JP2021040451A - ソーラー装置の発電エフィシェンシーの異常の判断方法 - Google Patents
ソーラー装置の発電エフィシェンシーの異常の判断方法 Download PDFInfo
- Publication number
- JP2021040451A JP2021040451A JP2019161481A JP2019161481A JP2021040451A JP 2021040451 A JP2021040451 A JP 2021040451A JP 2019161481 A JP2019161481 A JP 2019161481A JP 2019161481 A JP2019161481 A JP 2019161481A JP 2021040451 A JP2021040451 A JP 2021040451A
- Authority
- JP
- Japan
- Prior art keywords
- power generation
- solar
- ratio information
- abnormality
- historical
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000010248 power generation Methods 0.000 title claims abstract description 216
- 230000005856 abnormality Effects 0.000 title claims abstract description 58
- 230000005855 radiation Effects 0.000 claims abstract description 37
- 238000000034 method Methods 0.000 claims abstract description 29
- 230000002159 abnormal effect Effects 0.000 claims abstract description 27
- 238000004364 calculation method Methods 0.000 claims description 14
- 238000012417 linear regression Methods 0.000 claims description 5
- 238000001914 filtration Methods 0.000 claims description 4
- 238000005286 illumination Methods 0.000 abstract 1
- 238000012545 processing Methods 0.000 description 6
- 230000007613 environmental effect Effects 0.000 description 4
- 230000005611 electricity Effects 0.000 description 3
- 238000012544 monitoring process Methods 0.000 description 3
- 238000012360 testing method Methods 0.000 description 3
- 238000012549 training Methods 0.000 description 3
- 238000001514 detection method Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 230000036962 time dependent Effects 0.000 description 2
- 238000009825 accumulation Methods 0.000 description 1
- 238000004220 aggregation Methods 0.000 description 1
- 230000002776 aggregation Effects 0.000 description 1
- 230000002547 anomalous effect Effects 0.000 description 1
- 238000007635 classification algorithm Methods 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 238000012937 correction Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 230000008030 elimination Effects 0.000 description 1
- 238000003379 elimination reaction Methods 0.000 description 1
- 230000014509 gene expression Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/50—Photovoltaic [PV] energy
Landscapes
- Photovoltaic Devices (AREA)
Abstract
【解決手段】ソーラー現場の複数のソーラー発電装置が受けた日射量は標準日射照度より大きいかどうかを判断するステップS11と、前記複数のソーラー発電装置の各時点の発電比情報を取得するステップS12と、各ソーラー発電装置の各時点の前記発電比情報と基準発電比率情報との差が発電比域値より大きいかどうかを比較するステップS13と、前記発電比情報と前記基準発電比率情報との差が前記域値より大きいと、対応する各ソーラー発電装置が異常であると判断するステップS14、を備え、非線形回帰演算法により歴史発電比率情報を前記基準発電比率情報に整合させることで、より正確な判断基準が得られる。
