JP2020039254A - Installation construction method for floating fish reef - Google Patents

Installation construction method for floating fish reef Download PDF

Info

Publication number
JP2020039254A
JP2020039254A JP2018166732A JP2018166732A JP2020039254A JP 2020039254 A JP2020039254 A JP 2020039254A JP 2018166732 A JP2018166732 A JP 2018166732A JP 2018166732 A JP2018166732 A JP 2018166732A JP 2020039254 A JP2020039254 A JP 2020039254A
Authority
JP
Japan
Prior art keywords
sea
rope
barge
anchor
floating
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018166732A
Other languages
Japanese (ja)
Other versions
JP7072474B2 (en
Inventor
隆顕 志賀
Takaaki Shiga
隆顕 志賀
潔 北野
Kiyoshi Kitano
潔 北野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Okabe Co Ltd
Original Assignee
Okabe Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Okabe Co Ltd filed Critical Okabe Co Ltd
Priority to JP2018166732A priority Critical patent/JP7072474B2/en
Publication of JP2020039254A publication Critical patent/JP2020039254A/en
Application granted granted Critical
Publication of JP7072474B2 publication Critical patent/JP7072474B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

To provide an installation construction method for a floating fish reef capable of shortening a construction time because a mooring line is enabled to be drawn out from a position on a barge to the sea and be spread in a short period of time, capable of immersing an anchor with high positional accuracy, and capable of appropriately spreading the mooring rope while inhibiting the mooring line from being twisted.SOLUTION: A barge 1 equipped with a floating fish reef body 5, an anchor 6 to be immersed on a sea bottom, and a mooring line 7 that is constituted by a lower chain 8 connected to the anchor, an upper chin 9 connected to the floating fish reef body, and a mooring rope 10 connecting the chains to connect the floating fish reef body with the anchor is disposed in an installation sea area for the floating fish reef body. The lower chain 8's lower end 8a side and upper end 8b side and the upper chin 9 are temporarily fixed at X, Y, Z on the barge in advance. First, an intermediate part Q of the mooring rope is drawn by a work boat 2 to draw out the mooring rope from the barge to the sea S.SELECTED DRAWING: Figure 4

Description

本発明は、係留索を短時間で台船上から海に引き出して展開することが可能で施工時間を短縮することができ、また、アンカーを高い位置精度で沈設することが可能であると共に、係留索も、撚りなどが生じることなく適切に展開することが可能な浮魚礁の設置施工方法に関する。   The present invention enables the mooring line to be pulled out from the barge to the sea in a short time and deployed, thereby shortening the construction time, and also enabling the anchor to be laid down with high positional accuracy, and the mooring can be moored. The present invention also relates to a method for installing and constructing a floating fish reef that can be appropriately deployed without causing twisting or the like of a rope.

浮魚礁は、浮魚礁本体を、海底に沈設したアンカーに、係留索で係留することで設置され、海面や海の表層に位置付けられる浮魚礁本体により魚類などの海洋生物を蝟集するようになっている。   Floating reefs are installed by mooring the main body of the floating reef to anchors submerged on the seabed with mooring lines, and the floating reef body located on the sea surface or the surface layer of the sea gathers fish and other marine life. I have.

この種の浮魚礁に関連する背景技術が特許文献1及び2に示されている。特許文献1の「浮体の係留ロープ」は、海底に沈めたアンカーにチェーン、スイベル、FRPロッド、スイベル、チェーンによりブイを係留した。FRPロッドは従来の合成繊維のロープよりも引張強度力大であって大きく張力に耐える。従って細く出来る。細くすることにより潮流抵抗が減少し、相乗効果でFRPロッドに加わる張力も減少し、ブイの予備浮力、チェーンの直径、アンカーの把駐力を小さくできるようになっている。   Background art related to this type of floating reef is disclosed in Patent Documents 1 and 2. In the “mooring rope of a floating body” of Patent Document 1, a buoy is moored by a chain, a swivel, an FRP rod, a swivel, and a chain on an anchor submerged on the sea floor. The FRP rod has a higher tensile strength than conventional ropes made of synthetic fibers and withstands a large amount of tension. Therefore, it can be made thin. By reducing the thickness, the tidal resistance is reduced, and the tension applied to the FRP rod is also reduced by a synergistic effect, so that the preliminary buoyancy of the buoy, the diameter of the chain, and the holding force of the anchor can be reduced.

特許文献2の「浮魚礁」は、浮体と、アンカーと、該浮体とアンカーとを繋ぐ係留索を有し、潮流の速度が遅い時には浮体の上部が海面上に出、潮流の速度が速い時には浮体全体が海中に引き込まれるように、該浮体の浮力が調整されており、且つ、該浮体に係留索を介して標識ブイが取り付けられている。   Patent Document 2 “Floating fish reef” has a floating body, an anchor, and a mooring line connecting the floating body and the anchor. When the speed of the tidal current is slow, the upper part of the floating body comes out on the sea surface, and when the speed of the tidal current is fast, The buoyancy of the floating body is adjusted so that the entire floating body is drawn into the sea, and a sign buoy is attached to the floating body via a mooring line.

特開平6−158571号公報JP-A-6-158571 特開2007−236291号公報JP 2007-236291 A

図6には、従来の浮魚礁の設置施工状況の一例が示されている。浮魚礁本体a、係留索b及びアンカーcは、台船d上に搭載され、設置海域まで輸送される。   FIG. 6 shows an example of the state of installation and construction of a conventional floating fish reef. The floating reef body a, the mooring line b, and the anchor c are mounted on a barge d and transported to the installation sea area.

係留索bは、通常、設置海域の水深の1.5倍程度の長さとされ、例えば、水深が1,000〜1,300mであれば、1,500〜2,000m程度の長さとされる。   The mooring line b is usually about 1.5 times as long as the water depth of the installation sea area. For example, if the water depth is 1,000 to 1,300 m, the length is about 1,500 to 2,000 m. .

また、係留索bは一般的に、アンカーcに下端が連結される鋼製の下部チェーンeと、浮魚礁本体aに上端が連結される鋼製の上部チェーンfと、これら上部チェーンfと下部チェーンeとを連結する合成繊維製の係留ロープgとから構成され、水深が1,000m程度であれば、上部チェーンfが50m程度、下部チェーンeが200〜300m程度、残りの長さ分が係留ロープgとされる。   The mooring line b generally includes a steel lower chain e having a lower end connected to the anchor c, a steel upper chain f having an upper end connected to the floating reef main body a, and the upper chain f and the lower chain f. And a synthetic fiber mooring rope g connecting the chain e. If the water depth is about 1,000 m, the upper chain f is about 50 m, the lower chain e is about 200 to 300 m, and the remaining length is about The mooring rope g is used.

