JP2524897B2 - Beam formwork receiver in formwork support device - Google Patents

Beam formwork receiver in formwork support device

Info

Publication number
JP2524897B2
JP2524897B2 JP3044425A JP4442591A JP2524897B2 JP 2524897 B2 JP2524897 B2 JP 2524897B2 JP 3044425 A JP3044425 A JP 3044425A JP 4442591 A JP4442591 A JP 4442591A JP 2524897 B2 JP2524897 B2 JP 2524897B2
Authority
JP
Japan
Prior art keywords
stacking
support
slab
columns
receiving
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
JP3044425A
Other languages
Japanese (ja)
Other versions
JPH04261963A (en
Inventor
宏 江田
正彦 高草木
範行 木村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Horii & Co Ltd
Original Assignee
Horii & Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Horii & Co Ltd filed Critical Horii & Co Ltd
Priority to JP3044425A priority Critical patent/JP2524897B2/en
Publication of JPH04261963A publication Critical patent/JPH04261963A/en
Application granted granted Critical
Publication of JP2524897B2 publication Critical patent/JP2524897B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【産業上の利用分野】本発明は、適宜建造物の構築時
に、例えば、適宜積上式仮設支持塔上部に簡単に且つ確
実に差し込み装着でき、しかも、梁型枠及び梁型枠近傍
のスラブ型枠を床面等から確実に、簡単に、且つ安定的
に支えられるようにした型枠支持装置に於ける梁型枠部
用受体に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention can be easily and surely inserted into and mounted on the upper part of a stacking type temporary support tower when constructing a building, and the beam form and the slab near the beam form can be installed. TECHNICAL FIELD The present invention relates to a beam form frame receiver in a form supporting device capable of reliably, easily and stably supporting a form from a floor surface or the like.

【0002】[0002]

【従来の技術】従来、適宜建造物の梁やスラブ等のコン
クリート型枠を支えるには、適宜建枠部材を順次連結し
てタワーの如き支持用構造物を形成し、この支持用構造
物によって支持したり(実開昭47−18932号)、
或いは、長さ調節可能な複数のパイプサポート等によっ
て支持したりしていた。すなわち、梁型枠やスラブ型枠
に当接している根太や大引き等を、支持用構造物やパイ
プサポート等によって床面等から支持する手段がよく用
いられている。また、実開昭63−5145号公報に記
載されているような梁型枠受を備えた型枠支保工が提案
されており、これは、側面の長手方向に間隔をおいて多
数の貫通孔を設けた角パイプの両端に、それぞれジャッ
キを取付けた、一対の仮設支柱と、両端に、該仮設支柱
の角パイプにその貫通孔を介して着脱自在とした係着具
を設けるとともに、上面部に梁型枠の支持ジャッキを設
けた型枠受台とよりなるものである。更に、実開平1−
98858号公報に記載されているような梁型枠支持装
置等が提案されており、これは、高低調節可能な両側の
サイド支持部材と、上端支持板に梁型枠の底枠が水平状
態に取付けられた真中のセンター支持部材とからなる支
持体を形成し、この支持体のセンター支持部材の上端支
持板両端部に、上面に梁型枠の側枠とこの側枠傾倒防止
用の傾倒防止金具とが垂直状態に取付けられた左右一対
の大引材を、その先端部が前記各サイド支持部材上端に
水平状態に載置されるよう上下方向へ揺動自在に軸支し
たものである。
2. Description of the Related Art Conventionally, in order to properly support a concrete formwork such as a beam or a slab of a building, the building frame members are sequentially connected to form a supporting structure such as a tower, and this supporting structure is used. Support it (Shokai 47-18932),
Alternatively, it has been supported by a plurality of pipe supports whose lengths can be adjusted. That is, a means for supporting joists, large pulls, or the like that are in contact with the beam form or the slab form from the floor or the like with a supporting structure, a pipe support, or the like is often used. Further, a form support having a beam form support as described in Japanese Utility Model Laid-Open No. 63-5145 has been proposed, which has a large number of through holes at intervals in the longitudinal direction of the side surface. A pair of temporary struts with jacks attached to both ends of the square pipe provided with, and attachments detachably attached to the square pipes of the temporary struts through the through holes at the both ends of the square pipe. And a form frame pedestal provided with a beam form support jack. Furthermore, the actual Kaihei 1-
A beam form supporting device and the like as described in Japanese Patent No. 98858 has been proposed, in which side support members on both sides of which height can be adjusted and a bottom frame of the beam form are horizontally arranged on an upper end support plate. Forming a support consisting of the center support member attached in the middle, and the side frame of the beam formwork on the upper surface of both ends of the upper end support plate of the center support member of this support and the tilting prevention for tilting prevention of this side frame A pair of left and right large pulling members to which the metal fittings are attached in a vertical state are pivotally supported in the vertical direction so that the tip ends thereof are placed horizontally on the upper ends of the side supporting members.

【0003】[0003]

【発明が解決しようとする課題】ところが、従来の支持
手段のうち、パイプサポートを用いた場合は、かなり多
数のパイプサポートを一つ宛所定位置に設置しなければ
ならないと共に、個々のパイプサポートが倒れないよう
に支持しておかなければならず、これらの設置、解体作
業の能率が非常に悪い難点等があった。また、タワーの
如く構成される支持用構造物を用いた場合でも、梁型枠
部分とスラブ型枠部分とを夫々個別に支持していたの
で、支持用構造物の数が比較的多く必要となり、これら
の設置、解体作業の能率が悪いと共に、その運搬、取扱
い、保管等が面倒となる難点等があった。更に、前述の
如き梁型枠受を備えた型枠支保工にあっては、仮設支柱
上端部でスラブ型枠を支持し、梁型枠受で梁型枠を受け
るので、梁型枠受の高さ調節は行えるようになるが、仮
設支柱自体の長さを大きく調節できない難点があり、し
かも、梁型枠受を仮設支柱に装着するのに、その両端の
係着具をボルト、ナットを介して仮設支柱に固定するの
で、その取扱いが以外と面倒で、高所での組立て、解体
等にあまり適するものではない難点があった。そして、
前述の如き梁型枠支持装置にあっては、梁型枠の底枠を
支持する支持板が支持体のセンター支持部材に固定さ
れ、梁型枠の側枠及び床スラブを支持する傾倒防止金具
が支持板両端の大引材に固定されており、これらの部分
を支持体から分離することができず、その取扱いが面倒
で、高所での作業に適さず、しかも、その運搬、保管等
に好適ではない難点があった。しかして、梁型枠及び梁
型枠近傍のスラブ型枠の支持作業には高所での作業もあ
るため、その組立、解体作業はできる限り容易で且つ安
全に行えるように配慮しなければならない。
However, in the case of using the pipe supports among the conventional supporting means, a considerable number of pipe supports must be installed at one predetermined position, and individual pipe supports must be installed. It had to be supported so that it would not fall over, and there were drawbacks, such as the inefficiency of installation and disassembly work of these. Even when a supporting structure configured like a tower is used, since the beam form part and the slab form part are individually supported, a relatively large number of supporting structures are required. The installation and dismantling work were inefficient, and the transportation, handling, and storage were troublesome. Further, in the formwork support provided with the beam formwork support as described above, since the slab formwork is supported by the upper end of the temporary support and the beam formwork support is used to receive the beam formwork support, Although it becomes possible to adjust the height, there is a drawback that the length of the temporary strut itself cannot be adjusted significantly, and moreover, when attaching the beam form support to the temporary strut, use the bolts and nuts of the fastening tools at both ends thereof. Since it is fixed to the temporary support via the above, the handling is troublesome except for that, and there is a drawback that it is not very suitable for assembling at high places and disassembling. And
In the beam form supporting device as described above, the support plate for supporting the bottom frame of the beam form is fixed to the center support member of the support body, and the tilt preventing metal fitting for supporting the side frame of the beam form and the floor slab is provided. Are fixed to the pulling materials at both ends of the support plate, and these parts cannot be separated from the support, and their handling is troublesome, and they are not suitable for work in high places, and they are transported and stored. There is a disadvantage that is not suitable for. However, since the work of supporting the beam formwork and the slab formwork near the beam formwork involves work at high places, it must be considered that assembly and disassembly work can be performed as easily and safely as possible. .

