JP2019215070A - Construction method of pipe joint - Google Patents

Construction method of pipe joint Download PDF

Info

Publication number
JP2019215070A
JP2019215070A JP2018126537A JP2018126537A JP2019215070A JP 2019215070 A JP2019215070 A JP 2019215070A JP 2018126537 A JP2018126537 A JP 2018126537A JP 2018126537 A JP2018126537 A JP 2018126537A JP 2019215070 A JP2019215070 A JP 2019215070A
Authority
JP
Japan
Prior art keywords
fixing
hole
tool
screw
flange
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2018126537A
Other languages
Japanese (ja)
Other versions
JP7066109B2 (en
Inventor
元 井村
Hajime Imura
元 井村
祐作 篠田
Yusaku Shinoda
祐作 篠田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Onda Mfg Co Ltd
Original Assignee
Onda Mfg Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Onda Mfg Co Ltd filed Critical Onda Mfg Co Ltd
Priority to JP2018126537A priority Critical patent/JP7066109B2/en
Publication of JP2019215070A publication Critical patent/JP2019215070A/en
Application granted granted Critical
Publication of JP7066109B2 publication Critical patent/JP7066109B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Domestic Plumbing Installations (AREA)

Abstract

To provide a novel construction method of a pipe joint.SOLUTION: A construction method of a pipe joint 1 comprises: a specification step of specifying each of fixing holes 28 used for fixing and fixing holes 28 not used for fixing; a fixation step of inserting a screw 30 (fixing tool) into the fixing holes 28 used for fixing and fixing a tightening ring 23 (flange) to a wall 14 (construction surface); a shielding step of shielding the fixing holes 28 not used for fixing with a shielding part 36 (shielding member); and a fixation confirmation step performed in a state where the screw 30 used for fixing is exposed and the fixing hole 28 not used for fixing is shielded by the shielding part 36.SELECTED DRAWING: Figure 8

Description

本発明は、管継手の施工方法に関する。   The present invention relates to a method for installing a pipe joint.

壁に固定される管継手としては、例えば特許文献1に示されるように、壁に設けられた貫通孔に挿通される継手本体と、上記壁の第1面側に位置するよう継手本体に設けられている第1フランジと、上記壁の第2面側に位置するよう継手本体に取り付けられる第2フランジと、を備えたものが知られている。また、上記管継手においては、継手本体を壁に対し固定するため、ビスを第2フランジから壁を介して第1フランジに打ち込むことが考えられる。   As a pipe joint fixed to a wall, for example, as shown in Patent Document 1, a joint body inserted into a through hole provided in a wall and a joint body provided on a first surface side of the wall are provided. And a second flange attached to the joint body so as to be located on the second surface side of the wall. In the above-mentioned pipe joint, in order to fix the joint main body to the wall, it is conceivable that a screw is driven into the first flange from the second flange through the wall.

特開2014−35051号公報JP 2014-35051 A

本発明の目的は、新規な管継手の施工方法を提供することにある。   An object of the present invention is to provide a novel pipe joint construction method.

以下、上記課題を解決するための手段及びその作用効果について記載する。
上記課題を解決するために、請求項1に係る発明の管継手の施工方法は、固定具が挿通される固定用孔を周方向に間隔をおいて複数有する円板状のフランジが継手本体の端部に螺合され、前記端部に対する前記フランジの螺合位置を変更可能であり、前記複数の前記固定用孔のうち、前記継手本体に対する前記フランジの前記螺合位置に対応した一部の前記固定用孔を用いて施工面に固定され、前記フランジの前記螺合位置に対応しない残りの前記固定用孔は前記固定に用いない管継手の施工方法であって、前記固定に用いる前記固定用孔と前記固定に用いない前記固定用孔とをそれぞれ特定する特定工程と、前記固定に用いる前記固定用孔に前記固定具を挿通して前記フランジを前記施工面に固定する固定工程と、前記固定に用いない前記固定用孔を遮蔽部材で遮蔽する遮蔽工程と、前記固定に用いた前記固定具を露出させた状態でかつ前記固定に用いない前記固定用孔を前記遮蔽部材にて遮蔽した状態で行う前記固定の確認工程とを有する。
Hereinafter, means for solving the above-described problems and the effects thereof will be described.
In order to solve the above-mentioned problem, the pipe joint installation method according to the first aspect of the present invention is a method for constructing a pipe joint, in which a disc-shaped flange having a plurality of fixing holes through which a fixing tool is inserted is provided at intervals in a circumferential direction. It is screwed to an end, and the screwing position of the flange with respect to the end is changeable, and a part of the plurality of fixing holes corresponding to the screwing position of the flange with respect to the joint body. A method of installing a pipe joint that is fixed to a construction surface using the fixing hole and does not correspond to the screwing position of the flange, and the remaining fixing hole is not used for the fixing, wherein the fixing used for the fixing is performed. A fixing step of specifying the fixing hole and the fixing hole not used for fixing, and a fixing step of inserting the fixing tool into the fixing hole used for fixing and fixing the flange to the construction surface, Not used for fixing A shielding step of shielding the fixing hole with a shielding member, and the fixing performed in a state where the fixing tool used for the fixing is exposed and the fixing hole not used for the fixing is shielded by the shielding member. Confirmation step.

上記方法によれば、管継手のフランジが固定具によって施工面に固定されていることを確認工程で確認するときには、上記フランジに形成された固定用孔のうち固定具が挿通されていない固定用孔、言い換えれば上記固定に用いられていない固定用孔が遮蔽部材で遮蔽されている。このため、確認工程において、上記固定に用いられていない固定用孔に対し、固定具が未挿通であるとの誤認がなされてしまい、不必要に固定具の挿通が行われることを抑制できるようになる。   According to the above method, when confirming in the confirmation step that the flange of the pipe joint is fixed to the construction surface by the fixing tool, the fixing hole in which the fixing tool is not inserted among the fixing holes formed in the flange. The holes, in other words, the fixing holes not used for the fixing are shielded by the shielding member. For this reason, in the confirmation step, it is erroneously recognized that the fixing device is not inserted into the fixing hole not used for the fixing, so that it is possible to suppress unnecessary insertion of the fixing device. become.

請求項2に係る発明の管継手の施工方法は、固定具が挿通される固定用孔と工具を掛けるための工具用穴とを有するフランジが継手本体に螺合された管継手の施工方法であって、前記工具によって前記工具用穴を介して前記フランジを前記継手本体に螺合する螺合工程と、前記固定具によって前記固定用孔を介して前記フランジを施工面に固定する固定工程と、前記工具用穴を遮蔽部材で遮蔽する遮蔽工程と、前記固定具を露出させた状態でかつ前記工具用穴を前記遮蔽部材にて遮蔽した状態で行う前記固定の確認工程とを有する。   The method for installing a pipe joint according to the invention according to claim 2 is a method for installing a pipe joint in which a flange having a fixing hole through which a fixing tool is inserted and a tool hole for hanging a tool is screwed into the joint body. A screwing step of screwing the flange to the joint body through the tool hole by the tool; and a fixing step of fixing the flange to the work surface through the fixing hole by the fixing tool. A shielding step of shielding the tool hole with a shielding member; and a fixing confirmation step performed in a state where the fixing tool is exposed and the tool hole is shielded by the shielding member.

上記方法によれば、管継手のフランジが固定具によって施工面に固定されていることを確認工程で確認するときには、上記フランジに形成された工具用穴が遮蔽部材で遮蔽されている。このため、確認工程において、上記工具用穴に対し、固定具を未挿通な固定用孔であるとの誤認がなされてしまい、不必要に固定具の挿通が行われることを抑制できるようになる。   According to the above method, when it is confirmed in the confirmation step that the flange of the pipe joint is fixed to the construction surface by the fixture, the tool hole formed in the flange is shielded by the shielding member. For this reason, in the checking step, the fixing hole is erroneously recognized as a fixing hole in which the fixing tool has not been inserted into the tool hole, and it is possible to suppress unnecessary insertion of the fixing tool. .

壁に固定された管継手を示す断面図。Sectional drawing which shows the pipe joint fixed to the wall. 管継手における継手本体の端部に対する各部品の取付態様を示す斜視図。FIG. 4 is a perspective view showing an attachment state of each part to an end of the joint main body in the pipe joint. 管継手及びその締付リングを示す正面図。The front view which shows a pipe joint and its fastening ring. 管継手用の施工補助具を示す正面図。The front view which shows the construction aid for pipe fittings. 壁に対する管継手の施工手順を示す斜視図。The perspective view which shows the construction procedure of the pipe joint with respect to the wall. 壁に対する管継手の施工手順を示す斜視図。The perspective view which shows the construction procedure of the pipe joint with respect to the wall. 壁に対する管継手の施工手順を示す斜視図。The perspective view which shows the construction procedure of the pipe joint with respect to the wall. 施工補助具の使用態様を示す正面図。The front view which shows the use aspect of a construction auxiliary tool. 締付リングに対し施工補助具の遮蔽部を貼り付けた状態を示す正面図。The front view showing the state where the shielding part of the construction auxiliary tool was stuck on the fastening ring. 管継手の固定に用いられるビスの打ち込み態様を示す断面図。Sectional drawing which shows the driving mode of the screw used for fixing of a pipe joint.

