JP2024059154A - Server and Terminal - Google Patents

Server and Terminal Download PDF

Info

Publication number
JP2024059154A
JP2024059154A JP2022166657A JP2022166657A JP2024059154A JP 2024059154 A JP2024059154 A JP 2024059154A JP 2022166657 A JP2022166657 A JP 2022166657A JP 2022166657 A JP2022166657 A JP 2022166657A JP 2024059154 A JP2024059154 A JP 2024059154A
Authority
JP
Japan
Prior art keywords
information
fabricator
unit
orderer
order
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2022166657A
Other languages
Japanese (ja)
Inventor
直弥 脇田
祐一 松岡
慎 佐野
俊志 遠藤
光弘 眞鍋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Engineering Co Ltd
Original Assignee
Nippon Steel Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Engineering Co Ltd filed Critical Nippon Steel Engineering Co Ltd
Priority to JP2022166657A priority Critical patent/JP2024059154A/en
Priority to JP2023183592A priority patent/JP2024059608A/en
Publication of JP2024059154A publication Critical patent/JP2024059154A/en
Pending legal-status Critical Current

Links

Images

Abstract

【課題】プラットフォーマによる鉄骨の注文者とファブリケータとの仲介に係る手数料の請求を容易にする。【解決手段】注文情報受信部は、注文者から鉄骨の注文を示す注文情報を受信する。注文情報送信部は、注文情報を複数のファブリケータに送信する。受注情報受信部は、注文情報が示す注文を受けることを示す受注情報を、複数のファブリケータの一部である複数の候補ファブリケータから受信する。候補提示部は、複数の候補ファブリケータそれぞれを示す複数の候補ファブリケータ情報の少なくとも一部を注文者に提示する。選択部は、候補提示部が提示する一部のうちの1つである選択ファブリケータ情報を注文者に選択させる。請求部は、選択ファブリケータ情報が示すファブリケータに、手数料の請求をするための請求情報を送信する。【選択図】図1[Problem] To facilitate the charging of fees by a platformer for acting as an intermediary between a steel frame orderer and a fabricator. [Solution] An order information receiving unit receives order information indicating an order for steel frames from an orderer. An order information transmitting unit transmits the order information to a plurality of fabricators. An order information receiving unit receives order information indicating an acceptance of the order indicated by the order information from a plurality of candidate fabricators which are some of the plurality of fabricators. A candidate presentation unit presents at least a portion of the plurality of candidate fabricator information indicating each of the plurality of candidate fabricators to the orderer. A selection unit allows the orderer to select selected fabricator information which is one of the portions presented by the candidate presentation unit. A billing unit transmits billing information for billing a fee to a fabricator indicated by the selected fabricator information. [Selected Figure] Figure 1

Description

本発明は、サーバ及び端末に関する。 The present invention relates to a server and a terminal.

ゼネコンなどの建設会社は、建築に用いる鉄骨を調達するにあたって、ファブリケータに鉄骨の製造を依頼する。鉄骨の製造の依頼は、通常、見積もりのために正式図面ができる前になされるため、ファブリケータは依頼内容に基づいて予め将来の製造スケジュールを確保しておく。 When general contractors and other construction companies procure steel frames for use in buildings, they ask fabricators to manufacture the steel frames. Requests for steel frame manufacturing are usually made before official drawings are prepared for quotation, so fabricators reserve future manufacturing schedules in advance based on the details of the request.

特開2005-174064号公報JP 2005-174064 A

建設会社とファブリケータとの取引において、商社が仲介することがある。この場合、商社はファブリケータから鉄骨を購入し、当該鉄骨を建設会社に売却する。このとき、商社は建設会社に仲介手数料を含めた代金を請求することで、仲介手数料を回収することができる。そのため、商社は建設会社およびファブリケータとの間で鉄骨の所有権を移転させる必要があり、手続が煩雑になる。プラットフォーマが、建設会社とファブリケータとの取引を仲介しつつ、プラットフォーマが鉄骨の所有権を持たない場合、プラットフォーマは仲介に係る手数料を請求するタイミングを認識することが困難となる。
本発明の目的は、プラットフォーマによる鉄骨の注文者とファブリケータとの仲介に係る手数料の請求を容易にすることができるサーバ及び端末を提供することにある。
A trading company may act as an intermediary in transactions between a construction company and a fabricator. In this case, the trading company purchases steel beams from the fabricator and sells the steel beams to the construction company. At this time, the trading company can collect the intermediation fee by charging the construction company a price including the intermediation fee. Therefore, the trading company needs to transfer the ownership of the steel beams between the construction company and the fabricator, which makes the procedure complicated. If a platformer acts as an intermediary in transactions between a construction company and a fabricator but does not own the ownership of the steel beams, it becomes difficult for the platformer to recognize the timing of charging the intermediation fee.
An object of the present invention is to provide a server and a terminal that can easily charge fees associated with the intermediation between a steel frame orderer and a fabricator by a platform provider.

本発明の一態様によれば、サーバは、鉄骨を注文する注文者及び鉄骨を製造する複数のファブリケータと、ネットワーク経由で通信するサーバであって、前記注文者から鉄骨の注文を示す注文情報を受信する注文情報受信部と、前記注文情報を前記複数のファブリケータに送信する注文情報送信部と、前記注文情報が示す前記注文を受けることを示す受注情報を、前記複数のファブリケータの一部である複数の候補ファブリケータから受信する受注情報受信部と、前記複数の候補ファブリケータそれぞれを示す複数の候補ファブリケータ情報の少なくとも一部を前記注文者に提示する候補提示部と、前記候補提示部が提示する前記一部のうちの1つである選択ファブリケータ情報を前記注文者に選択させる選択部と、前記選択ファブリケータ情報が示すファブリケータに、手数料の請求をするための請求情報を送信する請求部と、を備える。 According to one aspect of the present invention, the server communicates with a customer who orders steel beams and multiple fabricators who manufacture the steel beams via a network, and includes an order information receiving unit that receives order information indicating an order for steel beams from the customer, an order information transmitting unit that transmits the order information to the multiple fabricators, an order information receiving unit that receives order information indicating that the order indicated by the order information will be accepted from multiple candidate fabricators that are some of the multiple fabricators, a candidate presentation unit that presents at least a portion of the multiple candidate fabricator information indicating each of the multiple candidate fabricators to the customer, a selection unit that allows the customer to select selected fabricator information that is one of the portions presented by the candidate presentation unit, and a billing unit that transmits billing information to bill the fabricator indicated by the selected fabricator information for a fee.

上記態様によれば、プラットフォーマによる鉄骨の注文者とファブリケータとの仲介に係る手数料の請求を容易にすることができる。 The above aspect makes it easier for the platformer to charge fees for acting as an intermediary between the steel frame orderer and the fabricator.

第1の実施形態に係る鉄骨注文システムを示す概略図である。FIG. 1 is a schematic diagram showing a steel frame ordering system according to a first embodiment. 第1の実施形態に係る鉄骨注文システムによる仲介の流れを示す概略シーケンス図である。FIG. 2 is a schematic sequence diagram showing the flow of mediation by the steel frame ordering system according to the first embodiment. 第1の実施形態に係るサーバの構成を示すブロック図である。FIG. 2 is a block diagram showing a configuration of a server according to the first embodiment. 第1の実施形態に係る注文情報入力画面の一例を示す図である。FIG. 11 is a diagram showing an example of an order information input screen according to the first embodiment. 第1の実施形態に係る相見積画面の例を示す図である。FIG. 13 is a diagram showing an example of a competitive quotation screen according to the first embodiment; 第1の実施形態に係る端末装置の構成を示すブロック図である。FIG. 2 is a block diagram showing a configuration of a terminal device according to the first embodiment. 第1の実施形態に係るサーバの動作を示す第1のフローチャートである。4 is a first flowchart showing an operation of a server according to the first embodiment. 第1の実施形態に係るサーバの動作を示す第2のフローチャートである。11 is a second flowchart showing the operation of the server according to the first embodiment. 第2の実施形態に係る鉄骨注文システムの構成を示す図である。FIG. 11 is a diagram showing the configuration of a steel frame ordering system according to a second embodiment. 第2の実施形態に係る請求情報の表示例を示す図である。FIG. 11 is a diagram showing an example of display of billing information according to the second embodiment. 少なくとも1つの実施形態に係るコンピュータの構成を示す概略ブロック図である。FIG. 1 is a schematic block diagram illustrating a configuration of a computer according to at least one embodiment.

〈第1の実施形態〉
《鉄骨注文システム1の構成》
以下、図面を参照しながら実施形態について詳しく説明する。
図1は、第1の実施形態に係る鉄骨注文システム1を示す概略図である。
鉄骨注文システム1は、建築会社や商社などの鉄骨の注文者と、鉄骨を製造するファブリケータとの小ロットの鉄骨の取引の仲介を行う。小ロットの鉄骨とは、300トン未満の鉄骨をいう。鉄骨注文システム1は、サーバ100と、複数の注文者端末200Aと、複数のファブリケータ端末200Bとを備える。サーバ100は、プラットフォーマによって運営される。注文者端末200Aは、注文者が保有し、注文者によって操作される端末装置200である。ファブリケータ端末200Bは、ファブリケータが保有し、ファブリケータによって操作される端末装置200である。サーバ100は、ネットワーク経由で注文者端末200A及びファブリケータ端末200Bと通信する。鉄骨注文システム1は、所在地によらず、注文者及びファブリケータの登録を受け付ける。つまり、鉄骨注文システム1は、広域(例えば、全国)のファブリケータ及び広域(例えば、全国)の注文者を対象に仲介を行う。
First Embodiment
<<Configuration of Steel Order System 1>>
Hereinafter, the embodiments will be described in detail with reference to the drawings.
FIG. 1 is a schematic diagram showing a steel frame ordering system 1 according to the first embodiment.
The steel frame ordering system 1 mediates transactions of small lots of steel frame between steel frame orderers such as construction companies and trading companies and fabricators that manufacture the steel frame. A small lot of steel frame refers to steel frame weighing less than 300 tons. The steel frame ordering system 1 includes a server 100, multiple orderer terminals 200A, and multiple fabricator terminals 200B. The server 100 is operated by a platformer. The orderer terminal 200A is a terminal device 200 owned by an orderer and operated by the orderer. The fabricator terminal 200B is a terminal device 200 owned by a fabricator and operated by the fabricator. The server 100 communicates with the orderer terminal 200A and the fabricator terminal 200B via a network. The steel frame ordering system 1 accepts registrations of orderers and fabricators regardless of their locations. In other words, the steel structure ordering system 1 acts as an intermediary between fabricators in a wide area (e.g., nationwide) and customers in a wide area (e.g., nationwide).

《仲介手順の概略》
図2は、第1の実施形態に係る鉄骨注文システム1による仲介の流れを示す概略シーケンス図である。
注文者は、注文者端末200Aを操作し、サーバ100に鉄骨の注文情報を送信する(ステップS1)。注文情報には、少なくとも鉄骨の数量計算に用いる図面と見積条件とが含まれる。初回の注文情報の送信は、通常、建築物の依頼者との金額交渉に用いる見積書を作成するために、建築物の依頼を受注する前に行われる。したがって、初回の注文情報に含まれる図面は、通常、概算図面である。
Overview of Mediation Procedures
FIG. 2 is a schematic sequence diagram showing the flow of intermediation by the steel frame ordering system 1 according to the first embodiment.
The orderer operates the orderer terminal 200A to transmit order information for steel frames to the server 100 (step S1). The order information includes at least drawings and quotation conditions used to calculate the quantity of steel frames. The initial order information is usually transmitted before the building request is accepted in order to prepare a quotation to be used in price negotiations with the building client. Therefore, the drawings included in the initial order information are usually rough estimate drawings.

サーバ100は、注文情報を受信すると、注文情報に含まれる図面と見積条件とに基づいて鉄骨の数量と単価を計算し、注文情報に係る鉄骨の料金を示す見積情報を生成する(ステップS2)。サーバ100は、生成した見積情報を注文者端末200Aに送信する(ステップS3)。つまり、概算図面に基づく見積情報の作成はサーバ100によってなされるため、ファブリケータは概算図面に基づく見積情報の作成を行わなくてよい。注文者は、契約するファブリケータを決定することなく見積情報を得ることができるため、ファブリケータの選択の自由を確保することができる。また、注文情報に含まれる図面が概算図面である場合、サーバ100は、当該注文情報をファブリケータに提示しない。これにより、ファブリケータは事前に不確定なスケジュールを確保しておく必要がない。 When the server 100 receives the order information, it calculates the quantity and unit price of the steel frame based on the drawings and quotation conditions included in the order information, and generates quotation information indicating the fee for the steel frame related to the order information (step S2). The server 100 transmits the generated quotation information to the orderer terminal 200A (step S3). In other words, since the server 100 creates quotation information based on the rough estimate drawings, the fabricator does not need to create quotation information based on the rough estimate drawings. The orderer can obtain quotation information without deciding which fabricator to contract with, so the freedom to choose a fabricator is ensured. Furthermore, if the drawings included in the order information are rough estimate drawings, the server 100 does not present the order information to the fabricator. This eliminates the need for the fabricator to secure an uncertain schedule in advance.

注文者は、図面を更新するたびに、注文者端末200Aを操作して注文情報を更新し、サーバ100に送信する(ステップS4)。サーバ100は、受信した注文情報に基づいて見積情報を生成し(ステップS5)、注文者端末200Aに送信する(ステップS6)。なお、サーバ100は、注文者端末200Aへ見積情報を送信するたびに、注文者に対して見積情報の生成に係る手数料を課金する。その後、注文者が依頼者から建築物の依頼を受注し、正式図面が完成すると、注文者は、注文者端末200Aを操作し、正式図面を含む注文情報をサーバ100に送信する(ステップS7)。 Each time the orderer updates the drawings, he/she operates the orderer terminal 200A to update the order information and transmits it to the server 100 (step S4). The server 100 generates quotation information based on the received order information (step S5) and transmits it to the orderer terminal 200A (step S6). Each time the server 100 transmits quotation information to the orderer terminal 200A, it charges the orderer a fee for generating the quotation information. After that, when the orderer receives a request for a building from the client and the official drawings are completed, the orderer operates the orderer terminal 200A to transmit the order information, including the official drawings, to the server 100 (step S7).

サーバ100は、注文情報を受信すると、注文情報に含まれる図面と見積条件とに基づいて鉄骨の数量と単価を計算し、注文情報に係る鉄骨の料金を示す見積情報を生成する(ステップS8)。次に、サーバ100は、受信した注文情報及び生成した見積情報を、予め登録されたファブリケータに提示する(ステップS9)。ファブリケータは、鉄骨注文システム1に登録するために年会費を支払う必要がある。ファブリケータは、ファブリケータ端末200Bを操作し、サーバ100にアクセスすることで、注文情報及び見積情報を閲覧することができる。 When the server 100 receives the order information, it calculates the quantity and unit price of the steel frame based on the drawings and quotation conditions included in the order information, and generates quotation information indicating the price of the steel frame related to the order information (step S8). Next, the server 100 presents the received order information and the generated quotation information to a fabricator that has been registered in advance (step S9). A fabricator must pay an annual fee to register with the steel frame ordering system 1. A fabricator can view the order information and quotation information by operating the fabricator terminal 200B and accessing the server 100.

