JP2021117710A - Management system and method - Google Patents

Management system and method Download PDF

Info

Publication number
JP2021117710A
JP2021117710A JP2020010384A JP2020010384A JP2021117710A JP 2021117710 A JP2021117710 A JP 2021117710A JP 2020010384 A JP2020010384 A JP 2020010384A JP 2020010384 A JP2020010384 A JP 2020010384A JP 2021117710 A JP2021117710 A JP 2021117710A
Authority
JP
Japan
Prior art keywords
worker
area
input
motivation
mental
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2020010384A
Other languages
Japanese (ja)
Other versions
JP7344139B2 (en
Inventor
翔太 大藪
Shota Oyabu
翔太 大藪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Solutions Ltd
Original Assignee
Hitachi Solutions Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Solutions Ltd filed Critical Hitachi Solutions Ltd
Priority to JP2020010384A priority Critical patent/JP7344139B2/en
Publication of JP2021117710A publication Critical patent/JP2021117710A/en
Application granted granted Critical
Publication of JP7344139B2 publication Critical patent/JP7344139B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

To provide a management system and a method, which enable the management of labor without imposing a heavy burden on workers.SOLUTION: In a management system in which a management server and multiple clients are connected via a network, the management server has an information collection unit configured to generate screen data for displaying a screen including a work result display area that time-sequentially displays work contents of each hour performed by a worker and a motivation input area that enables the worker to draw and input time transition of his/her mental and physical conditions caused by the work contents, and an index calculation unit configured to calculate an index indicating the mental and physical conditions of the worker for each hour based on information indicating the time transition of the mental and physical conditions drawn and input in the motivation input area.SELECTED DRAWING: Figure 1

Description

本発明は、労働者の労働を管理する技術に関する。 The present invention relates to a technique for managing the labor of workers.

近年、企業等ではそこで働く労働者の日々の労働の管理が重要となっている。それに伴い、労働を管理するための管理システムが提案されている。例えば、管理システムにおいて、労働者の日々の出退勤時刻をタイムカード等によって記録するとともに、労働者が勤務時間内に行った時間帯毎の作業内容を労働者の申告によって記録する。管理システムは、記録された情報を利用して、各労働者が健康で効率よく働けるように労働の管理を行う。更に詳細な労働者の情報を取得する管理システムも提案されている(特許文献1参照)。特許文献1には、従業者の健康管理を目的とするシステムが開示されている。 In recent years, it has become important for companies and the like to manage the daily labor of the workers who work there. Along with this, a management system for managing labor has been proposed. For example, in a management system, a worker's daily attendance and departure times are recorded by a time card or the like, and the work contents of each time zone performed by the worker during the working hours are recorded by the worker's declaration. The management system uses the recorded information to manage labor so that each worker can work in good health and efficiency. A management system for acquiring more detailed worker information has also been proposed (see Patent Document 1). Patent Document 1 discloses a system for the purpose of employee health management.

特許文献1に開示されたシステムは、健康管理データサーバと、職場従業員端末と、健康管理部門端末とを有している。健康管理データサーバは、収集した入退場情報や勤務情報に基づいて、長時間勤務者を抽出する。また、健康管理データサーバは、抽出された長時間勤務者の職場従業員端末に、職場従業員にヘルスチェックの実行を指示する指示情報を送信する。指示情報を受信した職場従業員端末では、職場従業員の操作に従ってヘルスチェックを実行してヘルスチェック情報を作成し、健康管理データサーバに送信する。そして、健康管理データサーバは、受信したヘルスチェック情報を、職場従業員に対応付けて健康管理データベースに蓄積する。また、健康管理データサーバは、健康管理部門端末からの要求に応じて、健康管理データベースからヘルスチェック情報を抽出し、健康管理部門端末に送信する。 The system disclosed in Patent Document 1 has a health management data server, a workplace employee terminal, and a health management department terminal. The health management data server extracts long working hours based on the collected entrance / exit information and work information. In addition, the health management data server transmits instruction information instructing the workplace employee to execute the health check to the extracted workplace employee terminal of the long-time worker. The workplace employee terminal that has received the instruction information executes the health check according to the operation of the workplace employee, creates the health check information, and sends it to the health management data server. Then, the health management data server stores the received health check information in the health management database in association with the workplace employees. In addition, the health management data server extracts health check information from the health management database and sends it to the health management department terminal in response to a request from the health management department terminal.

特開2006−243969号公報Japanese Unexamined Patent Publication No. 2006-243969

特許文献1に開示されたシステムでは、長時間勤務者として抽出された従業者が自身のヘルスチェック情報を職場従業員端末から入力する必要がある。管理のための情報を入力する作業は従業者の負担となる。 In the system disclosed in Patent Document 1, an employee extracted as a long-time worker needs to input his / her own health check information from a workplace employee terminal. The task of entering management information is a burden on the employee.

本開示のひとつの目的は、労働者に大きな負担をかけることなく労働の管理を可能にする技術を提供することである。 One object of the present disclosure is to provide a technique that enables labor management without imposing a heavy burden on workers.

本開示のひとつの態様による管理システムは、労働者が行った時間毎の労働内容を時系列に表示する第1領域と、前記労働内容に起因する自身の心身状態の時間遷移を前記労働者に描画入力させるための第2領域とを含む画面を表示するための画面データを生成する情報収集部と、前記第2領域に描画入力された心身状態の時間遷移を示す情報に基づいて、時間毎の前記労働者の心身状態を示す指標を算出する指標算出部と、を有する。 In the management system according to one aspect of the present disclosure, the first area for displaying the hourly work contents performed by the worker in chronological order and the time transition of the physical and mental state of the worker due to the work contents are displayed to the worker. Every hour based on the information collecting unit that generates screen data for displaying the screen including the second area for drawing input and the information indicating the time transition of the mental and physical state drawn and input in the second area. It has an index calculation unit for calculating an index indicating the mental and physical condition of the worker.

本開示のひとつの態様によれば、労働者に大きな負担をかけることなく労働の管理を行うことができる。 According to one aspect of the present disclosure, labor can be managed without imposing a heavy burden on workers.