以下、管継手の一実施形態について、図1〜図10を参照して説明する。
図1に示すように、管継手1の継手本体2としては例えばL字状のものがある。この継手本体2では、一方の端部2a(図1の上端部)にパイプ3が接続されるとともに、他方の端部2b(図1の右端部)に給水栓等を接続することが可能となっている。なお、パイプ3の端部には、金属製の筒状をなすインコア4が挿入されている。このインコア4がパイプ3内に没入することは同インコア4の端部に形成されたフランジ4aによって抑制されている。
Hereinafter, an embodiment of a pipe joint will be described with reference to FIGS. 1 to 10.
As shown in FIG. 1, for example, an L-shaped joint main body 2 of the pipe joint 1 is available. In this joint body 2, it is possible to connect the pipe 3 to one end 2a (upper end in FIG. 1) and to connect a water tap to the other end 2b (right end in FIG. 1). Has become. In addition, a metal tubular in-core 4 is inserted into the end of the pipe 3. The immersion of the incore 4 into the pipe 3 is suppressed by the flange 4 a formed at the end of the incore 4.

継手本体2における一方の端部2aの内側には、上記パイプ3の端部を収容する収容部5が形成されている。この収容部5の内奥には段差部6が形成されている。同収容部5の内周面には、端部2aの中心線(軸線)方向に互い間隔をおいて二つのOリング7,8が配置されている。また、収容部5の内周面において、Oリング7,8よりも端部2aの開口寄りの部分には、スペーサ9を挟んだ一対のロックリング10,11が、端部2aの開口に挿入された押輪12によって保持されている。この押輪12の外周面と上記端部2aの開口部の内周面との間は、Oリング13によってシールされている。   Inside the one end 2 a of the joint body 2, a housing portion 5 for housing the end of the pipe 3 is formed. A step portion 6 is formed inside the accommodation portion 5. Two O-rings 7 and 8 are arranged on the inner peripheral surface of the housing portion 5 at intervals from each other in the direction of the center line (axis) of the end portion 2a. A pair of lock rings 10 and 11 with a spacer 9 interposed therebetween is inserted into the opening of the end 2a at a portion of the inner peripheral surface of the housing 5 closer to the opening of the end 2a than the O-rings 7 and 8. Is held by the pressed pressing wheel 12. An O-ring 13 seals between the outer peripheral surface of the press ring 12 and the inner peripheral surface of the opening of the end 2a.

そして、継手本体2における端部2aの収容部5には、パイプ3の端部が上記端部2aの開口から挿入される。詳しくは、パイプ3の端部に挿入されたインコア4が収容部5内の上記段差部6に突き当たるようになるまで、同パイプ3の端部が収容部5内に挿入される。このときには、パイプ3の端部がOリング7,8、スペーサ9、ロックリング10,11、及び押輪12を貫通した状態となる、そして、ロックリング10,11がパイプ3の外周面に押圧されることにより、そのパイプ3の収容部5からの抜け出しが防止される。更に、このときにはOリング7,8がパイプ3の外周面に接触した状態となり、それによって継手本体2内を流れる流体(水等)がパイプ3の外周面と収容部5の内周面との間から管継手1の外に漏れることは抑制される。   Then, the end of the pipe 3 is inserted into the accommodation portion 5 of the end 2a of the joint body 2 from the opening of the end 2a. More specifically, the end of the pipe 3 is inserted into the housing 5 until the incore 4 inserted into the end of the pipe 3 comes into contact with the step 6 in the housing 5. At this time, the end of the pipe 3 penetrates the O-rings 7, 8, the spacer 9, the lock rings 10, 11, and the pressing ring 12, and the lock rings 10, 11 are pressed against the outer peripheral surface of the pipe 3. This prevents the pipe 3 from coming out of the storage section 5. Further, at this time, the O-rings 7 and 8 come into contact with the outer peripheral surface of the pipe 3, whereby the fluid (water or the like) flowing in the joint body 2 flows between the outer peripheral surface of the pipe 3 and the inner peripheral surface of the housing 5. Leakage from outside to the outside of the pipe joint 1 is suppressed.

継手本体2における他方の端部2bは、壁14に設けられた貫通孔15に挿通されるようになっている。また、上記端部2bの内側には給水栓等をねじ込むことが可能な雌ねじ部16が形成されている一方、端部2bの外周面には雄ねじ部17(図2)が形成されている。継手本体2の端部2bにおける壁14の第1面側(図1の左面側)の部分には、ナット18、供回り防止プレート19、及びゴムパッキン20が設けられている。また、継手本体2の端部2bにおける壁14の第2面側(図1の右面側)の部分には、ゴムパッキン21、スベリパッキン22、及び締付リング23が設けられている。   The other end 2 b of the joint body 2 is inserted into a through hole 15 provided in the wall 14. A female screw portion 16 into which a water tap or the like can be screwed is formed inside the end portion 2b, while a male screw portion 17 (FIG. 2) is formed on the outer peripheral surface of the end portion 2b. A nut 18, a rotation prevention plate 19, and a rubber packing 20 are provided on the first surface side (left surface side in FIG. 1) of the wall 14 at the end 2 b of the joint body 2. A rubber packing 21, a sliding packing 22, and a tightening ring 23 are provided at a portion of the end 2 b of the joint body 2 on the second surface side (the right surface side in FIG. 1) of the wall 14.

図2に示すように、継手本体2の端部2bの外周面(雄ねじ部17)における図2の上端部及び下端部にはそれぞれ、互いに平行となる平面状の平坦部24,25(図2には上端部24のみ図示)が形成されている。また、上記ナット18、供回り防止プレート19、ゴムパッキン20、ゴムパッキン21、スベリパッキン22、及び締付リング23はそれぞれ、孔18a,19a,20a,21a,22a,23aを有する板状に形成されている。そして、上記ナット18、供回り防止プレート19、ゴムパッキン20、ゴムパッキン21、スベリパッキン22、及び締付リング23は、それらの孔18a,19a,20a,21a,22a,23aを継手本体2の端部2bが順に貫通した状態となっている。   As shown in FIG. 2, the upper and lower ends of FIG. 2 on the outer peripheral surface (male thread portion 17) of the end 2b of the joint body 2 are flat flat portions 24 and 25 (FIG. (Only the upper end 24 is shown). The nut 18, the rotation preventing plate 19, the rubber packing 20, the rubber packing 21, the sliding packing 22, and the tightening ring 23 are each formed in a plate shape having holes 18a, 19a, 20a, 21a, 22a, 23a. Have been. The nut 18, the rotation preventing plate 19, the rubber packing 20, the rubber packing 21, the sliding packing 22, and the tightening ring 23 are provided with the holes 18 a, 19 a, 20 a, 21 a, 22 a, and 23 a of the joint body 2. The end portions 2b are sequentially penetrated.

上記ナット18は多角形の板状に形成されている。また、ナット18の孔18aの内周面には、端部2bの雄ねじ部17と螺合する雌ねじ18bが形成されている。従って、ナット18を端部2bの中心線(軸線)周りに回転させると、上記雄ねじ部17及び上記雌ねじ18bを通じて端部2bに対するナット18の螺合位置が変わり、それに伴いナット18が端部2bの軸線方向に変位する。また、ナット18の外周縁26及び内周縁27は、図1に示すように端部2bの開口から離れる方向に突出した形状を有しており、それによって外周縁26と内周縁27との間の部分よりも厚肉とされている。なお、こうしたナット18は、壁14の第1面側に位置するよう継手本体2に設けられる第1フランジとしての役割を担う。   The nut 18 is formed in a polygonal plate shape. On the inner peripheral surface of the hole 18a of the nut 18, a female screw 18b screwed with the male screw portion 17 of the end 2b is formed. Accordingly, when the nut 18 is rotated around the center line (axis) of the end 2b, the screwing position of the nut 18 with respect to the end 2b is changed through the male screw portion 17 and the female screw 18b, and the nut 18 is accordingly moved to the end 2b. Is displaced in the axial direction of. Further, the outer peripheral edge 26 and the inner peripheral edge 27 of the nut 18 have a shape protruding in a direction away from the opening of the end 2b as shown in FIG. Is thicker than the part. Note that such a nut 18 serves as a first flange provided on the joint body 2 so as to be located on the first surface side of the wall 14.

図2に示す上記供回り防止プレート19は、ナット18における端部2bの軸線周りの回転を規制するためのものである。この供回り防止プレート19の孔19aを貫通する端部2bの雄ねじ部17は、上記孔19aの内周面とは螺合していない。このため、供回り防止プレート19は、端部2bに対しその軸線方向にスライド移動させることが可能となっている。また、供回り防止プレート19における孔19aの内周面には、端部2bの雄ねじ部17に形成された平坦部24,25に対し面接触することにより、供回り防止プレート19における端部2bの軸線周りの同端部2bに対する相対回転を規制する一対の面接触部19bが形成されている。一方、供回り防止プレート19の外縁には、ナット18側に突出して同ナット18の外縁と面接触する突起19cが形成されている。そして、このように突起19cをナット18の外縁と面接触させることにより、ナット18の端部2bの軸線周りにおける同端部2bに対する相対回転が、供回り防止プレート19を通じて規制されるようになる。   The rotation preventing plate 19 shown in FIG. 2 is for restricting rotation of the nut 18 around the axis of the end 2b. The male screw portion 17 of the end 2b penetrating the hole 19a of the rotation preventing plate 19 is not screwed with the inner peripheral surface of the hole 19a. For this reason, the rotation prevention plate 19 can be slid in the axial direction with respect to the end 2b. Further, the inner peripheral surface of the hole 19a in the counter-rotation prevention plate 19 is in surface contact with the flat portions 24, 25 formed in the male screw portion 17 of the end portion 2b, so that the end 2b in the counter-rotation prevention plate 19 is formed. A pair of surface contact portions 19b for restricting relative rotation with respect to the same end portion 2b around the axis of are formed. On the other hand, a projection 19c is formed on the outer edge of the rotation prevention plate 19 so as to project toward the nut 18 and come into surface contact with the outer edge of the nut 18. By bringing the projection 19c into surface contact with the outer edge of the nut 18, the relative rotation of the end 2b of the nut 18 around the axis with respect to the same end 2b is regulated through the rotation prevention plate 19. .

