JP3514887B2 - Shoring system - Google Patents
Shoring systemInfo
- Publication number
- JP3514887B2 JP3514887B2 JP22927495A JP22927495A JP3514887B2 JP 3514887 B2 JP3514887 B2 JP 3514887B2 JP 22927495 A JP22927495 A JP 22927495A JP 22927495 A JP22927495 A JP 22927495A JP 3514887 B2 JP3514887 B2 JP 3514887B2
- Authority
- JP
- Japan
- Prior art keywords
- support
- lower frame
- column
- beam lower
- vertical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Tents Or Canopies (AREA)
- Rod-Shaped Construction Members (AREA)
Description
【発明の詳細な説明】
【0001】
【発明の属する技術分野】この発明は、コンクリート構
造物等の構築時において、スラブや壁、柱、梁等を形成
する型枠の支持及び、トラス構造物のトラス屋根の支持
等を行なうために用いる支保工システムに関する。
【0002】
【従来の技術】例えば、コンクリート構造物の構築にお
いて、スラブや壁、柱、梁等を形成するためには、各型
枠を下階のスラブ上に組立てた支保工で支持する必要が
ある。
【0003】従来、上記のような支保工は、パイプサポ
ートを用いるか、パイプを組み合せた仮設構造物が使用
されている。
【0004】
【発明が解決しようとする課題】ところで、パイプサポ
ートの使用は、荷重支持強度が不安定であり、多数本を
床上に林立させることになり、床面上での作業や歩行が
行なえない状態になるため、資材の搬入等他の作業がス
ラブの凝固まで待たなければならず、コンクリート構造
物の施工能率を低下させる要因になっている。
【0005】また、パイプを組合せた従来の仮設構造物
は、縦柱を上方に順次継足すと共に、この縦柱を所定の
間隔で並べて配置し、隣接する縦柱を順次横桟と斜材で
結合することにより、ジャングルジム状に組立てた構造
になっているため、この場合でも横桟と斜材によって各
縦柱間が閉鎖されることになり、床面上での資材の搬入
搬出や歩行等が困難で足場としての機能がない。
【0006】また、従来の仮設構造物において、スラブ
型枠や梁型枠を支持するため、最上部縦柱間に架設する
梁下枠は、上部横桟の両端を縦柱に取付ける構造になっ
ているため、縦柱との結合強度及び荷重支持強度が弱
く、仮設構造物の剛性を高めることができないと共に、
縦柱の配置間隔を変化させる場合、それに応じて梁下枠
の長さも変化させねばならず、梁下枠の種類数が多くな
り、資材管理や仮設構造物の組立てが複雑になり、製作
費用も高くつくという問題がある。
【0007】更に、従来の支保工は、床面上に組み立て
た状態で移動させることは困難であり、同一フロア上に
おいて、型枠支持場所を変える場合は、一度解体した状
態で移動させ、再度組み立てを行なわなければならず、
移動のために多くの労力と時間がかかるという問題があ
る。
【0008】そこで、この発明の課題は、寸法の規格化
により設計管理が容易となり、しかも荷重支持強度に優
れ、型枠支持位置の選択が自由に設定でき、壁とスラブ
の一体成形が可能となり、かつ、組み立て状態のままで
移動させることも可能となる型枠の支保工システムを提
供することにある。
【0009】
【課題を解決するための手段】上記のような課題を解決
するため、この発明は、少なくとも四方に配置した縦柱
を上方に順次継足すと共に、縦柱に設けたフランジに結
合金具を結合することによって、隣接する各縦柱を互に
水平材とブレースで結合して支柱を組み立て、この支柱
における上端部縦柱間に同じく縦柱に設けたフランジに
結合金具を結合することによって梁下枠を架設状に固定
し、該梁下枠に設けたピン孔を利用してこの梁下枠の所
望位置にサポート用支柱を垂直に固定し、このサポート
用支柱の上端及び上記縦柱の上端に支持高さの調節が可
能なサポートを取付け、このサポートで大引を介してス
ラブ型枠を支持するようにした構成を採用したものであ
る。
【0010】
【0011】
【0012】ここで、支柱を構成する縦柱は、上下端部
と中間部の外周面にフランジを有し、隣接する縦柱の上
部フランジ相互及び下部フランジ相互は、両端に結合金
具を有する水平材で結合すると共に、上下対角位置の結
合金具をブレースで結合し、このブレースに設けた水平
部材が両端の結合金具で両側や間部のフランジを接合
し、これによって剛性の高い支柱を組み立てる。
【0013】
【発明の実施の形態】以下、この発明の実施の形態を図
示例と共に説明する。
【0014】図1と図2及び図11に示すように、四方
に配置して順次上方に継足す縦柱1は、例えば、長さ1
800mmの鋼管を用い、上端部に継足し用のジョイン
ト2を有し、上端部と中間部の外面にフランジ3が固定
されている。
【0015】四方に配置した縦柱1は、隣接する縦柱相
互が上端部のフランジ3を利用して水平材4で結合さ
れ、かつ、上下の水平材4の端部対角位置がブレース5
によって結合されると共に、隣接する縦柱1の中間フラ
ンジ3は、ブレース5に設けた水平杆6によって結合す
る。
【0016】上記のように、四方に配置した縦柱1の上
方への継足しと、縦柱群の四面を水平材4とブレース5
及び水平杆6で結合することにより、必要とする高さの
支柱Aを構成することができる。なお、支柱Aは、縦柱
1を平面的に六本、八本等組合せて構成してもよい。
【0017】前記支柱Aにおける最上部縦柱1の上端に
は、この縦柱1の上端に予め取付けてあるジョイントを
用いて自在縦柱7が接続される。この自在縦柱7は、縦
柱1の略半分程度の上下長さを有し、上下端部と中間部
にフランジ3が設けられている。
【0018】支柱Aの上端で縦柱1に継足した自在縦柱
7は、隣接する自在縦柱7相互が上下に設けたフランジ
3を用いて梁下枠8で結合される。この梁下枠8は角パ
イプを用いた上桟9と下桟10をトラス材11で結合し
て形成されている。
【0019】前記縦柱1と自在縦柱7に設けたフランジ
3、3は、図10に示すように、外形が四角形で各辺に
対応する四箇所の位置に一対の角孔12が設けられ、前
記水平材4及び水平杆6の両端部と、梁下枠8における
上桟9及び下桟10の両端部には、上記角孔12を利用
してフランジ3、3に結合する結合金具13が固定され
ている。
【0020】この結合金具13は、図10に示すよう
に、上桟9と下桟10の両端部及び水平材4や水平杆6
の端部に固定するコ字状本体14の両側前縁に角孔12
へ係止するフック15を設け、このコ字状本体14内
に、縦柱1や自在縦柱7への当接部材16と、コ字状本
体14内の背面と当接部材16との間に圧入するクサビ
17を収納した構造を有し、フック15を角孔12に係
止した状態でクサビ17を圧入すると、角孔12とフッ
ク15の係合部を反力として当接部材16を縦柱1又は
自在縦柱7に圧接させることにより、縦柱1又は自在縦
柱7と水平材4等を直角の状態で強固に結合するように
なっている。
【0021】上記結合金具13における本体14の両面
で上下又は下部の位置にブレースピン18が突設固定さ
れ、ブレース5は、上下水平材4の対角位置にある結合
金具13のブレースピン18を結合する一対の斜材5a
を中央交差部分で互に枢着し、枢着部分に水平杆6の中
央部を枢止し、該水平杆6の両端に、前記水平材4と同
様の結合金具13を固定した構造を有し、斜材5aの両
端にピン孔を設け、隣接する縦柱1の対角位置にある上
下端部の結合と、縦柱1相互の中間部の結合を行なうこ
とになる。
【0022】前記梁下枠8の対向面間には、自在梁下枠
19が取付け位置を選べるように架設され、この自在梁
下枠19と梁下枠8及び自在縦柱7にサポート20が取
付けられ、これらサポート20により、大引21を介し
てスラブ型枠22や梁型枠を支持することになる。な
お、自在梁下枠19は梁下枠8と同じ構造になってい
る。
【0023】上記サポート20には、脱力器付サポート
20aと自在クランプ付サポート20bと、軽量サポー
ト20cの三種類が用意され、支持条件に応じて選択使
用されると共に、自在縦柱7に対するサポート20の取
付けは上部から直接挿入するのに対し、梁下枠8及び自
在梁下枠19への取付けにはサポート用支柱23が用い
られる。なお、各サポートにおいて、共通する部分は同
一符号を付して説明する。
【0024】脱力器付サポート20aは、図6に示すよ
うに、自在縦柱7及びサポート用支柱23内に嵌合する
