JP2021501079A - データフュージョンコンセプト - Google Patents
データフュージョンコンセプト Download PDFInfo
- Publication number
- JP2021501079A JP2021501079A JP2020520039A JP2020520039A JP2021501079A JP 2021501079 A JP2021501079 A JP 2021501079A JP 2020520039 A JP2020520039 A JP 2020520039A JP 2020520039 A JP2020520039 A JP 2020520039A JP 2021501079 A JP2021501079 A JP 2021501079A
- Authority
- JP
- Japan
- Prior art keywords
- data
- railroad track
- central processing
- processing unit
- data source
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 230000004927 fusion Effects 0.000 title description 7
- 238000000034 method Methods 0.000 claims abstract description 21
- 230000007613 environmental effect Effects 0.000 claims abstract description 11
- 230000008569 process Effects 0.000 claims abstract description 5
- 238000012545 processing Methods 0.000 claims description 47
- 230000001133 acceleration Effects 0.000 claims description 16
- 238000007781 pre-processing Methods 0.000 claims description 13
- 238000012544 monitoring process Methods 0.000 claims description 9
- 230000002457 bidirectional effect Effects 0.000 claims description 7
- 230000003287 optical effect Effects 0.000 claims description 7
- 238000010801 machine learning Methods 0.000 claims description 4
- 238000013528 artificial neural network Methods 0.000 claims description 3
- 230000001747 exhibiting effect Effects 0.000 abstract 1
- 239000000284 extract Substances 0.000 abstract 1
- 238000007689 inspection Methods 0.000 description 5
- 230000007246 mechanism Effects 0.000 description 5
- 230000009286 beneficial effect Effects 0.000 description 4
- 230000000704 physical effect Effects 0.000 description 4
- 230000006399 behavior Effects 0.000 description 3
- 230000008901 benefit Effects 0.000 description 3
- 238000004364 calculation method Methods 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 3
- 230000006872 improvement Effects 0.000 description 3
- 230000009467 reduction Effects 0.000 description 3
- 238000013144 data compression Methods 0.000 description 2
- 238000013461 design Methods 0.000 description 2
- 238000011161 development Methods 0.000 description 2
- 230000018109 developmental process Effects 0.000 description 2
- 238000001914 filtration Methods 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 230000002123 temporal effect Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000032683 aging Effects 0.000 description 1
- 238000013459 approach Methods 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000002405 diagnostic procedure Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 238000005265 energy consumption Methods 0.000 description 1
- 238000007499 fusion processing Methods 0.000 description 1
- 230000002068 genetic effect Effects 0.000 description 1
- 230000009022 nonlinear effect Effects 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 238000004092 self-diagnosis Methods 0.000 description 1
- 238000012546 transfer Methods 0.000 description 1
- 238000012795 verification Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L23/00—Control, warning or like safety means along the route or between vehicles or trains
- B61L23/04—Control, warning or like safety means along the route or between vehicles or trains for monitoring the mechanical state of the route
- B61L23/042—Track changes detection
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/50—Trackside diagnosis or maintenance, e.g. software upgrades
