JP2024534778A5 - - Google Patents

Info

Publication number
JP2024534778A5
JP2024534778A5 JP2024508803A JP2024508803A JP2024534778A5 JP 2024534778 A5 JP2024534778 A5 JP 2024534778A5 JP 2024508803 A JP2024508803 A JP 2024508803A JP 2024508803 A JP2024508803 A JP 2024508803A JP 2024534778 A5 JP2024534778 A5 JP 2024534778A5
Authority
JP
Japan
Prior art keywords
housing
fluid
support housing
volume
volume compensation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2024508803A
Other languages
English (en)
Japanese (ja)
Other versions
JP2024534778A (ja
Filing date
Publication date
Application filed filed Critical
Priority claimed from PCT/CN2022/000116 external-priority patent/WO2023019869A1/zh
Publication of JP2024534778A publication Critical patent/JP2024534778A/ja
Publication of JP2024534778A5 publication Critical patent/JP2024534778A5/ja
Pending legal-status Critical Current

Links

JP2024508803A 2021-08-17 2022-08-17 複合構造、ハウジング付き体積補償装置および製造方法 Pending JP2024534778A (ja)

Applications Claiming Priority (5)

Application Number Priority Date Filing Date Title
CN202110945484.7 2021-08-17
CN202110945484 2021-08-17
CN202110945535 2021-08-17
CN202110945535.6 2021-08-17
PCT/CN2022/000116 WO2023019869A1 (zh) 2021-08-17 2022-08-17 组合结构、带壳体积补偿装置和制作方法

Publications (2)

Publication Number Publication Date
JP2024534778A JP2024534778A (ja) 2024-09-26
JP2024534778A5 true JP2024534778A5 (cg-RX-API-DMAC7.html) 2025-08-20

Family

ID=85181539

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2024508803A Pending JP2024534778A (ja) 2021-08-17 2022-08-17 複合構造、ハウジング付き体積補償装置および製造方法

Country Status (3)

Country Link
JP (1) JP2024534778A (cg-RX-API-DMAC7.html)
CN (2) CN115704234A (cg-RX-API-DMAC7.html)
WO (1) WO2023019869A1 (cg-RX-API-DMAC7.html)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2026506384A (ja) * 2023-02-14 2026-02-24 チョー ワン 部材とそれに使用される体積補償装置
CN116922546B (zh) * 2023-09-18 2023-12-29 成都永益泵业股份有限公司 一种使用氧化锆制作成型件的方法及泵过流部件

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
GB932628A (en) * 1961-05-30 1963-07-31 Marley Concrete Ltd Improvements in or relating to expansible and contractible cores for moulding mouldable materials, such as concrete
CN106978805A (zh) * 2016-01-16 2017-07-25 杨学祥 一种充气膨胀挤土锚杆
CN106906953B (zh) * 2017-04-24 2019-04-02 山东科技大学 一种可预先施加围压的混凝土柱及其制作方法、加固方法
WO2019184958A1 (zh) * 2018-03-27 2019-10-03 王哲 组合结构及其制作方法
CN110578384B (zh) * 2018-06-08 2024-03-26 王哲 一种预压凝固组合结构
CN112573940B (zh) * 2019-09-27 2023-12-01 王哲 一种组合结构的多温度养护制作方法及组合结构
CN113638545B (zh) * 2019-12-08 2025-06-17 王哲 一种适用于宽温度范围的组合结构和制作方法

Similar Documents

Publication Publication Date Title
JP5908881B2 (ja) 圧力鋳造コンクリートまたはモルタルライナ付きスチールパイプとその製造方法
CN110306726B (zh) 组合结构及其制作方法
JP2011516309A5 (cg-RX-API-DMAC7.html)
CN108397216B (zh) 一种钢管混凝土拱架可缩式接头及拱架
JP2024534778A (ja) 複合構造、ハウジング付き体積補償装置および製造方法
CN110578384B (zh) 一种预压凝固组合结构
CN112573940B (zh) 一种组合结构的多温度养护制作方法及组合结构
CN207988359U (zh) 钢管混凝土高压成型装置及钢管混凝土
CN113638545B (zh) 一种适用于宽温度范围的组合结构和制作方法
US2683915A (en) Method of manufacturing structural elements of prestressed reinforced concrete
CN213018148U (zh) 一种新型结构的预应力钢筒混凝土顶管
CN222416436U (zh) 一种预应力混凝土钢管
WO2024169982A1 (zh) 组合结构、制作方法和约束装置
CN121552506A (zh) 传压装置和传压方法
HK40087978A (en) Combined structure, volume compensation device having housing, and manufacturing method
WO2007149177A2 (en) Method for maximizing the sharing of tensile load for cement-sheathed multi-wall pipe
CN111364529A (zh) 一种使用了自助式缸内注浆千斤顶的荷载箱
JP2026510417A (ja) 複合構造、製造方法及び拘束装置
CN218292259U (zh) 一种超高压钢管混凝土加压保护装置
US20260071421A1 (en) Expansion joint splicing device and method
JPH06185166A (ja) 鋼管コンクリート柱及びその製造方法
CN120443794A (zh) 一种高承载力的复合带肋薄壁不锈钢再生混凝土柱构件
CN118423516A (zh) 一阶段钢筒混凝土预应力管道及其生产方法
CN120505984A (zh) 深埋压力容器储能结构动态抗浮及预荷载协同施加工艺
Hubbard Non-Steel Cylinder Prestressed Concrete Pipes