【0004】[0004]

【課題を解決するための手段】そこで、本発明は、前述
の如き難点等を解消すると共に、熟練を要することな
く、梁型枠22及び梁型枠22近傍のスラブ型枠23を
床面等から確実且つ簡単に支えられるようにすべく創出
されたもので、請求項1記載の型枠支持装置Sに於ける
梁型枠部用受体Aにあっては、梁型枠とスラブ型枠を床
面等から支持する型枠支持装置の構成部材であって、所
定間隔を隔てて平行に配置される丸パイプ状の左右積上
用支柱1と、この左右積上用支柱1の内がわに、所定間
隔を隔てて平行に配置される丸パイプ状の左右梁部受用
支柱2と、左右積上用支柱1の外がわに、所定間隔を隔
てて平行に配置される丸パイプ状の左右スラブ部受用支
柱3と、これら左右積上用支柱1、左右梁部受用支柱
2、左右スラブ部受用支柱3夫々を一体的に連結する複
数の横架連結杆4と、一方の積上用支柱1の下端部分
に、その先端開口部6aが下方を向くように固着される
略円筒状の継手6とを備え、継手6は、先端開口部6a
と、中央膨出部6bと、基端嵌合部6cとに区分され、
先端開口部6aは、積上用支柱1端部外径より僅かに大
きな内径に設定し、中央膨出部6bは、筒心方向中央部
分が外方に向って比較的緩やかに湾出するよう形成する
と共に、積上用支柱1端部外径より大きな内径に設定
し、基端嵌合部6cは、積上用支柱1端部外径に略一致
する内径に設定すると共に、積上用支柱1端部に固着
し、先端開口部6aの周縁部分は、先端がわに行くに従
って漸次拡開するような略ラッパ状に形成し、左右積上
用支柱の下端部分を、継手6を介して適宜積上式仮設支
持塔上部に差し込み装着可能となるよう形成し、左右ス
ラブ部受用支柱3は、その上端部が左右梁部受用支柱2
の上端部より上方に位置するよう形成し、左右梁部受用
支柱2の上端部分には梁型枠支持用の受金具Gが、左右
スラブ部受用支柱3の上端部分にはスラブ型枠支持用の
受金具Gが、夫々差し込み装着可能となるよう構成する
手段を採用した。
Therefore, the present invention solves the above-mentioned problems and the like, and at the same time, without the need for skill, the beam form 22 and the slab form 23 in the vicinity of the beam form 22 are attached to the floor or the like. It is created to surely and easily support the beam form and the slab form in the beam form receiving member A in the form supporting device S according to claim 1. Which is a constituent member of a form supporting device for supporting the above from the floor surface and the like, and is a circular pipe-shaped left and right stacking support column 1 arranged in parallel at a predetermined interval, and the inside of this left and right stacking support column 1. Alligator-shaped round pipe-shaped right and left beam receiving struts 2 which are arranged parallel to each other with a predetermined interval, and circular pipe-shaped parallel arranging a predetermined interval on the outer shell of the left and right stacking struts 1 Left and right slab receiving columns 3, these left and right stacking columns 1, left and right beam receiving columns 2, left and right slab receiving columns A plurality of horizontal connecting rods 4 that integrally connect the columns 3 and a substantially cylindrical joint 6 that is fixed to the lower end portion of one of the stacking columns 1 so that its tip opening 6a faces downward. And the joint 6 has a tip opening 6a.
And a central bulging portion 6b and a base end fitting portion 6c,
The tip opening 6a is set to have an inner diameter slightly larger than the outer diameter of the end of the stacking strut 1, and the central bulging portion 6b is such that the central portion in the direction of the cylinder center projects relatively outwardly toward the outside. Along with the formation, it is set to an inner diameter that is larger than the outer diameter of the end of the stacking strut 1, and the base end fitting portion 6c is set to an inner diameter that substantially matches the outer diameter of the end of the stacking strut 1 and for stacking. It is fixed to the end of the strut 1 and the peripheral edge portion of the tip end opening 6a is formed in a substantially trumpet shape so that the tip gradually widens as the tip goes to the end, and the lower end portion of the left and right stacking strut is connected via the joint 6. It is formed so that it can be inserted and mounted on the upper part of the stacking type temporary support tower.
Is formed so as to be located above the upper end portion of the right and left beam parts, and a supporting bracket G for supporting the beam form is provided at the upper end portion of the left and right beam portion supporting columns 2 and a slab frame support is provided at the upper end portion of the left and right slab portion supporting columns 3. The means for arranging each of the receiving metal fittings G of FIG.

【0005】また、請求項2記載の型枠支持装置Sに於
ける梁型枠部用受体Aにあっては、継手6の基端嵌合部
6cの周壁の積上用支柱1端部固着部分に、適宜孔7を
穿設する手段を採用した。
Further, in the beam form receiving member A in the form supporting apparatus S according to the second aspect, the end portion of the supporting column 1 for stacking the peripheral wall of the base end fitting portion 6c of the joint 6 is formed. A means for appropriately forming the holes 7 in the fixed portion is adopted.

【0006】[0006]

【作用】しかして、請求項1記載の型枠支持装置Sに於
ける梁型枠部用受体Aにあっては、所定間隔を隔てて平
行に配置される丸パイプ状の左右積上用支柱1の内がわ
には、所定間隔を隔てて平行な丸パイプ状の左右梁部受
用支柱2が配置され、左右積上用支柱1の外がわには、
所定間隔を隔てて平行な丸パイプ状の左右スラブ部受用
支柱3が配置され、しかも、これら左右積上用支柱1、
左右梁部受用支柱2、左右スラブ部受用支柱3は、複数
の横架連結杆4によって一体的に連結される。そして、
継手6は、略円筒状を呈し、その先端開口部6aが下方
を向くように一方の積上用支柱1の下端部分に固着さ
れ、左右積上用支柱1の下端部分は、継手6を介して適
宜積上式仮設支持塔T上部(中間部積上体Cの支柱C1
端部)に差し込み連結される。また、継手6は、積上用
支柱1端部外径より僅かに大きな内径に設定される先端
開口部6aと、筒心方向中央部分が外方に向って比較的
緩やかに湾出すると共に、積上用支柱1端部外径より大
きな内径に設定される中央膨出部6bと、積上用支柱1
端部外径に略一致する内径に設定されると共に、積上用
支柱1端部に固着される基端嵌合部6cとに区分されて
いる。すなわち、継手6に適宜積上式仮設支持塔T上部
(中間部積上体Cの支柱C1端部)を差し込み装着する
際、差し込み始めは、継手6の筒心に対して若干傾いた
状態であっても、漸次差し込んでいく内に、仮設支持塔
T上部(中間部積上体Cの支柱C1端部)が、中央膨出
部6b内周壁に沿って移動するようになり、継手6の筒
心に対して一致するように矯正され、仮設支持塔T上部
(中間部積上体Cの支柱C1端部)が、基端嵌合部6c
に収まったときに、継手6の筒心に対して一致するよう
になる。更に、先端開口部6aの周縁部分は、適宜積上
式仮設支持塔T上部(中間部積上体Cの支柱C1端部)
に差し込み装着し易くなるように、先端がわに行くに従
って漸次拡開するような略ラッパ状を呈している。そし
て、左右スラブ部受用支柱3の上端部は、左右梁部受用
支柱2の上端部より上方に位置し、左右梁部受用支柱2
の上端部分には、梁型枠22支持用の受金具Gが、左右
スラブ部受用支柱3の上端部分には、スラブ型枠23支
持用の受金具Gが、夫々差し込まれることによって装着
されて、梁型枠22と、この梁型枠22近傍のスラブ型
枠23とを支持するようになる。
According to the beam form receiving member A in the form supporting device S according to the first aspect of the present invention, the circular pipe-shaped left and right stacking units are arranged in parallel at a predetermined interval. In the inner pillar of the column 1, parallel pipe-shaped left and right beam receiving struts 2 are arranged at predetermined intervals, and in the outer shell of the left and right stacking column 1,
Parallel pipe-shaped support struts 3 for receiving the left and right slabs are arranged at a predetermined interval, and these support struts 1 for stacking left and right,
The left and right beam portion receiving columns 2 and the left and right slab portion receiving columns 3 are integrally connected by a plurality of horizontal connecting rods 4. And
The joint 6 has a substantially cylindrical shape, and is fixed to the lower end portion of one of the stacking columns 1 so that the tip opening 6a faces downward. The upper part of the stacking type temporary support tower T (the pillar C1 of the intermediate part stacking body C)
It is inserted into the end part and connected. In addition, the joint 6 has a tip opening 6a whose inner diameter is set to be slightly larger than the outer diameter of the end of the stacking strut 1, and a central portion in the direction of the cylinder center that protrudes relatively gently outward. The central bulge portion 6b having an inner diameter larger than the outer diameter of the end of the stacking strut 1 and the stacking strut 1
The inner diameter is set to substantially match the outer diameter of the end portion, and is divided into a base end fitting portion 6c fixed to the end portion of the stacking support column 1. That is, when the upper part of the stacking temporary support tower T (the end of the column C1 of the intermediate part stacking body C) is inserted into the joint 6 as appropriate, at the beginning of insertion, it is slightly inclined with respect to the cylinder center of the joint 6. Even if there is, the upper part of the temporary support tower T (the end of the pillar C1 of the intermediate product stack C) comes to move along the inner peripheral wall of the central bulging part 6b while gradually inserting, and the joint 6 The temporary support tower T (upper end of the pillar C1 of the intermediate body C) is straightened so that it is aligned with the cylinder center, and the base end fitting portion 6c is formed.
When it fits in, it comes to coincide with the cylinder center of the joint 6. Further, the peripheral portion of the tip opening 6a is appropriately provided at the upper part of the stacking type temporary support tower T (end of the pillar C1 of the intermediate stacking body C).
It has a substantially trumpet shape in which the tip gradually expands as it goes into the crucible so that it can be easily inserted and attached. The upper ends of the left and right slab receiving columns 3 are located above the upper ends of the left and right beam receiving columns 2 and
The receiving metal fittings G for supporting the beam formwork 22 are attached to the upper end portions of the above, and the receiving metal fittings G for supporting the slab formwork 23 are attached to the upper end portions of the left and right slab part receiving columns 3 by inserting them, respectively. The beam form 22 and the slab form 23 near the beam form 22 are supported.

