JP2021189607A - Process managing device - Google Patents

Process managing device Download PDF

Info

Publication number
JP2021189607A
JP2021189607A JP2020092439A JP2020092439A JP2021189607A JP 2021189607 A JP2021189607 A JP 2021189607A JP 2020092439 A JP2020092439 A JP 2020092439A JP 2020092439 A JP2020092439 A JP 2020092439A JP 2021189607 A JP2021189607 A JP 2021189607A
Authority
JP
Japan
Prior art keywords
time
predetermined
person
charge
completion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2020092439A
Other languages
Japanese (ja)
Inventor
宏太 畑井
Kota Hatakei
章裕 花井
Akihiro Hanai
直也 佐々木
Naoya Sasaki
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kyocera Corp
Kyocera Communication Systems Co Ltd
Original Assignee
Kyocera Corp
Kyocera Communication Systems Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kyocera Corp, Kyocera Communication Systems Co Ltd filed Critical Kyocera Corp
Priority to JP2020092439A priority Critical patent/JP2021189607A/en
Priority to EP21814189.3A priority patent/EP4160227A4/en
Priority to CN202180037907.3A priority patent/CN115667943A/en
Priority to US17/927,329 priority patent/US20230288456A1/en
Priority to PCT/JP2021/020139 priority patent/WO2021241671A1/en
Publication of JP2021189607A publication Critical patent/JP2021189607A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/30Computing systems specially adapted for manufacturing

Landscapes

  • General Factory Administration (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

To surely confirm the progress of manufacturing processes while reducing the effort by a worker.SOLUTION: A process managing device (100) includes: a detecting unit (151) which detects that an object to be processed enters a predetermined range near a facility where processes are performed; and a process completion determining unit (11) that takes a time at which it is detected that the object to be processed enters the predetermined range or a time after a predetermined time has elapsed from the former time as a process starting time.SELECTED DRAWING: Figure 1

Description

本発明は、製品の製造工程の進行具合を管理する工程管理装置に関する。 The present invention relates to a process control device that controls the progress of a product manufacturing process.

生産ラインでは、生産スケジュールに沿って、スケジュール通りに生産が進むことが望ましい。しかし、必ずしもスケジュール通りに生産が進むとは限られない。実際の処理がスケジュールから外れた場合、速やかにスケジュールを組み直すことが望ましいが、スケジュールが外れているのかどうかを速やかに認識することは容易ではない。 On the production line, it is desirable that production proceeds according to the schedule according to the production schedule. However, production does not always proceed according to schedule. When the actual processing deviates from the schedule, it is desirable to reorganize the schedule promptly, but it is not easy to quickly recognize whether or not the schedule is off.

例えば、特許文献1には、作業者の作業工程途中のチェックポイントにおいて、工程の遅れ時間を算出し、遅れ時間が所定値以上である場合に、所定の工程を応援者に提示する工程管理装置が記載されている。 For example, in Patent Document 1, a process management device that calculates a process delay time at a checkpoint in the middle of a worker's work process and presents a predetermined process to a supporter when the delay time is equal to or longer than a predetermined value. Is described.

特開2017−37479号公報(2017年2月16日公開)Japanese Unexamined Patent Publication No. 2017-37479 (published on February 16, 2017)

しかしながら、上述のような従来技術は、必ずしも速やかにスケジュールを組み直すことができるとは限らない。チェックポイントになるまで、スケジュール通りに生産が進んでいるかどうか判断できないためである。 However, the above-mentioned conventional techniques cannot always re-schedule quickly. This is because it cannot be determined whether production is proceeding according to the schedule until the checkpoint is reached.

また、従来技術では、作業者の手作業によりチェック時刻を確認しており、作業の手間がかかるとともに、作業者の作業忘れ等によりチェックが正しく行われない等の可能性がある。 Further, in the conventional technique, the check time is confirmed manually by the worker, which may take time and effort, and the check may not be performed correctly due to the worker forgetting to work.

本発明の一態様は、上記の問題に鑑みてなされたものであり、その目的は、作業者の手間を削減しつつ、確実に製造工程の進行具合を確認できる工程管理装置を実現することを目的とする。 One aspect of the present invention has been made in view of the above problems, and an object thereof is to realize a process control device capable of surely confirming the progress of a manufacturing process while reducing the labor of a worker. The purpose.

前記の課題を解決するために、本発明の一態様に係る工程管理装置は、処理対象物が、工程を実施する設備近傍の所定範囲に入ったことを検知する検知部と、前記検知部が、前記処理対象物が前記所定範囲に入ったことを検知した時刻または該時刻から所定時間経過後の時刻を着工時刻とする着工判定部と、を備えたことを特徴としている。 In order to solve the above-mentioned problems, the process control device according to one aspect of the present invention includes a detection unit that detects that the object to be processed has entered a predetermined range in the vicinity of the equipment in which the process is performed, and the detection unit. It is characterized by including a construction start determination unit whose construction start time is the time when it is detected that the object to be processed has entered the predetermined range or the time after a predetermined time has elapsed from the time.

前記の構成によれば、工程の処理担当者等の人による入力処理を介さずに、着工時刻を決定することができるので、入力漏れ等により、着工の時刻を決定できないということを防止することができる。また、着工の時刻を自動的に決定することにより、製造工程の進行具合を適切に確認することができる。 According to the above configuration, the construction start time can be determined without the input processing by a person in charge of process processing or the like, so that it is possible to prevent the construction start time from being unable to be determined due to input omission or the like. Can be done. Further, by automatically determining the start time, the progress of the manufacturing process can be appropriately confirmed.

本発明の一態様の係る工程管理装置では、前記検知部は前記所定範囲から前記処理対象物が出たことを検知し、前記検知部が、前記処理対象物が前記所定範囲から出たことを検知した時刻または該時刻から所定時間前の時刻を完工時刻とする完工判定部を備えたものであってもよい。 In the process control device according to one aspect of the present invention, the detection unit detects that the processing object has come out of the predetermined range, and the detection unit detects that the processing object has come out of the predetermined range. It may be provided with a completion determination unit whose completion time is the detected time or a time predetermined time before the detected time.

前記の構成によれば、工程の処理担当者等の人による入力処理を介さずに、完工時刻を決定することができるので、入力漏れ等により、完工の時刻を決定できないということを防止することができる。 According to the above configuration, the completion time can be determined without the input processing by a person in charge of processing of the process, so that it is possible to prevent the completion time from being unable to be determined due to input omission or the like. Can be done.

本発明の一態様の係る工程管理装置では、前記処理対象物は、セラミックス成形体またはセラミックス焼成体であり、前記検知部は、前記セラミックス成形体またはセラミックス焼成体が1または複数個保持される保持具に付された無線通信タグを検知することにより、前記所定範囲にあることを検知するものであってもよい。 In the process control device according to one aspect of the present invention, the object to be processed is a ceramic molded body or a ceramic fired body, and the detection unit holds one or a plurality of the ceramic molded body or the ceramic fired body. By detecting the wireless communication tag attached to the tool, it may be detected that the ceramic is within the predetermined range.

セラミックス成形体またはセラミックス焼成体には、検知するための部材等を直接、付すことはできない。前記の構成によれば、セラミックス成形体またはセラミックス焼成体が保持された保持具に無線通信タグが付されているので、直接、部材等を付すことができないセラミックス成形体またはセラミックス焼成体が所定範囲に入ったか否かを適切に検知することができる。 A member or the like for detection cannot be directly attached to the ceramic molded body or the ceramic fired body. According to the above configuration, since the wireless communication tag is attached to the holder on which the ceramic molded body or the ceramic fired body is held, the ceramic molded body or the ceramic fired body to which the member or the like cannot be directly attached is within a predetermined range. It is possible to properly detect whether or not it has entered.

前記の課題を解決するために、本発明の一態様の係る工程管理装置は、実施対象となる工程の担当者が、自身が使用する通信端末を介して近距離無線により通信可能な提示部であって前記工程を実施する設備近傍の所定領域に設置された提示部に対し、前記近距離無線により前記工程の作業に関する作業指示書の提示を指示する指示入力を行った時刻を、着工時刻とする着工判定部を備えたことを特徴としている。 In order to solve the above-mentioned problems, the process control device according to one aspect of the present invention is a presenting unit capable of communicating by a person in charge of a process to be implemented by short-range radio via a communication terminal used by the person in charge of the process. The time at which the presentation unit installed in the predetermined area near the equipment for carrying out the process is instructed to present the work instruction sheet related to the work of the process by the short-range radio is set as the construction start time. It is characterized by having a construction start judgment unit.

前記の構成によれば、作業を行う上で必須となる作業指示書を提示させるための入力があった時刻を着工時刻とするので、着工時刻を確実に決定することができる。 According to the above configuration, since the time when the input for presenting the work instruction sheet which is indispensable for performing the work is input is set as the construction start time, the construction start time can be surely determined.

前記課題を解決するために、本発明の一態様に係る工程管理装置は、実施対象となる工程の担当者が、自身が使用する通信端末を介して近距離無線により通信可能な提示部であって前記工程を実施する設備近傍の所定領域に設置された提示部に対し、前記近距離無線により前記工程の作業内容に関する作業指示書の提示を指示する指示入力を行った後、前記設備が処理開始可能状態となった時刻を、着工時刻とする着工判定部を備えたものであってもよい。 In order to solve the above problems, the process control device according to one aspect of the present invention is a presentation unit capable of communicating by a person in charge of a process to be implemented by short-range radio via a communication terminal used by the person in charge of the process. After inputting an instruction to instruct the presentation unit installed in a predetermined area near the equipment for carrying out the process to present a work instruction sheet relating to the work content of the process by the short-range radio, the equipment processes. It may be provided with a construction start determination unit in which the startable state is set as the construction start time.

