JP2020122359A - Floor slab erection system, additional floor slab installation method, and floor slab removing method - Google Patents

Floor slab erection system, additional floor slab installation method, and floor slab removing method Download PDF

Info

Publication number
JP2020122359A
JP2020122359A JP2019015858A JP2019015858A JP2020122359A JP 2020122359 A JP2020122359 A JP 2020122359A JP 2019015858 A JP2019015858 A JP 2019015858A JP 2019015858 A JP2019015858 A JP 2019015858A JP 2020122359 A JP2020122359 A JP 2020122359A
Authority
JP
Japan
Prior art keywords
slab
floor slab
floor
erection machine
carrier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2019015858A
Other languages
Japanese (ja)
Inventor
浩郎 南
Hiroo Minami
浩郎 南
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Kajima Corp
Original Assignee
Kajima Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Kajima Corp filed Critical Kajima Corp
Priority to JP2019015858A priority Critical patent/JP2020122359A/en
Publication of JP2020122359A publication Critical patent/JP2020122359A/en
Pending legal-status Critical Current

Links

Abstract

To ensure the additional installation (or removal) of a floor slab with stability using a floor slab erection machine 10 and a floor slab carrying truck 30.SOLUTION: A floor slab erection machine 10 includes a movable body 11 that is movable on floor slabs 2A to 2M, and a floor slab weight lifting mechanism 15 that is supported by the movable body 11 and has a suspension point in a front side in the direction of traveling of the movable body 11, so as to move on the installed floor slabs 2A to 2M, thereby installing a floor slab 2N ahead of the floor slab 2M. A floor slab carrying truck 30 is for carrying the floor slab 2N which is additionally installed by the floor slab erection machine 10, and can pass through the passing space of the floor slab erection machine 10 to move from the rear side into the front side of the floor slab erection machine 10 while loading the floor slab 2N.SELECTED DRAWING: Figure 1

Description

本発明は、橋梁などにおいて橋軸方向に並べられて路面を構成する床版の架設システム及び架設方法(増設方法及び減設方法)に関する。ここにおいて、「架設」とは、新設床版の設置(増設)の他、架け替えのための既設床版の撤去(減設)を含む概念とする。 The present invention relates to a floor slab erection system and a erection method (extension method and reduction method) of bridges and the like that are arranged in the bridge axis direction to form a road surface. Here, "erection" is a concept including installation (expansion) of a new floor slab and removal (reduction) of an existing floor slab for replacement.

従来の床版架設システムでは、一般的に、床版架設機が床版上を移動して、床版の増設又は減設を行う。すなわち、床版架設機が設置済みの新設床版上を移動して、その移動方向前方に、新設床版を設置(増設)する。又は、床版架設機が撤去前の既設床版上を移動して、その移動方向後方の既設床版を撤去(減設)する。
また、かかる従来の床版架設システムでは、床版架設機と組み合わせて、床版運搬台車を使用する。床版運搬台車は、床版架設機が増設する床版又は減設した床版を運搬(搬入又は搬出)する。
In the conventional slab erection system, a slab erection machine generally moves on the slab to add or remove the slab. That is, the floor slab erection machine moves on the already installed new floor slab, and the new floor slab is installed (added) in front of the moving direction. Alternatively, the floor slab erection machine moves on the existing floor slab before removal, and the existing floor slab behind the moving direction is removed (removed).
Further, in such a conventional slab erection system, a slab carrier is used in combination with a slab erection machine. The slab carrier carries (carries in or out) the slab that the slab erection machine adds or the slab that has been reduced.

かかる従来の床版架設システムで用いられる床版架設機としては、例えば特許文献1に記載の床版架設機が知られている。これは、橋軸方向前後の門型フレームを連結してなる無軌条・自走式の門型構造体と、門型構造体の天井部の下面側に前後方向及び横方向に移動可能に設けられる吊り装置(例えばチェーンブロック)と、を備えている。 As a slab erection machine used in such a conventional slab erection system, for example, a slab erection machine described in Patent Document 1 is known. This is a railless, self-propelled gate-shaped structure that connects gate-shaped frames in the front and rear of the bridge axis, and is provided on the lower surface of the ceiling of the gate-shaped structure so as to be movable in the front-rear and lateral directions. And a hanging device (for example, a chain block) that is used.

このような床版架設機を用いたプレキャストコンクリート製の新設床版の架設作業は、
(1)床版架設機の後部での新設床版の取込み、すなわち、床版架設機の後部に位置させた吊り装置による、新設床版の長辺を橋軸方向に向けた状態での、新設床版の吊り上げ
(2)吊り装置の前側への移動による、新設床版の架設位置までの移送
(3)新設床版の長辺を橋軸直角方向に向けるように、新設床版の向きの変更(90°回転)
(4)そして、所定位置への設置
という工程で行われる。
The erection work of a new slab made of precast concrete using such a slab erection machine,
(1) Incorporation of a new floor slab in the rear part of the floor slab laying machine, that is, in the state where the long side of the new floor slab is directed in the bridge axis direction by a suspension device positioned at the rear part of the floor slab erection machine, Lifting the new floor slab (2) Transfer of the new floor slab to the erection position by moving the lifting device to the front side (3) Orientation of the new floor slab so that the long side of the new floor slab is oriented in the direction perpendicular to the bridge axis Change (90° rotation)
(4) Then, it is carried out in the process of installation at a predetermined position.

特許第3901657号公報(特開2004−300689)Japanese Patent No. 3901657 (Japanese Patent Laid-Open No. 2004-300689)

しかしながら、特許文献1に記載の床版架設機では、床版架設機の後部にて吊り装置により床版運搬台車などから床版を吊り上げて取込んだ後、吊り装置と共に床版を床版架設機の後部から前方へ移動させてから、床版を設置するようになっている。 However, in the floor slab erection machine described in Patent Document 1, after the floor slab is hoisted from a floor slab carrier or the like by a suspension device at the rear of the floor slab erection machine, the floor slab is installed together with the suspension device. The slab is installed after moving it from the rear of the machine to the front.

このため、床版架設機内で床版を吊り上げた状態で床版架設機の後部から前方へ長い距離移動させる必要があり、吊り装置の大掛かりな移動機構が必要となり、しかも移動に際し十分な安定性を確保する必要から、床版架設機の大型化を招く。
また、床版を吊った状態で長い距離動かすことから、床版を設置する際に、床版を安定的に設置するのが難しくなるという問題点もあった。
そして、これらは作業効率の悪化を招き、架設作業のコスト及び工期の増大を招く。
For this reason, it is necessary to move the slab in the slab erection machine in a state of being lifted, from the rear part of the slab erection machine to the front for a long distance, and a large-scale moving mechanism of the suspension device is required. As a result, the floor slab erection machine becomes larger.
Moreover, since the floor slab is moved for a long distance in a suspended state, it is difficult to stably install the floor slab when installing the floor slab.
And, these lead to deterioration of work efficiency, leading to an increase in construction work cost and construction period.

本発明は、このような実状に鑑み、床版架設機と床版運搬台車とを用いる床版架設システムにおいて、床版運搬台車の機能性向上により床版架設機及び架設作業の簡素化を図ることができるようにすることを課題とする。 In view of such an actual situation, the present invention, in a floor slab erection system using a slab erection machine and a slab dolly, simplifies the slab erection machine and erection work by improving the functionality of the slab dolly. The challenge is to be able to do so.

