JP2021127222A JP2020023316A JP2020023316A JP2021127222A JP 2021127222 A JP2021127222 A JP 2021127222A JP 2020023316 A JP2020023316 A JP 2020023316A JP 2020023316 A JP2020023316 A JP 2020023316A JP 2021127222 A JP2021127222 A JP 2021127222A
Authority
JP
Japan
Prior art keywords
cargo handling
balance
frame structure
twist lock
spreader
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2020023316A
Other languages
Japanese (ja)
Other versions
JP7201629B2 (en
Inventor
啓佑 藤本
Keisuke Fujimoto
啓佑 藤本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Mitsui E&S Machinery Co Ltd
Original Assignee
Mitsui E&S Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Mitsui E&S Machinery Co Ltd filed Critical Mitsui E&S Machinery Co Ltd
Priority to JP2020023316A priority Critical patent/JP7201629B2/en
Publication of JP2021127222A publication Critical patent/JP2021127222A/en
Application granted granted Critical
Publication of JP7201629B2 publication Critical patent/JP7201629B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

To provide a balance for cargo handling and a method for cargo handling that can improve work efficiency when cargo handling of objects other than containers is performed by a container crane.SOLUTION: A balance for cargo handling 1 includes a frame structure 2 extending from a twist lock pin 24 at one end to the twist lock pin 24 at the other end in the longitudinal direction X of a spreader 22 of a container crane. The twist lock pins 24 are engaged with a plurality of engaging portions 3 provided on the upper portion of the frame structure 2 so as to connect the cargo handling balance 1 to the spreader 22, a cargo handling object 30 other than containers or a holding jig 31 for holding the cargo handling object 30 is connected to a hanging metal fitting 4 provided at the lower part of the frame structure 2 with a cord 32, and cargo handling is performed with the cargo handling object 30 suspended below the cargo handling balance 1.SELECTED DRAWING: Figure 3

Description

本発明は、荷役用天秤および荷役方法に関し、より詳細には、コンテナクレーンによりコンテナ以外の荷役対象物の荷役を行う際の作業効率を向上できる荷役用天秤および荷役方法に関する。 The present invention relates to a cargo handling balance and a cargo handling method, and more particularly to a cargo handling balance and a cargo handling method capable of improving work efficiency when handling a cargo handling object other than a container by a container crane.

コンテナの荷役を主として行うコンテナクレーンは、トロリからワイヤロープによって懸吊されたヘッドブロックを有している。コンテナの荷役を行うときにはヘッドブロックの下側にスプレッダ(下部吊り具)を装着した状態で、スプレッダの下部に設けられているツイストロックピンとコンテナの上部に設けられている係合部とを係合させることで、コンテナを保持する(例えば、特許文献1参照)。 A container crane that mainly handles the cargo of a container has a head block suspended from a trolley by a wire rope. When loading and unloading the container, with the spreader (lower hanger) attached to the underside of the head block, engage the twist lock pin provided at the bottom of the spreader with the engaging part provided at the top of the container. By allowing the container to be held (see, for example, Patent Document 1).

従来、コンテナクレーンによりコンテナ以外の荷役対象物(例えば、コンテナに収容できない長尺部材など)の荷役を行う場合には、ヘッドブロックからスプレッダを取外して、ヘッドブロックの下側に荷役用天秤を連結していた。しかしながら、コンテナ以外の荷役対象物を荷役する度に、ヘッドブロックとスプレッダとの着脱作業を行う必要があるため、作業効率が悪かった。 Conventionally, when a container crane is used to handle a cargo handling object other than a container (for example, a long member that cannot be accommodated in a container), the spreader is removed from the head block and a cargo handling balance is connected to the underside of the head block. Was. However, the work efficiency is poor because it is necessary to attach / detach the head block and the spreader every time a cargo handling object other than the container is handled.

特開2012−76847号公報Japanese Unexamined Patent Publication No. 2012-76847

本発明の目的は、コンテナクレーンによりコンテナ以外の荷役対象物の荷役を行う際の作業効率を向上できる荷役用天秤および荷役方法を提供することにある。 An object of the present invention is to provide a cargo handling balance and a cargo handling method capable of improving work efficiency when handling a cargo handling object other than a container by a container crane.

上記のような目的を達成するための本発明の荷役用天秤は、コンテナクレーンによりコンテナ以外の荷役対象物の荷役を行う際に使用される荷役用天秤において、前記コンテナクレーンのスプレッダの長手方向における一方端のツイストロックピンから他方端のツイストロックピンまで延在するフレーム構造体と、前記フレーム構造体の上部に設けられて前記ツイストロックピンを係合可能な複数の係合部と、前記フレーム構造体の下部に設けられて索状体を連結可能な吊金具とを備えたことを特徴とする。 The cargo handling balance of the present invention for achieving the above object is a cargo handling balance used when handling a cargo handling object other than a container by a container crane in the longitudinal direction of the spreader of the container crane. A frame structure extending from the twist lock pin at one end to the twist lock pin at the other end, a plurality of engaging portions provided on the upper part of the frame structure and capable of engaging the twist lock pin, and the frame. It is characterized by being provided with a hanging metal fitting provided at the lower part of the structure and capable of connecting a cord-like body.

