パイプ10の下端部
が下方側のピン本体1に挿入されるのを許し、しかして
上方側竪パイプ10の下端部側面の係合孔11に下方側
竪パイプ10の係合突起2が面する位置まで挿入される
と、係合突起2は上方側竪パイプ10の退入付勢力から
開放されるため、係合突起2はばね3に付勢されて突出
して前記係合孔11に係合し、即ち、係合突起2の係合
面5に係合孔11の内縁が係合して上下の足場建枠a,
bは互いに連結されることになる。即ち、上方側竪パイ
プ10の下端部を下方側竪パイプ10のピン本体1に差
し込むだけで、両者は自動的に連結されることになる。According to claim 1 of the present invention, the lower scaffold building frame b
To the pin body 1 whose lower end side is connected to the vertical pipe 10 of
By inserting the lower end portion of the vertical pipe 10 of the upper side scaffolding frame a, the lower end portion of the vertical pipe 10 comes into contact with the sliding surface 4 of the engaging projection 3 during insertion, and the sliding surface 4 is contacted by the corresponding contact force. Since the projection 2 is loaded into the pin body 1 against the urging force of the spring 3 and the engagement projection 2 retracts into the pin body 1, the lower end of the vertical pipe 10 is It is allowed to be inserted into the lower pin body 1, and when it is inserted to a position where the engaging protrusion 2 of the lower vertical pipe 10 faces the engaging hole 11 of the lower end side surface of the upper vertical pipe 10. Since the engaging protrusion 2 is released from the retreating urging force of the upper vertical pipe 10, the engaging protrusion 2 is urged by the spring 3 and protrudes to engage with the engaging hole 11, that is, the engaging The inner surface of the engaging hole 11 engages with the engaging surface 5 of the projection 2 so that the upper and lower scaffold building frames a,
b will be connected to each other. That is, simply inserting the lower end of the upper vertical pipe 10 into the pin body 1 of the lower vertical pipe 10 will automatically connect the two.
【0012】また請求項1によれば、前記係合突起2の
上記滑り面4の途上に、該係合突起2をピン本体1の内
部方向の退入位置に係合するための係合段部8を形成し
てなるため、該係合突起2を直接にピン本体1の内部方
向に押圧操作するだけで、係合突起2をピン本体1の内
部に退入した状態に維持することができ、上方側の足場
建枠を下方側の足場建枠から簡単に分解することができ
る。Further, according to claim 1, an engaging step for engaging the engaging projection 2 with the retracted position of the pin body 1 in the inward direction is provided on the way of the sliding surface 4 of the engaging projection 2. Since the portion 8 is formed, the engaging projection 2 can be maintained in the retracted state inside the pin body 1 only by directly pressing the engaging projection 2 inward of the pin body 1. The scaffolding frame on the upper side can be easily disassembled from the scaffolding frame on the lower side.
【0013】なおまた係合突起2の係合段部8がピン本
体1の内周面23に係合して係合突起2が退入位置にあ
る状態で、再度、足場建枠aをピン本体1に差し込むこ
とによって、その差し込み途上で該足場建枠aの下端部
が係合突起2の若干突出している先端部を下方に押圧
し、これがために係合突起2の係合段部8はピン本体1
の内周面22から外れてその退入位置の状態から解除さ
れるため、係合突起2はピン本体1の側面から突出し、
足場建枠aの差し込み途上において係合突起2は足場建
枠aの係合孔11に自動的に係合することになる。Further, with the engagement step portion 8 of the engagement protrusion 2 engaged with the inner peripheral surface 23 of the pin body 1 and the engagement protrusion 2 in the retracted position, the scaffolding frame a is pinned again. By inserting into the main body 1, the lower end of the scaffolding construction frame a pushes the slightly projecting tip of the engaging projection 2 downward during insertion, which causes the engaging step 8 of the engaging projection 2. Is the pin body 1
Since it disengages from the inner peripheral surface 22 and is released from the retracted position, the engaging projection 2 projects from the side surface of the pin body 1,
The engaging protrusions 2 automatically engage with the engaging holes 11 of the scaffolding frame a while the scaffolding frame a is being inserted.
【0014】また請求項2によれば、前記係合突起2は
ガイド突起6によって横方向への変位を阻止するように
ピン本体1に支持されているため、竪パイプ10の負荷
を受けても、ピン本体1の側面からの突出作動やピン本
体1内部への退入作動を正確に行うことができると共
に、係合突起2の竪パイプ10に対する係合状態を良好
に維持することができる。According to the second aspect of the present invention, since the engaging projection 2 is supported by the pin body 1 by the guide projection 6 so as to prevent lateral displacement, even if the vertical pipe 10 receives a load. It is possible to accurately perform the projecting operation from the side surface of the pin body 1 and the retracting operation to the inside of the pin body 1, and it is possible to maintain the engagement state of the engagement protrusion 2 with the vertical pipe 10 in a good condition.
【0015】また請求項3によれば、係合突起2は連杆
部7を介してガイド突起6と一体構造物12に形成され
ているため、上方側足場建枠からの外力を強力に受け止
める作用を発揮する。Further, according to claim 3, since the engaging projection 2 is formed on the integrated structure 12 with the guide projection 6 via the connecting rod portion 7, the external force from the upper side scaffolding frame is strongly received. Exert an effect.
【0016】また請求項4によれば、前記係合突起2の
上記滑り面4の後端部に連続して、係合突起2の突出時
にピン本体1に係止して係合突起2の軸方向の負荷を受
け止める係止面部19を設けてなるため、係合突起2が
ばね3に付勢されて突出することによって係合突起2が
直接的にピン本体1に係止してその軸方向の負荷、従っ
て足場建枠aの引き抜き方向の荷重を受け止めることに
なるから、その係止作用を確実に行うことになる。According to a fourth aspect of the present invention, the engagement protrusion 2 is continuously connected to the rear end of the sliding surface 4 of the engagement protrusion 2 and is engaged with the pin body 1 when the engagement protrusion 2 is projected. Since the engaging surface portion 19 for receiving the axial load is provided, the engaging projection 2 is biased by the spring 3 and protrudes, so that the engaging projection 2 is directly engaged with the pin body 1 and the shaft thereof. Since the load in the direction, that is, the load in the pulling-out direction of the scaffolding frame a is received, the locking action is surely performed.