上記ゴムパッキン20の孔20a、上記ゴムパッキン21の孔21a、及び上記スベリパッキン22の孔22aを貫通する端部2bの雄ねじ部17は、それら孔20a,21a,22aの内周面とも螺合していない。このため、ゴムパッキン20、ゴムパッキン21、及びスベリパッキン22も、端部2bに対しその軸線方向にスライド移動させることが可能となっている。なお、図1に示すように、ゴムパッキン20はナット18及び供回り防止プレート19と壁14の第1面(図1の左面)との間に配置される一方、ゴムパッキン21及びスベリパッキン22は壁14の第2面(図1の右面)と締付リング23との間に配置される。   The male thread 17 of the end 2b passing through the hole 20a of the rubber packing 20, the hole 21a of the rubber packing 21, and the hole 22a of the sliding packing 22 is screwed with the inner peripheral surfaces of the holes 20a, 21a, 22a. I haven't. Therefore, the rubber packing 20, the rubber packing 21, and the sliding packing 22 can be slid in the axial direction with respect to the end 2b. As shown in FIG. 1, the rubber packing 20 is disposed between the nut 18 and the rotation preventing plate 19 and the first surface (the left surface in FIG. 1) of the wall 14, while the rubber packing 21 and the sliding packing 22 are provided. Is disposed between the second surface of the wall 14 (the right surface in FIG. 1) and the fastening ring 23.

上記締付リング23においては、その孔23aの内周面に端部2bの雄ねじ部17と螺合する雌ねじ23bが形成されている。従って、締付リング23を端部2bの軸線周りに回転させると、上記雄ねじ部17及び上記雌ねじ23bを通じて端部2bに対する締付リング23の螺合位置が変わり、それに伴い締付リング23が端部2bの軸線方向に変位する。なお、こうした締付リング23は、壁14(図1)の第2面側に位置するよう継手本体2に設けられる第2フランジとしての役割を担う。   In the fastening ring 23, a female screw 23b screwed with the male screw portion 17 of the end 2b is formed on the inner peripheral surface of the hole 23a. Therefore, when the tightening ring 23 is rotated around the axis of the end 2b, the screwing position of the tightening ring 23 with respect to the end 2b is changed through the male screw portion 17 and the female screw 23b, and accordingly the tightening ring 23 is Displaced in the axial direction of the portion 2b. The fastening ring 23 serves as a second flange provided on the joint main body 2 so as to be located on the second surface side of the wall 14 (FIG. 1).

図3に示すように、締付リング23における孔23aの周囲には、複数(この例では四つ)の固定用孔28が締付リング23の周方向に等間隔をおいて形成されており、且つ、一対の工具用穴29が締付リング23の中心線を挟む対称位置に形成されている。なお、上記固定用孔28は、継手本体2を壁14(図1)に固定するビス30(固定具)を挿通するためのものである。また、上記工具用穴29は、締付リング23を端部2bに対し同端部2bの軸線周りに工具を用いて回転させるためのものである。   As shown in FIG. 3, a plurality of (four in this example) fixing holes 28 are formed around the hole 23 a in the fastening ring 23 at equal intervals in the circumferential direction of the fastening ring 23. Further, a pair of tool holes 29 are formed at symmetrical positions with respect to the center line of the tightening ring 23. The fixing hole 28 is for inserting a screw 30 (fixing tool) for fixing the joint body 2 to the wall 14 (FIG. 1). The tool hole 29 is for rotating the tightening ring 23 with respect to the end 2b using a tool around the axis of the end 2b.

管継手1(継手本体2)は、ビス30を締付リング23から壁14を介してナット18に打ち込むことにより、その壁14に対し相対回転不能に固定される。詳しくは、締付リング23における複数の固定用孔28のうち、互いに最も離れた位置にある二つの固定用孔28を選択してビス30を挿通する。更に、そのビス30を、図1に示す締付リング23、スベリパッキン22、ゴムパッキン21、壁14、ゴムパッキン20、供回り防止プレート19を介して、ナット18に打ち込む。これにより、締付リング23が複数の固定用孔28のうちの一部を用いて壁14の第2面(施工面)に固定され、ひいては管継手1(継手本体2)が壁14に対し相対回転不能に固定されるようになる。   The pipe joint 1 (joint main body 2) is fixed to the wall 14 by screwing the screw 30 from the fastening ring 23 to the nut 18 via the wall 14. Specifically, of the plurality of fixing holes 28 in the tightening ring 23, two fixing holes 28 which are located farthest from each other are selected and the screw 30 is inserted. Further, the screw 30 is driven into the nut 18 via the tightening ring 23, the sliding packing 22, the rubber packing 21, the wall 14, the rubber packing 20, and the rotation preventing plate 19 shown in FIG. As a result, the fastening ring 23 is fixed to the second surface (construction surface) of the wall 14 using a part of the plurality of fixing holes 28, and the pipe joint 1 (the joint body 2) is It becomes fixed so that relative rotation is impossible.

次に、壁14に対する管継手1の上記施工(固定)の際に用いられる管継手用の施工補助具について説明する。
図4に示すように、施工補助具31は、剥離面32aを有するベースシート32と、そのベースシート32における剥離面32aのほぼ全体に対し糊によって仮止めされているラベル33と、を備えている。ベースシート32及びラベル33の中央部には、継手本体2の端部2b(図3)を挿通可能な挿通孔34が形成されている。
Next, a description will be given of a fitting aid for the fitting used in the above-described working (fixing) of the fitting 1 to the wall 14.
As shown in FIG. 4, the construction assisting tool 31 includes a base sheet 32 having a peeling surface 32a, and a label 33 temporarily fixed with glue to almost the entire peeling surface 32a of the base sheet 32. I have. In the center of the base sheet 32 and the label 33, an insertion hole 34 through which the end 2b (FIG. 3) of the joint body 2 can be inserted is formed.

この挿通孔34の内周面における図4の上端部及び下端部には、継手本体2における端部2bの雄ねじ部17に形成された平坦部24,25に対し線接触する線接触部34aが形成されている。これら線接触部34aは、継手本体2の端部2bが施工補助具31の挿通孔34に挿通されたとき、上記平坦部24,25との線接触を通じて端部2bに対し係合することにより、その端部2b(継手本体2)に対し端部2bの軸線周りでの施工補助具31の位置を決める位置決め部として機能する。   At the upper end and the lower end in FIG. 4 of the inner peripheral surface of the insertion hole 34, a line contact portion 34a that makes line contact with the flat portions 24 and 25 formed on the male screw portion 17 of the end 2b of the joint body 2 is provided. Is formed. When the end 2b of the joint body 2 is inserted into the insertion hole 34 of the construction assisting tool 31, these line contact portions 34a engage with the end 2b through line contact with the flat portions 24 and 25. , And functions as a positioning part for determining the position of the construction aid 31 around the axis of the end 2b with respect to the end 2b (the joint body 2).

ベースシート32及びラベル33における挿通孔34の周囲には、上述したように端部2b(図3)に対しその軸線周りでの施工補助具31の位置決めを行ったとき、締付リング23における互いに最も離れた位置にある二つの固定用孔28を露出させるための二つの露出部35が、挿通孔34の周方向に等間隔をおいて形成されている。これら露出部35に関しては、端部2bに対し施工補助具31が位置決めされたとき、締付リング23の固定用孔28が継手本体2の端部2aに対応する部分を避けるよう位置している場合に、上記固定用孔28が上記露出部35を介して露出されるよう形成されている。   As described above, when the positioning of the construction assisting tool 31 around the axis with respect to the end 2b (FIG. 3) is performed around the insertion hole 34 in the base sheet 32 and the label 33, Two exposed portions 35 for exposing the two fixing holes 28 at the farthest positions are formed at equal intervals in the circumferential direction of the insertion hole 34. With respect to these exposed portions 35, when the construction aid 31 is positioned with respect to the end 2b, the fixing hole 28 of the tightening ring 23 is positioned so as to avoid a portion corresponding to the end 2a of the joint body 2. In this case, the fixing hole 28 is formed so as to be exposed through the exposing portion 35.

また、ラベル33における挿通孔34の周囲であって露出部35の間の部分、言い換えれば挿通孔34の周方向において露出部35とは別の位置に、同ラベル33から切り離して上記剥離面32aから剥がすことにより、粘着シールとすることが可能な遮蔽部36が設けられている。なお、この例では遮蔽部36が二つ設けられている。これら遮蔽部36に関しては、上述したように端部2b(図3)に対しその軸線周りでの施工補助具31の位置決めを行ったとき、工具用穴29を遮蔽するように、且つ、露出部35を介して露出する固定用孔28以外の固定用孔28を遮蔽するように形成されている。   Further, at the portion around the insertion hole 34 in the label 33 and between the exposed portions 35, in other words, at a position different from the exposed portion 35 in the circumferential direction of the insertion hole 34, the separation surface 32 a is separated from the label 33. There is provided a shielding portion 36 that can be peeled off from the adhesive to form an adhesive seal. In this example, two shielding portions 36 are provided. As described above, when the positioning of the construction assisting tool 31 around the axis with respect to the end 2b (FIG. 3) is performed as described above, the shielding portion 36 shields the tool hole 29 and exposes the exposed portion. The fixing holes 28 other than the fixing holes 28 exposed through 35 are formed so as to be shielded.