上記のような目的を達成するための本発明の荷役方法は、荷役用天秤を使用してコンテナクレーンによりコンテナ以外の荷役対象物を荷役する荷役方法において、前記荷役用天秤を、前記コンテナクレーンのスプレッダの長手方向における一方端のツイストロックピンから他方端のツイストロックピンまで延在するフレーム構造体を有する構成とし、フレーム構造体の上部に設けられている複数の係合部に前記ツイストロックピンを係合させて前記荷役用天秤を前記スプレッダに連結し、前記荷役対象物または前記荷役対象物を保持する保持治具と、前記フレーム構造体の下部に設けられている吊金具とを索状体で接続して、前記荷役対象物を前記荷役用天秤の下方に吊持した状態で荷役することを特徴とする。 The cargo handling method of the present invention for achieving the above object is a cargo handling method in which a cargo handling object other than a container is handled by a container crane using a cargo handling balance. The structure has a frame structure extending from the twist lock pin at one end to the twist lock pin at the other end in the longitudinal direction of the spreader, and the twist lock pin is attached to a plurality of engaging portions provided on the upper part of the frame structure. Is engaged to connect the cargo handling balance to the spreader, and the holding jig for holding the cargo handling object or the cargo handling object and the hanging metal fitting provided at the lower part of the frame structure are cord-shaped. It is characterized in that it is connected by a body and the cargo handling object is handled in a state of being suspended below the cargo handling balance.

本発明によれば、荷役用天秤を構成するフレーム構造体の上部に設けられた複数の係合部にスプレッダのツイストロックピンを係合させることで、スプレッダに荷役用天秤を連結できる。そして、コンテナ以外の荷役対象物または荷役対象物を保持する保持治具と、フレーム構造体の下部に設けられている吊金具とを索状体で接続することで、荷役対象物を荷役用天秤の下方に吊持した状態で荷役することができる。コンテナ以外の荷役対象物の荷役を行う際にもヘッドブロックからスプレッダを取外す必要がないため、作業効率を向上できる。さらに、フレーム構造体がスプレッダの長手方向における一方端のツイストロックピンから他方端のツイストロックピンまで延在していることで、荷役対象物としてコンテナに収容できないような長尺部材の荷役を行う際にも荷役対象物を安定して吊持することができる。 According to the present invention, the cargo handling balance can be connected to the spreader by engaging the twist lock pins of the spreader with a plurality of engaging portions provided on the upper part of the frame structure constituting the cargo handling balance. Then, by connecting the cargo handling object other than the container or the holding jig for holding the cargo handling object and the hanging metal fitting provided at the lower part of the frame structure with a cord, the cargo handling object is a cargo handling balance. It can be loaded and unloaded while being suspended below. Since it is not necessary to remove the spreader from the head block when handling a cargo handling object other than the container, work efficiency can be improved. Further, since the frame structure extends from the twist lock pin at one end to the twist lock pin at the other end in the longitudinal direction of the spreader, the long member that cannot be accommodated in the container as a cargo handling object is handled. Even in this case, the cargo handling object can be stably suspended.

本発明の荷役用天秤の実施形態を側面視で例示する説明図である。It is explanatory drawing which illustrates embodiment of the cargo handling balance of this invention from the side view. 図1のA矢視図である。It is a view of arrow A of FIG. 図1の荷役用天秤をスプレッダに連結して、荷役対象物を荷役用天秤の下方に吊持した状態で荷役している状況を側面視で例示する説明図である。It is explanatory drawing which illustrates the situation which the cargo handling balance of FIG. 1 is connected to a spreader, and the cargo handling object is suspended below the cargo handling balance, and is exemplifying from the side view. 図3の状況を正面視で例示する説明図である。It is explanatory drawing which illustrates the situation of FIG. 3 from the front view.

以下、本発明の荷役用天秤および荷役方法を図に示した実施形態に基づいて説明する。 Hereinafter, the cargo handling balance and the cargo handling method of the present invention will be described based on the embodiment shown in the figure.

図1〜図4に例示する本発明に係る実施形態の荷役用天秤1は、コンテナクレーンにより、コンテナ以外の荷役対象物30を荷役する際に使用する。荷役対象物30としては、コンテナに収容できない長尺部材などが例示できる。 The cargo handling balance 1 of the embodiment according to the present invention illustrated in FIGS. 1 to 4 is used when loading and unloading a cargo handling object 30 other than a container by a container crane. Examples of the cargo handling object 30 include long members that cannot be accommodated in the container.

図1に例示するように、コンテナクレーンは、トロリからワイヤロープによって懸吊されたヘッドブロック20を備えている。ヘッドブロック20の下部に設けられている複数のツイストロックピン21と、スプレッダ22の上部に設けられている複数の係合部23とを係合させることで、ヘッドブロック20の下側にスプレッダ22が装着されている。 As illustrated in FIG. 1, the container crane includes a head block 20 suspended from a trolley by a wire rope. By engaging the plurality of twist lock pins 21 provided at the lower part of the head block 20 with the plurality of engaging portions 23 provided at the upper part of the spreader 22, the spreader 22 is placed below the head block 20. Is installed.

スプレッダ22の下部には、コンテナの上部の四隅に設けられている係合部に係合させる少なくとも4つのツイストロックピン24が設けられている。この実施形態では、20フィートコンテナの荷役に使用するスプレッダ22を例示している。複数のコンテナを同時に荷役可能なスプレッダ22では、ツイストロックピン24が4つ以上設けられているものもある。図中のX方向はスプレッダ22の平面視における長手方向X、Y方向は平面視において長手方向Xと直交するスプレッダ22の幅方向Y、Z方向は上下方向Zを示している。長手方向X、幅方向Yはそれぞれコンテナクレーンの走行方向、横行方向に対応する。 At the bottom of the spreader 22, at least four twist lock pins 24 are provided to engage the engaging portions provided at the four corners of the top of the container. This embodiment illustrates a spreader 22 used for loading and unloading a 20-foot container. Some spreaders 22 capable of handling a plurality of containers at the same time are provided with four or more twist lock pins 24. In the figure, the X direction indicates the longitudinal direction X in the plan view of the spreader 22, the Y direction indicates the width direction Y of the spreader 22 orthogonal to the longitudinal direction X in the plan view, and the Z direction indicates the vertical direction Z. The longitudinal direction X and the width direction Y correspond to the traveling direction and the transverse direction of the container crane, respectively.