外径を有するパイプ24に径方向に貫通する多数のピン
孔25を軸方向に一定の間隔で設け、パイプ24に上端
部から挿入する螺軸26の上端にコ字状の大引受27を
固定すると共に、螺軸26に、回動自在となるよう螺合
するジャッキハンドル28と、このジャッキハンドル2
8の下部に位置するようパイプ24の上端に設けた脱力
器29を取付けた構造になっている。
【0025】脱力器29は、図6の如く、パイプ24の
上端に固定したコ字状受金具30内に下部クサビ部材3
1と上部クサビ部材32を上下に重ねて収納し、受金具
30と上部クサビ部材32には螺軸26の貫通孔33、
34を設けると共に、下部クサビ部材31は長手方向に
移動自在となるよう受金具30で支持し、底部に螺軸2
6の貫通する長孔34aを有している。
【0026】受金具30と上部クサビ部材32は、ピン
35によって上部クサビ部材32の上下動のみを許容す
るよう結合され、下部クサビ部材31は上端縁部に係止
凹部36を有し、受金具30に上下動自在となるよう取
付けたピン37を係止凹部36に係合することにより、
下部クサビ部材31の前進位置が保持され、上部クサビ
部材32が押上げられていると共に、ピン37を上方へ
持ち上げて係止を解き、下部クサビ部材31を上り傾斜
側に移動させると、上部クサビ部材32は下降すること
になる。
【0027】従って、ジャッキハンドル28が上部クサ
ビ部材32で支持された螺軸26の大引受27は、ピン
37の抜差による下部クサビ部材31の移動により上下
動し、スラブ型枠等の支持を一気に解くことができる。
なお、図中38は螺軸26の下端にピン39で固定した
抜止用のリングであり、受金具30によって螺軸26は
上方に抜止め状態となる。
【0028】自在クランプ付サポート20bは、図7に
示すように、螺軸26の上端に円形のパイプ40を水平
に固定し、このパイプ40上に大引受41を円周方向に
可動となるよう載置し、大引受41の両端部にU字状と
なるパイプ抱持金具42、43を固定し、一方抱持金具
42にはねじ込みによって大引受41をパイプ40に圧
接固定するためのボルト44を装着し、大引受41の他
端側に固定したナット45に大引21を幅方向に押圧
し、一方抱持金具42とで大引21を挾持する締付ボル
ト46を装着している。
【0029】上記螺軸26には、ジャッキハンドル28
を回動自在に螺合し、図示例では、パイプ24との間に
脱力器29を設けた例を示したが、これを省略してもよ
い。
【0030】軽量サポート20cは、図2に示すよう
に、パイプ24の上端に挿入する螺軸26にジャッキハ
ンドル28を回動自在に螺合し、螺軸26の上端にコ字
状の大引受27を固定した構造になっている。
【0031】上記各サポート20を、梁下枠8や自在梁
下枠19に取付けるために用いるサポート用支柱23
は、図4に示すように、自在縦柱7と同様のパイプを用
い、上端部に下向コ字状の金具47と下端部に上下動自
在で上昇弾性が付勢されたピン48を設け、金具47を
梁下枠8又は自在梁下枠19の上桟9に外嵌し、その下
面に突設したピン49を上桟9の上面に設けたピン孔5
0に係止すると共に、下部のピン45を下桟10の下面
に設けたピン孔に係止することにより、梁下枠8又は自
在梁下枠19に対して垂直に固定すると共に、ピン孔5
0の間隔で取付け位置を選べるようになっており、各サ
ポート20はパイプ24をこのサポート用支柱23に挿
入することによって配置される。なお、サポート20の
上下高さの大きな調節は、ピン孔25を利用し、縦柱1
と自在縦柱7及びサポート用支柱23の上端部の位置に
おいて、ピン51の抜差によって行なう。
【0032】図3と図5は、梁下枠8に対する自在梁下
枠19の取付け構造を示し、梁下枠8の上桟9と下桟1
0に装着する支持金具52は、下向コ字状に形成され、
この支持金具52の内部上面に、上桟9及び下桟10に
設けたピン孔50、50に挿入するピン53を固定する
と共に、支持金具52の両側外面に設けたフランジ54
に結合金具13のフック15を係止する一対の角孔55
を設けた構造を有し、対向する梁下枠8間に位置させた
自在梁下枠19は、上棧9と下棧10の両端部に設けた
結合金具13のフック15を角孔55に係止することに
より梁下枠8間に架設する。
【0033】図8は、サポート20上に設けた大引21
の支持構造を示し、大引21はアルミ等の材料を用いて
断面略コ字状に形成し、背面の上下に突条56と凹溝5
7を長さ方向に沿って設けると共に、上下端部に開口幅
の狭い断面形状を有する溝58を設けて形成され、サポ
ート20の大引受27と大引21の下部とは、溝58に
先端を係止したクランプ59のボルト60によって締付
け固定し、大引21の上部とスラブ型枠22を支持する
根太22aの固定は、根太22aに外嵌してボルト61
で固定したコ字状金具62の係止片63を溝58内に係
止することによって行なっている。
【0034】上記大引21に作用する荷重が大きい場
合、図8に一点鎖線で示すように、二本の大引21、2
1を背中合せ状に配置して使用してもよく、また、大引
21の接続においても同様に背中合せ状とし、このと
き、突条56と凹溝57が互に嵌合する。
【0035】なお、大引21は、図7で示したように、
角パイプを用いたり、木製角材を使用するようにしても
よい。
【0036】図2は、支柱Aによってスラブ型枠22と
壁形枠64及び両型枠22、64間に設けたハンチ型枠
65によって、壁とスラブを一体のコンクリートで形成
する構造を示し、結合金具13を備えたジャッキ60を
フランジ3に水平状態で固定し、ジャッキ60に固定し
た大引受66に大引21を固定し、この大引21にコ字
状金具62で壁型枠64の根太67を固定し、壁型枠6
4を垂直に支持すると共に、ジャッキ60によりコンク
リート面からの壁型枠64の剥離を可能にしている。な
お、支柱Aに対する壁型枠64の取付構造は、壁型枠6
4を引込んで剥離できるものであればよい。
【0037】壁型枠64の根太67の上端とスラブ型枠
22の根太22aの端部を、大径管と小径管の組合せか
らなる伸縮自在のハンチ調節根太65aで結合し、この
根太65aでハンチ型枠65を支持することにより、ハ
ンチ部分の角度変化や長さの変化に対応できるようにし
ている。
【0038】図2と図12のように、ハンチ調節根太6
5aは、大径角パイプ65bと小径角パイプ65cを伸
縮自在に嵌合し、ボルト65dで長さ方向を結合すると
共に、両端部を根太67及び22aと各々ジョイント6
5eを用いて接続し、該ハンチ調節根太65aでハンチ
型枠65を支持している。
【0039】なお、ハンチ型枠65による荷重は、支柱
Aに対して斜に作用し、かつ、壁型枠64による荷重は
横方向であるので、図2の如く、床面に設置した支柱A
は、最下位縦柱1の下端部フランジ3と床面の間を斜材
68で結合したり、図12の如く、支柱Aの上端部と床
面をターンバックル101で結合し、支柱Aの移動発生
を防止している。
【0040】図9と図10は、隣接する支柱Aにおい
て、自在縦柱7間もしくは、縦柱1間に架設する伸縮梁
下枠71を示し、上桟72と下桟73をトラス材74で
結合した二組の梁下枠単体71aと71bを重ね合わ
せ、各々の上桟72及び下桟73を、長さ方向に一定の
間隔で設けた横孔75の部分で複数のボルト76、76
によりで結合することにより、横孔75の間隔で長さ方
向に長さの調整を自在とし、両上桟72及び下桟73の
相反する端部に結合金具13を設けた構造を有し、支柱
Aの配置間隔の変化に対応するようになっており、この
伸縮梁下枠71での結合により、隣接する支柱A間に通
路空間等を確保できると共に、伸縮梁下枠71にスラブ
型枠22や梁型枠を支持するために、前記したサポート
20を取付けることができる。
【0041】図10A乃至Cは、伸縮梁下枠71におけ
る長さ調整部分の構造を示し、両上桟72、72の端部
に、相手上桟上に外嵌するコ字状金具77を設け、上桟
72、72の上面に設けたピン孔78にコ字状金具77
のピン79を嵌合し、長さ方向の位置決めを行なってい
る。
【0042】図12と図13は、支柱Aに対する壁型枠
64の取付構造の他の例を示し、矩形状支持枠91の後
端上部に結合金具13を設け、この支持杆91の上部水
平棧91aに外嵌する下向コ字状の水平杆92を水平桟
91aに設けた多数のピン孔91bとピン98でのピン
結合により長さ方向に有段的に位置調整が自在となるよ
う固定し、水平杆92上に、大引21の受台93と、大
引21と溝58を利用してクランプ金物99で結合する
大引き止金具94と、該止金具94を固定ナット100
に対する回動で移動させるねじ部材95とを設けて壁大
引ジャッキ96を形成し、大引21と壁型枠64の根太
67をクランプ金物97で結合している。
【0043】上記支持枠91は、フランジ3に結合金具
13を係止することにより、縦柱1又は自在縦柱7の外
面に水平状態で突出するように固定され、大引受ジャッ