本実施形態による管理システムの構成を示す図である。It is a figure which shows the structure of the management system by this embodiment. 図1に示した管理サーバの構成を示す図である。It is a figure which shows the structure of the management server shown in FIG. 図1に示したクライアントの構成を示す図である。It is a figure which shows the structure of the client shown in FIG. 図1に示したデータベースの構成を示す図である。It is a figure which shows the structure of the database shown in FIG. 図4に示した人属性テーブルの構成を示す図である。It is a figure which shows the structure of the person attribute table shown in FIG. 図4に示した勤務時間テーブルの構成を示す図である。It is a figure which shows the structure of the working hours table shown in FIG. 図4に示した作業内容テーブルの構成を示す図である。It is a figure which shows the structure of the work content table shown in FIG. 図4に示したモチベーションテーブルの構成を示す図である。It is a figure which shows the structure of the motivation table shown in FIG. 図4に示した負荷係数テーブルの構成を示す図である。It is a figure which shows the structure of the load coefficient table shown in FIG. 図4に示した振り返りメモテーブルの構成を示す図である。It is a figure which shows the structure of the retrospective memo table shown in FIG. 図4に示した集計結果テーブルの構成を示す図である。It is a figure which shows the structure of the aggregation result table shown in FIG. 図1〜図3に示した管理システムにおける労働者の労働を管理する方法を説明するためのフローチャートである。It is a flowchart for demonstrating the method of managing the labor of the worker in the management system shown in FIGS. 1 to 3. 図12に示したステップ101における労働者データ登録処理を説明するためのフローチャートである。It is a flowchart for demonstrating the worker data registration process in step 101 shown in FIG. 図1及び図3に示したクライアントの表示部に表示される労働者用表示画面の一例を示す図である。It is a figure which shows an example of the display screen for workers displayed on the display part of the client shown in FIGS. 1 and 3. 図12に示したステップ102における労働者状態表示処理を説明するためのフローチャートである。It is a flowchart for demonstrating the worker state display process in step 102 shown in FIG. 図1に示した管理システムにおいて管理者が操作する端末に表示される管理者用表示画面の一例を示す図である。FIG. 5 is a diagram showing an example of an administrator display screen displayed on a terminal operated by an administrator in the management system shown in FIG. 1. 図15に示したステップ304における負荷指数の算出処理を説明するためのフローチャートである。It is a flowchart for demonstrating the calculation process of the load index in step 304 shown in FIG.

以下に、本実施形態の実施の形態について図面を参照して説明する。 Hereinafter, embodiments of this embodiment will be described with reference to the drawings.

図1は、本実施形態による管理システムの構成を示す図である。 FIG. 1 is a diagram showing a configuration of a management system according to the present embodiment.

本形態における管理システムは、労働者の労働と心身状態を管理する情報処理システムであり、図1に示すように、管理サーバ10と、複数のクライアント20−1〜20−nとを有し、クライアント20−1〜20−nがネットワーク90を介して管理サーバ10にアクセス可能に構成されている。 The management system in this embodiment is an information processing system that manages the labor and mental and physical conditions of workers, and has a management server 10 and a plurality of clients 20-1 to 20-n as shown in FIG. Clients 20-1 to 20-n are configured to be able to access the management server 10 via the network 90.

管理サーバ10は、労働者が行った労働に関する情報を入力させる画面を表示するための画面データをクライアント20−1〜20−nにネットワーク90を介して送信し、画面データによって表示された画面にて入力された情報に基づいて労働者の労働内容に起因する心身状態を示す指標を算出する。 The management server 10 transmits screen data for displaying a screen for inputting information about the labor performed by the worker to the clients 20-1 to 20-n via the network 90, and displays the screen data on the screen. Based on the information entered in the above, an index showing the physical and mental condition of the worker due to the work content of the worker is calculated.

図2は、図1に示した管理サーバ10の構成を示す図である。 FIG. 2 is a diagram showing the configuration of the management server 10 shown in FIG.

管理サーバ10は図2に示すように、情報収集部11と、指標算出部12と、送受信部13と、データベース14とを有している。 As shown in FIG. 2, the management server 10 has an information collection unit 11, an index calculation unit 12, a transmission / reception unit 13, and a database 14.

情報収集部11は、労働者が行った労働に関する情報を入力させる画面を表示するための画面データを生成し、この画面データによってクライアント20−1〜20−nに表示された画面を用いて、労働者が行った労働に関する情報を収集する。情報収集部11が生成する画面データは、第1領域と第2領域とを含む画面を表示するためのものである。第1領域は、労働者が行った時間毎の労働内容を時系列に表示する作業実績表示領域であり、第2領域は、労働内容に起因する自身の心身状態の時間遷移を労働者に描画入力させるためのモチベーション入力領域である。すなわち、情報収集部11は、労働者が行った時間毎の労働内容を時系列に表示する第1領域と、労働内容に起因する自身の心身状態の時間遷移を労働者に描画入力させるための第2領域とを含む画面を表示するための画面データを生成し、その画面データによってクライアント20−1〜20−nに表示された画面を用いて、労働者が行った労働に関する情報を収集する。 The information collecting unit 11 generates screen data for displaying a screen for inputting information on the labor performed by the worker, and uses the screen displayed on the clients 20-1 to 20-n by the screen data to display the screen data. Gather information about the work done by workers. The screen data generated by the information collecting unit 11 is for displaying a screen including the first area and the second area. The first area is a work record display area that displays the work contents of each hour performed by the worker in chronological order, and the second area draws the time transition of one's own mental and physical state due to the work contents to the worker. It is a motivation input area for inputting. That is, the information gathering unit 11 causes the worker to draw and input the first area for displaying the hourly work contents performed by the worker in chronological order and the time transition of his / her own mental and physical state due to the work contents. Generate screen data for displaying a screen including the second area, and collect information on the labor performed by the worker using the screen displayed on the clients 20-1 to 20-n based on the screen data. ..

指標算出部12は、情報収集部11にて収集された情報に基づいて、労働者の労働内容に起因する心身状態を示す指標を算出する。具体的には、情報収集部11が生成した画面データによってクライアント20−1〜20−nに表示された画面のモチベーション入力領域に描画入力され、情報収集部11にて収集された心身状態の時間遷移を示す情報に基づいて、時間毎の労働者の心身状態を示す指標を算出する。 The index calculation unit 12 calculates an index indicating the mental and physical condition caused by the labor content of the worker based on the information collected by the information collection unit 11. Specifically, the screen data generated by the information collecting unit 11 is drawn and input to the motivation input area of the screen displayed on the clients 20-1 to 20-n, and the time of the mental and physical state collected by the information collecting unit 11 is obtained. Based on the information indicating the transition, an index indicating the mental and physical condition of the worker for each hour is calculated.

送受信部13は、情報収集部11にて生成された画面データを、管理サーバ10にアクセスしてきたクライアント20−1〜20−nにネットワーク90を介して送信し、送信した画面データによってクライアント20−1〜20−nに表示された画面を用いて、労働者が行った労働に関する情報をネットワーク90を介して受信する。 The transmission / reception unit 13 transmits the screen data generated by the information collection unit 11 to the clients 20-1 to 20-n that have accessed the management server 10 via the network 90, and the transmission / reception unit 13 transmits the screen data to the clients 20-1 to 20-n. Using the screens displayed on 1 to 20-n, information on the labor performed by the worker is received via the network 90.

データベース14には、労働者の属性情報や、情報収集部11にて収集された労働に関する情報や、労働者の心身状態を示す指標を算出するための係数、さらには、その結果が登録されており、その詳細は後述する。 In the database 14, the attribute information of the worker, the information on the labor collected by the information collecting unit 11, the coefficient for calculating the index showing the mental and physical condition of the worker, and the result are registered. The details will be described later.

クライアント20−1〜20−nは、ネットワーク90を介して管理サーバ10にアクセス可能に構成されており、例えば、パーソナルコンピュータであり、スマートフォン等であってもよい。 The clients 20-1 to 20-n are configured to be accessible to the management server 10 via the network 90, and may be, for example, a personal computer, a smartphone, or the like.

図3は、図1に示したクライアント20−1の構成を示す図である。なお、図1に示したクライアント20−2〜20−nの構成についても、図3に示す構成と同様である。 FIG. 3 is a diagram showing the configuration of the client 20-1 shown in FIG. The configurations of the clients 20-2 to 20-n shown in FIG. 1 are the same as those shown in FIG.