図1および図2に例示するように、荷役用天秤1は、フレーム構造体2と、スプレッダ22のツイストロックピン24を係合可能な係合部3と、索状体22を連結可能な吊金具4とを備えている。 As illustrated in FIGS. 1 and 2, the cargo handling balance 1 has a frame structure 2, an engaging portion 3 capable of engaging the twist lock pin 24 of the spreader 22, and a suspension capable of connecting the cord 22. It is equipped with a metal fitting 4.

フレーム構造体2は例えば、形鋼などの金属部材によって形成される。フレーム構造体2は、スプレッダ22の長手方向Xにおける一方端のツイストロックピン24から他方端のツイストロックピン24まで延在している。さらに、フレーム構造体2は、幅方向Yにおける一方端のツイストロックピン24から他方端のツイストロックピン24まで延在している。この実施形態では、フレーム構造体2の長手方向Xおよび幅方向Yの外形寸法を、スプレッダ11の長手方向Xおよび幅方向Yの外形寸法と略同一のサイズに設定しているが、例えば平面視においてスプレッダ11の外形寸法よりも大きく、スプレッダ11よりも外側に張り出す構成のフレーム構造体2にすることもできる。 The frame structure 2 is formed of, for example, a metal member such as a shaped steel. The frame structure 2 extends from the twist lock pin 24 at one end to the twist lock pin 24 at the other end in the longitudinal direction X of the spreader 22. Further, the frame structure 2 extends from the twist lock pin 24 at one end to the twist lock pin 24 at the other end in the width direction Y. In this embodiment, the external dimensions of the frame structure 2 in the longitudinal direction X and the width direction Y are set to substantially the same sizes as the external dimensions of the spreader 11 in the longitudinal direction X and the width direction Y. The frame structure 2 may be larger than the outer dimensions of the spreader 11 and project outward from the spreader 11.

図2に例示するように、この実施形態のフレーム構造体2は格子状に形成されている。フレーム構造体2は、幅方向Yに間隔をあけて配置された長手方向Xに延在する2本の主桁2aと、長手方向Xに間隔をあけて配設された幅方向Yに延在する6本の横桁2b、2cとを有して構成されている。スプレッダ22の幅方向Yの両端のそれぞれのツイストロックピン24に対応する位置にそれぞれ主桁2aが配置されていて、一対の主桁2aが6本の横桁2b、2cによって連結されている。 As illustrated in FIG. 2, the frame structure 2 of this embodiment is formed in a grid pattern. The frame structure 2 extends in two main girders 2a extending in the longitudinal direction X arranged at intervals in the width direction Y and in the width direction Y arranged at intervals in the longitudinal direction X. It is configured to have six horizontal girders 2b and 2c. A main girder 2a is arranged at a position corresponding to each twist lock pin 24 at both ends of the spreader 22 in the width direction Y, and a pair of main girders 2a are connected by six cross girders 2b and 2c.

フレーム構造体2の長手方向Xの両端に配置されている2本の横桁2bの上面は、主桁2aの上面よりも上方に位置している。フレーム構造体2の長手方向Xの中央側(2本の横桁2bの間)に配置されている4本の横桁2cの上面は、主桁2aの上面と同じ高さに位置している。横桁2b、2cの下面は主桁2aの下面と同じ高さに位置している。 The upper surfaces of the two horizontal girders 2b arranged at both ends of the frame structure 2 in the longitudinal direction X are located above the upper surfaces of the main girder 2a. The upper surfaces of the four horizontal girders 2c arranged on the central side (between the two horizontal girders 2b) of the frame structure 2 in the longitudinal direction X are located at the same height as the upper surface of the main girder 2a. .. The lower surfaces of the cross girders 2b and 2c are located at the same height as the lower surface of the main girder 2a.

フレーム構造体2の上部に複数の係合部3が設けられている。平面視においてスプレッダ22に設けられているそれぞれのツイストロックピン24に対応する位置に係合部3が配置されている。この実施形態では、平面視におけるフレーム構造体2の四隅にそれぞれ係合部3が設けられている。それぞれの係合部3は、長手方向Xの両端に配置された横桁2aの上部に設けられている。 A plurality of engaging portions 3 are provided on the upper portion of the frame structure 2. The engaging portion 3 is arranged at a position corresponding to each twist lock pin 24 provided on the spreader 22 in a plan view. In this embodiment, engaging portions 3 are provided at each of the four corners of the frame structure 2 in a plan view. Each engaging portion 3 is provided on the upper portion of the cross girder 2a arranged at both ends in the longitudinal direction X.

係合部3は、ツイストロックピン24を挿入可能な係合穴を有している。係合穴にツイストロックピン24を挿入した状態でツイストロックピン24を水平方向に約90度回転させると、係合部3に対してツイストロックピン24が係合した状態となる。 The engaging portion 3 has an engaging hole into which the twist lock pin 24 can be inserted. When the twist lock pin 24 is rotated by about 90 degrees in the horizontal direction with the twist lock pin 24 inserted in the engagement hole, the twist lock pin 24 is engaged with the engaging portion 3.

この実施形態では、それぞれの係合部3に、スプレッダ22のツイストロックピン24を係合部3にガイドするガイド部材6が設けられている。ガイド部材6は、係合部3の近傍に位置したツイストロックピン24を係合部3に向かわせる方向に傾斜した金属板で構成されている。ガイド部材6はツイストロックピン24を係合部3にガイドする構成であれば、この実施形態と異なる構造や形状にすることもできる。 In this embodiment, each engaging portion 3 is provided with a guide member 6 that guides the twist lock pin 24 of the spreader 22 to the engaging portion 3. The guide member 6 is made of a metal plate inclined in a direction in which the twist lock pin 24 located in the vicinity of the engaging portion 3 is directed toward the engaging portion 3. The guide member 6 may have a structure or shape different from that of this embodiment as long as the twist lock pin 24 is guided to the engaging portion 3.