キ96と大引21を介して壁型枠64を支持し、該ジャ
ッキ96の操作により壁型枠64を水平に移動させるこ
とができるようになっている。
【0044】図14は、スラブ型枠22と大引21の結
合に用いるクランプ金物99の構造を示し、大引21の
溝58内に挿入して抜止状に係止する断面L字状とな
り、その上部の一端に受板102を設け、他端にはクサ
ビ103の打込溝104を設けた構造を有し、スラブ型
枠22の桟材105とこれに重ねた根太22aを受板1
02と打込溝104の間に嵌込み、溝104にクサビ1
03を打込むと、桟材105と根太22aを結合すると
同時に大引21とスラブ型枠22を固定化することにな
る。なお、図12において、壁型枠64と大引21の結
合も同様のクランプ金物99を用いて行なった例を示し
ている。
【0045】この発明の支保工システムは、上記のよう
な構成であり、下端をジャッキベース80で支持した縦
柱1を床面上の四箇所に起立配置し、隣接する縦柱1相
互を水平材4とブレース5及び水平杆6で結合すること
により枠条に組み、各縦柱1の上方への継足しと水平材
4とブレース5及び水平杆6による結合で必要とする高
さの支柱Aを組み立て、この支柱Aを必要な数だけ平面
的に配置する。
【0046】各支柱Aにおける最上部縦柱1の上端に自
在縦柱7を接続すると共に、隣接する自在縦柱7は梁下
枠8で結合する。また、対向する梁下枠8間にはスラブ
型枠22の支持条件に合わせて自在梁下枠19を架設す
る。
【0047】また、隣接する支柱A間において、自在縦
柱7間を伸縮梁下枠71で結合し、更に隣接する縦柱1
を伸縮式の水平材82で結合する。これにより支柱A間
に通路空間を確保できると共に、支柱A内及び通路空間
に足場板を架設することにより、作業足場を構成するこ
とができる。
【0048】各自在縦柱7の上端と梁下枠8及び自在梁
下枠19の所望位置にサポート20を形枠支持の条件に
合わせて取付け、各サポート20により大引21と根太
22aを介してスラブ型枠22や梁型枠を支持する。各
サポート20はジャッキ28の操作によって型枠支持高
さを設定すると共に、脱力器29は上昇状態にセットし
ておく。
【0049】また、各支柱Aにおいて壁面と対応する面
の縦柱1及び自在縦柱7には、図2の如く、フランジ3
を利用して取付けたジャッキ60に大引21と根太67
を介して壁型枠64を取付け、壁型枠64の上端とスラ
ブ型枠22の端部をハンチ壁枠65で連結する。
【0050】この状態で配筋後に壁型枠64からハンチ
型枠65及びスラブ型枠22上に連続してコンクリート
を投入すれば、壁とハンチ部及びスラブが一体のコンク
リート構造物やトンネルを構築することができる。
【0051】上記梁下枠8及び自在梁下枠19に対する
サポート20の取付け位置は自由に選択できるので、ス
ラブ型枠22の支持は、荷重の条件や梁の配置条件の変
化に対して簡単に対応でき、現場での各種条件の変化に
対して容易に対処できる。
【0052】また、支柱Aは、最低4本の縦柱1を水平
材4とブレース5で結合し、これを上方へ順次継足すこ
とによって構築されるので、荷重支持強度の優れたもの
となる。
【0053】コンクリートの凝固後における各型枠の脱
型は、支柱Aが緊張したスラブ荷動の支持状態で、ジャ
ッキ60を収縮させ、壁型枠64を法制的に引張り、壁
面から壁型枠64を剥離させる。このとき、壁型枠64
の上端に一端が連結されたハンチ型枠65がハンチ壁面
から引き離される。このように、壁型枠64の剥離時
は、支柱Aが反力支持を行なうことになる。
【0054】また、スラブ型枠22との脱型は、各サポ
ート20のジャッキ28を下降操作すると共に、脱力器
29を下降状態にセットすれば、スラブ型枠22が下降
し、同時にハンチ部型枠65の上端側もハンチ部分から
離脱する。
【0055】上下のような荷重支持を解いた状態で、支
柱Aを組立時と逆の手順で解体すればよいが、隣接する
施工現場へ組立状態で移動させる場合は、支柱Aの最下
部縦柱1の下端にキャスターを取付け、ジャッキベース
80を上昇させて該キャスターを接地させたり、四隅の
縦柱を電動リフター等でフランジ3を利用して持上げる
ことにより、移動性を付与すればよい。
【0056】
【発明の効果】以上のように、この発明によると、四本
以上の縦柱を水平材とブレースで結合し、縦柱を順次継
足することによって支柱を組み立て、この支柱における
上端部縦柱間に梁下枠を固定し、この梁下枠に支持高さ
の調節が可能なサポートを取付け、該サポートで大引を
介して被支持物を支持するようにしたので、支柱は剛性
が高く荷重支持力に優れていると共に、サポートの取付
け位置を選ぶことにより、スラブ型枠やトラス等の荷重
や支持条件に応じた支持の選択が行なえ、荷重支持の基
準化と共に、現場での荷重支持条件の変化にも容易に対
応することができる。
【0057】更に、支柱を単位基準として支保工の構築
を行なうので、支保工の基準設計化が可能になり、しか
も、支柱により、スラブ型枠と壁型枠及びハンチ型枠の
支持が可能になり、壁とスラブの一体化したコンクリー
ト構造物の構築が実現できる。Description: BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a support for a formwork forming slabs, walls, columns, beams, etc., and a truss structure when constructing a concrete structure or the like. TECHNICAL FIELD The present invention relates to a shoring system used for supporting a truss roof or the like. [0002] For example, in the construction of concrete structures, in order to form slabs, walls, columns, beams and the like, it is necessary to support each formwork with a supporter assembled on a lower slab. There is. [0003] Conventionally, such a shoring method uses a pipe support or a temporary structure combining pipes. [0004] By the way, the use of a pipe support has an unstable load supporting strength, so that a large number of trees are erected on the floor, and work or walking on the floor surface cannot be performed. Therefore, other operations such as loading of materials have to wait until the slab is solidified, which is a factor of reducing the construction efficiency of the concrete structure. Further, in a conventional temporary structure in which pipes are combined, vertical columns are successively extended upward, the vertical columns are arranged at predetermined intervals, and adjacent vertical columns are sequentially formed by horizontal bars and diagonal members. By joining, the structure is assembled in a jungle gym shape, so even in this case, the space between the vertical columns is closed by the cross beam and the diagonal material, and the loading and unloading and walking of materials on the floor surface Etc. are difficult and there is no function as a scaffold. Further, in the conventional temporary structure, a beam lower frame provided between the uppermost vertical columns has a structure in which both ends of the upper horizontal rail are attached to the vertical columns in order to support the slab form and the beam form. Therefore, the strength of the connection with the vertical column and the load bearing strength are weak, and the rigidity of the temporary structure cannot be increased.