クライアント20−1は図3に示すように、表示部21と、入力部22と、送受信部23とを有している。なお、クライアント20−1〜20−nには、その他に音声出力部や電源部等が設けられている場合もあるが、本発明にて直接関係のないものはその図示および説明を省略する。 As shown in FIG. 3, the client 20-1 has a display unit 21, an input unit 22, and a transmission / reception unit 23. In addition, the clients 20-1 to 20-n may be provided with an audio output unit, a power supply unit, and the like, but those not directly related to the present invention are not shown and described.

表示部21は、管理サーバ10から送信されてきた画面データによって、上述した作業実績表示領域とモチベーション入力領域とを含む画面を表示する。 The display unit 21 displays a screen including the work result display area and the motivation input area described above by the screen data transmitted from the management server 10.

入力部22は、表示部21に表示された作業実績表示領域やモチベーション入力領域に労働に関する情報を入力するためのものである。具体的には、クライアント20−1〜20−nがパーソナルコンピュータである場合はマウスが考えられ、クライアント20−1〜20−nがスマートフォンである場合は、表示部21上に重ね合わされたタッチパッドが考えられる。 The input unit 22 is for inputting information related to labor in the work result display area and the motivation input area displayed on the display unit 21. Specifically, when the clients 20-1 to 20-n are personal computers, a mouse can be considered, and when the clients 20-1 to 20-n are smartphones, a touch pad superimposed on the display unit 21 can be considered. Can be considered.

送受信部23は、ネットワーク90を介して管理サーバ10にアクセスすることによって、管理サーバ10から送信されてきた画面データをネットワーク90を介して受信し、入力部22を用いて入力された情報をネットワーク90を介して管理サーバ10に送信する。 By accessing the management server 10 via the network 90, the transmission / reception unit 23 receives the screen data transmitted from the management server 10 via the network 90, and receives the information input using the input unit 22 on the network. It is transmitted to the management server 10 via 90.

ここで、管理サーバ10が有するデータベース14の詳細について説明する。 Here, the details of the database 14 included in the management server 10 will be described.

図4は、図1に示したデータベース14の構成を示す図である。図5は、図4に示した人属性テーブルT1の構成を示す図である。図6は、図4に示した勤務時間テーブルT2の構成を示す図である。図7は、図4に示した作業内容テーブルT3の構成を示す図である。図8は、図4に示したモチベーションテーブルT4の構成を示す図である。図9は、図4に示した負荷係数テーブルT5の構成を示す図である。図10は、図4に示した振り返りメモテーブルT6の構成を示す図である。図11は、図4に示した集計結果テーブルT7の構成を示す図である。 FIG. 4 is a diagram showing the configuration of the database 14 shown in FIG. FIG. 5 is a diagram showing the configuration of the person attribute table T1 shown in FIG. FIG. 6 is a diagram showing the configuration of the working time table T2 shown in FIG. FIG. 7 is a diagram showing the configuration of the work content table T3 shown in FIG. FIG. 8 is a diagram showing the configuration of the motivation table T4 shown in FIG. FIG. 9 is a diagram showing the configuration of the load coefficient table T5 shown in FIG. FIG. 10 is a diagram showing the configuration of the retrospective memo table T6 shown in FIG. FIG. 11 is a diagram showing the configuration of the aggregation result table T7 shown in FIG.

図1に示したデータベース14は図4に示すように、人属性テーブルT1と、勤務時間テーブルT2と、作業内容テーブルT3と、モチベーションテーブルT4と、負荷係数テーブルT5と、振り返りメモテーブルT6と、集計結果テーブルT7とを有している。 As shown in FIG. 4, the database 14 shown in FIG. 1 includes a person attribute table T1, a working time table T2, a work content table T3, a motivation table T4, a load coefficient table T5, a retrospective memo table T6, and the like. It has an aggregation result table T7.

人属性テーブルT1には、管理する労働者の人的属性が登録されている。具体的には図5に示すように、労働者名、年齢、職種、役職、入社からの年次、所属チームが、管理する労働者毎に登録されている。 In the human attribute table T1, the human attributes of the workers to be managed are registered. Specifically, as shown in FIG. 5, the worker name, age, occupation, job title, year since joining the company, and affiliated team are registered for each managed worker.

勤務時間テーブルT2には、管理する労働者の勤務時間とその種別が登録されている。具体的には図6に示すように、労働者の勤務日、勤務の開始時刻およびその終了時刻が、時間帯種別毎に登録されている。例えば、労働者Aさんの勤務形態が、9時から17時30分を定時間内勤務とし、12時から12時45分および17時30分から18時が休憩時間となっている場合は、8時35分から19時32分まで労働した2019年7月1日の労働については、8時35分から9時までは定時外時間帯となり、9時から12時までは定時内時間帯となり、12時から12時45分までは休憩時間帯となり、12時45分から17時30分までは定時内時間帯となり、17時30分から18時までは休憩時間帯となり、18時から19時32分までは定時外時間帯となっている。 In the working hours table T2, the working hours of the workers to be managed and their types are registered. Specifically, as shown in FIG. 6, the working day of the worker, the start time of the work, and the end time thereof are registered for each time zone type. For example, if the working style of worker A is from 9:00 to 17:30 as a fixed time work, and from 12:00 to 12:45 and from 17:30 to 18:00 as a break time, 8 For work on July 1, 2019, which worked from 1:35 to 19:32, it will be a non-regular time zone from 8:35 to 9:00, a regular time zone from 9:00 to 12:00, and 12:00. From 12:45 to 12:45 is a break time, from 12:45 to 17:30 is a regular time zone, from 17:30 to 18:00 is a break time, and from 18:00 to 19:32 It is a non-regular time zone.

作業内容テーブルT3には、管理する労働者の作業内容とその開始および終了時刻が登録されている。具体的には図7に示すように、労働者が担当するプロジェクトについて、その作業内容が開始および終了時刻とともに登録されている。 In the work content table T3, the work content of the worker to be managed and the start and end times thereof are registered. Specifically, as shown in FIG. 7, the work contents of the project in charge of the worker are registered together with the start and end times.

モチベーションテーブルT4には、管理する労働者の労働に起因する心身状態となるモチベーション値が登録されている。モチベーション値は、管理サーバ10から送信された画面データによってクライアント20−1〜20−nに表示された画面に労働者が描画入力することで得られる。モチベーションテーブルT4には図8に示すように、労働者がクライアント20−1〜20−nに表示された画面に描画入力したモチベーション値が、その入力時刻に対応づけて登録されている。 In the motivation table T4, the motivation value that is the mental and physical condition caused by the labor of the managed worker is registered. The motivation value is obtained by drawing and inputting the motivation value on the screen displayed on the clients 20-1 to 20-n by the screen data transmitted from the management server 10. As shown in FIG. 8, in the motivation table T4, the motivation value drawn and input by the worker on the screen displayed on the clients 20-1 to 20-n is registered in association with the input time.