本発明に係る床版架設システムは、床版上を移動して床版の増設を行う床版架設機と、前記床版架設機が増設する床版を運搬する床版運搬台車と、を含み、
前記床版架設機は、床版上を移動可能な移動体と、前記移動体に支持されて前記移動体の移動方向前方に吊り点を有する床版揚重機構と、を含み、
前記床版運搬台車は、床版を積載した状態で、前記移動体の移動方向で見て、前記移動体の後方から前方へ、進入可能である。
The slab erection system according to the present invention includes a slab erection machine that moves on the slab to add a slab, and a slab carrier that transports the slab to be added by the slab erection machine. ,
The slab erection machine includes a movable body that is movable on the slab, and a slab lifting mechanism that is supported by the movable body and has a suspension point in front of the moving direction of the movable body,
The floor slab carriage is capable of entering from the rear to the front of the moving body when seen in the moving direction of the moving body with the floor slab loaded.

本発明に係る床版架設システムは、また、床版上を移動して床版の減設を行う床版架設機と、前記床版架設機が減設した床版を運搬する床版運搬台車と、を含み、
前記床版架設機は、床版上を移動可能な移動体と、前記移動体に支持されて前記移動体の移動方向後方に吊り点を有する床版揚重機構と、を含み、
前記床版運搬台車は、床版を積載した状態で、前記移動体の移動方向で見て、前記移動体の後方から前方へ、退出可能である。
The slab erection system according to the present invention also includes a slab erection machine that moves on the slab and reduces the slab, and a slab carrier for transporting the slab that the slab erection machine has reduced. And including,
The floor slab installation machine includes a movable body that is movable on the floor slab, and a floor slab lifting mechanism that is supported by the movable body and has a hanging point behind in the moving direction of the movable body,
The floor slab carrier is capable of exiting from the rear of the moving body to the front of the moving body when viewed in the moving direction of the moving body while the floor slab is loaded.

本発明に係る床版の増設方法は、床版上を移動して床版の増設を行う床版架設機と、前記床版架設機が増設する床版を運搬する床版運搬台車とを用い、
前記床版架設機が床版増設位置より後方に移動すると共に、前記床版運搬台車が床版を積載して、前記床版架設機の後方から前方へ進入する工程と、
前記床版架設機が床版揚重機構により前記床版運搬台車から床版を荷揚げする工程と、
前記床版運搬台車が前記床版架設機の前方から後方へ退出する工程と、
前記床版架設機が床版増設位置にて床版揚重機構により増設する床版を荷卸しして設置する工程と、
を含む。
The method of adding a floor slab according to the present invention uses a floor slab erection machine that moves on the slab to add a slab and a floor slab carrier that carries the floor slab added by the slab erection machine. ,
A step of moving the floor slab installation machine rearward from the floor slab extension position, loading the floor slab by the floor slab carrier, and advancing from the rear to the front of the floor slab installation machine;
A step of unloading a slab from the slab carrier by the slab erection machine using a slab lifting mechanism;
A step of leaving the floor slab carrier from the front to the rear of the floor slab installation machine;
A step of unloading and installing the floor slab to be added by the floor slab lifting mechanism at the floor slab erection machine,
including.

本発明に係る床版の減設方法は、床版上を移動して床版の減設を行う床版架設機と、前記床版架設機が減設した床版を運搬する床版運搬台車とを用い、
前記床版架設機が床版減設位置にて床版揚重機構により減設する床版を荷揚げして撤去する工程と、
前記床版架設機が床版減設位置より前方に移動すると共に、前記床版運搬台車が、空荷で、前記床版架設機の前方から後方へ進入する工程と、
前記床版架設機が床版揚重機構により前記床版運搬台車に床版を荷卸しする工程と、
前記床版運搬台車が床版を積載して前記床版架設機の後方から前方へ退出する工程と、
を含む。
A floor slab reduction method according to the present invention includes a floor slab erection machine that moves on the floor slab to reduce the floor slab, and a floor slab carrier that transports the floor slab reduced by the floor slab erection machine. And
A step of unloading and removing the floor slab to be removed by the floor slab lifting mechanism at the floor slab erection machine,
While the slab erection machine moves forward from the slab slab removal position, the slab dolly is empty, and a step of entering from the front of the slab erection machine to the rear,
The slab erection machine unloads the slab to the slab carrier by a slab lifting mechanism,
A step of loading the floor slab with the floor slab and retreating from the rear to the front of the slab erection machine;
including.

本発明によれば、床版の増設作業時は、床版運搬台車が床版を積載した状態で床版架設機の後方から前方へ進入可能であるという構成により、床版架設機及び架設作業の簡素化を図ることができる。
また、床版の減設作業時は、床版運搬台車が床版を積載した状態で床版架設機の後方から前方へ退出可能であるという構成により、床版架設機及び架設作業の簡素化を図ることができる。
According to the present invention, when the floor slab is added, the floor slab carrier is configured to be able to enter from the rear to the front of the slab erection machine with the floor slab being loaded. Can be simplified.
In addition, during the floor slab reduction work, the slab trolley can be exited from the rear to the front of the slab erection machine with the floor slab loaded, simplifying the slab erection work and erection work. Can be planned.

本発明の一実施形態として示す床版増設作業中のシステム全体の側面図Side view of the entire system during floor slab extension work shown as an embodiment of the present invention 床版増設作業中の床版架設機の側面図Side view of slab erection machine during slab extension work 床版架設機及び床版運搬台車の正面図Front view of slab erection machine and slab carrier 床版架設機の平面図Floor plan of slab erection machine 床版運搬台車の側面図Side view of slab carrier 床版運搬台車の平面図Floor plan trolley plan view 床版増設作業(1)の側面図及び平面図Side view and floor plan of floor slab extension work (1) 床版増設作業(2)の側面図及び平面図Side view and floor plan of floor slab extension work (2) 床版増設作業(3)の側面図及び平面図Side view and floor plan of floor slab extension work (3) 床版増設作業(4)の側面図及び平面図Side view and floor plan of floor slab extension work (4) 床版増設作業(5)の側面図及び平面図Side view and floor plan of floor slab extension work (5) 床版増設作業(6)の側面図及び平面図Side view and floor plan of floor slab extension work (6) 床版増設作業(7)の側面図及び平面図Side view and floor plan of floor slab extension work (7) 他の実施形態として示す床版減設作業中のシステム全体の側面図Side view of the entire system during floor slab reduction work shown as another embodiment 床版減設作業中の床版架設機の側面図Side view of floor slab installation machine during floor slab reduction work

以下、本発明の実施の形態について、主に床版増設作業の例で、説明する。
図1は本発明の一実施形態として示す床版増設作業中のシステム全体の側面図であり、床版架設機10と床版運搬台車30とが図示されている。
Hereinafter, an embodiment of the present invention will be described mainly by way of an example of floor slab extension work.
FIG. 1 is a side view of the entire system during a floor slab extension work as one embodiment of the present invention, in which a floor slab installation machine 10 and a floor slab carrier 30 are illustrated.

図2は床版増設作業中の床版架設機10の側面図、図3は床版架設機10及び床版運搬台車30の正面図、図4は床版架設機10の平面図である。また、図5は床版運搬台車30の側面図、図6は床版運搬台車30の平面図である。 2 is a side view of the floor slab erection machine 10 during the floor slab extension work, FIG. 3 is a front view of the floor slab erection machine 10 and the floor slab carrier 30, and FIG. 4 is a plan view of the floor slab erection machine 10. 5 is a side view of the floor slab carrier 30 and FIG. 6 is a plan view of the floor slab carrier 30.

