JP6565647B2 - Hanging jig for slinging - Google Patents

Hanging jig for slinging Download PDF

Info

Publication number
JP6565647B2
JP6565647B2 JP2015238304A JP2015238304A JP6565647B2 JP 6565647 B2 JP6565647 B2 JP 6565647B2 JP 2015238304 A JP2015238304 A JP 2015238304A JP 2015238304 A JP2015238304 A JP 2015238304A JP 6565647 B2 JP6565647 B2 JP 6565647B2
Authority
JP
Japan
Prior art keywords
ring
hanging
support portion
tip
slinging
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP2015238304A
Other languages
Japanese (ja)
Other versions
JP2017105554A (en
Inventor
敏文 山上
敏文 山上
一廣 佐久間
一廣 佐久間
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Original Assignee
Nippon Steel Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp filed Critical Nippon Steel Corp
Priority to JP2015238304A priority Critical patent/JP6565647B2/en
Publication of JP2017105554A publication Critical patent/JP2017105554A/en
Application granted granted Critical
Publication of JP6565647B2 publication Critical patent/JP6565647B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Description

本発明は、玉掛け用吊り治具に関するものであり、2つの吊りワイヤを用いる玉掛け作業時に、作業者が接触することなくクレーンフックの着脱を円滑に行うことができる玉掛け用吊り治具に関するものである。   The present invention relates to a hanging jig for slinging, and relates to a slinging jig for slinging that allows a crane hook to be attached and detached smoothly without contact by an operator during a slinging operation using two hanging wires. is there.

鉄鋼製品等の製造を行う現場では、重量物の搬送が行われている。搬送される重量物としては、鉄鋼製品だけでなく、例えばスパイラル鋼管の成形スタンドなどの製造機器も含まれる。このような重量物をクレーンで搬送する際、重量物の形状が単純であれば1点吊りが採用されるが、複雑な形状のものは多点吊りで吊り上げることになる。多点吊りの玉掛け作業は、重量物の重心出しなど手間のかかる作業となる。   At the site where steel products are manufactured, heavy objects are transported. The heavy objects to be conveyed include not only steel products but also manufacturing equipment such as spiral steel pipe forming stands. When transporting such a heavy object with a crane, if the shape of the heavy object is simple, one-point suspension is adopted, but a complicated shape is suspended by multi-point suspension. Multi-point hanging sling work is time-consuming work such as raising the center of gravity of heavy objects.

特許文献1には、危険な玉掛け作業を要することなくフックに簡単に掛け止める工事用敷鉄板が開示されているが、玉掛け用吊り治具の構成は開示されていない。   Patent Document 1 discloses a construction iron plate that can be easily hooked to a hook without requiring a dangerous slinging work, but does not disclose the configuration of a sling hanging jig.

また、例えば特許文献2や特許文献3には、2つの吊りワイヤを用いて吊り荷を運搬する際の玉掛け用吊り治具が開示されている。特許文献2は、フックを運搬物に引掛けると、バネまたはゴムが引っ張られて伸びるためにフックが運搬物から外れることなく運搬物が持ち上がるものである。また、特許文献3は、吊りフレームに過大な応力が作用するのを抑制し、吊りフレームの軽量化を図るものである。   Further, for example, Patent Document 2 and Patent Document 3 disclose a hanging jig for slinging when carrying a suspended load using two hanging wires. In Patent Document 2, when a hook is hooked on a transported object, a spring or rubber is pulled and stretched, so that the transported object is lifted without the hook being detached from the transported object. Further, Patent Document 3 is intended to suppress the application of excessive stress to the suspension frame and reduce the weight of the suspension frame.

特開平10−245805号公報JP-A-10-245805 特開平7−215656号公報JP 7-215656 A 特開2014−73908号公報JP 2014-73908 A

しかしながら、上記特許文献2、3による玉掛け作業では、吊りワイヤをクレーンフックに取り付ける際は、手作業で行う必要がある。   However, in the slinging work according to Patent Documents 2 and 3, when attaching the hanging wire to the crane hook, it is necessary to perform it manually.