次に、管継手1の施工方法について説明する。
図5に示すように、管継手1を壁14に固定する際には、継手本体2の端部2aに対しパイプ3を接続しておき、更に継手本体2の端部2bに対しナット18、供回り防止プレート19、及びゴムパッキン20を取り付ける。ちなみに、端部2bに対するその軸線方向についてのナット18の取り付け位置に関しては、ナット18を端部2bの軸線周りに回転させて同端部2bに対するナット18の螺合位置を変えることによって調整することができる。そして、こうした端部2bに対するナット18の取り付け位置の調整後、端部2bに取り付けられた供回り防止プレート19によってナット18の端部2bに対する軸線周りについての相対回転が規制され、更に端部2bに対するゴムパッキン20の取り付けが行われる。
Next, a method of installing the pipe joint 1 will be described.
As shown in FIG. 5, when fixing the pipe joint 1 to the wall 14, the pipe 3 is connected to the end 2 a of the joint main body 2, and the nut 18 is connected to the end 2 b of the joint main body 2. The rotation prevention plate 19 and the rubber packing 20 are attached. Incidentally, the mounting position of the nut 18 in the axial direction with respect to the end 2b is adjusted by rotating the nut 18 around the axis of the end 2b and changing the screwing position of the nut 18 with respect to the same end 2b. Can be. After the adjustment of the mounting position of the nut 18 with respect to the end 2b, the relative rotation about the axis with respect to the end 2b of the nut 18 is regulated by the rotation preventing plate 19 mounted on the end 2b. Of the rubber packing 20 is performed.

なお、ゴムパッキン20の孔20aの内径は、継手本体2の端部2bの外径よりも小径とされている。このため、継手本体2の端部2bに対しナット18、供回り防止プレート19、及びゴムパッキン20の順で取り付けを行うことによって、それらを端部2bが貫通した状態となったときには、ゴムパッキン20が端部2bに対し密着して供回り防止プレート19の端部2bからの脱落を防止するストッパとなる。   The inner diameter of the hole 20 a of the rubber packing 20 is smaller than the outer diameter of the end 2 b of the joint body 2. For this reason, by mounting the nut 18, the rotation prevention plate 19, and the rubber packing 20 in this order on the end 2b of the joint body 2, when the end 2b passes through them, the rubber packing The stopper 20 is in close contact with the end 2b and serves as a stopper for preventing the rotation prevention plate 19 from falling off from the end 2b.

ナット18、供回り防止プレート19、ゴムパッキン20が取り付けられた端部2bの先端には、その端部2bを壁14の貫通孔15に挿通する際に用いられる取り出し治具37が取り付けられる。この取り出し治具37は、端部2b内の雌ねじ部16(図1)に対し螺合される本体38と、その本体38に取り付けられている所定長さのチェーン40とを備えている。そして、パイプ3が接続された管継手1(継手本体2)を壁14の上部に配置した状態で、継手本体2の端部2bに取り付けられた取り出し治具37のチェーン40を、壁14の貫通孔15に対応して位置するように下に垂らす。   A take-out jig 37 used to insert the end 2b into the through hole 15 of the wall 14 is attached to the tip of the end 2b to which the nut 18, the rotation preventing plate 19, and the rubber packing 20 are attached. The take-out jig 37 includes a main body 38 screwed into the female screw portion 16 (FIG. 1) in the end 2b, and a chain 40 of a predetermined length attached to the main body 38. Then, with the pipe joint 1 (joint body 2) to which the pipe 3 is connected disposed above the wall 14, the chain 40 of the extraction jig 37 attached to the end 2 b of the joint body 2 is connected to the wall 14. It hangs down so as to be located corresponding to the through hole 15.

そして、貫通孔15を介してチェーン40を壁14における管継手1と反対側に引っ張り出すことにより、継手本体2の端部2bが貫通孔15に挿通される。このように端部2bが貫通孔15に挿通されたときには、端部2bの先端外周が壁14から突出して雄ねじ部17が露出するようになっている。すなわち、このときに雄ねじ部17が露出するよう、壁14の厚さに応じて端部2bに対するその軸線方向についてのナット18の取り付け位置が予め調整されている。端部2bが壁14の貫通孔15に挿通された状態のもと、壁14から露出する端部2bの先端外周に対し図2に示すゴムパッキン21、スベリパッキン22、及び締付リング23が取り付けられる。   Then, by pulling out the chain 40 to the opposite side of the wall 14 from the pipe joint 1 through the through hole 15, the end 2 b of the joint main body 2 is inserted into the through hole 15. When the end 2b is inserted into the through hole 15, the outer periphery of the tip of the end 2b projects from the wall 14 to expose the male screw portion 17. That is, the mounting position of the nut 18 in the axial direction with respect to the end portion 2b is adjusted in advance in accordance with the thickness of the wall 14 so that the male screw portion 17 is exposed at this time. With the end 2b inserted through the through hole 15 of the wall 14, the rubber packing 21, the sliding packing 22, and the tightening ring 23 shown in FIG. It is attached.

図6は、このように端部2bの先端外周に対しゴムパッキン21、スベリパッキン22、及び締付リング23を取り付けた状態を示している。この状態で、取り出し治具37を継手本体2の端部2bから取り外し、図7に示す工具41を用いた締付リング23の締め付けが行われる。この工具41は、所定の長さを有する本体バー42と、その本体バー42の長手方向の中央部に対し回動可能に支持された可動バー43と、を備えている。本体バー42の先端部にはピン42aが設けられている一方、可動バー43の先端部にはピン43aが設けられている。   FIG. 6 shows a state in which the rubber packing 21, the sliding packing 22, and the tightening ring 23 are attached to the outer periphery of the distal end of the end 2b. In this state, the take-out jig 37 is removed from the end 2b of the joint main body 2, and the tightening ring 23 is tightened using the tool 41 shown in FIG. The tool 41 includes a main body bar 42 having a predetermined length, and a movable bar 43 rotatably supported with respect to a central portion of the main body bar 42 in the longitudinal direction. A pin 42 a is provided at a tip of the main body bar 42, while a pin 43 a is provided at a tip of the movable bar 43.

管継手1を壁14に固定するための同管継手1の施工方法では、後述する螺合工程、特定工程、固定工程、遮蔽工程、及び確認工程が順に行われる。以下、これらの各工程について個別に詳しく説明する。   In the method of installing the pipe joint 1 for fixing the pipe joint 1 to the wall 14, a screwing step, a specifying step, a fixing step, a shielding step, and a checking step, which will be described later, are sequentially performed. Hereinafter, each of these steps will be individually described in detail.

[螺合工程]
この工程では、工具41によって締付リング23の工具用穴29を介して同締付リング23を継手本体2の端部2bに対し螺合する。詳しくは、図7に示すように、工具41のピン42a,43aを締付リング23の工具用穴29に差し込み、その状態で工具41を介して締付リング23を端部2bの軸線周りに回転させる。その結果、端部2bに対する締付リング23の螺合位置が変わり、それに伴い締付リング23が端部2bの軸線方向に変位する。そして、締付リング23が端部2bの軸線方向において壁14側に変位するよう、同締付リング23を工具41によって端部2bに対し相対回転させることにより、その締付リング23の締め付けが行われる。なお、締付リング23を端部2bに対し相対回転させることによって同端部2bに対する締付リング23の螺合位置を変えると、その締付リング23に形成されている固定用孔28の同締付リング23の周方向についての位置も変わる。
[Screwing process]
In this step, the tightening ring 23 is screwed to the end 2 b of the joint body 2 through the tool hole 29 of the tightening ring 23 by the tool 41. Specifically, as shown in FIG. 7, the pins 42a and 43a of the tool 41 are inserted into the tool holes 29 of the tightening ring 23, and in this state, the tightening ring 23 is inserted through the tool 41 around the axis of the end 2b. Rotate. As a result, the screwing position of the fastening ring 23 with respect to the end 2b is changed, and the fastening ring 23 is accordingly displaced in the axial direction of the end 2b. Then, the tightening ring 23 is rotated relative to the end 2b by the tool 41 so that the tightening ring 23 is displaced toward the wall 14 in the axial direction of the end 2b. Done. When the screwing position of the tightening ring 23 with respect to the end 2b is changed by rotating the tightening ring 23 relative to the end 2b, the fixing holes 28 formed in the tightening ring 23 are formed. The position of the tightening ring 23 in the circumferential direction also changes.

[特定工程]
この工程では、締付リング23における複数の固定用孔28のうち、管継手1の固定に用いる固定用孔28と上記固定に用いない固定用孔28とをそれぞれ特定する。詳しくは、図8に示すように、壁14から露出する端部2bが施工補助具31の挿通孔34に挿通されるよう、同施工補助具31を壁14に接している締付リング23にあてがう。このときの施工補助具31については、挿通孔34の線接触部34aと上記端部2bの平坦部24,25との線接触を通じて同端部2bに対し係合し、その係合によって端部2bに対する軸線周りについての位置決めが行われる。
[Specific process]
In this step, the fixing holes 28 used for fixing the pipe joint 1 and the fixing holes 28 not used for fixing are specified among the plurality of fixing holes 28 in the tightening ring 23. Specifically, as shown in FIG. 8, the construction assisting tool 31 is attached to the fastening ring 23 in contact with the wall 14 such that the end 2 b exposed from the wall 14 is inserted into the insertion hole 34 of the construction assisting tool 31. Apply At this time, the construction assisting tool 31 is engaged with the end 2b through the line contact between the line contact portion 34a of the insertion hole 34 and the flat portions 24 and 25 of the end 2b, and the end is engaged by the engagement. Positioning about the axis with respect to 2b is performed.

上述したように施工補助具31が端部2bに対し位置決めされたとき、施工補助具31における二つの露出部35から露出する固定用孔28があれば、それら固定用孔28が壁14に対する管継手1の固定に用いるべきものであると特定できる。また、上記施工補助具31が端部2bに対し位置決めされたとき、上記固定に用いるべき固定用孔28以外の固定用孔28については、施工補助具31の遮蔽部36によって遮蔽されるため、そうした遮蔽を通じて同固定用孔28が上記固定に用いない固定用孔28であると特定できるようになる。また、このときには工具用穴29も施工補助具31の遮蔽部36によって遮蔽される。   When the construction aid 31 is positioned with respect to the end 2b as described above, if there are the fixing holes 28 exposed from the two exposed portions 35 of the construction aid 31, the fixing holes 28 are pipes to the wall 14. It can be specified that the joint 1 should be used for fixing. Further, when the construction aid 31 is positioned with respect to the end 2b, the fixing holes 28 other than the fixing holes 28 to be used for fixing are shielded by the shielding part 36 of the construction aid 31, Through such shielding, the fixing hole 28 can be specified as the fixing hole 28 not used for the fixing. At this time, the tool hole 29 is also shielded by the shield part 36 of the construction aid 31.

なお、施工補助具31が端部2bに対し位置決めされたとき、露出部35から露出する固定用孔28がなければ、同露出部35からいずれかの固定用孔28が露出するよう端部2bに対する締付リング23の螺合位置が調整される。詳しくは、露出部35からいずれかの固定用孔28が露出するよう、図7に示す工具41を用いて端部2bの軸線周りについての同端部2bに対する締付リング23の相対位置が調整される。   When the construction assisting tool 31 is positioned with respect to the end 2b, if there is no fixing hole 28 exposed from the exposed portion 35, the end 2b is exposed such that any fixing hole 28 is exposed from the exposed portion 35. The screwing position of the tightening ring 23 with respect to is adjusted. More specifically, the relative position of the tightening ring 23 with respect to the end 2b around the axis of the end 2b is adjusted using the tool 41 shown in FIG. 7 so that one of the fixing holes 28 is exposed from the exposed portion 35. Is done.

[固定工程]
この工程では、図8に示すように、施工補助具31の露出部35から露出した固定用孔28、すなわち上記固定に用いる固定用孔28にビス30を挿通して締付リング23を壁14に固定する。詳しくは、上記ビス30が、図1に示す締付リング23、スベリパッキン22、ゴムパッキン21、壁14、ゴムパッキン20、供回り防止プレート19を介して、ナット18に打ち込まれる。これにより、締付リング23が上記固定用孔28を用いて壁14の施工面(図1の右面)に固定され、ひいては管継手1が壁14に対し相対回転不能に固定されるようになる。
[Fixing process]
In this step, as shown in FIG. 8, the screw 30 is inserted through the fixing hole 28 exposed from the exposed portion 35 of the construction assisting tool 31, that is, the fixing hole 28 used for the fixing, and the fastening ring 23 is Fixed to. Specifically, the screw 30 is driven into the nut 18 via the tightening ring 23, the sliding packing 22, the rubber packing 21, the wall 14, the rubber packing 20, and the rotation preventing plate 19 shown in FIG. Thereby, the fastening ring 23 is fixed to the construction surface (the right side in FIG. 1) of the wall 14 by using the fixing hole 28, and the pipe joint 1 is fixed to the wall 14 so as to be relatively non-rotatable. .

このように管継手1の壁14に対する固定が行われるとき、工具用穴29及び上記固定に用いない固定用孔28については、施工補助具31の遮蔽部36によって遮蔽されている。このため、工具用穴29及び上記固定に用いない固定用孔28に対し、誤ってビス30を挿通してしまうことは抑制されるようになる。ちなみに、仮に上記固定に用いない固定用孔28にビス30を挿通して壁14側に打ち込んだとすると、そのビス30が壁14等を貫通したときに継手本体2における端部2aに打ち込まれるおそれがあるが、こうしたことが生じることは抑制される。   When the pipe joint 1 is fixed to the wall 14 as described above, the tool holes 29 and the fixing holes 28 not used for the fixing are shielded by the shielding portion 36 of the construction assistant 31. For this reason, accidental insertion of the screw 30 into the tool hole 29 and the fixing hole 28 not used for fixing is suppressed. Incidentally, if the screw 30 is inserted into the fixing hole 28 not used for the fixing and is driven into the wall 14, there is a possibility that the screw 30 is driven into the end 2 a of the joint body 2 when penetrating the wall 14 or the like. However, this is prevented from occurring.

[遮蔽工程]
この工程では、施工補助具31を継手本体2の端部2bから取り外した状態で、締付リング23の工具用穴29、及び、上記固定に用いない固定用孔28を遮蔽することが行われる。詳しくは、施工補助具31を端部2bから取り外した後、ラベル33から遮蔽部36を切り離してベースシート32の剥離面32aから剥がし、その剥がした遮蔽部36を粘着シールとして図9に示すように締付リング23に対し工具用穴29及び上記固定に用いない固定用孔28を遮蔽するよう貼り付ける。なお、粘着シールとして締付リング23に対し貼り付けられた上記遮蔽部36は、締付リング23の工具用穴29及び上記固定に用いない固定用孔28を遮蔽する遮蔽部材としての役割を担う。
[Shielding process]
In this step, the tool hole 29 of the tightening ring 23 and the fixing hole 28 not used for fixing are shielded while the construction aid 31 is removed from the end 2b of the joint body 2. . More specifically, after removing the construction aid 31 from the end 2b, the shielding portion 36 is separated from the label 33 and peeled off from the release surface 32a of the base sheet 32, and the peeled shielding portion 36 is used as an adhesive seal as shown in FIG. Is attached to the tightening ring 23 so as to cover the tool hole 29 and the fixing hole 28 not used for fixing. In addition, the above-mentioned shielding part 36 affixed to the fastening ring 23 as an adhesive seal plays a role as a shielding member for shielding the tool hole 29 of the fastening ring 23 and the fixing hole 28 not used for fixing. .

[確認工程]
この工程は、壁14に対し管継手1を固定するためのビス30が適正な固定用孔28を介して打ち込まれているか否かを確認するためのものである。こうした確認は、図9に示すように遮蔽部36を粘着シールとして締付リング23に対し貼り付けることにより、工具用穴29及び上記固定に用いない固定用孔28を遮蔽した状態で、且つ、ビス30が挿通した固定用孔28(上記固定に用いる固定用孔28)を露出させた状態で行う。このため、上記確認の際、締付リング23の工具用穴29及び上記固定に用いられていない固定用孔28に対し、ビス30が未挿通であるとの誤認がなされてしまい、不必要にビス30の挿通及び打ち込みが行われることを抑制できる。
[Confirmation process]
This step is for confirming whether or not a screw 30 for fixing the pipe joint 1 to the wall 14 is driven through an appropriate fixing hole 28. As shown in FIG. 9, such a check is performed by attaching the shielding portion 36 as an adhesive seal to the tightening ring 23 to shield the tool hole 29 and the fixing hole 28 not used for fixing, and The fixing is performed in a state where the fixing holes 28 through which the screws 30 are inserted (the fixing holes 28 used for the fixing) are exposed. For this reason, at the time of the above confirmation, it is erroneously recognized that the screw 30 has not been inserted into the tool hole 29 of the tightening ring 23 and the fixing hole 28 not used for the fixing, which is unnecessary. The insertion and driving of the screw 30 can be suppressed.

また、上記遮蔽部36を粘着シールとして締付リング23に対し貼り付けることにより、工具用穴29及び上記固定に用いない固定用孔28を遮蔽部36で遮蔽したままにすることができる。このように締付リング23における工具用穴29及び上記固定に用いない固定用孔28を上記遮蔽部36で遮蔽した状態に保持することにより、上記確認時に工具用穴29及び上記固定に用いない固定用孔28に対し誤ってビス30を挿通してしまうことが一層効果的に抑制される。   Further, by attaching the shielding portion 36 to the fastening ring 23 as an adhesive seal, the tool hole 29 and the fixing hole 28 not used for fixing can be kept shielded by the shielding portion 36. By holding the tool hole 29 and the fixing hole 28 not used for fixing in the tightening ring 23 in the state of being shielded by the shielding portion 36 in this manner, the tool hole 29 and the fixing hole 28 are not used for the above-described confirmation. It is more effectively suppressed that the screw 30 is erroneously inserted into the fixing hole 28.