台船d上では、このような長大な長さの係留索bが上部チェーンfの部分、係留ロープgの部分、下部チェーンeの部分に分けて、整然と並べた状態で置かれている。   On the barge d, the mooring cable b having such a long length is divided into an upper chain f, a mooring rope g, and a lower chain e, and placed in an orderly manner.

設置海域での浮魚礁の設置施工は、まず、台船dもしくは台船dに随伴する作業船hのクレーン等により、浮魚礁本体aを、台船dから海sに降ろす。   In the installation work of the floating fish reef in the installation sea area, first, the floating fish reef main body a is lowered from the boat d to the sea s by the crane of the work boat h accompanying the boat d.

次に、浮魚礁本体aを曳航ロープiで作業船hに連結し、作業船hで浮魚礁本体aを曳航する。作業船hで浮魚礁本体aを曳航することにより、台船d上から係留索bを海sに向けて展開していく。具体的には、上部チェーンfが最初に台船d上から海sに引き出され、引き続き、係留ロープbが台船d上から海sに引き出されて、係留索bは展開されていく。このとき、下部チェーンeは台船d上に残しておく。   Next, the floating reef main body a is connected to the work boat h by the towing rope i, and the floating fish reef main body a is towed by the work boat h. The mooring line b is deployed from the barge d toward the sea s by towing the floating reef body a with the work boat h. Specifically, the upper chain f is first drawn out from the barge d to the sea s, and subsequently, the mooring rope b is drawn out from the barge d to the sea s, and the mooring line b is deployed. At this time, the lower chain e is left on the barge d.

次に、下部チェーンeとアンカーcだけが台船d上に残っている状態となったら、台船d上から海sへアンカーcを投下する。アンカーcを投下すると、下部チェーンeが台船d上から海sに引き出される。アンカーcが着底し、係留索b全体が海sに引き出されることにより、沈設されたアンカーcで浮魚礁本体aが設置海域に係留されることになる。従来の浮魚礁の設置施工にあっては、以下のような課題があった。   Next, when only the lower chain e and the anchor c remain on the barge d, the anchor c is dropped from the barge d to the sea s. When the anchor c is dropped, the lower chain e is pulled out from the barge d to the sea s. When the anchor c has landed and the entire mooring line b is pulled out to the sea s, the main body a of the floating reef is moored by the submerged anchor c in the installation sea area. The following problems were encountered in the installation and construction of conventional floating reefs.

(1)係留索bを台船d上から海sに引き出して展開する作業が、作業船hによる浮魚礁本体aの曳航によるため、上部チェーンfから始めて、係留ロープgのほぼすべてを引き出すために、それらの全長分、浮魚礁本体aを曳航しなければならず、多大な作業時間を要していた。   (1) Since the work of pulling out the mooring line b from the barge d to the sea s and deploying it is performed by the work boat h towing the floating reef body a, starting from the upper chain f and pulling out almost all of the mooring rope g. In addition, the floating fish reef main body a must be towed for the entire length thereof, which requires a large amount of work time.

(2)浮魚礁本体aが海sに降ろされていて、かつ上部チェーンfから係留ロープgにわたる部分の展開距離や展開範囲が広大となっている状態で、アンカーcを海sに投下するため、アンカーcの沈下に対し、先行して海sに送り込まれて係留ロープg等に引かれている状態の浮魚礁本体aが抵抗となってしまい、意図した位置にアンカーcを着底させることが難しく、アンカーcの沈設位置精度を高く確保することができなかった。   (2) To drop the anchor c into the sea s in a state where the floating reef main body a is lowered to the sea s and the deployment distance and the deployment range of the portion extending from the upper chain f to the mooring rope g are wide. The sinking of the anchor c causes the floating fish reef main body a to be sent to the sea s in advance and pulled by the mooring rope g or the like to become a resistance, and the anchor c to be landed at an intended position. Therefore, it was not possible to secure a high accuracy of the sunk position of the anchor c.

(3)アンカーcの沈設位置精度が悪いと、海底勾配等の影響により、アンカーcの設置位置及び設置深度が計画とは異なることとなり、その結果、浮魚礁本体aの設置位置が位置ずれしたり、設置深度が異なるものとなって、期待する蝟集効果が得られ難くなると共に、設計強度以上の水圧や波浪等の外力を受けることとなって耐久性や安全性が懸念されることになり、さらには、水域区画を越境してしまうなどの事態になると、自治体や漁業組合等との漁業調整の問題が発生する可能性があった。   (3) If the placement accuracy of the anchor c is poor, the installation position and the installation depth of the anchor c will be different from the plan due to the influence of the seabed gradient or the like, and as a result, the installation position of the floating reef main body a will shift. Or the installation depth is different, making it difficult to obtain the expected crowding effect, and receiving external forces such as water pressure and waves that exceed the design strength, raising concerns about durability and safety. In addition, when a situation such as crossing a water area boundary occurs, there is a possibility that a problem of fishery coordination with a local government or a fishery union may occur.

(4)係留索bを構成する係留ロープgを、沈降傾向のある比重の重い上部ロープjと、浮遊傾向のある軽量な下部ロープkとから構成し、上部ロープjを上部チェーンfにシャックル等の連結金物mで連結した場合、上部チェーンfは浮魚礁本体aから連結金物mに向けて海底方向に沈降し、上部ロープjは連結金物mから海面方向に浮揚する状態になることから、先行して海sに降ろしておいた浮魚礁本体aの動きや潮流などによって、係留索bには、重さのある連結金物m付近で撚りnが生じてしまうおそれがあり、これによるキンクや絡まりの発生が懸念された。   (4) The mooring rope g constituting the mooring line b is composed of an upper rope j having a specific gravity which tends to sink and a lower rope k which tends to float, and the upper rope j is shackled to an upper chain f. The upper chain f sinks in the direction of the seabed from the floating reef body a toward the connecting hardware m, and the upper rope j floats from the connecting hardware m toward the sea surface. The mooring line b may be twisted near the heavy metal fitting m due to the movement or tide of the floating fish reef main body a that has been lowered to the sea s, and this may cause kink or entanglement. Was concerned.

本発明は上記従来の課題に鑑みて創案されたものであって、係留索を短時間で台船上から海に引き出して展開することが可能で施工時間を短縮することができ、また、アンカーを高い位置精度で沈設することが可能であると共に、係留索も、撚りなどが生じることなく適切に展開することが可能な浮魚礁の設置施工方法を提供することを目的とする。   The present invention has been made in view of the above-mentioned conventional problems, and it is possible to pull out a mooring line from a barge to the sea in a short time and deploy the mooring line, shorten the construction time, and It is an object of the present invention to provide a method for installing and constructing a floating reef, which can be sunk with high positional accuracy, and in which a mooring line can be appropriately deployed without twisting or the like.

本発明にかかる浮魚礁の設置施工方法は、魚類などの海洋生物を蝟集する浮魚礁本体と、海底に沈設するためのアンカーと、該アンカーに下端が連結される下部チェーン、該浮魚礁本体に上端が連結される上部チェーン、並びにこれら上部チェーンや下部チェーンよりも軽量で、これらチェーン同士を連結する係留ロープで構成され、該浮魚礁本体を該アンカーに連結するための係留索とを搭載した台船及び少なくとも一隻の作業船を、該浮魚礁本体の設置海域に配置し、上記下部チェーンの少なくとも下端側と上端側及び上記上部チェーンは、予め上記台船に対して仮止めしておき、まず、上記作業船で上記係留ロープの中間部を牽引することにより、少なくとも該係留ロープを上記台船から海へ引き出し、次いで、上記上部チェーンの仮止めを残した状態で、上記アンカーを海底に着底させかつ上記下部チェーンを介して上記係留ロープが該アンカーで係留されるように、該下部チェーンの下端側の仮止めを解除して該アンカーを上記台船から海へ投下し、引き続き、該下部チェーンの上端側の仮止めを解除して、当該下部チェーン全体を該台船から海へ引き出し、その後、上記浮魚礁本体を上記台船から海へ移し、上記上部チェーンの仮止めを解除して該上部チェーンを該台船から海へ引き出し、上記係留索で上記浮魚礁本体を海底から係留することを特徴とする。   The method for installing and constructing a floating reef according to the present invention includes a floating reef main body for gathering marine life such as fish, an anchor for sinking on the seabed, a lower chain having a lower end connected to the anchor, and a floating reef main body. An upper chain to which the upper end is connected, and a mooring rope that is lighter than the upper and lower chains and that connects these chains, are provided with a mooring line for connecting the floating reef body to the anchor. A barge and at least one workboat are arranged in the sea area where the floating reef body is installed, and at least the lower and upper ends of the lower chain and the upper chain are temporarily fixed to the barge in advance. First, by pulling at least the mooring rope from the barge to the sea by towing the intermediate portion of the mooring rope with the work boat, The temporary anchor at the lower end of the lower chain is released by lowering the anchor so that the anchor is settled on the seabed and the mooring rope is moored by the anchor via the lower chain. From the barge to the sea, and then release the temporary fix at the upper end side of the lower chain, pull out the entire lower chain from the barge to the sea, and then remove the floating reef body from the barge. Moving to the sea, releasing the temporary fixation of the upper chain, pulling out the upper chain from the barge to the sea, and mooring the floating reef main body from the seabed with the mooring line.

少なくとも前記係留ロープを前記台船から海へ引き出す際、該係留ロープの中間部と該作業船とを曳航ロープで連結することを特徴とする。   At least when the mooring rope is withdrawn from the barge to the sea, an intermediate portion of the mooring rope and the work boat are connected by a towing rope.

前記係留ロープは、海に沈降可能な比重の重い上部ロープと、海に浮遊可能な比重の軽い下部ロープとを一連に連結して構成されていることを特徴とする。   The mooring rope is characterized in that an upper rope having a high specific gravity capable of sinking in the sea and a lower rope having a low specific gravity capable of floating in the sea are connected in series.

前記下部ロープは、前記上部ロープよりも長さが長く、前記係留ロープの中間部を牽引する前記作業船は、該下部ロープを牽引することを特徴とする。   The lower rope is longer than the upper rope, and the workboat that pulls an intermediate portion of the mooring rope pulls the lower rope.

本発明にかかる浮魚礁の設置施工方法にあっては、係留索を短時間で台船上から海に引き出して展開することができて施工時間を短縮することができ、また、アンカーを高い位置精度で沈設することができると共に、係留索も、撚りなどが生じることなく適切に展開することができる。   In the method for installing and constructing a floating reef according to the present invention, the mooring line can be pulled out from the barge to the sea in a short time and deployed, so that the construction time can be shortened. And the mooring line can be deployed properly without twisting or the like.

本発明に係る浮魚礁の設置施工方法の好適な一実施形態の第1工程を説明する斜視図である。It is a perspective view explaining the 1st process of one suitable embodiment of the installation construction method of the floating fish reef concerning the present invention. 図1の第1工程に続く第2工程を説明する斜視図である。FIG. 2 is a perspective view illustrating a second step following the first step in FIG. 1. 図2の第2工程に続く第3工程を説明する斜視図である。FIG. 3 is a perspective view illustrating a third step following the second step in FIG. 2. 図3の第3工程に続く第4工程を説明する斜視図である。FIG. 4 is a perspective view illustrating a fourth step following the third step in FIG. 3. 図4の第4工程に続く第5工程を説明する斜視図である。FIG. 5 is a perspective view illustrating a fifth step following the fourth step in FIG. 4. 従来の浮魚礁の設置施工状況の一例を説明する斜視図である。It is a perspective view explaining an example of the installation construction situation of the conventional floating fish reef.

以下に、本発明にかかる浮魚礁の設置施工方法の好適な一実施形態を、添付図面を参照して詳細に説明する。図1〜図5には、本実施形態に係る浮魚礁の設置施工方法が作業手順に従って示されている。   Hereinafter, a preferred embodiment of a method for installing and constructing a floating reef according to the present invention will be described in detail with reference to the accompanying drawings. 1 to 5 show a method of installing and constructing a floating reef according to the present embodiment according to a work procedure.