図1、図2及び図3に示されるように、橋梁の主桁(橋桁)1は、H形鋼などにより構成されて橋軸方向に延在している。主桁1はまた、図3からわかるように、本実施形態では4列構成である。 As shown in FIGS. 1, 2 and 3, the main girder (bridge girder) 1 of the bridge is made of H-shaped steel or the like and extends in the bridge axial direction. As shown in FIG. 3, the main girder 1 also has a four-column structure in this embodiment.

床版2(2A、2B、2C、・・・、2H、・・・、2M)は、床版架設機10により、1枚ずつ、主桁1の上に、主桁1の延在方向に並べられて、設置され、これにより路面を構成する。尚、床版2については、設置順に2A、2B、2C、・・・と記している。 The floor slabs 2 (2A, 2B, 2C,..., 2H,..., 2M) are placed one by one on the main girder 1 in the extending direction of the main girder 1 by the floor slab erection machine 10. They are lined up and installed to form a road surface. Note that the floor slab 2 is described as 2A, 2B, 2C,... In the order of installation.

図1(及び図2)では、床版増設作業は左から右へ矢印方向に進行する。従って、図1の左側には、主桁1の上に設置済みの新設床版2A〜2Mがあり、次に設置する新設床版2N(床版架設機10が吊り上げている設置用の新設床版2N)は、最新に設置された新設床版2Mに隣接する位置に設置されることになる。 In FIG. 1 (and FIG. 2), the floor slab extension work proceeds from left to right in the arrow direction. Therefore, on the left side of FIG. 1, there are new floor slabs 2A to 2M already installed on the main girder 1, and new floor slabs 2N to be installed next (new floor slabs for installation suspended by the floor slab erection machine 10) are installed. The slab 2N) will be installed at a position adjacent to the newly installed new floor slab 2M.

また、床版増設作業の進行方向が床版架設機10の基本的な移動方向となる。従って、床版架設機10が図1で右側に進むことを前進といい、逆に左側に進むことを後退という。また、床版架設機10の図1で右側が前方、図1で左側が後方となる。 Further, the progress direction of the floor slab addition work is the basic movement direction of the floor slab erection machine 10. Therefore, when the slab erection machine 10 moves to the right in FIG. 1, it is called forward, and when it goes to the left, it is called backward. The right side of the slab erection machine 10 in FIG. 1 is the front side, and the left side in FIG. 1 is the rear side.

本実施形態において、床版2(2A、2B、2C、・・・)は、鉄筋入りプレキャストコンクリート製であり、その短辺を橋軸方向に沿わせ、長辺を橋軸直角方向に沿わせて、設置する。床版2の短辺の長さは例えば2.5m、長辺の長さは例えば10mである。 In the present embodiment, the floor slab 2 (2A, 2B, 2C,...) is made of recast precast concrete, with its short sides along the bridge axis direction and its long sides along the bridge axis perpendicular direction. Install. The short side of the floor slab 2 has a length of 2.5 m, for example, and the long side has a length of 10 m, for example.

橋軸方向に隣り合う床版2(例えば図2の2Lと2M)は、30〜40cm程度の隙間(図2中のs)をあけて設置される。各床版2の長辺からはこの隙間に向かって鉄筋(定着用の継手;図2中のj)が突出している。尚、この隙間には、床版2の設置後に、間詰めコンクリート(モルタル)が打設される。 Floor slabs 2 (for example, 2L and 2M in FIG. 2) adjacent to each other in the bridge axis direction are installed with a gap (s in FIG. 2) of about 30 to 40 cm. Reinforcing bars (fixing joints; j in FIG. 2) project from the long sides of each floor slab 2 toward this gap. In this gap, after the floor slab 2 is installed, filling concrete (mortar) is placed.

床版架設機10は、設置済みの新設床版2A〜2M上、特に本実施形態では新設床版2A〜2M上にH形鋼などからなる枕木3を介して敷設されたレール4上を移動して、最新に設置された新設床版2Mの前方に新設床版2Nを設置する。 The slab erection machine 10 moves on the installed new slabs 2A to 2M, particularly on the rails 4 laid on the new slabs 2A to 2M in this embodiment via the sleepers 3 made of H-shaped steel or the like. Then, the new floor slab 2N is installed in front of the newly installed new floor slab 2M.

このため、床版架設機10は、床版2上を移動可能な移動体11と、この移動体11に支持されて移動体11の移動方向前方に吊り点を有する床版揚重機構15とを含む。 Therefore, the slab erection machine 10 includes a moving body 11 that can move on the slab 2, and a slab lifting mechanism 15 that is supported by the moving body 11 and has a hanging point in front of the moving direction of the moving body 11. including.

移動体11は、移動方向前側の第1台車12と移動方向後側の第2台車13とに分離構成され、これらの台車12、13は連結部材(連結ロッド及びワイヤ)14により連結されて一体的に移動する。 The moving body 11 is configured to be separated into a first carriage 12 on the front side in the movement direction and a second carriage 13 on the rear side in the movement direction, and these carriages 12 and 13 are integrally connected by a connecting member (connecting rod and wire) 14. Move.

床版揚重機構15は、移動体11の第1台車12に立設された支柱16に支持されて第1台車12の移動方向前方に張り出した桁17と、この桁17の先端側に設けられた吊り装置18とを含んで構成される。
吊り装置18は、少なくともシーブ又はワイヤ繰出し部を含み、ウインチなどの動力部は吊り装置18と一体でなくてもよい。吊り装置18は、床版運搬台車30から、床版2を吊り上げて受取り、床版設置位置の上方から床版2を吊り下ろすことで、床版2を所定の位置に設置することができる。
The slab lifting mechanism 15 is provided on a front end of the girder 17, which is supported by a column 16 standing on the first dolly 12 of the moving body 11 and projects toward the front in the moving direction of the first dolly 12. The hanging device 18 is provided.
The suspension device 18 includes at least a sheave or a wire payout portion, and a power unit such as a winch may not be integrated with the suspension device 18. The hanging device 18 can install the floor slab 2 at a predetermined position by hoisting and receiving the floor slab 2 from the floor slab carrier 30 and hanging the floor slab 2 from above the floor slab installation position.

ここにおいて、吊り装置18は桁17により支持され、桁17は移動体11(第1台車12)の移動方向前方に張り出しているため、吊り装置18自体を前後に移動させることなく、床版運搬台車30からの床版2の吊り上げ、床版設置位置への吊り下ろしが可能となる。 Here, since the suspension device 18 is supported by the girder 17, and the girder 17 projects to the front in the moving direction of the moving body 11 (first carriage 12 ), the suspension device 18 itself is not moved back and forth, and thus the floor slab transportation is performed. It is possible to lift the floor slab 2 from the carriage 30 and hang it down to the floor slab installation position.

また、床版2用の吊り装置18とは別に、補助の吊り装置19が桁17の前側に設けられる。この補助の吊り装置19は、床版2の設置と同時進行で枕木3及びレール4を設置する場合に、これらの吊り上げ、吊り下ろしに用いることができる。 In addition to the suspension device 18 for the floor slab 2, an auxiliary suspension device 19 is provided on the front side of the girder 17. When the sleepers 3 and the rails 4 are installed simultaneously with the installation of the floor slab 2, this auxiliary lifting device 19 can be used for lifting and lowering these.