ファブリケータは、提示された注文情報及び見積情報に基づいて当該注文の受注を希望するか否かを決定する。ファブリケータは、受注しない場合、当該見積情報に対するアクションをせず放置する。他方、ファブリケータは、受注を希望する場合、ファブリケータ端末200Bを操作し、提示された見積情報に含まれる単価をファブリケータが希望する単価に修正し(ステップS10)、修正された見積情報を含む受注情報をサーバ100に送信する(ステップS11)。つまり、ファブリケータは、図面から鉄骨の数量を計算する必要がなく、鉄骨の単価を修正するだけで見積情報を生成することができる。したがって、ファブリケータは、当該注文情報に対する受注を逸したとしても、発生する作業が少ないため、鉄骨注文システム1の利用に対するデメリットが少ない。なお、小ロットの鉄骨の取引においては、材料費に対する人件費等の割合が大きくなるため、鉄骨の単価はファブリケータによってばらつきが生じやすい。 The fabricator decides whether or not to accept the order based on the presented order information and quotation information. If the fabricator does not accept the order, it leaves the quotation information without taking any action. On the other hand, if the fabricator wishes to accept the order, the fabricator operates the fabricator terminal 200B to modify the unit price included in the presented quotation information to the unit price desired by the fabricator (step S10), and transmits the order information including the modified quotation information to the server 100 (step S11). In other words, the fabricator does not need to calculate the quantity of steel from the drawing, and can generate quotation information by simply modifying the unit price of the steel. Therefore, even if the fabricator misses the order for the order information, there is little disadvantage to using the steel ordering system 1 because there is little work to be done. Note that in small-lot steel transactions, the ratio of labor costs to material costs is large, so the unit price of steel is likely to vary depending on the fabricator.

サーバ100は、複数のファブリケータ(候補ファブリケータ)から受注情報を受信すると、受注情報を受信したファブリケータの中から、評価がよいファブリケータ、建築現場に所在地が近いファブリケータ及び見積額が安いファブリケータを、注文者に推薦するファブリケータとして抽出する(ステップS12)。サーバ100は、抽出したファブリケータの受注情報を、当該ファブリケータの評価とともに注文者端末200Aに提示する(ステップS13)。 When the server 100 receives order information from multiple fabricators (candidate fabricators), it extracts fabricators with good reviews, fabricators located close to the construction site, and fabricators with low estimated prices from among the fabricators that have received the order information, as fabricators to recommend to the customer (step S12). The server 100 presents the order information of the extracted fabricators, together with the fabricator's reviews, on the customer terminal 200A (step S13).

注文者は、提示された情報に基づいて鉄骨を注文するファブリケータ(契約ファブリケータ)を決定する。注文者は、注文者端末200Aを操作し、注文先に決定したファブリケータをサーバ100に通知する(ステップS14)。サーバ100は、注文先に決定されたファブリケータのファブリケータ端末200Bに注文の確定を通知する(ステップS15)。このときサーバ100は、注文者及びファブリケータに対して、プラットフォーマが提供する保証契約を提示し、当該保証契約を締結するか否かの入力を受け付ける。サーバ100は、注文先の決定に伴い、発注者に仲介手数料を課金する。 The orderer decides which fabricator (contract fabricator) to order the steel frame from based on the presented information. The orderer operates the orderer terminal 200A to notify the server 100 of the fabricator selected as the order recipient (step S14). The server 100 notifies the fabricator terminal 200B of the selected fabricator that the order has been confirmed (step S15). At this time, the server 100 presents the guarantee contract provided by the platform to the orderer and the fabricator, and accepts input as to whether or not to enter into the guarantee contract. Upon deciding on the order recipient, the server 100 charges the orderer a brokerage fee.

ファブリケータは、正式図面の完成後に注文を受注できるため、概算図面時点で受注する場合と比較して、受注から鉄骨の製造開始までの期間を短くすることができる。したがって、ファブリケータは、スケジュールの揺らぎを抑えることができる。またファブリケータは、閑散期に、すぐに着手可能な鉄骨の製造注文を受け入れることができる。
その後、ファブリケータによる鉄骨の納品が完了すると、サーバ100はファブリケータ端末200Bから必要に応じて料金の精算情報を受信し(ステップS16)、精算情報を注文者端末200Aに送信する(ステップS17)。これにより、注文者とファブリケータとの間で鉄骨の商取引が成立する。なお、鉄骨の所有権は、ファブリケータと注文者との間で直接的に受け渡され、サーバ100を運営するプラットフォーマは、ファブリケータから鉄骨の所有権を譲り受けない。取引の完結後、サーバ100は、注文者端末200Aからファブリケータの評価を示す個別評価情報を受信し、またファブリケータ端末200Bから注文者の評価を示す個別評価情報を受信する(ステップS18)。これにより、サーバ100は、注文者及びファブリケータの評価情報を更新する。
Fabricators can receive orders only after the official drawings are completed, so the time from order to start of steel frame manufacturing can be shorter than if orders were received at the time of rough drawings. This allows fabricators to reduce schedule fluctuations. Also, fabricators can accept orders for steel frame manufacturing that can be started immediately during off-seasons.
After that, when the delivery of the steel frame by the fabricator is completed, the server 100 receives the settlement information of the fee from the fabricator terminal 200B as necessary (step S16), and transmits the settlement information to the orderer terminal 200A (step S17). This completes the commercial transaction of the steel frame between the orderer and the fabricator. The ownership of the steel frame is directly transferred between the fabricator and the orderer, and the platform operator operating the server 100 does not receive the ownership of the steel frame from the fabricator. After the transaction is completed, the server 100 receives individual evaluation information indicating the fabricator's evaluation from the orderer terminal 200A, and also receives individual evaluation information indicating the orderer's evaluation from the fabricator terminal 200B (step S18). This causes the server 100 to update the evaluation information of the orderer and the fabricator.

このように、第1の実施形態に係る鉄骨注文システム1によれば、注文の受注から製作開始までの期間が短いため、ファブリケータは閑散期の発生を抑えることができる。また鉄骨注文システム1によれば、注文者は広域(例えば、全国)のファブリケータの中から注文先のファブリケータを容易に選定することができる。 As described above, according to the steel structure ordering system 1 of the first embodiment, the period from receipt of an order to the start of production is short, so fabricators can reduce the occurrence of off-seasons. Furthermore, according to the steel structure ordering system 1, a customer can easily select a fabricator to place an order with from fabricators in a wide area (e.g., nationwide).

《サーバ100の構成》
以下、鉄骨注文システム1の詳細な構成について説明する。
図3は、第1の実施形態に係るサーバ100の構成を示すブロック図である。サーバ100は、登録受付部101、ユーザデータベース102、支払確認部103、設定部104、請求部105、注文情報受信部106、算出部107、概算見積送信部108、注文情報送信部109、受注情報受信部110、候補提示部111、候補選択部112、契約提示部113、通知部114、精算処理部115、評価受付部116を備える。
Configuration of server 100
The detailed configuration of the steel structure ordering system 1 will be described below.
3 is a block diagram showing the configuration of the server 100 according to the first embodiment. The server 100 includes a registration reception unit 101, a user database 102, a payment confirmation unit 103, a setting unit 104, a billing unit 105, an order information reception unit 106, a calculation unit 107, an estimate transmission unit 108, an order information transmission unit 109, an order information reception unit 110, a candidate presentation unit 111, a candidate selection unit 112, a contract presentation unit 113, a notification unit 114, a settlement processing unit 115, and an evaluation reception unit 116.

登録受付部101は、注文者端末200A及びファブリケータ端末200Bから鉄骨注文システム1の利用登録を受け付ける。例えば、登録受付部101は、法人名、所在地、担当者名、注文者かファブリケータかの区分、口座情報、メールアドレス、パスワードを含む利用登録情報の入力を受け付ける。登録受付部101は、入力された利用登録情報をユーザデータベース102に記録する。口座情報は、クレジットカード、銀行、決済サービスなどの口座を示すものであってよい。なお、登録受付部101は、利用登録情報の入力画面などに、鉄骨注文システム1の利用ルールを表示させる。利用ルールは、例えば鉄骨の精算のルールや、問題解決のルールなどが挙げられる。鉄骨の精算のルールは、例えば、概算見積に係る鉄骨数量と実績数量の誤差が所定値を超える場合に精算を受け付け、誤差が所定値を超えない場合に精算を受け付けないことなどが挙げられる。 The registration reception unit 101 accepts registrations for use of the steel structure ordering system 1 from the orderer terminal 200A and the fabricator terminal 200B. For example, the registration reception unit 101 accepts input of registration information including the company name, location, name of person in charge, classification as orderer or fabricator, account information, email address, and password. The registration reception unit 101 records the input registration information in the user database 102. The account information may indicate an account for a credit card, bank, or payment service. The registration reception unit 101 displays the rules for use of the steel structure ordering system 1 on the input screen for the registration information. Examples of the rules for use include rules for steel structure settlement and problem solving rules. Examples of the rules for steel structure settlement include accepting settlement when the error between the steel structure quantity related to the rough estimate and the actual quantity exceeds a specified value, and not accepting settlement when the error does not exceed the specified value.

ユーザデータベース102は、利用登録情報と、当該利用登録情報に係る利用者の登録状態と、評価情報と、入金状態とを関連付けて記憶する。登録状態は、未登録及び登録の何れかの値をとる。例えば、サーバ100を運営するプラットフォーマは利用者の登録時に当該利用者の調査を行い、当該利用者を評価し、評価結果を示す評価情報をユーザデータベース102に記録する。評価情報は、例えば5段階評価を示す数値によって表されてよい。また評価情報は、利用者の特徴を説明する文字列を含んでいてもよい。入金状態は、利用者による年会費の入金がなされているか否かを示す。なお、注文者は、利用登録情報の入力の後、プラットフォーマによって確認がなされることによって登録される。他方、ファブリケータは、利用登録情報の入力の後、プラットフォーマによる確認がなされ、かつ年会費が支払われることによって登録となる。注文者は年会費の支払いを行わないため、注文者に係る入金状態はNULLであってよい。 The user database 102 stores the registration information, the registration status of the user related to the registration information, the evaluation information, and the payment status in association with each other. The registration status can be either "unregistered" or "registered." For example, the platformer operating the server 100 surveys the user when the user registers, evaluates the user, and records evaluation information indicating the evaluation result in the user database 102. The evaluation information may be expressed, for example, by a numerical value indicating a five-point evaluation. The evaluation information may also include a character string explaining the characteristics of the user. The payment status indicates whether or not the user has paid the annual membership fee. Note that an orderer is registered when the platformer confirms the user registration information after the user inputs the registration information. On the other hand, a fabricator is registered when the platformer confirms the user registration information after the user inputs the registration information and the annual membership fee is paid. Since the orderer does not pay the annual membership fee, the payment status for the orderer may be NULL.

請求部105は、鉄骨注文システム1の利用者に利用料金を請求する。
具体的には、請求部105は、利用登録情報がユーザデータベース102に登録されたファブリケータに、年会費を請求する。また、請求部105は、概算見積送信部108が注文者に概算見積情報を送信したときに、当該注文者に概算見積書の作成手数料を請求する。また、請求部105は、注文者が鉄骨の注文するファブリケータを決定したときに、当該注文者に紹介手数料を請求する。また、請求部105は、ユーザが契約提示部113によって提示された保証契約を締結したときに、ユーザに保証料を請求する。
請求部105は、例えば、ユーザデータベース102に記録された口座情報に基づいて課金情報を生成し、請求処理を実行する。
The billing section 105 bills users of the steel structure ordering system 1 for usage fees.
Specifically, the billing unit 105 bills fabricators whose user registration information is registered in the user database 102 for annual membership fees. When the rough estimate sending unit 108 sends rough estimate information to an orderer, the billing unit 105 bills the orderer for a rough estimate preparation fee. When the orderer decides on a fabricator to order steel beams from, the billing unit 105 bills the orderer for an introduction fee. When the user concludes a warranty contract presented by the contract presentation unit 113, the billing unit 105 bills the user for a guarantee fee.
The billing section 105 generates billing information based on, for example, the account information recorded in the user database 102, and executes billing processing.

支払確認部103は、ファブリケータによる年会費の支払いがなされたか否かを判定する。すなわち、支払確認部103は、利用登録情報が示す口座情報が示す口座からの入金の有無を判定する。支払確認部103は、入金の判定結果に基づいてユーザデータベース102が記憶する入金状態を更新する。支払確認部103は、ファブリケータによる年会費の支払いがなされていない場合に、ユーザデータベース102の登録状態を未登録に書き換える。 The payment confirmation unit 103 determines whether or not the fabricator has paid the annual membership fee. In other words, the payment confirmation unit 103 determines whether or not a deposit has been made from the account indicated by the account information indicated by the user registration information. The payment confirmation unit 103 updates the deposit status stored in the user database 102 based on the result of the deposit determination. If the fabricator has not paid the annual membership fee, the payment confirmation unit 103 rewrites the registration status in the user database 102 to unregistered.

設定部104は、注文者端末200Aからのアクセスに応じて、注文者端末200Aに鉄骨の注文情報の入力画面を表示させる。図4は、第1の実施形態に係る注文情報入力画面の一例を示す図である。入力画面には、プロジェクト名、建設地の所在地、工期、建方開始日、受注条件、見積条件、図面、及び当該図面が概算図面であるか正式図面であるかの区分を入力するための入力フォームが含まれる。見積条件は、例えば作図条件、材料条件、加工条件、防錆条件、評価管理条件、現場対応条件、書類条件などを含む。作図条件の例としては、工作図の作成の要否、合番図の作成の要否、仮設図面の作成の要否などが挙げられる。材料条件の例としては、鉄骨部材の種類、材料調達の要否、メーカー指定の有無などが挙げられる。加工条件の例としては、機械加工の有無、埋込金物の有無、曲げ加工の有無などが挙げられる。防錆条件の例としては、下地処理の種類、下塗りの有無、特殊塗装の有無などが挙げられる。評価管理条件の例としては、各種立合検査の要否などが挙げられる。現場対応条件の例としては、合番の要否、鳶作業の要否、鍛冶作業の要否などが挙げられる。書類条件の例としては、各種要領書、計画書、報告書の要否などが挙げられる。見積条件は、例えばチェックボックスやプルダウンメニューによって選択可能に表示されてよい。受注条件は、鉄骨の作成を受注可能なファブリケータの条件を示す。受注条件は、例えばファブリケータのグレードや評価などを表す。また見積条件は、チャットボット等による対話型の入力システムによって入力されてよい。
図面は、ビットマップデータやベクタデータで表された二次元の図面であってもよいし、CAD(Computer Aided Design)データやBIM(Building Information Modeling)データによって表された三次元の図面であってもよい。
The setting unit 104 displays an input screen for steel frame order information on the orderer terminal 200A in response to an access from the orderer terminal 200A. FIG. 4 is a diagram showing an example of an order information input screen according to the first embodiment. The input screen includes an input form for inputting the project name, the location of the construction site, the construction period, the start date of construction, order acceptance conditions, quotation conditions, drawings, and a classification as to whether the drawings are rough estimate drawings or official drawings. The quotation conditions include, for example, drawing conditions, material conditions, processing conditions, rust prevention conditions, evaluation management conditions, on-site response conditions, document conditions, and the like. Examples of drawing conditions include whether or not a working drawing needs to be created, whether or not a match number drawing needs to be created, and whether or not a temporary drawing needs to be created. Examples of material conditions include the type of steel frame member, whether or not material procurement is required, and whether or not a manufacturer is specified. Examples of processing conditions include whether or not machining is performed, whether or not embedded metal fittings are used, and whether or not bending is performed. Examples of rust prevention conditions include the type of base treatment, whether or not undercoating is performed, and whether or not special painting is performed. Examples of evaluation management conditions include whether or not various on-site inspections are required. Examples of on-site conditions include whether or not matching numbers are required, whether or not scaffolding work is required, and whether or not blacksmithing work is required. Examples of document conditions include whether or not various guidelines, plans, and reports are required. Estimation conditions may be displayed selectably using, for example, check boxes or pull-down menus. Order conditions indicate the conditions of fabricators who can accept orders for the creation of steel structures. Order conditions indicate, for example, the grade or evaluation of the fabricator. Estimation conditions may also be input using an interactive input system such as a chatbot.
The drawings may be two-dimensional drawings represented by bitmap data or vector data, or three-dimensional drawings represented by CAD (Computer Aided Design) data or BIM (Building Information Modeling) data.