- B61L27/53—Trackside diagnosis or maintenance, e.g. software upgrades for trackside elements or systems, e.g. trackside supervision of trackside control system conditions
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06N—COMPUTING ARRANGEMENTS BASED ON SPECIFIC COMPUTATIONAL MODELS
- G06N20/00—Machine learning
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Software Systems (AREA)
- Theoretical Computer Science (AREA)
- General Health & Medical Sciences (AREA)
- Biomedical Technology (AREA)
- Health & Medical Sciences (AREA)
- Physics & Mathematics (AREA)
- Medical Informatics (AREA)
- Computing Systems (AREA)
- General Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Mathematical Physics (AREA)
- Evolutionary Computation (AREA)
- Data Mining & Analysis (AREA)
- Computer Vision & Pattern Recognition (AREA)
- Artificial Intelligence (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
Abstract
Description
Claims (21)
- 鉄道線路の特徴をモニタするシステムであって、
複数のデータソースからデータを取り出しかつ処理し、前記鉄道線路の特徴を示す出力データを提供するように適合された中央演算装置と、
各データリンクを介してデータを前記中央演算装置に送るように適合された2つ以上のデータソースと、を備え、
前記データソースの少なくとも1つが、モニタされるべき前記鉄道線路の一部分の近傍に位置付けられる1または複数のセンサユニットを含み、
データソースによって送られる前記データが前記鉄道線路の様々な物理的特性および/または様々な環境特性を指すように前記データソースを設ける、
システム。 - 前記データソースが、データを前記中央演算装置に送る前に前記データの前処理を行うように適合される前処理ユニットを含む、請求項1に記載のシステム。
- 前記センサユニットがモニタされるべき前記鉄道線路の鉄道枕木上に配置される、請求項1または2に記載のシステム。
- 前記鉄道線路の一部分の近傍に位置付けられる前記センサユニットが、前記鉄道線路の一部分の加速度、速度および/または位置を感知するように構成され、および/または前記センサユニットが、加速度センサ、光学センサ、音響センサ、超音波センサ、電気センサおよび/または磁気センサ、もしくは温度センサである、請求項1から3の何れか一項に記載のシステム。
- 環境特性を指すデータを提供する前記データソースが、気象データまたは鉄道時刻表データを提供するように構成される、請求項1から4の何れか一項に記載のシステム。
- 前記データソースが、データを手入力するためのインタフェースを含む、請求項1から5の何れか一項に記載のシステム。
- 前記中央演算装置と、前記データソースとの間のデータリンクが双方向である、請求項1から6の何れか一項に記載のシステム。
- 前記中央演算装置がさらに、前記データソースを待機モードからデータ提供モードに切り替えることによって選択的に前記データソースを動作するように適合される、請求項7に記載のシステム。
- 前記データソースがさらに、動作条件に基づいて待機モードからデータ提供モードに切り替えるように適合される、請求項1から8の何れか一項に記載のシステム。
- 前記中央演算装置および/または前記データソースがさらに、履歴データを記憶および提供するように適合される、請求項1から9の何れか一項に記載のシステム。
- 前記データソースが、複数のサブソースおよび上位層を含む階層構造を有し、前記上位層は、前記複数のサブソースからデータを収集かつ前処理するように、および前処理されたデータを前記中央演算装置に提供するように適合される、請求項1から10の何れか一項に記載のシステム。
- 前記データソースまたはデータサブソースによって送られる前記データが共通オブザーバブルの様々な範囲または部分的に重なる範囲を示すように、前記データソースまたは前記データサブソースを設ける、請求項1から11の何れか一項に記載のシステム。
- 追加データリンクを一組のデータソース間またはデータソースのグループ間に設ける、請求項1から12の何れか一項に記載のシステム。
- 前記中央演算装置と前記データソースとの間のデータリンク、および/または一組のデータソース間またはデータソースのグループ間のデータリンクが無線方式である、請求項1から13の何れか一項に記載のシステム。
- 請求項1から14の何れか一項に記載のシステムを利用して鉄道線路の特徴をモニタする方法であって、
前記中央演算装置を介して、前記複数のデータソースからデータを取り出す段階と、
予め決められた指示に従って前記取り出したデータを処理する段階と、を含む
方法。 - 前記方法はさらに、前記中央演算装置および/または前記複数のデータソースの少なくとも1つを介して履歴データを記憶する段階を含む、請求項15に記載の方法。
- 前記方法はさらに、例えばニューラルネットワークを利用して前記予め決められた指示を変える機械学習をする段階を含む、請求項15または16に記載の方法。
- モニタされるべき前記特徴が、前記鉄道線路または前記鉄道線路の一部分の摩耗状態または衛生状態である、請求項15から17の何れか一項に記載の方法。
- 前記鉄道線路の前記特徴をモニタする段階が、前記鉄道線路または前記鉄道線路の一部分の多次元仮想モデルを生成する段階を含む、請求項15から18の何れか一項に記載の方法。
- 前記データソースが前記中央演算装置に送られるデータに対して実行する前処理段階を含む、請求項15から19の何れか一項に記載の方法。
- トリガ条件の少なくとも1つを満たした場合にのみデータが前記中央演算装置に送られるように、前記前処理段階が前記少なくとも1つのトリガ条件に関するデータを評価する段階を含む、請求項20に記載の方法。
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PCT/EP2017/077755 WO2019086095A1 (en) | 2017-10-30 | 2017-10-30 | Data fusion concept |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2021501079A true JP2021501079A (ja) | 2021-01-14 |
JP7244110B2 JP7244110B2 (ja) | 2023-03-22 |
Family
ID=60190875
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2020520039A Active JP7244110B2 (ja) | 2017-10-30 | 2017-10-30 | データフュージョンコンセプト |
Country Status (5)
Country | Link |
---|---|
US (1) | US20200307662A1 (ja) |
EP (1) | EP3703993A1 (ja) |
JP (1) | JP7244110B2 (ja) |
CN (1) | CN111315630A (ja) |