【0007】また、請求項2記載の型枠支持装置Sに於
ける梁型枠部用受体Aにあっては、孔7は、継手6の基
端嵌合部6cの周壁の積上用支柱1端部固着部分に穿設
され、この孔7から継手6内の水抜きが行われ、更に、
継手6の支柱1への溶接を確実にする。特に、孔7から
継手6内を視認でき、仮設支持塔Tの上部(中間部積上
体Cの支柱C1端部)が継手6内に確実に収まっている
か否かの判断が可能となる(すなわち、中間部積上体C
の支柱C1端部と、積上用支柱1端部とが接触している
か否かの判断が行える。)。
Further, in the beam form receiving member A in the form supporting apparatus S according to the second aspect, the hole 7 is for stacking the peripheral wall of the base end fitting portion 6c of the joint 6. The end of the column 1 is fixed to the fixed portion, and the water in the joint 6 is drained from this hole 7, and
Ensure the welding of the joint 6 to the column 1. In particular, the inside of the joint 6 can be visually recognized from the hole 7, and it becomes possible to judge whether or not the upper portion of the temporary support tower T (the end of the pillar C1 of the intermediate stacking body C) is securely accommodated in the joint 6 ( That is, the intermediate part stack C
It is possible to determine whether or not the end portion of the support column C1 and the end portion of the stacking support column 1 are in contact with each other. ).

【0008】[0008]

【実施例】以下、本発明を図示例に基づいて説明する。
図中Sは、適宜建造物の構築時に、梁型枠22と、この
梁型枠22近傍のスラブ型枠23とを床面等から同時に
支えられるようにした組立式の型枠支持装置を示し、こ
の型枠支持装置Sは、基礎枠体Bと、中間部積上体C
と、ジャッキベースDとで所望高さに組立てられる仮設
支持塔Tの上部に、本発明に係る梁型枠部用受体Aと、
受体連結具Fと、受金具Gとで組立てられる受枠Rを装
着して構成されており、平行に配置される一対の梁型枠
部用受体Aに装着される複数の受金具Gによって、梁型
枠22とスラブ型枠23の下部に夫々配設される大引き
20を保持することにより、梁型枠22とこの梁型枠2
2近傍のスラブ型枠23とを確実に、簡単に、効率的
に、且つ安定的に支えられるようにしたものである(第
1図参照)。
DESCRIPTION OF THE PREFERRED EMBODIMENTS The present invention will be described below based on illustrated examples.
In the figure, S indicates an assembling formwork support device capable of simultaneously supporting the beam formwork 22 and the slab formwork 23 near the beam formwork 22 from the floor surface or the like when constructing a building appropriately. The form supporting device S includes a base frame B and an intermediate part stacking body C.
And a beam form frame receiver A according to the present invention on the upper part of the temporary support tower T assembled to a desired height with the jack base D.
A receiving frame R assembled by a receiving body coupling tool F and a receiving metal fitting G is mounted, and by a plurality of receiving metal fittings G mounted on a pair of beam form frame receiving bodies A arranged in parallel. The beam form 22 and the beam form 2 are held by holding the large pulls 20 arranged below the beam form 22 and the slab form 23, respectively.
The slab form 23 in the vicinity of 2 can be reliably, easily, efficiently and stably supported (see FIG. 1).

【0009】前記仮設支持塔Tは、4本のジャッキベー
スDを、そのネジ棒D1上端部分が基礎枠体Bの支柱B
1下部に差し込まれるようにして夫々装着し、この基礎
枠体Bの上に、所定間隔を隔てて平行に配置される一対
の中間部積上体Cを複数組所望高さまで順次積上げるこ
とにより構成される。しかも、必要に応じて中間部積上
体C相互間や、基礎枠体Bと中間部積上体Cの間に適数
の筋交いEが略垂直方向に於いて装着される。
The temporary support tower T has four jack bases D, and the upper end portion of the screw rods D1 thereof is a pillar B of a base frame B.
1 By inserting each of them so as to be inserted into the lower part, and sequentially stacking a plurality of pairs of intermediate portion stacking bodies C arranged in parallel on the base frame body B at a predetermined interval to a desired height Composed. Moreover, a suitable number of braces E are attached in a substantially vertical direction between the intermediate body stacks C and between the base frame B and the intermediate body stacks C as needed.

【0010】基礎枠体Bは、4本の丸パイプ状の支柱B
1を正方形の角部に位置するように配置すると共に、隣
設する支柱B1相互を4本の連結杆B2を介して夫々連
結して、平面略正方形枠状に形成し、更に、一方の対角
位置にある支柱B1の上端部分に、略円筒状の継手B3
をその先端開口部が上方に向うように夫々固着して構成
されており、しかも、全体を補強すべく隣設する連結杆
B2相互を連結するように補強斜材が固着されている。
The base frame B is four round pipe-shaped supports B.
1 are arranged so as to be positioned at the corners of a square, and adjacent columns B1 are connected to each other through four connecting rods B2 to form a plane substantially square frame shape. A substantially cylindrical joint B3 is attached to the upper end portion of the pillar B1 in the angular position.
Are fixed to each other so that their front end openings face upward, and further, reinforcing diagonal members are fixed to connect the adjacent connecting rods B2 to reinforce the whole.

【0011】中間部積上体Cは、所定間隔を隔てて平行
に配置される丸パイプ状の左右支柱C1相互を連結杆C
2で略H字状に連結し、一方の支柱C1の下端部に、略
円筒状の継手B3をその先端開口部が下方に向うように
固着し、他方の支柱C1の上端部に、その先端開口部が
上方に向うように継手B3を固着して構成されており、
中間部積上体C相互の積上数の増減により型枠支持装置
(仮設支持塔T)全体の高さを任意に変更できるように
なる。
The intermediate product C is a rod C that connects the left and right pillars C1 in the shape of round pipes arranged in parallel with each other at a predetermined interval.
2 is connected in a substantially H shape, and a substantially cylindrical joint B3 is fixed to the lower end of one of the columns C1 so that its tip opening portion faces downward, and the other end is attached to the upper end of the other column C1. The joint B3 is fixed so that the opening faces upward,
It is possible to arbitrarily change the height of the entire formwork supporting device (temporary support tower T) by increasing or decreasing the number of products stacked on each other in the intermediate part stacking body C.

【0012】ジャッキベースDは、基礎枠体Bの支柱B
1内に挿入可能なネジ棒D1の下端部分にベースプレー
トD2を固着すると共に、ネジ棒D1に調節ハンドルD
3を螺合せしめて構成されており、調節ハンドルD3の
回転操作により、基礎枠体Bの支持高さが調節できるよ
うになる。
The jack base D is a support B of the base frame B.
The base plate D2 is fixed to the lower end portion of the screw rod D1 that can be inserted into the screw rod 1, and the adjustment handle D is attached to the screw rod D1.
3, the support height of the base frame B can be adjusted by rotating the adjustment handle D3.

【0013】前記受枠Rは、一対の梁型枠部用受体A
を、平行に配置されるよう仮設支持塔T最上部の中間部
積上体Cに夫々差し込み式に装着し、この一対の梁型枠
部用受体A相互を複数の受体連結具Fで連結し、梁型枠
部用受体A上部に複数の受金具Gを装着して構成され、
必要に応じて受体連結具F間に筋交いEが水平方向に於
いて装着される。
The receiving frame R is a pair of beam frame receiving members A.
Are respectively inserted into the uppermost intermediate product C of the temporary support tower T so as to be arranged in parallel, and the pair of beam form receivers A are mutually connected by a plurality of receiver connectors F. It is configured by connecting and mounting a plurality of brackets G on the upper part of the beam form receiver A.
If necessary, the braces E are mounted horizontally between the receiver couplings F.

【0014】梁型枠部用受体Aは、所定間隔を隔てて平
行に配置される丸パイプ状の左右積上用支柱1と、この
左右積上用支柱1の内がわに、所定間隔を隔てて平行に
配置される丸パイプ状の左右梁部受用支柱2と、左右積
上用支柱1の外がわに、所定間隔を隔てて平行に配置さ
れる丸パイプ状の左右スラブ部受用支柱3と、これら左
右積上用支柱1、左右梁部受用支柱2、左右スラブ部受
用支柱3夫々を一体的に連結する複数の角パイプ状の横
架連結杆4と、左右積上用支柱1、左右梁部受用支柱
2、左右スラブ部受用支柱3夫々の連結状態を更に補強
する複数の角パイプ状の補強斜杆5と、一方の積上用支
柱1の下端部分及び一方のスラブ部受用支柱3の下端部
分に夫々固着される略円筒状の継手6とから構成されて
いる。すなわち、左右梁部受用支柱2を二本の横架連結
杆4を介して連結し、この左右梁部受用支柱2の上端部
と左右積上用支柱1の上端部とを水平位置で揃えるよう
にして、左右積上用支柱1を左右梁部受用支柱2の外が
わに二本の横架連結杆4及び一本の補強斜杆5を介して
連結し、この左右積上用支柱1の下端部と左右スラブ部
受用支柱3の下端部とを水平位置で揃えるようにすると
共に、左右スラブ部受用支柱3の上端部が左右積上用支
柱1の上端部よりかなり上方に位置するように、左右ス
ラブ部受用支柱3を左右積上用支柱1の外がわに二本の
横架連結杆4及び一本の補強斜杆5を介して連結し、一
方の積上用支柱1の下端部分及び一方のスラブ部受用支
柱3の下端部分に、その先端開口部6aが下方を向くよ
うに継手6の基端部分を夫々固着して構成されている
(第7図参照)。尚、図中4aは、筋交いEを装着すべ
く横架連結杆4の所定位置に穿設される筋交い取付孔で
ある。
The beam form frame receiver A is a round pipe-shaped left-right stacking support column 1 which is arranged in parallel at a predetermined interval, and the left and right stacking support column 1 is provided with a predetermined interval in the crucible. Round pipe-shaped left and right beam slab receiving struts, which are arranged in parallel with each other, and circular pipe-shaped left and right slab receiving struts, which are arranged in parallel with a predetermined interval, on the outer wall of the left and right stacking struts 1. The pillar 3, a plurality of square pipe-shaped horizontal connecting rods 4 that integrally connect the left and right stacking pillars 1, the left and right beam portion receiving pillars 2, and the left and right slab portion supporting pillars 3, respectively, and the left and right stacking pillars 1, a plurality of rectangular pipe-shaped reinforcing slant rods 5 for further reinforcing the connection state of the left and right beam portion receiving columns 2, and the left and right slab portion receiving columns 3, and one lower end portion of one stacking column 1 and one slab portion It comprises a substantially cylindrical joint 6 fixed to the lower end portion of the receiving column 3. That is, the right and left beam receiving struts 2 are connected via two horizontal connecting rods 4, and the upper ends of the left and right beam receiving stanchions 2 and the upper ends of the left and right stacking supporting struts 1 are aligned at a horizontal position. Then, the left and right stacking columns 1 are connected to the outer beam of the left and right beam portion receiving columns 2 through two horizontal connecting rods 4 and one reinforcing slant rod 5, The lower end portion of the right and left slab receiving columns 3 are aligned horizontally, and the upper ends of the left and right slab receiving columns 3 are located substantially above the upper ends of the left and right stacking columns 1. The left and right slab receiving columns 3 are connected to the outer pillar of the left and right stacking columns 1 through two horizontal connecting rods 4 and one reinforcing slant rod 5, and one of the stacking columns 1 is connected. At the lower end portion and the lower end portion of one of the slab receiving columns 3, the base end portion of the joint 6 is arranged so that its tip opening 6a faces downward. It s secured to is configured (see Fig. 7). Incidentally, reference numeral 4a in the drawing is a brace attachment hole which is bored at a predetermined position of the horizontal connecting rod 4 for mounting the brace E.

【0015】また、前記継手6は、所定寸法の適宜金属
製円筒材を基にして構成され、先端部分の先端開口部6
aと、基端部分の基端嵌合部6cと、先端開口部6aと
基端嵌合部6cとの間の中央膨出部6bとに区分され、
先端開口部6aは、積上用支柱1(中間部積上体Cの支
柱C1)端部外径より僅かに大きな内径に設定され、中
央膨出部6bは、上下方向中央部分が外方に向って比較
的緩やかに湾出するよう形成されると共に、積上用支柱
1(中間部積上体Cの支柱C1)端部外径より大きな内
径に設定され、基端嵌合部6cは、積上用支柱1(中間
部積上体Cの支柱C1)端部外径に略一致する内径に設
定されると共に、積上用支柱1端部が固着(溶接)され
ている。すなわち、継手6に適宜積上式仮設支持塔T上
部(中間部積上体Cの支柱C1端部)を差し込み装着す
る際(或いは、適宜積上式仮設支持塔T上部に設けた上
向きに開口している継手に他方の積上用支柱1下端部を
差し込み装着する際)、差し込み始めは、継手6の筒心
に対して若干傾いた状態であっても、漸次差し込んでい
く内に、仮設支持塔T上部(中間部積上体Cの支柱C1
端部)が(或いは、他方の積上用支柱1下端部が)、中
央膨出部6b内周壁に沿って移動するようになって、継
手6の筒心に対して一致するように矯正され、仮設支持
塔T上部(中間部積上体Cの支柱C1端部)が(或い
は、他方の積上用支柱1下端部が)、基端嵌合部6cに
収まったときに、継手6の筒心に対して一致するように
構成してある。しかも、先端開口部6aの周縁部分は、
中間部積上体Cの支柱C1の端部を(或いは、他方の積
上用支柱1下端部を)継手6内に導入し易くなるよう
に、先端がわに行くに従って漸次拡開するような略ラッ
パ状に形成されている。また、継手6の基端嵌合部6c
の周壁には、水抜きのための、または、継手6を支柱1
に確実に溶接できるようするための、または、中間部積
上体Cの支柱C1端部が継手6内に確実に収まっている
か否かを外部から視認できるようにするための孔7が適
数穿設され、先端開口部6a寄り周壁には、水抜き(空
気抜き)のための孔7が穿設されている(第8図参
照)。ところで、この継手6と、基礎枠体Bの継手B3
と、中間部積上体Cの継手C3と、端部支持体Hの継手
H3は、夫々同じ構成となっている。
Further, the joint 6 is constructed on the basis of an appropriate metal cylindrical member having a predetermined size, and the tip opening 6 of the tip portion is formed.
a, a base end fitting portion 6c of the base end portion, and a central bulging portion 6b between the tip opening 6a and the base end fitting portion 6c,
The tip opening 6a is set to have an inner diameter slightly larger than the outer diameter of the end of the stacking column 1 (column C1 of the intermediate portion stacking body C), and the central bulging portion 6b has a vertically central portion outward. It is formed so as to project relatively slowly toward the outside, and is set to an inner diameter larger than the outer diameter of the end portion of the stacking support column 1 (support column C1 of the intermediate stacking body C). The stacking column 1 (the column C1 of the intermediate portion stacking body C) is set to an inner diameter that substantially matches the outer diameter of the end, and the stacking column 1 end is fixed (welded). That is, when the upper part of the stacking type temporary support tower T (the end of the column C1 of the intermediate stacking body C) is appropriately inserted into the joint 6 (or when appropriate, the upward opening provided on the upper part of the stacking type temporary support tower T) When the lower end of the other stacking support column 1 is inserted into and attached to the existing joint), even if it is slightly tilted with respect to the cylinder center of the joint 6 at the beginning of insertion, temporary insertion is performed while gradually inserting. Upper part of the support tower T (the pillar C1 of the intermediate body C)
The end portion (or the lower end portion of the other stacking support column 1) moves along the inner peripheral wall of the central bulging portion 6b and is corrected so as to coincide with the cylinder center of the joint 6. , When the upper part of the temporary support tower T (the end of the pillar C1 of the intermediate stacking body C) (or the lower end of the other stacking pillar 1) fits in the base end fitting portion 6c, It is configured so as to coincide with the cylinder center. Moreover, the peripheral portion of the tip opening 6a is
In order to make it easier to introduce the end of the column C1 of the intermediate part stacking body C (or the lower end of the other stacking column 1) into the joint 6, the tip gradually expands as it goes to the crook. It is formed in a substantially trumpet shape. In addition, the base end fitting portion 6c of the joint 6
For the drainage or the joint 6 on the peripheral wall of
A proper number of holes 7 for ensuring reliable welding, or for visually confirming from outside whether the end of the column C1 of the intermediate product C is securely contained in the joint 6. A hole 7 for water drainage (air drainage) is formed in the peripheral wall near the tip opening 6a (see FIG. 8). By the way, this joint 6 and the joint B3 of the base frame B
The joint C3 of the intermediate product C and the joint H3 of the end support H have the same configuration.

【0016】受体連結具Fは、連結杆F2の両端に、ク
ランプF1を固着すると共に、筋交い取付孔F4が穿設
されている筋交い取付片F3を固着して構成されてお
り、一対の梁型枠部用受体A相互を連結してその強度及
び剛性を高めるべく用いられるものである(第3図、第
4図参照)。
The receiving body connecting tool F is constructed by fixing the clamps F1 to both ends of the connecting rod F2 and fixing the brace attaching pieces F3 having the brace attaching holes F4. It is used to connect the mold frame receivers A to each other to enhance their strength and rigidity (see FIGS. 3 and 4).

【0017】受金具Gは、梁型枠部用受体Aの積上用支
柱1、梁部受用支柱2、スラブ部受用支柱3上端部分に
差し込み可能なネジ棒G1と、このネジ棒G1上端に固
着されると共に、大引き20等を安定的に支持できるよ
うに形成される受片G2と、ネジ棒G1に螺合される調
節ハンドルG3とからなり、調節ハンドルG3を適宜回
転せしめることにより、積上用支柱1、梁部受用支柱
2、スラブ部受用支柱3上端からの受片G2までの距離
を任意に調節できるように構成されている。
The receiving metal member G is a threaded rod G1 which can be inserted into the upper end portion of the beam form frame receiver A, the beam portion receiving pillar 2, and the slab portion receiving pillar 3 and the upper end of this screw rod G1. It comprises a receiving piece G2 that is fixedly attached to, and is formed so as to stably support the large pull 20 and the like, and an adjusting handle G3 that is screwed to the screw rod G1. By appropriately rotating the adjusting handle G3, The stacking support column 1, the beam receiving support column 2, and the slab receiving support column 3 are configured so that the distance from the upper end to the receiving piece G2 can be arbitrarily adjusted.

【0018】図中T1は、仮設支持塔Tの側部に配置さ
れて、型枠支持装置全体の強度、剛性、及び安定性等の
向上を図ると共に、梁型枠部用受体Aのスラブ部受用支
柱3に連結されて、スラブ型枠23からのスラブ部受用
支柱3にかかる負荷をより確実に受け止められるように
した補助支持枠を示し、この補助支持枠T1は、ジャッ
キベースDを介して床面等の所定位置に端部支持体Hを
配置し、この端部支持体Hの上に中間部積上体Cを順次
積上状に連結して構成され、しかも、最上部の中間部積
上体Cが梁型枠部用受体Aのスラブ部受用支柱3下端部
分に連結されると共に、複数の補助枠連結具Jを介して
仮設支持塔Tに並設状に固定される。
In the figure, T1 is arranged on the side of the temporary support tower T to improve the strength, rigidity, stability and the like of the entire form supporting device, and at the same time, the slab of the beam form receiver A. The auxiliary support frame connected to the part support column 3 so as to more reliably receive the load applied to the slab part support column 3 from the slab form 23 is shown. This auxiliary support frame T1 is provided with a jack base D. The end support H is arranged at a predetermined position such as the floor surface, and the intermediate stack C is sequentially stacked on the end support H to form a stack. The partial product C is connected to the lower end portion of the slab receiving column 3 of the beam frame receiving member A, and is fixed in parallel to the temporary support tower T via the plurality of auxiliary frame connecting members J. .

【0019】端部支持体Hは、2本の支柱H1を平行に
配置すると共に、支柱H1相互を連結杆H2を介して連
結し、一方の支柱H1の上端部分に、その先端開口部が
上方に向うように継手H3を固着して構成されている。
In the end support H, two pillars H1 are arranged in parallel, and the pillars H1 are connected to each other through a connecting rod H2, and the upper end portion of one pillar H1 has an upper end opening. The joint H3 is fixed so as to face the.

【0020】補助枠連結具Jは、補助支持枠T1を仮設
支持塔Tに連結するためのもので、連結杆の両端にクサ
ビ固定式のクランプが夫々固着されたもので、このクラ
ンプは、端部支持体Hの支柱H1と、中間部積上体Cの
支柱C1とを夫々掴持できるように構成されている。
The auxiliary frame connector J is used to connect the auxiliary support frame T1 to the temporary support tower T, and is a wedge-fixing type clamp fixed to both ends of the connecting rod. The pillar H1 of the partial support H and the pillar C1 of the intermediate portion stacking body C can be respectively held.

【0021】ところで、筋交いEは、中間部積上体Cの
連結杆C2に穿設した筋交い取付孔や、基礎枠体Bの連
結杆B2に穿設した筋交い取付孔や、梁型枠部用受体A
の筋交い取付孔4aや、受体連結具Fの筋交い取付片F
3に穿設した筋交い取付孔F4や、端部支持体Hの連結
杆H2に穿設した筋交い取付孔等に、その両端部分が取
外し可能に装着できるよう構成されている。
By the way, the brace E is a brace mounting hole formed in the connecting rod C2 of the intermediate stacking body C, a brace mounting hole formed in the connecting rod B2 of the base frame B, and a beam form frame portion. Receiver A
Brace mounting hole 4a of B, and brace mounting piece F of receiver coupling F
Both ends of the brace attachment holes F4 formed in 3 and the brace attachment holes formed in the connecting rod H2 of the end support H are detachably attachable.

【0022】尚、梁型枠部用受体Aの具体的構成、形
状、寸法、材質、積上用支柱1の具体的形状、寸法、梁
部受用支柱2の具体的形状、寸法、スラブ部受用支柱3
の具体的形状、寸法、横架連結杆4の具体的形状、寸
法、継手6の具体的形状、寸法、支柱1への具体的固着
手段等は、図示例のものに限定されることなく適宜自由
に設定できるものである。
The concrete configuration, shape, size and material of the beam frame receiver A, the specific shape and size of the stacking support column 1, the specific shape, size and slab of the beam support column 2. Support post 3
The specific shape, dimensions, the specific shape and dimensions of the horizontal connecting rod 4, the specific shape and dimensions of the joint 6, the specific fixing means to the support column 1, etc. are not limited to those shown in the drawings, and may be changed as appropriate. It can be set freely.

【0023】型枠支持装置及び本発明の梁型枠部用受体
Aは、前述の如く構成されており、次に、この型枠支持
装置を利用した梁型枠部の支持手段について説明する
と、先ず、ジャッキベースDのネジ棒D1上端部分を基
礎枠体Bの支柱B1下端部分内に差し込むようにして複
数のジャッキベースDを基礎枠体Bに夫々装着し、この
基礎枠体Bを所望位置に設置する。このとき、ジャッキ
ベースDが基礎枠体Bから脱落しないように、適宜脱落
防止手段を施しておいても良い。
The form supporting device and the beam form receiving member A of the present invention are constructed as described above. Next, the supporting means of the beam forming part utilizing this form supporting device will be explained. First, a plurality of jack bases D are attached to the base frame B, respectively, by inserting the upper end portion of the screw rod D1 of the jack base D into the lower end portion of the support column B1 of the base frame body B, and the base frame body B is desired. Install in position. At this time, in order to prevent the jack base D from falling off the base frame B, drop-off prevention means may be appropriately provided.

【0024】そして、基礎枠体Bの上に一対の中間部積
上体Cを複数組順次積上げて所望高さの積上式仮設支持
塔Tを形成する。尚、図示例の仮設支持塔Tは、所定間
隔を隔てて平行となるよう配置される一対の中間部積上
体Cを順次積上げ式に連結することにより構成されるよ
うになるが、仮設支持塔T全体の一方の対向面部分を構
成する一対の中間部積上体Cと、他方の対向面部分を構
成する一対の中間部積上体Cとを、高さ方向に於いて交
互に順次積上げるようにして構成しており、組立てられ
た仮設支持塔T全体の強度及び剛性を高くすると共に強
度及び剛性を均一とするように工夫されている。
Then, a plurality of pairs of intermediate portion stacking bodies C are successively stacked on the base frame B to form a stacking type temporary support tower T having a desired height. The temporary support tower T in the illustrated example is configured by sequentially connecting a pair of intermediate body stacks C arranged in parallel with each other at a predetermined interval in a stacking manner. A pair of intermediate-portion stacking bodies C that form one facing surface portion of the entire tower T and a pair of intermediate-portion stacking bodies C that form the other facing surface portion are alternately and sequentially arranged in the height direction. It is configured to be stacked, and is devised so as to increase the strength and rigidity of the entire assembled temporary support tower T and to make the strength and rigidity uniform.

【0025】それから、この仮設支持塔Tの上に、受枠
Rを装着する。すなわち、仮設支持塔Tの最上部にある
中間部積上体Cの支柱C1に積上用支柱1を連結するよ
うにして、平行に配置される一対の梁型枠部用受体Aを
仮設支持塔Tの上に装着し、この一対の梁型枠部用受体
A相互を複数の受体連結具Fで連結し、更に、梁型枠部
用受体Aの梁部受用支柱2上端部分に、梁型枠22を支
持するための受金具Gのネジ棒G1下端部分を夫々差し
込み、スラブ部受用支柱3上端部分に、スラブ型枠23
を支持するための受金具Gのネジ棒G1下端部分を夫々
差し込んで、受枠Rが構成される。しかも、梁部受用支
柱2に装着された受金具Gでは、梁型枠22の梁底型枠
下面にある複数の根太21を支持する大引き20が支持
され、スラブ部受用支柱3に装着された受金具Gでは、
スラブ型枠23下面にある大引き20が支持され、梁型
枠22と、この梁型枠22近傍のスラブ型枠23とを同
時に支持している。そして、この型枠支持装置は、梁に
沿って適宜複数配置され、型枠支持装置相互は、水平つ
なぎ25によって連結される。
Then, the receiving frame R is mounted on the temporary support tower T. That is, a pair of beam form frame receivers A that are arranged in parallel are temporarily installed so that the stacking columns 1 are connected to the columns C1 of the intermediate stacking body C at the uppermost portion of the temporary support tower T. It is mounted on a support tower T, and the pair of beam form receiving bodies A are connected to each other by a plurality of receiving body connecting tools F, and the upper ends of the beam receiving columns 2 of the beam forming frame receiving bodies A are further connected. The lower ends of the threaded rods G1 of the metal fittings G for supporting the beam form 22 are inserted into the respective parts, and the slab form 23 is inserted into the upper end of the slab receiving column 3.
The receiving frame R is configured by inserting the lower ends of the screw rods G1 of the receiving metal fittings G for supporting the brackets. In addition, in the receiving metal fitting G mounted on the beam receiving column 2, the large pulls 20 that support the plurality of joists 21 on the lower surface of the beam bottom frame of the beam frame 22 are supported and attached to the slab receiving column 3. In the receiving bracket G,
The large pull 20 on the lower surface of the slab form 23 is supported, and simultaneously supports the beam form 22 and the slab form 23 near the beam form 22. Then, a plurality of the frame support devices are appropriately arranged along the beam, and the frame support devices are connected to each other by a horizontal joint 25.

【0026】また、型枠支持装置全体の強度、剛性、及
び安定性等をより高めなければならないときや、スラブ
型枠23からの負荷が大きいとき等は、仮設支持塔Tに
並設されるように、補助支持枠T1を梁型枠部用受体A
のスラブ部受用支柱3に連結すると共に、補助支持枠T
1を複数の補助枠連結具Jを介して仮設支持塔Tに連結
して使用する。すなわち、ジャッキベースDのネジ棒D
1上端部分を端部支持体Hの支柱H1下端部分内に差し
込んで複数のジャッキベースDを端部支持体Hに夫々装
着し、この端部支持体Hを所定位置に設置する。そし
て、端部支持体Hの上に複数の中間部積上体Cを順次積
上げて所定高さの積上式補助支持枠T1を形成する。こ
のとき、最上位置の中間部積上体Cの支柱C1をスラブ
部受用支柱3に連結する。
Further, when the strength, rigidity, stability and the like of the entire form supporting device must be further enhanced, or when the load from the slab form 23 is large, the temporary supporting tower T is installed in parallel. As described above, the auxiliary supporting frame T1 is attached to the beam form receiving member A.
Of the auxiliary support frame T while being connected to the slab receiving column 3 of
1 is connected to the temporary support tower T via a plurality of auxiliary frame connectors J and used. That is, the screw rod D of the jack base D
The upper end portion 1 is inserted into the lower end portion of the column H1 of the end support member H, the plurality of jack bases D are attached to the end support member H, and the end support member H is set at a predetermined position. Then, a plurality of intermediate portion stacking bodies C are sequentially stacked on the end portion supporting body H to form a stacking type auxiliary support frame T1 having a predetermined height. At this time, the pillar C1 of the intermediate-portion stack C at the uppermost position is connected to the slab-receiving pillar 3.

【0027】尚、筋交いDは、必要に応じて適宜位置に
装着される。ところで、型枠支持装置(仮設支持塔T)
の組立は、下から順に積上げるようにしても良いし、地
上等で横にして組立てた後、クレーン等を利用して起こ
しても良い。
The brace D is attached at an appropriate position as needed. By the way, formwork support device (temporary support tower T)
The assembling may be done by stacking from the bottom up, or may be done by using a crane or the like after assembling it sideways on the ground or the like.

【0028】[0028]

【発明の効果】従って、請求項1記載の型枠支持装置に
於ける梁型枠部用受体は、梁型枠とスラブ型枠を床面等
から支持する型枠支持装置の構成部材であって、所定間
隔を隔てて平行に配置される丸パイプ状の左右積上用支
柱と、この左右積上用支柱の内がわに、所定間隔を隔て
て平行に配置される丸パイプ状の左右梁部受用支柱と、
左右積上用支柱の外がわに、所定間隔を隔てて平行に配
置される丸パイプ状の左右スラブ部受用支柱と、これら
左右積上用支柱、左右梁部受用支柱、左右スラブ部受用
支柱夫々を一体的に連結する複数の横架連結杆と、一方
の積上用支柱の下端部分に、その先端開口部が下方を向
くように固着される略円筒状の継手とを備え、継手は、
先端開口部と、中央膨出部と、基端嵌合部とに区分さ
れ、先端開口部は、積上用支柱端部外径より僅かに大き
な内径に設定し、中央膨出部は、筒心方向中央部分が外
方に向って比較的緩やかに湾出するよう形成すると共
に、積上用支柱端部外径より大きな内径に設定し、基端
嵌合部は、積上用支柱端部外径に略一致する内径に設定
すると共に、積上用支柱端部に固着し、先端開口部の周
縁部分は、先端がわに行くに従って漸次拡開するような
略ラッパ状に形成し、左右積上用支柱の下端部分を、継
手を介して適宜積上式仮設支持塔上部に差し込み装着可
能となるよう形成し、左右スラブ部受用支柱は、その上
端部が左右梁部受用支柱の上端部より上方に位置するよ
う形成し、左右梁部受用支柱の上端部分には梁型枠支持
用の受金具が、左右スラブ部受用支柱の上端部分にはス
ラブ型枠支持用の受金具が、夫々差し込み装着可能とな
るよう構成したので、所望高さに自由に調節できる仮設
支持塔の上部に容易に且つ確実に差し込み装着でき、し
かも、取扱いが容易で、高所での組立て、解体作業が容
易に行えるようになり、高所作業に伴う危険性を減少す
ることができ、その運搬、保管にも便利な梁型枠部用受
体となる。また、梁型枠と梁型枠近傍のスラブ型枠とを
バランス良く支えられるようになると共に、梁型枠と梁
型枠近傍のスラブ型枠とを安定的に且つ正確に支持でき
るようになり、更に、同じ受金具を利用して、梁型枠
と、この梁型枠より上方に位置するスラブ型枠とを、安
定的に且つ強固に支持できるようになる。しかも、梁型
枠部用受体の自身の構成が簡素となり、堅牢で、耐久性
に富み、量産に適し、低廉に提供できるものとなる。
Therefore, the beam form receiving member in the form supporting device according to the first aspect is a component of the form supporting device for supporting the beam form and the slab form from the floor surface or the like. There is a circular pipe-shaped left-right stacking strut that is arranged in parallel at a predetermined interval, and a circular pipe-shaped strut that is arranged in parallel at a predetermined interval in the inner wall of this left-right stacking strut. Left and right beam support pillars,
Round pipe-shaped left and right slab receiving struts, which are arranged parallel to each other on the outer wall of the left and right stacking struts, and these left and right slab receiving stanchions, left and right beam receiving stanchions, left and right slab receiving stanchions A plurality of horizontal connecting rods that integrally connect each of them, and a substantially cylindrical joint that is fixed to the lower end portion of one of the stacking columns so that its tip opening faces downward are provided. ,
It is divided into a tip opening, a central bulge, and a base end fitting portion.The tip opening is set to an inner diameter slightly larger than the outer diameter of the end of the stacking strut, and the central bulge is a cylinder. The center part in the axial direction is formed so as to project relatively outwardly, and the inner diameter is set to be larger than the outer diameter of the end of the stacking support column. The inner diameter is set to approximately match the outer diameter, and it is fixed to the end of the stacking support column, and the peripheral edge of the tip opening is formed into a substantially trumpet shape that gradually expands as the tip goes to the left and right. The lower end of the stacking column is formed so that it can be installed by inserting it into the upper part of the stacking type temporary support tower through a joint, and the upper ends of the left and right slab part receiving columns are the upper ends of the left and right beam part receiving columns. The brackets for supporting the beam formwork are formed at the upper end of the left and right beam support columns. The brackets for supporting the slab formwork are configured so that they can be inserted and installed at the upper ends of the support posts for the bulges, so they can be easily and securely inserted into the upper part of the temporary support tower that can be freely adjusted to the desired height. A beam type that can be attached, is easy to handle, and can be easily assembled and disassembled at high places, reducing the risks associated with work at high places and being convenient for transportation and storage. It will be the frame receiver. Further, the beam formwork and the slab formwork in the vicinity of the beam formwork can be supported in good balance, and the beam formwork and the slab formwork in the vicinity of the beam formwork can be stably and accurately supported. Further, it becomes possible to stably and firmly support the beam formwork and the slab formwork located above the beam formwork by using the same receiving metal fittings. In addition, the structure of the beam frame receiver is simple, robust, and durable, suitable for mass production, and can be provided at low cost.

【0029】特に、継手は、先端開口部と、中央膨出部
と、基端嵌合部とに区分され、先端開口部は、積上用支
柱端部外径より僅かに大きな内径に設定し、中央膨出部
は、筒心方向中央部分が外方に向って比較的緩やかに湾
出するよう形成すると共に、積上用支柱端部外径より大
きな内径に設定し、基端嵌合部は、積上用支柱端部外径
に略一致する内径に設定すると共に、積上用支柱端部に
固着し、先端開口部の周縁部分は、先端がわに行くに従
って漸次拡開するような略ラッパ状に形成し、左右積上
用支柱の下端部分を、継手を介して適宜積上式仮設支持
塔上部に差し込み装着可能となるよう形成したので、継
手に適宜積上式仮設支持塔上部(中間部積上体の支柱端
部)を差し込み装着する際、差し込み始めは、継手の筒
心に対して若干傾いた状態であっても、漸次差し込んで
いく内に、仮設支持塔上部(中間部積上体の支柱端部)
が、中央膨出部内周壁に沿って移動するようになって、
継手の筒心に対して一致するように矯正され、仮設支持
塔上部(中間部積上体の支柱端部)が、基端嵌合部に収
まったときに、継手の筒心に対して一致するようにな
る。しかも、先端開口部の周縁部分によって、仮設支持
塔上部(中間部積上体の支柱端部)を継手内により導入
し易くなる。すなわち、梁型枠部用受体の適宜積上式仮
設支持塔上部(中間部積上体の支柱端部)への差し込み
装着が誰でも簡単に容易に行えるようになると共に、正
確な装着状態が期待できるようになる。
Particularly, the joint is divided into a tip opening portion, a central bulge portion, and a base end fitting portion, and the tip opening portion is set to have an inner diameter slightly larger than the outer diameter of the end of the column for stacking. , The central bulging part is formed so that the central part in the direction of the center of the cylinder projects toward the outside relatively slowly, and is set to have an inner diameter larger than the outer diameter of the end of the supporting column for stacking. Is set to an inner diameter that substantially matches the outer diameter of the end of the stacking support column, and is fixed to the end of the stacking support column so that the peripheral edge portion of the tip opening gradually expands as the tip goes to the crook. Since it is formed into a substantially trumpet shape, and the lower end part of the left and right stacking support columns can be appropriately inserted into the upper part of the stacking type temporary support tower through a joint so that it can be mounted When inserting (the end of the support column of the intermediate part stacking body) and installing it, at the beginning of insertion, tilt it slightly with respect to the joint core Even state, within going insert progressively temporary support tower top (pillar end of the intermediate portion product body)
However, as it moves along the inner wall of the central bulge,
Corrected to match the joint core, and when the upper part of the temporary support tower (the end of the column of the intermediate product stack) fits into the base fitting part, it matches the joint cylinder. Come to do. Moreover, the peripheral portion of the tip opening facilitates the introduction of the upper portion of the temporary support tower (the end portion of the column of the intermediate stacking body) into the joint. That is, anyone can easily and easily insert the beam form frame receiver into the upper part of the stacking type temporary support tower (the end of the pillar of the intermediate part stacking body) and the accurate mounting state. Can be expected.

【0030】また、請求項2記載の型枠支持装置に於け
る梁型枠部用受体は、継手の基端嵌合部の周壁の積上用
支柱端部固着部分に、適宜孔を穿設したので、この孔に
よって、継手内の水抜きが容易に且つ確実に行われるよ
うになると共に、継手を支柱に確実に溶接できるように
なる。特に、孔によって仮設支持塔の上部(中間部積上
体の支柱端部)が継手内に確実に収まっているか否かを
外部から容易に視認できるようになる(すなわち、中間
部積上体の支柱端部と、積上用支柱端部とが接触してい
るか否かの確認が容易に行えるようになる。)。
Further, in the beam form part receiver in the form support device according to the second aspect, holes are appropriately drilled in the portion of the peripheral wall of the base end fitting part of the joint for fixing the end part of the stacking support column. Since it is provided, this hole allows easy and reliable drainage of water in the joint, as well as reliable welding of the joint to the column. In particular, the holes make it possible to easily visually confirm from outside whether or not the upper part of the temporary support tower (the end of the column of the intermediate product stack) is securely contained in the joint (that is, the intermediate product stack It will be possible to easily confirm whether or not the support column end and the stacking support column end are in contact with each other.).

【図面の簡単な説明】[Brief description of drawings]

【図1】型枠支持装置の正面図FIG. 1 is a front view of a form support device.

【図2】型枠支持装置の側面図FIG. 2 is a side view of the form support device.

【図3】型枠支持装置上部の受枠の斜視図FIG. 3 is a perspective view of a receiving frame on an upper portion of the form supporting device.

【図4】型枠支持装置上部の受枠の平面図FIG. 4 is a plan view of a receiving frame on the upper side of the form supporting device.

【図5】補助支持枠を装着した状態の型枠支持装置の正
面図
FIG. 5 is a front view of the form support device with an auxiliary support frame attached.

【図6】補助支持枠を装着した状態の型枠支持装置の側
面図
FIG. 6 is a side view of the form support device with an auxiliary support frame attached.

【図7】梁型枠部用受体の斜視図FIG. 7 is a perspective view of a beam form frame receiver.

【図8】継手部分の断面図FIG. 8 is a sectional view of a joint portion.

【符号の説明】[Explanation of symbols]

S 型枠支持装置 R 受枠 T 仮設支持塔 T1 補助
支持枠 A 梁型枠部用受体 1 積上
用支柱 2 梁部受用支柱 3 スラ
ブ部受用支柱 4 横架連結杆 4a 筋交
い取付孔 5 補強斜杆 6 継手 6a 先端開口部 6b 中央
膨出部 6c 基端嵌合部 7 孔 B 基礎枠体 B1 支柱 B2 連結杆 B3 継手 C 中間部積上体 C1 支柱 C2 連結杆 C3 継手 D ジャッキベース D1 ネジ
棒 D2 ベースプレート D3 調節
ハンドル E 筋交い F 受体連結具 F1 クラ
ンプ F2 連結杆 F3 筋交
い取付片 F4 筋交い取付孔 G 受金具 G1 ネジ
棒 G2 受片 G3 調節
ハンドル H 端部支持体 H1 支柱 H2 連結杆 H3 継手 J 補助枠連結具 20 大引き 21 根太 22 梁型枠 23 スラ
ブ型枠 25 水平つなぎ
S Form support device R Receiving frame T Temporary support tower T1 Auxiliary supporting frame A Beam form frame receiver 1 Stacking column 2 Beam part receiving column 3 Slab part receiving column 4 Horizontal connecting rod 4a Bracing mounting hole 5 Reinforcing diagonal Rod 6 Joint 6a Tip opening 6b Central bulge 6c Base end fitting 7 Hole B Foundation frame B1 Strut B2 Connecting rod B3 Joint C Intermediate part stacking body C1 Strut C2 Connecting rod C3 Joint D Jack base D1 Screw rod D2 Base plate D3 Adjusting handle E Brace F Receiver connecting tool F1 Clamp F2 Connecting rod F3 Brace attaching piece F4 Brace attaching hole G Receiving metal fitting G1 Screw rod G2 Receiving piece G3 Adjusting handle H End support H1 Support H3 Jointing rod J Auxiliary frame connection tool 20 Daihiki 21 Joists 22 Beam formwork 23 Slab formwork 25 Horizontal connection