前記の構成によれば、作業を行う上で必須となる作業指示書を提示させるための入力があり、かつ当該設備が処理開始可能状態になった時刻を着工時刻とするので、着工時刻を確実に決定することができる。 According to the above configuration, there is an input for presenting the work instruction sheet which is indispensable for performing the work, and the time when the equipment is ready to start processing is set as the start time, so that the start time is sure. Can be decided.

前記課題を解決するために、本発明の一態様に係る工程管理装置は、実施対象となる工程を実施する設備近傍の所定領域に設置された提示部に提示された、前記工程の作業内容に関する作業指示書を実施対象となる工程の担当者が閲覧したことを検知する閲覧検知部から、前記閲覧を示す信号を取得したとき、当該時点を着工時刻とする着工判定部を備えたものであってもよい。 In order to solve the above problems, the process control device according to one aspect of the present invention relates to the work content of the process presented to the presentation unit installed in a predetermined area near the equipment for carrying out the process to be performed. When a signal indicating the browsing is acquired from the browsing detection unit that detects that the person in charge of the process to be implemented has browsed the work instruction, it is equipped with a construction start determination unit that sets the time as the construction start time. You may.

前記の構成によれば、作業を行う上で必須となる作業指示書の閲覧があったときを着工時刻とするので、着工時刻を確実に決定することができる。 According to the above configuration, the construction start time is set when the work instruction sheet, which is indispensable for performing the work, is viewed, so that the construction start time can be reliably determined.

本発明の一態様の係る工程管理装置では、前記担当者が工程を実施する設備近傍の所定範囲に入ったことを検知する検知部を備え、前記検知部が、前記担当者が前記所定範囲に入ったことを検知した時刻から所定時間内に前記指示入力があった場合、前記着工判定部は、当該指示入力が行われた時刻を着工時刻とするものであってもよい。 The process management device according to one aspect of the present invention includes a detection unit that detects that the person in charge has entered a predetermined range in the vicinity of the equipment where the process is performed, and the detection unit is within the predetermined range. When the instruction input is received within a predetermined time from the time when the entry is detected, the construction start determination unit may set the time when the instruction input is performed as the construction start time.

前記の構成によれば、工程の担当者が工程を実行する場所に確実にいる場合に、着工時刻を決定するので、着工時刻の決定の精度を高めることができる。 According to the above configuration, when the person in charge of the process is surely in the place where the process is executed, the construction start time is determined, so that the accuracy of determining the construction start time can be improved.

本発明の一態様の係る工程管理装置では、前記検知部が、前記担当者が前記所定範囲に入ったことを検知してから所定時間内に前記指示入力が無い場合、警告を発する警告部を備え、前記着工判定部は、前記警告後に前記指示入力があった場合、前記担当者が前記所定範囲に入った時刻または該時刻から所定時間経過後の時刻を着工時刻とするものであってもよい。 In the process control device according to one aspect of the present invention, the warning unit that issues a warning if the detection unit does not input the instruction within a predetermined time after detecting that the person in charge has entered the predetermined range. In preparation, when the instruction is input after the warning, the construction start determination unit may set the time when the person in charge enters the predetermined range or the time after the predetermined time has elapsed as the construction start time. good.

前記の構成によれば、担当者が作業指示書の提示を失念した場合でも、担当者に警告することにより、着工時刻を決定することができる。 According to the above configuration, even if the person in charge forgets to present the work instruction, the construction start time can be determined by warning the person in charge.

本発明の一態様の係る工程管理装置では、実施対象となる工程の担当者が、自身が使用する通信端末を介して近距離無線により通信可能な提示部であって前記工程を実施する設備近傍の所定領域に設置された提示部に対し、前記近距離無線により前記工程の作業終了時に確認が必要な作業終了確認書の提示を指示する指示入力を行った時刻または該時刻から所定時間経過後の時刻を、完工時刻とする完工判定部を備えたものであってもよい。 In the process control device according to one aspect of the present invention, the person in charge of the process to be implemented is a presentation unit capable of communicating by short-range radio via the communication terminal used by the person in charge of the process, and is near the equipment for performing the process. The time when an instruction is input to the presentation unit installed in the predetermined area to instruct the presentation of the work completion confirmation that needs to be confirmed at the end of the work of the process by the short-range radio, or after a predetermined time has elapsed from the time. It may be provided with a completion determination unit which sets the time of the above as the completion time.

前記の構成によれば、作業を終了するときに確認が必要となる作業終了確認書を提示させるための入力があった時刻または該時刻から所定時間経過後の時刻を完工時刻とするので、完工時刻を確実に決定することができる。 According to the above configuration, the completion time is set to the time when the input for presenting the work completion confirmation that needs to be confirmed when the work is completed or the time after a predetermined time has elapsed from the time is set as the completion time. The time can be determined with certainty.

本発明の一態様の係る工程管理装置では、実施対象となる工程を実施する設備近傍の所定領域に設置された提示部に提示された、前記工程の作業終了時に確認が必要な作業終了確認書を実施対象となる工程の担当者が閲覧したことを検知する閲覧検知部から、前記閲覧を示す信号を取得したとき、当該時点または該時点から所定時間経過後の時刻を、完工時刻とする完工判定部を備えたものであってもよい。 In the process control apparatus according to one aspect of the present invention, a work completion confirmation document presented to a presentation unit installed in a predetermined area near the equipment for carrying out the process to be carried out, which needs to be confirmed at the end of the work of the process. When the signal indicating the browsing is acquired from the browsing detection unit that detects that the person in charge of the process to be implemented has browsed, the completion time is the time at that time or after a predetermined time has elapsed from that time. It may be provided with a determination unit.

前記の構成によれば、作業を終了するときに確認が必要となる作業終了確認書の閲覧があったとき、または当該時点から所定時間経過後の時刻を完工時刻とするので、完工時刻を確実に決定することができる。 According to the above configuration, the completion time is assured when the work completion confirmation is viewed, which requires confirmation when the work is completed, or the time after a predetermined time has elapsed from that time. Can be decided.

前記課題を解決するために、本発明の一態様の係る工程管理装置は、処理対象物が1または複数個保持される保持具に、当該保持具と対応付けられた対応情報が付されており、前記対応情報は、前記保持具と一体に搬送されるとともに、工程を実施する設備近傍の所定領域に備えられた読み取り機によって読み取り可能であり、前記工程前に、当該工程に対応する前記読み取り機によって前記対応情報を読み取ることにより、前記所定領域に設置された提示部に該工程の作業内容を示す作業指示書を提示する指示が行われた時刻を着工時刻とする着工判定部を備えたことを特徴としている。 In order to solve the above-mentioned problems, in the process control apparatus according to one aspect of the present invention, the holder in which one or more objects to be processed are held is attached with the corresponding information associated with the holder. The corresponding information is conveyed integrally with the holder and can be read by a reader provided in a predetermined area near the equipment where the process is performed, and the reading corresponding to the process is performed before the process. The construction start determination unit is provided with the time when the instruction to present the work instruction sheet indicating the work content of the process is given to the presentation unit installed in the predetermined area by reading the correspondence information by the machine. It is characterized by that.

前記の構成によれば、作業を行う上で必須となる作業指示書を提示させるために対応情報が読み取られた時刻を着工時刻とするので、着工時刻を確実に決定することができる。 According to the above configuration, since the time when the corresponding information is read in order to present the work instruction sheet which is indispensable for performing the work is set as the construction start time, the construction start time can be surely determined.

本発明の一態様の係る工程管理装置では、実施対象となる工程の担当者が工程を実施する設備近傍の所定範囲に入ったことを検知する検知部を備え、前記検知部が、前記担当者が前記所定範囲に入ったことを検知してから所定時間内に、前記読み取りが行われない場合、警告を発する警告部を備え、前記着工判定部は、前記警告後に前記読み取りがあった場合、前記担当者が前記所定範囲に入った時刻または該時刻から所定時間経過後の時刻を着工時刻とするものであってもよい。 The process control device according to one aspect of the present invention includes a detection unit that detects that the person in charge of the process to be implemented has entered a predetermined range in the vicinity of the equipment in which the process is performed, and the detection unit is the person in charge. The construction start determination unit is provided with a warning unit that issues a warning when the reading is not performed within a predetermined time after detecting that the vehicle has entered the predetermined range, and the construction start determination unit receives the reading after the warning. The construction start time may be the time when the person in charge enters the predetermined range or the time after the predetermined time has elapsed from the time.

本発明の一態様の係る工程管理装置では、前記完工時刻が、予め定められたスケジュールよりも遅れている場合、遅延通知を外部の管理装置に送信する遅延通知送信部を備えたものであってもよい。 The process management device according to one aspect of the present invention includes a delay notification transmission unit that transmits a delay notification to an external management device when the completion time is later than a predetermined schedule. May be good.

前記の構成によれば、完工時刻がスケジュールから遅れている場合、その旨を通知することができる。 According to the above configuration, if the completion time is behind the schedule, it is possible to notify that fact.