第1台車12が床版揚重機構15を搭載するのに対し、第2台車13は、カウンターウエイト20を搭載する。 The first carriage 12 is equipped with a floor slab lifting mechanism 15, while the second carriage 13 is equipped with a counterweight 20.

カウンターウエイト20は、第1台車12における床版揚重機構15の支持部(支柱16)から離れた吊り装置18の吊り点にかかる荷重によるモーメントを打ち消すためのものである。 The counterweight 20 is for canceling the moment due to the load applied to the suspension point of the suspension device 18 which is separated from the support portion (support 16) of the floor slab lifting mechanism 15 in the first carriage 12.

従って、吊り上げる床版2の荷重をFW、支柱16から吊り点までの距離(桁17の長さ)をL1、支柱16からカウンターウエイト20までの距離(連結部材14の長さ)をL2、とすると、カウンターウエイト20の重さCWは、下記のように設定する。
CW×L2≧FW×L1
CW≧FW×(L1/L2)
よって、L2>>L1とすることで、カウンターウエイト20(重さCW)の軽量化を図ることができる。
Therefore, the load of the floor slab 2 to be lifted is FW, the distance from the support 16 to the suspension point (length of the girder 17) is L1, and the distance from the support 16 to the counterweight 20 (length of the connecting member 14) is L2. Then, the weight CW of the counterweight 20 is set as follows.
CW×L2≧FW×L1
CW≧FW×(L1/L2)
Therefore, the weight of the counterweight 20 (weight CW) can be reduced by setting L2>>L1.

本実施形態では、第1台車12と第2台車13は連結部材14で連結されているため、連結部材14の長さを調整することで、支柱16からカウンターウエイト20までの距離を長く設定することができる。従って、カウンターウエイト20の軽量化を図りやすい。そして、カウンターウエイト20の軽量化は床版への負荷軽減につながる。 In the present embodiment, since the first carriage 12 and the second carriage 13 are connected by the connecting member 14, by adjusting the length of the connecting member 14, the distance from the column 16 to the counterweight 20 is set to be long. be able to. Therefore, it is easy to reduce the weight of the counterweight 20. Further, the weight reduction of the counterweight 20 leads to the reduction of the load on the floor slab.

移動体11はまた、左右の接地部、本実施形態では左右の車輪(軌道輪)21で、床版2上(床版2上に枕木3を介して敷設された左右一対のレール4)に支持されていて、左右の接地部間、従って左右の車輪21間に、床版運搬台車30が通り抜けることのできる空間25を有する(図3参照)。 The moving body 11 is also provided with left and right ground contact portions, in the present embodiment, left and right wheels (race wheels) 21, on the floor slab 2 (a pair of left and right rails 4 laid on the floor slab 2 via sleepers 3). There is a space 25, which is supported and between the left and right ground contact parts, and thus between the left and right wheels 21, through which the slab carrier 30 can pass (see FIG. 3).

本実施形態では、移動体11の下方に通り抜け用の空間25を形成するための移動体11の左右の接地部として、車輪21を設けている。これにより、接地部で走行でき、接地部が走行部を兼ねることができる。また、特に軌道輪とすることで、通り抜け用の空間25の位置を安定させることができる。 In the present embodiment, the wheels 21 are provided as the left and right ground contact portions of the moving body 11 for forming the space 25 for passing therethrough under the moving body 11. As a result, the vehicle can travel on the ground contact portion, and the ground contact portion can also serve as the traveling portion. In addition, particularly by using a bearing ring, the position of the space 25 for passage can be stabilized.

詳しくは、移動体11の第1台車(第1車輪保持部)12は、図3に示されるように、第1台車12上に立設される支柱16と共に左右一対設けられ、左右の支柱16、16が比較的高位置で横つなぎ部材22により剛結されている。
また、桁17は、図4の平面図に示されるように、左右の支柱16、16から前方に突設されて、先端側で横つなぎ部17aにより連結されている。従って、桁17は平面視でコ字形のフレーム形状をなしている。
Specifically, as shown in FIG. 3, a pair of left and right first trolleys (first wheel holding portions) 12 of the moving body 11 are provided together with a stanchion 16 erected on the first trolley 12. , 16 are rigidly connected by a horizontal connecting member 22 at a relatively high position.
Further, as shown in the plan view of FIG. 4, the girder 17 is provided so as to project forward from the left and right struts 16 and is connected to the tip end side by a horizontal connecting portion 17a. Therefore, the girder 17 has a U-shaped frame shape in a plan view.

第2台車(第2車輪保持部)13についても同様で、第2台車13上に搭載されるカウンターウエイト20と共に左右一対設けられる。そして、左右の第2台車13、13にそれぞれ支柱23、23が設けられ、左右の支柱23、23が比較的高位置で横つなぎ部材24により剛結されている。
また、連結部材14についても同様で、左右一対設けられる。
The same applies to the second carriage (second wheel holding portion) 13, and a pair of right and left is provided together with the counterweight 20 mounted on the second carriage 13. The columns 23, 23 are provided on the left and right second carriages 13, 13 respectively, and the columns 23, 23 on the left and right are rigidly connected at a relatively high position by a horizontal connecting member 24.
The same applies to the connecting members 14, and a left and right pair are provided.

従って、左右の第1台車12、12間、及び、左右の第2台車13、13間で、横つなぎ部材22、24及び横つなぎ部17aより下方に、床版運搬台車30が通り抜けることができる空間25が形成される。 Therefore, the floor slab carrier 30 can pass below the left and right first carriages 12, 12 and between the left and right second carriages 13, 13 below the horizontal connecting members 22, 24 and the horizontal connecting portion 17a. A space 25 is formed.

次に床版運搬台車30について、図1、図3、図5及び図6により説明する。
床版運搬台車30は、床版架設機10が増設する床版2Nを運搬(搬入)するもので、設置済みの新設床版2A〜2M上、特に新設床版2A〜2M上に枕木3を介して敷設された左右一対のレール5上を移動する。
床版運搬台車30用の左右一対のレール5は、床版架設機10用の左右一対のレール4と同じ枕木3を利用して、床版架設機10用の左右一対のレール4間に敷設される。
Next, the floor slab carrier 30 will be described with reference to FIGS. 1, 3, 5, and 6.
The floor slab carrier 30 transports (carries in) the floor slab 2N to be added by the floor slab erection machine 10, and puts the sleepers 3 on the installed new floor slabs 2A to 2M, particularly on the new floor slabs 2A to 2M. It moves on the pair of right and left rails 5 laid via the rails.
The pair of left and right rails 5 for the slab carrier 30 are laid between the pair of left and right rails 4 for the slab erection machine 10 using the same sleepers 3 as the pair of left and right rails 4 for the slab erection machine 10. To be done.

床版運搬台車30は、橋軸方向(レール5の延在方向)に長い車体31と、車体31の下部に取付けられて左右一対のレール5上を転動する車輪(軌道輪)32と、を備えている。床版運搬台車30は、更に、車体31上に、床版2を積載しかつ向きを変えることができるターンテーブル33を備えている。 The slab carrier 30 includes a vehicle body 31 that is long in the bridge axis direction (extending direction of the rails 5 ), wheels (race wheels) 32 that are attached to the lower portion of the vehicle body 31 and roll on the pair of left and right rails 5, Equipped with. The floor slab carrier 30 further includes a turntable 33 on which a floor slab 2 can be loaded and turned on a vehicle body 31.