If the spacing between the vertical columns is changed, the length of the beam lower frame must be changed accordingly, increasing the number of types of beam lower frames, complicating material management and assembling temporary structures, and manufacturing costs. Is also expensive. Further, it is difficult to move the conventional shoring in a state where it is assembled on the floor surface. When changing the form supporting position on the same floor, the shoring is once dismantled and moved again. Must be assembled,
There is a problem that much labor and time are required for moving. Accordingly, an object of the present invention is to make design management easy by standardizing dimensions, to have excellent load bearing strength, to freely select a form supporting position, and to be able to integrally mold a wall and a slab. Another object of the present invention is to provide a formwork support system that can be moved in an assembled state. [0009] In order to solve the above-mentioned problems, the present invention is to sequentially extend at least vertical columns arranged in four directions upward, and connect the vertical columns to flanges provided on the vertical columns.
By combining the alloy tool, assembling the pillar by combining a respective vertical columns adjacent in mutually horizontal member and brace, a flange provided also on Tatebashira between the upper end vertical pillar of the pillar
The beam lower frame is fixed in an erected state by connecting the connecting metal fittings, and a pin hole provided in the beam lower frame is used to place the beam lower frame.
Vertically fix the support post in the desired position, and
A support whose height can be adjusted is attached to the upper end of the supporting column and the upper end of the vertical column .
This is a configuration in which a love form is supported. [0012] Here, the vertical column constituting the support column has flanges on the outer peripheral surfaces of the upper and lower ends and the intermediate portion, and the upper flange and the lower flange of the adjacent vertical column have opposite ends. In addition to joining with horizontal members having joining metal fittings, the joining metal fittings at the upper and lower diagonal positions are joined with braces, and the horizontal member provided on this brace joins the flanges on both sides and between the parts with joining fittings at both ends, thereby Assemble rigid supports. Embodiments of the present invention will be described below with reference to the drawings. As shown in FIG. 1, FIG. 2 and FIG. 11, a vertical column 1 arranged in four directions and successively added upward has, for example, a length of 1.
An 800 mm steel pipe is used, a joint 2 for extension is provided at the upper end, and a flange 3 is fixed to the outer surfaces of the upper end and the intermediate part. The vertical columns 1 arranged in four directions are connected to each other by horizontal members 4 using the flanges 3 at the upper ends of the adjacent vertical columns, and the diagonal positions of the upper and lower horizontal members 4 at the diagonal ends are braces 5.
And the intermediate flanges 3 of the adjacent vertical columns 1 are connected by a horizontal rod 6 provided on a brace 5. As described above, the vertical columns 1 arranged in four directions are extended upward, and the four surfaces of the vertical column group are connected to the horizontal members 4 and the braces 5.