搬送物が重量物である場合、それを搬送するための吊り具もまた重量物である。例えばスパイラル鋼管の成形スタンドを造管工程へと搬送する際、搬送用の吊具として、成形スタンドの構造に合わせて吊具を2つ使用することがあるが、この吊りワイヤのリングやクレーンフックは、それぞれの重量が例えば20kg以上であり、これらを持ち上げて手作業で玉掛けするのは、極めて重労働である。   When the conveyed product is heavy, the lifting tool for conveying it is also heavy. For example, when transporting a forming stand of a spiral steel pipe to the pipe making process, two suspension tools may be used as a suspension for transportation in accordance with the structure of the forming stand. Each of them has a weight of, for example, 20 kg or more, and it is very hard work to lift them and hang them manually.

本発明は以上のような問題点に鑑みてなされたものであり、多点吊りの玉掛け作業時に、作業者が吊りワイヤに直接触れることなく、吊りワイヤへのクレーンフックの着脱を円滑に行うことができる玉掛け用吊り治具を提供することを目的とする。   The present invention has been made in view of the above-described problems, and smoothly attaches / detaches a crane hook to / from a hanging wire without the operator directly touching the hanging wire during a multi-point hanging slinging operation. An object of the present invention is to provide a hanging jig for slinging.

上記問題を解決するため、本発明は、2つの吊りワイヤを同時にクレーンフックに玉掛けする際に用いる玉掛け用吊り治具であって、床面上に立てられた2本の平行な支柱を有し、これら2本の平行な支柱には、前方に互いに平行に突出するアーム部がそれぞれ取り付けられ、前記2本の平行な支柱の間および前記各アーム部の間に、クレーンフックを通過させる通過空間を形成し、前記アーム部の上面を、先にクレーンフックに玉掛けされる第一の吊りワイヤの先端のリングを支持する第一の支持部とし、前記支柱の前面を、後からクレーンフックに玉掛けされる第二の吊りワイヤの先端のリングを支持する第二の支持部とした、玉掛け用吊り治具を提供する。   In order to solve the above problems, the present invention is a slinging jig used when slung two hanging wires on a crane hook at the same time, and has two parallel struts standing on a floor surface. These two parallel struts are each attached with an arm portion projecting forward in parallel with each other, and a passing space through which a crane hook passes between the two parallel struts and between each arm portion. The upper surface of the arm portion is a first support portion that supports the ring at the tip of the first hanging wire that is previously slung on the crane hook, and the front surface of the column is slung on the crane hook later A suspending jig for hanging is provided as a second support portion that supports a ring at the tip of a second suspension wire.

上記玉掛け用吊り治具において、前記第一の支持部に支持されたリングの上端は、前記第二の支持部に支持されたリングの上端よりも下方に位置することが好ましい。   In the above hanging jig for hanging, it is preferable that an upper end of the ring supported by the first support portion is positioned below an upper end of the ring supported by the second support portion.

また、前記第一の支持部には、前記第一の吊りワイヤの先端のリングの幅方向位置をガイドするガイド板が設けられていてもよい。その場合、前記ガイド板は、前記各アーム部にそれぞれ取り付けられ、下方から上方に向けて、前記ガイド板同士の間隔が広がるようにしてもよい。さらに、前記ガイド板に、前記第一の支持部に支持されたリングの前記支柱側への位置ずれを防ぐ押さえ部材が設けられていてもよい。   The first support portion may be provided with a guide plate that guides the position in the width direction of the ring at the tip of the first suspension wire. In this case, the guide plates may be attached to the arm portions, respectively, so that the distance between the guide plates increases from the bottom to the top. Furthermore, the guide plate may be provided with a pressing member that prevents displacement of the ring supported by the first support portion toward the support column.

また、前記第二の支持部には、前記第二の吊りワイヤの先端のリングのねじれを防ぐ押さえ部材が設けられていてもよい。   The second support portion may be provided with a pressing member that prevents twisting of the ring at the tip of the second suspension wire.