ターンテーブル33は、車体31に支持されて水平面内を回転可能な円形の旋回部33aと、旋回部33a上に固定支持された長方形状の床版載置部33bとからなる。 The turntable 33 includes a circular swivel portion 33a that is supported by the vehicle body 31 and is rotatable in a horizontal plane, and a rectangular floor slab mounting portion 33b that is fixed and supported on the swivel portion 33a.

従って、床版運搬台車30は、ターンテーブル33の旋回部33aにより、床版載置部33bの長手方向を床版運搬台車30の移動方向に合わせることで、床版2を積載した状態で床版架設機10の前記空間25を通り抜けることができる。
床版運搬台車30は、また、ターンテーブル33の旋回部33aにより、床版載置部33bの向きを変えることで、床版載置部33b上に積載された床版2の向きを変え、床版2の長手方向を橋軸直角方向にして、設置時の方向に合わせることができる。
Therefore, the floor slab carrier 30 is configured such that the turning portion 33 a of the turntable 33 aligns the longitudinal direction of the floor slab mounting portion 33 b with the moving direction of the floor slab carrier 30 so that the floor slab 2 is loaded with the floor slab 2. It can pass through the space 25 of the plate erection machine 10.
The slab carrier 30 also changes the orientation of the floor slab 2 mounted on the floor slab mounting portion 33b by changing the orientation of the floor slab mounting portion 33b by the turning portion 33a of the turntable 33. The longitudinal direction of the floor slab 2 can be set to the direction perpendicular to the bridge axis so that it can be aligned with the direction at the time of installation.

次に、上記の床版架設機10と床版運搬台車30とを用いた床版増設作業について、図7〜図13の工程図を参照しつつ、説明する。尚、図7〜図13において、各図の(A)は側面図、(B)は平面図である。 Next, the floor slab extension work using the floor slab erection machine 10 and the floor slab carrier 30 will be described with reference to the process diagrams of FIGS. 7 to 13. 7 to 13, (A) is a side view and (B) is a plan view.

図7は床版2Mの設置を終えた状態で、床版架設機10は、未だ床版2Mを増設したときの床版増設位置にいる。床版運搬台車30は、次に設置する床版(床版2Mの前方に隣接させて次に設置する床版)2Nを積載して、床版架設機10の近くまで到達したところである。尚、床版運搬台車30において、設置用の床版2Nは、床版長手方向を床版橋軸方向に向けた状態で積載している。 FIG. 7 shows a state in which the floor slab 2M has been installed, and the floor slab erection machine 10 is still in the floor slab addition position when the floor slab 2M is added. The floor slab carrier 30 has just loaded a floor slab to be installed next (a floor slab to be installed next to the front of the floor slab 2M) 2N and has reached the vicinity of the slab erection machine 10. In the floor slab carrier 30, the floor slab 2N for installation is loaded with the floor slab longitudinal direction oriented in the floor slab bridge axis direction.

次に図8に示すように、床版架設機10が床版増設位置より後方に移動すると共に、床版運搬台車30が、床版2Nを積載したまま、床版架設機10の通り抜け空間(図3の25)を通って、床版架設機10の後方から前方へ進入する。 Next, as shown in FIG. 8, the floor slab erection machine 10 moves rearward from the slab slab extension position, and the slab dolly carrier 30 keeps the floor slab 2N loaded while passing through the floor slab erection machine 10 through the space ( Passing from the rear side to the front side of the floor slab erection machine 10 through 25) in FIG.

次に図9に示すように、床版運搬台車30において、ターンテーブル33(床版載置部33b)を90°回転させ、積載している床版2Nの向きを、床版長手方向が橋軸直角方向となるように、変更する。従って、図10での床版架設機10の後退移動する位置は、床版架設機10の前方に、床版運搬台車30がターンテーブル33により床版2Nを旋回させ得るスペースができる位置である。 Next, as shown in FIG. 9, in the floor slab carrier 30, the turntable 33 (the floor slab mounting portion 33b) is rotated by 90° so that the loaded floor slabs 2N are oriented in the longitudinal direction of the bridge. Change so that the direction is perpendicular to the axis. Therefore, the position where the slab erection machine 10 moves backward in FIG. 10 is a position in front of the slab erection machine 10 where there is a space where the slab carriage 30 can turn the slab 2N by the turntable 33. ..

次に図10に示すように、床版架設機10が床版受取位置まで前方へ移動した後、床版架設機10が床版揚重機構15により床版運搬台車30から床版2Nを荷揚げする。
荷揚げ後、床版運搬台車30は、ターンテーブル33(床版載置部33b)を元の位置まで90°回転させて、退出に備える。
Next, as shown in FIG. 10, after the slab erection machine 10 has moved forward to the slab reception position, the slab erection machine 10 uses the slab lifting mechanism 15 to unload the slab 2N from the slab carrier 30. To do.
After unloading, the floor slab carrier 30 rotates the turntable 33 (the floor slab mounting portion 33b) 90° to the original position to prepare for exit.

次に図11に示すように、床版運搬台車30が、空荷状態で、床版架設機10の通り抜け空間を通って、床版架設機10の前方から後方へ退出すると共に、床版架設機10が前進して床版受取位置から床版増設位置へ移動する。床版架設機10の床版受取位置から床版増設位置への移動距離はわずかである。 Next, as shown in FIG. 11, while the floor slab carrier 30 is in an empty state, it passes through the space through which the floor slab erection machine 10 passes, and exits from the front of the floor slab erection machine 10 to the rear, The machine 10 moves forward and moves from the floor slab receiving position to the floor slab extension position. The moving distance from the floor slab receiving position of the floor slab erection machine 10 to the floor slab extension position is short.

次に図12に示すように、床版架設機10が、床版揚重機構15により、増設する床版2Nを荷卸しして、設置済みの床版2Mの前方に隣接させて、設置する。
このとき、床版運搬台車30は空荷状態で図外の新設床版の置き場へ移動している。
Next, as shown in FIG. 12, the floor slab erection machine 10 unloads the floor slab 2N to be added by the floor slab lifting mechanism 15, and installs the floor slab 2M adjacent to the front of the installed floor slab 2M. ..
At this time, the floor slab carrier 30 is moving to a place for placing a new floor slab (not shown) in an empty state.

次に図13に示すように、今回設置した床版2Nの前縁上に、枕木3を設置し、床版2M上の枕木3と床版2N上の枕木3とにより支持させて、レール4を設置する。これらの設置には、床版揚重機構15の吊り装置18とは別の、補助の吊り装置19を用いることができる。
ここで設置する枕木3及びレール4は、床版運搬台車30により床版2Nと共に床版2N上に載せて運搬し、床版2Nの設置後に、床版2N上の所定位置に設置すればよい。
床版運搬車両30用のレール5についても同様である。
Next, as shown in FIG. 13, a sleeper 3 is installed on the front edge of the floor slab 2N installed this time, supported by the sleeper 3 on the floor slab 2M and the sleeper 3 on the floor slab 2N, and the rail 4 Set up. For these installations, an auxiliary suspension device 19 different from the suspension device 18 of the floor slab lifting mechanism 15 can be used.
The sleepers 3 and the rails 4 installed here may be carried on the floor slab 2N together with the floor slab 2N by the floor slab carrier 30 and may be installed at a predetermined position on the floor slab 2N after the floor slab 2N is installed. ..
The same applies to the rail 5 for the floor slab 30.