And by connecting with the horizontal rod 6, the support A of required height can be comprised. Note that the column A may be configured by combining the vertical columns 1 in a plane such as six or eight columns. A free vertical column 7 is connected to the upper end of the uppermost vertical column 1 of the column A using a joint previously attached to the upper end of the vertical column 1. The free vertical column 7 has a vertical length of about half of the vertical column 1, and the upper and lower ends and an intermediate portion are provided with flanges 3. The free vertical column 7 joined to the vertical column 1 at the upper end of the column A is connected to the adjacent vertical columns 7 by the lower beam frame 8 using the flanges 3 provided above and below. The beam lower frame 8 is formed by joining an upper beam 9 and a lower beam 10 using a square pipe with a truss member 11. As shown in FIG. 10, the flanges 3, 3 provided on the vertical column 1 and the free vertical column 7 have a rectangular outer shape, and a pair of square holes 12 are provided at four positions corresponding to each side. At both ends of the horizontal member 4 and the horizontal rod 6 and at both ends of the upper beam 9 and the lower beam 10 in the beam lower frame 8, there are provided connecting fittings 13 which are connected to the flanges 3, 3 using the square holes 12. Has been fixed. As shown in FIG. 10, the connecting bracket 13 is connected to both ends of the upper beam 9 and the lower beam 10 and the horizontal member 4 or the horizontal rod 6.
Square holes 12 in both front edges of the U-shaped body 14
A hook 15 is provided for engaging the vertical column 1 and the free vertical column 7 between the U-shaped main body 14 and the contact member 16 between the rear surface of the U-shaped main body 14 and the abutting member 16. When the wedge 17 is press-fitted while the hook 15 is locked in the square hole 12, the engaging portion between the square hole 12 and the hook 15 is used as a reaction force to form the contact member 16. When the vertical column 1 or the free vertical column 7 is pressed against the vertical column 1 or the free vertical column 7, the vertical column 1 or the free vertical column 7 and the horizontal member 4 and the like are firmly connected at a right angle. Brace pins 18 are protruded and fixed at the upper and lower or lower positions on both sides of the main body 14 of the coupling metal 13. The brace 5 is connected to the brace pins 18 of the coupling metal 13 at diagonal positions of the upper and lower horizontal members 4. A pair of diagonal members 5a to be connected
Are pivoted to each other at a central intersection, the central portion of the horizontal rod 6 is pivoted to the pivoted portion, and the same fitting 13 as the horizontal member 4 is fixed to both ends of the horizontal rod 6. Then, pin holes are provided at both ends of the diagonal member 5a, so that the upper and lower ends at the diagonal positions of the adjacent vertical columns 1 are connected and the intermediate portions between the vertical columns 1 are connected. A free beam lower frame 19 is installed between the opposing surfaces of the beam lower frame 8 so that the mounting position can be selected. A support 20 is mounted on the free beam lower frame 19, the beam lower frame 8 and the free vertical column 7. The slab formwork 22 and the beam formwork are supported by the supports 20 via the pulley 21. The free beam lower frame 19 has the same structure as the beam lower frame 8. As the support 20, three types of a support 20a with a force remover, a support 20b with a free clamp, and a lightweight support 20c are prepared and used selectively according to the support conditions. Is directly inserted from above, whereas the support column 23 is used for mounting to the beam lower frame 8 and the free beam lower frame 19. In addition, in each support, the common parts are described with the same reference numerals. As shown in FIG. 6, the support 20a with a force remover has a large number of pin holes 25 radially penetrating a flexible vertical column 7 and a pipe 24 having an outer diameter fitted into the support column 23. A jack handle which is provided at a constant interval in the direction, fixes a U-shaped large undertaking 27 to the upper end of a screw shaft 26 inserted from the upper end into the pipe 24, and is screwed to the screw shaft 26 so as to be rotatable. 28 and this jack handle 2
8 is provided with a force remover 29 provided at the upper end of the pipe 24 so as to be located at the lower part of the pipe 8. As shown in FIG. 6, a lowering wedge member 3 is provided in a U-shaped metal fitting 30 fixed to the upper end of a pipe 24, as shown in FIG.
The upper wedge member 32 and the upper wedge member 32 are stacked one on top of the other.
34, and the lower wedge member 31 is supported by the receiving bracket 30 so as to be movable in the longitudinal direction.
It has six through holes 34a. The receiving member 30 and the upper wedge member 32 are connected by a pin 35 so as to allow only the upper wedge member 32 to move up and down. The lower wedge member 31 has a locking recess 36 at the upper end edge. By engaging a pin 37 movably attached to the upper surface 30 with the locking recess 36,
When the lower wedge member 31 is held at the advanced position, the upper wedge member 32 is pushed up, and the pin 37 is lifted upward to release the lock, and the lower wedge member 31 is moved upward and inclined. The member 32 will descend. Therefore, the large support 27 of the screw shaft 26 whose jack handle 28 is supported by the upper wedge member 32 moves up and down by the movement of the lower wedge member 31 due to the removal of the pin 37, thereby supporting the slab form and the like. Can be solved at once.
In the figure, reference numeral 38 denotes a retaining ring fixed to the lower end of the screw shaft 26 with a pin 39, and the screw shaft 26 is stopped upward by the metal fitting 30. As shown in FIG. 7, the support 20b with a free clamp fixes a circular pipe 40 horizontally to the upper end of the screw shaft 26, and allows the large undertaking 41 to move on the pipe 40 in the circumferential direction. The pipe holding metal fittings 42 and 43 each having a U-shape are fixed to both ends of the large undertaking 41 and are mounted on the holding metal fitting 42. The large pull 21 is pressed in the width direction to a nut 45 fixed to the other end of the large pull receiving 41, and a tightening bolt 46 for holding the large pull 21 with the holding fitting 42 is mounted. The screw shaft 26 has a jack handle 28
Are rotatably screwed together, and in the illustrated example, an example is shown in which a force remover 29 is provided between the pipe and the pipe 24, but this may be omitted. As shown in FIG. 2, the lightweight support 20c has a jack handle 28 rotatably screwed onto a screw shaft 26 inserted into the upper end of the pipe 24. 27 is fixed. A support post 23 used to attach each of the supports 20 to the beam lower frame 8 and the free beam lower frame 19.
As shown in FIG. 4, a pipe similar to the vertical column 7 is used, and a downwardly U-shaped metal fitting 47 is provided at the upper end and a pin 48 is provided at the lower end so as to be vertically movable and urged upwardly. The fitting 47 is externally fitted to the upper beam 9 of the beam lower frame 8 or the free beam lower frame 19, and a pin 49 projecting from the lower surface thereof is provided on the upper surface of the upper beam 9.
0 and the lower pin 45 is fixed to a pin hole provided on the lower surface of the lower rail 10 so as to be vertically fixed to the beam lower frame 8 or the free beam lower frame 19 and to be fixed to the pin hole. 5
The mounting position can be selected at an interval of 0, and each support 20 is arranged by inserting a pipe 24 into this support column 23. The large adjustment of the vertical height of the support 20 is performed by using the pin hole 25 and
At the positions of the upper ends of the free vertical column 7 and the support column 23 by pulling out the pin 51. FIGS. 3 and 5 show a mounting structure of the free beam lower frame 19 to the beam lower frame 8, and the upper beam 9 and the lower beam 1 of the beam lower frame 8 are shown.