注文情報受信部106は、注文者端末200Aによって入力された注文情報を受信する。なお、注文情報受信部106は、注文情報に含まれる概算図面であるか正式図面であるかの区分が正式図面であることを示す場合、注文が確定されたものとして扱う。つまり、注文情報受信部106は、注文者から注文情報の確定を受け付ける確定部の一例である。 The order information receiving unit 106 receives the order information input by the orderer terminal 200A. If the classification of the order information as to whether it is a rough drawing or a formal drawing indicates that it is a formal drawing, the order information receiving unit 106 treats the order as having been confirmed. In other words, the order information receiving unit 106 is an example of a confirmation unit that accepts confirmation of the order information from the orderer.

算出部107は、注文情報に含まれる図面及び見積条件に基づいてまたは応じて、鉄骨の種類別の数量及び単価を算出する。例えば、算出部107は、以下の手順で鉄骨の種類別の数量及び単価を算出する。
算出部107は、図面から詳細部分を推定し、推定された詳細部分に基づいて鉄骨の種類別の数量を算出する。算出部107は、例えば図面及び見積条件に含まれる材料条件を入力とし、種類別の数量を出力とするモデルによって、鉄骨の種類別の数量を算出する。算出部107は、決定した鉄骨の種類別の数量に基づいて鉄骨の溶接量を推定する。算出部107は、推定した溶接量と1ピースあたりの鉄骨の重量と加工条件とから鉄骨の加工難度を推定する。算出部107は、鉄骨の市況価格と加工難度と見積条件とに基づいて鉄骨の種類別の単価を算出する。
概算見積送信部108は、算出部107が算出した鉄骨の種類別の数量及び単価に基づく概算見積情報を生成し、注文情報を送信した注文者端末200Aに送信する。
The calculation unit 107 calculates the quantity and unit price of each type of steel frame based on or in response to the drawings and estimate conditions included in the order information. For example, the calculation unit 107 calculates the quantity and unit price of each type of steel frame in the following procedure.
The calculation unit 107 estimates detailed parts from the drawings, and calculates the quantity of each type of steel frame based on the estimated detailed parts. The calculation unit 107 calculates the quantity of each type of steel frame using a model that takes, for example, material conditions included in the drawings and the estimation conditions as input and outputs the quantity of each type. The calculation unit 107 estimates the welding amount of the steel frame based on the determined quantity of each type of steel frame. The calculation unit 107 estimates the processing difficulty of the steel frame from the estimated welding amount, the weight of the steel frame per piece, and the processing conditions. The calculation unit 107 calculates the unit price of each type of steel frame based on the market price of the steel frame, the processing difficulty, and the estimation conditions.
The rough estimate sending unit 108 generates rough estimate information based on the quantity and unit price of each type of steel frame calculated by the calculation unit 107, and sends it to the orderer terminal 200A that sent the order information.

注文情報送信部109は、注文情報に含まれる図面の区分が正式図面である場合に、当該注文情報、及び算出部107が算出した鉄骨の種類別の数量及び単価を示す概算見積情報を、ユーザデータベース102が記憶するファブリケータ宛に送信する。概算見積情報は、例えばCSVデータによって表される。例えば、注文情報送信部109は、ファブリケータのメールアドレスに注文情報を添付した電子メールを送信してもよいし、注文情報の閲覧画面へアクセスするためのURLが記載された電子メールをファブリケータのメールアドレスに送信してもよい。また、注文情報送信部109は、ファブリケータ端末200Bがサーバ100にアクセスしたときに、注文情報の閲覧画面をファブリケータ端末200Bに送信してもよい。 When the classification of the drawings included in the order information is a formal drawing, the order information transmission unit 109 transmits the order information and the rough estimate information indicating the quantity and unit price of each type of steel frame calculated by the calculation unit 107 to the fabricator stored in the user database 102. The rough estimate information is represented, for example, by CSV data. For example, the order information transmission unit 109 may send an email with the order information attached to the fabricator's email address, or may send an email containing a URL for accessing the order information viewing screen to the fabricator's email address. In addition, the order information transmission unit 109 may transmit the order information viewing screen to the fabricator terminal 200B when the fabricator terminal 200B accesses the server 100.

受注情報受信部110は、ファブリケータ端末200Bから注文情報が示す鉄骨の注文の受注を希望する受注情報を受信する。受注情報には、正式見積情報が含まれる。正式見積情報は、注文情報送信部109が送信した概算見積情報のうち単価部分をファブリケータにて書き換えたデータである。つまり、正式見積情報は、算出部107が算出した単価を補正するための単価補正情報の一例である。また正式見積情報は、鉄骨の受注価格を示す受注価格情報の一例である。なお、受注情報は必ずしもすべてのファブリケータから受信されない。例えば繁忙期のために受注できないファブリケータは受注情報を送信しない。以下、受注情報を送信したファブリケータを候補ファブリケータともいう。 The order information receiving unit 110 receives order information from the fabricator terminal 200B, which indicates a desire to receive an order for the steel frame indicated by the order information. The order information includes formal quotation information. The formal quotation information is data in which the fabricator has rewritten the unit price portion of the rough quotation information sent by the order information sending unit 109. In other words, the formal quotation information is an example of unit price correction information for correcting the unit price calculated by the calculation unit 107. The formal quotation information is also an example of order price information indicating the order price of the steel frame. Note that order information is not necessarily received from all fabricators. For example, a fabricator that is unable to accept orders due to a busy season will not send order information. Hereinafter, the fabricator that sent the order information is also referred to as a candidate fabricator.

候補提示部111は、受注情報受信部110が受信した受注情報が一定数に達したときに、又は注文情報を受信してから一定期間が経過したときに、受信した複数の受注情報と、ユーザデータベース102が記憶する情報とに基づいて、複数の候補ファブリケータの中から3つの推薦ファブリケータを抽出する。例えば、候補提示部111は、以下の手順で推薦ファブリケータを抽出する。
候補提示部111は、受注情報に含まれる正式見積情報が示す受注価格、ファブリケータの所在地から建築現場までの距離、及びファブリケータの評価のそれぞれをスコアに変換する。スコアは受注価格が安いほど高く、所在地から建築現場までの距離が短いほど高く、ファブリケータの評価が高いほど高い値である。スコアは例えば候補ファブリケータを母集団とする標準偏差によって求めてよい。候補提示部111は、スコアの合計値が所定の閾値以上である候補ファブリケータ、またはスコアが上位の所定数以内の候補ファブリケータの中から、受注価格のスコアが最も高いもの、距離のスコアが最も高いもの、及び評価のスコアが最も高いものを、それぞれ推薦ファブリケータとして抽出する。
つまり、候補提示部111は、複数の候補ファブリケータ情報のうち、他の候補ファブリケータより所在地が建築現場に近い候補ファブリケータに係る候補ファブリケータ情報、他の候補ファブリケータよりも受注価格が安い候補ファブリケータに係る候補ファブリケータ情報、及び他の候補ファブリケータよりも評価が高い候補ファブリケータに係る候補ファブリケータ情報を、抽出する。
When a certain number of pieces of order information have been received by the order information receiving unit 110, or when a certain period of time has passed since the order information was received, the candidate presentation unit 111 extracts three recommended fabricators from among the multiple candidate fabricators based on the multiple pieces of received order information and information stored in the user database 102. For example, the candidate presentation unit 111 extracts the recommended fabricators in the following procedure.
The candidate presentation unit 111 converts the order price indicated in the formal quotation information included in the order information, the distance from the fabricator's location to the construction site, and the fabricator's evaluation into scores. The lower the order price, the higher the score, the shorter the distance from the location to the construction site, and the higher the fabricator's evaluation. The score may be calculated, for example, by standard deviation using the candidate fabricators as a population. The candidate presentation unit 111 extracts, as recommended fabricators, the candidate fabricators with the highest order price score, the highest distance score, and the highest evaluation score from among the candidate fabricators whose total score is equal to or greater than a predetermined threshold value, or the candidate fabricators whose scores are within a predetermined number of the top scores.
In other words, the candidate presentation unit 111 extracts, from among multiple candidate fabricator information, candidate fabricator information relating to candidate fabricators located closer to the construction site than the other candidate fabricators, candidate fabricator information relating to candidate fabricators with lower order prices than the other candidate fabricators, and candidate fabricator information relating to candidate fabricators with higher ratings than the other candidate fabricators.

候補提示部111は、抽出した推薦ファブリケータに係る受注情報及び評価情報を、比較可能に提示する相見積画面を注文者端末200Aに送信する。図5は、第1の実施形態に係る相見積画面の例を示す図である。図5に示すように、相見積画面には、3つの推薦ファブリケータの所在地、評価及び受注価格が並べて表示される。また受注価格は、項目ごとに3つの推薦ファブリケータが提示する単価及び金額が並べて表示される。 The candidate presentation unit 111 sends a comparative quotation screen to the orderer terminal 200A, which presents the order information and evaluation information of the extracted recommended fabricators in a comparative manner. FIG. 5 is a diagram showing an example of the comparative quotation screen according to the first embodiment. As shown in FIG. 5, the comparative quotation screen displays the locations, evaluations, and order prices of the three recommended fabricators side by side. In addition, the unit prices and amounts offered by the three recommended fabricators for each item are displayed side by side for the order prices.

候補選択部112は、注文者端末200Aから、3つの推薦ファブリケータのうち鉄骨を注文する契約ファブリケータの選択を受け付ける。注文者端末200Aは、図5に示す相見積画面において、所望のファブリケータに関連付けられた発注ボタンを押下することで、契約ファブリケータを選択する。 The candidate selection unit 112 accepts the selection of a contract fabricator from among the three recommended fabricators to order the steel frame from the orderer terminal 200A. The orderer terminal 200A selects a contract fabricator by pressing the order button associated with the desired fabricator on the competitive quote screen shown in FIG. 5.

通知部114は、各候補ファブリケータに、鉄骨の注文の受注の可否を通知する。具体的には、通知部114は、候補提示部111が3つの推薦ファブリケータを抽出したときに、抽出されなかった候補ファブリケータに、注文を受注できない旨を通知する。また通知部114は、候補選択部112が契約ファブリケータの選択を受け付けたときに、選択されなかった推薦ファブリケータに、注文を受注できない旨を通知する。また通知部114は、候補選択部112が契約ファブリケータの選択を受け付けたときに、推薦ファブリケータに、注文を受注した旨を通知する。 The notification unit 114 notifies each candidate fabricator of whether or not they will accept the steel frame order. Specifically, when the candidate presentation unit 111 extracts three recommended fabricators, the notification unit 114 notifies the candidate fabricators that were not extracted that they will not be able to accept the order. In addition, when the candidate selection unit 112 accepts the selection of a contract fabricator, the notification unit 114 notifies the recommended fabricators that were not selected that they will not be able to accept the order. In addition, when the candidate selection unit 112 accepts the selection of a contract fabricator, the notification unit 114 notifies the recommended fabricators that they will be able to accept the order.

契約提示部113は、候補選択部112によって契約ファブリケータが選択された場合に、注文者及び契約ファブリケータに、注文に関する保証契約情報を提示する。保証契約は、注文者または契約ファブリケータであるユーザとプラットフォーマとの間で締結される契約であって、ユーザ間で債務の支払いがなされないときにプラットフォーマが支払いの義務を負う契約である。契約提示部113は、ユーザから提示した補償契約情報が示す保証契約を締結するか否かを受け付ける。 When a contract fabricator is selected by the candidate selection unit 112, the contract presentation unit 113 presents the guarantee contract information for the order to the orderer and the contract fabricator. A guarantee contract is a contract concluded between the user, who is the orderer or contract fabricator, and the platformer, and is a contract under which the platformer is obligated to make payment when a debt is not paid between the users. The contract presentation unit 113 accepts whether or not to conclude a guarantee contract indicated by the compensation contract information presented by the user.

精算処理部115は、ファブリケータ端末200Bから製作した鉄骨の実績数量を示す実績情報を受信する。精算処理部115は、実績情報が示す実績数量と算出部107が算出した数量との誤差が所定値を超える場合に、ファブリケータ端末200Bから精算後の料金を示す精算情報の入力を受け付ける。他方、精算処理部115は、実績情報が示す実績数量と算出部107が算出した数量との誤差が所定値を超えない場合に精算情報を受け付けない。 The settlement processing unit 115 receives actual results information indicating the actual quantity of steel beams fabricated from the fabricator terminal 200B. If the difference between the actual quantity indicated by the actual results information and the quantity calculated by the calculation unit 107 exceeds a predetermined value, the settlement processing unit 115 accepts input of settlement information indicating the fee after settlement from the fabricator terminal 200B. On the other hand, if the difference between the actual quantity indicated by the actual results information and the quantity calculated by the calculation unit 107 does not exceed the predetermined value, the settlement processing unit 115 does not accept settlement information.

評価受付部116は、注文者から契約ファブリケータの評価を示す個別評価情報の入力を受け付ける。また評価受付部116は、契約ファブリケータから注文者の評価を示す個別評価情報の入力を受け付ける。個別評価情報は、例えば5段階評価を示す数値によって表されてよい。また評価情報は、利用者の特徴を説明する文字列を含んでいてもよい。
評価受付部116は、受信した個別評価情報に基づいてユーザデータベース102が記憶する評価情報を更新する。例えば、評価受付部116は、個別評価情報が示す数値の平均値を求めることで評価情報を更新する。また例えば、評価受付部116は、個別評価情報に含まれる文字列を、評価情報に係る文字列に追記する。
The evaluation receiving unit 116 receives input of individual evaluation information indicating an evaluation of the contract fabricator from the customer. The evaluation receiving unit 116 also receives input of individual evaluation information indicating the customer's evaluation from the contract fabricator. The individual evaluation information may be expressed by a numerical value indicating, for example, a five-point scale. The evaluation information may also include a character string that describes the characteristics of the user.
The evaluation receiving unit 116 updates the evaluation information stored in the user database 102 based on the received individual evaluation information. For example, the evaluation receiving unit 116 updates the evaluation information by calculating the average value of the numerical values indicated by the individual evaluation information. In addition, for example, the evaluation receiving unit 116 adds a character string included in the individual evaluation information to a character string related to the evaluation information.

《端末装置200の構成》
図6は、第1の実施形態に係る端末装置の構成を示すブロック図である。注文者端末200A及びファブリケータ端末200Bは、サーバ100と通信する端末装置200である。端末装置200は、受信部201、表示制御部202、入力部203、送信部204を備える。受信部201は、サーバ100からデータを受信する。表示制御部202は、受信部201がサーバ100から受信した情報をLCDパネルやタッチパネルなどの表示装置に表示させる。入力部203は、キーボード、マウス、タッチパネルなどの入力装置を介して、ユーザによる入力操作を受け付ける。送信部204は、入力部203に入力されたデータをサーバ100に送信する。
Configuration of terminal device 200
6 is a block diagram showing the configuration of a terminal device according to the first embodiment. The orderer terminal 200A and the fabricator terminal 200B are terminal devices 200 that communicate with the server 100. The terminal device 200 includes a receiving unit 201, a display control unit 202, an input unit 203, and a transmitting unit 204. The receiving unit 201 receives data from the server 100. The display control unit 202 displays the information received by the receiving unit 201 from the server 100 on a display device such as an LCD panel or a touch panel. The input unit 203 accepts input operations by a user via an input device such as a keyboard, a mouse, or a touch panel. The transmitting unit 204 transmits the data input to the input unit 203 to the server 100.