WO (1) | WO2019086095A1 (ja) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2019185873A1 (en) * | 2018-03-29 | 2019-10-03 | Konux Gmbh | System and method for detecting and associating railway related data |
CN111551642A (zh) * | 2020-04-02 | 2020-08-18 | 四川睿铁科技有限责任公司 | 一种钢轨裂纹监测系统 |
US20230219604A1 (en) * | 2020-05-26 | 2023-07-13 | Konux Gmbh | Railway point managing system and method |
WO2022043395A1 (en) * | 2020-08-31 | 2022-03-03 | Konux Gmbh | Sensor to sensor edge traffic inference, system and method |
CN113657025A (zh) * | 2021-07-23 | 2021-11-16 | 上海睿而维科技有限公司 | 一种轨道结构多传感器动态匹配系统 |
Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5245855A (en) * | 1991-06-24 | 1993-09-21 | Rittenhouse-Zemen & Associates, Inc. | Rail seat abrasion measurement |
JPH0818556B2 (ja) * | 1988-05-27 | 1996-02-28 | フォエスト ― アルピネ アイゼンバーンシステメ ゲゼルシャフト ミット ベシュレンクテル ハフツング | レールのポイント又は交差部の状態検知装置 |
US20030106967A1 (en) * | 2001-12-06 | 2003-06-12 | Union Switch & Signal, Inc. | Modular point detector for railroad track signal |
JP2005162167A (ja) * | 2003-12-05 | 2005-06-23 | Nec Corp | 鉄道車両による障害物検知システム、障害物検知方法及びプログラム |
DE102004014282A1 (de) * | 2004-03-22 | 2005-10-13 | Db Netz Ag | Diagnose und Zustandsmonitoring im Überlaufbereich von Weichen, starren Herzstücken und Kreuzungen |
US7392117B1 (en) * | 2003-11-03 | 2008-06-24 | Bilodeau James R | Data logging, collection, and analysis techniques |
US20090326746A1 (en) * | 2008-06-30 | 2009-12-31 | Mian Zahid F | Wireless railroad monitoring |
JP2010071019A (ja) * | 2008-09-22 | 2010-04-02 | Sanyo Denken Kk | 融雪器制御システム及び方法 |
JP2014510860A (ja) * | 2011-04-10 | 2014-05-01 | ヴィルフリート シェルフ | 鉄道レールを修復する目的で軌道部分を測量するための装置 |
US20160103083A1 (en) * | 2014-10-10 | 2016-04-14 | Progress Rail Services Corporation | System and method for detecting wheel bearing condition |
JP2016162383A (ja) * | 2015-03-05 | 2016-09-05 | 株式会社日立製作所 | 侵入物検知システム |
KR20170024651A (ko) * | 2015-08-25 | 2017-03-08 | 동우기술(주) | 철도 모의주행을 위한 가상선로 생성 장치와 이를 이용한 가상선로 생성방법 및 가상선로 생성프로그램이 저장된 기록매체 |
US20170066459A1 (en) * | 2015-09-03 | 2017-03-09 | Sameer Singh | Rail track asset survey system |
Family Cites Families (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB0307406D0 (en) * | 2003-03-31 | 2003-05-07 | British Telecomm | Data analysis system and method |
CA2728105C (en) * | 2008-06-17 | 2013-06-18 | Weir-Jones Engineering Consultants Ltd. | System and method for detecting rock fall |
NO331979B1 (no) * | 2010-09-17 | 2012-05-14 | Stiftelsen Norsar | System og metode for tidlig deteksjon av tog |
EP2862778B1 (en) * | 2013-10-15 | 2017-01-04 | Bayern Engineering GmbH & Co. KG | Method for generating measurement results from sensor signals |
CN104401360A (zh) * | 2014-11-18 | 2015-03-11 | 北京交通大学 | 基于多手段融合的铁路轨道系统安全实时监控方法及系统 |
-
2017
- 2017-10-30 EP EP17791401.7A patent/EP3703993A1/en not_active Withdrawn
- 2017-10-30 US US16/759,848 patent/US20200307662A1/en not_active Abandoned
- 2017-10-30 JP JP2020520039A patent/JP7244110B2/ja active Active
- 2017-10-30 WO PCT/EP2017/077755 patent/WO2019086095A1/en unknown
- 2017-10-30 CN CN201780096230.4A patent/CN111315630A/zh active Pending
Patent Citations (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH0818556B2 (ja) * | 1988-05-27 | 1996-02-28 | フォエスト ― アルピネ アイゼンバーンシステメ ゲゼルシャフト ミット ベシュレンクテル ハフツング | レールのポイント又は交差部の状態検知装置 |
US5245855A (en) * | 1991-06-24 | 1993-09-21 | Rittenhouse-Zemen & Associates, Inc. | Rail seat abrasion measurement |