図1に例示するように、フレーム構造体2の下部には、吊金具4が設けられている。吊金具4としてはアイプレートやフックなどが例示できる。この実施形態では、それぞれの主桁2aの長手方向Xにおける両端部とその間に複数の吊金具4が間隔をあけて配設されている。 As illustrated in FIG. 1, a hanging metal fitting 4 is provided at the lower part of the frame structure 2. Examples of the hanging metal fitting 4 include an eye plate and a hook. In this embodiment, both ends of each main girder 2a in the longitudinal direction X and a plurality of hanging metal fittings 4 are arranged at intervals.

フレーム構造体2の下部にはさらに、複数の支持脚5が設けられている。支持脚5は、フレーム構造体2の下部に設けられた吊金具4の下端よりも下方に突出している。平面視におけるフレーム構造体2の四隅にそれぞれ支持脚5が配置されている。支持脚5の底面を地面Gに接地させると、吊金具4が地面Gに接地しない状態で、フレーム構造体2が支持脚5によって支持された状態となる。荷役用天秤1に設ける吊金具4および支持脚5の数や配置等はこの実施形態に限定されず、他にも様々な構成にすることができる。 A plurality of support legs 5 are further provided in the lower portion of the frame structure 2. The support legs 5 project downward from the lower end of the hanging metal fitting 4 provided at the lower part of the frame structure 2. Support legs 5 are arranged at the four corners of the frame structure 2 in a plan view. When the bottom surface of the support leg 5 is grounded to the ground G, the frame structure 2 is supported by the support leg 5 without the hanging metal fitting 4 touching the ground G. The number and arrangement of the hanging metal fittings 4 and the supporting legs 5 provided on the cargo handling balance 1 are not limited to this embodiment, and various other configurations can be used.

この実施形態ではさらに、フレーム構造体2の上部にフォークリフトのフォーク(爪)を差し込み可能な差込部7が設けられている。図2に例示するように、長手方向Xの中央側に配置された2本の横桁2cの4ヶ所に差込部7が設けられている。荷役用天秤1の幅方向Y側からフォークリフトのフォークを差込部7に差し込むことで、フォークリフトにより荷役用天秤1を簡易に搬送できる。 In this embodiment, an insertion portion 7 into which a fork (claw) of a forklift can be inserted is further provided on the upper part of the frame structure 2. As illustrated in FIG. 2, insertion portions 7 are provided at four locations of two horizontal girders 2c arranged on the center side in the longitudinal direction X. By inserting the fork of the forklift into the insertion portion 7 from the width direction Y side of the cargo handling balance 1, the cargo handling balance 1 can be easily conveyed by the forklift.

この実施形態の荷役用天秤1は、スプレッダ22だけでなく、ヘッドブロック20や、ヘッドブロック20に装着して使用される吊りビームにも連結できる構成になっている。フレーム構造体2の上部には、ヘッドブロック20に設けられているツイストロックピン21を係合可能なヘッドブロック用の係合部8とガイド部材9が設けられている。係合部8およびガイド部材9は、2本の主桁2aの上部の4ヶ所設けられている。ヘッドブロック20用の係合部8およびガイド部材9は、長手方向Xおよび幅方向Yにおいて、スプレッダ22用の係合部3およびガイド部材6よりもフレーム構造体2の中央側に配置されている。 The cargo handling balance 1 of this embodiment is configured to be connected not only to the spreader 22 but also to the head block 20 and a suspended beam used by being attached to the head block 20. An engaging portion 8 for a head block and a guide member 9 for engaging the twist lock pin 21 provided on the head block 20 are provided on the upper portion of the frame structure 2. The engaging portion 8 and the guide member 9 are provided at four locations above the two main girders 2a. The engaging portion 8 and the guide member 9 for the head block 20 are arranged closer to the center of the frame structure 2 than the engaging portion 3 for the spreader 22 and the guide member 6 in the longitudinal direction X and the width direction Y. ..

フレーム構造体2の上部にはさらに、索状体32を連結可能な吊金具4が複数ヶ所に設けられている。これらの吊金具4と吊ビームに設けられているフックとを索状体32で接続することで、吊ビームの下側に荷役用天秤1を吊り下げることができる。フレーム構造体2の上部に設けられている差込部7および吊金具4は、係合部3、8よりも低い位置に配置されている。 Further, hanging metal fittings 4 to which the cord-like body 32 can be connected are provided at a plurality of places on the upper portion of the frame structure 2. By connecting these hanging metal fittings 4 and the hooks provided on the hanging beam with a cord-like body 32, the cargo handling balance 1 can be hung under the hanging beam. The insertion portion 7 and the hanging metal fitting 4 provided on the upper portion of the frame structure 2 are arranged at positions lower than the engaging portions 3 and 8.

次に、荷役用天秤1を使用してコンテナ以外の荷役対象物30の荷役を行う方法を説明する。 Next, a method of handling the cargo handling object 30 other than the container by using the cargo handling balance 1 will be described.