本発明の一態様に係る工程管理装置では、実施対象となる工程は、当該工程の最後に処理対象物の測定処理が必要となるものであり、前記測定処理に用いる測定機が所定の格納位置から外された後、所定時間経過後の時刻、または、該格納位置に戻された時刻を完工時刻とする完工判定部を備えたものであってもよい。 In the process control apparatus according to one aspect of the present invention, the process to be implemented requires a measurement process of the object to be processed at the end of the process, and the measuring machine used for the measurement process is in a predetermined storage position. It may be provided with a completion determination unit whose completion time is the time after the elapse of a predetermined time after being removed from the storage position or the time when the time is returned to the storage position.

前記の構成によれば、工程の最後に必要となる測定処理に用いる測定機が所定の格納位置から外されたこと、または、該格納位置に戻されたことを用いて完工時刻を決定する。そして、測定機が格納位置から外されたことは、当該測定機が用いられたこと、すなわち工程処理が最終段階となっていることを示す。よって、測定機が所定の格納位置から外された後、所定時間経過後の時刻、または、該格納位置に戻された時刻を完工時刻とすることにより、完工時刻を確実に決定することができる。 According to the above configuration, the completion time is determined by the fact that the measuring machine used for the measurement process required at the end of the process is removed from the predetermined storage position or returned to the storage position. The fact that the measuring machine is removed from the storage position indicates that the measuring machine has been used, that is, the process is in the final stage. Therefore, the completion time can be reliably determined by setting the time after the predetermined time elapses after the measuring machine is removed from the predetermined storage position or the time when the measuring machine is returned to the storage position as the completion time. ..

本発明の各態様に係る工程管理装置は、コンピュータによって実現してもよく、この場合には、コンピュータを前記工程管理装置が備える各部(ソフトウェア要素)として動作させることにより前記工程管理装置をコンピュータにて実現させる工程管理装置の制御プログラム、およびそれを記録したコンピュータ読み取り可能な記録媒体も、本発明の範疇に入る。 The process control device according to each aspect of the present invention may be realized by a computer. In this case, the process control device is turned into a computer by operating the computer as each part (software element) included in the process control device. The control program of the process control device to be realized and the computer-readable recording medium on which the control program is recorded also fall within the scope of the present invention.

本発明の一態様によれば、工程の処理担当者等の人による入力処理を介さずに、着工時刻を決定することができるので、入力漏れ等により、着工の時刻を決定できないということを防止することができるという効果を奏する。また、これにより、製造工程の進行具合を適切に確認することができる。 According to one aspect of the present invention, since the construction start time can be determined without the input processing by a person in charge of process processing or the like, it is possible to prevent the construction start time from being unable to be determined due to input omission or the like. It has the effect of being able to do it. In addition, this makes it possible to appropriately confirm the progress of the manufacturing process.

本実施形態に係る検知部の例、および工程管理装置の要部構成を示すブロック図である。It is a block diagram which shows the example of the detection part which concerns on this embodiment, and the structure of the main part of a process control apparatus. 本実施形態に係る工程管理システムの全体概要を示す図である。It is a figure which shows the whole outline of the process control system which concerns on this embodiment. 判定情報の例を示す図である。It is a figure which shows the example of the determination information. 上記工程管理装置における処理の流れを示すフローチャートである。It is a flowchart which shows the flow of processing in the said process control apparatus. 検知部によるタグを検知する別の例を示す図である。It is a figure which shows another example of detecting a tag by a detection part. 本発明の他の実施形態に係る提示部の例、および工程管理装置の要部構成を示すブロック図である。It is a block diagram which shows the example of the presentation part which concerns on other embodiment of this invention, and the structure of the main part of a process control apparatus. 判定情報の別の例を示す図である。It is a figure which shows another example of the determination information. 本発明の他の実施形態に係る検知部の例、および工程管理装置の要部構成を示すブロック図である。It is a block diagram which shows the example of the detection part which concerns on other embodiment of this invention, and the structure of the main part of a process control apparatus. 本発明の他の実施形態に係る読取部の例、および工程管理装置の要部構成を示すブロック図である。It is a block diagram which shows the example of the reading part which concerns on other embodiment of this invention, and the structure of the main part of the process control apparatus. 判定情報の別の例を示す図である。It is a figure which shows another example of the determination information.

〔実施形態1〕
〔全体概要〕
以下、本発明の一実施形態について、詳細に説明する。まず、図2を参照して、本実施形態に係る工程管理システム110について説明する。図2は、工程管理システム110の全体概要を示す図である。なお、本実施形態では、工程管理装置100が管理する対象として、セラミックスの製造に関わる設備を例に挙げて説明するが、これに限られるものではない。処理工程を含む製造設備であれば、どのような設備であってもよく、機械等の各種製造工場、食品工場、印刷・製紙工場、石油化学工場等の設備であってもよい。
[Embodiment 1]
[Overview]
Hereinafter, one embodiment of the present invention will be described in detail. First, the process control system 110 according to the present embodiment will be described with reference to FIG. FIG. 2 is a diagram showing an overall outline of the process control system 110. In the present embodiment, the equipment related to the production of ceramics will be described as an example of the object to be managed by the process control device 100, but the present invention is not limited to this. Any equipment may be used as long as it is a manufacturing equipment including a processing process, and may be equipment of various manufacturing factories such as machines, food factories, printing / papermaking factories, petrochemical factories and the like.

図2に示すように、本実施形態に係る工程管理システム110は、セラミックス製造システム101および工程管理装置100を含む。 As shown in FIG. 2, the process control system 110 according to the present embodiment includes a ceramics manufacturing system 101 and a process control device 100.

本実施形態に係る工程管理システム110では、セラミックス製造システム101に各工程について、処理の着工および完工を自動的に取得し、工程管理装置100において、それぞれの設備における着工時刻、完工時刻を決定するものである。着工時刻、完工時刻を自動的に決定できることにより、製造スケジュール通りに製造処理が進んでいるのか否かを適切かつ、速やかに判断することができる。 In the process management system 110 according to the present embodiment, the ceramics manufacturing system 101 automatically acquires the start and completion of processing for each process, and the process management device 100 determines the start time and completion time of each facility. It is a thing. By being able to automatically determine the start time and the completion time, it is possible to appropriately and promptly determine whether or not the manufacturing process is proceeding according to the manufacturing schedule.

〔セラミックス製造システム〕
図2に示すように、セラミックス製造システム101には、セラミックスを製造するための各工程の処理に用いる、成形装置200、切削装置300、焼成装置400、および研削装置500を1または複数台含む。なお、以下では、セラミックス製造システム101に含まれる各設備(成形装置200、切削装置300、焼成装置400、研削装置500)を総称して工程処理設備Xと呼ぶ。
[Ceramics manufacturing system]
As shown in FIG. 2, the ceramics manufacturing system 101 includes one or a plurality of molding apparatus 200, cutting apparatus 300, firing apparatus 400, and grinding apparatus 500 used for processing each step for producing ceramics. In the following, each equipment (molding apparatus 200, cutting apparatus 300, firing apparatus 400, grinding apparatus 500) included in the ceramics manufacturing system 101 is collectively referred to as process processing equipment X.

そして、セラミックス製造システム101では、以下の工程を経てセラミックス製品を製造する。まず、セラミックスの原料があり、当該セラミックスの原料を成形装置200により成形することによりセラミックス成形体を形成する。次に、セラミックス成形体を切削装置300により切削し、切削後のセラミックス成形体を焼成装置400により焼成し、焼成後のセラミックス焼成体を研削装置500により研削することにより、セラミックス製品を製造する。 Then, the ceramics manufacturing system 101 manufactures a ceramic product through the following steps. First, there is a raw material for ceramics, and a ceramic molded body is formed by molding the raw material for the ceramics with a molding apparatus 200. Next, the ceramic molded body is cut by the cutting device 300, the cut ceramic molded body is fired by the firing device 400, and the fired ceramic molded body is ground by the grinding device 500 to manufacture a ceramic product.

〔工程管理装置〕
次に、図1を参照して、工程管理装置100について説明する。図1は、工程管理装置100の要部構成を示すブロック図である。
[Process control device]
Next, the process control device 100 will be described with reference to FIG. FIG. 1 is a block diagram showing a main configuration of the process control device 100.

図1に示すように、工程管理装置100は、制御部10、記憶部20、取得部30、操作受付部40、表示部50、および通信部60を含む。 As shown in FIG. 1, the process management device 100 includes a control unit 10, a storage unit 20, an acquisition unit 30, an operation reception unit 40, a display unit 50, and a communication unit 60.

制御部10は、工程管理装置100における処理を実行するものであり、着完工判定部(着工判定部、完工判定部)11および時計部12を含む。 The control unit 10 executes the process in the process control device 100, and includes a start completion determination unit (construction start determination unit, completion determination unit) 11 and a clock unit 12.

着完工判定部11は、セラミックス製造システム101における工程処理設備Xを用いて処理工程の着工、および完工を判定し、時計部12を参照してそれぞれの時刻である着工時刻、および完工時刻を決定する。 The start / completion determination unit 11 determines the start and completion of the processing process using the process processing equipment X in the ceramics manufacturing system 101, and determines the start time and the completion time, which are the respective times, with reference to the clock unit 12. do.