負荷係数テーブルT5は、管理サーバ10において、モチベーションテーブルT4に登録されたモチベーション値を用いて、時間毎の労働者の心身状態を示す指標となる負荷指数を算出する際に用いる負荷係数が登録されている。具体的には図9に示すように、時間帯の種別毎に負荷係数が登録されており、モチベーションテーブルT4に登録されたモチベーション値を所定の一定値から減算した残余の値に負荷係数が乗算されることで、負荷指数が算出される。負荷指数は、定時内時間帯を基準とした場合、休憩時間帯は小さく、定時外時間帯や深夜時間帯は大きく設定されており、それにより、同じモチベーション値であっても、負荷指数は、定時内時間帯よりも、休憩時間帯は小さく、定時外時間帯や深夜時間帯は大きくなる。 In the load coefficient table T5, the load coefficient used when calculating the load index which is an index showing the mental and physical condition of the worker for each hour is registered in the management server 10 by using the motivation value registered in the motivation table T4. ing. Specifically, as shown in FIG. 9, the load coefficient is registered for each type of time zone, and the load coefficient is multiplied by the residual value obtained by subtracting the motivation value registered in the motivation table T4 from a predetermined constant value. By doing so, the load index is calculated. When the load index is based on the regular time zone, the break time zone is small and the non-regular time zone and the midnight time zone are set large. Therefore, even if the motivation value is the same, the load index is set. The break time zone is smaller than the regular time zone, and the non-regular time zone and the midnight time zone are larger.

振り返りメモテーブルT6には、管理する労働者が労働に対して感じたこと等が振り返りメモとして登録されている。振り返りメモは、管理サーバ10から送信された画面データによってクライアント20−1〜20−nに表示された画面に労働者が入力することで得られる。振り返りメモテーブルT6には図10に示すように、労働者がクライアント20−1〜20−nに表示された画面に入力した振り返りメモが、その入力時刻に対応づけて登録されている。 In the retrospective memo table T6, what the managing worker felt about the labor and the like are registered as retrospective memos. The retrospective memo is obtained by the worker inputting the screen data displayed on the clients 20-1 to 20-n by the screen data transmitted from the management server 10. As shown in FIG. 10, in the retrospective memo table T6, retrospective memos input by the worker on the screen displayed on the clients 20-1 to 20-n are registered in association with the input time.

集計結果テーブルT7には、図11に示すように、管理する労働者毎に、モチベーションテーブルT4に登録されたモチベーション値を用いて算出された、時間毎の労働者の心身状態を示す指標となる負荷指数が登録されている。負荷指数は上述したように、モチベーションテーブルT4に登録されたモチベーション値を所定の一定値から減算した残余の値に、負荷係数テーブルT5に登録された負荷係数が乗算されることで算出される。また、図11に示すように、集計結果テーブルT7には、振り返りメモテーブルT6に登録された振り返りメモの個数が労働者毎に登録されている。 As shown in FIG. 11, the aggregation result table T7 serves as an index showing the mental and physical condition of the worker for each hour, which is calculated by using the motivation value registered in the motivation table T4 for each worker to be managed. The load index is registered. As described above, the load index is calculated by multiplying the residual value obtained by subtracting the motivation value registered in the motivation table T4 from a predetermined constant value by the load coefficient registered in the load coefficient table T5. Further, as shown in FIG. 11, in the aggregation result table T7, the number of retrospective memos registered in the retrospective memo table T6 is registered for each worker.

以下に、上記のように構成された管理システムにおける労働者の労働を管理する方法について説明する。 The method of managing the labor of workers in the management system configured as described above will be described below.

図12は、図1〜図3に示した管理システムにおける労働者の労働を管理する方法を説明するためのフローチャートである。 FIG. 12 is a flowchart for explaining a method of managing the labor of workers in the management system shown in FIGS. 1 to 3.

図1〜図3に示した管理システムにおける労働者の労働を管理する場合はまず、労働者の労働に関する情報を登録する労働者データ登録処理を実行する(ステップ101)。 When managing the labor of a worker in the management system shown in FIGS. 1 to 3, first, a worker data registration process for registering information on the labor of the worker is executed (step 101).

図13は、図12に示したステップ101における労働者データ登録処理を説明するためのフローチャートである。 FIG. 13 is a flowchart for explaining the worker data registration process in step 101 shown in FIG.

図1〜図3に示した管理システムにおける労働者データ登録処理においては、まず、労働者が操作するクライアント20−1がネットワーク90を介して管理サーバ10にアクセスすると、管理サーバ10の情報収集部11から、労働者が行った労働に関する情報を入力させる画面を表示するための画面データが送受信部13を介して送信され、ネットワーク90を介してクライアント20−1にて受信される。管理サーバ10の情報収集部11においては、労働者が行った労働に関する情報を入力させる画面を表示するための画面データが生成されているため、上述したように、クライアント20−1がネットワーク90を介して管理サーバ10にアクセスすることで、クライアント20−1は、、労働者が行った労働に関する情報を入力させる画面を表示するための画面データを管理サーバ10の情報収集部11から取得することができる。 In the worker data registration process in the management system shown in FIGS. 1 to 3, first, when the client 20-1 operated by the worker accesses the management server 10 via the network 90, the information collection unit of the management server 10 From 11, screen data for displaying a screen for inputting information about the work performed by the worker is transmitted via the transmission / reception unit 13, and is received by the client 20-1 via the network 90. In the information collecting unit 11 of the management server 10, screen data for displaying a screen for inputting information about the labor performed by the worker is generated. Therefore, as described above, the client 20-1 connects the network 90. By accessing the management server 10 via the management server 10, the client 20-1 acquires screen data for displaying a screen for inputting information on the labor performed by the worker from the information collecting unit 11 of the management server 10. Can be done.

管理サーバ10から送信された画面データは、クライアント20−1の送受信部23にて受信され、表示部21において労働者用表示画面として表示され、労働者による労働内容に起因するモチベーションの入力を待つ(ステップ201)。 The screen data transmitted from the management server 10 is received by the transmission / reception unit 23 of the client 20-1, is displayed as a worker display screen on the display unit 21, and waits for the worker to input motivation due to the work content. (Step 201).

図14は、図1及び図3に示したクライアント20−1の表示部21に表示される労働者用表示画面の一例を示す図である。 FIG. 14 is a diagram showing an example of a worker display screen displayed on the display unit 21 of the client 20-1 shown in FIGS. 1 and 3.

図14に示すように、図1及び図3に示したクライアント20−1の表示部21に表示される労働者用表示画面50には、第1領域である作業実績表示領域51と、第2領域であるモチベーション入力領域52と、第3領域である振り返りメモ入力領域54とが含まれており、作業実績表示領域51とモチベーション入力領域52とが労働者用表示画面50の上下に並べて表示される。 As shown in FIG. 14, the worker display screen 50 displayed on the display unit 21 of the client 20-1 shown in FIGS. 1 and 3 has a work result display area 51 as a first area and a second work result display area 51. A motivation input area 52, which is an area, and a retrospective memo input area 54, which is a third area, are included, and the work result display area 51 and the motivation input area 52 are displayed side by side on the worker display screen 50. NS.