図1に例示するように、コンテナクレーンを操作して、ヘッドブロック20に装着されているスプレッダ22を、地面Gに載置している荷役用天秤1の直上まで移動させる。そして、スプレッダ22のそれぞれのツイストロックピン24と、荷役用天秤1の上部に設けられている係合部3との位置合わせをした後に、ヘッドブロック20およびスプレッダ22を下降させて、スプレッダ22のそれぞれのツイストロックピン24を荷役用天秤1の係合部3に設けられている係合孔に挿入する。そして、スプレッダ22のツイストロックピンを水平方向に約90度回転させて、それぞれのツイストロックピン24と係合部3とを係合させた状態にすることで、スプレッダ22の下側に荷役用天秤1を連結する。 As illustrated in FIG. 1, the container crane is operated to move the spreader 22 mounted on the head block 20 to just above the cargo handling balance 1 placed on the ground G. Then, after aligning each twist lock pin 24 of the spreader 22 with the engaging portion 3 provided on the upper part of the cargo handling balance 1, the head block 20 and the spreader 22 are lowered to lower the spreader 22. Each twist lock pin 24 is inserted into an engagement hole provided in the engagement portion 3 of the cargo handling balance 1. Then, the twist lock pin of the spreader 22 is rotated about 90 degrees in the horizontal direction so that the twist lock pin 24 and the engaging portion 3 are engaged with each other so that the twist lock pin 24 can be used for cargo handling on the lower side of the spreader 22. The balance 1 is connected.

次いで、荷役用天秤1を地面Gに載置した状態、または、荷役用天秤1を宙に浮かせた状態で、図3および図4に例示するように、荷役対象物30または荷役対象物30を保持する保持治具31と、フレーム構造体2の下部に設けられている吊金具4とを索状体32で接続する。保持治具31としては、パレットやベルトなどが例示できる。そして、ヘッドブロック20およびスプレッダ22とともに荷役用天秤1を上方移動させて、荷役対象物30を荷役用天秤1の下方に吊持した状態で荷役する。 Next, with the cargo handling balance 1 placed on the ground G or with the cargo handling balance 1 floating in the air, as illustrated in FIGS. 3 and 4, the cargo handling object 30 or the cargo handling object 30 is placed. The holding jig 31 to be held and the hanging metal fitting 4 provided at the lower part of the frame structure 2 are connected by a cord-like body 32. Examples of the holding jig 31 include a pallet and a belt. Then, the cargo handling balance 1 is moved upward together with the head block 20 and the spreader 22, and the cargo handling object 30 is suspended below the cargo handling balance 1 for cargo handling.

このように、本発明によれば、荷役用天秤1を構成するフレーム構造体2の上部に係合部3を設け、フレーム構造体2の下部に吊金具4を設けたことで、スプレッダ22の下側に荷役用天秤1を連結して、荷役対象物30の荷役を行うことが可能となる。コンテナ以外の荷役対象物30の荷役を行う際にもヘッドブロック20からスプレッダ22を取外す必要がなく、荷役対象物30からコンテナの荷役にシフトする際にも、スプレッダ22から荷役用天秤1を取外すだけでよいので、コンテナクレーンの作業効率を向上できる。特に、コンテナ以外の荷役対象物30の荷役を行う機会が多いコンテナクレーンには非常に有益である。 As described above, according to the present invention, the spreader 22 is provided with the engaging portion 3 provided on the upper portion of the frame structure 2 constituting the cargo handling balance 1 and the hanging metal fitting 4 provided on the lower portion of the frame structure 2. By connecting the cargo handling balance 1 to the lower side, it is possible to handle the cargo handling object 30. It is not necessary to remove the spreader 22 from the head block 20 when handling the cargo handling object 30 other than the container, and when shifting from the cargo handling object 30 to the cargo handling of the container, the cargo handling balance 1 is removed from the spreader 22. The work efficiency of the container crane can be improved. In particular, it is very useful for a container crane, which has many opportunities to handle the cargo handling object 30 other than the container.

さらに、荷役用天秤1は、フレーム構造体2がスプレッダ22の長手方向Xにおける一方端のツイストロックピン24から他方端のツイストロックピン24まで延在していることで、フレーム構造体2の下部に設ける吊金具4どうしの長手方向Xのスパン(間隔)を長く確保できる。それ故、荷役対象物30としてコンテナに収容できないような長尺部材の荷役を行う際にも荷役対象物30を安定して吊持できる。 Further, in the cargo handling balance 1, the frame structure 2 extends from the twist lock pin 24 at one end to the twist lock pin 24 at the other end in the longitudinal direction X of the spreader 22, so that the lower portion of the frame structure 2 is provided. It is possible to secure a long span (interval) in the longitudinal direction X between the hanging metal fittings 4 provided in the above. Therefore, the cargo handling object 30 can be stably suspended even when cargo handling of a long member that cannot be accommodated in the container as the cargo handling object 30 is performed.

また、ヘッドブロック20のツイストロックピン21は一般的に手動で回転させるため、従来ではヘッドブロック20と荷役用天秤とを連結する際にヘッドブロック20のツイストロックピン21を作業者が手で回す必要があった。一方、スプレッダ22のツイストロックピン24はコンテナクレーンのオペレータが機械的に遠隔操作できるので、本発明の荷役用天秤1を使用すると、スプレッダ22とコンテナとを連結する作業と同じ要領で、スプレッダ22と荷役用天秤1との連結作業をオペレータによる遠隔操作で行える。それ故、荷役用天秤1の装着作業を少ない作業者でより効率的に行うことができる。 Further, since the twist lock pin 21 of the head block 20 is generally rotated manually, the operator manually rotates the twist lock pin 21 of the head block 20 when connecting the head block 20 and the cargo handling balance. I needed it. On the other hand, since the twist lock pin 24 of the spreader 22 can be mechanically remotely controlled by the operator of the container crane, when the cargo handling balance 1 of the present invention is used, the spreader 22 is connected in the same manner as the work of connecting the spreader 22 and the container. And the cargo handling balance 1 can be connected by remote control by the operator. Therefore, the work of mounting the cargo handling balance 1 can be performed more efficiently with a small number of workers.