より具体的に説明する。本実施形態では、工程処理設備Xの近傍に検知部151が備えられている。検知部151は、工程処理設備Xから所定範囲に検知対象が存在するか否かを検知するものであり、例えば、RFID(Radio Frequency Identification)リーダである。本実施形態では、処理対象物であるセラミックス製品を載置した台にタグ(無線通信タグ)152に付されており、タグ152が検知部151の検知範囲に入ることにより、処理対象物が工程処理設備Xから所定範囲に入ったか否か、また、所定範囲から出たか否かを検知することができる。なお、検知部151がRFIDリーダの場合、タグ152はRFIDタグである。 A more specific explanation will be given. In the present embodiment, the detection unit 151 is provided in the vicinity of the process processing equipment X. The detection unit 151 detects whether or not a detection target exists in a predetermined range from the process processing equipment X, and is, for example, an RFID (Radio Frequency Identification) reader. In the present embodiment, the tag (wireless communication tag) 152 is attached to a table on which the ceramic product to be processed is placed, and the tag 152 is within the detection range of the detection unit 151, so that the object to be processed is processed. It is possible to detect whether or not the processing equipment X has entered the predetermined range and whether or not the processing equipment X has entered the predetermined range. When the detection unit 151 is an RFID reader, the tag 152 is an RFID tag.

検知部151は、所定の周期で、所定の範囲内における検知対象(タグ)の有無を検知し、検知結果を工程管理装置100に送信する。所定の周期は例えば数秒であってもよい。また、所定の範囲は例えば半径数メートルであってもよい。 The detection unit 151 detects the presence or absence of a detection target (tag) within a predetermined range at a predetermined cycle, and transmits the detection result to the process management device 100. The predetermined period may be, for example, several seconds. Further, the predetermined range may be, for example, a radius of several meters.

着完工判定部11は、取得部30を介して、検知部151からタグ152を検知した旨の信号を取得すると、処理対象物が工程処理設備Xの所定範囲内に入ったと判断し、当該時点、または当該時点から所定時間経過の時点で着工があったと決定し、着工があったと決定した時点を時計部12を参照して着工時刻と決定する。また、着完工判定部11は、判定情報21Aを参照し、着工したのは、どの工程のどの製品であるのかについても判定する。 When the completion completion determination unit 11 acquires a signal indicating that the tag 152 has been detected from the detection unit 151 via the acquisition unit 30, it determines that the object to be processed has entered the predetermined range of the process processing equipment X, and at that time point. Or, it is determined that the construction has started when a predetermined time has elapsed from that time, and the time when it is determined that the construction has started is determined as the construction start time with reference to the clock unit 12. Further, the construction start completion determination unit 11 refers to the determination information 21A, and also determines which product in which process has started construction.

また、着完工判定部11は、検知部151が検知したタグ152が検知されなくなった旨の信号を取得すると、処理対象物が工程処理設備Xの所定範囲内から出たと判断し、当該時点、または当該時点から所定時間前の時点で完工したと決定し、完工したと決定した時点を時計部12を参照して完工時刻と決定する。 Further, when the completion completion determination unit 11 acquires the signal that the tag 152 detected by the detection unit 151 is no longer detected, it determines that the object to be processed has come out of the predetermined range of the process processing equipment X, and at that time, Alternatively, it is determined that the construction is completed at a time before a predetermined time from the relevant time, and the time when it is determined that the construction is completed is determined as the completion time with reference to the clock unit 12.

ここで、図3を参照して、判定情報21Aについて説明する。図3は、判定情報21Aの例を示す図である。判定情報21Aは、着完工判定部11が着工、完工の判定に用いる情報であり、検知部151を識別する情報、工程内容、タグ152を識別するID、製品が対応付けられたものである。図3に示す例では、検知部151を識別する情報として「D1」、工程内容が「成形工程」、タグ152を識別するIDが「RF1」、製品が「P1」が対応付けられており、検知部151「D1」において検知された場合、当該工程は「成形工程」であること、検知されたタグ152が「RF1」の場合、処理対象物となる製品は「P1」であることが示されている。以下、同様である。なお、検知部151と処理工程との対応関係、およびタグ152と製品との対応関係は予め設定されているものとする。 Here, the determination information 21A will be described with reference to FIG. FIG. 3 is a diagram showing an example of the determination information 21A. The determination information 21A is information used by the start / completion determination unit 11 for determining the start / completion of construction, and is associated with information for identifying the detection unit 151, a process content, an ID for identifying the tag 152, and a product. In the example shown in FIG. 3, "D1" is associated with the information for identifying the detection unit 151, the process content is "molding process", the ID for identifying the tag 152 is "RF1", and the product is "P1". When it is detected by the detection unit 151 "D1", it indicates that the process is a "molding process", and when the detected tag 152 is "RF1", it indicates that the product to be processed is "P1". Has been done. The same applies hereinafter. It is assumed that the correspondence relationship between the detection unit 151 and the processing process and the correspondence relationship between the tag 152 and the product are set in advance.

取得部30は、セラミックス製造システム101の工程処理設備X近傍に備えられた検知部151から検知結果を示す信号を取得し、着完工判定部11に送信する。 The acquisition unit 30 acquires a signal indicating the detection result from the detection unit 151 provided in the vicinity of the process processing equipment X of the ceramics manufacturing system 101, and transmits the signal to the completion determination unit 11.

操作受付部40は、工程管理装置100に対するユーザの操作を受け付けるものであり、例えば、キーボード、マウス等である。なお、タッチパネル等により、表示部50と操作受付部40とが一体となったものであってもよい。 The operation receiving unit 40 receives a user's operation on the process management device 100, and is, for example, a keyboard, a mouse, or the like. The display unit 50 and the operation reception unit 40 may be integrated by a touch panel or the like.

表示部50は、情報を表示する表示装置であり、例えば、液晶ディスプレイ、プラズマディスプレイ、有機ELディスプレイ等である。 The display unit 50 is a display device that displays information, and is, for example, a liquid crystal display, a plasma display, an organic EL display, or the like.

通信部60は、外部機器との通信を行うものであり、例えば、着完工判定部11の判定結果を外部機器に送信する。 The communication unit 60 communicates with an external device, and for example, transmits the determination result of the completion completion determination unit 11 to the external device.

以上のように、本実施形態に係る工程管理装置100は、処理対象物が、工程を実施する設備近傍の所定範囲に入ったことを検知する検知部151と、検知部151が、処理対象物が所定範囲に入ったことを検知した時刻または該時刻から所定時間経過後の時刻を着工時刻とする着完工判定部11と、を備えている。また、検知部151は所定範囲から処理対象物が出たことを検知し、着完工判定部11は、検知部151が、処理対象物が所定範囲から出たことを検知した時刻または該時刻から所定時間前の時刻を完工時刻とするものであってもよい。 As described above, in the process management device 100 according to the present embodiment, the detection unit 151 for detecting that the object to be processed has entered a predetermined range in the vicinity of the equipment for performing the process, and the detection unit 151 have the object to be processed. The construction start determination unit 11 is provided with a time when it is detected that the vehicle has entered a predetermined range or a time after a predetermined time has elapsed from the time. Further, the detection unit 151 detects that the object to be processed has come out of the predetermined range, and the completion completion determination unit 11 detects that the object to be processed has come out of the predetermined range, or from that time. The time before the predetermined time may be set as the completion time.

さらに、処理対象物は、セラミックス成形体またはセラミックス焼成体であってよく、検知部151は、セラミックス成形体またはセラミックス焼成体が1または複数個保持される保持具に付された無線通信タグを検知することにより、所定範囲にあることを検知するものであってもよい。 Further, the object to be processed may be a ceramic molded body or a ceramic fired body, and the detection unit 151 detects a wireless communication tag attached to a holder in which one or more ceramic molded bodies or ceramic fired bodies are held. By doing so, it may be detected that the ceramic is within a predetermined range.

なお、検知部151は、工程管理装置100に含まれていてもよいし、含まれていなくてもよい。すなわち、検知部151を含めて工程管理装置100と呼んでもよい。 The detection unit 151 may or may not be included in the process control device 100. That is, the process control device 100 may be referred to including the detection unit 151.

〔処理の流れ〕
次に、図4を参照して工程管理装置100における処理の流れを説明する。図4は、工程管理装置100における処理の流れを示すフローチャートである。
[Processing flow]
Next, the flow of processing in the process control device 100 will be described with reference to FIG. FIG. 4 is a flowchart showing the flow of processing in the process management device 100.

図4に示すように、工程管理装置100は、検知部151がタグ152を検知した旨の信号を取得すると(S101でYES)、着完工判定部11は着工があったと判定し、着工時刻を決定する(S102)。そして、着工があった工程の内容、および対象となる製品(処理対象物)を示す情報を表示部50に表示、または通信部60を介して外部に送信する(S103)。なお、表示と外部への送信の両方を行ってもよい。 As shown in FIG. 4, when the process management device 100 acquires a signal indicating that the detection unit 151 has detected the tag 152 (YES in S101), the start completion determination unit 11 determines that the construction has started, and determines the start time. Determine (S102). Then, the content of the process in which the construction has started and the information indicating the target product (processed object) are displayed on the display unit 50 or transmitted to the outside via the communication unit 60 (S103). In addition, both display and transmission to the outside may be performed.