前記2つの吊りワイヤは、スパイラル鋼管の成形スタンドを搬送するものであってもよい。また、前記第一の吊りワイヤの先端のリングは弾性を有しない硬質材料からなり、前記第二の吊りワイヤの先端のリングは弾性を有してもよい。   The two hanging wires may convey a spiral steel pipe forming stand. The ring at the tip of the first hanging wire may be made of a hard material that does not have elasticity, and the ring at the tip of the second hanging wire may have elasticity.

本発明によれば、重量物等の玉掛け作業において、2つの吊りワイヤに直接触れることなく、吊りワイヤへのクレーンフックの着脱を円滑に行うことができ、玉掛け作業員の負担を大幅に軽減することができる。   According to the present invention, it is possible to smoothly attach and detach the crane hook to and from the hanging wire without directly touching the two hanging wires in the hanging operation of a heavy object or the like, and greatly reduce the burden on the slinging worker. be able to.

本発明の実施形態にかかる玉掛け用吊り治具の例を示す斜視図である。It is a perspective view which shows the example of the hanging jig | tool for slinging concerning embodiment of this invention. 図1に示す玉掛け用吊り治具の第一の支持部に第一リングが保持された状態を上から見た図である。It is the figure which looked at the state by which the 1st ring was hold | maintained at the 1st support part of the hanging jig for sling shown in FIG. 1 from the top. 図1に示す玉掛け用吊り治具の第二の支持部に第二リングが保持された状態を正面から見た図である。It is the figure which looked at the state where the 2nd ring was hold | maintained at the 2nd support part of the hanging jig for sling shown in FIG. 1 from the front. 図1に示す玉掛け用吊り治具を用いた玉掛け作業の最初の工程を示す斜視図である。It is a perspective view which shows the first process of the slinging operation | work using the slinging jig for slinging shown in FIG. 図4に続く工程を示す斜視図である。FIG. 5 is a perspective view illustrating a process following FIG. 4. 図5に続く工程を示す斜視図である。FIG. 6 is a perspective view illustrating a process following FIG. 5.

以下、本発明の実施の形態を、図を参照して説明する。   Hereinafter, embodiments of the present invention will be described with reference to the drawings.

図1は、本発明の実施形態にかかる玉掛け用吊り治具1の一例であり、例えばスパイラル鋼管の成形スタンドを搬送する際の玉掛け作業時に使用される。   FIG. 1 is an example of a slinging jig 1 for slinging according to an embodiment of the present invention, and is used, for example, during slinging when a spiral steel pipe forming stand is conveyed.

玉掛け用吊り治具1は、床面上に略鉛直方向に立てられた2本の平行な支柱11、11と、これらの支柱11、11にそれぞれ取り付けられたアーム部12、12を有する。アーム部12、12は、例えば溶接等により支柱11、11に接合され、支柱11、11から前方に突出し、かつ互いに平行である。2本の支柱11、11の間、および各アーム部12、12の間には、クレーンフックが自由に通過可能な空間10が形成されている。支柱11、11間の距離は、使用するクレーンフックのサイズに応じて設定されるが、安定してクレーンフックが通過できるようにするためには、例えばクレーンフックの最大幅の1.2倍以上とすることが好ましい。支柱11、11は、例えば床面にアンカ等で固定されたプレートに接合され、転倒等を防止するように設置される。支柱11やアーム部12の材質およびサイズは、重量物用の吊りワイヤやクレーンフックに対して十分な機械的強度を有するように決定される。なお、本明細書において、支柱11に対してアーム部12が取り付けられている方を前方、水平方向において前後方向と直交する方向を幅方向と称する。   The sling hanging jig 1 has two parallel support pillars 11 and 11 erected on a floor surface in a substantially vertical direction, and arm portions 12 and 12 attached to the support pillars 11 and 11, respectively. The arm parts 12 and 12 are joined to the support pillars 11 and 11 by, for example, welding or the like, project forward from the support pillars 11 and 11, and are parallel to each other. A space 10 through which a crane hook can freely pass is formed between the two struts 11 and 11 and between the arm portions 12 and 12. The distance between the columns 11 and 11 is set according to the size of the crane hook to be used. In order to allow the crane hook to pass stably, for example, 1.2 times or more of the maximum width of the crane hook. It is preferable that The support columns 11 and 11 are joined to a plate fixed to the floor surface with an anchor or the like, for example, and are installed so as to prevent falling or the like. The material and size of the column 11 and the arm portion 12 are determined so as to have sufficient mechanical strength with respect to a heavy wire hanging wire or a crane hook. In this specification, the direction in which the arm portion 12 is attached to the column 11 is referred to as the front, and the direction orthogonal to the front-rear direction in the horizontal direction is referred to as the width direction.