【選択図】図1
Description
ソーラー現場の複数のソーラー発電装置が受けた日射量は標準日射照度より大きいかどうかを判断するステップと、
前記複数のソーラー発電装置の各時点の発電比情報を取得するステップと、
各ソーラー発電装置の各時点の前記発電比情報と基準発電比率情報との差が発電比域値より大きいかどうかを比較するステップと、を備え、
前記発電比情報と前記基準発電比率情報との差が前記域値より大きいと、対応する各ソーラー発電装置が異常であると判断する。
ただし、yiは歴史発電比率情報(RAP)であり、a0、a1、a2…anが回帰係数であり、これらの回帰係数が各発電比情報および日射量から求められ、自変数xは日射量であり、ソーラー発電工場により記録され、従属変数yは前記データ処理モジュール90により算出され、εは誤差を示し、回帰線を実際資料へより近づけるために設定された補償値である。
20 訓練情報
30 回帰2次曲線
40 電圧電流情報
40A 第1電圧電流情報
50 第2電圧電流情報
60 第3電圧電流情報
70 第4電圧電流情報
80 ソーラー発電装置
90 データ処理モジュール
tr1 異常曲線
tr2 正常曲線
Claims (10)
- ソーラー現場の複数のソーラー発電装置が受けた日射量は標準日射照度より大きいかどうかを判断するステップと、
前記複数のソーラー発電装置の各時点の発電比情報を取得するステップと、
各ソーラー発電装置の各時点の前記発電比情報と基準発電比率情報との差が発電比域値より大きいかどうかを比較するステップと、を備え、
前記発電比情報と前記基準発電比率情報との差が前記域値より大きいと、対応する各ソーラー発電装置が異常であると判断するソーラー装置の発電エフィシェンシーの異常の判断方法。 - 各ソーラー発電装置の各時点の前記発電比情報と基準発電比率情報との差が発電比域値より大きいかどうかを比較するステップは、
各ソーラー発電装置の複数の歴史発電比率情報を取得するステップをさらに備え、
前記複数の歴史発電比率情報から前記基準発電比率情報を算出する請求項1に記載のソーラー装置の発電エフィシェンシーの異常の判断方法。 - 前記基準発電比率情報は非線形回帰演算法により前記複数の歴史発電比率情報から算出される請求項2に記載のソーラー装置の発電エフィシェンシーの異常の判断方法。
- 前記基準発電比率情報は最近傍演算法により前記複数の歴史発電比率情報から算出される請求項2に記載のソーラー装置の発電エフィシェンシーの異常の判断方法。
- ソーラー現場の複数のソーラー発電装置が受けた日射量は標準日射照度より大きいかどうかを判断するステップは、ノズルをろ過除去するステップをさらに含み、前記ノズルをろ過除去するステップは前記日射量と前記標準日射照度との差が誤差値より大きいかどうかを判断し、大きいと判断した場合、前記日射量がノズルと見なされ、ろ過除去され、大きくないと判断した場合、前記日射量が正常のデータと見なされる請求項3又は4に記載のソーラー装置の発電エフィシェンシーの異常の判断方法。
- 前記発電比情報は異なる多種類の発電データから算出され、前記発電データが直流発電電力と、発電装置定格電力と、前記日射量と、前記標準日射照度とを含む請求項5に記載のソーラー装置の発電エフィシェンシーの異常の判断方法。
- 各ソーラー発電装置の複数の歴史発電比率情報を取得するステップにおいて、前記複数の歴史発電データは過去の各時点の歴史直流発電電力と、歴史発電装置定格電力と、歴史日射量と、前記標準日射照度とを含む請求項6に記載のソーラー装置の発電エフィシェンシーの異常の判断方法。
- 前記複数の歴史発電比率情報から非線形回帰演算法により前記基準発電比率情報を算出するステップにおいて、非線形回帰演算法は以下の方程式で実行され、
yi=a0+a1x+a2x2+…+anxn+ε
ただし、yiは歴史発電比率情報(RAP)であり、a0、a1、a2…anは回帰係数であり、εは誤差である請求項7に記載のソーラー装置の発電エフィシェンシーの異常の判断方法。 - 各ソーラー発電装置と正常に作動するソーラー発電装置との間の平均発電異常正常比を比較する請求項8に記載のソーラー装置の発電エフィシェンシーの異常の判断方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019161481A JP2021040451A (ja) | 2019-09-04 | 2019-09-04 | ソーラー装置の発電エフィシェンシーの異常の判断方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2019161481A JP2021040451A (ja) | 2019-09-04 | 2019-09-04 | ソーラー装置の発電エフィシェンシーの異常の判断方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2021040451A true JP2021040451A (ja) | 2021-03-11 |
Family
ID=74847479
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2019161481A Pending JP2021040451A (ja) | 2019-09-04 | 2019-09-04 | ソーラー装置の発電エフィシェンシーの異常の判断方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2021040451A (ja) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116761306A (zh) * | 2023-08-14 | 2023-09-15 | 华能山东发电有限公司烟台发电厂 | 一种两用照明装置的照明优化方法及系统 |
CN117325690A (zh) * | 2023-08-25 | 2024-01-02 | 珠海康晋电气股份有限公司 | 基于智能协同管控的新能源充电桩电力控制系统 |
Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005340464A (ja) * | 2004-05-26 | 2005-12-08 | Sharp Corp | 太陽電池アレイ診断装置およびそれを用いた太陽光発電システム |
JP2011216811A (ja) * | 2010-04-02 | 2011-10-27 | Sharp Corp | 太陽電池異常診断システム、太陽電池異常診断装置および太陽電池異常診断方法 |
US20120004870A1 (en) * | 2009-02-17 | 2012-01-05 | Siemens Aktiengesellschaft | Method and device for monitoring a photovoltaic unit |
JP2012195495A (ja) * | 2011-03-17 | 2012-10-11 | Toshiba Corp | 異常診断装置およびその方法、コンピュータプログラム |
JP2014154728A (ja) * | 2013-02-08 | 2014-08-25 | Hitachi Advanced Digital Inc | 太陽電池パネル監視プログラム、太陽電池パネル監視装置及び太陽電池パネル監視方法 |
JP2016134929A (ja) * | 2015-01-15 | 2016-07-25 | 株式会社Nttファシリティーズ | 太陽光発電診断装置および太陽光発電診断方法 |
JP2016134930A (ja) * | 2015-01-15 | 2016-07-25 | 株式会社Nttファシリティーズ | 太陽光発電診断装置および太陽光発電診断方法 |
JP2016201921A (ja) * | 2015-04-10 | 2016-12-01 | 株式会社東芝 | 太陽光発電設備の発電量の低下を検出する方法、装置、およびプログラム |
JP2017184472A (ja) * | 2016-03-30 | 2017-10-05 | 株式会社ラプラス・システム | 太陽光発電システムの発電診断方法、及び発電診断装置 |
JP2018084421A (ja) * | 2016-11-21 | 2018-05-31 | 濱田重工株式会社 | 太陽光発電監視装置及び太陽光発電監視方法 |
WO2019130718A1 (ja) * | 2017-12-28 | 2019-07-04 | 住友電気工業株式会社 | 判定装置、太陽光発電システム、判定方法および判定プログラム |
-
2019
- 2019-09-04 JP JP2019161481A patent/JP2021040451A/ja active Pending
Patent Citations (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2005340464A (ja) * | 2004-05-26 | 2005-12-08 | Sharp Corp | 太陽電池アレイ診断装置およびそれを用いた太陽光発電システム |
US20120004870A1 (en) * | 2009-02-17 | 2012-01-05 | Siemens Aktiengesellschaft | Method and device for monitoring a photovoltaic unit |
JP2011216811A (ja) * | 2010-04-02 | 2011-10-27 | Sharp Corp | 太陽電池異常診断システム、太陽電池異常診断装置および太陽電池異常診断方法 |
JP2012195495A (ja) * | 2011-03-17 | 2012-10-11 | Toshiba Corp | 異常診断装置およびその方法、コンピュータプログラム |
JP2014154728A (ja) * | 2013-02-08 | 2014-08-25 | Hitachi Advanced Digital Inc | 太陽電池パネル監視プログラム、太陽電池パネル監視装置及び太陽電池パネル監視方法 |
JP2016134929A (ja) * | 2015-01-15 | 2016-07-25 | 株式会社Nttファシリティーズ | 太陽光発電診断装置および太陽光発電診断方法 |
JP2016134930A (ja) * | 2015-01-15 | 2016-07-25 | 株式会社Nttファシリティーズ | 太陽光発電診断装置および太陽光発電診断方法 |
JP2016201921A (ja) * | 2015-04-10 | 2016-12-01 | 株式会社東芝 | 太陽光発電設備の発電量の低下を検出する方法、装置、およびプログラム |
JP2017184472A (ja) * | 2016-03-30 | 2017-10-05 | 株式会社ラプラス・システム | 太陽光発電システムの発電診断方法、及び発電診断装置 |
JP2018084421A (ja) * | 2016-11-21 | 2018-05-31 | 濱田重工株式会社 | 太陽光発電監視装置及び太陽光発電監視方法 |
WO2019130718A1 (ja) * | 2017-12-28 | 2019-07-04 | 住友電気工業株式会社 | 判定装置、太陽光発電システム、判定方法および判定プログラム |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN116761306A (zh) * | 2023-08-14 | 2023-09-15 | 华能山东发电有限公司烟台发电厂 | 一种两用照明装置的照明优化方法及系统 |
CN116761306B (zh) * | 2023-08-14 | 2023-11-07 | 华能山东发电有限公司烟台发电厂 | 一种两用照明装置的照明优化方法及系统 |