0 is formed in a downward U-shape,
Pins 53 to be inserted into the pin holes 50, 50 provided in the upper rail 9 and the lower rail 10 are fixed to the inner upper surface of the support fitting 52, and flanges 54 provided on both outer surfaces of the support fitting 52 are provided.
A pair of square holes 55 for locking the hooks 15 of the fitting 13
The flexible beam lower frame 19 located between the opposing beam lower frames 8 is provided with the hooks 15 of the coupling fittings 13 provided at both ends of the upper ridge 9 and the lower ridge 10 in the square holes 55. It is erected between the beam lower frames 8 by locking. FIG. 8 shows a guide 21 provided on a support 20.
The guide 21 is formed in a substantially U-shaped cross section using a material such as aluminum, and has a ridge 56 and a concave groove
7 are provided along the length direction, and a groove 58 having a narrow cross-sectional shape is provided at the upper and lower ends. Is fixed by a bolt 60 of a clamp 59 which holds the slab formwork 22. The upper part of the large pulley 21 and the joist 22a supporting the slab formwork 22 are fixed by fitting the joist 22a to the bolt 61a.
This is achieved by locking the locking piece 63 of the U-shaped metal fitting 62 fixed in the groove 58. When the load acting on the large pulley 21 is large, as shown by a dashed line in FIG.
1 may be used in a back-to-back configuration, and the back-to-back configuration may also be used for connection of the large pulley 21. At this time, the ridges 56 and the concave grooves 57 are fitted to each other. It should be noted that, as shown in FIG.
A square pipe may be used, or a wooden square may be used. FIG. 2 shows a structure in which the slab form 22 and the wall form 64 by the support A and the haunch form 65 provided between the form forms 22 and 64 form the wall and the slab by integral concrete. A jack 60 provided with the connecting metal 13 is fixed to the flange 3 in a horizontal state, and the large bar 21 is fixed to the large underpinning 66 fixed to the jack 60. Fix the joist 67 and fix the wall form 6
4 is supported vertically, and the jack 60 allows the wall form 64 to be separated from the concrete surface. The mounting structure of the wall form 64 with respect to the column A is the same as the wall form 6
What is necessary is just to be able to pull in and peel off. The upper end of the joist 67 of the wall formwork 64 and the end of the joist 22a of the slab formwork 22 are joined by a stretchable haunch adjusting joist 65a composed of a combination of a large-diameter pipe and a small-diameter pipe. By supporting the haunch formwork 65, it is possible to cope with a change in angle and a change in length of the haunch portion. As shown in FIG. 2 and FIG.
5a, a large-diameter square pipe 65b and a small-diameter square pipe 65c are fitted in an expandable and contractable manner, and are joined in the length direction with bolts 65d, and both ends are jointed with joists 67 and 22a.
5e, and the haunch form 65 is supported by the haunch adjusting joist 65a. The load from the haunch form 65 acts obliquely to the column A, and the load from the wall form 64 is in the horizontal direction. Therefore, as shown in FIG.
Is connected between the lower end flange 3 of the lowermost vertical column 1 and the floor with a diagonal member 68, or as shown in FIG. 12, the upper end of the column A and the floor are connected with a turnbuckle 101, and It prevents movement. 9 and 10 show a telescopic beam lower frame 71 erected between the free vertical columns 7 or between the vertical columns 1 in the adjacent column A, and the upper beam 72 and the lower beam 73 are truss members 74. The two coupled beam lower frames 71a and 71b are overlapped, and each of the upper beam 72 and the lower beam 73 is connected to a plurality of bolts 76, 76 at a portion of a horizontal hole 75 provided at a constant interval in the length direction.
By connecting by means of, the length can be freely adjusted in the length direction at intervals of the horizontal hole 75, and a structure is provided in which the connecting bracket 13 is provided at opposite ends of the upper and lower rails 72 and 73, It is adapted to the change of the arrangement interval of the support A, and by the connection with the elastic beam lower frame 71, a passage space and the like can be secured between the adjacent supports A and the slab formwork is provided on the expandable beam lower frame 71. The support 20 described above can be attached to support the beam formwork 22 and the beam formwork. FIGS. 10A to 10C show the structure of the length adjusting portion of the telescopic beam lower frame 71. At the ends of both upper rails 72, a U-shaped metal fitting 77 which fits over the other upper rail is provided. , A U-shaped metal fitting 77 is inserted into a pin hole 78 provided on the upper surface of
The pins 79 are fitted to each other to perform positioning in the length direction. FIGS. 12 and 13 show another example of the mounting structure of the wall form 64 to the column A. A connecting bracket 13 is provided on the upper rear end of the rectangular supporting frame 91. A downwardly U-shaped horizontal rod 92 externally fitted to the stay 91a is connected to a number of pin holes 91b provided in the horizontal bar 91a and pins 98 so that the position can be adjusted stepwise in the longitudinal direction. On the horizontal rod 92, a receiving stand 93 of the large pulley 21, a large stop fitting 94 which is connected with a clamp hardware 99 using the large pulley 21 and the groove 58, and a fixing nut 100
And a screw member 95 that is moved by rotation with respect to the wall, a large wall jack 96 is formed, and the large wall 21 and the joist 67 of the wall form 64 are connected by a clamp hardware 97. The support frame 91 is fixed to the outer surface of the vertical column 1 or the free vertical column 7 so as to protrude in a horizontal state by locking the coupling fitting 13 to the flange 3. The wall form 64 is supported through the support 21, and the wall form 64 can be moved horizontally by operating the jack 96. FIG. 14 shows the structure of a clamp hardware 99 used for connecting the slab formwork 22 and the large pulley 21. The clamp fitting 99 is inserted into the groove 58 of the large pulley 21 and latches in a locking manner so as to have an L-shaped cross section. It has a structure in which a receiving plate 102 is provided at one upper end and a driving groove 104 for a wedge 103 is provided at the other end, and the crosspiece 105 of the slab formwork 22 and the joist 22a overlapped therewith are received by the receiving plate 1.
02 and the driving groove 104, and the wedge 1 is inserted into the groove 104.
When 03 is driven in, the crosspiece 105 and the joist 22a are connected, and at the same time, the large pulley 21 and the slab formwork 22 are fixed. Note that FIG. 12 shows an example in which the wall formwork 64 and the pulling bar 21 are connected using the same clamp hardware 99. The shoring system of the present invention has the above-described configuration, and the vertical columns 1 having the lower ends supported by the jack bases 80 are erected at four places on the floor, and the adjacent vertical columns 1 are horizontally aligned. It is assembled into a frame by being connected with the member 4 and the brace 5 and the horizontal rod 6, and a column having a height required for the extension of each vertical column 1 and the connection by the horizontal member 4, the brace 5 and the horizontal rod 6. A is assembled, and the required number of columns A are arranged in a plane. A free vertical column 7 is connected to the upper end of the uppermost vertical column 1 in each column A, and the adjacent free vertical columns 7 are connected by a beam lower frame 8. A free beam lower frame 19 is installed between the opposing beam lower frames 8 according to the support conditions of the slab formwork 22. Further, between the adjacent columns A, the free vertical columns 7 are connected by an elastic beam lower frame 71, and the adjacent vertical columns 1 are further connected.