《鉄骨注文システム1の動作》
図7は、第1の実施形態に係るサーバ100の動作を示す第1のフローチャートである。図8は、第1の実施形態に係るサーバ100の動作を示す第2のフローチャートである。注文者が注文者端末200Aを操作し、サーバ100にアクセスすると、設定部104は、注文情報の入力画面データを生成し、注文者端末200Aに送信する(ステップS101)。注文者端末200Aの受信部201がサーバ100から注文情報の入力画面データを受信すると、表示制御部202は表示装置に図4に示すような注文情報の入力画面を表示させる。注文者端末200Aの入力部203は注文者から注文情報の入力を受け付ける。注文者の操作によって入力画面の見積依頼ボタンが押下されると、注文者端末200Aの送信部204は注文情報をサーバ100に送信する。
<<Operation of Steel Ordering System 1>>
FIG. 7 is a first flowchart showing the operation of the server 100 according to the first embodiment. FIG. 8 is a second flowchart showing the operation of the server 100 according to the first embodiment. When an orderer operates the orderer terminal 200A to access the server 100, the setting unit 104 generates input screen data for order information and transmits it to the orderer terminal 200A (step S101). When the receiving unit 201 of the orderer terminal 200A receives the input screen data for order information from the server 100, the display control unit 202 causes the display device to display an input screen for order information as shown in FIG. 4. The input unit 203 of the orderer terminal 200A accepts input of order information from the orderer. When the orderer operates to press the quote request button on the input screen, the transmitting unit 204 of the orderer terminal 200A transmits the order information to the server 100.

サーバ100の注文情報受信部106は、注文情報を受信すると(ステップS102)、注文情報に含まれる概算図面であるか正式図面であるかの区分が正式図面であることを示すか否かを判定する(ステップS103)。 When the order information receiving unit 106 of the server 100 receives the order information (step S102), it determines whether the classification of the order information, whether it is an approximate drawing or a formal drawing, indicates that it is a formal drawing (step S103).

区分が概算図面を示す場合(ステップS103:NO)、算出部107は、ステップS102で受信した注文情報に含まれる図面及び見積条件に基づいて、鉄骨の種類別の数量及び単価を算出する(ステップS104)。概算見積送信部108は、ステップS104で算出した鉄骨の種類別の数量及び単価に基づく概算見積情報を生成する(ステップS105)。概算見積送信部108は、生成した概算見積情報を、注文者端末200Aに送信する(ステップS106)。このとき、請求部105は、ユーザデータベース102から注文者の口座情報を読み出し、当該口座情報に基づいて見積情報の生成に係る手数料の請求処理を行う(ステップS107)。 If the category indicates a rough estimate drawing (step S103: NO), the calculation unit 107 calculates the quantity and unit price for each type of steel frame based on the drawing and estimate conditions included in the order information received in step S102 (step S104). The rough estimate sending unit 108 generates rough estimate information based on the quantity and unit price for each type of steel frame calculated in step S104 (step S105). The rough estimate sending unit 108 sends the generated rough estimate information to the orderer terminal 200A (step S106). At this time, the billing unit 105 reads the orderer's account information from the user database 102 and performs billing processing for the fee related to the generation of the estimate information based on the account information (step S107).

注文者端末200Aの受信部201がサーバ100から概算見積情報を受信すると、表示制御部202は受信した概算見積情報を表示装置に表示させる。これにより、注文者は、ファブリケータを選定することなく鉄骨の概算見積を得ることができる。なお、注文情報の区分が概算図面を示す場合、サーバ100は、ファブリケータ端末200Bに注文情報を提示しない。 When the receiving unit 201 of the orderer terminal 200A receives the rough estimate information from the server 100, the display control unit 202 displays the received rough estimate information on the display device. This allows the orderer to obtain a rough estimate for the steel frame without selecting a fabricator. Note that if the order information category indicates rough drawings, the server 100 does not present the order information to the fabricator terminal 200B.

他方、注文情報の区分が正式図面を示す場合(ステップS103:YES)、算出部107は、ステップS102で受信した注文情報に含まれる図面及び見積条件に基づいて、鉄骨の種類別の数量及び単価を算出する(ステップS108)。注文情報送信部109は、ステップS108で算出した鉄骨の種類別の数量及び単価に基づく概算見積情報を生成する(ステップS109)。注文情報送信部109は、生成した概算見積情報と、ステップS102で受信した注文情報と、注文者の評価情報とを、ユーザデータベース102において登録状態が登録を示し、かつ注文情報に含まれる受注条件を満たすファブリケータに送信する(ステップS110)。このとき、注文情報送信部109は、さらに正式図面に基づいて生成された工作図を、注文情報とともにファブリケータに送信してもよい。例えば、サーバ100は、プラットフォーマが作成した工作図のアップロードを受け付け、アップロードされた工作図をファブリケータに送信する。これにより、ファブリケータは、受注の確約のない案件について工作図を作成する必要がなくなる。 On the other hand, if the classification of the order information indicates a formal drawing (step S103: YES), the calculation unit 107 calculates the quantity and unit price for each type of steel frame based on the drawing and the estimate conditions included in the order information received in step S102 (step S108). The order information transmission unit 109 generates rough estimate information based on the quantity and unit price for each type of steel frame calculated in step S108 (step S109). The order information transmission unit 109 transmits the generated rough estimate information, the order information received in step S102, and the evaluation information of the orderer to a fabricator whose registration status in the user database 102 indicates registration and that satisfies the order acceptance conditions included in the order information (step S110). At this time, the order information transmission unit 109 may also transmit a shop drawing generated based on the formal drawing to the fabricator together with the order information. For example, the server 100 accepts an upload of a shop drawing created by the platformer and transmits the uploaded shop drawing to the fabricator. This means that fabricators no longer need to create shop drawings for jobs that do not have a guaranteed order.

ファブリケータ端末200Bの受信部201が、概算見積情報、注文情報及び評価情報を受信すると、表示制御部202は、受信した概算見積情報、注文情報及び評価情報を表示装置に表示させる。ファブリケータは、表示された情報に基づいて、注文情報が示す鉄骨の注文の受注を希望するか否かを判断する。ファブリケータは、受注を希望する場合、概算見積情報が示す単価を修正することで正式見積情報を生成する。ファブリケータ端末200Bの送信部204は、正式見積情報を含む受注情報をサーバ100に送信する。 When the receiving unit 201 of the fabricator terminal 200B receives the rough estimate information, order information, and evaluation information, the display control unit 202 displays the received rough estimate information, order information, and evaluation information on the display device. Based on the displayed information, the fabricator determines whether or not he wishes to accept the order for the steel frame indicated by the order information. If the fabricator wishes to accept the order, he generates formal estimate information by modifying the unit price indicated by the rough estimate information. The transmitting unit 204 of the fabricator terminal 200B transmits the order information including the formal estimate information to the server 100.

サーバ100がステップS110で注文情報を複数のファブリケータ端末200Bに送信すると、受注情報受信部110は、ファブリケータ端末200Bからの受注情報の受信を待機する(ステップS111)。受注情報受信部110は、受信した受注情報が一定数に達したか否かを判定する(ステップS112)。受注情報が一定数に達していない場合(ステップS112:NO)、受注情報受信部110は、ステップS110で注文情報を送信した日付から一定期間が経過しているか否かを判定する(ステップS113)。注文情報の送信から一定期間が経過していない場合(ステップS113:NO)、ステップS111に戻り注文情報の受信を待機する。 When the server 100 transmits order information to multiple fabricator terminals 200B in step S110, the order information receiving unit 110 waits to receive order information from the fabricator terminals 200B (step S111). The order information receiving unit 110 determines whether the received order information has reached a certain number (step S112). If the received order information has not reached the certain number (step S112: NO), the order information receiving unit 110 determines whether a certain period of time has passed since the date on which the order information was transmitted in step S110 (step S113). If the certain period of time has not passed since the transmission of the order information (step S113: NO), the process returns to step S111 and waits to receive order information.

他方、受信した受注情報が一定数に達した場合(ステップS112:YES)、または注文情報を送信した日付から一定期間が経過した場合(ステップS113:YES)、候補提示部111は、受信した複数の受注情報と、ユーザデータベース102が記憶する情報とに基づいて、受注情報に係る候補ファブリケータごとに、受注価格、所在地から建築現場までの距離、及び評価のスコアを算出する(ステップS114)。候補提示部111は、算出したスコアに基づいて、スコアの合計値が所定の閾値以上である候補ファブリケータを抽出する(ステップS115)。候補提示部111は、抽出した候補ファブリケータの中から、受注価格のスコアが最も高いもの、距離のスコアが最も高いもの、及び評価のスコアが最も高いものを、それぞれ推薦ファブリケータとして抽出する(ステップS116)。候補提示部111は、ステップS116で抽出した推薦ファブリケータに係る受注情報及び評価情報に基づいて相見積画面データを生成し、注文者端末200Aに送信する(ステップS117)。 On the other hand, if the number of received order information reaches a certain number (step S112: YES), or if a certain period of time has passed since the date of sending the order information (step S113: YES), the candidate presentation unit 111 calculates the order price, the distance from the location to the construction site, and the evaluation score for each candidate fabricator related to the order information based on the received multiple order information and the information stored in the user database 102 (step S114). Based on the calculated scores, the candidate presentation unit 111 extracts candidate fabricators whose total score is equal to or greater than a predetermined threshold (step S115). From the extracted candidate fabricators, the candidate presentation unit 111 extracts the fabricator with the highest order price score, the highest distance score, and the highest evaluation score as a recommended fabricator (step S116). The candidate presentation unit 111 generates comparative quotation screen data based on the order information and evaluation information related to the recommended fabricator extracted in step S116, and transmits it to the orderer terminal 200A (step S117).

通知部114は、ステップS116で抽出されなかった候補ファブリケータのファブリケータ端末200Bに、注文を受注できない旨を通知する(ステップS118)。なお、ステップS118以降に受注情報受信部110が新たに受注情報を受信した場合、通知部114はその内容によらず、受注情報の送信元のファブリケータ端末200Bに注文を受注できない旨を通知する。 The notification unit 114 notifies the fabricator terminal 200B of the candidate fabricator that was not extracted in step S116 that the order cannot be accepted (step S118). If the order information receiving unit 110 receives new order information after step S118, the notification unit 114 notifies the fabricator terminal 200B that sent the order information that the order cannot be accepted, regardless of the content of the new order information.

注文者端末200Aの受信部201が相見積画面データを受信すると、表示制御部202は図5に示すような相見積画面を表示装置に表示させる。これにより、注文者は、受注価格、所在地から建築現場までの距離、及び評価のそれぞれの観点からファブリケータを選定することができる。注文者が、図5に示す発注ボタンのうち、選定したファブリケータに関連付けられたものを押下すると、送信部204は選定されたファブリケータの情報を含む選定情報をサーバ100に送信する。 When the receiving unit 201 of the orderer terminal 200A receives the comparative quotation screen data, the display control unit 202 displays the comparative quotation screen as shown in FIG. 5 on the display device. This allows the orderer to select a fabricator from the standpoints of order price, distance from the customer's location to the construction site, and evaluation. When the orderer presses one of the order buttons shown in FIG. 5 that is associated with the selected fabricator, the transmitting unit 204 transmits selection information including information on the selected fabricator to the server 100.

候補選択部112は、注文者端末200Aから選定情報を受信する(ステップS119)。通知部114は、契約ファブリケータのファブリケータ端末200Bに選定情報が示す選定結果を通知する(ステップS120)。つまり、通知部114は、選定情報が示す契約ファブリケータに注文を受注した旨を通知する。つまり、契約ファブリケータは、鉄骨の注文を受ける受注者の一例である。他方、通知部114は、ステップS116で抽出した推薦ファブリケータのうち、契約ファブリケータに選定されなかったものに注文を受注できない旨を通知する。 The candidate selection unit 112 receives the selection information from the orderer terminal 200A (step S119). The notification unit 114 notifies the contract fabricator's fabricator terminal 200B of the selection result indicated by the selection information (step S120). That is, the notification unit 114 notifies the contract fabricator indicated by the selection information that the order has been received. In other words, the contract fabricator is an example of a contractor that receives an order for steel frames. On the other hand, the notification unit 114 notifies the recommended fabricators extracted in step S116 that were not selected as contract fabricators that they cannot receive the order.

契約提示部113は、注文者端末200A及び契約ファブリケータのファブリケータ端末200Bに、保証契約情報を送信する(ステップS121)。注文者端末200A及びファブリケータ端末200Bの受信部201が保証契約情報を受信すると、表示制御部202は受信した保証契約情報を表示装置に表示させる。注文者及びファブリケータは、プラットフォーマと保証契約を締結するか否かを判断し、判断結果をサーバ100に送信する。契約提示部113は、注文者端末200A及びファブリケータ端末200Bから保証契約を締結するか否かを示す保証諾否情報を受信する(ステップS122)。請求部105は、各保証諾否情報が保証契約を締結することを示すか否かを判定する(ステップS123)。保証契約を締結することを示す場合(ステップS123:YES)、請求部105は、補償契約を締結するユーザの口座情報に基づいてユーザへの保証料の請求処理を実行する(ステップS124)。なお、契約提示部113は、契約ファブリケータに対し、注文に係る鉄骨を配送する配送業者の情報を提示し、プラットフォーマに配送業者の手配を依頼するか否かの入力を受け付けてもよい。通常、配送業者の手配はファブリケータが行うため、これによってファブリケータの手間を省くことができる。
また、請求部105は、注文者の口座情報に基づいて、注文者への紹介手数料の請求処理を実行する(ステップS125)。なお、請求部105は、注文者に加えて、又は注文者に代えて、契約ファブリケータに手数料の請求処理を実行してもよい。また、請求部105は、契約ファブリケータから配送業者の手配の依頼を受け付けた場合に、契約ファブリケータに配送手数料の請求処理を実行してもよい。
The contract presentation unit 113 transmits the warranty contract information to the orderer terminal 200A and the fabricator terminal 200B of the contract fabricator (step S121). When the receiving unit 201 of the orderer terminal 200A and the fabricator terminal 200B receives the warranty contract information, the display control unit 202 displays the received warranty contract information on the display device. The orderer and the fabricator judge whether or not to conclude a warranty contract with the platformer, and transmit the judgment result to the server 100. The contract presentation unit 113 receives warranty acceptance/rejection information indicating whether or not to conclude a warranty contract from the orderer terminal 200A and the fabricator terminal 200B (step S122). The billing unit 105 judges whether or not each warranty acceptance/rejection information indicates that a warranty contract is to be concluded (step S123). If it indicates that a warranty contract is to be concluded (step S123: YES), the billing unit 105 executes a process of billing the user for the warranty fee based on the account information of the user who concludes the compensation contract (step S124). The contract presentation unit 113 may present the contract fabricator with information on a delivery company that will deliver the steel frame related to the order, and may receive an input as to whether or not to request the platformer to arrange for the delivery company. Normally, the fabricator arranges for the delivery company, so this can save the fabricator time.
The billing unit 105 also executes a process of billing the customer for the referral fee based on the customer's account information (step S125). The billing unit 105 may also execute a process of billing the contract fabricator for the fee in addition to or instead of the customer. The billing unit 105 may also execute a process of billing the contract fabricator for the delivery fee when it receives a request from the contract fabricator to arrange for a delivery company.

その後、契約ファブリケータは注文者との契約に基づいて鉄骨を製作し、注文者に納品する。なお、注文者は、契約ファブリケータから鉄骨が納入されたときに、サーバ100に契約ファブリケータが製作した鉄骨が不適合品であるか否かを示す情報を送信してよい。鉄骨が不適合品であるとの情報をサーバ100が受信した場合、プラットフォーマは納入された鉄骨の調査を行う。鉄骨が不適合品であり、かつ保証契約を締結している場合、プラットフォーマは保証契約に従って保証債務を履行する。すべての鉄骨の納品が完了すると、契約ファブリケータは、鉄骨の実績数量を積算する。ファブリケータ端末200Bの入力部203は実績数量の入力を受け付け、送信部204は入力された実績数量を示す実績情報をサーバ100に送信する。 Then, the contract fabricator fabricates the steel frame based on the contract with the customer and delivers it to the customer. When the steel frame is delivered by the contract fabricator, the customer may send information to the server 100 indicating whether the steel frame fabricated by the contract fabricator is non-conforming. If the server 100 receives information that the steel frame is non-conforming, the platformer will investigate the delivered steel frame. If the steel frame is non-conforming and a warranty contract has been concluded, the platformer will fulfill the warranty obligation in accordance with the warranty contract. Once delivery of all the steel frame is complete, the contract fabricator will add up the actual quantity of the steel frame. The input unit 203 of the fabricator terminal 200B accepts the input of the actual quantity, and the transmission unit 204 transmits actual information indicating the input actual quantity to the server 100.

