JP2022182213A - Cofferdam construction - Google Patents

Cofferdam construction Download PDF

Info

Publication number
JP2022182213A
JP2022182213A JP2021089659A JP2021089659A JP2022182213A JP 2022182213 A JP2022182213 A JP 2022182213A JP 2021089659 A JP2021089659 A JP 2021089659A JP 2021089659 A JP2021089659 A JP 2021089659A JP 2022182213 A JP2022182213 A JP 2022182213A
Authority
JP
Japan
Prior art keywords
box frame
struts
pair
box
temporary
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2021089659A
Other languages
Japanese (ja)
Other versions
JP7285880B2 (en
Inventor
前田英樹
Hideki Maeda
菊田亮一
Ryoichi Kikuta
笠岡真佐志
Masashi Kasaoka
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NIPPON SUPIIDE SHIYOA KK
Original Assignee
NIPPON SUPIIDE SHIYOA KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NIPPON SUPIIDE SHIYOA KK filed Critical NIPPON SUPIIDE SHIYOA KK
Priority to JP2021089659A priority Critical patent/JP7285880B2/en
Publication of JP2022182213A publication Critical patent/JP2022182213A/en
Application granted granted Critical
Publication of JP7285880B2 publication Critical patent/JP7285880B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Revetment (AREA)

Abstract

To provide a cofferdam construction in which the falling and flowing-out of sandbags hardly occur even when a water level rises.SOLUTION: A cofferdam construction in claim 1 is constituted by fixing a pair of facing panels using a strut to form a box frame and fixing the plurality of box frames using a connection member. In a cofferdam construction in claim 2, the box frame is constituted by attaching the struts between vertical beams provided at both side faces of the pair of facing panels in the invention of the claim 1. In a cofferdam construction in claim 3, the box frame is constituted by attaching the struts between slide rails provided at both side faces of the pair of facing panels in the invention of the claim 1.SELECTED DRAWING: Figure 1

Description

本発明は水中や水際などに構造物を造る際、陸上と同じ条件で工事を行うため、水を仮堤防などで締切る、いわゆる仮締切り工に関する。 The present invention relates to so-called temporary cofferdam construction, in which water is coffered with a temporary embankment or the like in order to construct a structure underwater or at the water's edge under the same conditions as on land.

河川の護岸工事など水中あるいは水際に構築物を建造する場合、一時的に工事に必要な部分から排水しドライワークとなし、工事を行うことが多い。この方法として、仮締切り工法が知られている。 When constructing a structure in water or at the water's edge, such as river bank protection work, it is often the case that the necessary part of the construction is temporarily drained to dry work before construction is carried out. A temporary cofferdam construction method is known as this method.

堤防を開削して工事を行う場合などには、鋼矢板二重式工法という仮締切り工法が採用される。鋼矢板を二重(平行)に打設後、鋼矢板間をタイロッドで連結することで仮設堤防を構築するものである。 When excavating a levee for construction work, a temporary coffering construction method called the steel sheet pile double construction method is adopted. A temporary embankment is constructed by connecting the steel sheet piles with tie rods after the steel sheet piles are doubled (in parallel).

堤防の開削を行わない程度の工事の場合は、大型土のうを用いたり、土堤を築いたりして仮設堤防を築く盛土式や、一枚の鋼矢板を打設し、押え盛り土で矢板を支持し仮設堤防となしたりする方法が採用される。また、対向するパネルを切梁で固定することで箱枠を形成し、該箱枠内に土のうなどを詰めて仮設堤防となすこともある。 In the case of construction work that does not require excavation of the embankment, an embankment method is used to build a temporary embankment by using large sandbags or building an earthen embankment, or a single sheet of steel sheet piles is driven in and the sheet piles are supported by embankments. and a temporary embankment will be adopted. Alternatively, a box frame may be formed by fixing opposing panels with struts, and a temporary embankment may be formed by filling the box frame with sandbags or the like.