アーム部12は、図1に示すように側面形状が略V字状であり、アーム部12の上面が、先にクレーンフックに玉掛けされる第一の吊りワイヤ21の先端のリング(以下、第一リング23と称する)を支持する第一の支持部13となる。また、支柱11の前面すなわちアーム部12が取り付けられている側の面が、後からクレーンフックに玉掛けされる第二の吊りワイヤ22の先端のリング(以下、第二リング24と称する)を支持する第二の支持部14となる。クレーンフックを各リングに玉掛けして吊りあげる際には、クレーンフックを斜め上方向へ動かすことにより、2つのリングを順次、円滑に玉掛けすることができる。そのため、第一リング23および第二リング24が、それぞれ第一の支持部13、第二の支持部14に支持されたときに、第一リング23の上端よりも第二リング24の上端の位置を高くする必要がある。したがって、各リング23、24の寸法に応じてこの条件を満たすように、アーム部12を取り付ける位置やアーム部12の形状が決定される。   As shown in FIG. 1, the arm portion 12 has a substantially V-shaped side surface, and the upper surface of the arm portion 12 has a ring (hereinafter referred to as a first ring) at the tip of a first hanging wire 21 that is previously slung on a crane hook. This is the first support portion 13 that supports a single ring 23). Further, the front surface of the support column 11, that is, the surface on which the arm portion 12 is attached, supports a ring (hereinafter referred to as a second ring 24) at the tip of the second suspension wire 22 that is subsequently slung on the crane hook. It becomes the 2nd support part 14 to do. When hanging the crane hook on each ring, the two rings can be slung smoothly one after another by moving the crane hook obliquely upward. Therefore, when the 1st ring 23 and the 2nd ring 24 are each supported by the 1st support part 13 and the 2nd support part 14, the position of the upper end of the 2nd ring 24 rather than the upper end of the 1st ring 23 Need to be high. Therefore, the position where the arm portion 12 is attached and the shape of the arm portion 12 are determined so as to satisfy this condition according to the dimensions of the rings 23 and 24.

図2は、第一リング23が第一の支持部13に保持されている状態を上方から見た図である。図1および図2に示すように、第一の支持部13には、ガイド板15および第一リング押さえ部材16が、各アーム部12、12にそれぞれ設けられている。ガイド板15は、各アーム部12、12の幅方向外側付近に取り付けられ、第一リング23の幅方向の位置ずれを抑制して所定範囲内に保持するとともに、第一リング23をクレーンフックから外す際には、第一リング23を第一の支持部13に誘導する役割をする。左右のガイド板15、15同士の間隔は、クレーン運転者の技術に応じて適宜決めればよく、運転者の熟練度が高い場合には、第一リング23の最大幅よりもわずかに大きければよい。ただし、第一リング23をクレーンフックから外す際の操作を容易にするために、アーム部12に固定されたガイド板15の下端から上端に向けて、対向するガイド板15同士の間隔が広がるようにすることが好ましい。第一リング押さえ部材16は、各ガイド板15の、対向する面の支柱11寄りの位置に、突起状に設けられている。第一リング押さえ部材16は、第一の吊りワイヤ21の曲げモーメント等により支柱11側に引っ張られる第一リング23を、第一の支持部13内に保持するために設けられる。   FIG. 2 is a view of the state in which the first ring 23 is held by the first support portion 13 as viewed from above. As shown in FIGS. 1 and 2, the first support portion 13 is provided with a guide plate 15 and a first ring pressing member 16 in each of the arm portions 12 and 12, respectively. The guide plate 15 is attached in the vicinity of the outer side in the width direction of each of the arm portions 12 and 12 and suppresses the positional deviation of the first ring 23 in the width direction and holds it within a predetermined range. When removing, it plays a role of guiding the first ring 23 to the first support portion 13. The distance between the left and right guide plates 15 and 15 may be appropriately determined according to the skill of the crane operator, and may be slightly larger than the maximum width of the first ring 23 when the skill level of the operator is high. . However, in order to facilitate the operation when removing the first ring 23 from the crane hook, the distance between the opposing guide plates 15 increases from the lower end to the upper end of the guide plate 15 fixed to the arm portion 12. It is preferable to make it. The first ring pressing member 16 is provided in a protruding shape at a position of each guide plate 15 near the column 11 on the opposing surface. The first ring pressing member 16 is provided to hold the first ring 23 that is pulled toward the support column 11 by the bending moment of the first suspension wire 21 in the first support portion 13.

また、図3は、第二リング24が第二の支持部14に保持されている状態を正面から見た図である。図1および図3に示すように、第二の支持部14には、2本の支柱11、11間に第二リング押さえ部材17が設けられている。第二リング押さえ部材17は、例えば支柱11、11間に水平方向に架設された横材からなる。第二リング押さえ部材17は、第二リング24が支柱11の後方すなわちアーム部12の反対側に不均一な力で押しつけられて第二リング24がねじれたり第二の支持部14から外れたりするのを防止するものである。   FIG. 3 is a front view of the state in which the second ring 24 is held by the second support portion 14. As shown in FIGS. 1 and 3, the second support portion 14 is provided with a second ring pressing member 17 between the two columns 11, 11. The second ring pressing member 17 is made of, for example, a cross member laid in the horizontal direction between the columns 11 and 11. In the second ring pressing member 17, the second ring 24 is pressed against the rear side of the support 11, that is, on the opposite side of the arm portion 12 with a non-uniform force, so that the second ring 24 is twisted or detached from the second support portion 14. This is to prevent this.

以下、本発明の実施形態にかかる玉掛け用吊り治具1を用いたクレーン玉掛け作業の手順を説明する。   Hereinafter, the procedure of the crane slinging operation using the sling hanging jig 1 according to the embodiment of the present invention will be described.

図4〜図6は、上述の玉掛け用吊り治具1を用いて、2つの吊りワイヤをクレーンフックに取り付ける状態を示す。   FIGS. 4-6 shows the state which attaches two hanging wires to a crane hook using the above-mentioned sling hanging jig 1. FIG.