サーバ100の精算処理部115は、ファブリケータ端末200Bから実績情報を受信する(ステップS126)。精算処理部115は、実績情報が示す実績数量と算出部107が算出した計算数量との誤差が所定値を超えるか否かを判定する(ステップS127)。実績数量と計算数量との誤差が所定値を超える場合(ステップS127:YES)、精算処理部115は、ステップS111で受信した正式見積情報と誤差とに基づいて精算情報を生成し、注文者端末200Aに送信する(ステップS128)。他方、実績数量と計算数量との誤差が所定値を超えない場合(ステップS127:NO)、精算処理部115は、鉄骨の精算をしない旨をファブリケータ端末200Bに通知する(ステップS129)。 The settlement processing unit 115 of the server 100 receives the actual results information from the fabricator terminal 200B (step S126). The settlement processing unit 115 determines whether the error between the actual quantity indicated by the actual results information and the calculated quantity calculated by the calculation unit 107 exceeds a predetermined value (step S127). If the error between the actual quantity and the calculated quantity exceeds the predetermined value (step S127: YES), the settlement processing unit 115 generates settlement information based on the official estimate information received in step S111 and the error, and sends it to the orderer terminal 200A (step S128). On the other hand, if the error between the actual quantity and the calculated quantity does not exceed the predetermined value (step S127: NO), the settlement processing unit 115 notifies the fabricator terminal 200B that the steel frame will not be settled (step S129).

評価受付部116は、注文者から契約ファブリケータの評価を示す個別評価情報の入力を受け付ける。また評価受付部116は、契約ファブリケータから注文者の評価を示す個別評価情報の入力を受け付ける(ステップS130)。評価受付部116は、受信した個別評価情報に基づいてユーザデータベース102が記憶する注文者及び契約ファブリケータの評価情報を更新する(ステップS131)。 The evaluation receiving unit 116 receives input of individual evaluation information indicating the evaluation of the contract fabricator from the customer. The evaluation receiving unit 116 also receives input of individual evaluation information indicating the customer's evaluation from the contract fabricator (step S130). The evaluation receiving unit 116 updates the evaluation information of the customer and the contract fabricator stored in the user database 102 based on the received individual evaluation information (step S131).

《作用・効果》
このように、第1の実施形態に係る鉄骨注文システム1によれば、サーバ100は、注文者から注文情報を受信して複数のファブリケータに送信する。またサーバ100は、複数のファブリケータの少なくとも一部である複数の候補ファブリケータから受信し、候補ファブリケータの情報を注文者に提示する。これにより、注文者は、鉄骨注文システム1に登録された広域(例えば、全国)のファブリケータから鉄骨を注文可能なファブリケータを知ることができる。また、例えば、ファブリケータは、鉄骨注文システム1に登録された全国の注文者から鉄骨の注文を受けることができる。つまり、鉄骨注文システム1によれば、ファブリケータは閑散期において鉄骨の注文を受けることができ、注文者は、容易に依頼先のファブリケータを探すことができる。
<Action and Effects>
Thus, according to the steel frame ordering system 1 of the first embodiment, the server 100 receives order information from an orderer and transmits it to a plurality of fabricators. The server 100 also receives information from a plurality of candidate fabricators, which are at least a portion of the plurality of fabricators, and presents the information of the candidate fabricators to the orderer. This allows the orderer to know which fabricators can order steel frames from among the wide-area (e.g., nationwide) fabricators registered in the steel frame ordering system 1. Also, for example, a fabricator can receive steel frame orders from orderers registered in the steel frame ordering system 1 throughout the country. In other words, according to the steel frame ordering system 1, a fabricator can receive steel frame orders during the off-season, and an orderer can easily find a fabricator to request.

また第1の実施形態に係る鉄骨注文システム1によれば、サーバ100は、複数の候補ファブリケータから受信した複数の候補ファブリケータ情報のうち、他の候補ファブリケータより所在地が建築現場に近いもの、他の候補ファブリケータよりも受注価格が安いもの、及び他の候補ファブリケータよりも評価が高いものを注文者に提示する。これにより、注文者は、価格、場所及び評価の異なる視点に基づいてファブリケータを選定することができる。 Furthermore, according to the steel frame ordering system 1 of the first embodiment, the server 100 presents to the orderer, among the multiple candidate fabricator information received from the multiple candidate fabricators, those that are located closer to the construction site than the other candidate fabricators, those that have lower order prices than the other candidate fabricators, and those that are more highly rated than the other candidate fabricators. This allows the orderer to select a fabricator based on the different perspectives of price, location, and rating.

また第1の実施形態に係る鉄骨注文システム1によれば、サーバ100は、注文者から注文を受けるファブリケータが満たすべき受注条件の設定を受け付け、複数のファブリケータのうち受注条件を満たすファブリケータに注文情報を送信する。これにより、鉄骨注文システム1は、注文者の要求を満たすファブリケータを提示することができ、また受注条件を満たさないファブリケータに無駄な作業を発生させない。 Furthermore, according to the steel structure ordering system 1 of the first embodiment, the server 100 accepts settings of order conditions that must be met by fabricators who receive orders from customers, and transmits order information to fabricators among multiple fabricators that meet the order conditions. This allows the steel structure ordering system 1 to present fabricators that meet the requirements of the customer, and also prevents unnecessary work from being generated by fabricators that do not meet the order conditions.

また第1の実施形態に係る鉄骨注文システム1によれば、サーバ100は、注文情報に含まれる図面に基づいて鉄骨の数量及び単価を算出する。これにより、サーバ100は概算見積情報を自動的に生成することができる。 Furthermore, according to the steel frame ordering system 1 of the first embodiment, the server 100 calculates the quantity and unit price of the steel frame based on the drawings included in the order information. This allows the server 100 to automatically generate rough estimate information.

また第1の実施形態に係る鉄骨注文システム1によれば、注文情報が鉄骨の見積条件を示す見積条件情報を含み、サーバ100は、見積条件情報を用いて数量及び単価を算出する。これにより、鉄骨注文システム1は、情報の漏れによって鉄骨の数量及び単価の概算が実際とかけ離れたものとなることを防ぐことができる。 Furthermore, according to the steel structure ordering system 1 of the first embodiment, the order information includes quotation condition information indicating the quotation conditions for the steel structure, and the server 100 calculates the quantity and unit price using the quotation condition information. This allows the steel structure ordering system 1 to prevent the estimated quantity and unit price of the steel structure from becoming far from the actual value due to information leaks.

また第1の実施形態に係る鉄骨注文システム1によれば、サーバ100は、ファブリケータ端末200Bから自動算出した鉄骨の数量に基づく精算を受け付ける。これにより、見積に係る数量が実績と異なる場合にも、ファブリケータに損失が生じないようにすることができる。またサーバ100は、自動算出した鉄骨の数量と実績数量との誤差が所定値を超える場合に精算を受け付け、誤差が所定値を超えない場合に精算を受け付けない。これにより、鉄骨注文システム1は、細かな誤差に基づく清算の発生による注文者の手間が生じることを防止することができる。 Furthermore, according to the steel structure ordering system 1 of the first embodiment, the server 100 accepts settlement based on the quantity of steel structure automatically calculated from the fabricator terminal 200B. This prevents the fabricator from incurring losses even if the estimated quantity differs from the actual quantity. The server 100 also accepts settlement when the error between the automatically calculated quantity of steel structure and the actual quantity exceeds a specified value, and does not accept settlement when the error does not exceed the specified value. This allows the steel structure ordering system 1 to prevent the customer from having to go through the trouble of settlement based on small errors.

第1の実施形態に係る鉄骨注文システム1は、ファブリケータ端末200Bから自動算出された単価を補正した正式見積情報を含む受注情報を受信する。これにより、ファブリケータは、図面に基づいて鉄骨の数量を計算する必要がなく、単価を補正することで容易に見積情報を生成することができる。 The steel frame ordering system 1 according to the first embodiment receives order information including formal quotation information in which the unit price automatically calculated from the fabricator terminal 200B has been corrected. This allows the fabricator to easily generate quotation information by correcting the unit price without the need to calculate the quantity of steel frames based on the drawings.

また、第1の実施形態に係る鉄骨注文システム1によれば、サーバ100は、注文情報に含まれる図面が正式図面情報である場合に、注文情報を複数のファブリケータに送信し、図面が概算図面情報である場合に注文情報をファブリケータに送信しない。これにより、ファブリケータは鉄骨作成の受注前に不確定なスケジュールを確保しておく必要がない。 In addition, according to the steel structure ordering system 1 of the first embodiment, the server 100 transmits the order information to multiple fabricators when the drawings included in the order information are formal drawing information, and does not transmit the order information to a fabricator when the drawings are approximate drawing information. This eliminates the need for fabricators to secure an uncertain schedule before receiving an order for steel structure fabrication.

また、第1の実施形態に係る鉄骨注文システム1によれば、サーバ100は、図面情報に基づいて鉄骨の溶接量を求め、鉄骨の加工難度を推定し、加工難度に基づいて鉄骨の単価を算出する。これにより、サーバ100は鉄骨の種類に応じて適切に単価を算出することができる。 In addition, according to the steel frame ordering system 1 of the first embodiment, the server 100 determines the amount of welding for the steel frame based on the drawing information, estimates the processing difficulty of the steel frame, and calculates the unit price of the steel frame based on the processing difficulty. This allows the server 100 to calculate the unit price appropriately according to the type of steel frame.

また、第1の実施形態に係る鉄骨注文システム1によれば、サーバ100は、数量及び単価を自動算出した場合に、注文者に手数料を請求する。またサーバ100は、ファブリケータから年会費の支払いを受け付け、年会費を支払った複数のファブリケータに、注文情報を送信する。これにより、鉄骨注文システム1は、プラットフォーマの収益を適切に創出することができる。 Furthermore, according to the steel structure ordering system 1 of the first embodiment, the server 100 charges a fee to the orderer when the quantity and unit price are automatically calculated. The server 100 also accepts payment of an annual membership fee from the fabricator, and transmits order information to multiple fabricators that have paid the annual membership fee. This allows the steel structure ordering system 1 to appropriately generate revenue for the platform operator.

また、第1の実施形態に係る鉄骨注文システム1によれば、サーバ100は、注文者から注文情報の確定を受け付け、注文者によって確定された注文情報をファブリケータ端末200Bに送信する。これにより、ファブリケータは構想段階や企画段階ではなく、設計が完了した段階で注文情報を取得することができる。設計が完了した段階で鉄骨の注文を受注することで、受注から鉄骨の生産開始までの期間を短くすることができる。つまりファブリケータは、閑散期に、直ぐに生産に着手できる鉄骨の注文を受けることができる。 Furthermore, according to the steel frame ordering system 1 of the first embodiment, the server 100 accepts confirmation of order information from the orderer and transmits the order information confirmed by the orderer to the fabricator terminal 200B. This allows the fabricator to obtain order information at the stage when the design is complete, rather than at the conceptual or planning stage. By receiving an order for steel frames at the stage when the design is complete, the period from receiving the order to starting production of the steel frames can be shortened. In other words, the fabricator can receive orders for steel frames that can be produced immediately during the off-season.

また、第1の実施形態に係る鉄骨注文システム1によれば、サーバ100は注文者からファブリケータの評価を受け付け、ファブリケータから注文者の評価を受け付ける。またサーバ100は、注文者に、候補ファブリケータ情報と共に評価情報を提示する。これにより、注文者は過去の評価を参照しながらファブリケータを選定することができる。 In addition, according to the steel structure ordering system 1 of the first embodiment, the server 100 accepts fabricator evaluations from the orderer, and accepts the orderer's evaluations from the fabricator. The server 100 also presents the orderer with evaluation information along with information on candidate fabricators. This allows the orderer to select a fabricator while referring to past evaluations.

また、第1の実施形態に係る鉄骨注文システム1によれば、サーバ100は、候補ファブリケータ情報とともに、当該候補ファブリケータ情報が示すファブリケータから送信された見積情報を提示する。これにより、注文者は提示された見積情報を参照しながらファブリケータを選定することができる。特に、第1の実施形態によれば、サーバ100は、複数の候補ファブリケータ別の見積情報を比較可能に提示する。これにより、注文者は候補ファブリケータの相見積を実現することができる。 Furthermore, according to the steel structure ordering system 1 of the first embodiment, the server 100 presents, together with the candidate fabricator information, quotation information sent from the fabricator indicated by the candidate fabricator information. This allows the orderer to select a fabricator by referring to the presented quotation information. In particular, according to the first embodiment, the server 100 presents quotation information for multiple candidate fabricators in a comparable manner. This allows the orderer to obtain competitive quotations from the candidate fabricators.

また、第1の実施形態に係る鉄骨注文システム1によれば、サーバ100は、注文者から、複数の候補ファブリケータのうち鉄骨を注文する契約ファブリケータの選択を受け付けたときに、保証契約情報を提示し、前記保証契約を締結するか否かを受け付ける。これにより、注文者及びファブリケータは、信用リスクを回避することができる。 In addition, according to the steel structure ordering system 1 of the first embodiment, when the server 100 receives from the orderer a selection of a contract fabricator from among multiple candidate fabricators to order steel structures, the server 100 presents warranty contract information and receives a decision as to whether or not to enter into the warranty contract. This allows the orderer and the fabricator to avoid credit risk.

また、第1の実施形態に係る鉄骨注文システム1によれば、サーバ100は、複数の候補ファブリケータのうち、候補ファブリケータ情報が注文者に提示されなかったものに、注文者に選定されなかったことを通知する。これにより、候補ファブリケータ情報を注文者に提示されなかったファブリケータは、受注できなかったことをすぐに知ることができ、受注成立の待ち時間を短くすることができる。 In addition, according to the steel structure ordering system 1 of the first embodiment, the server 100 notifies those of the multiple candidate fabricators whose candidate fabricator information was not presented to the orderer that they were not selected by the orderer. This allows the fabricators whose candidate fabricator information was not presented to the orderer to immediately know that they were unable to accept the order, shortening the wait time for the order to be fulfilled.

また、第1の実施形態に係る鉄骨注文システム1は、300トンよりも少ない小ロットの鉄骨の取引を扱う。小ロットの鉄骨は、材料費に対する人件費等の割合が大きくなるため、鉄骨の単価はファブリケータによってばらつきが生じやすい。したがって、鉄骨注文システム1は、小ロットの鉄骨の取引を扱うことで、注文者に様々なファブリケータの選択肢を提示することができる。 The steel frame ordering system 1 according to the first embodiment also handles small-lot steel frame transactions of less than 300 tons. Since the ratio of labor costs to material costs is high for small-lot steel frames, the unit price of the steel frame is likely to vary depending on the fabricator. Therefore, by handling small-lot steel frame transactions, the steel frame ordering system 1 can present the customer with a variety of fabricator options.

また、第1の実施形態に係る鉄骨注文システム1のサーバ100を運営する主体は、鉄骨の所有権を譲り受けない。これにより、プラットフォーマは在庫リスクを負うことを防ぐことができる。 In addition, the entity that operates the server 100 of the steel structure ordering system 1 according to the first embodiment does not take over ownership of the steel structure. This prevents the platform operator from bearing inventory risk.

〈第2の実施形態〉
ファブリケータと注文者との間での取引の段階は、ファブリケータが鉄骨を製作する製作段階、製作した鉄骨を注文者へ納品する納品段階、ファブリケータが注文者との間で精算を行い、注文者から鉄骨の代金を受け取る領収段階を含む。ファブリケータは、製作段階において鉄骨の材料費などを一時的に負担し、領収段階において材料費を含む代金を回収する。
Second Embodiment
The stages of a transaction between a fabricator and a customer include a production stage where the fabricator produces the steel frame, a delivery stage where the fabricated steel frame is delivered to the customer, and a receipt stage where the fabricator settles the account with the customer and receives payment for the steel frame from the customer. The fabricator temporarily covers the material costs of the steel frame during the production stage, and collects the payment including the material costs during the receipt stage.