Are connected by a telescopic horizontal member 82. Thus, a passage space can be secured between the columns A, and a work scaffold can be configured by erection of a scaffold plate in the column A and in the passage space. A support 20 is attached to the upper end of each free vertical column 7 and the desired position of the beam lower frame 8 and the free beam lower frame 19 in accordance with the conditions for supporting the formwork, and each support 20 passes through a large pull 21 and a joist 22a. To support the slab formwork 22 and the beam formwork. Each support 20 sets the form supporting height by operating the jack 28, and the de-energizer 29 is set in the raised state. As shown in FIG. 2, a flange 3 is attached to the vertical column 1 and the free vertical column 7 on the surface corresponding to the wall surface in each column A.
The jack 21 and joist 67 are attached to the jack 60 attached by using
The upper end of the wall form 64 and the end of the slab form 22 are connected by a haunch wall frame 65. In this state, if the concrete is continuously poured from the wall form 64 onto the haunch form 65 and the slab form 22 after the arrangement of the reinforcing bars, a concrete structure or a tunnel in which the wall, the haunch portion and the slab are integrated is constructed. can do. Since the mounting position of the support 20 with respect to the beam lower frame 8 and the free beam lower frame 19 can be freely selected, the support of the slab form 22 can be easily performed with respect to changes in load conditions and beam arrangement conditions. It can respond and can easily deal with changes in various conditions on site. The column A is constructed by connecting at least four vertical columns 1 with the horizontal member 4 and the brace 5 and sequentially extending them upward, so that the load supporting strength is excellent. . After the concrete is solidified, the molds are removed from the mold by shrinking the jack 60 and legally pulling the wall form 64 from the wall surface while supporting the slab load with the column A tensioned. 64 is peeled off. At this time, the wall form 64
A haunch formwork 65 having one end connected to the upper end of the haunch is separated from the haunch wall surface. As described above, when the wall form 64 is peeled, the support A performs the reaction force support. To release the slab form 22 from the slab form 22, the jacks 28 of each support 20 are lowered, and the de-energizer 29 is set in a lowered state. The upper end side of the frame 65 is also separated from the haunch portion. The column A may be dismantled in the reverse procedure of the assembling operation in a state where the load support as described above is released. However, when the column A is to be moved to an adjacent construction site in the assembled state, the lowermost column of the column A A caster may be attached to the lower end of the column 1 and the jack base 80 may be raised to ground the caster, or the vertical columns at the four corners may be lifted using the flange 3 with an electric lifter or the like to provide mobility. . As described above, according to the present invention, four or more vertical columns are connected to the horizontal member by the brace, and the vertical columns are sequentially extended to form a column, and the upper end of the column is formed. Since the beam lower frame was fixed between the vertical columns, a support capable of adjusting the support height was attached to this beam lower frame, and the support supported the object to be supported through the pulling by the support. It has high rigidity and excellent load bearing capacity, and by selecting the mounting position of the support, it is possible to select the support according to the load and supporting conditions of the slab formwork and truss, etc. Can easily cope with the change of the load supporting condition. Further, since the shoring is constructed on the basis of the stanchions as a unit, the shoring can be designed in a standard design, and the slab, the wall and the haunch forms can be supported by the stanchions. Thus, the construction of a concrete structure in which the wall and the slab are integrated can be realized.
【図面の簡単な説明】
【図1】支保工システムの全体構造を示す断面図
【図2】同上要部を拡大した縦断面図
【図3】自在縦柱と梁下枠及び自在梁下枠の結合構造を
示す平面図
【図4】梁下枠に対するサポート用支柱の取付構造を示
す斜視図
【図5】梁下枠に対する自在梁下枠の取付構造を示す斜
視図
【図6】脱力器付サポートを示す分解斜視図
【図7】(A)は自在サポートの正面図、(B)は同上
の右側面図、(C)は同じく左端面図
【図8】サポートと大引及びスラブ型枠の関係を示す拡
大縦断面図
【図9】(A)は伸縮梁下枠の平面図、(B)は同正面
図
【図10】(A)は伸縮梁下枠の結合構造を示す平面
図、(B)は同上の結合金具の部分を示す正面図、
(C)は(A)の矢印C−Cに沿う断面図
【図11】(A)乃至(E)は支柱構成材料の種類を示
す説明図
【図12】壁型枠を支持するジャッキ部分の他の例を示
す縦断正面図
【図13】同上要部の分解斜視図
【図14】大引とスラブ型枠の結合に用いるクランプ金
物の分解斜視図
【符号の説明】
A 支柱
1 縦柱
2 ジョイント
3 フランジ
4 水平材
5 ブレース
6 水平杆
7 自在縦柱
8 梁下枠
13 結合金具
19 自在梁下枠
20 サポート
21 大引
22 スラブ型枠
23 サポート用支柱
60 ジャッキ
64 壁型枠
65 ハンチ型枠BRIEF DESCRIPTION OF THE DRAWINGS FIG. 1 is a cross-sectional view showing the entire structure of a shoring system. FIG. 2 is a vertical cross-sectional view showing an enlarged main part of the same. FIG. 3 is a free vertical column, a beam lower frame, and a free beam lower frame. FIG. 4 is a perspective view showing a mounting structure of a support column to a beam lower frame. FIG. 5 is a perspective view showing a mounting structure of a free beam lower frame to a beam lower frame. FIG. 7A is a front view of the universal support, FIG. 7B is a right side view of the same, and FIG. 7C is a left end view of the same. FIG. FIG. 9 (A) is a plan view of a telescopic beam lower frame, FIG. 9 (B) is a front view of the same, and FIG. 10 (A) is a plan view showing a joint structure of the telescopic beam lower frame. FIG. 1B is a front view showing a portion of the above-described joint fitting;
(C) is a cross-sectional view taken along the arrow CC of (A). (FIGS. 11A to 11E) are explanatory diagrams showing the types of strut constituent materials. FIG. 12 is a view of a jack portion supporting a wall formwork. FIG. 13 is an exploded perspective view of a main part of the same. FIG. 14 is an exploded perspective view of a clamp hardware used for connecting a slab formwork to a slab form. [Description of References] A Column 1 Column 2 Joint 3 Flange 4 Horizontal member 5 Brace 6 Horizontal rod 7 Free vertical column 8 Beam lower frame 13 Joint fitting 19 Free beam lower frame 20 Support 21 Large pull 22 Slab form 23 Support column 60 Jack 64 Wall form 65 Haunch form
───────────────────────────────────────────────────── フロントページの続き (58)調査した分野(Int.Cl.7,DB名) E04G 11/08,11/48 E04G 17/14,25/00 ──────────────────────────────────────────────────続 き Continued on the front page (58) Field surveyed (Int.Cl. 7 , DB name) E04G 11 / 08,11 / 48 E04G 17 / 14,25 / 00
Claims (1)
順次継足すと共に、縦柱に設けたフランジに結合金具を
結合することによって、隣接する各縦柱を互に水平材と
ブレースで結合して支柱を組み立て、この支柱における
上端部縦柱間に同じく縦柱に設けたフランジに結合金具
を結合することによって梁下枠を架設状に固定し、該梁
下枠に設けたピン孔を利用してこの梁下枠の所望位置に
サポート用支柱を垂直に固定し、このサポート用支柱の
上端及び上記縦柱の上端に支持高さの調節が可能なサポ
ートを取付け、このサポートで大引を介してスラブ型枠
を支持するようにした支保工システム。(57) [Claims] [Claim 1] At least vertical columns arranged at least in four directions are sequentially added upward, and a coupling bracket is attached to a flange provided on the vertical column.