浮魚礁の設置施工に際しては、浮魚礁の設備を搭載して設置海域へ輸送する台船1と、設置海域で設置施工を支援する、少なくとも一隻の作業船2,3,4が用いられる。図示例では、二隻の作業船2,4に加えて、設置海域での作業の安全を図る作業船3として、警戒船が示されている(図5参照)。   At the time of installation of the floating fish reef, a barge 1 that carries the equipment of the floating fish reef and transports it to the installation sea area, and at least one work boat 2, 3, 4 that supports the installation and construction in the installation sea area is used. In the illustrated example, in addition to the two work boats 2 and 4, a guard boat is shown as the work boat 3 for ensuring safety in the installation sea area (see FIG. 5).

台船1上に搭載される浮魚礁の設備は、主に、魚類などの海洋生物を蝟集するために海Sに移される浮魚礁本体5と、海底に沈設するためのアンカー6と、浮魚礁本体5をアンカー6に連結するための係留索7とから構成される。   The equipment of the floating reef mounted on the barge 1 mainly includes a floating reef main body 5 that is moved to the sea S for gathering marine life such as fish, an anchor 6 for sinking on the seabed, and a floating reef. And a mooring line 7 for connecting the main body 5 to the anchor 6.

浮魚礁本体5、アンカー6、並びに係留索7は、それぞれが個別に台船1上に搭載された後、係留索7の上端7aが浮魚礁本体5と連結され、係留索7の下端7bがアンカー6と連結されて、アンカー6と浮魚礁本体5とが係留索7で連結された状態とされる。浮魚礁本体5としては、通常、表層浮魚礁と称される、海面において沈降することなく浮かぶタイプのものや、海面において潮流の流速で浮き沈みするタイプのものなどを含む。   After the floating reef main body 5, the anchor 6, and the mooring line 7 are individually mounted on the barge 1, the upper end 7a of the mooring line 7 is connected to the floating fish reef main body 5, and the lower end 7b of the mooring line 7 is The anchor 6 is connected to the anchor 6 and the main body 5 of the floating reef is connected to the mooring line 7. Examples of the floating reef main body 5 include a type that floats without sinking on the sea surface, a type that floats and sinks at the tidal flow velocity on the sea surface, which is usually called a surface floating reef.

係留索7は主に、アンカー6側の鋼製等の下部チェーン8と、浮魚礁本体5側の鋼製等の上部チェーン9と、これら上部チェーン9や下部チェーン8よりも軽量な(比重が小さい)合成樹脂製等であって、上部チェーン9と下部チェーン8とを結ぶ係留ロープ10とから構成される。   The mooring cable 7 is mainly composed of a lower chain 8 made of steel or the like on the anchor 6 side, an upper chain 9 made of steel or the like on the floating reef main body 5 side, and lighter (specific gravity is lower than those of the upper chain 9 and the lower chain 8). (Small) made of synthetic resin or the like, and is composed of a mooring rope 10 connecting the upper chain 9 and the lower chain 8.

下部チェーン8の一端である下端8a(7b)がアンカー6に連結される。上部チェーン9の一端である上端9a(7a)が浮魚礁本体5に連結される。上部チェーン9の他端である下端9b及び下部チェーン8の他端である上端8bそれぞれに、係留ロープ10の両端が連結され、これにより、係留ロープ10によってこれらチェーン8,9同士が一連に連結される。   A lower end 8 a (7 b) which is one end of the lower chain 8 is connected to the anchor 6. An upper end 9 a (7 a) which is one end of the upper chain 9 is connected to the floating reef main body 5. Both ends of the mooring rope 10 are connected to the lower end 9b, which is the other end of the upper chain 9, and the upper end 8b, which is the other end of the lower chain 8, so that the chains 8, 9 are connected in series by the mooring rope 10. Is done.

また、係留ロープ10は、海Sに沈降可能な比重の重い上部ロープ10aと、海Sに浮遊可能な、上部ロープ10aよりも比重の軽い下部ロープ10bとを一連に連結して構成することが好ましい。   Further, the mooring rope 10 may be configured by connecting a series of an upper rope 10a having a heavy specific gravity capable of sinking in the sea S and a lower rope 10b having a lower specific gravity than the upper rope 10a capable of floating in the sea S. preferable.

例えば、水深が1,300m程度であれば、係留索7の全長は、2,000m程度となり、上部チェーン9の長さが50m程度、下部チェーン8の長さが250m程度で、係留ロープ10の長さが残りの1,700m程度となり、この係留ロープ10の長さの40%程度の700mが上部ロープ10a、60%程度の1,000mが下部ロープ10bで構成される。すなわち、下部ロープ10bは、上部ロープ10aよりも長大な長さ寸法とされる。   For example, if the water depth is about 1,300 m, the total length of the mooring cable 7 is about 2,000 m, the length of the upper chain 9 is about 50 m, the length of the lower chain 8 is about 250 m, The remaining length is about 1,700 m, and about 40% of the length of the mooring rope 10 is constituted by the upper rope 10a, and about 60% is constituted by the lower rope 10b. That is, the lower rope 10b has a longer length than the upper rope 10a.

下部ロープ10bの比重を海水よりも軽くすると、下部チェーン8との連結箇所から下部ロープ10bが浮き上がる傾向となり、同様に、上部ロープ10aの比重を海水よりも重くすると、上部チェーン9の連結箇所から上部ロープ10aが沈み込む傾向となり、いずれにしても、浮魚礁の設置施工時や設置後に作用する潮流力などで、これらロープ10a,10bがチェーン8,9に絡み付くなどの不都合を防ぐことができ、ロープ10a,10bとチェーン8,9の連結箇所の強度低下を抑制することができる。   If the specific gravity of the lower rope 10b is lighter than that of seawater, the lower rope 10b tends to rise from the connecting point with the lower chain 8, and similarly, if the specific gravity of the upper rope 10a is heavier than seawater, The upper rope 10a tends to sink, and in any case, it is possible to prevent such inconvenience that the ropes 10a and 10b are entangled with the chains 8 and 9 due to the tidal force acting during and after installation of the floating reef. In addition, it is possible to suppress a decrease in the strength of the connecting portion between the ropes 10a, 10b and the chains 8, 9.