【0017】また請求項5によれば、前記係合突起2の
上記係合面5に連続して、該突起2をばね3の付勢力に
抗してピン本体1の内部に退入力を負荷するための副滑
り面9を設けてなるため、係合突起2が前記係合段部8
の作用によってピン本体1の内部に退入した状態におい
て、係合突起2の先端部がピン本体1の側面から若干量
突出していても、竪パイプ10のピン本体1からの引き
抜き時に該副滑り面9の作用によって係合突起2をばね
3の付勢力に抗してピン本体1の内部に退入させるよう
になっているため、竪パイプ10をピン本体1から支障
なく引き抜くことができる。According to a fifth aspect of the present invention, a repulsive force is applied to the inside of the pin body 1 continuously from the engaging surface 5 of the engaging protrusion 2 against the biasing force of the spring 3. Since the sub-sliding surface 9 is provided for the purpose of
When the vertical pipe 10 is pulled out from the pin body 1 even if the tip portion of the engaging projection 2 slightly protrudes from the side surface of the pin body 1 in the state of retracting inside the pin body 1 due to the action of By the action of the surface 9, the engaging projection 2 is made to retract into the pin body 1 against the biasing force of the spring 3, so that the vertical pipe 10 can be pulled out from the pin body 1 without any trouble.
【0018】[0018]
【実施例】図1は、上方側の足場建枠aと下方側足場建
枠bとの連結前の状態を示し、足場建枠は、左右の竪パ
イプ10,10と両パイプ10,10をつなぐ横パイプ
13と縦横パイプ10,13間にわたって取り付けられ
る補強桟14,14とからなり、横パイプ13に足場板
15がその爪15aを横パイプ13に掛合することによ
って懸架されている。そして竪パイプ10,10の下端
部には足場板15側に面して係合孔11が穿設されてお
り、上下の竪パイプ10,10の間に本発明に係る連結
ピン16が差し込まれるようになっている。EXAMPLE FIG. 1 shows a state before the scaffolding frame a on the upper side and the scaffolding frame b on the lower side are connected to each other. It consists of a horizontal pipe 13 to be connected and reinforcing bars 14, 14 mounted between the vertical and horizontal pipes 10, 13, and a scaffolding plate 15 is suspended on the horizontal pipe 13 by engaging its claws 15a with the horizontal pipe 13. An engaging hole 11 is formed at the lower end of the vertical pipes 10, 10 facing the scaffolding plate 15 side, and the connecting pin 16 according to the present invention is inserted between the upper and lower vertical pipes 10, 10. It is like this.
【0019】なお、連結ピン16のピン本体1の下端部
付近にはその側面より突出する連結用突起17が設けら
れ、下方側竪パイプ10、10の上端部付近には前記連
結用突起8が係合する連結孔18が穿設されている。A connecting projection 17 is provided near the lower end of the pin body 1 of the connecting pin 16 so as to project from its side surface, and the connecting projection 8 is provided near the upper ends of the lower vertical pipes 10, 10. A connecting hole 18 that engages is formed.
【0020】図2は、連結ピン16が上下の足場建枠
a、bの竪パイプ10,10間に差し込まれた状態の外
観を示し、図3は、連結ピン16の内部構造を示す。連
結ピン16は全体が上下に貫通する管状のピン本体1を
有し、そのピン中央部1aが肉圧に形成されてピン上部
1bとピン下部1cとの間に外周段部1d,1eが形成
され、ピン上部1bに差し込まれる上方側足場建枠aの
竪パイプ10とピン下部1cに差し込まれる下方側足場
建枠bの竪パイプ10とはそれぞれの端面が外周段部1
d,1eに当接して位置決めされ、その位置で竪パイプ
10下端部の係合孔11にピン本体1から突出する係合
突起2が係合すると共に、下方側足場建枠bの竪パイプ
10上端部の連結孔18にピン本体1の連結用突起17
が係合するようになっている。FIG. 2 shows the external appearance of the connecting pin 16 inserted between the vertical pipes 10, 10 of the upper and lower scaffold building frames a, b, and FIG. 3 shows the internal structure of the connecting pin 16. The connecting pin 16 has a tubular pin main body 1 which penetrates vertically in its entirety, and the pin central portion 1a is formed by meat pressure to form outer peripheral step portions 1d and 1e between the pin upper portion 1b and the pin lower portion 1c. The vertical pipe 10 of the upper scaffolding frame a inserted into the pin upper portion 1b and the vertical pipe 10 of the lower scaffolding frame b inserted into the pin lower portion 1c have their respective end surfaces at the outer peripheral step portion 1.
d, 1e are positioned, and the engaging projections 2 projecting from the pin main body 1 engage with the engaging holes 11 at the lower end of the vertical pipe 10 at that position, and the vertical pipe 10 of the lower scaffolding building frame b is engaged. The projection 17 for connecting the pin body 1 is provided in the connecting hole 18 at the upper end.
Are to be engaged.