さらに、スプレッダ22には、スプレッダ22のツイストロックピン24とコンテナの係合部との位置合わせをアシストする支援システムを構成するセンサやカメラ等が設置されている場合が多いが、本発明では、そのような支援システムをスプレッダ22のツイストロックピン24と荷役用天秤1の係合部3との位置合わせに利用できる。それ故、ヘッドブロック20のツイストロックピン21と荷役用天秤1の係合部8との位置合せを行う場合よりも、スプレッダ22のツイストロックピン24と荷役用天秤1の係合部3との位置合わせをより効率的に精度よく行える。また、荷役用天秤1により荷役対象物30を荷役する際にも、前述した支援システムを利用することが可能である。 Further, the spreader 22 is often provided with a sensor, a camera, or the like that constitutes a support system that assists the alignment of the twist lock pin 24 of the spreader 22 with the engaging portion of the container. Such a support system can be used to align the twist lock pin 24 of the spreader 22 with the engaging portion 3 of the cargo handling balance 1. Therefore, the twist lock pin 24 of the spreader 22 and the engaging portion 3 of the cargo handling balance 1 are more closely aligned than the case where the twist lock pin 21 of the head block 20 and the engaging portion 8 of the cargo handling balance 1 are aligned. Alignment can be performed more efficiently and accurately. Further, when the cargo handling object 30 is handled by the cargo handling balance 1, the above-mentioned support system can be used.

この実施形態のように、フレーム構造体2の幅方向Yの外形寸法をスプレッダ22の幅方向Yの外形寸法以上にすると、フレーム構造体2の下部に設ける吊金具4どうしの幅方向Yのスパンを長く確保できるので、荷役対象物30を安定して吊持するには有利になる。 When the external dimension of the frame structure 2 in the width direction Y is made equal to or larger than the external dimension of the spreader 22 in the width direction Y as in this embodiment, the span of the hanging metal fittings 4 provided at the lower part of the frame structure 2 in the width direction Y Can be secured for a long time, which is advantageous for stably suspending the cargo handling object 30.

荷役用天秤1が支持脚5を有する構成にすると、荷役用天秤1を地面Gに載置する際に、支持脚5によりフレーム構造体2を安定して支持できる。さらに、荷役用天秤1を地面Gに載置した状態で吊金具4が地面Gに接触しないので、吊金具4が損傷するリスクを低くできる。 When the cargo handling balance 1 is configured to have the support legs 5, the frame structure 2 can be stably supported by the support legs 5 when the cargo handling balance 1 is placed on the ground G. Further, since the hanging metal fitting 4 does not come into contact with the ground G when the cargo handling balance 1 is placed on the ground G, the risk of damage to the hanging metal fitting 4 can be reduced.

荷役用天秤1がガイド部材6を有する構成にすると、スプレッダ22のツイストロックピン24と荷役用天秤1の係合部3との位置合せを行う際に、ガイド部材6により、スプレッダ22のツイストロックピン24が係合部3の係合孔に向かうようにガイドされるので、スプレッダ22と荷役用天秤1との連結作業をより行い易くなる。ガイド部材6は例えば、フレーム構造体2に対して着脱可能な構成にすることもできる。スプレッダ22側にスプレッダ22とコンテナとの位置合わせに使用するガイド部材が設けられており、スプレッダ22側のガイド部材と荷役用天秤1のガイド部材6とが干渉するような場合には、ガイド部材6を取外しておくとよい。 When the cargo handling balance 1 is configured to have the guide member 6, the guide member 6 is used to align the twist lock pin 24 of the spreader 22 with the engaging portion 3 of the cargo handling balance 1. Since the pin 24 is guided toward the engaging hole of the engaging portion 3, it becomes easier to connect the spreader 22 and the cargo handling balance 1. For example, the guide member 6 may be configured to be removable from the frame structure 2. A guide member used for aligning the spreader 22 and the container is provided on the spreader 22 side, and when the guide member on the spreader 22 side and the guide member 6 of the cargo handling balance 1 interfere with each other, the guide member It is good to remove 6.

荷役用天秤1が差込部7を有する構成にすると、フォークリフトによって荷役用天秤1を簡易に搬送できるので、荷役用天秤1の利便性が高くなる。差込部7は例えば、フレーム構造体2の下部に設けることもできる。 When the cargo handling balance 1 is configured to have the insertion portion 7, the cargo handling balance 1 can be easily transported by the forklift, so that the convenience of the cargo handling balance 1 is enhanced. The insertion portion 7 may be provided, for example, at the lower part of the frame structure 2.

フレーム構造体2の上部に吊金具4を設けた構成にすると、荷役用天秤1を吊りビームにも連結することが可能になるので、荷役用天秤1の汎用性がより高くなる。また、フレーム構造体2の上部にヘッドブロック用の係合部8を設けると、荷役用天秤1をヘッドブロック20にも連結することが可能になるので、荷役用天秤1の汎用性がより高くなる。 If the hanging bracket 4 is provided on the upper part of the frame structure 2, the cargo handling balance 1 can be connected to the suspension beam, so that the cargo handling balance 1 is more versatile. Further, if the engaging portion 8 for the head block is provided on the upper part of the frame structure 2, the cargo handling balance 1 can be connected to the head block 20, so that the cargo handling balance 1 is more versatile. Become.

なお、支持脚5や、ガイド部材6、差込部7、吊ビーム用の吊金具4、ヘッドブロック用の係合部8、ヘッドブロック用のガイド部材9は、荷役用天秤1において必須の構成要件ではなく、それぞれ任意に設けることができる。 The support legs 5, the guide member 6, the insertion portion 7, the hanging bracket 4 for the hanging beam, the engaging portion 8 for the head block, and the guide member 9 for the head block are essential configurations in the cargo handling balance 1. It is not a requirement, but can be set arbitrarily.