作業実績表示領域51は、労働者が行った時間毎の労働内容が時系列に表示される領域であって、時間軸を横軸に取る。労働内容は、クライアント20−1にインストールされたアウトルックなどのスケジュールを管理できるソフトウェアに入力された予定表に基づいて作業実績がデータベース14の作業内容テーブルT3に登録されており、その後、労働者がモチベーション入力領域52にモチベーションライン53を入力するために労働者用表示画面50がクライアント20−1の表示部21に表示された際に、作業実績として作業実績表示領域51に表示されることになる。また、クライアント20−1が管理サーバ10にアクセスすることで労働者用表示画面50がクライアント20−1に表示された状態で、労働者が入力部22を介して入力してもよい。 The work record display area 51 is an area in which the work contents for each hour performed by the worker are displayed in chronological order, and the time axis is taken as the horizontal axis. As for the labor content, the work record is registered in the work content table T3 of the database 14 based on the schedule entered in the software that can manage the schedule such as the outlook installed in the client 20-1, and then the worker When the worker display screen 50 is displayed on the display unit 21 of the client 20-1 in order to input the motivation line 53 in the motivation input area 52, it will be displayed in the work result display area 51 as the work result. .. Further, the worker may input via the input unit 22 in a state where the worker display screen 50 is displayed on the client 20-1 when the client 20-1 accesses the management server 10.

モチベーション入力領域52は、作業実績表示領域51に表示された労働内容に起因する労働者自身の心身状態となるモチベーションの時間遷移を労働者に描画入力させるための領域であって、時間軸を横軸に取り、また、モチベーションの高さを縦軸に取り、モチベーション入力領域52の上方向にいくほどモチベーションが高いものとする。 The motivation input area 52 is an area for causing the worker to draw and input the time transition of the motivation that becomes the worker's own mental and physical state due to the work content displayed in the work result display area 51, and the time axis is horizontal. It is assumed that the motivation is higher as the axis is taken and the height of motivation is taken as the vertical axis and the motivation input area 52 goes upward.

振り返りメモ入力領域54は、特定の時間における労働者の心身状態に関するテキストを入力可能な領域である。 The retrospective memo input area 54 is an area in which text regarding the mental and physical condition of the worker at a specific time can be input.

このように構成された労働者用表示画面50がクライアント20−1の表示部21に表示された状態で、労働者がモチベーション入力領域52に労働内容に起因するモチベーションをモチベーションライン53として入力すると、入力されたモチベーションライン53がクライアント20−1からネットワーク90を介して管理サーバ10に送信され、管理サーバ10の情報収集部11にて受け取られる(ステップ202)。 When the worker display screen 50 configured in this way is displayed on the display unit 21 of the client 20-1, and the worker inputs the motivation caused by the work content into the motivation input area 52 as the motivation line 53, The input motivation line 53 is transmitted from the client 20-1 to the management server 10 via the network 90, and is received by the information collecting unit 11 of the management server 10 (step 202).

モチベーション入力領域52に対するモチベーションの入力は、例えば始業前のタイミングで前日一日分のモチベーションを、上述したようにモチベーションライン53を描くことによって行われる。モチベーションライン53は、クライアント20−1の入力部22がマウスの場合はマウスを用いて、クライアント20−1がスマートフォンである場合はタッチパッドを用いて行われ、ポインタが示す軌跡を描くことで行われる。そのため、図14に示すように、労働者のモチベーションの高さの時間遷移を曲線で描画入力させることができる。このように労働者は、モチベーションの高さを曲線で感覚的に描画すればよいので、モチベーションという感覚的な指標を容易に入力することができる。なお、曲線ではなく、折れ線等の一部に直線を含む連続した線で描画入力させても、同様の効果を得ることができる。 The motivation input to the motivation input area 52 is performed, for example, by drawing the motivation for the day before the previous day at the timing before the start of work and drawing the motivation line 53 as described above. The motivation line 53 is performed by using a mouse when the input unit 22 of the client 20-1 is a mouse and by using a touch pad when the client 20-1 is a smartphone, and draws a trajectory indicated by a pointer. It is said. Therefore, as shown in FIG. 14, it is possible to draw and input the time transition of the height of motivation of the worker with a curve. In this way, the worker only has to sensuously draw the height of motivation with a curve, so that a sensuous index of motivation can be easily input. The same effect can be obtained by drawing and inputting a continuous line including a straight line as a part of a polygonal line or the like instead of a curved line.

またその際、作業実績表示領域51とモチベーション入力領域52とが、時間軸を横軸に取って労働者用表示画面50の上下に並べて表示されているため、労働者はモチベーションの時間遷移を容易に描画することができる。また、作業実績表示領域51に入力された時間毎の労働内容を色およびテキストの少なくとも一方により識別可能に時系列に表示すれば、労働者は工数管理等のために入力する時間毎の労働内容と同じ画面上で自身の心身の状態となるモチベーションラインも入力すればよいので、労働者における入力の負担を軽くすることができる。なお、モチベーション入力領域52に入力されたモチベーションライン53は、引き直したり、部分的に上下に移動させたりすることができる。 At that time, since the work result display area 51 and the motivation input area 52 are displayed side by side on the worker display screen 50 with the time axis as the horizontal axis, the worker can easily change the motivation time. Can be drawn on. Further, if the hourly labor content input in the work record display area 51 is displayed in chronological order so as to be identifiable by at least one of the color and the text, the worker can input the hourly labor content for man-hour management and the like. Since it is sufficient to input the motivation line that is the state of one's mind and body on the same screen as the above, the burden of input on the worker can be lightened. The motivation line 53 input to the motivation input area 52 can be redrawn or partially moved up and down.

管理サーバ10の情報収集部11においては、モチベーションライン53が受け取られると、受け取られたモチベーションラインからタイムスタンプごとのモチベーション値が算出される(ステップ203)。 When the motivation line 53 is received, the information collecting unit 11 of the management server 10 calculates the motivation value for each time stamp from the received motivation line (step 203).

また、管理サーバ10の情報収集部11においては、振り返りメモ入力領域54への振り返りメモの入力を待つ状態において(ステップ204)、労働者が振り返りメモ入力領域54に労働内容に起因する振り返りメモとして入力すると、入力された振り返りメモがクライアント20−1からネットワーク90を介して管理サーバ10に送信され、管理サーバ10の情報収集部11にて受け取られる(ステップ205)。このように、特定の時間における心身状態に関するテキストを入力可能な振り返りメモ入力領域54を、作業実績表示領域51およびモチベーション入力領域52と共に表示することにより、労働者の心身状態を描画入力により感覚的に入力させるとともに、その心身状態に関するテキスト情報も収集可能となり、描画に示されないような管理に有益な情報が収集できる。なお、振り返りメモ入力領域54を、作業実績表示領域51およびモチベーション入力領域52のうち一方と共に表示する構成としてもよい。 Further, in the information collecting unit 11 of the management server 10, in a state of waiting for the input of the retrospective memo to the retrospective memo input area 54 (step 204), the worker enters the retrospective memo input area 54 as a retrospective memo due to the work content. Upon input, the input retrospective memo is transmitted from the client 20-1 to the management server 10 via the network 90, and is received by the information collecting unit 11 of the management server 10 (step 205). In this way, by displaying the retrospective memo input area 54 in which the text related to the mental and physical condition at a specific time can be input together with the work result display area 51 and the motivation input area 52, the mental and physical condition of the worker can be sensuously input by drawing. In addition to being able to input to, text information about the mental and physical condition can also be collected, and useful information for management that is not shown in the drawing can be collected. The retrospective memo input area 54 may be displayed together with one of the work result display area 51 and the motivation input area 52.