第1の実施形態に係る鉄骨注文システム1は、注文情報の送信元の注文者と、当該注文情報に係る注文を受注するファブリケータ(選択ファブリケータ)との間で受注が確定したときに、注文者またはファブリケータに仲介手数料を請求する。ここで、ファブリケータに仲介手数料を請求する場合、この受注確定時点において、取引の段階は製作段階以前であり、ファブリケータにとって手数料を支払うことが容易でない可能性がある。これに対し、第2の実施形態に係る鉄骨注文システム1は、ファブリケータが鉄骨の代金を領収する領収段階において、手数料の請求を行う。なお、領収段階において請求する手数料は、仲介手数料に限られず、例えばファブリケータによる鉄骨注文システム1の利用手数料や、注文者に請求される手数料をファブリケータが立て替えるものであってもよい。
例えば、手数料は、ファブリケータを鉄骨注文システム1に登録することに対する登録手数料、ファブリケータを注文者に紹介したことに対する紹介手数料、および鉄骨の注文の成立に対する仲介手数料の両方を含んでいてもよいし、いずれか一方を含んでいてもよい。なお、各種手数料をまとめて請求することで、鉄骨注文システム1はファブリケータおよび注文者の手間を低減することができる。
The steel structure ordering system 1 according to the first embodiment charges an agency fee to the orderer or fabricator when an order is confirmed between the orderer who transmitted the order information and the fabricator (selected fabricator) who receives the order related to the order information. Here, when charging an agency fee to the fabricator, at the time of order confirmation, the transaction stage is before the production stage, and it may not be easy for the fabricator to pay the fee. In contrast, the steel structure ordering system 1 according to the second embodiment charges the fee at the receipt stage when the fabricator receives the price of the steel structure. Note that the fee charged at the receipt stage is not limited to an agency fee, and may be, for example, a fee for the fabricator's use of the steel structure ordering system 1 or a fee charged to the orderer paid in advance by the fabricator.
For example, the fees may include all or any one of a registration fee for registering a fabricator in the steel structure ordering system 1, an introduction fee for introducing a fabricator to a customer, and an intermediary fee for the completion of an order for a steel structure. By charging the various fees together, the steel structure ordering system 1 can reduce the work of the fabricator and the customer.

なお、注文者に請求される手数料をファブリケータが立て替える場合、図2のステップS11で送信される受注情報に含まれる見積情報には当該手数料が含まれないため、ファブリケータは、受注の確定後に当該手数料を含む見積情報を出し直してもよい。 Note that if the fabricator pays the fee to be charged to the customer, the quotation information included in the order information sent in step S11 of FIG. 2 does not include the fee, so the fabricator may resubmit quotation information including the fee after the order is confirmed.

第2の実施形態に係るサーバ100は、ワークフローシステムとして機能する。第2の実施形態に係るサーバ100は、注文者による鉄骨の注文から清算までの処理を、一連のワークフローとして取り扱い、ワークフローごとに生成される一つのワークフローデータを、処理に応じて更新する。つまり、注文者からの注文情報の受信、注文者への概算見積情報の送信、ファブリケータへの注文情報の送信、ファブリケータからの受注情報の受信、注文者への候補情報(相見積画面データ)の送信、受注確定通知(選定結果情報)の送信などは、ワークフローを介して行われる。以下、「ワークフロー」とは、ワークフローシステムで扱われるワークフローデータを言う。サーバ100による受注確定通知の送信後も、ファブリケータおよび注文者は、当該ワークフローを用いて取引に関する連絡を行うことができる。 The server 100 according to the second embodiment functions as a workflow system. The server 100 according to the second embodiment handles the process from ordering steel frames by the customer to settlement as a series of workflows, and updates one workflow data generated for each workflow according to the process. In other words, receiving order information from the customer, sending rough estimate information to the customer, sending order information to the fabricator, receiving order information from the fabricator, sending candidate information (competitive quote screen data) to the customer, and sending an order confirmation notice (selection result information) are all performed via workflows. Hereinafter, "workflow" refers to workflow data handled by the workflow system. Even after the server 100 sends an order confirmation notice, the fabricator and the customer can use the workflow to communicate about the transaction.

図9は、第2の実施形態に係る鉄骨注文システム1の構成を示す図である。第2の実施形態に係る鉄骨注文システム1は、第1の実施形態に係る構成に加え、さらに判定部117および更新部118を備える。 Figure 9 is a diagram showing the configuration of a steel structure ordering system 1 according to the second embodiment. In addition to the configuration according to the first embodiment, the steel structure ordering system 1 according to the second embodiment further includes a determination unit 117 and an update unit 118.

判定部117は、受注が確定したファブリケータ、すなわち図8に示すステップS119の選定情報が示すファブリケータが領収段階にあるか否かを判定する。例えば、判定部117は、ファブリケータから代金を受け取った旨の報告を受け付け、または注文者から代金を支払った旨の報告を受け付け、当該報告に基づいてファブリケータが領収段階にあるか否かを判定することができる。判定部117は、判定に用いる情報が提供された場合に、ユーザデータベース102に記憶された当該情報の提供元であるファブリケータまたは注文者の評価情報を高い評価に更新してもよい。また判定部117は、判定に用いる情報が提供されなかった場合に、ユーザデータベース102に記憶された当該情報の提供元であるファブリケータまたは注文者の評価情報を低い評価に更新してもよい。 The determination unit 117 determines whether or not the fabricator whose order has been confirmed, i.e., the fabricator indicated by the selection information in step S119 shown in FIG. 8, is in the receipt stage. For example, the determination unit 117 can receive a report from the fabricator that payment has been received, or receive a report from the orderer that payment has been paid, and determine whether or not the fabricator is in the receipt stage based on the report. When information used for the determination is provided, the determination unit 117 may update the evaluation information of the fabricator or orderer that is the source of the information stored in the user database 102 to a higher evaluation. Also, when information used for the determination is not provided, the determination unit 117 may update the evaluation information of the fabricator or orderer that is the source of the information stored in the user database 102 to a lower evaluation.

更新部118は、ファブリケータおよび注文者によるワークフローの更新を受け付ける。ワークフローは、ファブリケータおよび注文者の取引の段階に応じて更新される。 The update unit 118 accepts updates to the workflow by the fabricator and the orderer. The workflow is updated according to the stage of the transaction between the fabricator and the orderer.

請求部105は、判定部117によってファブリケータが領収段階にあると判定された場合に、当該ファブリケータに手数料の請求情報を送信する。ファブリケータは、請求情報に従って、プラットフォーマに手数料を支払う。請求部105は、判定部117による領収段階の判定に用いる情報が提供された場合に、減額した手数料に係る請求情報を送信してもよい。または請求部105は、判定部117による領収段階の判定に用いる情報が提供されない場合に、増額した手数料に係る請求情報を送信してもよい。
請求部105は、手数料の請求時期の決定の根拠を示す根拠情報を、請求情報と共に送信してよい。根拠の例としては、ファブリケータから代金領収の報告を受けたこと、注文者から代金支払いの報告を受けたこと、日付が建方開始時期に至ったこと、鉄骨の納品日が入力されたこと、受注の確定から一定期間が経過したことなどが挙げられる。
なお、判定部117による領収段階にあるか否かの判定は必ずしも正確でないため、実際にはファブリケータが鉄骨の代金を受け取っていない可能性がある。そのため、請求部105は、請求情報の送信後、ファブリケータから支払予定日情報を受け付け、当該支払予定日に基づいて支払い期間を設定してもよい。例えば、注文者による代金の支払いが手形によってなされる場合に、ファブリケータは手形期日を支払予定日とする支払予定日情報をサーバ100に送信する。また例えば、請求部105は、支払予定日に請求情報を送信し直してもよい。
When the determining unit 117 determines that the fabricator is in the receipt stage, the billing unit 105 transmits billing information for the fee to the fabricator. The fabricator pays the fee to the platformer according to the billing information. When the information used by the determining unit 117 to determine the receipt stage is provided, the billing unit 105 may transmit billing information for a reduced fee. Alternatively, when the information used by the determining unit 117 to determine the receipt stage is not provided, the billing unit 105 may transmit billing information for an increased fee.
The billing unit 105 may transmit, together with the billing information, basis information indicating the basis for determining the timing of billing the fee. Examples of the basis include a fact that a report of receipt of the fee has been received from the fabricator, a fact that a report of payment of the fee has been received from the customer, the date of the start of construction has arrived, the delivery date of the steel frame has been input, a certain period of time has passed since the confirmation of the order, etc.
Note that since the determination unit 117 does not always accurately determine whether or not the receipt stage has been reached, there is a possibility that the fabricator has not actually received payment for the steel frame. Therefore, after transmitting the billing information, the billing unit 105 may receive scheduled payment date information from the fabricator and set the payment period based on the scheduled payment date. For example, when the orderer pays the price by bill, the fabricator transmits scheduled payment date information to the server 100, with the due date of the bill as the scheduled payment date. Also, for example, the billing unit 105 may resend the billing information on the scheduled payment date.

ファブリケータ端末200Bの表示制御部202は、サーバ100から請求情報を受信すると、請求情報を表示装置に表示させる。図10は、第2の実施形態に係る請求情報の表示例を示す図である。請求情報には、プロジェクト名、請求額、請求情報の送信タイミングの根拠とが含まれる。これにより、ファブリケータは、プラットフォーマに手数料を支払うべきこと、プラットフォーマに支払うべき手数料の額を認識することができる。また、これにより、ファブリケータは、なぜ請求情報が送られてきたのかを認識することができる。 When the display control unit 202 of the fabricator terminal 200B receives the billing information from the server 100, it causes the display device to display the billing information. FIG. 10 is a diagram showing an example of the display of billing information according to the second embodiment. The billing information includes the project name, the billing amount, and the basis for the timing of sending the billing information. This allows the fabricator to recognize that a fee should be paid to the platformer, and the amount of the fee to be paid to the platformer. This also allows the fabricator to recognize why the billing information has been sent.

以下に、判定部117がファブリケータが領収段階にあるか否かの判定するための構成について説明する。 The following describes the configuration by which the determination unit 117 determines whether the fabricator is in the receipt stage.

《第1の構成例》
第1の構成例では、ファブリケータは、鉄骨の納品日が決まったときに、注文情報に係るワークフローに当該納品日を記録して、ワークフローを更新する。または、ファブリケータは、鉄骨の納品が完了したときに、注文情報に係るワークフローに当該納品日を記録して、ワークフローを更新する。つまり、更新部118は、ファブリケータから納品日の更新指示を受け付け、ワークフローを更新する。更新部118は、鉄骨が納品されることを示す納品情報を、ファブリケータから受信する納品情報受信部の一例である。
First Configuration Example
In the first configuration example, when the delivery date of the steel frame is decided, the fabricator records the delivery date in the workflow related to the order information and updates the workflow. Alternatively, when the delivery of the steel frame is completed, the fabricator records the delivery date in the workflow related to the order information and updates the workflow. In other words, the update unit 118 receives an instruction to update the delivery date from the fabricator and updates the workflow. The update unit 118 is an example of a delivery information receiving unit that receives delivery information indicating that the steel frame will be delivered from the fabricator.

判定部117は、ワークフローに納品日が記録されたか否かを判定し、納品日が記録された場合に、ファブリケータが領収段階にあると判定する。つまり、判定部117は、ファブリケータから注文者への鉄骨の納品が予定された場合、または鉄骨の納品が完了した場合に、ファブリケータが領収段階にあると判定する。 The determination unit 117 determines whether or not a delivery date has been recorded in the workflow, and if a delivery date has been recorded, determines that the fabricator is in the receipt stage. In other words, the determination unit 117 determines that the fabricator is in the receipt stage when the delivery of the steel frame from the fabricator to the customer is scheduled, or when the delivery of the steel frame has been completed.

鉄骨が納品予定である、または納品されたということは、上記の納品段階の終了を意味する。したがって、判定部117は、ファブリケータが納品段階の次の段階である領収段階にあると判定することができる。 The fact that the steel beams are scheduled to be delivered or have been delivered means that the above-mentioned delivery stage has ended. Therefore, the determination unit 117 can determine that the fabricator is in the receipt stage, which is the stage following the delivery stage.

請求部105は、判定部117によってファブリケータが領収段階にあると判定された場合に、ファブリケータへ手数料の請求情報を送信する。請求部105は、判定部117によってファブリケータが領収段階にあると判定された時点で請求情報を送信してもよいし、ワークフローに記録された納品日まで待ってから請求情報を送信してもよい。 When the determination unit 117 determines that the fabricator is in the receipt stage, the billing unit 105 transmits billing information for the fee to the fabricator. The billing unit 105 may transmit the billing information at the time when the determination unit 117 determines that the fabricator is in the receipt stage, or may wait until the delivery date recorded in the workflow before transmitting the billing information.

《第2の構成例》
第2の構成例では、注文者は、ファブリケータから鉄骨が納品されたときに、注文情報に係るワークフローに当該納品日を記録して、ワークフローを更新する。つまり、更新部118は、注文者から納品日の更新指示を受け付け、ワークフローを更新する。更新部118は、鉄骨が納品されることを示す納品情報を、注文者から受信する納品情報受信部の一例である。
Second Configuration Example
In the second configuration example, when the steel beams are delivered from the fabricator, the orderer records the delivery date in the workflow related to the order information and updates the workflow. That is, the update unit 118 receives an instruction to update the delivery date from the orderer and updates the workflow. The update unit 118 is an example of a delivery information receiving unit that receives delivery information indicating that the steel beams will be delivered from the orderer.

判定部117は、ワークフローに納品日が記録されたか否かを判定し、納品日が記録された場合に、ファブリケータが領収段階にあると判定する。つまり、判定部117は、ファブリケータから注文者への鉄骨の納品が予定された場合、または鉄骨の納品が完了した場合に、ファブリケータが領収段階にあると判定する。 The determination unit 117 determines whether or not a delivery date has been recorded in the workflow, and if a delivery date has been recorded, determines that the fabricator is in the receipt stage. In other words, the determination unit 117 determines that the fabricator is in the receipt stage when the delivery of the steel frame from the fabricator to the customer is scheduled, or when the delivery of the steel frame has been completed.

請求部105は、判定部117によってファブリケータが領収段階にあると判定された場合に、ファブリケータへ手数料の請求情報を送信する。請求部105は、判定部117によってファブリケータが領収段階にあると判定された時点で請求情報を送信してもよいし、ワークフローに記録された納品日まで待ってから請求情報を送信してもよい。 When the determination unit 117 determines that the fabricator is in the receipt stage, the billing unit 105 transmits billing information for the fee to the fabricator. The billing unit 105 may transmit the billing information at the time when the determination unit 117 determines that the fabricator is in the receipt stage, or may wait until the delivery date recorded in the workflow before transmitting the billing information.

《第3の構成例》
第3の構成例では、注文者は、鉄骨の建方開始時期が変更されるたびに、注文情報に係るワークフローに当該建方開始時期を更新する。つまり、更新部118は、注文者から納品日の更新指示を受け付け、ワークフローを更新する。一般的に、建方開始時期はしばしば変化するため、プラットフォーマは鉄骨の納品予定を管理することが困難である。他方、第2の構成例のように、ワークフローにおいて建方開始時期が適宜更新されることで、サーバ100は、最新の鉄骨の納品予定を予測することが容易である。建方開始時期の更新は、既に設定されている建方開始時期より前に更新される。更新部118は、鉄骨の建方開始時期を示す建方開始時期情報を注文者から取得する取得部の一例である。
Third Configuration Example
In the third configuration example, the orderer updates the construction start date in the workflow related to the order information every time the construction start date of the steel frame is changed. In other words, the update unit 118 accepts an instruction to update the delivery date from the orderer and updates the workflow. In general, since the construction start date changes frequently, it is difficult for the platformer to manage the delivery schedule of the steel frame. On the other hand, as in the second configuration example, by appropriately updating the construction start date in the workflow, it is easy for the server 100 to predict the latest delivery schedule of the steel frame. The construction start date is updated to be earlier than the construction start date that has already been set. The update unit 118 is an example of an acquisition unit that acquires construction start date information indicating the construction start date of the steel frame from the orderer.