次に、本実施形態における管継手1の作用について説明する。
図10に示すように、管継手1を壁14に対し固定するためのビス30は、締付リング23の固定用孔28に挿通された状態で、作業者によって締付リング23側からナット18側に打ち込まれる。このビス30が締付リング23の固定用孔28の中心線に対し傾くことなく適正に打ち込まれた場合、図10の上側に位置するビス30のようになる。すなわち、上記ビス30が、締付リング23の固定用孔28、スベリパッキン22、ゴムパッキン21、壁14、ゴムパッキン20、供回り防止プレート19、及び、ナット18における外周縁26と内周縁27との間の部分を貫通する。
Next, the operation of the pipe joint 1 in the present embodiment will be described.
As shown in FIG. 10, a screw 30 for fixing the pipe joint 1 to the wall 14 is inserted into the fixing hole 28 of the tightening ring 23, and a nut 18 is inserted by the operator from the tightening ring 23 side. Driven to the side. When this screw 30 is properly driven without inclining with respect to the center line of the fixing hole 28 of the tightening ring 23, the screw 30 becomes like the screw 30 located on the upper side in FIG. That is, the screw 30 is fixed to the fixing hole 28 of the tightening ring 23, the sliding packing 22, the rubber packing 21, the wall 14, the rubber packing 20, the rotation prevention plate 19, and the outer peripheral edge 26 and the inner peripheral edge 27 of the nut 18. And through the part between.

一方、作業者によって締付リング23側からナット18側に打ち込まれるビス30が締付リング23の固定用孔28の中心線に対し傾いていると、そのビス30の打ち込み方向の先端部(図10の左端部)が締付リング23の外周縁26寄りもしくは内周縁27寄りに振れた状態となる。なお、図10の一点鎖線L1は、ビス30の打ち込み方向の先端部が締付リング23の外周縁26寄りに振れた状態で、そのビス30を打ち込んだときの同ビス30の移動軌跡を示している。また、図10の一点鎖線L2は、ビス30の打ち込み方向の先端部が締付リング23の内周縁27寄りに振れた状態で、そのビス30を打ち込んだときの同ビス30の移動軌跡を示している。   On the other hand, if the screw 30 driven by the operator from the tightening ring 23 side to the nut 18 side is inclined with respect to the center line of the fixing hole 28 of the tightening ring 23, the tip of the screw 30 in the driving direction (FIG. 10 (left end portion) is swung toward the outer peripheral edge 26 or the inner peripheral edge 27 of the tightening ring 23. The dashed-dotted line L1 in FIG. 10 shows the movement locus of the screw 30 when the screw 30 is driven in a state where the tip of the screw 30 in the driving direction swings toward the outer peripheral edge 26 of the tightening ring 23. ing. A dashed line L2 in FIG. 10 shows a movement locus of the screw 30 when the screw 30 is driven in a state where the tip of the screw 30 in the driving direction swings toward the inner peripheral edge 27 of the tightening ring 23. ing.

上述したようにビス30が固定用孔28の中心線に対し傾いた状態で打ち込まれたと仮定すると、ナット18に対するビス30の打ち込みが不十分になって壁14に対し管継手1(継手本体2)を適正に固定できなくなったり、ビス30の先端部によって継手本体2の端部2bが傷ついたりするおそれがある。   As described above, assuming that the screw 30 is driven in a state inclined with respect to the center line of the fixing hole 28, the screw 30 is not sufficiently driven into the nut 18 and the pipe joint 1 (joint body 2) ) May not be properly fixed, or the end 2b of the joint body 2 may be damaged by the tip of the screw 30.

しかし、仮にビス30が固定用孔28の中心線に対し傾いた状態で打ち込まれ、それによってビス30の先端部が厚肉となった上記外周縁26や上記内周縁27にさしかかると、外周縁26の内側の周面26aや内周縁27の外側の周面27aに対するビス30の傾斜角度に応じて次のような現象が生じる。   However, if the screw 30 is driven in a state of being inclined with respect to the center line of the fixing hole 28, and the tip of the screw 30 reaches the thickened outer peripheral edge 26 or inner peripheral edge 27, the outer peripheral edge The following phenomenon occurs depending on the inclination angle of the screw 30 with respect to the inner peripheral surface 26a of the inner peripheral surface 26 and the outer peripheral surface 27a of the inner peripheral edge 27.

すなわち、ビス30の先端部が外周縁26寄りに振れており、且つ、外周縁26の周面26aに対するビス30の傾斜角度が比較的小さい場合には、ビス30の先端部が上記周面26aによって同ビス30の傾きをなくす方向に変位するようガイドされ、それによってビス30が固定用孔28の中心線に対し傾かないよう正しく打ち込まれる。   That is, when the tip of the screw 30 is swung toward the outer peripheral edge 26 and the inclination angle of the screw 30 with respect to the peripheral surface 26a of the outer peripheral edge 26 is relatively small, the distal end of the screw 30 is The screw 30 is guided so as to be displaced in a direction in which the inclination of the screw 30 is eliminated, whereby the screw 30 is correctly driven so as not to be inclined with respect to the center line of the fixing hole 28.

また、ビス30の先端部が外周縁26寄りに振れており、且つ、外周縁26の周面26aに対するビス30の傾斜角度が比較的大きい場合には、外周縁26が厚肉とされているため、ビス30の先端部が上記外周縁26にさしかかることにより、ビス30の打ち込みに伴って作業者が受ける手応えに変化が生じる。そうした手応えの変化によって作業者は、ビス30が固定用孔28の中心線に対し傾いていることを知ることができるようになる。そして、ビス30が傾いていることを上記手応えにより知った作業者は、そのビス30を傾かないよう正しく打ち込み直すことができる。   When the tip of the screw 30 swings toward the outer peripheral edge 26 and the inclination angle of the screw 30 with respect to the peripheral surface 26a of the outer peripheral edge 26 is relatively large, the outer peripheral edge 26 is made thick. Therefore, when the tip of the screw 30 approaches the outer peripheral edge 26, the response received by the worker with the driving of the screw 30 changes. Such a change in response allows the operator to know that the screw 30 is inclined with respect to the center line of the fixing hole 28. Then, the worker who knows that the screw 30 is tilted by the above-mentioned response can correctly re-drive the screw 30 so as not to tilt.

一方、ビス30の先端部が内周縁27寄りに振れており、且つ、内周縁27の周面27aに対するビス30の傾斜角度が比較的小さい場合には、ビス30の先端部が上記周面27aによって同ビス30の傾きをなくす方向に変位するようガイドされ、それによってビス30が固定用孔28の中心線に対し傾かないよう正しく打ち込まれる。   On the other hand, when the tip of the screw 30 is swinging toward the inner peripheral edge 27 and the inclination angle of the screw 30 with respect to the peripheral surface 27a of the inner peripheral edge 27 is relatively small, the distal end of the screw 30 is The screw 30 is guided so as to be displaced in a direction in which the inclination of the screw 30 is eliminated, whereby the screw 30 is correctly driven so as not to be inclined with respect to the center line of the fixing hole 28.

また、ビス30の先端部が内周縁27寄りに振れており、且つ、内周縁27の周面27aに対するビス30の傾斜角度が比較的大きい場合には、内周縁27が厚肉とされているため、ビス30の先端部が上記内周縁27にさしかかることにより、ビス30の打ち込みに伴って作業者が受ける手応えに変化が生じる。そうした手応えの変化によって作業者は、ビス30が固定用孔28の中心線に対し傾いていることを知ることができるようになる。そして、ビス30が傾いていることを上記手応えにより知った作業者は、そのビス30を傾かないよう正しく打ち込み直すことができる。   When the tip of the screw 30 swings toward the inner peripheral edge 27 and the inclination angle of the screw 30 with respect to the peripheral surface 27a of the inner peripheral edge 27 is relatively large, the inner peripheral edge 27 is made thick. Therefore, when the tip of the screw 30 approaches the inner peripheral edge 27, the response received by the operator with the driving of the screw 30 changes. Such a change in response allows the operator to know that the screw 30 is inclined with respect to the center line of the fixing hole 28. Then, the worker who knows that the screw 30 is tilted by the above-mentioned response can correctly re-drive the screw 30 so as not to tilt.

以上詳述した本実施形態によれば、以下に示す効果が得られるようになる。
(1)ビス30が締付リング23の固定用孔28の中心線に対し傾いた状態で打ち込まれることにより、壁14に対し管継手1(継手本体2)を適正に固定できなくなることを抑制できる。
According to the embodiment described above, the following effects can be obtained.
(1) It is possible to prevent the pipe joint 1 (joint main body 2) from being unable to be properly fixed to the wall 14 by driving the screw 30 while being inclined with respect to the center line of the fixing hole 28 of the tightening ring 23. it can.

(2)ビス30が締付リング23の固定用孔28の中心線に対し傾いて同ビス30の先端部が上記内周縁27寄りに振れた状態となり、その状態のもとでビス30が打ち込まれることによって継手本体2の端部2bが同ビス30の先端部によって傷つき、端部2bからの流体漏れに繋がることを抑制できる。   (2) The screw 30 is inclined with respect to the center line of the fixing hole 28 of the tightening ring 23, and the tip of the screw 30 is swung toward the inner peripheral edge 27, and the screw 30 is driven in that state. This can prevent the end 2b of the joint main body 2 from being damaged by the tip of the screw 30 and leading to fluid leakage from the end 2b.

(3)ナット18の外周縁26及び内周縁27を厚肉とすることにより、同ナット18の強度を高めることができる。このため、締付リング23からナット18へのビス30の打ち込みによって管継手1が壁14に対し固定されたとき、ナット18に対しビス30からの力がかかるとしても、その力の作用によってナット18が変形することを抑制できる。   (3) By making the outer peripheral edge 26 and the inner peripheral edge 27 of the nut 18 thick, the strength of the nut 18 can be increased. For this reason, when the pipe joint 1 is fixed to the wall 14 by driving the screw 30 from the tightening ring 23 into the nut 18, even if a force from the screw 30 is applied to the nut 18, the action of the force acts on the nut 18. 18 can be suppressed from being deformed.