【0021】係合突起2は、特に図4に良く示されるよ
うにその先端部の上面側に平坦なあるいは若干アール状
の下向きの傾斜面に形成されてなる滑り面4を有し、こ
の滑り面4の後端部に連続して水平な係止面部19を有
し、更に係合突起2の下面側には前記係止面部19と平
行な係合面5を有し、この係合面5の先端部に連続して
上向きの傾斜面である副滑り面9を有している。また該
係合突起2は、その基端部から下方に延びる連杆部7と
連杆部7の下端部から係合突起2と同方向に該突起2よ
り短く突出するガイド突起6とを一体に形成して略コ字
状の肉厚な金属製の一体構造物12に形成してあり、そ
の背面側に略コ字状の板ばね3の一端部をかしめ止めま
たはスポット溶接によって固着するか、あるいはその背
面側に設けた突起に板ばね3に設けた小孔を係合するな
どして両者を連携し、板ばね3の他端部をピン上部2b
の内周面に固定することなく当接せしめ、これによって
金属製一体構造物12を構成する係合突起2は板ばね3
に付勢されてピン本体1のピン上部1bの側面から突出
するとともに、ガイド突起6はピン本体1の肉厚部1a
のガイド孔20に常時係合するようになっている。な
お、ガイド突起6は肉厚部1aの肉厚内に没入しておく
ことが好ましいが、若干量その先端部が肉厚部1aの外
側面から突出してもよい。As shown in FIG. 4 in particular, the engaging projection 2 has a sliding surface 4 formed on the upper surface side of the tip end thereof as a flat or slightly rounded downward sloping surface. The rear end of the surface 4 has a horizontal engaging surface portion 19, and an engaging surface 5 parallel to the engaging surface portion 19 is provided on the lower surface side of the engaging protrusion 2. 5 has a sub-sliding surface 9 that is an upwardly inclined surface that is continuous with the tip end portion of 5. In addition, the engaging projection 2 is integrally formed with a connecting rod portion 7 extending downward from a base end portion thereof and a guide projection 6 protruding from a lower end portion of the connecting rod portion 7 in the same direction as the engaging projection 2 and shorter than the protrusion 2. Is formed into a substantially U-shaped thick metal monolithic structure 12, and one end of the substantially U-shaped leaf spring 3 is fixed to the back side thereof by caulking or spot welding. Alternatively, a small hole provided in the leaf spring 3 is engaged with a protrusion provided on the back side thereof to cooperate with each other, and the other end of the leaf spring 3 is connected to the pin upper portion 2b.
It is brought into contact with the inner peripheral surface of the metal plate without being fixed, so that the engaging projections 2 constituting the metal integrated structure 12 are the leaf springs 3.
Of the pin body 1 is protruded from the side surface of the pin upper portion 1b of the pin body 1, and the guide protrusion 6 is formed by the thick portion 1a of the pin body 1.
The guide hole 20 is always engaged. It is preferable that the guide protrusion 6 is immersed in the thickness of the thick portion 1a, but the tip portion may slightly project from the outer surface of the thick portion 1a.
【0022】なおまた係合突起2の滑り面4には、後述
のように重要な作用を有する係合段部8が設けられてい
る。The sliding surface 4 of the engaging projection 2 is provided with an engaging step portion 8 having an important function as described later.
【0023】またピン本体1のピン下部1c側の連結用
突起17は左右に一対設けられ、両連結用突起17は同
じく断面略U字状の板ばね21によってその両端部が上
述のように固着または係合によって互いに連携され、両
連結用突起17は板ばね21によってピン下部1cの側
面から突出付勢されている。Further, a pair of connecting protrusions 17 on the pin lower portion 1c side of the pin body 1 are provided on the left and right, and both connecting protrusions 17 are fixed at both ends by a leaf spring 21 having a substantially U-shaped cross section as described above. Alternatively, they are linked with each other by engagement, and the connecting projections 17 are biased by the leaf spring 21 so as to project from the side surface of the pin lower portion 1c.
【0024】使用時には、先ずピン本体1のピン下部1
cを、その側面より突出する連結用突起17を板ばね2
1の付勢力に抗してピン本体1の内部に退入せしめた状
態で下方側足場建枠bの竪パイプ10の上端部に差し込
み、連結用突起17を竪パイプ10の連結孔18に係合
させる。これによってピン本体1は竪パイプ10の上端
部に取りつけられ、以後は不使用時でも取り外す必要は
ない。In use, first, the pin lower portion 1 of the pin body 1
c is a leaf spring 2 having a connecting protrusion 17 protruding from its side surface.
1 is inserted into the upper end of the vertical pipe 10 of the lower scaffolding building frame b in a state of being retracted into the pin body 1 against the urging force of 1, and the connecting projection 17 is engaged with the connecting hole 18 of the vertical pipe 10. To combine. As a result, the pin body 1 is attached to the upper end portion of the vertical pipe 10, and thereafter it is not necessary to remove it even when it is not used.
【0025】次に図5に示すように、上方側足場建枠a
の竪パイプ10を下方側足場建枠bに取りつけてあるピ
ン本体1のピン上部1bに差し込むことによって、その
差し込み途上で係合突起2の先端部傾斜面たる滑り面4
に上記竪パイプ10の下端部が当接し、これによって係
合突起2は板ばね3の付勢力に抗してピン本体1の内部
に退入させるような負荷を受け、この退入付勢力によっ
て係合突起2はピン本体1の内部に退入して竪パイプ1
0の下端部がピン本体1のピン上部1bに段部1dに当
接するまで挿入されるのを許し、しかして竪パイプ10
の下端部が段部1dに当接することによって竪パイプ1
0側面の係合孔11にピン本体1の係合突起2が面する
ことになり、係合突起2は竪パイプ10の退入付勢力か
ら開放されるため、係合突起2は板ばね3に付勢されて
突出して前記係合孔11に係合し、その係合面5が係合
孔11の内縁に当接することによって抜き出し不能とな
り、上下の足場建枠a,bは互いに連結されることにな
る。即ち、上方側足場建枠aの竪パイプ10下端部を下
方側足場建枠bのピン本体1に差し込むだけで、両者は
自動的に連結されることになる。なお、係合突起2は前
述のように肉厚な金属製一体物12に形成され、図2に
示すように正面視矩形状を呈しているので、これが係合
する竪パイプ側係合孔11は図2に示すように上下に若
干余裕を持って同様の矩形状に形成されることが、少な
くとも係合孔11の下側内縁が直線状に形成されること
が、がたつき防止の上からも好ましい。Next, as shown in FIG. 5, the upper side scaffolding frame a
The vertical pipe 10 is inserted into the pin upper portion 1b of the pin body 1 attached to the lower scaffolding building frame b, so that the sliding surface 4 that is the tip end inclined surface of the engaging projection 2 is inserted in the middle of the insertion.
The lower end of the vertical pipe 10 comes into contact with the engaging portion 2 and the engaging projection 2 receives a load that causes it to retract into the pin body 1 against the biasing force of the leaf spring 3, and this retracting biasing force causes the engaging protrusion 2 to retract. The engaging protrusion 2 is retracted into the pin body 1 to move the vertical pipe 1
The lower end portion of 0 is allowed to be inserted into the upper pin portion 1b of the pin body 1 until it abuts on the step portion 1d.
When the lower end of the vertical pipe 1 abuts on the stepped portion 1d, the vertical pipe 1
The engaging protrusion 2 of the pin body 1 faces the engaging hole 11 on the 0 side surface, and the engaging protrusion 2 is released from the retracting biasing force of the vertical pipe 10. The upper and lower scaffolding frames a and b are connected to each other by being urged to project to engage with the engaging hole 11 and the engaging surface 5 abuts the inner edge of the engaging hole 11 so that it cannot be extracted. Will be. That is, the both ends are automatically connected only by inserting the lower end of the vertical pipe 10 of the upper scaffolding frame a into the pin body 1 of the lower scaffolding frame b. Since the engagement protrusion 2 is formed on the thick metal integrated body 12 as described above and has a rectangular shape in a front view as shown in FIG. 2, the vertical pipe side engagement hole 11 with which the engagement protrusion 2 engages is formed. As shown in FIG. 2, it may be formed in a similar rectangular shape with some allowance in the upper and lower sides, or at least the lower inner edge of the engagement hole 11 may be formed in a straight shape to prevent rattling. Is also preferable.
【0026】本発明の実施例によれば、風力や振動その
他の外力を受けて上方側足場建枠aの竪パイプ10がピ
ン本体1から抜け出ようとする力が係合面5に負荷する
と、これを阻止する抜け止め力は、ばね3によって直接
的に突出付勢される係合突起2の係合面5が担っている
ので、確実に竪パイプ10をピン本体1に係止すること
ができる。According to the embodiment of the present invention, when the vertical pipe 10 of the upper scaffolding building frame a tends to come out of the pin body 1 due to an external force such as wind force, vibration, etc., the engaging surface 5 is loaded with the force. Since the engaging surface 5 of the engaging projection 2 which is directly biased by the spring 3 to project the retaining force to prevent this, the vertical pipe 10 can be reliably locked to the pin body 1. it can.
【0027】また本発明の実施例によれば、係合突起2
は、これと一体のガイド突起6がピン本体1に常時係合
して係合突起2の横方向の変位を阻止されるようになっ
ているため、その係合面5での係合作用を確実に維持す
ることができ、更には係合突起2とガイド突起6とは連
杆部7を介して剛体たる金属製の一体構造物12に形成
されているため、より安定した抜け止め力を維持するこ
とができる。Further, according to the embodiment of the present invention, the engaging projection 2
Since the guide protrusion 6 integrated with the pin is always engaged with the pin body 1 to prevent the lateral displacement of the engaging protrusion 2, the engaging action on the engaging surface 5 is prevented. Since the engaging projection 2 and the guide projection 6 can be reliably maintained and are formed on the metal integral structure 12 which is a rigid body via the connecting rod portion 7, a more stable retaining force can be obtained. Can be maintained.
【0028】また本発明の実施例は、上方側足場建枠a
を下方側足場建枠bから取り外す場合に、その取り外す
作業が非常に簡単に行えることを特徴とする。即ち、図
7に示すように滑り面4には前述のように係合段部8が
形成されており、係合突起2を例えば作業者の足先によ
って板ばね3の付勢力に抗して矢印のように若干上方側
に且つ退入方向に押圧すれば、係合突起2は、ガイド突
起6のピン本体1に対する当接点22を支点としてピン
本体1の内部に退入すると共に、その退入途上で係合段
部8はピン本体1の内周面23に係合し、その後係合突
起2に対する押圧力を開放しても該係合突起2は係合段
部8の係合作用によってその退入位置に維持されること
になる。なお、係合突起2の係合段部8がピン本体1の
内周面23に係合して係合突起2を退入位置に維持させ
る場合であってもその先端部、即ち係合突起2の滑り面
4の先端部はピン本体1の側面より突出するようにして
ある。In the embodiment of the present invention, the upper scaffolding frame a
When removing from the lower scaffold building frame b, the removing work can be performed very easily. That is, as shown in FIG. 7, the sliding surface 4 is formed with the engaging stepped portion 8 as described above, and the engaging projection 2 is resisted against the biasing force of the leaf spring 3 by the tip of the operator, for example. When pressed slightly upward as shown by the arrow and in the retreating direction, the engaging projection 2 retreats into the pin body 1 with the contact point 22 of the guide projection 6 on the pin body 1 as a fulcrum, and the retreat thereof. The engaging step portion 8 engages with the inner peripheral surface 23 of the pin body 1 on the way of entry, and even if the pressing force on the engaging protrusion 2 is released thereafter, the engaging protrusion 2 engages with the engaging step portion 8. Will be maintained in the retracted position. Even when the engagement step portion 8 of the engagement protrusion 2 is engaged with the inner peripheral surface 23 of the pin body 1 to maintain the engagement protrusion 2 at the retracted position, the tip portion thereof, that is, the engagement protrusion. The tip end of the sliding surface 4 of 2 is projected from the side surface of the pin body 1.
【0029】このようにして上方側竪パイプ10は、そ
の係合孔11が係合突起2の係合から開放されるから該
パイプ10をピン本体1から抜き出せばよいことにな
る。In this way, the upper vertical pipe 10 has its engaging hole 11 released from the engagement of the engaging projection 2, so that the pipe 10 can be pulled out from the pin body 1.
【0030】なおまた、係合突起2がその係合段部8の
作用でピン本体1の内部に退入した状態に維持される場
合に、その先端部までもピン本体1の外側面に突出しな
いように配慮する必要はなく、たとえ係合突起2の先端
部がピン本体1の外側面から突出していても本発明の実
施例によれば、係合突起2の前記係合面5に連続して上
向きの傾斜面である副滑り面9を設けてなるため、竪パ
イプ10をピン本体1のピン上部1bから引き抜くと
き、その引き抜き途上で副滑り面9に竪パイプ10の係
合孔11の内縁が当接し、これによって係合突起2は板
ばね3の付勢力に抗してピン本体1の内部に退入させる
ような負荷を受け、この退入付勢力によって係合突起2
はピン本体1の内部に退入して竪パイプ10の下端部が
ピン本体1のピン上部1bからの引き抜きを許すことに
なる。When the engagement projection 2 is maintained in the state of retracting into the pin body 1 by the action of the engagement step portion 8, the tip of the engagement projection 2 also protrudes to the outer surface of the pin body 1. According to the embodiment of the present invention, even if the tip of the engaging projection 2 projects from the outer surface of the pin body 1, it is continuous with the engaging surface 5 of the engaging projection 2. Since the sub-sliding surface 9 which is an upward inclined surface is provided, when the vertical pipe 10 is pulled out from the pin upper portion 1b of the pin body 1, the sub-sliding surface 9 is engaged with the engaging hole 11 of the vertical pipe 10 during the pulling-out process. The inner edge of the pin abuts, whereby the engaging projection 2 receives a load that resists the biasing force of the leaf spring 3 and causes it to retract into the inside of the pin main body 1.