上記で例示した実施形態では、20フィートコンテナを荷役対象とするスプレッダ22に装着する荷役用天秤1を例示したが、例えば、40フィートコンテナなどの他のサイズのコンテナを荷役対象とするスプレッダ22に装着可能な荷役用天秤1にすることもできる。また、例えば、複数のコンテナを同時に荷役可能なスプレッダ22に装着可能な荷役用天秤1にすることもできる。スプレッダ22のサイズが異なる場合にも同様に、フレーム構造体2は、スプレッダ22の長手方向Xにおける一方端のツイストロックピン24から他方端のツイストロックピン24まで延在する構成とする。なお、複数種類のサイズのコンテナを荷役対象とする、ツイストロックピン24の位置を長手方向Xに変更可能なスプレッダ22の場合には、スプレッダ22に荷役用天秤1を装着した状態で、フレーム構造体2がスプレッダ22の長手方向における一方端のツイストロックピン24から他方端のツイストロックピン24まで延在していればよい。 In the embodiment illustrated above, the cargo handling balance 1 for mounting the 20-foot container on the spreader 22 for cargo handling has been illustrated, but for example, the spreader 22 for loading other size containers such as a 40-foot container. It can also be a load-handling balance 1 that can be attached. Further, for example, a cargo handling balance 1 capable of mounting a plurality of containers on a spreader 22 capable of handling cargo at the same time can be used. Similarly, when the sizes of the spreaders 22 are different, the frame structure 2 is configured to extend from the twist lock pin 24 at one end to the twist lock pin 24 at the other end in the longitudinal direction X of the spreader 22. In the case of the spreader 22 in which the position of the twist lock pin 24 can be changed in the longitudinal direction X for handling containers of a plurality of sizes, the frame structure is provided with the cargo handling balance 1 attached to the spreader 22. The body 2 may extend from the twist lock pin 24 at one end to the twist lock pin 24 at the other end in the longitudinal direction of the spreader 22.

1 荷役用天秤
2 フレーム構造体
2a 主桁
2b (端の)横桁
2c (中央の)横桁
3 係合部
4 吊金具
5 支持脚
6 ガイド部材
7 差込部
8 (ヘッドブロック用の)係合部
9 (ヘッドブロック用の)ガイド部材
20 ヘッドブロック
21 (ヘッドブロックに設けられた)ツイストロックピン
22 スプレッダ
23 (スプレッダに設けられた)係合部
24 (スプレッダに設けられた)ツイストロックピン
30 荷役対象物
31 保持治具
32 索状体
G 地面
1 Loading balance 2 Frame structure 2a Main girder 2b (end) cross girder 2c (center) cross girder 3 Engaging part 4 Hanging bracket 5 Support leg 6 Guide member 7 Inserting part 8 (for head block) Joint 9 (for head block) Guide member 20 Head block 21 (provided on head block) Twist lock pin 22 Spreader 23 (provided on spreader) Engagement part 24 (provided on spreader) Twist lock pin 30 Cargo handling object 31 Holding jig 32 Cord-like body G Ground

Claims (6)

コンテナクレーンによりコンテナ以外の荷役対象物の荷役を行う際に使用される荷役用天秤において、
前記コンテナクレーンのスプレッダの長手方向における一方端のツイストロックピンから他方端のツイストロックピンまで延在するフレーム構造体と、前記フレーム構造体の上部に設けられて前記ツイストロックピンを係合可能な複数の係合部と、前記フレーム構造体の下部に設けられて索状体を連結可能な吊金具とを備えたことを特徴とする荷役用天秤。
In a cargo handling balance used when loading and unloading cargo handling objects other than containers with a container crane
A frame structure extending from one end twist lock pin to the other end twist lock pin in the longitudinal direction of the spreader of the container crane and the twist lock pin provided on the upper part of the frame structure can be engaged with the twist lock pin. A cargo handling balance provided with a plurality of engaging portions and a hanging metal fitting provided at a lower portion of the frame structure and capable of connecting a cord-like body.
前記フレーム構造体の下部に設けられた前記吊金具の下端よりも下方に突出した支持脚を有する請求項1に記載の荷役用天秤。 The cargo handling balance according to claim 1, which has a support leg protruding downward from the lower end of the hanging metal fitting provided at the lower part of the frame structure. 前記ツイストロックピンを前記係合部にガイドするガイド部材を有する請求項1または2に記載の荷役用天秤。 The cargo handling balance according to claim 1 or 2, further comprising a guide member for guiding the twist lock pin to the engaging portion. フォークリフトのフォークを差し込み可能な差込部を有する請求項1〜3のいずれか1項に記載の荷役用天秤。 The cargo handling balance according to any one of claims 1 to 3, which has an insertion portion into which a fork of a forklift can be inserted. 前記フレーム構造体の上部に索状体を連結可能な吊金具を有する請求項1〜4のいずれか1項に記載の荷役用天秤。 The cargo handling balance according to any one of claims 1 to 4, which has a hanging metal fitting to which a cord can be connected to the upper part of the frame structure. 荷役用天秤を使用してコンテナクレーンによりコンテナ以外の荷役対象物を荷役する荷役方法において、
前記荷役用天秤を、前記コンテナクレーンのスプレッダの長手方向における一方端のツイストロックピンから他方端のツイストロックピンまで延在するフレーム構造体を有する構成とし、フレーム構造体の上部に設けられている複数の係合部に前記ツイストロックピンを係合させて前記荷役用天秤を前記スプレッダに連結し、前記荷役対象物または前記荷役対象物を保持する保持治具と、前記フレーム構造体の下部に設けられている吊金具とを索状体で接続して、前記荷役対象物を前記荷役用天秤の下方に吊持した状態で荷役することを特徴とする荷役方法。
In a cargo handling method in which a cargo handling object other than a container is handled by a container crane using a cargo handling balance.
The cargo handling balance has a frame structure extending from one end of the twist lock pin to the other end of the twist lock pin in the longitudinal direction of the spreader of the container crane, and is provided on the upper portion of the frame structure. A holding jig for holding the cargo handling object or the cargo handling object by engaging the twist lock pins with a plurality of engaging portions to connect the cargo handling balance to the spreader, and a lower portion of the frame structure. A cargo handling method characterized by connecting an provided hanging metal fitting with a cord-like body and handling the cargo handling object in a state of being suspended below the cargo handling balance.
JP2020023316A 2020-02-14 2020-02-14 Loading/unloading balance and loading/unloading method Active JP7201629B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020023316A JP7201629B2 (en) 2020-02-14 2020-02-14 Loading/unloading balance and loading/unloading method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020023316A JP7201629B2 (en) 2020-02-14 2020-02-14 Loading/unloading balance and loading/unloading method