尚、本実施形態では、枕木3は、設置済みの床版2上に配置したが、床版架設機10の荷重を設置済みの新設床版2にかけたくない場合は、設置済みの新設床版2、2間(隙間)における主桁1上に、脚部(束)付きの枕木を設置し、この枕木上にレールを敷設する構成とすればよい。 In the present embodiment, the sleepers 3 are arranged on the installed floor slab 2, but if the load of the floor slab erection machine 10 is not desired to be applied to the installed new floor slab 2, the installed new floor slab is installed. A sleeper with a leg (bundle) may be installed on the main girder 1 between two and two (gap), and a rail may be laid on the sleeper.

図13は床版2Nの設置を終えた状態で、床版架設機10は、未だ床版2Nを増設したときの床版増設位置にいる。床版運搬台車30は、次に設置する床版(床版2Nの前方に隣接させて次に設置する床版)2Oを積載して、床版架設機10の近くまで到達したところである。図7と図13とを比較すれば、床版増設作業が1枚分進行したことがわかる。 FIG. 13 shows a state in which the floor slab 2N has been installed, and the floor slab erection machine 10 is still at the floor slab extension position when the floor slab 2N is added. The floor slab carrier 30 has just loaded a floor slab to be installed next (a floor slab to be installed next to the front of the floor slab 2N) 20 and has reached the vicinity of the slab erection machine 10. Comparing FIG. 7 and FIG. 13, it can be seen that the floor slab extension work has proceeded for one sheet.

本実施形態によれば、床版の増設作業時は、床版運搬台車30が、床版架設機10の床版設置側である床版架設機10の前方まで進入して、増設用の床版を床版架設機10に受け渡すことできる。従って、床版受取り後、床版設置までの床版架設機10の移動距離を少なくすることができる。これにより、床版を吊った状態から、わずかな動作で、床版を安定的に設置できるようになる。 According to the present embodiment, during the work of adding a floor slab, the floor slab carrier 30 advances to the front of the floor slab erection machine 10 on the floor slab installation side of the slab erection machine 10 to expand the floor slab. The plate can be delivered to the slab erection machine 10. Therefore, the moving distance of the floor slab erection machine 10 after receiving the floor slab and before installing the floor slab can be reduced. As a result, the floor slab can be stably installed with a slight movement from the suspended state.

また、本実施形態によれば、ターンテーブル33付きの床版運搬台車30を用い、床版架設機10の前方で床版の向きを変えることができ、これにより、床版架設機10にて床版の向きを変える必要がなくなる。これも床版の安定的な設置に寄与する。 Further, according to the present embodiment, the floor slab carrier 30 equipped with the turntable 33 can be used to change the direction of the floor slab in front of the slab erection machine 10. There is no need to change the orientation of the slab. This also contributes to the stable installation of the floor slab.

次に、床版減設作業を行う場合について、図14及び図15により、説明する。
図14は本発明の他の実施形態として示す床版減設作業中のシステム全体(床版架設機10及び床版運搬台車30)の側面図、図15は床版減設作業中の床版架設機10の側面図である。
Next, the case of performing the floor slab reduction work will be described with reference to FIGS. 14 and 15.
FIG. 14 is a side view of the entire system (floor erection machine 10 and floor slab carrier 30) during floor slab reduction work as another embodiment of the present invention, and FIG. 15 is a floor slab during floor slab reduction work. It is a side view of the erection machine 10.

図14及び図15に示す床版架設機10及び床版運搬台車30は、図1及び図2に示したものと向きが違うだけで同じものであり、床版増設作業と床版減設作業とで用い方のみが異なる。従って、同一構成要素には同一符号を付してある。また、床版2については、撤去順に2A、2B、2C、・・・と記してある。 The floor slab erection machine 10 and the floor slab carrier 30 shown in FIGS. 14 and 15 are the same as those shown in FIGS. 1 and 2 except that the orientation is the same. Only the usage differs between and. Therefore, the same components are designated by the same reference numerals. Further, regarding the floor slab 2, 2A, 2B, 2C,... Are described in the order of removal.

図14(及び図15)では、床版減設作業は左から右へ矢印方向に進行する。従って、最初に既設床版2Aを撤去する際には、主桁1上に撤去前の既設床版2B、2C、2D、・・・がある。 In FIG. 14 (and FIG. 15), the floor slab reduction work proceeds from left to right in the arrow direction. Therefore, when first removing the existing floor slab 2A, the existing floor slabs 2B, 2C, 2D,... Before removal are present on the main girder 1.

本実施形態の床版架設機10は、床版上を移動可能な移動体11と、移動体11に支持されて移動体11の移動方向後方に吊り点を有する床版揚重機構15と、を含み、撤去前の既設床版2B、2C、2D、・・・上、特にこれらの床版上に枕木3を介して敷設されたレール4上を移動して、その移動方向後方の既設床版2Aを撤去(減設)する。 The slab erection machine 10 of the present embodiment includes a movable body 11 that can move on the slab, a slab lifting mechanism 15 that is supported by the movable body 11 and has a suspension point behind the moving body 11 in the moving direction of the movable body 11. , The existing floor slabs 2B, 2C, 2D,... Before removal, especially on the rails 4 laid on these floor slabs through the sleepers 3, and the existing floors behind the moving direction Version 2A is removed (removed).

本実施形態の床版運搬台車30は、床版架設機10が減設した床版2Aを運搬(搬出)するもので、床版2Aを積載した状態で、床版架設機10の通り抜け空間を通って、床版架設機10の後方から前方へ、退出可能である。 The floor slab carrier 30 of the present embodiment transports (unloads) the floor slab 2A, which has been removed by the floor slab erection machine 10, and in a state in which the floor slab 2A is loaded, a slab through which the floor slab erection machine 10 passes through. It is possible to exit from the rear of the floor slab erection machine 10 to the front through it.

上記の床版架設機10と床版運搬台車30とを用いた床版減設作業は、大略、次のように行われる。 The floor slab reduction work using the floor slab installation machine 10 and the floor slab carrier 30 is generally performed as follows.

(1)床版架設機10が床版減設位置にて床版揚重機構15により減設する床版2Aを荷揚げして撤去する。
(2)床版架設機10が床版減設位置より前方に移動すると共に、床版運搬台車30が、空荷で、床版架設機10の前方から後方へ進入する。
(3)床版架設機10が床版揚重機構15により床版運搬台車30に床版2Aを荷卸しする。この後、床版運搬台車30は、ターンテーブル33により床版2Aの向きを変えて、退出に備える。
(4)床版運搬台車30が床版を積載して床版架設機10の後方から前方へ退出し、これにより減設した床版2Aを搬出する。
(1) The slab erection machine 10 unloads and removes the slab 2A to be removed by the slab lifting mechanism 15 at the slab removal position.
(2) The slab erection machine 10 moves forward from the slab slab reduction position, and the slab carriage 30 moves forward from the slab erection machine 10 to the rear with an empty load.
(3) The slab erection machine 10 uses the slab lifting mechanism 15 to unload the slab 2A onto the slab carrier 30. After this, the floor slab carrier 30 changes the direction of the floor slab 2A by the turntable 33 to prepare for the exit.
(4) The floor slab carrier 30 loads the floor slab and exits from the rear to the front of the slab erection machine 10 to carry out the floor slab 2A that has been reduced.