Will retreat into the pin body 1 and the lower end of the vertical pipe 10 will allow the pin body 1 to be pulled out from the pin upper portion 1b.
【0031】そして再び下方側の足場建枠bに取り付け
たピン本体1に上方側の足場建枠aを連結する際には、
ピン本体1の係合突起2は前述のようにピン本体1内部
への退入位置に維持されているから、単に上方側竪パイ
プ10をピン本体1のピン上部1bに差し込むだけでよ
いことは前述のとおりである。When the upper scaffolding frame a is connected to the pin body 1 attached to the lower scaffolding frame b again,
Since the engaging projection 2 of the pin body 1 is maintained at the retracted position into the pin body 1 as described above, it is sufficient to simply insert the upper vertical pipe 10 into the pin upper portion 1b of the pin body 1. As described above.
【0032】しかもその差し込み途上で該足場建枠aの
下端部が係合突起2のピン本体1から若干突出している
先端部を下方に押圧し、これがために係合突起2の係合
段部8はピン本体1の内周面23から外れてその退入位
置の状態から解除されるため、係合突起2はピン本体1
の側面から突出し、足場建枠aの差し込み途上において
係合突起2は足場建枠aの係合孔11に自動的に係合す
ることになる。In addition, the lower end of the scaffolding frame a pushes the tip of the engagement projection 2 slightly protruding from the pin body 1 in the middle of the insertion thereof, which causes the engagement step of the engagement projection 2. Since 8 is disengaged from the inner peripheral surface 23 of the pin body 1 and released from its retracted position, the engaging projection 2 is fixed to the pin body 1.
Of the scaffolding building frame a, the engaging projections 2 are automatically engaged with the engaging holes 11 of the scaffolding building frame a.
【0033】従って、係合突起2に対する作業者の操作
は単に足場建枠aを引き抜く際の退入操作のみで、足場
建枠aをピン本体1に差し込む際に係合突起2の係合操
作、即ちこれを突出させる操作はなんら必要がなく、足
場建枠aをピン本体1に差し込むだけで自動的にロック
されることになる。Therefore, the operator's operation on the engaging projection 2 is only the retreat operation when pulling out the scaffolding frame a, and the engaging operation of the engaging projection 2 when inserting the scaffolding frame a into the pin body 1. That is, there is no need to perform any operation for projecting this, and the scaffolding frame a can be automatically locked just by inserting it into the pin body 1.
【0034】このように上下の足場建枠a,bの組立作
業も分解作業も一人の作業者によって簡単に行うことが
できる。Thus, the assembling work and the disassembling work of the upper and lower scaffold building frames a and b can be easily performed by one operator.
【0035】図8は、本発明の他の実施例を示すもの
で、前記実施例にあっては、ピン本体1の中央部はピン
上下部1b,1cに比べて肉厚な肉厚部1aに形成さ
れ、これに形成される段部1d,1eに上下の竪パイプ
10の端部が当接するようになっているが、必ずしもそ
の必要がなく、この実施例に示すように中央部1aをピ
ン上下部1b,1cと同一の厚さとして段部を形成せ
ず、直接に上下の竪パイプ10の互いの端部qを当接す
るようにしてもよい。即ち、本発明ではガイド突起6は
ガイド孔20に当接するだけの肉厚がピン本体1にあれ
ばよく、またガイド突起6がピン本体1から突出するこ
とがないから、上下の竪パイプ10のそれぞれの端部が
直接に互いに当接してもガイド突起6が障害となること
がない。従って、前記実施例のように中央部が肉厚部1
aに形成されたピン本体1であってもガイド突起6が前
記実施例のように肉厚部1aに対応する位置、即ちこの
肉厚部にガイド孔20を設ける必要がなく、ピン本体1
のピン上部1bまたはピン下部1cの位置にガイド孔2
0を設けてこれにガイド突起6が係合するようにしても
よい。FIG. 8 shows another embodiment of the present invention. In the above embodiment, the central portion of the pin body 1 is thicker than the upper and lower portions 1b and 1c of the pin 1a. The end portions of the upper and lower vertical pipes 10 come into contact with the step portions 1d and 1e formed on the central portion 1a as shown in this embodiment. The step portions may not be formed to have the same thickness as the pin upper and lower portions 1b and 1c, and the ends q of the upper and lower vertical pipes 10 may directly abut each other. That is, in the present invention, the guide protrusion 6 only needs to be thick enough to contact the guide hole 20 in the pin body 1, and the guide protrusion 6 does not protrude from the pin body 1. Even if the respective end portions directly contact each other, the guide protrusion 6 does not become an obstacle. Therefore, as in the above embodiment, the thick portion 1 is formed in the central portion.
Even in the pin body 1 formed in a, it is not necessary to provide the guide hole 20 at the position where the guide protrusion 6 corresponds to the thick portion 1a as in the above embodiment, that is, this thick portion, and the pin body 1
The guide hole 2 at the position of the upper pin 1b or the lower pin 1c of the
0 may be provided and the guide protrusion 6 may be engaged with it.
【0036】図1を参照すれば分かるようにピン本体1
の中央部の肉厚部aの横側に足場板15の爪15aが近
接するため、もしガイド突起6がピン本体1の外側面か
ら突出しておれば、このガイド突起6が爪15aに当接
してこれをピン本体1内部へ退入させ、これが原因で係
合突起2も退入される危険があるが、本発明ではガイド
突起6がピン本体1から突出することがないのでその虞
れがない。尤も爪15aの当接に支障をきたさない程度
にガイド突起6の先端部がピン本体1から突出してもよ
い。As can be seen by referring to FIG. 1, the pin body 1
Since the claws 15a of the scaffolding plate 15 are close to the side of the thick portion a at the center of the pin, if the guide protrusions 6 project from the outer surface of the pin body 1, the guide protrusions 6 abut on the claws 15a. There is a risk that this will retract into the pin body 1 and the engaging projection 2 will also retract due to this, but in the present invention, the guide projection 6 does not project from the pin body 1, so there is a risk of this. Absent. However, the tip of the guide protrusion 6 may protrude from the pin body 1 to the extent that the contact of the claw 15a is not hindered.