下部チェーン8及び上部チェーン9は共に、上端(一端)8b,9aから下端(他端)8a,9bへ向け、折り返して行き来させた配列で、一連にかつ重ね合わせなく平坦に敷き並べて、台船1上に搭載される。   The lower chain 8 and the upper chain 9 are both folded back and forth from the upper end (one end) 8b, 9a to the lower end (the other end) 8a, 9b, and are laid flatly and one after another without being overlapped. 1 mounted.

上部ロープ10aは、上端(一端)から下端(他端)へ向け、折り返して一連に行き来させた配列の束10xを複数並べるようにして、台船1上に搭載される。   The upper rope 10a is mounted on the barge 1 in such a manner that a plurality of bundles 10x in an array that is folded back and forth from the upper end (one end) to the lower end (the other end) are arranged.

下部ロープ10bは、上端(一端)から下端(他端)へ向け、一連に巻いたコイル10yを複数並べるようにして、台船1上に搭載される。浮魚礁本体5及びアンカー6も、台船1上に置かれる。   The lower rope 10b is mounted on the barge 1 in such a manner that a plurality of coils 10y wound in series are arranged from the upper end (one end) to the lower end (the other end). The floating reef body 5 and the anchor 6 are also placed on the barge 1.

下部チェーン8は、後述するように、アンカー6を台船1から海Sへ投下する以前については、少なくとも下端8a側と上端8b側が台船1に対して、仮止め(仮固定)X,Yされる。仮固定X,Yが解除されると、下部チェーン8は、海Sへ引き出すことが可能となる。ちなみに、仮固定Yは、仮固定Xを解除した際に下部チェーン8全体が一度に一挙に海Sに投げ出されて、アンカー6が海底に着底してしまうことを防ぐために設定される。よって、下部チェーン8は、上端8b側と下端8a側だけでなく、一連なりの当該下部チェーン8が下端8a側から上端8b側へ向けて順序よく整然と台船1から海Sへ順次に引き出されるように、適宜な複数箇所を台船1に対して仮止めすることが好ましい。   As will be described later, before the anchor 6 is dropped from the barge 1 to the sea S, the lower chain 8 is temporarily fixed (temporarily fixed) X, Y at least on the lower end 8 a side and the upper end 8 b side to the barge 1. Is done. When the temporary fixing X and Y are released, the lower chain 8 can be pulled out to the sea S. Incidentally, the temporary fixing Y is set in order to prevent the entire lower chain 8 from being thrown into the sea S at once at a time when the temporary fixing X is released, so that the anchor 6 does not land on the seabed. Therefore, the lower chain 8 is drawn not only from the upper end 8b side and the lower end 8a side, but also a series of lower chains 8 from the barge 1 to the sea S in order from the lower end 8a side to the upper end 8b side. It is preferable to temporarily fix a plurality of appropriate places to the barge 1.

上部チェーン9は、後述するように、浮魚礁本体5を台船1から海Sへ移す以前については、長さ方向の少なくともいずれかの箇所が台船1に対して、仮止めZされる。仮固定Zが解除されると、上部チェーン9は、その全体の海Sへの引き出しが可能となる。上部チェーン9については、好ましくは、下端9b側周辺の箇所を台船1に仮止めZすることが好ましい。   As will be described later, the upper chain 9 is temporarily fixed Z to the barge 1 at least at any point in the length direction before the main body 5 is moved from the barge 1 to the sea S. When the temporary fixing Z is released, the entire upper chain 9 can be pulled out to the sea S. Regarding the upper chain 9, it is preferable that the portion around the lower end 9 b side is temporarily fixed to the barge 1.

図1に示すように配置された台船1及び作業船2〜4が浮魚礁本体5の設置海域に到達すると、図2〜図5に順次に示す手順で浮魚礁の設置施工が行われる。   When the barge 1 and the work boats 2 to 4 arranged as shown in FIG. 1 reach the sea area where the floating fish reef main body 5 is installed, the installation of the floating fish reef is performed in the order shown in FIGS.

いずれかの作業船2を台船1に接舷するなどし、台船1上の係留索7の係留ロープ10と海上の作業船2とを連結する。この際、作業船2で曳航される曳航ロープ11を用いて、作業船2と係留ロープ10とを連結することが好ましい。作業船2は、また曳航ロープ11を用いる場合にはその曳航ロープ11は、係留ロープ8の中間部Q、具体的には係留ロープ10の長さ方向ほぼ中央部に連結される。   One of the workboats 2 comes alongside the barge 1 to connect the mooring ropes 10 of the mooring lines 7 on the barge 1 and the workboats 2 at sea. At this time, it is preferable to connect the work boat 2 and the mooring rope 10 using the tow rope 11 towed by the work boat 2. When the work boat 2 uses the tow rope 11, the tow rope 11 is connected to an intermediate portion Q of the mooring rope 8, specifically, to a substantially central portion in the longitudinal direction of the mooring rope 10.

そして、作業船2を操船して係留ロープ10の中間部Qを牽引することにより、図2に示すように、係留ロープ10を台船1から海Sへ引き出して展開していく。この際、係留ロープ10だけでなく、図3に示すように、引き続き、上部チェーン9をその仮止めZされている位置まで、台船1から海Sへ引き出すことが好ましい。   Then, by pulling the intermediate portion Q of the mooring rope 10 by maneuvering the work boat 2, the mooring rope 10 is pulled out from the barge 1 to the sea S and deployed as shown in FIG. At this time, it is preferable that the upper chain 9 be continuously pulled out from the barge 1 to the sea S to the position where the upper chain 9 is temporarily fixed Z as shown in FIG.

係留ロープ10の中間部Qを作業船2に連結して牽引し海Sへ引き出すことにより、浮魚礁本体を曳航して係留索を上部チェーンから順次に引き出していく従来に比して、係留ロープ10のおおよそ半分の長さ分の曳航距離・曳航時間で係留ロープ10全体(上部チェーン9の一部を含む)等を海Sへ展開することができ、作業時間を半減できて、迅速に作業を完了することができる。   By connecting the intermediate portion Q of the mooring rope 10 to the work boat 2 and towing it to the sea S, the mooring rope is compared with the conventional case where the floating reef body is towed and the mooring line is sequentially pulled out from the upper chain. The entire mooring rope 10 (including a part of the upper chain 9) and the like can be deployed to the sea S with a towing distance and a towing time that is approximately half the length of 10, so that the work time can be reduced by half and work can be performed quickly. Can be completed.