その後、管理サーバ10の情報収集部11においては、ステップ203にて算出されたタイムスタンプ毎のモチベーション値がモチベーションテーブルT4に登録されるとともに(ステップ206)、ステップ205にて受け取られた振り返りメモが振り返りメモテーブルT6に登録される(ステップ207)。 After that, in the information collecting unit 11 of the management server 10, the motivation value for each time stamp calculated in step 203 is registered in the motivation table T4 (step 206), and the retrospective memo received in step 205 is recorded. It is registered in the retrospective memo table T6 (step 207).

図1〜図3に示した管理システムにおいては、上述した労働者データ登録処理を実行した後、労働者状態表示処理を実行する(ステップ102)。 In the management system shown in FIGS. 1 to 3, the worker status display process is executed after the worker data registration process described above is executed (step 102).

図15は、図12に示したステップ102における労働者状態表示処理を説明するためのフローチャートである。 FIG. 15 is a flowchart for explaining the worker state display process in step 102 shown in FIG.

図1〜図3に示した管理システムにおける労働者状態表示処理においては、まず、管理者が操作する端末が管理サーバ10にアクセスすると、管理サーバ10の情報収集部11から、労働者の心身の状態を表示する画面を表示するための画面データが送受信部13を介して送信され、管理者が操作する端末にて受信される。 In the worker status display processing in the management system shown in FIGS. 1 to 3, first, when the terminal operated by the administrator accesses the management server 10, the information collecting unit 11 of the management server 10 informs the worker's mind and body. Screen data for displaying the screen for displaying the status is transmitted via the transmission / reception unit 13 and received by the terminal operated by the administrator.

図16は、図1に示した管理システムにおいて管理者が操作する端末に表示される管理者用表示画面の一例を示す図である。 FIG. 16 is a diagram showing an example of an administrator display screen displayed on a terminal operated by an administrator in the management system shown in FIG.

図16に示すように、図1に示した管理システムにおいて管理者が操作する端末に表示される管理者用表示画面60には、条件入力領域61と、状態表示領域62とが含まれている。 As shown in FIG. 16, the administrator display screen 60 displayed on the terminal operated by the administrator in the management system shown in FIG. 1 includes a condition input area 61 and a status display area 62. ..

条件入力領域61は、状態表示領域62に心身の状態を表示する労働者に関する条件を入力するための領域である。 The condition input area 61 is an area for inputting a condition relating to a worker who displays the state of mind and body in the state display area 62.

状態表示領域62は、条件入力領域61に入力された条件によって選択された労働者に関する心身の状態を表示する領域である。 The state display area 62 is an area for displaying the mental and physical states of the worker selected by the conditions input in the condition input area 61.

このように構成された管理者用表示画面60が、管理者が操作する端末に表示された状態で、管理者が管理対象とする労働者の条件を条件入力領域61にて入力すると、入力された条件が、管理者が操作する端末から管理サーバ10に送信され、管理サーバ10の指標算出部12にて受け取られる(ステップ301)。条件入力領域61における条件の入力は、条件入力領域61に表示された項目毎に該当する範囲等を選択することにより行われる。 When the administrator's display screen 60 configured in this way is displayed on the terminal operated by the administrator and the condition of the worker to be managed by the administrator is input in the condition input area 61, the input is input. The condition is transmitted from the terminal operated by the administrator to the management server 10 and received by the index calculation unit 12 of the management server 10 (step 301). The condition input in the condition input area 61 is performed by selecting the corresponding range or the like for each item displayed in the condition input area 61.

指標算出部12においては、データベース14が参照され、条件入力領域61に入力された条件に該当する労働者を対象者とし、その対象者となる労働者の労働に関するデータが取得される(ステップ302)。 In the index calculation unit 12, the database 14 is referred to, the worker corresponding to the condition input in the condition input area 61 is targeted, and the data on the labor of the target worker is acquired (step 302). ).

その後、対象者となる労働者のそれぞれについて、ステップ304〜306の処理を実行する(ステップ303A,303B)。 After that, the processes of steps 304 to 306 are executed for each of the target workers (steps 303A and 303B).

まず、指標算出部12においては、ステップ302にて取得されたデータを用いて、労働者の労働内容に起因する心身の状態を示す指標となる負荷指数が算出される(ステップ304)。 First, the index calculation unit 12 calculates a load index, which is an index indicating a mental and physical condition caused by the work content of the worker, using the data acquired in step 302 (step 304).

図17は、図15に示したステップ304における負荷指数の算出処理を説明するためのフローチャートである。 FIG. 17 is a flowchart for explaining the calculation process of the load index in step 304 shown in FIG.

指標算出部12においては、まず、計測対象とする時間範囲のデータのリストをデータベース14から取得され(ステップ401)、負荷指数が初期化される(ステップ402)。 In the index calculation unit 12, first, a list of data in the time range to be measured is acquired from the database 14 (step 401), and the load index is initialized (step 402).

その後、計測対象とする時間範囲の単位時間毎に、ステップ404〜407の処理を実行する(ステップ403A,403B)。 After that, the processes of steps 404 to 407 are executed for each unit time in the time range to be measured (steps 403A and 403B).

まず、指標算出部12においては、処理対象となる単位時間のタイムスタンプとモチベーション値がモチベーションテーブルT4から取り出される(ステップ404)。 First, in the index calculation unit 12, the time stamp and the motivation value of the unit time to be processed are taken out from the motivation table T4 (step 404).

次に、指標算出部12においては、モチベーションテーブルT4から取り出されたモチベーション値に基づいて労働者による労働による精神的負担を示す負荷指数が算出される。このように、労働者が入力しやすいモチベーション値に基づいて、労働者の労働管理に利用しやすい負荷指数が算出されるので、管理に有用な情報を容易に取得することができる。 Next, the index calculation unit 12 calculates a load index indicating the mental burden of labor by the worker based on the motivation value extracted from the motivation table T4. In this way, since the load index that is easy to use for the labor management of the worker is calculated based on the motivation value that the worker can easily input, information useful for the management can be easily obtained.

負荷指数の算出は、まず、モチベーションテーブルT4から取り出されたモチベーション値が所定の一定値から減算され、それにより得られる残余に基づく基礎負荷値が算出される(ステップ405)。これにより、負荷指数をモチベーション値から容易に算出することができる。 In the calculation of the load index, first, the motivation value extracted from the motivation table T4 is subtracted from a predetermined constant value, and the basic load value based on the residual obtained by the subtraction is calculated (step 405). As a result, the load index can be easily calculated from the motivation value.

次に、指標算出部12においては、ステップ405にて算出された基礎負荷値に負荷係数が乗算される(ステップ406)。指標算出部12においては、負荷係数テーブルT5が参照され、ステップ405にて算出された基礎負荷値に、処理対象となる単位時間に対応する負荷係数が乗算されることで、その積算値が負荷指数として算出されることになる。負荷指数は、上述したように負荷係数テーブルT5において、休憩時間帯は小さく、定時外時間帯や深夜時間帯は大きく設定されている。それにより、同じモチベーション値であっても、負荷指数は、定時内時間帯よりも、休憩時間帯は小さく、定時外時間帯や深夜時間帯は大きくなる。このように、モチベーションと勤務状況の両者を反映する負荷係数を用いることで、時間帯に応じた労働者への負荷の違いを反映した負荷指数を容易に算出することができる。 Next, in the index calculation unit 12, the load coefficient is multiplied by the basic load value calculated in step 405 (step 406). In the index calculation unit 12, the load coefficient table T5 is referred to, and the basic load value calculated in step 405 is multiplied by the load coefficient corresponding to the unit time to be processed, so that the integrated value is loaded. It will be calculated as an index. As described above, the load index is set to be small in the break time zone and large in the non-regular time zone and the midnight time zone in the load coefficient table T5. As a result, even if the motivation value is the same, the load index is smaller in the break time zone and larger in the non-regular time zone and the midnight time zone than in the regular time zone. In this way, by using the load coefficient that reflects both motivation and working conditions, it is possible to easily calculate the load index that reflects the difference in the load on workers according to the time of day.