CN117325690A (zh) * | 2023-08-25 | 2024-01-02 | 珠海康晋电气股份有限公司 | 基于智能协同管控的新能源充电桩电力控制系统 |
CN117325690B (zh) * | 2023-08-25 | 2024-05-14 | 珠海康晋电气股份有限公司 | 基于智能协同管控的新能源充电桩电力控制系统 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Dhimish et al. | Parallel fault detection algorithm for grid-connected photovoltaic plants | |
Dhimish et al. | Comparing Mamdani Sugeno fuzzy logic and RBF ANN network for PV fault detection | |
US8482309B2 (en) | Failure detecting method for a solar power generation system | |
Lujano-Rojas et al. | Probabilistic modelling and analysis of stand-alone hybrid power systems | |
CN104167988B (zh) | 一种光伏系统效率异常告警的判断方法 | |
KR101238620B1 (ko) | 태양광발전 시스템의 고장 인식 장치 및 이의 진단 방법 | |
US20140188410A1 (en) | Methods for Photovoltaic Performance Disaggregation | |
EP3059856A1 (en) | Method for predicting a future timing of lowering of a current value or power generation quantity of a solar power generation system | |
KR102230548B1 (ko) | Frbfnn 모델을 이용한 태양광 발전설비의 발전예측 및 효율진단 시스템 | |
WO2016166991A1 (ja) | 太陽光発電設備の診断システムおよびプログラム | |
Iyengar et al. | Solarclique: Detecting anomalies in residential solar arrays | |
JP2021040451A (ja) | ソーラー装置の発電エフィシェンシーの異常の判断方法 | |
Liu et al. | Condition classification and performance of mismatched photovoltaic arrays via a pre-filtered Elman neural network decision making tool | |
CN115208310A (zh) | 一种光伏发电系统的监控方法 | |
Soffiah et al. | Fault detection in grid connected PV system using artificial neural network | |
AL-DAHOUD et al. | Machine Learning in Renewable Energy Application: Intelligence System for Solar Panel Cleaning | |
CN104767480A (zh) | 用于汇流箱的汇流检测方法及系统、太阳能电站 | |
Wong et al. | Operational performance and economic analysis of three PV tracking technologies in an Australian PV plant | |
TWI671996B (zh) | 判斷太陽能發電模組朝向的方法 | |
TW201727559A (zh) | 再生能源電廠的管理方法與系統 | |
TWI716990B (zh) | 太陽能裝置發電效能異常判斷方法 | |
CN104779914A (zh) | 用于汇流箱的汇流检测方法及系统、太阳能电站 | |
Rodil et al. | A novel methodology for determination of soiling on PV panels by means of grey box modelling | |
CN104796086A (zh) | 用于汇流箱的汇流检测方法及系统、太阳能电站 | |
CN104767485A (zh) | 用于汇流箱的汇流检测方法及系统、太阳能电站 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20190904 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20201006 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20210106 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20210305 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20210608 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20210908 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20211207 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20220628 |