また、係留索7を海Sへ引き出して展開するときに、大きな抵抗となる浮魚礁本体を曳航するために、多大な作業時間を要し、操船操作も煩雑であった従来とは異なり、浮魚礁本体5を台船1上に残したままで、係留ロープ10等だけを台船1から引き出して海Sへ展開するので、スムーズに短時間でかつ容易な操船操作で、係留ロープ10等の展開作業を完了することができる。   Further, when the mooring line 7 is pulled out to the sea S and deployed, it takes a lot of work time to tow the floating reef body which causes a great resistance, and unlike the conventional case where the boat maneuvering operation is complicated, the floating operation is difficult. With the fish reef body 5 left on the barge 1, only the mooring ropes 10 are pulled out from the barge 1 and deployed to the sea S, so that the mooring ropes 10 can be deployed smoothly, quickly, and easily. Work can be completed.

作業船2に連結されて当該作業船2で牽引される係留ロープ10の中間部Qは、海水よりも比重の軽い下部ロープ10bとなる。このように、浮き上がる傾向のある下部ロープ10bに作業船2を連結して係留ロープ10を牽引するようにしているため、容易な操船で係留ロープ10全体をスムーズに海Sへ展開することができる。   An intermediate portion Q of the mooring rope 10 connected to the work boat 2 and towed by the work boat 2 is a lower rope 10b having a lower specific gravity than seawater. As described above, since the work boat 2 is connected to the lower rope 10b which tends to float and the mooring rope 10 is towed, the entire mooring rope 10 can be smoothly deployed to the sea S by easy boat maneuvering. .

また、係留ロープ10を牽引するとき、上部ロープ10aは沈み込む傾向にあり、下部ロープ10bは浮き上がる傾向にあるので、これらロープ10a,10bが絡まり合うことも抑制することができる。   Also, when the mooring rope 10 is towed, the upper rope 10a tends to sink and the lower rope 10b tends to float, so that the ropes 10a and 10b can be prevented from becoming entangled.

次に、図4に示すように、アンカー6を海Sへ投下する。この投下作業の前準備として、あるいは投下開始時に、曳航ロープ11は撤去される。曳航ロープ11の撤去は、曳航ロープ11と作業船2もしくは係留ロープ10との連結箇所で、当該連結を解除することで行われる。曳航ロープ11を用いない場合は、作業船2と係留ロープ10との連結を解除する。またこのとき、上部チェーン9の仮止めZは、そのまま残した状態とする。   Next, as shown in FIG. 4, the anchor 6 is dropped into the sea S. The tow rope 11 is removed as preparation for the drop operation or at the start of the drop operation. Removal of the tow rope 11 is performed by disconnecting the connection at a connection point between the tow rope 11 and the work boat 2 or the mooring rope 10. When the tow rope 11 is not used, the connection between the work boat 2 and the mooring rope 10 is released. At this time, the temporary fixing Z of the upper chain 9 is left as it is.

アンカー6を海Sへ投下するときには、下部チェーン8の下端8a側の仮止めXを解除し、これにより台船1上からのアンカー6の投下を可能にすると共に、下部チェーン8の上端8b側の仮止めYの位置まで、当該下部チェーン8がアンカー6の沈降に従って、海Sへ引き出されるようにする。下部チェーン8を複数箇所で仮止めしている場合には、下部チェーン8が順次引き出されていくことに応じて、順次に仮止めを解除していく。   When the anchor 6 is dropped into the sea S, the temporary fixing X on the lower end 8a side of the lower chain 8 is released, whereby the anchor 6 can be dropped from the barge 1 and the upper end 8b side of the lower chain 8 , The lower chain 8 is drawn out to the sea S in accordance with the sinking of the anchor 6. When the lower chain 8 is temporarily fixed at a plurality of locations, the temporary fixing is sequentially released as the lower chain 8 is sequentially pulled out.

これにより、台船1上から海Sへアンカー6を投下すると、アンカー6に引っ張られて、下部チェーン8の上端8b側の仮止めYの位置まで、下部チェーン8のほぼ大部分が海Sへ向けて引き出される。   Accordingly, when the anchor 6 is dropped from the barge 1 to the sea S, the anchor 6 is pulled by the anchor 6, and almost the majority of the lower chain 8 reaches the sea S up to the position of the temporary fixing Y on the upper end 8 b side of the lower chain 8. It is drawn toward.

引き続き、下部チェーン8の上端8b側の仮止めYを解除する。これにより、下部チェーン8全体が台船1上から海Sへ引き出される。海Sへのアンカー6の投下に伴う下部チェーン8の引き出しにより、アンカー6は海底に着底され、また、先行して海Sに展開しておいた係留ロープ10等が、下部チェーン8を介して、アンカー6に係留される。   Subsequently, the temporary fixing Y on the upper end 8b side of the lower chain 8 is released. Thereby, the entire lower chain 8 is pulled out from the barge 1 to the sea S. By pulling out the lower chain 8 with the drop of the anchor 6 to the sea S, the anchor 6 is settled on the sea floor, and the mooring rope 10 and the like which have been deployed in the sea S in advance are passed through the lower chain 8. And anchored at anchor 6.

アンカー6を投下するとき、浮魚礁本体5は台船1上に載置されており、係留ロープ10等が海Sに展開されているだけなので、先行して送り込まれて係留ロープ等で引かれている状態の浮魚礁本体が沈降するアンカーの抵抗となってしまう従来とは異なり、アンカー6は、そのような抵抗を受けることなく、下部チェーン8やこれに連結された係留ロープ10等を引っ張りながら、台船1の直下の海底に向けて、ほぼ真っ直ぐに沈降していくことができる。   When the anchor 6 is dropped, the floating reef main body 5 is placed on the barge 1 and the mooring ropes 10 and the like are only deployed in the sea S, so they are sent in advance and pulled by the mooring ropes. The anchor 6 pulls the lower chain 8 and the mooring rope 10 connected to the lower chain 8 without receiving such resistance, unlike the conventional method in which the floating reef main body in a state where the body of the floating fish reef becomes a resistance of the sinking anchor. However, it can sink almost straight toward the seabed directly below the barge 1.

従って、アンカー6を的確に意図した位置に着底させることができ、アンカー6の沈設位置精度を高く確保することができる。   Therefore, the anchor 6 can be properly settled at the intended position, and the anchoring position accuracy of the anchor 6 can be ensured high.

アンカー6の沈設位置精度を高めることができるので、アンカー6の設置位置及び設置深度を計画通りとすることができ、これにより、期待通りの蝟集効果が得られると共に、設計強度以上の水圧や波浪等の外力を受けることもなく高い耐久性及び安全性を確保でき、さらには、水域区画を越境してしまうなどの事態も防ぐことができて、自治体や漁業組合等との漁業調整の問題が発生するおそれもなくすことができる。   Since the accuracy of the anchoring position of the anchor 6 can be improved, the installation position and the installation depth of the anchor 6 can be made as planned, whereby the expected gathering effect can be obtained, and the water pressure and the waves exceeding the design strength can be obtained. High durability and safety can be ensured without receiving external force such as the above, and the situation such as crossing the water area can be prevented. It is possible to eliminate the possibility of occurrence.

その後、台船1上に搭載されている浮魚礁本体5を、図5に示すように、当該台船1もしくは作業船4に設備されているクレーンなどの重機により、台船1から海Sへ移す。海Sに移された浮魚礁本体5には、クレーンなどから浮魚礁本体5を取り外す作業などを行うために、作業者が往来できるよう、ロープ12を作業船4と連結しておくと良い。なお、このロープ12は、浮魚礁本体5での作業が完了したら、連結が解除される。   Then, as shown in FIG. 5, the floating reef main body 5 mounted on the barge 1 is moved from the barge 1 to the sea S by a heavy machine such as a crane provided on the barge 1 or the work boat 4. Move. The rope 12 may be connected to the work boat 4 so that the worker can come and go with the floating fish reef main body 5 moved to the sea S in order to perform an operation of removing the floating fish reef main body 5 from a crane or the like. Note that the connection of the rope 12 is released when the work on the floating reef main body 5 is completed.

次いで、上部チェーン9の仮止めZを解除し、上部チェーン9のすべてを台船1上から海Sへ引き出す。このようにして海Sに移された浮魚礁本体5は、既に海底に沈設されているアンカー6により、海底から係留索7を介して係留される。   Next, the temporary fixing Z of the upper chain 9 is released, and the entire upper chain 9 is pulled out from the barge 1 to the sea S. The floating reef main body 5 transferred to the sea S in this manner is moored from the sea floor via the mooring line 7 by the anchor 6 already laid on the sea floor.

係留索7がアンカー6により係留された後で浮魚礁本体5を海Sへ移すようにしたので、先行して海に降ろしておいた浮魚礁本体の動き等により上部チェーンと上部ロープとの連結箇所でキンクや絡まりの発生が懸念される従来に対し、係留索7に絡まり等の不具合が生じることを防いで、設置状態における係留索7の健全性を高く確保することができる。   After the mooring cable 7 is moored by the anchor 6, the floating reef body 5 is moved to the sea S, so that the upper chain and the upper rope are connected by the movement of the floating fish reef body that has been previously lowered into the sea. In contrast to the conventional case in which kink or entanglement is likely to occur at a location, it is possible to prevent a problem such as entanglement in the mooring line 7 and to secure high soundness of the mooring line 7 in the installed state.

以上説明した本実施形態に係る浮魚礁の設置施工方法にあっては、係留索7を短時間で台船1上から海Sに引き出して展開することができて施工時間を短縮することができると共に、アンカー6を高い位置精度で沈設することができ、係留索7も、撚りなどが生じることなく適切に展開することができる。   In the method for installing and constructing a floating reef according to the present embodiment described above, the mooring line 7 can be pulled out from the barge 1 to the sea S in a short time and deployed, thereby shortening the construction time. At the same time, the anchor 6 can be sunk with high positional accuracy, and the mooring line 7 can also be appropriately deployed without twisting or the like.

1 台船
2〜4 作業船
5 浮魚礁本体
6 アンカー
7 係留索
8 下部チェーン
8a 下部チェーンの下端
8b 下部チェーンの上端
9 上部チェーン
9a 上部チェーンの上端
10 係留ロープ
10a 上部ロープ
10b 下部ロープ
11 曳航ロープ
Q 係留ロープの中間部
S 海
X〜Z 仮止め
Reference Signs List 1 barge 2-4 work boat 5 floating reef main body 6 anchor 7 mooring line 8 lower chain 8a lower chain lower end 8b lower chain upper end 9 upper chain 9a upper chain upper end 10 mooring rope 10a upper rope 10b lower rope 11 towing rope Q Intermediate part of mooring rope S Sea X ~ Z Temporary fixing

Claims (4)