そして、指標算出部12においては、それまで算出された負荷値に、ステップ406にて算出された負荷指数が加算される(ステップ407)。 Then, in the index calculation unit 12, the load index calculated in step 406 is added to the load value calculated up to that point (step 407).

また、指数算出部12においては、振り返りメモテーブルT6が参照され、対象となる労働者の振り返りメモの個数が集計され(ステップ305)、対象となる労働者のデータに負荷指数と振り返りメモの個数が付加され、集計結果テーブルT7に登録される(ステップ306)。 Further, in the index calculation unit 12, the retrospective memo table T6 is referred to, the number of retrospective memos of the target worker is totaled (step 305), and the load index and the number of retrospective memos are added to the data of the target worker. Is added and registered in the aggregation result table T7 (step 306).

その後、情報収集部11において、集計結果テーブルT7が参照され、管理者用表示画面60の状態表示領域62に、所定の条件に該当する複数の労働者に関するモチベーションラインおよび負荷指数を含む画面を表示するための画面データが生成される。 After that, the information collecting unit 11 refers to the aggregation result table T7, and displays a screen including motivation lines and load indexes for a plurality of workers who meet a predetermined condition in the status display area 62 of the administrator display screen 60. Screen data is generated.

そして、情報収集部11にて生成された画面データが、管理サーバ10から管理者が操作する端末に送信され、管理者用表示画面60の状態表示領域62に、所定の条件に該当する複数の労働者に関するモチベーションラインおよび負荷指数を含む管理者用表示画面が表示される(ステップ307)。これにより、所定の条件に該当する複数の労働者の状態の時間遷移を並べて表示することができる。例えば、チームメンバーのモチベーションを並べて表示し、比較することができる。なお、管理者用表示画面に労働者に関するモチベーションラインおよび負荷指数のいずれか一方のみを表示する構成としてもよい。 Then, the screen data generated by the information collecting unit 11 is transmitted from the management server 10 to the terminal operated by the administrator, and a plurality of screen data corresponding to the predetermined conditions are set in the status display area 62 of the administrator display screen 60. A display screen for managers including a motivation line and load index for workers is displayed (step 307). As a result, it is possible to display the time transitions of the states of a plurality of workers who meet a predetermined condition side by side. For example, the motivations of team members can be displayed side by side and compared. It should be noted that the display screen for the manager may be configured to display only one of the motivation line and the load index related to the worker.

このように、労働者の労働を管理するために労働者の労働に起因する心身の状態を入力する際に、労働者は、第1領域である作業実績表示領域51に表示される時間毎の労働内容を見ながら、第2領域であるモチベーション入力領域52に時間毎の自身の心身状態の遷移を描画入力すればよいので、労働者の負担を軽くしながら労働者の状態の情報を収集し、労働の管理を行うことが可能になる。 In this way, when inputting the mental and physical condition caused by the labor of the worker in order to manage the labor of the worker, the worker is displayed every hour in the work performance display area 51 which is the first area. While observing the work content, it is sufficient to draw and input the transition of one's own mental and physical state every hour in the motivation input area 52, which is the second area, so that information on the worker's state can be collected while reducing the burden on the worker. , It becomes possible to manage labor.

なお、モチベーション入力領域52への入力は、モチベーションを複数のレベルで表し、自身のモチベーションがどのレベルかを選択する態様でもよい。例えば、3段階表示、5段階表示、7段階表示など、さらに、段階は、レベル1〜レベル5のような数値による表現でもよいし、上/中/下のような状態による表現でもよい。 The input to the motivation input area 52 may represent motivation at a plurality of levels, and may be an embodiment in which one's own motivation level is selected. For example, a three-stage display, a five-stage display, a seven-stage display, and the like, and further, the stage may be expressed by a numerical value such as level 1 to level 5, or may be expressed by a state such as upper / middle / lower.

また、労働者の労働内容に起因する心身の状態として、労働に関するモチベーションを入力させる構成を例に挙げて説明したが、労働者の心身の状態としては、モチベーションに限らず、体調の善し悪しなどであってもよい。 In addition, as an example of the mental and physical condition caused by the work content of the worker, the configuration in which the motivation related to labor is input was explained as an example. There may be.

上述した本発明の実施形態は、本発明の説明のための例示であり、本発明の範囲をそれらの実施形態にのみ限定する趣旨ではない。当業者は、本発明の範囲を逸脱することなしに、他の様々な態様で本発明を実施することができる。 The above-described embodiments of the present invention are examples for the purpose of explaining the present invention, and the scope of the present invention is not limited to those embodiments. One of ordinary skill in the art can practice the present invention in various other aspects without departing from the scope of the present invention.

10…管理サーバ、11…情報収集部、12…指標算出部、13,23…送受信部、14…データベース、20−1〜20−n…クライアント、21…表示部、22…入力部、50…労働者用入力画面、51…作業実績表示領域、52…モチベーション入力領域、53…モチベーションライン、54…振り返りメモ入力領域、60…管理者用表示画面、61…条件入力領域、62…状態表示領域、90…ネットワーク 10 ... Management server, 11 ... Information collection unit, 12 ... Index calculation unit, 13, 23 ... Transmission / reception unit, 14 ... Database, 20-1 to 20-n ... Client, 21 ... Display unit, 22 ... Input unit, 50 ... Worker input screen, 51 ... work record display area, 52 ... motivation input area, 53 ... motivation line, 54 ... retrospective memo input area, 60 ... administrator display screen, 61 ... condition input area, 62 ... status display area , 90 ... network

Claims (10)