特許文献1には、複数の親杭を所定の間隔をおいて打設し、この親杭の外周に腹起し材を架渡し、さらにこの腹起しの外側に鋼矢板を打設するという仮締切り工法が開示されている。 In Patent Document 1, a plurality of main piles are driven at predetermined intervals, a waling material is laid around the outer periphery of the main piles, and a steel sheet pile is driven on the outer side of the waling. A temporary cofferdam construction method is disclosed.

特開2003-206539号公報Japanese Patent Application Laid-Open No. 2003-206539

上記大型土のうを用いる締切り工法には、増水時に大型土のうの転倒・流失などが発生し、工事現場やその後背地への影響が問題となる事も少なくない。通常、大型土のうは布積みで施工され自重により構造体の安定性を確保しているが、大型土のう同士は連結されておらず一体性がないことから、増水時の流勢により不安定な状態になりやすい。このことは、上記箱枠内に土のうなどを詰めた仮設堤防にも当てはまる。 In the cofferdam construction method using the above-mentioned large-sized sandbags, the large-sized sandbags are often overturned and washed away when the water level rises, and the impact on the construction site and its hinterland often poses a problem. Normally, large sandbags are piled up with cloth to ensure the stability of the structure by their own weight. easy to become This also applies to temporary embankments in which the box frame is stuffed with sandbags or the like.

そこで本発明は、増水時などにおいても転倒や流失が発生しづらい、仮締切り工を提供することを目的とする。 SUMMARY OF THE INVENTION Accordingly, it is an object of the present invention to provide a temporary cofferdam that is less likely to overturn or be washed away even when the water level is high.

上記の目的を達成する本発明の構成は以下の通りである。 The configuration of the present invention for achieving the above object is as follows.

(1) 請求項1に記載の仮締切工は、対向するパネルを切梁で固定することで箱枠を形成し、複数の箱枠を連結部材で固定して構成した。 (1) The temporary cofferdam described in claim 1 is configured by fixing opposing panels with struts to form a box frame, and fixing a plurality of box frames with connecting members.

(2) 請求項2に記載の仮締切工は、請求項1に記載の発明において、箱枠を、対向する一対のパネルの両側面に設けた縦梁間に、切梁を取り付けて構成した。 (2) In the temporary cofferdam described in claim 2, in the invention described in claim 1, the box frame is constructed by attaching struts between vertical beams provided on both side surfaces of a pair of facing panels.

(3) 請求項3に記載の仮締切工は、請求項1に記載の発明において、箱枠を、対向する一対の、パネルの両側面に設けたスライドレール間に、切梁を取り付けて構成した。 (3) The temporary cofferdam described in claim 3 is the invention described in claim 1, wherein the box frame is configured by attaching struts between a pair of opposing slide rails provided on both sides of the panel. did.

上記のように構成される本発明が、如何に作用して課題を解決するかを図面を参照しながら概説する。なお、各図におけるFとは前方を、Bは後方を、Rは右方向を、Lは左方向を意味するものである。 How the present invention configured as described above works to solve the problems will be outlined with reference to the drawings. In each figure, F means forward, B means rearward, R means rightward, and L means leftward.

図4に示すように、本発明に係る仮締切工10は、箱枠11を連結部材12で固定して構成してある。 As shown in FIG. 4, a temporary cofferdam 10 according to the present invention is constructed by fixing a box frame 11 with a connecting member 12 .

上述の従来例である、対向するパネルを切梁で固定することで箱枠を形成し、該箱枠内に土のうなどを詰めて形成する仮設堤防とは、図4における土のう50が入った左右方向の複数の箱枠11一列のみで構成されるものである。かかる構造であると、上述の通り増水時の水圧で転倒する恐れがある。 The above-mentioned conventional example of a temporary embankment formed by fixing opposing panels with struts to form a box frame, and filling the box frame with sandbags, etc. It is composed of only one row of a plurality of box frames 11 in the direction. With such a structure, there is a risk of overturning due to the water pressure when the water level rises as described above.