先ず、図4に示すように、2つの吊りワイヤ21、22の各リング(第一リング23および第二リング24)を、玉掛け用吊り治具1の第一の支持部13および第二の支持部14にそれぞれセットする。本実施形態においては、第一リング23は、例えば2本のワイヤからなる吊りワイヤ21が接続された鉄製等の硬質材料からなるリングであり、第二リング24は、例えば弾性を有するワイヤ製のリングである。また、第一リング23および第二リング24の最大幅は、玉掛け用吊り治具1の支柱11、11同士の間隔よりも僅かに大きい。第一リング23はアーム部12の先端側に載置され、ガイド板15によって幅方向の位置ずれを防ぎ、第一リング押さえ部材16によって前後方向の位置ずれを防いで、第一の支持部13の所定位置に支持されている。また、第二リング24は支柱11、11およびアーム部12、12の基端側に囲まれ、第二リング押さえ部材17によってねじれたり支柱11の後方に外れたりするのを防いで、第二の支持部14に支持されている。そして、第二リング24の上端は、第一リング23の上端よりも高い位置に支持されている。   First, as shown in FIG. 4, the rings (first ring 23 and second ring 24) of the two suspension wires 21 and 22 are connected to the first support portion 13 and the second support of the hanging jig 1 for slinging. Set in each part 14. In the present embodiment, the first ring 23 is a ring made of a hard material such as iron to which, for example, a suspension wire 21 made of two wires is connected, and the second ring 24 is made of a wire having elasticity, for example. It is a ring. Further, the maximum width of the first ring 23 and the second ring 24 is slightly larger than the interval between the columns 11 and 11 of the sling hanging jig 1. The first ring 23 is placed on the distal end side of the arm portion 12, the position shift in the width direction is prevented by the guide plate 15, and the position shift in the front-rear direction is prevented by the first ring pressing member 16. Are supported at predetermined positions. The second ring 24 is surrounded by the base end sides of the support columns 11 and 11 and the arm portions 12 and 12, and prevents the second ring pressing member 17 from twisting or detaching to the rear of the support column 11. It is supported by the support part 14. The upper end of the second ring 24 is supported at a position higher than the upper end of the first ring 23.

この状態でクレーンを操縦し、図4に示すように、クレーンフック31を、玉掛け用吊り治具1の前方の、先に玉掛けされる第一リング23の斜め下方に配置させる。そして、クレーンフック31を斜め上方に移動し、第一リング23を掛ける(図5)。クレーンフック31が第一リング23を掛けた状態でさらに斜め上方に移動することで、第一の支持部13に載置されていた第一リング23の向きが起こされ、第二リング24と略平行になる。続いて、後で玉掛けされる第二リング24を掛ける(図6)。その後、二本の吊りワイヤ21、22によって成形スタンド等の運搬物が吊り上げられ、運搬される。   In this state, the crane is operated, and as shown in FIG. 4, the crane hook 31 is disposed in front of the slinging jig 1 for slinging and below the first ring 23 that is slung first. Then, the crane hook 31 is moved obliquely upward and the first ring 23 is hung (FIG. 5). By moving the crane hook 31 further obliquely upward with the first ring 23 being hung, the direction of the first ring 23 placed on the first support portion 13 is raised, which is substantially the same as the second ring 24. Become parallel. Subsequently, the second ring 24 to be slung later is hung (FIG. 6). Thereafter, a transported object such as a molding stand is lifted and transported by the two suspension wires 21 and 22.

第一リング23および第二リング24をクレーンフック31から外す際には、クレーンを操作してクレーンフック31を玉掛け用吊り治具1の上方に配置させ、クレーンフック31を、取り付け時とは逆の斜め下方に移動させることにより、第二リング24および第一リング23が順次、元の位置に保持される。したがって、それぞれの吊りワイヤ21、22に次の運搬物を取り付ければ、そのまま次の玉掛け作業を行うことができる。このようにして、吊り上げ時には円滑に2つのリングをクレーンフック31に掛け、取り外す際には2つのリングを所定の位置に戻すことができる。   When removing the first ring 23 and the second ring 24 from the crane hook 31, the crane is operated to place the crane hook 31 above the slinging jig 1 for slinging, and the crane hook 31 is opposite to that at the time of attachment. The second ring 24 and the first ring 23 are sequentially held in their original positions by being moved obliquely downward. Therefore, if the next transported item is attached to each of the suspension wires 21 and 22, the next slinging operation can be performed as it is. In this way, the two rings can be smoothly hung on the crane hook 31 when lifted, and the two rings can be returned to a predetermined position when removed.

以上のように、本発明によれば、重量物または長尺物等の玉掛け作業において、作業者が直接吊りワイヤやクレーンフックに触れることなく、クレーン操作のみによって、2つの吊りワイヤを同時にクレーンフックに着脱することができる。したがって、玉掛け作業者の労力を大幅に低減するとともに、少ない人数で作業を行うことができる。   As described above, according to the present invention, in hanging work such as heavy objects or long objects, the operator does not directly touch the suspension wire or the crane hook, and the two suspension wires are simultaneously connected to the crane hook only by the crane operation. It can be attached and detached. Therefore, the labor of the slinging worker can be greatly reduced and the work can be performed by a small number of people.