本実施形態によれば、床版の減設作業時は、床版運搬台車30が、床版架設機10の床版撤去側である床版架設機10の後方まで進入することができるので、床版架設機10が撤去した床版を安定的に床版運搬台車30に荷卸しすることができる。しかも、床版運搬台車30は、床版を積載した状態で、床版架設機10の後方から前方へ退出することができる。従って、床版の減設作業時の床版架設機10の移動距離を少なくして、撤去作業を簡素化することができる。 According to the present embodiment, during the floor slab reduction work, the floor slab carrier 30 can enter to the rear of the slab erection machine 10, which is the slab removal side of the slab erection machine 10. The floor slab removed by the slab erection machine 10 can be stably unloaded to the slab carrier 30. Moreover, the floor slab carrier 30 can exit from the rear of the floor slab erection machine 10 to the front with the floor slab loaded. Therefore, the moving distance of the floor slab erection machine 10 during the floor slab reduction work can be reduced, and the removal work can be simplified.

また、本実施形態によれば、ターンテーブル33付きの床版運搬台車30を用い、床版架設機10の後方で床版の向きを変えることができ、これにより、床版架設機10にて床版の向きを変える必要がなくなる。これも床版の安定的な撤去に寄与する。 Further, according to the present embodiment, the floor slab carrier 30 with the turntable 33 can be used to change the direction of the floor slab behind the floor slab erection machine 10. There is no need to change the orientation of the slab. This also contributes to the stable removal of the floor slab.

上記のように、床版増設作業のみならず、床版減設作業を行うことができる。従って、床版の架け替えに際し、床版減設作業(既設床版の撤去)を行った後、床版増設作業(新設床版の設置)を行うことができる。また、床版架設機及び床版運搬台車を2組用意して、それぞれを床版の架け替え箇所の前後に配置することにより、床版の架け替えを並行して作業することもできる。 As described above, not only the floor slab extension work but also the floor slab reduction work can be performed. Therefore, when replacing the floor slab, it is possible to perform the floor slab addition work (installation of the new floor slab) after the floor slab reduction work (removal of the existing floor slab). Further, by preparing two sets of floor slab installation machines and floor slab carriers and arranging them in front of and behind the floor slab replacement location, respectively, the floor slab replacement can be performed in parallel.

尚、図示の実施形態はあくまで本発明を例示するものであり、本発明は、説明した実施形態により直接的に示されるものに加え、特許請求の範囲内で当業者によりなされる各種の改良・変更を包含するものであることは言うまでもない。 It should be noted that the illustrated embodiment is merely an example of the present invention, and the present invention is not limited to what is directly shown by the described embodiment, and various improvements made by those skilled in the art within the scope of the claims. It goes without saying that it includes changes.

1 主桁
2(2A、2B、2C、・・・、2M、2N) 床版
3 枕木
4 レール
5 レール
10 床版架設機
11 移動体
12 第1台車
13 第2台車
14 連結部材
15 床版揚重機構
16 支柱
17 桁
17a 横つなぎ部
18 吊り装置
19 補助の吊り装置
20 カウンターウエイト
21 車輪
22 横つなぎ部材
23 支柱
24 横つなぎ部材
25 通り抜け空間
30 床版運搬台車
31 車体
32 車輪
33 ターンテーブル
33a 旋回部
33b 床版載置部
1 main girder 2 (2A, 2B, 2C,..., 2M, 2N) floor slab 3 sleepers 4 rails 5 rails 10 floor slab erection machine 11 moving body 12 first truck 13 second truck 14 connecting member 15 floor sill Weight mechanism 16 Struts 17 Girders 17a Horizontal joints 18 Suspension devices 19 Auxiliary suspension devices 20 Counterweights 21 Wheels 22 Horizontal splice members 23 Struts 24 Horizontal splice members 25 Pass-through spaces 30 Floor slab carriers 31 Vehicle bodies 32 Wheels 33 Turntables 33a Turning Part 33b floor plate mounting part

Claims (9)

床版上を移動して床版の増設を行う床版架設機と、前記床版架設機が増設する床版を運搬する床版運搬台車と、を含む、床版架設システムであって、
前記床版架設機は、床版上を移動可能な移動体と、前記移動体に支持されて前記移動体の移動方向前方に吊り点を有する床版揚重機構と、を含み、
前記床版運搬台車は、床版を積載した状態で、前記移動体の移動方向で見て、前記移動体の後方から前方へ、進入可能であることを特徴とする、床版架設システム。
A slab erection system that includes a slab erection machine that moves on the slab and adds a slab, and a slab carrier that carries the slab that the slab erection machine adds,
The slab erection machine includes a movable body that is movable on the slab, and a slab lifting mechanism that is supported by the movable body and has a suspension point in front of the moving direction of the movable body,
The floor slab erection system, wherein the floor slab carrier is capable of entering from the rear side to the front side of the moving body when seen in the moving direction of the moving body while the floor slab is loaded.
床版上を移動して床版の減設を行う床版架設機と、前記床版架設機が減設した床版を運搬する床版運搬台車と、を含む、床版架設システムであって、
前記床版架設機は、床版上を移動可能な移動体と、前記移動体に支持されて前記移動体の移動方向後方に吊り点を有する床版揚重機構と、を含み、
前記床版運搬台車は、床版を積載した状態で、前記移動体の移動方向で見て、前記移動体の後方から前方へ、退出可能であることを特徴とする、床版架設システム。
A slab erection system including a slab erection machine that moves on the slab and removes the slab, and a slab carrier that conveys the slab that the slab erection machine has reduced. ,
The floor slab installation machine includes a movable body that is movable on the floor slab, and a floor slab lifting mechanism that is supported by the movable body and has a hanging point behind in the moving direction of the movable body,
The floor slab installation system, wherein the floor slab carrier is capable of exiting from the rear of the moving body to the front of the moving body when viewed in the moving direction of the moving body with the floor slab loaded.
前記移動体は、左右の接地部で床版上に支持されていて、左右の接地部間に前記床版運搬台車が通り抜けることのできる空間を有する、請求項1又は請求項2記載の床版架設システム。 The floor slab according to claim 1 or 2, wherein the movable body is supported on the floor slab by the left and right ground contact portions, and has a space between the left and right ground contact portions through which the floor slab carriage can pass. Erection system. 前記接地部は、車輪を備える、請求項3記載の床版架設システム。 The floor slab installation system according to claim 3, wherein the ground contact portion includes wheels. 前記移動体は、前記床版揚重機構を支持する第1台車と、前記第1台車に連結部材を介して連結された第2台車とに分離構成され、
前記第2台車は、前記第1台車における前記床版揚重機構の支持部から離れた前記吊り点にかかる荷重によるモーメントを打ち消すためのカウンターウエイトを搭載する、請求項1〜請求項4のいずれか1つに記載の床版架設システム。
The moving body is configured to be separated into a first carriage that supports the floor slab lifting mechanism and a second carriage that is connected to the first carriage via a connecting member,
5. The second carriage is equipped with a counterweight for canceling a moment due to a load applied to the suspension point apart from the supporting portion of the floor slab lifting mechanism in the first carriage, any one of claims 1 to 4. The slab erection system described in 1 above.
前記床版揚重機構は、前記移動体に立設された支柱に支持されて前記移動体の移動方向前方又は後方に張り出した桁と、この桁の先端側に設けられた吊り装置とを含んで構成される、請求項1〜請求項5のいずれか1つに記載の床版架設システム。 The floor slab lifting mechanism includes a girder that is supported by a column that is erected on the moving body and that projects to the front or rear in the moving direction of the moving body, and a suspension device that is provided on the tip side of this girder. The floor slab erection system according to any one of claims 1 to 5, which is configured by. 前記床版運搬台車は、ターンテーブルを有し、ターンテーブル上に積載される床版の向きを変更可能である、請求項1〜請求項6のいずれか1つに記載の床版架設システム。 The floor slab installation system according to any one of claims 1 to 6, wherein the floor slab carrier has a turntable, and the orientation of the floor slab loaded on the turntable can be changed. 床版上を移動して床版の増設を行う床版架設機と、前記床版架設機が増設する床版を運搬する床版運搬台車とを用いる、床版の増設方法であって、
前記床版架設機が床版増設位置より後方に移動すると共に、前記床版運搬台車が床版を積載して、前記床版架設機の後方から前方へ進入する工程と、
前記床版架設機が床版揚重機構により前記床版運搬台車から床版を荷揚げする工程と、
前記床版運搬台車が前記床版架設機の前方から後方へ退出する工程と、
前記床版架設機が床版増設位置にて床版揚重機構により増設する床版を荷卸しして設置する工程と、
を含む、床版の増設方法。
A slab extension method using a slab erection machine that moves on a slab and adds a slab, and a slab carrier that transports the slab to be added by the slab erection machine,
A step of moving the floor slab installation machine rearward from the floor slab extension position, loading the floor slab by the floor slab carrier, and advancing from the rear to the front of the floor slab installation machine;
A step of unloading a slab from the slab carrier by the slab erection machine using a slab lifting mechanism;
A step of leaving the floor slab carrier from the front to the rear of the floor slab installation machine;
A step of unloading and installing the floor slab to be added by the floor slab lifting mechanism at the floor slab erection machine,
How to add floor slabs.
床版上を移動して床版の減設を行う床版架設機と、前記床版架設機が減設した床版を運搬する床版運搬台車とを用いる、床版の減設方法であって、
前記床版架設機が床版減設位置にて床版揚重機構により減設する床版を荷揚げして撤去する工程と、
前記床版架設機が床版減設位置より前方に移動すると共に、前記床版運搬台車が、空荷で、前記床版架設機の前方から後方へ進入する工程と、
前記床版架設機が床版揚重機構により前記床版運搬台車に床版を荷卸しする工程と、
前記床版運搬台車が床版を積載して前記床版架設機の後方から前方へ退出する工程と、
を含む、床版の減設方法。
A floor slab reduction method that uses a floor slab erection machine that moves on the floor slab to reduce the floor slab and a floor slab carrier that transports the floor slab reduced by the floor slab erection machine. hand,
A step of unloading and removing the floor slab to be removed by the floor slab lifting mechanism at the floor slab erection machine,
While the slab erection machine moves forward from the slab slab removal position, the slab dolly is empty, and a step of entering from the front of the slab erection machine to the rear,
The slab erection machine unloads the slab to the slab carrier by a slab lifting mechanism,
A step of loading the floor slab with the floor slab and retreating from the rear to the front of the slab erection machine;
Floor slab reduction method, including.
JP2019015858A 2019-01-31 2019-01-31 Floor slab erection system, additional floor slab installation method, and floor slab removing method Pending JP2020122359A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2019015858A JP2020122359A (en) 2019-01-31 2019-01-31 Floor slab erection system, additional floor slab installation method, and floor slab removing method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2019015858A JP2020122359A (en) 2019-01-31 2019-01-31 Floor slab erection system, additional floor slab installation method, and floor slab removing method

Publications (1)

Publication Number Publication Date
JP2020122359A true JP2020122359A (en) 2020-08-13

Family

ID=71992302

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2019015858A Pending JP2020122359A (en) 2019-01-31 2019-01-31 Floor slab erection system, additional floor slab installation method, and floor slab removing method

Country Status (1)

Country Link
JP (1) JP2020122359A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7421466B2 (en) 2020-11-05 2024-01-24 株式会社ピーエス三菱 Concrete slab replacement method

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003328322A (en) * 2002-05-17 2003-11-19 Kitagawa Iron Works Co Ltd Erection method and erection apparatus for floor slab
JP2004232426A (en) * 2003-02-03 2004-08-19 Kawada Construction Co Ltd Floor panel laying apparatus
JP2004300688A (en) * 2003-03-28 2004-10-28 Pc Bridge Co Ltd Mobile pre-cast floor slab erection machine
JP2010037727A (en) * 2008-07-31 2010-02-18 Ps Mitsubishi Construction Co Ltd Equipment and method for erecting precast pc plate for floor slab
JP2017019659A (en) * 2015-07-15 2017-01-26 コベルコ建機株式会社 crane
JP2018052689A (en) * 2016-09-29 2018-04-05 コベルコ建機株式会社 crane

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003328322A (en) * 2002-05-17 2003-11-19 Kitagawa Iron Works Co Ltd Erection method and erection apparatus for floor slab
JP2004232426A (en) * 2003-02-03 2004-08-19 Kawada Construction Co Ltd Floor panel laying apparatus
JP2004300688A (en) * 2003-03-28 2004-10-28 Pc Bridge Co Ltd Mobile pre-cast floor slab erection machine
JP2010037727A (en) * 2008-07-31 2010-02-18 Ps Mitsubishi Construction Co Ltd Equipment and method for erecting precast pc plate for floor slab
JP2017019659A (en) * 2015-07-15 2017-01-26 コベルコ建機株式会社 crane
JP2018052689A (en) * 2016-09-29 2018-04-05 コベルコ建機株式会社 crane

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP7421466B2 (en) 2020-11-05 2024-01-24 株式会社ピーエス三菱 Concrete slab replacement method

Similar Documents

Publication Publication Date Title
JP5051591B2 (en) Precast PC plate erection device for floor slab and its erection method
JP3721166B2 (en) Floor slab erection device
JP3946342B2 (en) Bridge erection device
JP4414906B2 (en) Bridge girder construction and removal method and bridge girder construction equipment
JP3968579B2 (en) Self-propelled precast slab erection machine
JP5507383B2 (en) Heavy load erection machine and heavy load erection method
JP5485076B2 (en) Tunnel construction equipment and construction method
JP2006265884A (en) Method of removing existing pier of viaduct
JP2016166453A (en) Floor slab construction device
JP2014190107A (en) Method of building bridge girder, removal method, and apparatus for constructing bridge girder
JP4405958B2 (en) Bridge girder construction and removal method and bridge girder construction equipment
JP2020002563A (en) Deck slab construction method
KR101160273B1 (en) Straddle carrier for bridge construction
JP3901657B2 (en) Self-propelled precast slab erection machine
JP5793062B2 (en) Tunnel construction apparatus and tunnel construction method
JP2020122359A (en) Floor slab erection system, additional floor slab installation method, and floor slab removing method
JP2008075307A (en) Method and equipment for conveying tunnel material
JP4330141B2 (en) Precast concrete floor laying equipment
JP2019173435A (en) Floor system replacement method and floor system replacement device
JP2004263449A (en) Pc floor slab laying device and pc floor slab laying method using the pc floor slab laying device
JP7466368B2 (en) Deck replacement method
JP5027015B2 (en) Cable conveyor
JP2023119948A (en) Floor slab replacement method and boom inversion type floor slab erection machine
JPH08134844A (en) Erection method of bridge
JP4888737B2 (en) Under-orbit transport mechanism

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210914

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220621

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20220705

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20220901

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20221101

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20230110

A601 Written request for extension of time

Free format text: JAPANESE INTERMEDIATE CODE: A601

Effective date: 20230307

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20230704