【0037】特に図8に示す実施例のようにピン本体1
のピン上部1bまたはピン下部1cにガイド突起6を位
置させる場合には、該ガイド突起6は足場板15の爪1
5aに当接する危険性が少ないからガイド突起6の先端
部がかなりピン本体1から突出するようになっていても
よい。In particular, as in the embodiment shown in FIG. 8, the pin body 1
When the guide protrusion 6 is positioned on the pin upper portion 1b or the pin lower portion 1c of the pin, the guide protrusion 6 is used as the claw 1 of the scaffolding plate 15.
The tip portion of the guide protrusion 6 may considerably protrude from the pin body 1 since there is little risk of contact with the pin 5a.
【0038】図9は、また本発明の他の実施例を示すも
ので、前記実施例にあっては、前記ガイド突起6は係合
突起2の下方側にくるように形成されているが、必ずし
もその必要はなく、図9に示すように係合突起2の上部
側に連杆部7を介してガイド突起6が位置し、この位置
にガイド孔20をピン本体1に形成するようにしてもよ
い。FIG. 9 shows another embodiment of the present invention. In the embodiment, the guide protrusion 6 is formed below the engaging protrusion 2. This is not always necessary, and as shown in FIG. 9, the guide protrusion 6 is located on the upper side of the engaging protrusion 2 via the connecting rod portion 7, and the guide hole 20 is formed in the pin body 1 at this position. Good.
【0039】またこれまで説明した足場建枠a、bは、
冒頭で述べたように竪パイプ10と横パイプ13からな
る略門形の足場建枠の連結に適用する場合について説明
したが、これに限定されることなく所謂単管からなる足
場建枠の連結にも適用することができることは勿論であ
る。The scaffolding frames a and b described above are
As described at the beginning, the case of applying to the connection of the substantially gate-shaped scaffolding construction frame composed of the vertical pipe 10 and the horizontal pipe 13 has been described, but the present invention is not limited to this, and the connection of a scaffolding construction frame made of a so-called single pipe is described. Of course, it can also be applied to.
【0040】図10は、主に単管24からなる上下の足
場建枠a、bを一対の係合突起2,2を用いて連結する
ようにした実施例を示すもので、この実施例は、ピン本
体1に一対の係合突起2,2を互いに上下反対方向に設
けたもので、図示の状態からピン本体1をその上下の足
場建枠a、bから抜き取るためには、下側の係合突起2
を若干下向きに付勢しながら押圧すればよく、また上側
の係合突起2を若干上向きに付勢しながら押圧すればよ
いことは、これまでの説明より明白である。FIG. 10 shows an embodiment in which upper and lower scaffolding building frames a and b mainly composed of a single pipe 24 are connected using a pair of engaging projections 2 and 2. This embodiment is shown in FIG. , A pair of engaging protrusions 2 and 2 are provided on the pin body 1 in mutually opposite directions, and in order to pull out the pin body 1 from the upper and lower scaffold building frames a and b from the state shown in the drawing, Engagement protrusion 2
It is clear from the above description that the above can be pressed with a slight downward bias, and the upper engagement protrusion 2 can be pressed with a slight upward bias.
【0041】[0041]
【発明の効果】本発明の請求項1によれば、上方側の足
場建枠の下端部を、下方側の足場建枠の連結ピンに差し
込むだけで、上下の足場建枠は自動的に連結されること
になるから、一層連結作業が簡単であり、最小限の作業
者で能率的に足場建枠の組み立てを行うことができる。According to the first aspect of the present invention, the upper and lower scaffold building frames are automatically connected only by inserting the lower end of the upper scaffold building frame into the connecting pin of the lower scaffold building frame. Therefore, the connection work is further simplified, and the scaffolding frame can be assembled efficiently with a minimum number of workers.
【0042】また本発明の請求項1によれば、上方側の
足場建枠の下端部を、下方側の足場建枠の連結ピンから
抜き出す場合には、作業者がその足先で係合突起を軽く
押圧するだけで、両足場建枠を分解することもできるか
ら分解作業も極めて簡単であり、最小限の作業者で能率
的に足場建枠の分解を行うことができる。Further, according to claim 1 of the present invention, when the lower end of the upper scaffolding frame is pulled out from the connecting pin of the lower scaffolding frame, the operator engages the engaging projection at the tip of the foot. Since both scaffolding frames can be disassembled by simply pressing, the disassembling work is extremely easy, and the scaffolding frame can be disassembled efficiently with a minimum number of workers.
【0043】また本発明の請求項1によれば、係合突起
を直接操作して足場建枠に対して係脱するため、係合突
起の足場建枠に対する係合と開放とを正確に且つ確実に
行うことができる。According to the first aspect of the present invention, since the engaging projection is directly operated to engage and disengage from the scaffold building frame, the engaging projection can be accurately engaged and released with respect to the scaffold building frame. It can be done reliably.
【0044】また請求項1によれば、係合突起を直接に
ピン本体の内部方向に押圧操作するだけで、係合突起を
ピン本体の内部に退入した状態に維持することができ、
上方側の足場建枠を下方側の足場建枠から簡単に分解す
ることができると共に、係合突起を直接に操作して係合
突起の係合段部をピン本体の内部に退入維持させるた
め、係合突起の解除を確実に行うことができる。According to the first aspect of the present invention, the engaging projection can be maintained in the retracted state inside the pin main body only by directly pressing the engaging projection inward of the pin main body.
The upper scaffolding frame can be easily disassembled from the lower scaffolding frame, and the engaging projections can be directly operated to keep the engaging step of the engaging projections retracted into the pin body. Therefore, the engagement protrusion can be reliably released.
【0045】また請求項1によれば、係合突起の退入状
態において、足場建枠をピン本体に差し込む際に、その
差し込み途上で該足場建枠の下端部が係合突起のピン本
体から若干突出している先端部を下方に押圧し、これが
ために係合突起の係合段部はピン本体の内周面から外れ
てその退入位置の状態から解除されるため、係合突起は
ピン本体の側面から突出し、足場建枠の差し込み途上に
おいて係合突起は足場建枠の係合孔に自動的に係合する
ことになる。According to the first aspect, when the scaffolding building frame is inserted into the pin body in the retracted state of the engaging projection, the lower end of the scaffolding building frame is inserted from the pin body of the engaging projection during the insertion. The slightly protruding tip is pressed downward, which causes the engagement step of the engagement projection to disengage from the inner peripheral surface of the pin body and to be released from its retracted position. The engaging protrusions project from the side surface of the main body and automatically engage with the engaging holes of the scaffolding building frame while the scaffolding building frame is being inserted.
【0046】従って、係合突起に対する作業者の操作は
単に足場建枠を引き抜く際の退入操作のみで、足場建枠
をピン本体に差し込む際に係合突起の係合操作、即ちこ
れを突出させる操作はなんら必要がなく、足場建枠をピ
ン本体に差し込むだけで自動的にロックされることにな
るから、足場建枠の組立.分解作業のサイクルにおいて
単に一回の連結ピン操作で済み、これらの現場作業を格
段に迅速且つ容易に行うことができる。Therefore, the operation of the engaging projection by the operator is only the retreat operation when pulling out the scaffolding frame, and the engaging operation of the engaging projection when the scaffolding frame is inserted into the pin body, that is, the projecting thereof. Assembling the scaffolding frame is unnecessary because there is no need to perform any operation, and it will be automatically locked simply by inserting the scaffolding frame into the pin body. In the cycle of disassembly work, only one operation of the connecting pin is required, and these on-site works can be performed remarkably quickly and easily.
【0047】また請求項2によれば、係合突起の作動を
正確に維持することができると共に、係合突起を正確に
維持するガイド突起は、連結ピンの外側面から殆ど突出
されることがないから、他の障害物に当接して誤作動を
起こす危険がなく、それだけ安全に使用することができ
る。According to the second aspect of the present invention, the operation of the engagement projection can be accurately maintained, and the guide projection that accurately maintains the engagement projection is almost projected from the outer surface of the connecting pin. Since it does not exist, there is no danger of contact with other obstacles and causing malfunction, and thus it can be used safely.
【0048】またガイド突起を連結ピンから突出させて
もガイド突起の誤作動に支障をきたさない位置に設ける
ことができるから、各種の足場建枠に対する適用範囲を
大幅に広げることができる。Further, even if the guide protrusion is projected from the connecting pin, it can be provided at a position where it does not hinder the malfunction of the guide protrusion, so that the range of application to various scaffold construction frames can be greatly expanded.
【0049】また請求項3によれば、係合突起は連杆部
を介してガイド突起と一体構造物に形成されているた
め、上方側足場建枠からの外力を強力に受け止める作用
を発揮し、耐久性を格段に向上させることができる。Further, according to the third aspect, since the engaging projection is formed integrally with the guide projection through the connecting rod portion, it exerts an action of strongly receiving the external force from the upper side scaffolding construction frame. , The durability can be significantly improved.
【0050】また請求項4によれば、係合突起がばねに
付勢されて突出することによって係合突起の係止面部が
直接的にピン本体に係止してその軸方向の負荷、従って
足場建枠の引き抜き方向の荷重を受け止めることになる
から、その係止作用を確実に行うことになる。According to the present invention, the engaging projection is biased by the spring to project so that the engaging surface portion of the engaging projection is directly engaged with the pin main body, so that the axial load, and hence the axial load. Since the load in the pull-out direction of the scaffolding construction frame is received, the locking action is surely performed.
【0051】また請求項5によれば、係合突起が前記係
合段部の作用によってピン本体の内部に退入した状態に
おいて、係合突起の先端部がピン本体の側面から若干量
突出していても、足場建枠を連結ピンから支障なく引き
抜くことができるから、この面からも足場建枠の分解作
業を円滑に且つ能率的に行うことができる。According to a fifth aspect of the present invention, the tip of the engaging projection slightly protrudes from the side surface of the pin body when the engaging projection is retracted into the pin body by the action of the engaging step portion. However, since the scaffolding frame can be pulled out from the connecting pin without any trouble, the scaffolding frame can be disassembled smoothly and efficiently from this aspect as well.
【図1】本発明の一実施例の斜視図である。FIG. 1 is a perspective view of an embodiment of the present invention.
【図2】同要部正面図である。FIG. 2 is a front view of the main part.
【図3】同縦断正面図である。FIG. 3 is a vertical sectional front view of the same.
【図4】同要部斜視図である。FIG. 4 is a perspective view of the main part.
【図5】同要部の作動状態を示す縦断正面図である。FIG. 5 is a vertical sectional front view showing an operating state of the main part.
【図6】同要部の作動状態を示す縦断正面図である。FIG. 6 is a vertical sectional front view showing an operating state of the main part.
【図7】同要部の作動状態を示す縦断正面図である。FIG. 7 is a vertical sectional front view showing an operating state of the main part.
【図8】同他の実施例を示す縦断正面図である。FIG. 8 is a vertical sectional front view showing the other embodiment.
【図9】同更に他の実施例を示す縦断正面図である。FIG. 9 is a vertical sectional front view showing still another embodiment of the present invention.
【図10】同更に他の実施例を示す縦断正面図である。FIG. 10 is a vertical sectional front view showing another embodiment of the present invention.
a,b 足場建枠 1 ピン本体1 2 係合突起 3 ばね 4 滑り面 5 係合面 6 ガイド突起 7 連杆部 8 係合段部 9 副滑り面 10 竪パイプ 11 係合孔 16 連結ピン 19 係止面部 20 ガイド孔 24 単管 a, b Scaffolding frame 1 Pin body 1 2 Engagement protrusion 3 Spring 4 Sliding surface 5 Engaging surface 6 Guide protrusion 7 Linking rod portion 8 Engaging step portion 9 Sub-sliding surface 10 Vertical pipe 11 Engaging hole 16 Connecting pin 19 Locking surface 20 Guide hole 24 Single pipe
Claims (5)
出すると共にその側面からピン本体1の内部に退入自在
な係合突起2と、該突起2をピン本体1の側面より突出
付勢するばね3とを内蔵し、係合突起2には、該突起2
をばね3の付勢力に抗してピン本体1の内部に退入力を
負荷するための滑り面4と、該滑り面4の途上に形成さ
れ、前記係合突起2をピン本体1の内部方向の退入位置
に係合するための係合段部8と、前記係合突起2がピン
本体1の側面より突出する時には足場建枠に係合すると
共に該係合突起2をばね3の付勢力に抗して押圧操作す
ることによって足場建枠に対する係合を解除する係合面
5とを設けてなる足場建枠用連結ピン1. A hollow pin body (1) having an engaging projection (2) projecting from its side surface and capable of retracting from the side surface into the pin body (1), and the projection (2) protruding from the side surface of the pin body (1). The spring 3 for urging is built-in, and the engaging protrusion 2 has the protrusion 2
Is formed on the way of the sliding surface 4 for loading retraction force inside the pin body 1 against the biasing force of the spring 3.
The engaging projection 2 in the retracted position in the inner direction of the pin body 1.
And an engaging step portion 8 for engaging with the scaffold building frame when the engaging projection 2 projects from the side surface of the pin body 1, and the engaging projection 2 resists the biasing force of the spring 3. And a connecting surface 5 for releasing the engagement with the scaffolding construction frame by pressing and pushing the scaffolding construction frame connecting pin.
係合して係合突起2の軸方向に直交する横方向への変位
を阻止するガイド突起6を一体形成してなる請求項1記
載の足場建枠用連結ピン2. The engagement projection 2 is integrally formed with a guide projection 6 which is constantly engaged with the pin body 1 and prevents the engagement projection 2 from being displaced in a lateral direction orthogonal to the axial direction. Paragraph 1 connection pin for scaffolding frame
に沿って軸方向に延びる連杆部7を介して前記係合突起
2に一体形成されてなる請求項2記載の足場建枠用連結
ピン3. The scaffolding construction frame according to claim 2, wherein the guide protrusion 6 is integrally formed with the engaging protrusion 2 via a connecting rod portion 7 extending in the axial direction along the inner wall of the pin body 1. Connecting pin
に連続して、係合突起2の突出時にピン本体1に係止し
て係合突起2の軸方向の負荷を受け止める係止面部19
を設けてなる請求項1〜3のいずれか記載の足場建枠用
連結ピン4. The engagement projection 2 receives the axial load of the engagement projection 2 continuously with the rear end of the sliding surface 4 and is locked to the pin body 1 when the engagement projection 2 is projected. Locking surface part 19
A scaffolding frame connecting pin according to any one of claims 1 to 3, wherein
に連続して、該突起2をばね3の付勢力に抗してピン本
体1の内部に退入力を負荷するための副滑り面9を設け
てなる請求項1〜4のいずれか記載の足場建枠用連結ピ
ン5. The projection 2 is provided continuously with the tip of the engagement surface 5 of the engagement projection 2 to load the projection 2 against the urging force of the spring 3 into the interior of the pin body 1. A scaffolding frame connecting pin according to any one of claims 1 to 4, wherein a sub-sliding surface 9 is provided.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4059490A JP2543644B2 (en) | 1992-02-12 | 1992-02-12 | Connecting pin for scaffolding frame |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4059490A JP2543644B2 (en) | 1992-02-12 | 1992-02-12 | Connecting pin for scaffolding frame |
Publications (2)
Publication Number | Publication Date |
---|---|
JPH0626192A JPH0626192A (en) | 1994-02-01 |
JP2543644B2 true JP2543644B2 (en) | 1996-10-16 |
Family
ID=13114790
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP4059490A Expired - Fee Related JP2543644B2 (en) | 1992-02-12 | 1992-02-12 | Connecting pin for scaffolding frame |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2543644B2 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5878898B2 (en) * | 2013-08-08 | 2016-03-08 | 信和株式会社 | Scaffolding coupling device |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS58120345U (en) * | 1982-02-10 | 1983-08-16 | 株式会社カクユ− | Lock pin for joining pipe materials such as bitty scaffolding |
JPS62189447U (en) * | 1986-05-22 | 1987-12-02 | ||
JPH0713299Y2 (en) * | 1989-07-15 | 1995-03-29 | 富士通テン株式会社 | Audio circuit |
-
1992
- 1992-02-12 JP JP4059490A patent/JP2543644B2/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
JPH0626192A (en) | 1994-02-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5400870A (en) | Scaffolding frame system | |
JP3842530B2 (en) | Goods holder | |
JP4629245B2 (en) | Pipe joint | |
JP2543644B2 (en) | Connecting pin for scaffolding frame | |
JP2530773B2 (en) | Scaffolding frame | |
JP2543651B2 (en) | Connecting pin for scaffolding frame | |
JPH09302922A (en) | Pipe joint | |
JP2548893B2 (en) | Connecting pin for scaffolding frame | |
JP2653975B2 (en) | Pipe joint | |
JP3443035B2 (en) | Connecting pins for scaffolding frames | |
JPH0724521Y2 (en) | Pipe joint | |
JP2530774B2 (en) | Connection device for building frame for scaffolding | |
JPH07292958A (en) | Joint of scaffolding frame | |
JP2543634B2 (en) | Single pipe connection device for temporary installation | |
JP3306001B2 (en) | Connecting pins for scaffolding frames | |
JP2000145134A (en) | Hook device | |
JP2543635B2 (en) | Single pipe connection device for temporary installation | |
JP3631400B2 (en) | Scaffolding frame connector | |
JPH0913661A (en) | Pipe joint | |
JPH0453403Y2 (en) | ||
JP2714924B2 (en) | Lock pins for scaffolding members | |
JP2599725Y2 (en) | clip | |
JP3642592B2 (en) | Connecting pin for scaffolding frame | |
JPH0523357Y2 (en) | ||
JPH10332049A (en) | Tube clamp |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 19960604 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20070725 Year of fee payment: 11 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080725 Year of fee payment: 12 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20080725 Year of fee payment: 12 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090725 Year of fee payment: 13 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100725 Year of fee payment: 14 |
|
LAPS | Cancellation because of no payment of annual fees |