(4)管継手1の端部2bに螺合されたナット18を、螺合位置の調整を通じて同端部2bの軸線方向に変位させることができる。そして、そうしたナット18の変位を通じて端部2bを壁14の貫通孔15に挿通させたときの同端部2bの壁14からの突出量を壁14の厚さ等に応じて調整することができ、同調整によって端部2bに対する締付リング23の適切な螺合代を確保することができる。   (4) The nut 18 screwed to the end 2b of the pipe joint 1 can be displaced in the axial direction of the end 2b by adjusting the screwing position. Through such displacement of the nut 18, the amount of protrusion of the end 2b from the wall 14 when the end 2b is inserted into the through hole 15 of the wall 14 can be adjusted according to the thickness of the wall 14. By the adjustment, an appropriate screwing allowance of the fastening ring 23 to the end 2b can be secured.

なお、上記実施形態は、例えば以下のように変更することもできる。
・ナット18の外周縁26と内周縁27との両方を厚肉に形成する代わりに、外周縁26と内周縁27との一方のみを厚肉に形成するようにしてもよい。
In addition, the said embodiment can also be changed as follows, for example.
-Instead of forming both the outer peripheral edge 26 and the inner peripheral edge 27 of the nut 18 to be thick, only one of the outer peripheral edge 26 and the inner peripheral edge 27 may be formed to be thick.

・管継手1にナット18における端部2bの軸線周りの回転を規制するための供回り防止プレート19を設けることは必須ではない。例えば、ナット18を設ける代わりに継手本体2の端部2bに対しフランジを一体形成した場合、上記供回り防止プレート19を省略することができる。   It is not essential to provide the pipe joint 1 with the rotation prevention plate 19 for restricting the rotation of the end 2b of the nut 18 around the axis. For example, when the flange is formed integrally with the end 2b of the joint main body 2 instead of providing the nut 18, the above-mentioned rotation prevention plate 19 can be omitted.

・供回り防止プレート19の突起19cを省略してもよい。
・締付リング23に工具用穴29を形成することは必須ではない。
・締付リング23の固定用孔28を壁14に対する管継手1の固定に必要な数(この例では二つ)だけ形成するようにしてもよい。
-The projection 19c of the rotation prevention plate 19 may be omitted.
-It is not essential to form the tool hole 29 in the tightening ring 23.
The number of the fixing holes 28 of the tightening ring 23 may be formed by the number necessary for fixing the pipe joint 1 to the wall 14 (two in this example).

・施工補助具31におけるラベル33の遮蔽部36については、必ずしも粘着シールとなるものである必要はない。
[その他の技術思想]
次に、上記実施形態から把握できる技術思想について記載する。
-About the shield part 36 of the label 33 in the construction assistance tool 31, it is not necessarily required to be an adhesive seal.
[Other technical ideas]
Next, technical ideas that can be grasped from the above embodiment will be described.

(イ)固定具が挿通される固定用孔を周方向に間隔をおいて複数有する円板状のフランジが継手本体の端部に螺合され、前記端部に対する前記フランジの螺合位置を変更可能であり、前記複数の前記固定用孔のうち、前記継手本体に対する前記フランジの前記螺合位置に対応した一部の前記固定用孔を用いて施工面に固定され、前記フランジの前記螺合位置に対応しない残りの前記固定用孔は前記固定に用いない管継手の施工方法であって、
前記固定に用いる前記固定用孔と前記固定に用いない前記固定用孔とをそれぞれ特定する特定工程と、
前記固定に用いる前記固定用孔に前記固定具を挿通して前記フランジを前記施工面に固定する固定工程と、
前記固定に用いない前記固定用孔を遮蔽部材で遮蔽する遮蔽工程と、
前記固定に用いた前記固定具を露出させた状態でかつ前記固定に用いない前記固定用孔を前記遮蔽部材にて遮蔽した状態で行う前記固定の確認工程と
を有する管継手の施工方法。
(B) A disk-shaped flange having a plurality of fixing holes into which the fixing tool is inserted at a circumferential interval is screwed into an end of the joint body, and a screwing position of the flange with respect to the end is changed. It is possible to fix to the work surface using a part of the fixing holes corresponding to the screwing position of the flange with respect to the joint body, among the plurality of fixing holes, and The remaining fixing holes not corresponding to the position is a method of installing a pipe joint not used for the fixing,
A specifying step of specifying each of the fixing hole used for the fixing and the fixing hole not used for the fixing,
A fixing step of inserting the fixing tool into the fixing hole used for the fixing and fixing the flange to the construction surface,
A shielding step of shielding the fixing hole not used for the fixing with a shielding member,
Confirming the fixation in a state where the fixing tool used for the fixation is exposed and the fixing hole not used for the fixation is shielded by the shielding member.

上記方法によれば、管継手のフランジが固定具によって施工面に固定されていることを確認工程で確認するときには、上記フランジに形成された固定用孔のうち固定具が挿通されていない固定用孔、言い換えれば上記固定に用いられていない固定用孔が遮蔽部材で遮蔽されている。このため、確認工程において、上記固定に用いられていない固定用孔に対し、固定具が未挿通であるとの誤認がなされてしまい、不必要に固定具の挿通が行われることを抑制できるようになる。   According to the above method, when confirming in the confirmation step that the flange of the pipe joint is fixed to the construction surface by the fixing tool, the fixing hole in which the fixing tool is not inserted among the fixing holes formed in the flange. The holes, in other words, the fixing holes not used for the fixing are shielded by the shielding member. For this reason, in the confirmation step, it is erroneously recognized that the fixing device is not inserted into the fixing hole not used for the fixing, so that it is possible to suppress unnecessary insertion of the fixing device. become.

(ロ)固定具が挿通される固定用孔と工具を掛けるための工具用穴とを有するフランジが継手本体に螺合された管継手の施工方法であって、
前記工具によって前記工具用穴を介して前記フランジを前記継手本体に螺合する螺合工程と、
前記固定具によって前記固定用孔を介して前記フランジを施工面に固定する固定工程と、
前記工具用穴を遮蔽部材で遮蔽する遮蔽工程と、
前記固定具を露出させた状態でかつ前記工具用穴を前記遮蔽部材にて遮蔽した状態で行う前記固定の確認工程と
を有する管継手の施工方法。
(B) A method for constructing a pipe joint in which a flange having a fixing hole through which a fixing tool is inserted and a tool hole for hanging a tool is screwed into the joint body,
A screwing step of screwing the flange to the joint body through the tool hole by the tool,
A fixing step of fixing the flange to a construction surface via the fixing hole by the fixing tool,
A shielding step of shielding the tool hole with a shielding member,
A fixing confirmation step performed in a state where the fixing tool is exposed and the tool hole is shielded by the shielding member.

上記方法によれば、管継手のフランジが固定具によって施工面に固定されていることを確認工程で確認するときには、上記フランジに形成された工具用穴が遮蔽部材で遮蔽されている。このため、確認工程において、上記工具用穴に対し、固定具を未挿通な固定用孔であるとの誤認がなされてしまい、不必要に固定具の挿通が行われることを抑制できるようになる。   According to the above method, when it is confirmed in the confirmation step that the flange of the pipe joint is fixed to the construction surface by the fixture, the tool hole formed in the flange is shielded by the shielding member. For this reason, in the checking step, the fixing hole is erroneously recognized as a fixing hole in which the fixing tool has not been inserted into the tool hole, and it is possible to suppress unnecessary insertion of the fixing tool. .

(ハ)固定具が挿通される固定用孔を周方向に間隔をおいて複数有する円板状のフランジが継手本体の端部に螺合され、前記端部に対する前記フランジの螺合位置を変更可能であり、前記複数の前記固定用孔のうち、前記継手本体に対する前記フランジの前記螺合位置に対応した一部の前記固定用孔を用いて施工面に固定され、前記フランジの前記螺合位置に対応しない残りの前記固定用孔は前記固定に用いない管継手の施工に用いられる施工補助具であって、
シート状をなすとともに、
前記継手本体の前記端部の先端が挿通可能な挿通孔と、
前記挿通孔の周囲に設けられた露出部と、
前記挿通孔の周囲において、前記露出部とは周方向の別の位置に設けられた遮蔽部と
を備え、
前記挿通孔は、前記継手本体の前記端部に対して係合することで、前記継手本体に対して前記端部の軸線周りでの位置を決める位置決め部を備え、
当該位置決め状態において、前記露出部は前記固定に用いる前記固定用孔を露出させ、前記遮蔽部は前記固定に用いない前記固定用孔を遮蔽する管継手用の施工補助具。
(C) A disc-shaped flange having a plurality of fixing holes into which the fixing tool is inserted at a circumferential interval is screwed into the end of the joint body, and the screwing position of the flange with respect to the end is changed. It is possible to fix to the work surface using a part of the fixing holes corresponding to the screwing position of the flange with respect to the joint body, among the plurality of fixing holes, and The remaining fixing holes not corresponding to the position is a construction aid used for the construction of the pipe joint not used for the fixing,
In the form of a sheet,
An insertion hole through which the tip of the end of the joint body can be inserted,
An exposed portion provided around the insertion hole,
Around the insertion hole, the exposed portion includes a shielding portion provided at another position in a circumferential direction,
The insertion hole is provided with a positioning unit that engages with the end of the joint body to determine a position around the axis of the end with respect to the joint body,
In the positioning state, the exposing part exposes the fixing hole used for the fixing, and the shielding part shields the fixing hole not used for the fixing.