次に、工程管理装置100は、検知部151が検知したタグ152が検知されなくなった旨の信号を取得すると(S104でYES)、着完工判定部11は完工したと判定し、完工時刻を決定する(S105)。そして、完工した工程の内容、および対象となる製品(処理対象物)を示す情報を表示部50に表示、または通信部60を介して外部に送信する(S106)。なお、着工と同様、完工についても表示と外部への送信の両方を行ってもよい。 Next, when the process management device 100 acquires a signal to the effect that the tag 152 detected by the detection unit 151 is no longer detected (YES in S104), the completion completion determination unit 11 determines that the construction has been completed, and determines the completion time. (S105). Then, the content of the completed process and the information indicating the target product (processed object) are displayed on the display unit 50 or transmitted to the outside via the communication unit 60 (S106). As with the start of construction, both display and transmission to the outside may be performed for the completion of construction.

〔変形例〕
上述した実施形態では、工程処理設備Xの近傍に備えられた検知部151によりタグ152が検知されたか否か、すなわち、工程処理設備Xから所定範囲内に処理対象物が入ったかどうかにより、着工、完工を判断していた。
[Modification example]
In the above-described embodiment, construction starts depending on whether or not the tag 152 is detected by the detection unit 151 provided in the vicinity of the process processing equipment X, that is, whether or not the object to be processed is within a predetermined range from the process processing equipment X. , Judging the completion.

検知部151の構成は、これに限られるものではない。例えば、工程処理設備Xにより処理を行うためには、ある地点を通過しなければならない等であれば、当該ある地点に検知部151を設け、タグ152が検知部151を通過したか否かにより、タグ152が検知されたか否かを判定してもよい(図5参照)。 The configuration of the detection unit 151 is not limited to this. For example, if it is necessary to pass through a certain point in order to perform processing by the process processing equipment X, a detection unit 151 is provided at the certain point, and it depends on whether or not the tag 152 has passed through the detection unit 151. , It may be determined whether or not the tag 152 is detected (see FIG. 5).

また、検知部151を設置する地点は、出入口の1箇所であってもよいし、入口と出口の2カ所であってもよい。 Further, the detection unit 151 may be installed at one place at the entrance / exit or at two places, the entrance and the exit.

〔実施形態2〕
本発明の他の実施形態について、以下に説明する。なお、説明の便宜上、上記実施形態にて説明した部材と同じ機能を有する部材については、同じ符号を付記し、その説明を繰り返さない。
[Embodiment 2]
Other embodiments of the present invention will be described below. For convenience of explanation, the same reference numerals are given to the members having the same functions as the members described in the above-described embodiment, and the description thereof will not be repeated.

図6に本実施形態に係る提示部600の例、および工程管理装置100Aの要部構成を示すブロック図である。 FIG. 6 is a block diagram showing an example of the presentation unit 600 according to the present embodiment and a configuration of a main part of the process control device 100A.

図6に示すように、本実施形態では、工程処理設備Xの近傍に提示部600が備えられており、提示部600に提示された内容を確認して、処理担当者は処理を行うことを想定している。そして、処理担当者が使用する担当者端末(通信端末)700と提示部600とが近距離無線通信により通信可能となっており、工程処理設備Xにおける処理開始前に、担当者端末700から提示部600に対し、工程の作業内容を示す作業指示書、図面、製品情報、ロット番号等の提示指示がなされる。 As shown in FIG. 6, in the present embodiment, the presentation unit 600 is provided in the vicinity of the process processing equipment X, and the person in charge of processing confirms the content presented to the presentation unit 600 and performs the processing. I'm assuming. Then, the person in charge terminal (communication terminal) 700 used by the person in charge of processing and the presentation unit 600 can communicate with each other by short-range wireless communication, and the person in charge terminal 700 presents the product before the start of processing in the process processing equipment X. A work instruction sheet showing the work contents of the process, drawings, product information, lot numbers, and the like are instructed to be presented to the unit 600.

また、工程処理設備Xにおける処理が完工したときに、処理担当者が完工時に確認すべき事項が含まれる、換言すれば完工時に確認が必要となる作業終了確認書を提示部600に提示する確認提示指示が担当者端末700から提示部600に対してなされてもよい。 Further, when the processing in the process processing equipment X is completed, the confirmation that the processing person in charge presents to the presentation unit 600 a work completion confirmation that includes items to be confirmed at the time of completion, in other words, confirmation at the time of completion. The presentation instruction may be given from the person in charge terminal 700 to the presentation unit 600.

本実施形態に係る取得部30は、提示部600から上記提示指示(作業者の能動的な行為、例えば作業指示書の呼出入力)を受信した旨を示す信号、または作業者が作業指示書を閲覧した旨を示す信号を取得して、着完工判定部11に通知する。作業者が作業指示書を閲覧したか否かは、例えば、作業指示書のページがめくられたことを検知してもよいし、提示部600に作業者の視線を検知するセンサ(閲覧検知部)を備え、当該センサにより作業者が提示部600に提示されている作業指示書を閲覧していることを検知してもよい。 The acquisition unit 30 according to the present embodiment receives a signal indicating that the presentation instruction (active action of the worker, for example, a call input of the work instruction) has been received from the presentation unit 600, or the worker issues a work instruction. It acquires a signal indicating that it has been browsed and notifies the completion determination unit 11. Whether or not the worker has viewed the work instruction sheet may be determined by, for example, detecting that the page of the work instruction sheet has been turned, or a sensor (viewing detection unit) that detects the worker's line of sight on the presentation unit 600. ), It may be detected that the operator is viewing the work instruction sheet presented to the presentation unit 600 by the sensor.

着完工判定部11は、取得部30を介して、提示部600が上記提示指示を受信、または閲覧した旨の信号を取得すると、当該時点、または当該時点から所定時間経過の時点で着工があったと決定し、着工があったと決定した時点を時計部12を参照して着工時刻と決定する。また、着完工判定部11は、判定情報21Bを参照し、着工したのは、どの工程であるのかについても判定する。 When the presentation unit 600 acquires a signal to the effect that the presentation instruction has been received or viewed via the acquisition unit 30, the construction start determination unit 11 starts construction at that time or at a time when a predetermined time has elapsed from that time. It is determined that the construction has started, and the time when it is determined that the construction has started is determined as the construction start time with reference to the clock unit 12. Further, the construction start completion determination unit 11 also refers to the determination information 21B and determines which process the construction has started.

また、着完工判定部11は、取得部30を介して、提示部600が上記確認提示指示を受信、または閲覧した旨の信号を取得すると、当該時点、または当該時点から所定時間経過の時点で完工したと決定し、完工したと決定した時点を時計部12を参照して完工時刻と決定する。 Further, when the presentation unit 600 acquires a signal indicating that the presentation unit 600 has received or viewed the confirmation presentation instruction via the acquisition unit 30, the completion completion determination unit 11 at that time, or at a time when a predetermined time has elapsed from that time. It is determined that the construction is completed, and the time when it is determined that the construction is completed is determined as the completion time with reference to the clock unit 12.

ここで、図7を参照して、判定情報21Bについて説明する。図7は、判定情報21Bの例を示す図である。判定情報21Bは、着完工判定部11が着工、完工の判定に用いる情報であり、提示部600を識別する情報、および工程内容が対応付けられたものである。図7に示す例では、提示部600を識別する情報として「E1」、工程内容が「成形工程」が対応付けられており、提示部600「E1」において提示指示を受信した場合、当該工程は「成形工程」であることが示されている。以下、同様である。なお、提示部600と処理工程との対応関係は予め設定されているものとする。 Here, the determination information 21B will be described with reference to FIG. 7. FIG. 7 is a diagram showing an example of the determination information 21B. The determination information 21B is information used by the start / completion determination unit 11 for determining the start / completion of construction, and is associated with the information for identifying the presentation unit 600 and the process contents. In the example shown in FIG. 7, "E1" is associated with the information for identifying the presentation unit 600, and "molding process" is associated with the process content. When the presentation unit 600 "E1" receives the presentation instruction, the process is performed. It is shown to be a "molding process". The same applies hereinafter. It is assumed that the correspondence between the presentation unit 600 and the processing process is set in advance.

以上のように、本実施形態に係る工程管理装置100Aは、実施対象となる工程の担当者が、自身が使用する担当者端末700を介して近距離無線により通信可能な提示部600であって前記工程を実施する設備近傍の所定領域に設置された提示部600に対し、近距離無線により工程の作業内容に関する作業指示書の提示を指示する指示入力を行った時刻、または、作業指示書を実施対象となる工程の担当者が閲覧したことを検知する閲覧検知部から、前記閲覧を示す信号を取得した時点を着工時刻とする着完工判定部11を備えている。 As described above, the process management device 100A according to the present embodiment is a presentation unit 600 in which the person in charge of the process to be implemented can communicate by short-range radio via the person in charge terminal 700 used by the person in charge. The time when the presentation unit 600 installed in the predetermined area near the equipment for carrying out the process is instructed to present the work instruction sheet regarding the work content of the process by short-range radio, or the work instruction sheet is input. It is provided with a start completion determination unit 11 whose construction start time is the time when the signal indicating the browsing is acquired from the browsing detection unit that detects that the person in charge of the process to be implemented has browsed.

〔変形例1〕
なお、本実施形態においてさらに、工程処理設備Xの近傍に検知部155を設ける構成であってもよい。
[Modification 1]
In addition, in this embodiment, the detection unit 155 may be further provided in the vicinity of the process processing equipment X.