Publications (2)

Publication Number Publication Date
JP2021127222A true JP2021127222A (en) 2021-09-02
JP7201629B2 JP7201629B2 (en) 2023-01-10

Family

ID=77487944

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020023316A Active JP7201629B2 (en) 2020-02-14 2020-02-14 Loading/unloading balance and loading/unloading method

Country Status (1)

Country Link
JP (1) JP7201629B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113979279A (en) * 2021-10-13 2022-01-28 东风汽车零部件(集团)有限公司通用铸锻分公司 Loading and unloading dual-purpose device matched with foamed plastic model trolley
CN117446641A (en) * 2023-12-22 2024-01-26 山西省安装集团股份有限公司 Power plant generator stator hoisting device and method

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5345673U (en) * 1976-09-22 1978-04-18
JPS61157581U (en) * 1985-03-22 1986-09-30
JPH0682096U (en) * 1993-04-30 1994-11-25 東洋運搬機株式会社 Lifting device for cargo handling vehicles
JPH07215655A (en) * 1994-02-07 1995-08-15 Mitsubishi Heavy Ind Ltd Pallet device
JP2001031364A (en) * 1999-07-22 2001-02-06 Toyota Autom Loom Works Ltd Spreader device
US20030222468A1 (en) * 2002-05-28 2003-12-04 Metropolitan Stevedore Company Cargo cage and spreader attachment and method of use
JP3198322U (en) * 2015-04-16 2015-06-25 株式会社きんでん Balance and hanging
JP2020007126A (en) * 2018-07-11 2020-01-16 株式会社三井E&Sマシナリー Crane attachment

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US7875674B2 (en) 2008-05-01 2011-01-25 Wacker Chemical Corporation Building materials incorporated with hydrophobic silicone resin(s)

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5345673U (en) * 1976-09-22 1978-04-18
JPS61157581U (en) * 1985-03-22 1986-09-30
JPH0682096U (en) * 1993-04-30 1994-11-25 東洋運搬機株式会社 Lifting device for cargo handling vehicles
JPH07215655A (en) * 1994-02-07 1995-08-15 Mitsubishi Heavy Ind Ltd Pallet device
JP2001031364A (en) * 1999-07-22 2001-02-06 Toyota Autom Loom Works Ltd Spreader device
US20030222468A1 (en) * 2002-05-28 2003-12-04 Metropolitan Stevedore Company Cargo cage and spreader attachment and method of use
JP3198322U (en) * 2015-04-16 2015-06-25 株式会社きんでん Balance and hanging
JP2020007126A (en) * 2018-07-11 2020-01-16 株式会社三井E&Sマシナリー Crane attachment

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113979279A (en) * 2021-10-13 2022-01-28 东风汽车零部件(集团)有限公司通用铸锻分公司 Loading and unloading dual-purpose device matched with foamed plastic model trolley
CN113979279B (en) * 2021-10-13 2023-12-19 东风汽车零部件(集团)有限公司通用铸锻分公司 Loading and unloading dual-purpose device matched with foam plastic model trolley
CN117446641A (en) * 2023-12-22 2024-01-26 山西省安装集团股份有限公司 Power plant generator stator hoisting device and method
CN117446641B (en) * 2023-12-22 2024-03-08 山西省安装集团股份有限公司 Power plant generator stator hoisting device and method

Also Published As

Publication number Publication date
JP7201629B2 (en) 2023-01-10

Similar Documents

Publication Publication Date Title
JP2021127222A (en) Balance for cargo handling and cargo handling method
RU186471U1 (en) Removable lifting device
JP2016132566A (en) Structure of hanging load-carrying platform
US2905501A (en) Lifting hitch
KR20130136136A (en) Crane assembly for lifting steel and lifting method using the same
KR200426101Y1 (en) Transfer apparatus for glass box
JP5731311B2 (en) Concrete block lifting jig
CN209834574U (en) Container
JP7015250B2 (en) Elevating system, and carrier elements for such elevating system
JP7411600B2 (en) Quay crane and cargo handling method
JP3173693U (en) Box-shaped container hanger
KR101807768B1 (en) Sling assembly
JP6820605B2 (en) How to transport hanging tools and heavy objects
JP2022019184A (en) Hanging holder
KR101630134B1 (en) Spreader Bar for Excavator
US20230166649A1 (en) Securing aid and securing structure for article to be transported
JPH0738068U (en) Long steel hoist
JPH07215655A (en) Pallet device
KR20130020382A (en) Hoist jig of bollard
JP3219302U (en) Mobile house hanging
JP2501968Y2 (en) Container lifting device
JP3030175U (en) Attachment and cargo handling vehicle that connects this attachment
JP6565647B2 (en) Hanging jig for slinging
CN205442385U (en) A hoisting structure for large -scale article
JP2001335297A (en) Metal hanger piece

Legal Events

Date Code Title Description
A625 Written request for application examination (by other person)

Free format text: JAPANESE INTERMEDIATE CODE: A625

Effective date: 20220111

TRDD Decision of grant or rejection written
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20221125

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20221129

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20221222

R150 Certificate of patent or registration of utility model

Ref document number: 7201629

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313111

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350