以上、本発明の好適な実施形態について説明したが、本発明はかかる例に限定されない。当業者であれば、特許請求の範囲に記載された技術的思想の範疇内において、各種の変更例または修正例に想到しうることは明らかであり、それらについても当然に本発明の技術的範囲に属するものと了解される。   As mentioned above, although preferred embodiment of this invention was described, this invention is not limited to this example. It is obvious for those skilled in the art that various changes or modifications can be conceived within the scope of the technical idea described in the claims. It is understood that it belongs to.

本発明は、鉄鋼関連の重量物のみならず、あらゆる重量物や長尺物を2つの吊りワイヤで吊り上げる際の玉掛け用吊り治具として適用できる。   The present invention can be applied as a slinging jig for hanging not only steel-related heavy objects but also all heavy objects and long objects with two suspension wires.

1 玉掛け用吊り治具
10 空間
11 支柱
12 アーム部
13 第一の支持部
14 第二の支持部
15 ガイド板
16 第一リング押さえ部材
17 第二リング押さえ部材
21 第一の吊りワイヤ
22 第二の吊りワイヤ
23 第一リング
24 第二リング
31 クレーンフック
DESCRIPTION OF SYMBOLS 1 Hanging hang | hanging jig | tool 10 Space 11 Support | pillar 12 Arm part 13 First support part 14 Second support part 15 Guide plate 16 First ring pressing member 17 Second ring pressing member 21 First hanging wire 22 Second Hanging wire 23 First ring 24 Second ring 31 Crane hook

Claims (8)

2つの吊りワイヤを同時にクレーンフックに玉掛けする際に用いる玉掛け用吊り治具であって、
床面上に立てられた2本の平行な支柱を有し、
これら2本の平行な支柱には、前方に互いに平行に突出するアーム部がそれぞれ取り付けられ、
前記2本の平行な支柱の間および前記各アーム部の間に、クレーンフックを通過させる通過空間を形成し、
前記アーム部の上面を、先にクレーンフックに玉掛けされる第一の吊りワイヤの先端のリングを支持する第一の支持部とし、
前記支柱の前面を、後からクレーンフックに玉掛けされる第二の吊りワイヤの先端のリングを支持する第二の支持部とした、玉掛け用吊り治具。
A hanging jig used to hang two hanging wires on a crane hook at the same time,
It has two parallel struts standing on the floor,
These two parallel struts are each attached with an arm portion projecting forward in parallel with each other,
Forming a passage space through which a crane hook passes between the two parallel struts and between the arm portions;
The upper surface of the arm portion is a first support portion that supports the ring at the tip of the first hanging wire that is first slung on the crane hook,
A slinging jig that uses the front surface of the support as a second support part that supports a ring at the tip of a second hanging wire that is slung on a crane hook later.
前記第一の支持部に支持されたリングの上端は、前記第二の支持部に支持されたリングの上端よりも下方に位置する、請求項1に記載の玉掛け用吊り治具。   2. The sling hanging jig according to claim 1, wherein an upper end of the ring supported by the first support portion is positioned below an upper end of the ring supported by the second support portion. 前記第一の支持部には、前記第一の吊りワイヤの先端のリングの幅方向位置をガイドするガイド板が設けられている、請求項1または2に記載の玉掛け用吊り治具。   The sling hanging jig according to claim 1 or 2, wherein the first support portion is provided with a guide plate for guiding a position in a width direction of a ring at a tip of the first hanging wire. 前記ガイド板は、前記各アーム部にそれぞれ取り付けられ、下方から上方に向けて、前記ガイド板同士の間隔が広がる、請求項3に記載の玉掛け用吊り治具。   4. The sling hanging jig according to claim 3, wherein the guide plates are attached to the respective arm portions, and the distance between the guide plates is increased from below to above. 前記ガイド板に、前記第一の支持部に支持されたリングの前記支柱側への位置ずれを防ぐ押さえ部材が設けられている、請求項3または4に記載の玉掛け用吊り治具。   5. The sling hanging jig according to claim 3, wherein the guide plate is provided with a pressing member that prevents displacement of the ring supported by the first support portion toward the support column. 前記第二の支持部には、前記第二の吊りワイヤの先端のリングのねじれを防ぐ押さえ部材が設けられている、請求項1〜5のいずれか一項に記載の玉掛け用吊り治具。   The sling hanging jig according to any one of claims 1 to 5, wherein a pressing member that prevents twisting of a ring at a tip of the second hanging wire is provided on the second support portion. 前記2つの吊りワイヤは、スパイラル鋼管の成形スタンドを搬送するものである、請求項1〜6のいずれか一項に記載の玉掛け用吊り治具。   The suspending jig for slinging according to any one of claims 1 to 6, wherein the two suspending wires convey a forming stand of a spiral steel pipe. 前記第一の吊りワイヤの先端のリングは弾性を有しない硬質材料からなり、前記第二の吊りワイヤの先端のリングは弾性を有する、請求項1〜7のいずれか一項に記載の玉掛け用吊り治具。   The ring at the tip of the first hanging wire is made of a hard material having no elasticity, and the ring at the tip of the second hanging wire is elastic, according to any one of claims 1 to 7. Hanging jig.
JP2015238304A 2015-12-07 2015-12-07 Hanging jig for slinging Expired - Fee Related JP6565647B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015238304A JP6565647B2 (en) 2015-12-07 2015-12-07 Hanging jig for slinging