判定部117は、現在の日付がワークフローに係る建方開始時期または建方開始時期より後の日付であるか否かを判定し、現在の日付が建方開始時期または建方開始時期より後の日付である場合に、ファブリケータが領収段階にあると判定する。つまり、判定部117は、注文者から取得した建方開始時期情報に基づいて、ファブリケータが領収段階にあると判定する。なお、建方開始時期は必ずしも更新されなくてよく、判定部117は、設定部104がステップS102で受け付けた注文情報に含まれる建方開始日に基づいてファブリケータが領収段階にあるか否かを判定してもよい。この場合、設定部104は鉄骨の建方開始時期を示す建方開始時期情報を注文者から取得する取得部の一例である。
請求部105は、判定部117によってファブリケータが領収段階にあると判定された場合に、ファブリケータへ手数料の請求情報を送信する。なお、建方開始時期までにファブリケータが鉄骨の納品ができていない場合、ファブリケータは鉄骨の納品予定日を支払予定日とする支払予定日情報をサーバ100に送信することができる。これにより、請求部105は、納品予定日までの期間を支払い期間に設定することができる。
The determination unit 117 determines whether the current date is the construction start time related to the workflow or a date later than the construction start time, and determines that the fabricator is in the receipt stage if the current date is the construction start time or a date later than the construction start time. That is, the determination unit 117 determines that the fabricator is in the receipt stage based on the construction start time information acquired from the orderer. Note that the construction start time does not necessarily need to be updated, and the determination unit 117 may determine whether the fabricator is in the receipt stage based on the construction start date included in the order information accepted by the setting unit 104 in step S102. In this case, the setting unit 104 is an example of an acquisition unit that acquires construction start time information indicating the construction start time of the steel frame from the orderer.
The billing unit 105 transmits billing information for the fee to the fabricator when the determining unit 117 determines that the fabricator is in the receipt stage. If the fabricator has not delivered the steel frame by the start of construction, the fabricator can transmit to the server 100 scheduled payment date information that sets the scheduled delivery date of the steel frame as the scheduled payment date. This enables the billing unit 105 to set the period up to the scheduled delivery date as the payment period.

《第4の構成例》
第4の構成例に係る判定部117は、候補提示部111が注文者端末200Aに、抽出された候補ファブリケータ情報を送信した日付から所定期間が経過したときに、ファブリケータが領収段階にあると判定する。例えば、判定部117は、鋼材の種類に応じた標準的な調達期間と工期の和によって、当該所定期間を求めてよい。なお、通常、ファブリケータにとって、鉄骨の資材の調達期間が納期のボトルネックとなることが多いため、上記のように鋼材の種類に応じた標準的な調達期間と工期の和を用いることで、精度よく鉄骨の納品予定日を推定することができる。なお、判定部117は、工期を用いずに調達期間に基づいて納品予定日を推定してもよい。受注が確定した日付から所定期間が経過した時点でファブリケータが鉄骨の納品ができていない場合、ファブリケータは鉄骨の納品予定日を支払予定日とする支払予定日情報をサーバ100に送信することができる。これにより、請求部105は、納品予定日までの期間を支払い期間に設定することができる。
<<Fourth Configuration Example>>
The determination unit 117 according to the fourth configuration example determines that the fabricator is in the receipt stage when a predetermined period has passed since the date on which the candidate presentation unit 111 transmitted the extracted candidate fabricator information to the orderer terminal 200A. For example, the determination unit 117 may obtain the predetermined period by the sum of the standard procurement period and the construction period according to the type of steel material. Since the procurement period of steel materials is usually a bottleneck for the delivery date for fabricators, the scheduled delivery date of the steel frame can be accurately estimated by using the sum of the standard procurement period and the construction period according to the type of steel material as described above. The determination unit 117 may estimate the scheduled delivery date based on the procurement period without using the construction period. If the fabricator has not been able to deliver the steel frame when a predetermined period has passed since the date on which the order was confirmed, the fabricator can transmit scheduled payment date information to the server 100, which sets the scheduled delivery date of the steel frame as the scheduled payment date. This allows the billing unit 105 to set the period until the scheduled delivery date as the payment period.

《第5の構成例》
第5の構成例に係る判定部117は、候補選択部112が注文者端末200Aから3つの推薦ファブリケータのうち鉄骨を注文する契約ファブリケータの選択を受け付けた日付(受注が確定した日付)から所定期間が経過したときに、ファブリケータが領収段階にあると判定する。例えば、判定部117は、鋼材の種類に応じた標準的な調達期間と工期の和によって、当該所定期間を求めてよい。なお、判定部117は、工期を用いずに調達期間に基づいて納品予定日を推定してもよい。受注が確定した日付から所定期間が経過した時点でファブリケータが鉄骨の納品ができていない場合、ファブリケータは鉄骨の納品予定日を支払予定日とする支払予定日情報をサーバ100に送信することができる。これにより、請求部105は、納品予定日までの期間を支払い期間に設定することができる。
なお、請求部105は、候補選択部112が注文者端末200Aから3つの推薦ファブリケータのうち鉄骨を注文する契約ファブリケータの選択を受け付けたときに、請求情報を送信してもよい。
Fifth Configuration Example
The determination unit 117 according to the fifth configuration example determines that the fabricator is in the receipt stage when a predetermined period has passed since the date on which the candidate selection unit 112 accepted the selection of the contract fabricator to order the steel frame from the orderer terminal 200A among the three recommended fabricators (the date on which the order was confirmed). For example, the determination unit 117 may determine the predetermined period by the sum of the standard procurement period and the construction period according to the type of steel material. The determination unit 117 may estimate the scheduled delivery date based on the procurement period without using the construction period. If the fabricator has not been able to deliver the steel frame when a predetermined period has passed from the date on which the order was confirmed, the fabricator can transmit scheduled payment date information to the server 100, which sets the scheduled delivery date of the steel frame as the scheduled payment date. This allows the billing unit 105 to set the period until the scheduled delivery date as the payment period.
The billing unit 105 may transmit billing information when the candidate selection unit 112 receives a selection of a contract fabricator from among the three recommended fabricators to order the steel frame from the orderer terminal 200A.

《第6の構成例》
第6の構成例に係る判定部117は、精算処理部115が清算に係る情報を受け付けたときに、ファブリケータが領収段階にあると判定する。例えば、判定部117は、精算処理部115が図8のステップS126で実績情報を受信したときに、ファブリケータが領収段階にあると判定してよい。また例えば、判定部117は、精算処理部115がファブリケータから直接清算情報を受け付けたときに、ファブリケータが領収段階にあると判定してよい。
<<Sixth Configuration Example>>
The determination unit 117 according to the sixth configuration example determines that a fabricator is in the receipt stage when the settlement processing unit 115 receives information related to settlement. For example, the determination unit 117 may determine that a fabricator is in the receipt stage when the settlement processing unit 115 receives performance information in step S126 of Fig. 8. Also, for example, the determination unit 117 may determine that a fabricator is in the receipt stage when the settlement processing unit 115 receives settlement information directly from the fabricator.

清算情報によって請求額が変化する場合、請求部105は、清算によって変化した代金に基づいて手数料を決定してよい。 If the billing amount changes due to the settlement information, the billing unit 105 may determine the fee based on the price that has changed due to the settlement.

以上、第2の実施形態に係るいくつかの構成例について説明したが、サーバ100は、上記構成例を互いに組み合わせてファブリケータが領収段階にあるか否かを判定してもよい。
例えば、判定部117は、第1の構成例のように納品日の入力があった場合に、納品日に基づいて領収段階であると判定してよい。一方で納品日の入力がなされないまま建方開始時期に至った場合、第3の構成例のように建方開始時期に基づいて領収段階であると判定してよい。
また例えば、更新部118がファブリケータおよび注文者の両方から納品日の更新を受け付ける場合に、ファブリケータによって更新された納品日に基づいて領収段階であると判定してもよいし、注文者によって更新された納品日に基づいて領収段階であると判定してもよい。
また例えば、判定部117は、第1から第6の構成例のそれぞれの機能を有し、得られた複数の情報に基づいてファブリケータが領収段階にあるか否かを判定してもよい。
Although several configuration examples according to the second embodiment have been described above, the server 100 may determine whether or not the fabricator is in the receipt stage by combining the above configuration examples.
For example, the determination unit 117 may determine that the product is in the receipt stage based on the delivery date when the delivery date is input as in the first configuration example. On the other hand, when the construction start time arrives without the delivery date being input, the determination unit 117 may determine that the product is in the receipt stage based on the construction start time as in the third configuration example.
Also, for example, when the update unit 118 receives updates of the delivery date from both the fabricator and the orderer, it may determine that the product is in the receipt stage based on the delivery date updated by the fabricator, or it may determine that the product is in the receipt stage based on the delivery date updated by the orderer.
Also, for example, the determination unit 117 may have the functions of each of the first to sixth configuration examples, and may determine whether or not the fabricator is in the receipt stage based on a plurality of pieces of obtained information.

〈他の実施形態〉
以上、図面を参照して一実施形態について詳しく説明してきたが、具体的な構成は上述のものに限られることはなく、様々な設計変更等をすることが可能である。すなわち、他の実施形態においては、上述の処理の順序が適宜変更されてもよい。また、一部の処理が並列に実行されてもよい。
上述した実施形態に係るサーバ100は、単独のコンピュータによって構成されるものであってもよいし、サーバ100の構成を複数のコンピュータに分けて配置し、複数のコンピュータが互いに協働することでサーバ100として機能するものであってもよい。
Other Embodiments
Although one embodiment has been described in detail above with reference to the drawings, the specific configuration is not limited to the above, and various design changes are possible. That is, in other embodiments, the order of the above-mentioned processes may be changed as appropriate. Also, some of the processes may be executed in parallel.
The server 100 according to the above-described embodiment may be configured as a single computer, or the configuration of the server 100 may be divided and arranged among multiple computers, and the multiple computers may function as the server 100 by working together.

上述した実施形態に係るサーバ100は、注文情報に含まれる図面に基づいて自動的に鉄骨の数量及び単価を算出するが、これに限られない。例えば、他の実施形態に係るサーバ100は、プラットフォーマから図面に基づいて手作業で算出された鉄骨の数量及び単価の入力を受け付けてもよい。また、上述した実施形態に係るサーバ100は、受注情報に基づいて自動的に推薦ファブリケータを抽出するが、これに限られない。例えば、他の実施形態に係るサーバ100は、受信した受注情報をプラットフォーマに提示し、プラットフォーマから推薦ファブリケータの選択を受け付けてもよい。 The server 100 according to the above-described embodiment automatically calculates the quantity and unit price of steel frames based on the drawings included in the order information, but is not limited to this. For example, the server 100 according to another embodiment may accept input of the quantity and unit price of steel frames calculated manually based on the drawings from the platformer. Also, the server 100 according to the above-described embodiment automatically extracts recommended fabricators based on order information, but is not limited to this. For example, the server 100 according to another embodiment may present the received order information to the platformer and accept the selection of a recommended fabricator from the platformer.

上述した実施形態に係るサーバ100は、複数の候補ファブリケータのうち、所在地、受注価格、及び評価の観点から3つの候補ファブリケータを抽出するが、これに限られない。例えば、他の実施形態に係るサーバ100は、所在地、受注価格、及び評価のうち2つの観点に基づいて2つの候補ファブリケータを抽出してもよい。また他の実施形態に係るサーバは、他の基準に基づいて推薦ファブリケータを抽出してもよい。
また他の実施形態に係るサーバ100は、すべての候補ファブリケータに係る候補ファブリケータ情報を注文者端末200Aに提示してもよい。このとき、注文者端末200Aは、受信したすべての候補ファブリケータ情報を表示してもよいし、注文者端末200Aにて受注価格、所在地から建築現場までの距離、及び評価のそれぞれの観点から候補ファブリケータ情報を抽出し、またはソートして表示してもよい。
The server 100 according to the embodiment described above extracts three candidate fabricators from among a plurality of candidate fabricators based on the perspectives of location, order price, and reputation, but is not limited to this. For example, the server 100 according to another embodiment may extract two candidate fabricators based on two perspectives of location, order price, and reputation. Furthermore, the server according to another embodiment may extract a recommended fabricator based on other criteria.
Furthermore, the server 100 according to another embodiment may present candidate fabricator information relating to all candidate fabricators to the orderer terminal 200A. In this case, the orderer terminal 200A may display all of the received candidate fabricator information, or the orderer terminal 200A may extract or sort the candidate fabricator information from the viewpoints of order price, distance from the location to the construction site, and evaluation, and display the extracted candidate fabricator information.

上述した実施形態に係るサーバ100は、注文者から受注条件の設定を受け付けるが、これに限られない。例えば他の実施形態に係るサーバ100は、予め受注条件を定めておいてもよい。例えば、サーバ100は、評価情報が5段階評価の3ポイント以上のファブリケータにのみ、注文情報を送信してもよい。 The server 100 according to the embodiment described above accepts the setting of order conditions from the orderer, but is not limited to this. For example, the server 100 according to other embodiments may predetermine the order conditions. For example, the server 100 may transmit order information only to fabricators whose evaluation information is rated at 3 points or more on a 5-point scale.

上述した実施形態に係るサーバ100は、受注情報が一定数に達した場合または注文情報を送信した日付から一定期間が経過した場合に、候補ファブリケータの抽出を行うが、これに限られない。例えば、他の実施形態に係るサーバ100は、注文者から推薦ファブリケータの提示要求を受け付けた場合に、候補ファブリケータの抽出を行ってもよい。また他の実施形態に係るサーバ100は、注文者から予め受注締切日の指定を受け付け、当該受注締切日が満了した時点で候補ファブリケータの抽出を行ってもよい。 The server 100 according to the embodiment described above extracts candidate fabricators when a certain number of order information items are received or when a certain period of time has passed since the date on which the order information was sent, but is not limited to this. For example, the server 100 according to another embodiment may extract candidate fabricators when a request for a recommended fabricator is received from an orderer. The server 100 according to another embodiment may also accept a specified order deadline from an orderer in advance, and extract candidate fabricators when the order deadline has passed.

上述した実施形態に係るファブリケータ端末200Bは、正式見積情報を含む受注情報をサーバ100に送信するが、これに限られない。例えば他の実施形態に係るファブリケータ端末200Bは、概算見積情報と正式見積情報との差分を示す補正情報をサーバ100に送信してもよい。この場合、サーバ100は補正情報と概算見積情報とに基づいて正式見積情報を生成し、生成した正式見積情報を注文者端末200Aに送信する。 The fabricator terminal 200B according to the embodiment described above transmits order information including formal estimate information to the server 100, but is not limited to this. For example, the fabricator terminal 200B according to another embodiment may transmit correction information indicating the difference between the rough estimate information and the formal estimate information to the server 100. In this case, the server 100 generates formal estimate information based on the correction information and the rough estimate information, and transmits the generated formal estimate information to the orderer terminal 200A.

上述した実施形態に係るサーバ100は、注文情報をファブリケータの所在地によらずに送信するが、これに限られない。例えば、他の実施形態に係るサーバ100は、注文者との契約内容に応じて、注文情報を送信するファブリケータを絞り込んでもよい。例えば、サーバ100は、注文者との契約内容によって、注文情報の送信先を、全国のファブリケータ、建設地と同一地方のファブリケータ、建設地と同一自治体のファブリケータなどに限定してもよい。この場合、請求部105が請求する手数料の額は、注文情報の送信範囲に応じて異なっていてよい。 Although the server 100 according to the embodiment described above transmits the order information regardless of the location of the fabricator, this is not limited to this. For example, the server 100 according to another embodiment may narrow down the fabricators to which the order information is transmitted depending on the contents of the contract with the orderer. For example, the server 100 may limit the destinations of the order information to fabricators nationwide, fabricators in the same region as the construction site, fabricators in the same municipality as the construction site, etc. depending on the contents of the contract with the orderer. In this case, the amount of the fee charged by the billing unit 105 may differ depending on the transmission range of the order information.