魚類などの海洋生物を蝟集する浮魚礁本体と、海底に沈設するためのアンカーと、該アンカーに下端が連結される下部チェーン、該浮魚礁本体に上端が連結される上部チェーン、並びにこれら上部チェーンや下部チェーンよりも軽量で、これらチェーン同士を連結する係留ロープで構成され、該浮魚礁本体を該アンカーに連結するための係留索とを搭載した台船及び少なくとも一隻の作業船を、該浮魚礁本体の設置海域に配置し、
上記下部チェーンの少なくとも下端側と上端側及び上記上部チェーンは、予め上記台船に対して仮止めしておき、
まず、上記作業船で上記係留ロープの中間部を牽引することにより、少なくとも該係留ロープを上記台船から海へ引き出し、
次いで、上記上部チェーンの仮止めを残した状態で、上記アンカーを海底に着底させかつ上記下部チェーンを介して上記係留ロープが該アンカーで係留されるように、該下部チェーンの下端側の仮止めを解除して該アンカーを上記台船から海へ投下し、引き続き、該下部チェーンの上端側の仮止めを解除して、当該下部チェーン全体を該台船から海へ引き出し、
その後、上記浮魚礁本体を上記台船から海へ移し、上記上部チェーンの仮止めを解除して該上部チェーンを該台船から海へ引き出し、上記係留索で上記浮魚礁本体を海底から係留することを特徴とする浮魚礁の設置施工方法。
Floating reef main body for gathering marine life such as fish, anchor for submerging on the sea floor, lower chain connected to the lower end of the anchor, upper chain connected to the upper end to the floating reef main body, and these upper chains A barge and at least one work boat, which are lighter than the lower chain and a mooring rope for connecting these chains, and which are equipped with a mooring line for connecting the floating reef body to the anchor. Placed in the sea where the floating reef body is installed,
At least the lower and upper ends of the lower chain and the upper chain are temporarily fixed to the barge in advance,
First, by pulling at least the mooring rope from the barge to the sea by towing the intermediate portion of the mooring rope with the work boat,
Then, with the temporary anchoring of the upper chain left, the anchor is settled on the seabed and the lower chain is temporarily anchored so that the mooring rope is anchored by the anchor via the lower chain. Release the stopper and drop the anchor from the barge into the sea, then release the temporary fix on the upper end side of the lower chain, pull out the entire lower chain from the barge to the sea,
Thereafter, the main body of the floating reef is moved from the barge to the sea, the temporary fixing of the upper chain is released, the upper chain is pulled out of the barge to the sea, and the main body of the floating reef is moored from the seabed with the mooring line. Floating reef installation and construction method.
少なくとも前記係留ロープを前記台船から海へ引き出す際、該係留ロープの中間部と該作業船とを曳航ロープで連結することを特徴とする請求項1に記載の浮魚礁の設置施工方法。   2. The method according to claim 1, wherein an intermediate portion of the mooring rope and the work boat are connected by a towing rope at least when the mooring rope is drawn from the barge to the sea. 前記係留ロープは、海に沈降可能な比重の重い上部ロープと、海に浮遊可能な比重の軽い下部ロープとを一連に連結して構成されていることを特徴とする請求項1または2に記載の浮魚礁の設置施工方法。   3. The mooring rope according to claim 1, wherein the upper rope having a high specific gravity capable of sinking in the sea and the lower rope having a low specific gravity capable of floating in the sea are connected in series. 4. Floating fish reef installation and construction method. 前記下部ロープは、前記上部ロープよりも長さが長く、前記係留ロープの中間部を牽引する前記作業船は、該下部ロープを牽引することを特徴とする請求項3に記載の浮魚礁の設置施工方法。   The installation of a floating reef according to claim 3, wherein the lower rope is longer than the upper rope, and the work boat towing an intermediate portion of the mooring rope tow the lower rope. Construction method.
JP2018166732A 2018-09-06 2018-09-06 How to install and construct a floating fish reef Active JP7072474B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018166732A JP7072474B2 (en) 2018-09-06 2018-09-06 How to install and construct a floating fish reef

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018166732A JP7072474B2 (en) 2018-09-06 2018-09-06 How to install and construct a floating fish reef

Publications (2)

Publication Number Publication Date
JP2020039254A true JP2020039254A (en) 2020-03-19
JP7072474B2 JP7072474B2 (en) 2022-05-20

Family

ID=69796761

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018166732A Active JP7072474B2 (en) 2018-09-06 2018-09-06 How to install and construct a floating fish reef

Country Status (1)

Country Link
JP (1) JP7072474B2 (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4932434A (en) * 1972-07-24 1974-03-25
JPS62283093A (en) * 1986-05-30 1987-12-08 Zeniraito V:Kk Mooring device of light buoy and the like
JP2007236291A (en) * 2006-03-09 2007-09-20 Asahi Kasei Construction Materials Co Ltd Floating fish reef
JP2010207106A (en) * 2009-03-06 2010-09-24 Okabe Co Ltd Method for recovering middle-layer floating fish bank and metal fitting for recovery, usable therefor
CN204047600U (en) * 2014-06-25 2014-12-31 浙江海洋学院 Floating fish shelter
JP2016067249A (en) * 2014-09-29 2016-05-09 岡部株式会社 Recovery device and method for floating fish reef
JP2016158516A (en) * 2015-02-27 2016-09-05 粕谷製網株式会社 Floating fish bank, and construction method and recovery method of the same

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4932434A (en) * 1972-07-24 1974-03-25
JPS62283093A (en) * 1986-05-30 1987-12-08 Zeniraito V:Kk Mooring device of light buoy and the like
JP2007236291A (en) * 2006-03-09 2007-09-20 Asahi Kasei Construction Materials Co Ltd Floating fish reef
JP2010207106A (en) * 2009-03-06 2010-09-24 Okabe Co Ltd Method for recovering middle-layer floating fish bank and metal fitting for recovery, usable therefor
CN204047600U (en) * 2014-06-25 2014-12-31 浙江海洋学院 Floating fish shelter
JP2016067249A (en) * 2014-09-29 2016-05-09 岡部株式会社 Recovery device and method for floating fish reef
JP2016158516A (en) * 2015-02-27 2016-09-05 粕谷製網株式会社 Floating fish bank, and construction method and recovery method of the same

Also Published As

Publication number Publication date
JP7072474B2 (en) 2022-05-20

Similar Documents

Publication Publication Date Title
RU2607492C2 (en) Mooring system connecting element and use thereof
AU2009312647B2 (en) Method for assembling an operating rig for a fluid in a body of water and associated operating rig
CN109415106B (en) Emergency stop system and method
EP0653349B1 (en) Line fisher for use in anchor laying
US9745023B2 (en) Water anchors
JP6406665B2 (en) Floating fish reef collection device and collection method
US5065687A (en) Mooring system
US5566636A (en) Off shore mooring system
US9896164B2 (en) Float mooring method, mooring member, and method of recovering same
US8181589B2 (en) Gravity anchor
US3929087A (en) Method of retrieving anchors
CN109901273B (en) Construction method for laying optical cable junction boxes on sea in ultra-deep water
JP2018039475A (en) Method for extension of mooring cable, method for mooring floating body structure and method for construction of floating body type offshore wind power generation facility
JP2020039254A (en) Installation construction method for floating fish reef
JPH0656076A (en) Submarine cable laying construction method and laying work ship thereof
US6536364B1 (en) Mooring apparatus
KR101281654B1 (en) Anchoring method of vessel with caisson pipe
KR101324118B1 (en) Ice management method using vessel with caisson pipe
KR101281652B1 (en) Offshore plant anchoring method using vessel with caisson pipe
JP2008037143A (en) Holding force testing method and device
CN114084283B (en) Dragging point conversion structure and dragging point conversion method using same
CN113294591B (en) Arrangement method for dragging steel cable of submarine pipeline between islands
JPH0735158B2 (en) Light buoy mooring device
JP7015577B2 (en) Tube float structure
KR101346258B1 (en) Vessel with caisson pipe

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20210708

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20220414

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220426

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220510

R150 Certificate of patent or registration of utility model

Ref document number: 7072474

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150