US20030106967A1 (en) * | 2001-12-06 | 2003-06-12 | Union Switch & Signal, Inc. | Modular point detector for railroad track signal |
US7392117B1 (en) * | 2003-11-03 | 2008-06-24 | Bilodeau James R | Data logging, collection, and analysis techniques |
JP2005162167A (ja) * | 2003-12-05 | 2005-06-23 | Nec Corp | 鉄道車両による障害物検知システム、障害物検知方法及びプログラム |
DE102004014282A1 (de) * | 2004-03-22 | 2005-10-13 | Db Netz Ag | Diagnose und Zustandsmonitoring im Überlaufbereich von Weichen, starren Herzstücken und Kreuzungen |
US20090326746A1 (en) * | 2008-06-30 | 2009-12-31 | Mian Zahid F | Wireless railroad monitoring |
JP2010071019A (ja) * | 2008-09-22 | 2010-04-02 | Sanyo Denken Kk | 融雪器制御システム及び方法 |
JP2014510860A (ja) * | 2011-04-10 | 2014-05-01 | ヴィルフリート シェルフ | 鉄道レールを修復する目的で軌道部分を測量するための装置 |
US20160103083A1 (en) * | 2014-10-10 | 2016-04-14 | Progress Rail Services Corporation | System and method for detecting wheel bearing condition |
JP2016162383A (ja) * | 2015-03-05 | 2016-09-05 | 株式会社日立製作所 | 侵入物検知システム |
KR20170024651A (ko) * | 2015-08-25 | 2017-03-08 | 동우기술(주) | 철도 모의주행을 위한 가상선로 생성 장치와 이를 이용한 가상선로 생성방법 및 가상선로 생성프로그램이 저장된 기록매체 |
US20170066459A1 (en) * | 2015-09-03 | 2017-03-09 | Sameer Singh | Rail track asset survey system |
Also Published As
Publication number | Publication date |
---|---|
CN111315630A (zh) | 2020-06-19 |
US20200307662A1 (en) | 2020-10-01 |
WO2019086095A1 (en) | 2019-05-09 |
EP3703993A1 (en) | 2020-09-09 |
JP7244110B2 (ja) | 2023-03-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2021501079A (ja) | データフュージョンコンセプト | |
CN104091070B (zh) | 一种基于时间序列分析的轨道交通故障诊断方法和系统 | |
CN107609304A (zh) | 大跨度铁路桥梁的基于phm的故障诊断预测系统及方法 | |
JP6125559B2 (ja) | 鉄道車両の損害推定方法 | |
JP6271400B2 (ja) | 鉄道地上設備の劣化推定システム及びその方法 | |
CN106774275B (zh) | 可视化列车运行监控装置的控制功能的测试系统和方法 | |
CN105976062A (zh) | 信号灯时长数据的挖掘方法、出行服务实现方法和装置 | |
CN103617110A (zh) | 服务器设备状态检修系统 | |
JP2008507647A5 (ja) | ||
CN106741015B (zh) | 一种基于大数据的地铁信号设备状态修分析方法 | |
CN107085944A (zh) | 一种交通数据处理系统及方法 | |
JP6583947B1 (ja) | 踏切危険度判別プログラム及びシステム | |
JP5941771B2 (ja) | 遅延損失評価装置、遅延損失算出および表示方法 | |
JP2015013487A (ja) | 列車運行管理システム、列車運行シミュレーション装置及び列車運行シミュレーション方法 | |
CN110100216A (zh) | 移动并且自主的音频感测和分析系统以及方法 | |
Abidin et al. | Towards improved vehicle arrival time prediction in public transportation: integrating SUMO and Kalman filter models | |
CN115222265A (zh) | 一种铁路全线路轨道状态确定方法及装置 | |
CN113267217B (zh) | 一种桥群监测系统以及桥群监测方法 | |
CN205247622U (zh) | 一种车辆排队长度监测系统 | |
JP5439871B2 (ja) | データ圧縮方法、装置、およびプログラム | |
US20230356763A1 (en) | Monitoring passing trains, system and method | |
Chraim et al. | Monitoring track health using rail vibration sensors | |
CN110758478A (zh) | 铁路信号设备预告警系统及方法 | |
CN117208050A (zh) | 一种列车定位方法、装置、设备及可读存储介质 | |
Salanova et al. | Multimodal Cooperative ITS Safety System at Level-Crossings |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20200520 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20210427 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20210607 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20211124 |
|
A601 | Written request for extension of time |
Free format text: JAPANESE INTERMEDIATE CODE: A601 Effective date: 20220221 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20220422 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20220913 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20221121 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20230207 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20230302 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 7244110 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |