JP2020061796A - 運転計画最適化装置 - Google Patents
運転計画最適化装置 Download PDFInfo
- Publication number
- JP2020061796A JP2020061796A JP2018189528A JP2018189528A JP2020061796A JP 2020061796 A JP2020061796 A JP 2020061796A JP 2018189528 A JP2018189528 A JP 2018189528A JP 2018189528 A JP2018189528 A JP 2018189528A JP 2020061796 A JP2020061796 A JP 2020061796A
- Authority
- JP
- Japan
- Prior art keywords
- power
- heat treatment
- facility
- charge
- schedule
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/30—Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
- Y02B70/3225—Demand response systems, e.g. load shedding, peak shaving
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02P—CLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
- Y02P80/00—Climate change mitigation technologies for sector-wide applications
- Y02P80/10—Efficient use of energy, e.g. using compressed air or pressurized fluid as energy carrier
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S20/00—Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
- Y04S20/20—End-user application control systems
- Y04S20/222—Demand response systems, e.g. load shedding, peak shaving
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Charge And Discharge Circuits For Batteries Or The Like (AREA)
Abstract
Description
〔第1実施形態〕
最初に、第1実施形態について説明する。本第1実施形態に係る熱処理工場最適化装置は、図1に示すように、複数(8台)の熱処理炉R1〜R8及び1あるいは複数の蓄電設備Jを備える熱処理工場Aを最適化対象としている。この熱処理工場Aは、本発明における施設に相当し、また複数の熱処理炉R1〜R8は、本発明における電力負荷設備に相当する。
次に、本発明の第2実施形態について、図10〜図14を参照して説明する。第2実施形態に係る熱処理工場最適化装置は、図10に示すように、第1実施形態における蓄電設備Jを第1蓄電設備J1と第2蓄電設備J2に置き換えた熱処理工場Bを最適化対象とするものである。これら第1蓄電設備J1及び第2蓄電設備J2のうち、第1蓄電設備J1は充放電計画を求めるに際してサイクル寿命を考慮すべき設備であり、第2蓄電設備J2は、サイクル寿命を考慮する必要がない設備である。
(1)充放電回数の積算値<充放電回数しきい値
(2)初期容量に対する容量低下率<容量低下率しきい値
(3)初期出力に対する出力低下率<出力低下率しきい値
上記充放電回数しきい値、容量低下率しきい値及び出力低下率しきい値は、作業者によって適宜設定されるが、例えば80%である。
(1)上記実施形態では、複数の熱処理炉R1〜R8を電力負荷設備とした場合について説明したが、本発明はこれに限定されない。すなわち、本発明は、複数の熱処理炉R1〜R8以外の様々な電力負荷設備に適用可能であり、また熱処理工場A,B以外の様々な施設に適用することが可能である。
D 系統電源
J 蓄電設備
J1 第1蓄電設備
J2 第2蓄電設備
R1〜R8 熱処理炉(電力負荷設備)
U 上流側ライン
S 部品ストレージ
L 下流側ライン
X 部品(対象物)
1 記憶部
1a 熱処理炉データベース
1b プログラム記憶部
2 操作部
3 通信部
4 演算部
4a 予測部
4b 最適化部
5 表示部
Claims (7)
- 複数の電力負荷設備及び1あるいは複数の蓄電設備を備える施設の消費電力のピークを最小化する運転計画最適化装置であって、
前記電力負荷設備の予測消費電力データに基づいて、前記電力負荷設備の運転スケジュールと前記蓄電設備の充放電スケジュールとを求める最適化部を備えることを特徴とする運転計画最適化装置。 - 前記最適化部は、前記運転スケジュール及び前記充放電スケジュールの両方または一方を求め、当該求めた一方のスケジュールを固定して他方のスケジュールを求めることを繰り返すことで、前記運転スケジュールと前記放電スケジュールとを反復的に求めることを特徴とする請求項1に記載の運転計画最適化装置。
- 前記最適化部は、前記蓄電設備の充放電回数が最小となるように充放電スケジュールとを求めることを特徴とする請求項1または2に記載の運転計画最適化装置。
- 前記蓄電設備が複数設けられる場合、各々の前記蓄電設備の充放電回数が均等化されるように充放電スケジュールとを求めることを特徴とする請求項1〜3のいずれか一項に記載の運転計画最適化装置。
- 前記施設はさらに分散電源を備えることを特徴とする請求項1〜4のいずれか一項に記載の運転計画最適化装置。
- 前記施設は 系統電力を前記電力負荷設備及び前記蓄電設備に供給することを特徴とする請求項1〜5のいずれか一項に記載の運転計画最適化装置。
- 前記電力負荷設備は、所定の対象物に熱処理を施す熱処理炉であることを特徴とする請求項1〜6のいずれか一項に記載の運転計画最適化装置。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018189528A JP7176338B2 (ja) | 2018-10-04 | 2018-10-04 | 運転計画最適化装置 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2018189528A JP7176338B2 (ja) | 2018-10-04 | 2018-10-04 | 運転計画最適化装置 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2020061796A true JP2020061796A (ja) | 2020-04-16 |
JP7176338B2 JP7176338B2 (ja) | 2022-11-22 |
Family
ID=70220382
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2018189528A Active JP7176338B2 (ja) | 2018-10-04 | 2018-10-04 | 運転計画最適化装置 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP7176338B2 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023228264A1 (ja) * | 2022-05-24 | 2023-11-30 | 武蔵精密工業株式会社 | 電力制御システム |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013121514A1 (ja) * | 2012-02-14 | 2013-08-22 | 東芝三菱電機産業システム株式会社 | 電力平準化装置 |
JP2014085981A (ja) * | 2012-10-26 | 2014-05-12 | Hitachi Ltd | エネルギー管理システム |
JP2016226099A (ja) * | 2015-05-28 | 2016-12-28 | 株式会社日立製作所 | エネルギー管理システム、エネルギー管理方法、およびエネルギー管理装置 |
-
2018
- 2018-10-04 JP JP2018189528A patent/JP7176338B2/ja active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2013121514A1 (ja) * | 2012-02-14 | 2013-08-22 | 東芝三菱電機産業システム株式会社 | 電力平準化装置 |
JP2014085981A (ja) * | 2012-10-26 | 2014-05-12 | Hitachi Ltd | エネルギー管理システム |
JP2016226099A (ja) * | 2015-05-28 | 2016-12-28 | 株式会社日立製作所 | エネルギー管理システム、エネルギー管理方法、およびエネルギー管理装置 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2023228264A1 (ja) * | 2022-05-24 | 2023-11-30 | 武蔵精密工業株式会社 | 電力制御システム |
Also Published As
Publication number | Publication date |
---|---|
JP7176338B2 (ja) | 2022-11-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Senjyu et al. | A unit commitment problem by using genetic algorithm based on unit characteristic classification | |
CN111695742B (zh) | 一种综合能源系统日前调度区间优化方法、系统及设备 | |
Zhang et al. | Integrated optimization of production planning and scheduling for a kind of job-shop | |
CN110854932B (zh) | 一种交直流配电网多时间尺度优化调度方法及系统 | |
Zhang et al. | Cost-oriented load forecasting | |
US10175746B2 (en) | Power consumption control system and method | |
US20180181153A1 (en) | Equipment Operation Plan Generating Device and Equipment Operation Plan Generating Method | |
Li et al. | Restoration strategy for active distribution systems considering endogenous uncertainty in cold load pickup | |
CN113592319A (zh) | 基于insga-ⅱ的复杂约束下的柔性作业车间调度方法及装置 | |
WO2016189938A1 (ja) | エネルギー管理システム、エネルギー管理方法、およびエネルギー管理装置 | |
JP7176338B2 (ja) | 運転計画最適化装置 | |
Badri et al. | Flow shop scheduling under Time-Of-Use electricity tariffs using fuzzy multi-objective linear programming approach | |
JP2000217253A (ja) | 使用電力量予測方法 | |
JP7024237B2 (ja) | 運転計画作成支援装置及び方法 | |
JP2004239519A (ja) | 蓄熱プラントの制御装置 | |
JP6917288B2 (ja) | 保守計画生成システム | |
JP7139811B2 (ja) | 処理計画指示装置 | |
CN107851999B (zh) | 电力系统 | |
JP2011169234A (ja) | 運転スケジュール演算装置 | |
Sun et al. | An effective approach for the scheduling of refining process with uncertain iterations in steel-making and continuous casting process | |
EP4138008A1 (en) | Energy supply/demand operation guidance device and method for energy supply/demand operation in ironworks | |
Shahnazari-Shahrezaei et al. | Solving a multi-objective mathematical model for a multi-skilled project scheduling problem by particle swarm optimization and differential evolution algorithms | |
Gupta et al. | Integrating Reliability-Based Preventive Maintenance in Job Shop Scheduling: A Simulation Study | |
Liu et al. | Application of genetic algorithm and fuzzy gantt chart to project scheduling with resource constraints | |
Yin et al. | A multi-objective scheduling optimization model considering product blockage and machine faults |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20210608 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20220414 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20220426 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20220621 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20221011 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20221024 |
|
R151 | Written notification of patent or utility model registration |
Ref document number: 7176338 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |