JPS61157581U - - Google Patents
Info
- Publication number
- JPS61157581U JPS61157581U JP4204885U JP4204885U JPS61157581U JP S61157581 U JPS61157581 U JP S61157581U JP 4204885 U JP4204885 U JP 4204885U JP 4204885 U JP4204885 U JP 4204885U JP S61157581 U JPS61157581 U JP S61157581U
- Authority
- JP
- Japan
- Prior art keywords
- hanging
- rotating shaft
- pairs
- blocks
- latch
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 230000007246 mechanism Effects 0.000 claims description 8
Description
図面はこの考案の一実施例を示すもので、第1
図は連結枠機構と吊具との関係構造を示す斜視図
、第2図は吊具と連結ブロツク案内支承機構との
関係構造を示す斜視図、第3図はブロツクの縦断
面図及び平面図である。
Aは連結枠機構、Bは吊具、Cは連結ブロツク
案内支承機構、1は吊枠、4は回転軸、5は駆動
機構、7はラツチ、10はブロツク、11は吊帯
、12はラツチ係合孔、16はガイド支柱、17
は縦溝、18はスリツト、19はばね。
The drawing shows one embodiment of this invention.
The figure is a perspective view showing the relationship between the connecting frame mechanism and the hanging tool, Figure 2 is a perspective view showing the relationship between the hanging tool and the connecting block guide and support mechanism, and Figure 3 is a vertical sectional view and a plan view of the block. It is. A is a connecting frame mechanism, B is a hanging tool, C is a connecting block guide support mechanism, 1 is a hanging frame, 4 is a rotating shaft, 5 is a drive mechanism, 7 is a latch, 10 is a block, 11 is a sling, 12 is a latch Engagement hole, 16 is a guide column, 17
18 is a vertical groove, 18 is a slit, and 19 is a spring.
Claims (1)
ラツチを固定した回動軸とこの回動軸を同期して
回動動作させる駆動機構を備えた連結枠機構、吊
帯をもつて結ばれしかも上記ラツチを嵌入係合さ
せる孔を設けた2個一対をなす2組のブロツクか
らなる吊具、この吊具の上記ブロツクを収嵌させ
る縦溝と吊帯を通すスリツト及び内底部にばねを
収設してなる2個一対をなす2組の連結ブロツク
案内支承機構によつて構成されていることを特徴
とする管棒材料の荷役装置。 A connecting frame mechanism that is attached vertically to both ends of the hanging frame and has a rotating shaft with a latch fixed to the lower end and a drive mechanism that rotates the rotating shaft in synchronization, and is connected with a hanging strap. Moreover, the hanging tool consists of two pairs of blocks each having a hole for fitting and engaging the latch, a vertical groove in which the blocks are fitted, a slit through which the strap passes, and a spring in the inner bottom. 1. A cargo handling device for tube and rod materials, characterized in that it is constituted by two sets of connecting block guide and support mechanisms arranged in pairs.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4204885U JPS61157581U (en) | 1985-03-22 | 1985-03-22 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP4204885U JPS61157581U (en) | 1985-03-22 | 1985-03-22 |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS61157581U true JPS61157581U (en) | 1986-09-30 |
Family
ID=30552433
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP4204885U Pending JPS61157581U (en) | 1985-03-22 | 1985-03-22 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS61157581U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2021127222A (en) * | 2020-02-14 | 2021-09-02 | 株式会社三井E&Sマシナリー | Balance for cargo handling and cargo handling method |
-
1985
- 1985-03-22 JP JP4204885U patent/JPS61157581U/ja active Pending
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2021127222A (en) * | 2020-02-14 | 2021-09-02 | 株式会社三井E&Sマシナリー | Balance for cargo handling and cargo handling method |