しかし本発明に係る仮締切工10であれば、土のう50が入った最前方左右方向一列の箱枠11が、それぞれ後方に複数の箱枠11と連結部材12で固定されている。それゆえ各箱枠11が互いに支えあうことで、増水時にも水圧で転倒や流出することを可及的に抑制することが可能となるのである。 However, in the case of the temporary coffering work 10 according to the present invention, the box frames 11 in the foremost left-right direction containing the sandbags 50 are fixed at the rear by a plurality of box frames 11 and connecting members 12, respectively. Therefore, by supporting each other between the box frames 11, it is possible to suppress the overturning and outflow due to the water pressure as much as possible even when the water level is high.

また、土のう50が入っていない箱枠11の場合、箱枠11内を水が流れることが可能であることも、転倒や流出を抑制することに資するものである。 In addition, in the case of the box frame 11 that does not contain the sandbag 50, the fact that water can flow inside the box frame 11 also contributes to suppressing overturning and outflow.

さらには箱枠11の上部に覆工板を載置すれば、当該覆工板の上で作業を行うことが可能という利点もある。 Furthermore, if a lining board is placed on the upper part of the box frame 11, there is also an advantage that work can be performed on the lining board.

本発明に係る仮締切工の斜視図Perspective view of temporary cofferdam according to the present invention 請求項2に記載の箱枠の斜視図A perspective view of the box frame according to claim 2 請求項3記載の箱枠の斜視図A perspective view of the box frame according to claim 3 本発明に実施状態を示す説明図Explanatory diagram showing the implementation state of the present invention 連結部材の斜視図Perspective view of connecting member

以下、好ましい発明の実施形態につき、図面を参照しながら概説する。 なお、本発明構成要素の実施形態は、下記の実施形態に何ら限定されることはなく、本発明の技術的範囲に属する限り、種々の形態を採りうる。 Preferred embodiments of the invention are outlined below with reference to the drawings. It should be noted that the embodiments of the constituent elements of the present invention are not limited to the following embodiments, and can take various forms as long as they fall within the technical scope of the present invention.

図1に示すように、請求項1記載の仮締切工10は、複数の箱枠11を複数の連結部材12で固定して構成されるものである。具体的には前後方向に隣接する箱枠11同士が連結部材12で固定されている。図中左右方向に並ぶ箱枠11同士は固定されていないが、むろん本発明は左右方向に並ぶ箱枠を連結部材で固定する態様のものを、排除するものではない。 As shown in FIG. 1 , the temporary cofferdam 10 according to claim 1 is constructed by fixing a plurality of box frames 11 with a plurality of connecting members 12 . Specifically, the box frames 11 adjacent to each other in the front-rear direction are fixed by connecting members 12 . Although the box frames 11 aligned in the left-right direction in the figure are not fixed to each other, the present invention does not exclude a mode in which the box frames lined up in the left-right direction are fixed by connecting members.

箱枠11は、対向する一対のパネル13を1本以上の切梁14で固定することで形成してある。 The box frame 11 is formed by fixing a pair of opposing panels 13 with one or more struts 14 .

パネル13は所要水圧あるいは所要土圧に対応する強度を与えられた、所要寸法の長方形に形成された鋼材により形成されている。パネル13の周囲は
切梁14はジャッキ構造となっており、その両端部がパネル13の前記縦支持部材15に固着されている。
The panel 13 is made of a rectangular steel material having a required size and having a strength corresponding to a required water pressure or a required earth pressure. A strut 14 has a jack structure around the panel 13 , and both ends of the strut 14 are fixed to the vertical support members 15 of the panel 13 .

切梁14の両基端には、パネル13に対する着脱可能な支持構造が設けられている。この着脱可能な支持構造としては、周知の構造が採用される。例えば、図示省略するが、縦支持部材15の所定位置に装着用のブラケットが設けられ、この装着用のブラケットに切梁14の基端が嵌められて、ピンなどによって着脱可能に固定できるような構造とされる。もちろんこれに限定されない。 Both proximal ends of the struts 14 are provided with detachable support structures for the panels 13 . A well-known structure is adopted as this detachable support structure. For example, although not shown, a bracket for mounting is provided at a predetermined position of the vertical support member 15, and the proximal end of the strut 14 is fitted to this bracket for mounting so that it can be detachably fixed with a pin or the like. Structured. Of course, it is not limited to this.

連結部材12は、図5に示すように略コ字状を呈し、所要強度を備えた鋼材である。むろんこれは一例であり、箱枠11同士を連結固定する事が可能であれば、任意の形状を採用できる。 The connecting member 12 is substantially U-shaped as shown in FIG. 5 and is a steel material having a required strength. Of course, this is just an example, and any shape can be adopted as long as the box frames 11 can be connected and fixed to each other.

請求項2記載の発明においては、図2に示すように、箱枠20を、対向する一対のパネル13の両側面に設けた縦梁21間に、切梁14を取り付けて構成してある。 In the second aspect of the invention, as shown in FIG. 2, the box frame 20 is constructed by attaching struts 14 between vertical beams 21 provided on both side surfaces of a pair of panels 13 facing each other.

この縦梁21は、鋼材よりなる角柱であり、パネル13に設けた凸状の挿入部に対応した凹状の受領部が設けられている。該受領部に該挿入部を嵌合することでパネル13を縦梁21に固定するものである。 The vertical beam 21 is a rectangular column made of steel, and is provided with a concave receiving portion corresponding to the convex inserting portion provided on the panel 13 . The panel 13 is fixed to the vertical beam 21 by fitting the insertion portion into the receiving portion.

むろん上記縦梁の構造は一例であり、縦梁21の長手方向に縦溝を設け、該縦溝にパネル13を嵌め込むようにしても良いし、あるいは縦梁21を断面コ字状の長尺部材で形成し、内部にパネル13を嵌め込む形態としても良い。 Of course, the above structure of the vertical beams is an example, and vertical grooves may be provided in the longitudinal direction of the vertical beams 21 and the panels 13 may be fitted into the vertical grooves, or the vertical beams 21 may be formed into elongated members having a U-shaped cross section. , and the panel 13 may be fitted inside.

請求項3に記載の発明においては、図3に示すように、箱枠30を、対向する一対の、パネル13の両側面に設けたスライドレール31間に、切梁14を取り付けて構成した。 In the third aspect of the invention, as shown in FIG. 3, the box frame 30 is constructed by attaching struts 14 between a pair of facing slide rails 31 provided on both sides of the panel 13 .

このスライドレール31は、構造材を組合わせて所要長さに形成され、使用時における前後方向の両面に軸線に沿って案内溝32,32がそれぞれ形成されている。図3に示される実施形態では、リップ付き溝形鋼をウエブ表面側を重ね合わせて一体形状にされ、その内側が案内溝32となるように形成されている。なお、このスライドレール31は、この実施形態に限定されるものではなく、他の部材を使用して所要断面強度が得られ、かつパネル13の端部を嵌め合わせて保持できる案内溝が形成されるものであればよい。 The slide rail 31 is formed to have a required length by combining structural materials, and guide grooves 32, 32 are formed along the axis on both sides in the front-rear direction during use. In the embodiment shown in FIG. 3, lipped channel steel is superimposed on the web surface side to form an integral shape, and the inner side thereof is formed to serve as the guide groove 32 . The slide rail 31 is not limited to this embodiment, and is provided with a guide groove that can obtain the required cross-sectional strength by using other members and that can hold the edge of the panel 13 by fitting it. Anything is fine.

10・・仮締切工
11・・箱枠
12・・連結部材
13・・パネル
14・・切梁
20・・箱枠
21・・縦梁
30・・箱枠
31・・スライドレール
32・・案内溝
10 Temporary cofferdam 11 Box frame 12 Connecting member 13 Panel 14 Strut 20 Box frame 21 Vertical beam 30 Box frame 31 Slide rail 32 Guide groove

連結部材12は、図5に示すように略コ字状を呈し、所要強度を備えた鋼材である。 The connecting member 12 is substantially U-shaped as shown in FIG. 5 and is a steel material having a required strength.

Claims (3)

対向するパネルを切梁で固定することで箱枠を形成したこと、
複数の箱枠を連結部材で固定したこと、
を特徴とする仮締切工。
Forming a box frame by fixing opposing panels with struts;
Fixing a plurality of box frames with connecting members,
A temporary cofferdam characterized by
箱枠を、対向する一対の、パネルの両側面に設けた縦梁間に、切梁を取り付けて構成した請求項1に記載の仮締切工。 A temporary cofferdam according to claim 1, wherein the box frame is constructed by attaching struts between a pair of facing longitudinal beams provided on both sides of the panel. 箱枠を対向する一対の、パネルの両側面に設けたスライドレール間に、切梁を取り付けて構成した請求項1に記載の仮締切工。 A temporary cofferdam according to claim 1, wherein a strut is attached between a pair of slide rails provided on both sides of the panel facing each other.
JP2021089659A 2021-05-27 2021-05-27 Temporary cofferdam Active JP7285880B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021089659A JP7285880B2 (en) 2021-05-27 2021-05-27 Temporary cofferdam

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021089659A JP7285880B2 (en) 2021-05-27 2021-05-27 Temporary cofferdam

Publications (2)

Publication Number Publication Date
JP2022182213A true JP2022182213A (en) 2022-12-08
JP7285880B2 JP7285880B2 (en) 2023-06-02

Family

ID=84329051

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021089659A Active JP7285880B2 (en) 2021-05-27 2021-05-27 Temporary cofferdam

Country Status (1)

Country Link
JP (1) JP7285880B2 (en)

Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52143223U (en) * 1976-04-26 1977-10-29
JPS55116929A (en) * 1979-02-28 1980-09-08 Misawa Van Kk Burying method of sheathing
JPH06228933A (en) * 1993-02-04 1994-08-16 Setouchi Kinmo Shoko Kk Matress-shaped gabion, and erection and laying thereof
JP3044871U (en) * 1997-06-27 1998-01-16 エッチ・エス技研工業株式会社 Panel connection jig
JP2002227224A (en) * 2000-11-30 2002-08-14 Fujibayashi Concrete Kogyo Kk Installation method for concrete block for earth retaining
JP2004044329A (en) * 2002-05-21 2004-02-12 Hitachi Metals Ltd Panel for coupled-fame stuffed with earth and rock, and coupled-frame stuffed with earth and rock
JP2004124670A (en) * 2002-10-02 2004-04-22 Nippon Supiide Shiyoa Kk Preloading panel type earth retaining
JP2006070437A (en) * 2004-08-31 2006-03-16 Nippon Supiide Shiyoa Kk Earth retaining method and device for excavated ditch
JP3129192U (en) * 2006-11-27 2007-02-08 有限会社荒井建設 Water sacs
US20150267362A1 (en) * 2005-11-24 2015-09-24 Hesco Bastion Limited Gabions
JP2015193998A (en) * 2014-03-31 2015-11-05 昭和機械商事株式会社 Slope face reinforcing body, as well as slope face structure and slope face structure construction method
JP2016098479A (en) * 2014-11-18 2016-05-30 株式会社熊谷組 Precast concrete member used for constructing foundation, and foundation construction method
JP2016118030A (en) * 2014-12-19 2016-06-30 太陽工業株式会社 Box-shaped sandbag
JP2017075463A (en) * 2015-10-13 2017-04-20 前田工繊株式会社 Piled sandbag structure
JP2017218844A (en) * 2016-06-09 2017-12-14 日本スピードショア株式会社 Slide rail erection-type simple earth retaining method
JP2019019483A (en) * 2017-07-13 2019-02-07 株式会社ドーコン Frame structure
JP3231818U (en) * 2020-01-16 2021-04-30 株式会社ワンワールドジャパン Waterproof block body

Patent Citations (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS52143223U (en) * 1976-04-26 1977-10-29
JPS55116929A (en) * 1979-02-28 1980-09-08 Misawa Van Kk Burying method of sheathing
JPH06228933A (en) * 1993-02-04 1994-08-16 Setouchi Kinmo Shoko Kk Matress-shaped gabion, and erection and laying thereof
JP3044871U (en) * 1997-06-27 1998-01-16 エッチ・エス技研工業株式会社 Panel connection jig
JP2002227224A (en) * 2000-11-30 2002-08-14 Fujibayashi Concrete Kogyo Kk Installation method for concrete block for earth retaining
JP2004044329A (en) * 2002-05-21 2004-02-12 Hitachi Metals Ltd Panel for coupled-fame stuffed with earth and rock, and coupled-frame stuffed with earth and rock
JP2004124670A (en) * 2002-10-02 2004-04-22 Nippon Supiide Shiyoa Kk Preloading panel type earth retaining
JP2006070437A (en) * 2004-08-31 2006-03-16 Nippon Supiide Shiyoa Kk Earth retaining method and device for excavated ditch
US20150267362A1 (en) * 2005-11-24 2015-09-24 Hesco Bastion Limited Gabions
JP3129192U (en) * 2006-11-27 2007-02-08 有限会社荒井建設 Water sacs
JP2015193998A (en) * 2014-03-31 2015-11-05 昭和機械商事株式会社 Slope face reinforcing body, as well as slope face structure and slope face structure construction method
JP2016098479A (en) * 2014-11-18 2016-05-30 株式会社熊谷組 Precast concrete member used for constructing foundation, and foundation construction method
JP2016118030A (en) * 2014-12-19 2016-06-30 太陽工業株式会社 Box-shaped sandbag
JP2017075463A (en) * 2015-10-13 2017-04-20 前田工繊株式会社 Piled sandbag structure
JP2017218844A (en) * 2016-06-09 2017-12-14 日本スピードショア株式会社 Slide rail erection-type simple earth retaining method
JP2019019483A (en) * 2017-07-13 2019-02-07 株式会社ドーコン Frame structure
JP3231818U (en) * 2020-01-16 2021-04-30 株式会社ワンワールドジャパン Waterproof block body

Also Published As

Publication number Publication date
JP7285880B2 (en) 2023-06-02

Similar Documents

Publication Publication Date Title
US8545129B2 (en) Cofferdam modules
JP5464370B2 (en) Filling reinforcement structure
KR200452946Y1 (en) Welded H type steel sheet pile and integrated composite order wall
JP5418369B2 (en) Filling reinforcement structure
JP2017210787A (en) Aseismatic structure of cut-and-cover tunnel
JP7285880B2 (en) Temporary cofferdam
JP2019199705A (en) Box culvert insertion assisting device
JP6714307B2 (en) Reinforcement method for existing steel sheet pile wall
JP3905776B2 (en) Revetment structure
JP6835138B2 (en) Reinforcement structure of existing steel sheet pile wall
JP2004052277A (en) Construction method for double closing levee
JP2018119336A (en) Reinforced structure of embankment
JP4069004B2 (en) Revetment structure
KR102617795B1 (en) Retaining wall system combine H-piles with steel reinforcement structure
US3452546A (en) Steel pile assembly for the erection of underground concrete walls
JP2018154997A (en) Wall body structure with filling material
JP2011214252A (en) Structure for reinforcing embankment
JP6489055B2 (en) Reinforcement structure and reinforcement method for existing steel sheet pile wall
JP7172446B2 (en) embankment structure
JP5348053B2 (en) Filling reinforcement structure
JPH0684622B2 (en) Parent-side Yokoyaita method
JP5889102B2 (en) Tide structure
US1751835A (en) Cofferdam and method of construction
RU2816995C1 (en) Method for construction of hydraulic structures on rocky soils
JP4231194B2 (en) Revetment structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210528

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220608

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20220808

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20221206

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230206

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230425

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230523

R150 Certificate of patent or registration of utility model

Ref document number: 7285880

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150