By binding to assemble the posts attached at each other horizontal member and brace each vertical column adjacent, fitting to a flange provided also on Tatebashira between the upper end vertical pillar of the pillar
To fix the beam lower frame in an erected form, and to a desired position of the beam lower frame using a pin hole provided in the beam lower frame.
Fix the support post vertically, and
A support system in which a support capable of adjusting a support height is attached to an upper end and an upper end of the vertical column, and the support supports the slab formwork via a pulling support.
Priority Applications (3)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22927495A JP3514887B2 (en) | 1995-09-06 | 1995-09-06 | Shoring system |
| TW84112920A TW287217B (en) | 1995-09-06 | 1995-12-05 | Framework for supporting weight |
| CN 95121414 CN1102984C (en) | 1995-09-06 | 1995-12-08 | Support system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP22927495A JP3514887B2 (en) | 1995-09-06 | 1995-09-06 | Shoring system |
Publications (2)
| Publication Number | Publication Date |
|---|---|
| JPH0972089A JPH0972089A (en) | 1997-03-18 |
| JP3514887B2 true JP3514887B2 (en) | 2004-03-31 |
Family
ID=16889550
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP22927495A Expired - Lifetime JP3514887B2 (en) | 1995-09-06 | 1995-09-06 | Shoring system |
Country Status (3)
| Country | Link |
|---|---|
| JP (1) | JP3514887B2 (en) |
| CN (1) | CN1102984C (en) |
| TW (1) | TW287217B (en) |
Families Citing this family (9)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP4684490B2 (en) * | 2001-08-10 | 2011-05-18 | 株式会社有弘メンテナンス | Support system |
| JP5647772B2 (en) * | 2009-06-08 | 2015-01-07 | 日鐵住金建材株式会社 | Lifting movable overhang scaffold |
| CN103866852B (en) * | 2014-03-20 | 2016-06-22 | 北京工业大学 | A kind of how high-rise assembling type steel structure central supported system being engaged splicing |
| JP6471565B2 (en) * | 2015-03-20 | 2019-02-20 | 株式会社大林組 | Structure |
| CN108868088B (en) * | 2018-08-31 | 2023-11-28 | 浙江新盛建设集团有限公司 | A convertible and movable three-way telescopic scaffolding and its use method |
| KR102456803B1 (en) * | 2020-09-22 | 2022-10-21 | 배기옥 | System support apparatus |
| CN112942676B (en) * | 2021-01-29 | 2023-10-13 | 中国建筑第八工程局有限公司 | Truss structure fracture-preventing supporting device |
| CN113323502B (en) * | 2021-05-24 | 2022-06-07 | 河北国贵科技有限公司 | Height-adjustable frame-containing steel plate net and frame supporting beam combined structure and adjusting method thereof |
| JP7875405B2 (en) * | 2022-05-18 | 2026-06-18 | アルインコ株式会社 | Shoring |
Family Cites Families (4)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JPH0738555Y2 (en) * | 1989-11-13 | 1995-09-06 | 住金鋼材工業株式会社 | Beam formwork support frame |
| JP2524897B2 (en) * | 1991-02-15 | 1996-08-14 | ホリー株式会社 | Beam formwork receiver in formwork support device |
| JP2631598B2 (en) * | 1992-04-27 | 1997-07-16 | 鹿島建設株式会社 | Mobile formwork device and formwork method |
| JPH0656343U (en) * | 1993-01-11 | 1994-08-05 | 隆也 宗清 | Square butter joint for construction |
-
1995
- 1995-09-06 JP JP22927495A patent/JP3514887B2/en not_active Expired - Lifetime
- 1995-12-05 TW TW84112920A patent/TW287217B/en active
- 1995-12-08 CN CN 95121414 patent/CN1102984C/en not_active Expired - Lifetime
Also Published As
| Publication number | Publication date |
|---|---|
| JPH0972089A (en) | 1997-03-18 |
| TW287217B (en) | 1996-10-01 |
| CN1102984C (en) | 2003-03-12 |
| CN1144868A (en) | 1997-03-12 |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP2603178B2 (en) | Formwork equipment | |
| JP3106335B2 (en) | System formwork | |
| JPH0972089A (en) | Support system | |
| JP2002364170A (en) | Formwork equipment and formwork method | |
| JP2631598B2 (en) | Mobile formwork device and formwork method | |
| JPH08284439A (en) | Heavy load formwork support and its members | |
| US5676874A (en) | Floor form assembly and apparatus used therewith | |
| JPS61290164A (en) | Method and apparatus for supporting beam and slab | |
| JP2878589B2 (en) | Temporary structure | |
| JP4222581B2 (en) | Beam form apparatus and installation / disassembly method of the beam form apparatus | |
| JP3247749B2 (en) | Construction method of long span truss beams | |
| JPH0536042Y2 (en) | ||
| JP3029324B2 (en) | Temporary enclosures and foundations for temporary enclosures | |
| JP2992882B2 (en) | Beam formwork device | |
| EP1388625B1 (en) | Load support and corresponding support base which are used in civil engineering and buildings | |
| JP2006200162A (en) | Construction method of jack base and formwork support | |
| JPH04106267A (en) | Column formwork equipment | |
| JP2542018Y2 (en) | End support frame of stacked temporary support frame | |
| KR102915480B1 (en) | A floor post for construction and floor post system for construction | |
| JP3254509B2 (en) | Beam unit formwork | |
| JPH0311298Y2 (en) | ||
| JPH0354265Y2 (en) | ||
| JPH0633117Y2 (en) | Slab formwork unit with supporting work | |
| JP2611917B2 (en) | Pillar formwork equipment | |
| JP2024111886A (en) | Temporary Stage |
Legal Events
| Date | Code | Title | Description |
|---|---|---|---|
| A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20040114 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20090123 Year of fee payment: 5 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100123 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20100123 Year of fee payment: 6 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110123 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20110123 Year of fee payment: 7 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20120123 Year of fee payment: 8 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20130123 Year of fee payment: 9 |
|
| FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20140123 Year of fee payment: 10 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
| EXPY | Cancellation because of completion of term |