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015238304A JP6565647B2 (en) 2015-12-07 2015-12-07 Hanging jig for slinging

Publications (2)

Publication Number Publication Date
JP2017105554A JP2017105554A (en) 2017-06-15
JP6565647B2 true JP6565647B2 (en) 2019-08-28

Family

ID=59058786

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015238304A Expired - Fee Related JP6565647B2 (en) 2015-12-07 2015-12-07 Hanging jig for slinging

Country Status (1)

Country Link
JP (1) JP6565647B2 (en)

Also Published As

Publication number Publication date
JP2017105554A (en) 2017-06-15

Similar Documents

Publication Publication Date Title
JP2015083511A (en) Heavy object transport method and heavy object transport apparatus
JP6207789B1 (en) Floor construction method, floor slab unit lifting device, and floor slab unit lifting device
CN205998851U (en) A kind of prefabricated panel multipoint hoisting device
CN201864452U (en) Mechanically-controlled lifting device for ring piece
CN102476776B (en) Ring lifting tool with function of mechanical control
JP2015006935A (en) Hoisting tool
JP6565647B2 (en) Hanging jig for slinging
JP6739240B2 (en) Lifting member and lifting device
CN204434069U (en) Suspender
KR20130006716U (en) Jig for big pipe transporting
CN205820693U (en) Multiple degrees of freedom steel ingot demoulding sling
CN211521340U (en) Lifting appliance for preventing hanging basket from falling off
CN107445048A (en) Material frame semi-automatic extraction fixture
CN202414964U (en) Travelling crane hoisting auxiliary device
JP2010235220A (en) Method of transporting long object
JP2007308289A (en) Block lifting method and device
JP2019182643A (en) Hanging tool and transportation method of heavy load
JP6130584B1 (en) Hanging adapter
CN108358035A (en) A kind of coiled material hanging tool
KR20130024455A (en) Jig for welder transport
JP2019167762A (en) Column reinforcement hanging jig
JP2007070083A (en) Hoisting method and device of block
CN102029329B (en) Electrically-controlled blanking device of large-sized stamping part
CN212050147U (en) Porous type balance hanger template
CN203582276U (en) Lifting bracket

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180803

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20190605

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190620

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190702

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190715

R151 Written notification of patent or utility model registration

Ref document number: 6565647

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151

LAPS Cancellation because of no payment of annual fees