〈コンピュータ構成〉
図11は、少なくとも1つの実施形態に係るコンピュータの構成を示す概略ブロック図である。
コンピュータ50は、プロセッサ51、メインメモリ53、ストレージ55、インタフェース57を備える。
上述のサーバ100及び端末装置200は、それぞれコンピュータ50に実装される。そして、上述した各処理部の動作は、プログラムの形式でストレージ55に記憶されている。プロセッサ51は、プログラムをストレージ55から読み出してメインメモリ53に展開し、当該プログラムに従って上記処理を実行する。また、プロセッサ51は、プログラムに従って、上述した各記憶部に対応する記憶領域をメインメモリ53に確保する。プロセッサ51の例としては、CPU(Central Processing Unit)、GPU(Graphic Processing Unit)、マイクロプロセッサなどが挙げられる。
Computer Configuration
FIG. 11 is a schematic block diagram illustrating a configuration of a computer according to at least one embodiment.
The computer 50 includes a processor 51 , a main memory 53 , a storage 55 , and an interface 57 .
The above-mentioned server 100 and terminal device 200 are each implemented in a computer 50. The operations of the above-mentioned processing units are stored in the storage 55 in the form of a program. The processor 51 reads the program from the storage 55, loads it in the main memory 53, and executes the above-mentioned processing in accordance with the program. The processor 51 also secures storage areas in the main memory 53 corresponding to the above-mentioned storage units in accordance with the program. Examples of the processor 51 include a CPU (Central Processing Unit), a GPU (Graphic Processing Unit), and a microprocessor.

プログラムは、コンピュータ50に発揮させる機能の一部を実現するためのものであってもよい。例えば、プログラムは、ストレージに既に記憶されている他のプログラムとの組み合わせ、または他の装置に実装された他のプログラムとの組み合わせによって機能を発揮させるものであってもよい。なお、他の実施形態においては、コンピュータ50は、上記構成に加えて、または上記構成に代えてPLD(Programmable Logic Device)などのカスタムLSI(Large Scale Integrated Circuit)を備えてもよい。PLDの例としては、PAL(Programmable Array Logic)、GAL(Generic Array Logic)、CPLD(Complex Programmable Logic Device)、FPGA(Field Programmable Gate Array)が挙げられる。この場合、プロセッサ51によって実現される機能の一部または全部が当該集積回路によって実現されてよい。このような集積回路も、プロセッサの一例に含まれる。 The program may be for implementing some of the functions to be performed by the computer 50. For example, the program may be implemented by combining it with other programs already stored in the storage or other programs implemented in other devices. In other embodiments, the computer 50 may include a custom LSI (Large Scale Integrated Circuit) such as a PLD (Programmable Logic Device) in addition to or instead of the above configuration. Examples of PLDs include PAL (Programmable Array Logic), GAL (Generic Array Logic), CPLD (Complex Programmable Logic Device), and FPGA (Field Programmable Gate Array). In this case, some or all of the functions implemented by the processor 51 may be implemented by the integrated circuit. Such an integrated circuit is also included as an example of a processor.

ストレージ55の例としては、磁気ディスク、光磁気ディスク、光ディスク、半導体メモリ等が挙げられる。ストレージ55は、コンピュータ50のバスに直接接続された内部メディアであってもよいし、インタフェース57または通信回線を介してコンピュータ50に接続される外部メディアであってもよい。また、このプログラムが通信回線によってコンピュータ50に配信される場合、配信を受けたコンピュータ50が当該プログラムをメインメモリ53に展開し、上記処理を実行してもよい。少なくとも1つの実施形態において、ストレージ55は、一時的でない有形の記憶媒体である。 Examples of storage 55 include a magnetic disk, a magneto-optical disk, an optical disk, and a semiconductor memory. Storage 55 may be an internal medium directly connected to the bus of computer 50, or an external medium connected to computer 50 via interface 57 or a communication line. In addition, when this program is distributed to computer 50 via a communication line, computer 50 that receives the program may expand the program in main memory 53 and execute the above-mentioned processing. In at least one embodiment, storage 55 is a non-transitory tangible storage medium.

また、当該プログラムは、前述した機能の一部を実現するためのものであってもよい。さらに、当該プログラムは、前述した機能をストレージ55に既に記憶されている他のプログラムとの組み合わせで実現するもの、いわゆる差分ファイル(差分プログラム)であってもよい。 The program may be for realizing some of the functions described above. Furthermore, the program may be a so-called differential file (differential program) that realizes the functions described above in combination with other programs already stored in storage 55.

1…鉄骨注文システム 100…サーバ 101…登録受付部 102…ユーザデータベース 103…支払確認部 104…設定部 105…請求部 106…注文情報受信部 107…算出部 108…概算見積送信部 109…注文情報送信部 110…受注情報受信部 111…候補提示部 112…候補選択部 113…契約提示部 114…通知部 115…精算処理部 116…評価受付部 117…判定部 118…更新部 120…確認結果受信部 200…端末装置 200A…注文者端末 200B…ファブリケータ端末 201…受信部 202…表示制御部 203…入力部 204…送信部 50…コンピュータ 51…プロセッサ 53…メインメモリ 55…ストレージ 57…インタフェース 1...Steel frame ordering system 100...Server 101...Registration reception unit 102...User database 103...Payment confirmation unit 104...Setting unit 105...Billing unit 106...Order information reception unit 107...Calculation unit 108...Approximate estimate transmission unit 109...Order information transmission unit 110...Order information reception unit 111...Candidate presentation unit 112...Candidate selection unit 113...Contract presentation unit 114...Notification unit 115...Settlement processing unit 116...Evaluation reception unit 117...Determination unit 118...Update unit 120...Confirmation result reception unit 200...Terminal device 200A...Orderer terminal 200B...Fabricator terminal 201...Reception unit 202...Display control unit 203...Input unit 204...Transmission unit 50...Computer 51...Processor 53...Main memory 55...Storage 57...Interface

Claims (9)

鉄骨を注文する注文者及び鉄骨を製造する複数のファブリケータと、ネットワーク経由で通信するサーバであって、
前記注文者から鉄骨の注文を示す注文情報を受信する注文情報受信部と、
前記注文情報を前記複数のファブリケータに送信する注文情報送信部と、
前記注文情報が示す前記注文を受けることを示す受注情報を、前記複数のファブリケータの一部である複数の候補ファブリケータから受信する受注情報受信部と、
前記複数の候補ファブリケータそれぞれを示す複数の候補ファブリケータ情報の少なくとも一部を前記注文者に提示する候補提示部と、
前記候補提示部が提示する前記一部のうちの1つである選択ファブリケータ情報を前記注文者に選択させる選択部と、
前記選択ファブリケータ情報が示すファブリケータに、手数料の請求をするための請求情報を送信する請求部と、
を備えるサーバ。
A server that communicates with an orderer who orders a steel frame and a plurality of fabricators that manufacture the steel frame via a network,
an order information receiving unit that receives order information indicating an order for a steel frame from the orderer;
an order information transmitting unit that transmits the order information to the plurality of fabricators;
an order information receiving unit that receives order information indicating that the order indicated by the order information will be accepted from a plurality of candidate fabricators that are part of the plurality of fabricators;
a candidate presentation unit that presents at least a portion of a plurality of candidate fabricator information items indicating each of the plurality of candidate fabricators to the orderer;
a selection unit that allows the orderer to select selected fabricator information that is one of the portion presented by the candidate presentation unit;
a billing unit that transmits billing information for billing a fee to the fabricator indicated by the selected fabricator information;
A server comprising:
前記選択ファブリケータ情報が示すファブリケータが、前記注文者から前記鉄骨の代金を受け取る領収段階にあるか否かを判定する判定部、
を更に備え、
前記請求部は、前記領収段階にあると前記判定部が判定する場合に、前記請求情報を前記選択ファブリケータ情報が示すファブリケータに送信する、
請求項1に記載のサーバ。
a determination unit that determines whether or not the fabricator indicated by the selected fabricator information is in a receipt stage of receiving payment for the steel frame from the orderer;
Further comprising:
the billing unit transmits the billing information to the fabricator indicated by the selected fabricator information when the determination unit determines that the process is in the receipt stage;
The server of claim 1 .
前記判定部は、前記選択ファブリケータ情報が示すファブリケータから前記注文者への前記鉄骨の納品が予定された場合、または前記鉄骨の納品が完了した場合に、前記領収段階にあると判定する、
請求項2に記載のサーバ。
The determination unit determines that the process is in the receipt stage when the delivery of the steel frame from the fabricator indicated by the selected fabricator information to the orderer is scheduled or when the delivery of the steel frame has been completed.
The server according to claim 2.
前記鉄骨の建方開始時期を示す建方開始時期情報を前記注文者から取得する取得部、
を更に備え、
前記判定部は、前記取得部により取得される前記建方開始時期に基づき、前記領収段階にあると判定する、
請求項2に記載のサーバ。
An acquisition unit that acquires construction start time information indicating a construction start time of the steel frame from the orderer;
Further comprising:
The determination unit determines that the construction is in the receipt stage based on the construction start time acquired by the acquisition unit.
The server according to claim 2.
前記判定部は、前記選択部が前記選択ファブリケータ情報を選択させてから、所定期間経過する場合に、前記領収段階にあると判定する、
請求項2に記載のサーバ。
the determining unit determines that the process is in the receipt stage when a predetermined period of time has elapsed since the selecting unit caused the selected fabricator information to be selected;
The server according to claim 2.
前記選択ファブリケータ情報が示すファブリケータへの前記鉄骨の注文、が確定するか否かを決定する決定部、
を更に備え、
前記判定部は、前記確定すると前記決定部が決定してから所定期間経過した場合に、前記領収段階にあると判定する、
請求項2に記載のサーバ。
a decision unit that decides whether or not to confirm an order for the steel frame to the fabricator indicated by the selected fabricator information;
Further comprising:
The determination unit determines that the receipt stage is in a case where a predetermined period of time has elapsed since the determination unit determined that the receipt stage is in a case where ...
The server according to claim 2.
前記鉄骨が納品されることを示す納品情報を、前記注文者又は前記選択ファブリケータ情報が示すファブリケータから、受信する納品情報受信部、
を更に備え、
前記判定部は、前記納品情報受信部により前記納品情報が受信される場合に、前記領収段階にあると判定する、
請求項2に記載のサーバ。
a delivery information receiving unit that receives delivery information indicating that the steel frame will be delivered from the orderer or the fabricator indicated by the selected fabricator information;
Further comprising:
The determination unit determines that the process is in the receipt stage when the delivery information is received by the delivery information receiving unit.
The server according to claim 2.
前記鉄骨の料金の精算を受け付ける精算処理部、
を更に備え、
前記判定部は、前記精算処理部により前記精算が受け付けられる場合に、前記領収段階にあると判定する、
請求項2に記載のサーバ。
a settlement processing unit that accepts settlement of the fee for the steel frame;
Further comprising:
The determination unit determines that the system is in the receipt stage when the settlement is accepted by the settlement processing unit.
The server according to claim 2.
鉄骨を注文する注文者及び鉄骨を製造する複数のファブリケータとネットワーク経由で通信するサーバ、と通信する端末であって、
前記注文者及び前記複数のファブリケータの間でやり取りされる情報を含む注文情報であって、前記注文者により注文される鉄骨の注文に関する注文情報、を表示部に表示させる表示制御手段と、
前記注文情報に対応する手数料を請求するための請求情報を前記サーバから受信する請求情報受信部と、
を備え、
前記表示制御手段は、前記請求情報が前記サーバから受信されるタイミングが決定される際に用いられた情報を、前記請求情報とともに、前記表示部に表示させる、
端末。
A terminal that communicates with a server that communicates with an orderer who orders a steel frame and a plurality of fabricators that manufacture the steel frame via a network,
A display control means for displaying, on a display unit, order information including information exchanged between the orderer and the plurality of fabricators, the order information relating to the order for the steel frame placed by the orderer;
a billing information receiving unit that receives billing information for billing a fee corresponding to the order information from the server;
Equipped with
the display control means causes the display unit to display information used in determining the timing for receiving the billing information from the server together with the billing information.
Terminal.
JP2022166657A 2022-10-18 2022-10-18 Server and Terminal Pending JP2024059154A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2022166657A JP2024059154A (en) 2022-10-18 2022-10-18 Server and Terminal
JP2023183592A JP2024059608A (en) 2022-10-18 2023-10-25 Server and Terminal

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2022166657A JP2024059154A (en) 2022-10-18 2022-10-18 Server and Terminal

Related Child Applications (1)

Application Number Title Priority Date Filing Date
JP2023183592A Division JP2024059608A (en) 2022-10-18 2023-10-25 Server and Terminal

Publications (1)

Publication Number Publication Date
JP2024059154A true JP2024059154A (en) 2024-05-01

Family

ID=90828211

Family Applications (2)

Application Number Title Priority Date Filing Date
JP2022166657A Pending JP2024059154A (en) 2022-10-18 2022-10-18 Server and Terminal
JP2023183592A Pending JP2024059608A (en) 2022-10-18 2023-10-25 Server and Terminal

Family Applications After (1)

Application Number Title Priority Date Filing Date
JP2023183592A Pending JP2024059608A (en) 2022-10-18 2023-10-25 Server and Terminal

Country Status (1)

Country Link
JP (2) JP2024059154A (en)

Also Published As

Publication number Publication date
JP2024059608A (en) 2024-05-01

Similar Documents

Publication Publication Date Title
JP3948429B2 (en) Price revision method and price revision support system
JP2001243358A (en) Method for mediating power selling and buying
KR20170017446A (en) Reverse auction type material purchasing system with split purchase function
KR102043894B1 (en) Offering Method for Differential Cost Estimate sheet using on-line network system
JP7431360B2 (en) Computer, control method and program
EP1321875A1 (en) Commodity order acceptance and transportation system, method and recording medium
JP4505232B2 (en) Transaction mediation system and transaction mediation method
JP2024059608A (en) Server and Terminal
JP7475411B1 (en) Server, program and order intermediation method
JP2002329157A (en) Payment system for on-line shopping
KR102408341B1 (en) Reservation system for hotel
JP7425153B1 (en) Server, steel order system, program and order intermediary method
JP2024059235A (en) Server, orderer terminal, program and order intermediation method
JP2002056163A (en) System and method for settling paid money for article or service
JP7152907B2 (en) CUSTOMER RENTAL SUPPORT SYSTEM AND METHOD
JP2024061685A (en) Terminal, program and display control method
KR101949034B1 (en) Real estate business method using real estate integrated information system
JP2024061922A (en) Server, program and order intermediation method
KR101076650B1 (en) System and method for dealing service
JP2001306911A (en) Cotton transaction method using network
JP6978119B2 (en) Financial instrument transaction management device, financial instrument transaction management method in financial instrument transaction management system, program
JP2002041869A (en) Transportation business transaction surrogate server, system and method for transportation business transaction using the same server and recording medium having program for computer to execute the same method recorded thereon
JP2002063484A (en) Electronic procuring system, electronic procurement support device and electronic procuring method
JP2002352118A (en) Electronic commercial transaction system
JP7218026B1 (en) Sales management device, user device and program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20221031

A871 Explanation of circumstances concerning accelerated examination

Free format text: JAPANESE INTERMEDIATE CODE: A871

Effective date: 20221031

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230124

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20230323

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230517

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20230725

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20231025

A911 Transfer to examiner for re-examination before appeal (zenchi)

Free format text: JAPANESE INTERMEDIATE CODE: A911

Effective date: 20231106

A912 Re-examination (zenchi) completed and case transferred to appeal board

Free format text: JAPANESE INTERMEDIATE CODE: A912

Effective date: 20231117