検知部155は、工程処理設備Xの所定範囲内に処理担当者が入ったか否かを検知するものである。なお、検知部155が処理担当者を検知する方法としては、人感センサ(赤外線センサ)で検知してもよいし、処理担当者のIDカードや携帯通信端末を読み取ることにより検知してもよいし、ビーコン等により検知してもよい。 The detection unit 155 detects whether or not a person in charge of processing has entered within a predetermined range of the process processing equipment X. As a method for the detection unit 155 to detect the person in charge of processing, it may be detected by a motion sensor (infrared sensor) or by reading the ID card or mobile communication terminal of the person in charge of processing. However, it may be detected by a beacon or the like.

そして、着完工判定部11は、検知部151が、処理担当者が工程処理設備Xの所定範囲に入ったことを検知したときから所定時間内に提示指示があった旨、または作業指示書の閲覧があった旨の信号を取得した場合、当該停止時が行われた時刻を着工時刻と決定する。 Then, the completion determination unit 11 indicates that the presentation instruction has been given within a predetermined time from the time when the detection unit 151 detects that the processing person has entered the predetermined range of the process processing equipment X, or the work instruction sheet. When a signal indicating that there was a browsing is obtained, the time when the stop time was performed is determined as the construction start time.

〔変形例2〕
図8に本実施形態の変形例を示す。図8に示すように、本変形例では、工程管理装置100Bの制御部10Aに警告部13が含まれている。警告部13は、検知部151が、処理担当者が工程処理設備Xの所定範囲に入ったことを検知してから所定時間内に提示指示または提示確認を示す信号を取得しない場合、表示部50を介して警告を発するものである。なお、表示部50以外に音声出力部等を設け、当該音声出力部を介して警告を発してもよい。
[Modification 2]
FIG. 8 shows a modified example of this embodiment. As shown in FIG. 8, in this modification, the warning unit 13 is included in the control unit 10A of the process control device 100B. When the detection unit 151 does not acquire a signal indicating a presentation instruction or presentation confirmation within a predetermined time after detecting that the processing person has entered the predetermined range of the process processing equipment X, the warning unit 13 does not acquire the presentation instruction or the presentation confirmation signal, the display unit 50. It issues a warning through. A voice output unit or the like may be provided in addition to the display unit 50, and a warning may be issued via the voice output unit.

また、着完工判定部11は、警告部13による警告後に、提示指示があった旨、または作業指示書の閲覧があった旨を示す信号を取得した場合、処理担当者が工程処理設備Xの所定範囲に入った時刻または当該時刻から所定時間経過後の時刻を着工時刻と決定してもよい。 Further, when the completion completion determination unit 11 obtains a signal indicating that the presentation instruction has been given or the work instruction has been viewed after the warning by the warning unit 13, the processing person in charge of the process processing equipment X receives a signal indicating that the presentation instruction has been given or the work instruction has been viewed. The construction start time may be determined to be the time within the predetermined range or the time after the predetermined time has elapsed from the time.

〔変形例3〕
また、工程管理装置100が工程処理設備Xの状態を取得でき、着完工判定部11は、提示部600に対し提示指示があった後、処理を実行する工程処理設備Xが処理開始可能状態になったとき、着工があったと判定し、着工時刻を決定してもよい。
[Modification 3]
Further, the process management device 100 can acquire the state of the process processing equipment X, and the process start determination unit 11 is in a state where the process processing equipment X that executes the processing can start the processing after the presentation instruction is given to the presentation unit 600. When it becomes, it may be determined that the construction has started and the construction start time may be determined.

〔実施形態3〕
本発明の他の実施形態について、以下に説明する。なお、説明の便宜上、上記実施形態にて説明した部材と同じ機能を有する部材については、同じ符号を付記し、その説明を繰り返さない。
[Embodiment 3]
Other embodiments of the present invention will be described below. For convenience of explanation, the same reference numerals are given to the members having the same functions as the members described in the above-described embodiment, and the description thereof will not be repeated.

図9は、本実施形態に係る読取部160の例、および工程管理装置100Cの要部構成を示すブロック図である。なお、本実施形態では、処理対象物が1または複数個ずつ、保持具で保持されており、保持具ごと、処理を行う工程処理設備Xに運搬されることを想定している。そして、本実施形態では、保持具に当該保持具と対応付けられた対応情報(例えば、バーコード)が付されており、図9に示すように工程処理設備Xの近傍には対応情報を読み取るための読取部(読み取り機)160が備えられている。 FIG. 9 is a block diagram showing an example of the reading unit 160 according to the present embodiment and a configuration of a main part of the process control device 100C. In this embodiment, it is assumed that one or a plurality of objects to be processed are held by the holder, and each holder is transported to the process processing equipment X for processing. Then, in the present embodiment, the holder is attached with the corresponding information (for example, a bar code) associated with the holder, and as shown in FIG. 9, the corresponding information is read in the vicinity of the process processing equipment X. A reader (reader) 160 for this purpose is provided.

そして、当該対応情報が読取部160により読み取られることにより、工程の作業内容を示す作業指示書、図面、製品情報、ロット番号等が提示部600に提示される。 Then, when the corresponding information is read by the reading unit 160, a work instruction sheet, a drawing, a product information, a lot number, and the like indicating the work contents of the process are presented to the presentation unit 600.

図9に示すように、本実施形態に係る工程管理装置100Cは、記憶部20に判定情報21Cを格納している。 As shown in FIG. 9, the process management device 100C according to the present embodiment stores the determination information 21C in the storage unit 20.

そして、着完工判定部11は、取得部30を介して、読取部160が対応情報の読取りを行った旨の信号を取得すると、当該時点、または当該時点から所定時間経過の時点で着工があったと決定し、着工があったと決定した時点を時計部12を参照して着工時刻と決定する。また、着完工判定部11は、判定情報21Cを参照し、着工したのは、どの工程であるのかについても判定する。 Then, when the start / completion determination unit 11 acquires a signal to the effect that the reading unit 160 has read the corresponding information via the acquisition unit 30, the construction starts at that time or at a time when a predetermined time has elapsed from that time. It is determined that the construction has started, and the time when it is determined that the construction has started is determined as the construction start time with reference to the clock unit 12. Further, the construction start completion determination unit 11 also refers to the determination information 21C and determines which process the construction has started.

ここで、図10を参照して、判定情報21Cについて説明する。図10は、判定情報21Cの例を示す図である。判定情報21Cは、着完工判定部11が着工、完工の判定に用いる情報であり、読取部160を識別する情報、工程内容、バーコード(対応情報)、製品が対応付けられたものである。図10に示す例では、読取部160を識別する情報として「R1」、工程内容が「成形工程」、バーコードが「B1」、製品が「G1」が対応付けられており、読取部160「R1」において読取りが行われた場合、当該工程は「成形工程」であること、読取られたバーコードが「B1」の場合、処理対象物となる製品は「G1」であることが示されている。以下、同様である。なお、読取部160と処理工程との対応関係、およびバーコードと製品との対応関係は予め設定されているものとする。 Here, the determination information 21C will be described with reference to FIG. FIG. 10 is a diagram showing an example of the determination information 21C. The determination information 21C is information used by the start / completion determination unit 11 for determining the start / completion of construction, and is associated with information for identifying the reading unit 160, a process content, a barcode (correspondence information), and a product. In the example shown in FIG. 10, "R1" is associated with the information for identifying the reading unit 160, the process content is "molding process", the barcode is "B1", and the product is "G1". When reading is performed in "R1", it is shown that the process is "molding process", and when the read barcode is "B1", the product to be processed is "G1". There is. The same applies hereinafter. It is assumed that the correspondence between the reading unit 160 and the processing process and the correspondence between the barcode and the product are set in advance.

以上のように、本実施形態に係る工程管理装置100Cは、処理対象物が1または複数個保持される保持具に、当該保持具と対応付けられた対応情報が付されており、前記対応情報は、前記保持具と一体に搬送されるとともに、工程を実施する設備近傍の所定領域に備えられた読取部160によって読み取り可能であり、前記工程前に、当該工程に対応する読取部160によって前記対応情報を読み取ることにより、前記所定領域に設置された提示部600に該工程の作業内容を示す作業指示書を提示する指示が行われた時刻を着工時刻とする着完工判定部11を備える。 As described above, in the process control device 100C according to the present embodiment, the holder in which one or more objects to be processed are held is attached with the correspondence information associated with the holder, and the correspondence information is described. Is conveyed integrally with the holder and can be read by a reading unit 160 provided in a predetermined area near the equipment where the process is carried out, and before the process, the reading unit 160 corresponding to the process said. By reading the correspondence information, the presentation unit 600 installed in the predetermined area is provided with a construction start determination unit 11 whose construction start time is the time when the instruction to present the work instruction sheet indicating the work content of the process is given.

また、工程管理装置100Cでは、実施対象となる工程の担当者が工程を実施する設備近傍の所定範囲に入ったことを検知する検知部155を備え、検知部155が、担当者が所定範囲に入ったことを検知してから所定時間内に、読み取りが行われない場合、警告を発する警告部13を備え、着完工判定部11は、警告後に読み取りがあった場合、担当者が所定範囲に入った時刻または該時刻から所定時間経過後の時刻を着工時刻とする。 Further, the process control device 100C includes a detection unit 155 for detecting that the person in charge of the process to be implemented has entered a predetermined range in the vicinity of the equipment for performing the process, and the detection unit 155 has the person in charge within the predetermined range. A warning unit 13 that issues a warning if reading is not performed within a predetermined time after detecting the entry is provided, and the construction start determination unit 11 has a person in charge within a predetermined range when reading is performed after the warning. The construction start time shall be the time of entry or the time after a predetermined time has elapsed from that time.

〔変形例4〕
上述した全ての実施形態において、着完工判定部11が決定した完工時刻が、予め定められたスケジュールよりも遅れている場合、遅延通知を外部の管理装置に送信する遅延通知送信部を備えた構成であってもよい。これにより、完工時刻がスケジュールから遅れている場合、その旨を通知することができる。
[Modification 4]
In all the above-described embodiments, when the completion time determined by the completion completion determination unit 11 is later than the predetermined schedule, the configuration includes a delay notification transmission unit that transmits a delay notification to an external management device. May be. As a result, if the completion time is behind the schedule, it is possible to notify that fact.

〔変形例5〕
判定対象となる処理工程が、当該工程の最後に処理対象物の測定処理が必要となるものである場合、着完工判定部11は、前記測定処理に用いる測定機が所定の格納位置から外された後、所定時間経過後の時刻、または、該格納位置に戻された時刻を完工時刻としてもよい。
[Modification 5]
When the processing process to be determined requires the measurement process of the object to be processed at the end of the process, the completion determination unit 11 removes the measuring machine used for the measurement process from the predetermined storage position. After that, the time after the lapse of a predetermined time or the time returned to the storage position may be set as the completion time.

これは、例えば、格納場所から測定機が持ち出されることを検知するセンサを設け、当該センサによる検知結果を着完工判定部11において取得することにより実現できる。 This can be realized, for example, by providing a sensor for detecting that the measuring device is taken out from the storage location and acquiring the detection result by the sensor in the completion determination unit 11.

〔ソフトウェアによる実現例〕
工程管理装置100(100A、100B、100C)の制御ブロック(特に制御部10(10A、10B))は、集積回路(ICチップ)等に形成された論理回路(ハードウェア)によって実現してもよいし、ソフトウェアによって実現してもよい。
[Example of implementation by software]
The control block (particularly, the control unit 10 (10A, 10B)) of the process control device 100 (100A, 100B, 100C) may be realized by a logic circuit (hardware) formed in an integrated circuit (IC chip) or the like. However, it may be realized by software.

後者の場合、工程管理装置100は、各機能を実現するソフトウェアであるプログラムの命令を実行するコンピュータを備えている。このコンピュータは、例えば少なくとも1つのプロセッサ(制御装置)を備えていると共に、上記プログラムを記憶したコンピュータ読み取り可能な少なくとも1つの記録媒体を備えている。そして、上記コンピュータにおいて、上記プロセッサが上記プログラムを上記記録媒体から読み取って実行することにより、本発明の目的が達成される。上記プロセッサとしては、例えばCPU(Central Processing Unit)を用いることができる。上記記録媒体としては、「一時的でない有形の媒体」、例えば、ROM(Read Only Memory)等の他、テープ、ディスク、カード、半導体メモリ、プログラマブルな論理回路などを用いることができる。また、上記プログラムを展開するRAM(Random Access Memory)などをさらに備えていてもよい。また、上記プログラムは、該プログラムを伝送可能な任意の伝送媒体(通信ネットワークや放送波等)を介して上記コンピュータに供給されてもよい。なお、本発明の一態様は、上記プログラムが電子的な伝送によって具現化された、搬送波に埋め込まれたデータ信号の形態でも実現され得る。 In the latter case, the process control device 100 includes a computer that executes instructions of a program that is software that realizes each function. This computer includes, for example, at least one processor (control device) and at least one computer-readable recording medium in which the program is stored. Then, in the computer, the processor reads the program from the recording medium and executes the program, thereby achieving the object of the present invention. As the processor, for example, a CPU (Central Processing Unit) can be used. As the recording medium, a "non-temporary tangible medium", for example, a ROM (Read Only Memory) or the like, a tape, a disk, a card, a semiconductor memory, a programmable logic circuit, or the like can be used. Further, a RAM (Random Access Memory) for expanding the above program may be further provided. Further, the program may be supplied to the computer via any transmission medium (communication network, broadcast wave, etc.) capable of transmitting the program. It should be noted that one aspect of the present invention can also be realized in the form of a data signal embedded in a carrier wave, in which the above program is embodied by electronic transmission.

本発明は上述した各実施形態に限定されるものではなく、請求項に示した範囲で種々の変更が可能であり、異なる実施形態にそれぞれ開示された技術的手段を適宜組み合わせて得られる実施形態についても本発明の技術的範囲に含まれる。さらに、各実施形態にそれぞれ開示された技術的手段を組み合わせることにより、新しい技術的特徴を形成することができる。 The present invention is not limited to the above-described embodiments, and various modifications can be made within the scope of the claims, and the embodiments obtained by appropriately combining the technical means disclosed in the different embodiments. Is also included in the technical scope of the present invention. Further, by combining the technical means disclosed in each embodiment, new technical features can be formed.

10、10A 制御部
11 着完工判定部(着工判定部、完工判定部)
12 時計部
13 警告部
20 記憶部
21A、21B、21C 判定情報
30 取得部
40 操作受付部
50 表示部
60 通信部
100、100A、100B、100C 工程管理装置
101 セラミックス製造システム
110 工程管理システム
151、155 検知部
152 タグ
160 読取部
200 成形装置
300 切削装置
400 焼成装置
500 研削装置
600 提示部
700 担当者端末(通信端末)
10, 10A Control unit 11 Completion determination unit (Construction start determination unit, Completion determination unit)
12 Clock unit 13 Warning unit 20 Storage unit 21A, 21B, 21C Judgment information 30 Acquisition unit 40 Operation reception unit 50 Display unit 60 Communication unit 100, 100A, 100B, 100C Process control device 101 Ceramics manufacturing system 110 Process control system 151, 155 Detection unit 152 Tag 160 Reading unit 200 Molding device 300 Cutting device 400 Firing device 500 Grinding device 600 Presenting unit 700 Person in charge terminal (communication terminal)

Claims (14)