フロントページの続き (56)参考文献 実開 昭63−5145(JP,U) 実開 平1−98858(JP,U) 実開 昭47−18932(JP,U) 実開 昭63−3754(JP,U)Continued front page (56) References Open 63-5145 (JP, U) Open Flat 1-98858 (JP, U) Open 47-18932 (JP, U) Open 63-63754 (JP , U)

Claims (2)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 梁型枠とスラブ型枠を床面等から支持す
る型枠支持装置の構成部材であって、所定間隔を隔てて
平行に配置される丸パイプ状の左右積上用支柱と、この
左右積上用支柱の内がわに、所定間隔を隔てて平行に配
置される丸パイプ状の左右梁部受用支柱と、左右積上用
支柱の外がわに、所定間隔を隔てて平行に配置される
パイプ状の左右スラブ部受用支柱と、これら左右積上用
支柱、左右梁部受用支柱、左右スラブ部受用支柱夫々を
一体的に連結する複数の横架連結杆と、一方の積上用支
柱の下端部分に、その先端開口部が下方を向くように
着される略円筒状の継手とを備え、継手は、先端開口部
と、中央膨出部と、基端嵌合部とに区分され、先端開口
部は、積上用支柱端部外径より僅かに大きな内径に設定
し、中央膨出部は、筒心方向中央部分が外方に向って比
較的緩やかに湾出するよう形成すると共に、積上用支柱
端部外径より大きな内径に設定し、基端嵌合部は、積上
用支柱端部外径に略一致する内径に設定すると共に、積
上用支柱端部に固着し、先端開口部の周縁部分は、先端
がわに行くに従って漸次拡開するような略ラッパ状に形
成し、左右積上用支柱の下端部分を、継手を介して適宜
積上式仮設支持塔上部に差し込み装着可能となるよう形
成し、左右スラブ部受用支柱は、その上端部が左右梁部
受用支柱の上端部より上方に位置するよう形成し、左右
梁部受用支柱の上端部分には梁型枠支持用の受金具が、
左右スラブ部受用支柱の上端部分にはスラブ型枠支持用
の受金具が、夫々差し込み装着可能となるよう構成した
ことを特徴とする型枠支持装置に於ける梁型枠部用受
体。
1. A component of a form supporting device for supporting a beam form and a slab form from a floor surface or the like, and circular pipe-shaped left and right stacking columns arranged in parallel at a predetermined interval. , The inner pillars of the left and right stacking pillars, the circular pipe-shaped left and right beam portion receiving pillars arranged in parallel at a predetermined interval, and the outer pillars of the left and right stacking pillars at a predetermined interval. circles arranged parallel to
The pipe-shaped left and right slab part receiving columns, the left and right stacking columns, the left and right beam part receiving columns, and the plurality of horizontal connecting rods that integrally connect the left and right slab part receiving columns, respectively, and one of the stacking columns the lower end portion, with the distal end opening and a substantially cylindrical joint being solid <br/> dressed so as to face downward, fitting the tip opening
And the central bulge and the base end fitting part
The inside diameter is set to be slightly larger than the outside diameter of the end of the supporting column for stacking.
However, the central bulging part is
It is formed so as to project out relatively gently, and the stacking support
Set the inner diameter larger than the outer diameter of the end,
Set the inner diameter to approximately match the outer diameter of the support column end, and
It is fixed to the end of the upper strut, and the peripheral edge of the tip opening is the tip.
It is shaped like a trumpet that gradually expands as it goes to the river.
The left and right slab support columns are formed so that the lower ends of the left and right stacking columns can be installed by inserting them into the upper part of the stacking type temporary support tower via joints. It is formed so as to be located above the upper end of the strut, and at the upper end of the left and right beam part receiving strut, there is a bracket for supporting the beam formwork.
A support for a beam form part in a form support device, characterized in that receiving brackets for supporting a slab form are configured so that they can be inserted and mounted on the upper end portions of the right and left slab part receiving columns.
【請求項2】 継手の基端嵌合部の周壁の積上用支柱端
部固着部分に、適宜孔を穿設したことを特徴とする請求
項1記載の型枠支持装置に於ける梁型枠部用受体。
2. An end of a prop for stacking a peripheral wall of a base end fitting portion of a joint.
2. The beam form frame receiver in the form supporting device according to claim 1 , wherein holes are appropriately formed in the part fixing portion .
JP3044425A 1991-02-15 1991-02-15 Beam formwork receiver in formwork support device Expired - Lifetime JP2524897B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP3044425A JP2524897B2 (en) 1991-02-15 1991-02-15 Beam formwork receiver in formwork support device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP3044425A JP2524897B2 (en) 1991-02-15 1991-02-15 Beam formwork receiver in formwork support device

Publications (2)

Publication Number Publication Date
JPH04261963A JPH04261963A (en) 1992-09-17
JP2524897B2 true JP2524897B2 (en) 1996-08-14

Family

ID=12691138

Family Applications (1)

Application Number Title Priority Date Filing Date
JP3044425A Expired - Lifetime JP2524897B2 (en) 1991-02-15 1991-02-15 Beam formwork receiver in formwork support device

Country Status (1)

Country Link
JP (1) JP2524897B2 (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2946432B2 (en) * 1991-03-26 1999-09-06 東日本旅客鉄道株式会社 Phase detector
JPH0530340U (en) * 1991-09-20 1993-04-20 ホリー株式会社 Movable jack
JPH06217605A (en) * 1993-01-27 1994-08-09 Kubota Corp Device for driving rotary cover
JPH0671752U (en) * 1993-03-17 1994-10-07 三井造船株式会社 Mobile erection equipment
JP2878589B2 (en) * 1994-04-06 1999-04-05 アサヒ産業株式会社 Temporary structure
JP3514887B2 (en) * 1995-09-06 2004-03-31 株式会社有弘メンテナンス Shoring system
JP2007309029A (en) * 2006-05-22 2007-11-29 Alinco Inc Single-pipe scaffold
JP5647772B2 (en) * 2009-06-08 2015-01-07 日鐵住金建材株式会社 Lifting movable overhang scaffold
JP5172796B2 (en) * 2009-08-17 2013-03-27 株式会社タイセン工業 Horizontal member and gantry using the horizontal member

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0536042Y2 (en) * 1986-06-30 1993-09-13
JPH0532593Y2 (en) * 1987-12-23 1993-08-20

Also Published As

Publication number Publication date
JPH04261963A (en) 1992-09-17

Similar Documents

Publication Publication Date Title
EP0711889A2 (en) Form panel
KR101011417B1 (en) System Formwork for FSM
JP2524897B2 (en) Beam formwork receiver in formwork support device
WO2013040495A1 (en) Concrete forming systems and methods
CN111206768B (en) Light beam plate structure platform and construction method thereof
CA2534944A1 (en) Bridge overhang bracket
GB2216584A (en) Assembly of surfaces for the construction of concrete injection moulds
CN218912324U (en) Reinforcing steel bar framework binding auxiliary frame
JP4623570B2 (en) Construction method of jack base and formwork support
CN111535613A (en) Freely combined lattice type supporting structure and construction process
CN216840604U (en) Plane supporting unit for beam formwork and formwork supporting system
WO2009123567A2 (en) A connector claw
JPH0536042Y2 (en)
JPH0447300Y2 (en)
CN220645265U (en) Installation node of steel roof structure lifting device
KR102361789B1 (en) Supporter for installating horizontal member of supporting system
JP2670427B2 (en) Construction method of reinforced concrete columns and reinforcing bar positioning jig used for the implementation
CN216949489U (en) Inclined column angle jig frame
JP2542018Y2 (en) End support frame of stacked temporary support frame
JPH08312160A (en) Reinforcing structure of sill frame in moving building
JP3170409B2 (en) Concrete foundation support bracket
JPH0119718Y2 (en)
JPH06299699A (en) Support device of floor form
JPH0115799Y2 (en)
JPH0723484Y2 (en) Intermediate part stacking body in stacking type temporary support frame

Legal Events

Date Code Title Description
R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R360 Written notification for declining of transfer of rights

Free format text: JAPANESE INTERMEDIATE CODE: R360

R370 Written measure of declining of transfer procedure

Free format text: JAPANESE INTERMEDIATE CODE: R370

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080531

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20080531

Year of fee payment: 12

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090531

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20090531

Year of fee payment: 13

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20100531

Year of fee payment: 14

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110531

Year of fee payment: 15

EXPY Cancellation because of completion of term
FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110531

Year of fee payment: 15