労働者が行った時間毎の労働内容を時系列に表示する第1領域と、前記労働内容に起因する自身の心身状態の時間遷移を前記労働者に描画入力させるための第2領域とを含む画面を表示するための画面データを生成する情報収集部と、
前記第2領域に描画入力された心身状態の時間遷移を示す情報に基づいて、時間毎の前記労働者の心身状態を示す指標を算出する指標算出部と、
を有する管理システム。
It includes a first area for displaying the hourly work contents performed by the worker in chronological order, and a second area for causing the worker to draw and input the time transition of his / her own mental and physical state caused by the work contents. An information gathering unit that generates screen data for displaying screens,
An index calculation unit that calculates an index indicating the mental and physical condition of the worker for each hour based on the information indicating the time transition of the mental and physical condition drawn and input in the second area.
Management system with.
前記第2領域は、前記労働者のモチベーションの高さの時間遷移を、曲線または一部に直線を含む連続した線で描画入力させるための領域である、
請求項1に記載の管理システム。
The second region is a region for drawing and inputting the time transition of the height of motivation of the worker with a curved line or a continuous line including a straight line in a part thereof.
The management system according to claim 1.
前記指標算出部は、前記モチベーションの高さを示すモチベーション値に基づき、前記労働者に対する労働による精神的負担を示す負荷指数を算出する、
請求項2に記載の管理システム。
The index calculation unit calculates a load index indicating the mental burden of labor on the worker based on the motivation value indicating the height of the motivation.
The management system according to claim 2.
前記負荷指数は、所定の一定値から前記モチベーション値を減算することにより得られる残余に基づく値である、
請求項3に記載の管理システム。
The load index is a value based on the residual obtained by subtracting the motivation value from a predetermined constant value.
The management system according to claim 3.
前記負荷指数は、指定された期間における、前記残余の値に時間帯に応じた負荷係数を乗算することにより得られる値の積算値である、
請求項4に記載の管理システム。
The load index is an integrated value of values obtained by multiplying the residual value by a load coefficient according to a time zone in a specified period.
The management system according to claim 4.
前記情報収集部は、前記第1領域と前記第2領域とを画面の上下に並べて前記第1領域および前記第2領域の時間軸を横軸に取り、前記第2領域におけるモチベーションの高さを縦軸に取るように前記画面データを生成する、
請求項2に記載の管理システム。
The information collecting unit arranges the first area and the second area on the upper and lower sides of the screen, takes the time axis of the first area and the second area on the horizontal axis, and determines the height of motivation in the second area. Generate the screen data so that it is on the vertical axis.
The management system according to claim 2.
前記第1領域は、前記労働者が行った時間毎の労働内容の実績を前記労働者に入力させ、入力された時間毎の労働内容を色およびテキストの少なくとも一方により識別可能に時系列に表示する領域である、
請求項1に記載の管理システム。
In the first area, the worker is made to input the actual result of the hourly work performed by the worker, and the input hourly work content is displayed in chronological order so as to be identifiable by at least one of color and text. Area to do,
The management system according to claim 1.
前記情報収集部は、特定の時間における心身状態に関するテキストを入力可能な第3領域を、前記第1領域および前記第2領域の少なくとも一方と共に表示するための画面データを生成する、
請求項1に記載の管理システム。
The information collecting unit generates screen data for displaying a third area in which a text relating to a mental and physical state at a specific time can be input together with at least one of the first area and the second area.
The management system according to claim 1.
前記情報収集部は、更に、所定の条件に該当する複数の労働者に関する前記連続した線および前記負荷指数の少なくとも一方を含む画面を表示するための画面データを生成する、
請求項3に記載の管理システム。
The information gathering unit further generates screen data for displaying a screen including at least one of the continuous line and the load index for a plurality of workers who meet a predetermined condition.
The management system according to claim 3.
情報処理システムが、
労働者が行った時間毎の労働内容を時系列に表示する第1領域と、前記労働内容に起因する自身の心身状態の時間遷移を前記労働者に描画入力させるための第2領域とを含む画面を表示するための画面データを生成し、
前記第2領域に描画入力された心身状態の時間遷移を示す情報に基づいて、時間毎の前記労働者の心身状態を示す指標を算出する、
管理方法。
Information processing system
It includes a first area for displaying the hourly work contents performed by the worker in chronological order, and a second area for causing the worker to draw and input the time transition of his / her own mental and physical state caused by the work contents. Generate screen data to display the screen,
Based on the information indicating the time transition of the mental and physical state drawn and input in the second area, an index indicating the mental and physical state of the worker for each hour is calculated.
Management method.
JP2020010384A 2020-01-24 2020-01-24 Management systems and methods Active JP7344139B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2020010384A JP7344139B2 (en) 2020-01-24 2020-01-24 Management systems and methods

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2020010384A JP7344139B2 (en) 2020-01-24 2020-01-24 Management systems and methods

Publications (2)

Publication Number Publication Date
JP2021117710A true JP2021117710A (en) 2021-08-10
JP7344139B2 JP7344139B2 (en) 2023-09-13

Family

ID=77174926

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2020010384A Active JP7344139B2 (en) 2020-01-24 2020-01-24 Management systems and methods

Country Status (1)

Country Link
JP (1) JP7344139B2 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008129805A (en) * 2006-11-20 2008-06-05 Ricoh Co Ltd Mental health supporting device and mental health supporting system
JP2014045940A (en) * 2012-08-31 2014-03-17 Institute Of Physical & Chemical Research Psychological data collection device, psychological data collection program, and psychological data collection method
WO2014083656A1 (en) * 2012-11-29 2014-06-05 株式会社日立製作所 Store operation information system and operation information system for business system
JP2018200622A (en) * 2017-05-29 2018-12-20 株式会社新菱 Mental Health Measure Support System and Mental Health Measure Support Method

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008129805A (en) * 2006-11-20 2008-06-05 Ricoh Co Ltd Mental health supporting device and mental health supporting system
JP2014045940A (en) * 2012-08-31 2014-03-17 Institute Of Physical & Chemical Research Psychological data collection device, psychological data collection program, and psychological data collection method
WO2014083656A1 (en) * 2012-11-29 2014-06-05 株式会社日立製作所 Store operation information system and operation information system for business system
JP2018200622A (en) * 2017-05-29 2018-12-20 株式会社新菱 Mental Health Measure Support System and Mental Health Measure Support Method

Also Published As

Publication number Publication date
JP7344139B2 (en) 2023-09-13

Similar Documents

Publication Publication Date Title
JP6298855B2 (en) Organizational development support system, organizational development support method, and program
US20150302179A1 (en) Real-time aggregation and display of data
US20140278653A1 (en) Method And System For Optimizing Field Service Appoint Scheduling
KR102194683B1 (en) Method and appratus for managing legal counseling schedule
JP6478267B2 (en) Organization improvement activity support device, organization improvement activity support method, and organization improvement activity support program
JP4009578B2 (en) Personnel assessment method, personnel assessment system program, personnel assessment system server device, personnel assessment system terminal device, and personnel assessment system
JP2020038718A (en) Information processor and program
JP2015153246A (en) Nursing care management analyzer and program
JP6073912B2 (en) Work slip recording support system and program
JP2021117710A (en) Management system and method
JP2023184440A (en) Information processing device
JP2009276904A (en) Project management device, project management method, project management program and recording medium
JP6415681B1 (en) HR evaluation method and HR evaluation system
JP2002083098A (en) Target managing system
JP2017072903A (en) Customer service information managing system
JP7410687B2 (en) Organizational change support system, organizational change support method, and organizational change support program
JP2018190348A (en) Task management device, task management system, and task management method
JP2001250022A (en) Device and method for supporting business activity, and recording medium
JP2002288403A (en) Method, system, and program for project management
JP2003122885A (en) Business activity supporting system and computer program
JP2017117316A (en) Evaluation system, server device for evaluation system, program for evaluation system server device, and evaluation method
JP6630862B1 (en) Questionnaire management system, questionnaire management program and questionnaire management method
WO2024079789A1 (en) Hybrid work support method and hybrid work support system
Rämänen et al. Human role in industrial installed base information gathering
KR100699201B1 (en) Sales Force Automation management method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20220630

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20230531

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230606

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20230711

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20230808

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20230901

R150 Certificate of patent or registration of utility model

Ref document number: 7344139

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150