処理対象物が、工程を実施する設備近傍の所定範囲に入ったことを検知する検知部と、
前記検知部が、前記処理対象物が前記所定範囲に入ったことを検知した時刻または該時刻から所定時間経過後の時刻を着工時刻とする着工判定部と、を備えたことを特徴とする工程管理装置。
A detector that detects that the object to be processed has entered a predetermined range near the equipment where the process is performed, and
The step is characterized in that the detection unit includes a construction start determination unit whose construction start time is a time when the processing object is detected to be within the predetermined range or a time after a predetermined time has elapsed from the time. Management device.
前記検知部は前記所定範囲から前記処理対象物が出たことを検知し、
前記検知部が、前記処理対象物が前記所定範囲から出たことを検知した時刻または該時刻から所定時間前の時刻を完工時刻とする完工判定部を備えたことを特徴とする請求項1に記載の工程管理装置。
The detection unit detects that the object to be processed has come out from the predetermined range, and determines that the object to be processed has come out.
The first aspect of the present invention is characterized in that the detection unit includes a completion determination unit whose completion time is the time when the processing object is detected to have come out of the predetermined range or the time before the predetermined time. The process control device described.
前記処理対象物は、セラミックス成形体またはセラミックス焼成体であり、
前記検知部は、前記セラミックス成形体またはセラミックス焼成体が1または複数個保持される保持具に付された無線通信タグを検知することにより、前記所定範囲にあることを検知することを特徴とする請求項1または2に記載の工程管理装置。
The object to be treated is a ceramic molded body or a ceramic fired body.
The detection unit is characterized in that it detects that the ceramic molded body or the ceramic fired body is within the predetermined range by detecting a wireless communication tag attached to a holder for holding one or a plurality of the ceramic molded body. The process control device according to claim 1 or 2.
実施対象となる工程の担当者が、自身が使用する通信端末を介して近距離無線により通信可能な提示部であって前記工程を実施する設備近傍の所定領域に設置された提示部に対し、前記近距離無線により前記工程の作業内容に関する作業指示書の提示を指示する指示入力を行った時刻を、着工時刻とする着工判定部を備えたことを特徴とする工程管理装置。 The person in charge of the process to be implemented is a presenter capable of communicating by short-range wireless via a communication terminal used by himself / herself, and the presenter is installed in a predetermined area near the equipment for carrying out the process. A process management device including a construction start determination unit, wherein the construction start time is the time when an instruction input for instructing the presentation of a work instruction sheet regarding the work content of the process is performed by the short-range radio. 実施対象となる工程の担当者が、自身が使用する通信端末を介して近距離無線により通信可能な提示部であって前記工程を実施する設備近傍の所定領域に設置された提示部に対し、前記近距離無線により前記工程の作業内容に関する作業指示書の提示を指示する指示入力を行った後、前記設備が処理開始可能状態となった時刻を、着工時刻とする着工判定部を備えたことを特徴とする工程管理装置。 The person in charge of the process to be implemented is a presenter capable of communicating by short-range wireless via a communication terminal used by himself / herself, and the presenter is installed in a predetermined area near the equipment for carrying out the process. It is provided with a construction start determination unit that sets the time when the equipment is ready to start processing after inputting instructions instructing the presentation of work instructions regarding the work contents of the process by the short-range radio. A process control device characterized by. 実施対象となる工程を実施する設備近傍の所定領域に設置された提示部に提示された、前記工程の作業内容に関する作業指示書を実施対象となる工程の担当者が閲覧したことを検知する閲覧検知部から、前記閲覧を示す信号を取得したとき、当該時点を着工時刻とする着工判定部を備えたことを特徴とする工程管理装置。 Browsing to detect that the person in charge of the process to be implemented has viewed the work instruction sheet regarding the work content of the process presented to the presentation unit installed in the predetermined area near the equipment to be implemented. A process management device including a construction start determination unit whose construction start time is the time when the signal indicating the browsing is acquired from the detection unit. 前記担当者が工程を実施する設備近傍の所定範囲に入ったことを検知する検知部を備え、
前記検知部が、前記担当者が前記所定範囲に入ったことを検知した時刻から所定時間内に前記指示入力があった場合、前記着工判定部は、当該指示入力が行われた時刻を着工時刻とすることを特徴とする請求項4に記載の工程管理装置。
It is equipped with a detector that detects that the person in charge has entered a predetermined range near the equipment where the process is carried out.
When the detection unit receives the instruction input within a predetermined time from the time when the person in charge detects that the person in charge has entered the predetermined range, the construction start determination unit sets the time when the instruction input is performed as the construction start time. The process control device according to claim 4, wherein the process control device is characterized in that.
前記検知部が、前記担当者が前記所定範囲に入ったことを検知してから所定時間内に前記指示入力が無い場合、警告を発する警告部を備え、
前記着工判定部は、前記警告後に前記指示入力があった場合、前記担当者が前記所定範囲に入った時刻または該時刻から所定時間経過後の時刻を着工時刻とすることを特徴とする請求項7に記載の工程管理装置。
The detection unit includes a warning unit that issues a warning if there is no instruction input within a predetermined time after detecting that the person in charge has entered the predetermined range.
The claim is characterized in that, when the instruction is input after the warning, the construction start determination unit sets the time when the person in charge enters the predetermined range or the time after the predetermined time elapses from the time as the construction start time. 7. The process control device according to 7.
実施対象となる工程の担当者が、自身が使用する通信端末を介して近距離無線により通信可能な提示部であって前記工程を実施する設備近傍の所定領域に設置された提示部に対し、前記近距離無線により前記工程の作業終了時に確認が必要な作業終了確認書の提示を指示する指示入力を行った時刻または該時刻から所定時間経過後の時刻を、完工時刻とする完工判定部を備えたことを特徴とする工程管理装置。 The person in charge of the process to be implemented is a presenter capable of communicating by short-range radio via the communication terminal used by the person in charge of the process, and the presenter is installed in a predetermined area near the facility where the process is to be performed. A completion determination unit whose completion time is the time when an instruction is input to instruct the presentation of a work completion confirmation that needs to be confirmed at the end of the work of the process by the short-range radio, or the time after a predetermined time has elapsed from the time. A process control device characterized by being equipped. 実施対象となる工程を実施する設備近傍の所定領域に設置された提示部に提示された、前記工程の作業終了時に確認が必要な作業終了確認書を実施対象となる工程の担当者が閲覧したことを検知する閲覧検知部から、前記閲覧を示す信号を取得したとき、当該時点または該時点から所定時間経過後の時刻を、完工時刻とする完工判定部を備えたことを特徴とする工程管理装置。 The person in charge of the process to be implemented viewed the work completion confirmation that needs to be confirmed at the end of the work of the process, which was presented to the presentation unit installed in the predetermined area near the equipment to implement the process to be implemented. Process management characterized in that it is provided with a completion determination unit, which sets the completion time as the time at the time or after a predetermined time has elapsed from the time when the signal indicating the browsing is acquired from the browsing detection unit that detects the fact. Device. 処理対象物が1または複数個保持される保持具に、当該保持具と対応付けられた対応情報が付されており、
前記対応情報は、前記保持具と一体に搬送されるとともに、工程を実施する設備近傍の所定領域に備えられた読み取り機によって読み取り可能であり、
前記工程前に、当該工程に対応する前記読み取り機によって前記対応情報を読み取ることにより、前記所定領域に設置された提示部に該工程の作業内容を示す作業指示書を提示する指示が行われた時刻を着工時刻とする着工判定部を備えたことを特徴とする工程管理装置。
Correspondence information associated with the holder is attached to the holder in which one or more objects to be processed are held.
The correspondence information is conveyed integrally with the holder and can be read by a reader provided in a predetermined area near the equipment where the process is carried out.
Prior to the process, by reading the corresponding information with the reader corresponding to the process, an instruction was given to present a work instruction sheet showing the work contents of the process to the presentation unit installed in the predetermined area. A process management device characterized by having a construction start determination unit whose construction start time is the time.
実施対象となる工程の担当者が工程を実施する設備近傍の所定範囲に入ったことを検知する検知部を備え、
前記検知部が、前記担当者が前記所定範囲に入ったことを検知してから所定時間内に、前記読み取りが行われない場合、警告を発する警告部を備え、
前記着工判定部は、前記警告後に前記読み取りがあった場合、前記担当者が前記所定範囲に入った時刻または該時刻から所定時間経過後の時刻を着工時刻とすることを特徴とする請求項11に記載の工程管理装置。
Equipped with a detector that detects that the person in charge of the process to be implemented has entered a predetermined range near the equipment where the process is to be implemented.
The detection unit includes a warning unit that issues a warning if the reading is not performed within a predetermined time after detecting that the person in charge has entered the predetermined range.
11. The process control device according to.
前記完工時刻が、予め定められたスケジュールよりも遅れている場合、遅延通知を外部の管理装置に送信する遅延通知送信部を備えたことを特徴とする請求項2に記載の工程管理装置。 The process management device according to claim 2, further comprising a delay notification transmission unit that transmits a delay notification to an external management device when the completion time is later than a predetermined schedule. 実施対象となる工程は、当該工程の最後に処理対象物の測定処理が必要となるものであり、
前記測定処理に用いる測定機が所定の格納位置から外された後、所定時間経過後の時刻、または、該格納位置に戻された時刻を完工時刻とする完工判定部を備えたことを特徴とする請求項1に記載の工程管理装置。
The process to be implemented requires measurement processing of the object to be processed at the end of the process.
It is characterized by having a completion determination unit whose completion time is the time after a predetermined time elapses after the measuring machine used for the measurement process is removed from the predetermined storage position or the time when the measuring machine is returned to the storage position. The process control device according to claim 1.
JP2020092439A 2020-05-27 2020-05-27 Process managing device Pending JP2021189607A (en)

Priority Applications (5)

Application Number Priority Date Filing Date Title
JP2020092439A JP2021189607A (en) 2020-05-27 2020-05-27 Process managing device
EP21814189.3A EP4160227A4 (en) 2020-05-27 2021-05-27 State determination device, state determination system, production system, process management device, and state determination method
CN202180037907.3A CN115667943A (en) 2020-05-27 2021-05-27 State determination device, state determination system, production system, process management device, and state determination method
US17/927,329 US20230288456A1 (en) 2020-05-27 2021-05-27 State determination device, state determination system, production system, step management device, and state determination method
PCT/JP2021/020139 WO2021241671A1 (en) 2020-05-27 2021-05-27 State determination device, state determination system, production system, process management device, and state determination method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020092439A JP2021189607A (en) 2020-05-27 2020-05-27 Process managing device

Publications (1)

Publication Number Publication Date
JP2021189607A true JP2021189607A (en) 2021-12-13

Family

ID=78850357

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020092439A Pending JP2021189607A (en) 2020-05-27 2020-05-27 Process managing device

Country Status (1)

Country Link
JP (1) JP2021189607A (en)

Similar Documents

Publication Publication Date Title
KR101445531B1 (en) Data collection system, data collection device, recording medium for data collection system program, and recording medium for data collection program
CN104950702A (en) Robot system for determining operator by biometric authentication
JP2007026212A (en) Work information management system and mobile terminal device
JP6977296B2 (en) Work time measurement system and work instruction system using it
WO2009073255A1 (en) Asset management system and method for an automotive vehicle
KR20150093044A (en) Management system using a NFC
US10831871B2 (en) Robot system having biometric authentication function
JP6190509B1 (en) Gas cylinder management system
JP2021189607A (en) Process managing device
US20230288456A1 (en) State determination device, state determination system, production system, step management device, and state determination method
JP2006228082A (en) Maintenance inspection system
JP5139650B2 (en) Work results collection system and work results collection method
JP2007265361A (en) Method for managing and operating information on tool used in manufacturing process
JP2016177591A (en) Personnel management system, information analysis apparatus, personnel management method, and personnel management program
JP2018179792A (en) Repair supporting system and method for returnable container
JP4913013B2 (en) Management method and management system for moving body
JP2010102495A (en) Plate material working process management system
CN111273616A (en) Monitoring system
JP6816577B2 (en) Reader device, wireless tag, information presentation system
JP2018106606A (en) Work process management rack, work process management system, and work process management method
JP7218791B2 (en) Manufacturing control method
JP2021051543A (en) Management system and management method
JP2012133723A (en) Process control system and method for processed articles
JP2021077329A (en) Reading device and production process management system
US20230113553A1 (en) Assignment and de-assignment in portable devices via a charger

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20230508

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240130