上記構成によれば、管継手の継手本体を施工面に対し固定する際には、施工補助具の挿通孔が継手本体の端部に対し係合される。このとき、施工補助具における継手本体の上記端部の軸線周りについての位置が、同施工補助具の位置決め部により、次のように位置決めされる。すなわち、継手本体のフランジに形成されている複数の固定用孔のうち、上記固定に用いる固定用孔が施工補助具の露出部によって露出されるとともに、上記固定に用いない固定用孔が施工補助具の遮蔽部によって遮蔽されるよう、施工補助具の位置決めが行われる。そして、施工補助具の露出部によって露出されている上記固定用孔に固定具を挿通することにより、その固定具で継手本体のフランジが施工面に対し固定される。このとき、上記固定に用いない固定用孔については施工補助具の遮蔽部によって遮蔽されているため、その固定用孔に対し誤って固定具を挿通してしまうことは抑制される。   According to the above configuration, when fixing the joint body of the pipe joint to the construction surface, the insertion hole of the construction aid is engaged with the end of the joint body. At this time, the position of the end of the joint body around the axis in the construction aid is positioned as follows by the positioning part of the construction aid. That is, among the plurality of fixing holes formed in the flange of the joint body, the fixing holes used for the fixing are exposed by the exposed portions of the construction aid, and the fixing holes not used for the fixing are The positioning of the construction assisting tool is performed so as to be shielded by the shielding portion of the tool. Then, by inserting the fixing tool through the fixing hole exposed by the exposed portion of the construction aid, the flange of the joint body is fixed to the construction surface by the fixing tool. At this time, since the fixing holes not used for the fixing are shielded by the shielding portion of the construction auxiliary tool, it is possible to prevent the fixing tool from being inserted into the fixing holes by mistake.

(ニ)固定具が挿通される固定用孔と工具を掛けるための工具用穴とを周方向に間隔をおいて有する円板状のフランジが継手本体の端部に螺合され、前記工具によって前記工具用穴を介して前記フランジを前記継手本体に螺合させるとともに、前記固定具によって前記固定用孔を介して施工面に固定される管継手の施工に用いられる施工補助具であって、
シート状をなすとともに、
前記継手本体の前記端部の先端が挿通可能な挿通孔と、
前記挿通孔の周囲に設けられた露出部と、
前記挿通孔の周囲において、前記露出部とは周方向の別の位置に設けられた遮蔽部と
を備え、
前記挿通孔は、前記継手本体の前記端部に対して係合することで、前記継手本体に対して前記端部の軸線周りでの位置を決める位置決め部を備え、
当該位置決め状態において、前記露出部は前記固定用孔を露出させ、前記遮蔽部は前記工具用穴を遮蔽する管継手用の施工補助具。
(D) A disk-shaped flange having a fixing hole through which the fixing tool is inserted and a tool hole for hooking a tool at a circumferential interval is screwed into an end of the joint main body, and A threading aid for screwing the flange to the joint body through the tool hole, and a construction auxiliary tool used for construction of a pipe joint fixed to a construction surface through the fixing hole by the fixing tool,
In the form of a sheet,
An insertion hole through which the tip of the end of the joint body can be inserted,
An exposed portion provided around the insertion hole,
Around the insertion hole, the exposed portion includes a shielding portion provided at another position in a circumferential direction,
The insertion hole is provided with a positioning unit that engages with the end of the joint body to determine a position around the axis of the end with respect to the joint body,
In the positioning state, the exposing portion exposes the fixing hole, and the shielding portion shields the tool hole.

上記構成によれば、管継手の継手本体を施工面に対し固定する際には、施工補助具の挿通孔が継手本体の端部に対し係合される。このとき、施工補助具における継手本体の上記端部の軸線周りについての位置が、同施工補助具の位置決め部により、次のように位置決めされる。すなわち、継手本体のフランジに形成されている固定用孔が施工補助具の露出部によって露出されるとともに、同フランジに形成されている工具用穴が施工補助具の遮蔽部によって遮蔽されるよう、施工補助具の位置決めが行われる。そして、施工補助具の露出部によって露出されている上記固定用孔に固定具を挿通することにより、その固定具で継手本体のフランジが施工面に対し固定される。このとき、上記工具用穴については施工補助具の遮蔽部によって遮蔽されているため、その工具用穴に対し誤って固定具を挿通してしまうことは抑制される。   According to the above configuration, when fixing the joint body of the pipe joint to the construction surface, the insertion hole of the construction aid is engaged with the end of the joint body. At this time, the position of the end of the joint body around the axis in the construction aid is positioned as follows by the positioning part of the construction aid. That is, the fixing hole formed in the flange of the joint body is exposed by the exposed portion of the construction aid, and the tool hole formed in the flange is shielded by the shield of the construction aid. The positioning of the construction aid is performed. Then, by inserting the fixing tool through the fixing hole exposed by the exposed portion of the construction aid, the flange of the joint body is fixed to the construction surface by the fixing tool. At this time, since the tool hole is shielded by the shield portion of the construction auxiliary tool, it is possible to prevent the fixing tool from being accidentally inserted into the tool hole.

(ホ)前記遮蔽部は粘着シールで構成されている前記(ハ)又は(ニ)に記載の管継手用の施工補助具。
上記構成によれば、継手本体の端部に対し位置決めされた施工補助具から遮蔽部を剥がして粘着シールとしてフランジに貼り付けることにより、同フランジにおける上記固定に用いない固定用孔や上記工具用穴を上記遮蔽部で遮蔽したままにすることができる。このようにフランジにおける上記固定に用いない固定用孔や上記工具用穴を上記遮蔽部で遮蔽した状態に保持することにより、上記固定に用いない固定用孔や上記工具用穴に対し誤って固定具を挿通してしまうことが一層効果的に抑制されるようになる。
(E) The construction aid for a pipe joint according to (C) or (D), wherein the shielding portion is formed of an adhesive seal.
According to the above configuration, the shielding portion is peeled off from the construction auxiliary tool positioned with respect to the end of the joint main body, and is adhered to the flange as an adhesive seal. The holes can remain shielded by the shield. In this way, by holding the fixing holes and the tool holes not used for the fixing in the flange in a state of being shielded by the shielding portion, the fixing holes and the tool holes not used for the fixing are erroneously fixed. The insertion of the tool is more effectively suppressed.

(へ)壁に設けられた貫通孔に挿通される継手本体と、
前記壁の第1面側に位置するよう前記継手本体に設けられている第1フランジと、
前記壁の第2面側に位置するよう前記継手本体に取り付けられる第2フランジと、
を備えており、
前記第2フランジから前記壁を介して前記第1フランジにビスを打ち込むことにより、前記継手本体が前記壁に対し固定される管継手であって、
前記第1フランジの外周縁及び内周縁の少なくとも一方が、それら外周縁と内周縁との間の部分よりも厚肉とされていることを特徴とする管継手。
(F) a joint body inserted into a through hole provided in the wall;
A first flange provided on the joint body so as to be located on a first surface side of the wall;
A second flange attached to the joint body so as to be located on a second surface side of the wall;
With
A pipe joint in which the joint body is fixed to the wall by driving a screw from the second flange into the first flange through the wall,
A pipe joint, wherein at least one of an outer peripheral edge and an inner peripheral edge of the first flange is thicker than a portion between the outer peripheral edge and the inner peripheral edge.

1…管継手、2…継手本体、2a…端部、2b…端部、3…パイプ、4…インコア、4a…フランジ、5…収容部、6…段差部、7…Oリング、8…Oリング、9…スペーサ、10…ロックリング、11…ロックリング、12…押輪、13…Oリング、14…壁、15…貫通孔、16…雌ねじ部、17…雄ねじ部、18…ナット、18a…孔、18b…雌ねじ、19…供回り防止プレート、19a…孔、19b…面接触部、19c…突起、20…ゴムパッキン、20a…孔、21…ゴムパッキン、21a…孔、22…スベリパッキン、22a…孔、23…締付リング、23a…孔、23b…雌ねじ、24…平坦部、25…平坦部、26…外周縁、26a…周面、27…内周縁、27a…周面、28…固定用孔、29…工具用穴、30…ビス、31…施工補助具、32…ベースシート、32a…剥離面、33…ラベル、34…挿通孔、34a…線接触部、35…露出部、36…遮蔽部、37…取り出し治具、38…本体、40…チェーン、41…工具、42…本体バー、42a…ピン、43…可動バー、43a…ピン。

DESCRIPTION OF SYMBOLS 1 ... Pipe joint, 2 ... joint main body, 2a ... end part, 2b ... end part, 3 ... pipe, 4 ... in core, 4a ... flange, 5 ... accommodation part, 6 ... step part, 7 ... O-ring, 8 ... O Ring, 9: Spacer, 10: Lock ring, 11: Lock ring, 12: Press ring, 13: O-ring, 14: Wall, 15: Through hole, 16: Female thread, 17: Male thread, 18: Nut, 18a ... Hole, 18b: female screw, 19: rotation prevention plate, 19a: hole, 19b: surface contact portion, 19c: protrusion, 20: rubber packing, 20a: hole, 21: rubber packing, 21a: hole, 22: sliding packing, 22a ... hole, 23 ... tightening ring, 23a ... hole, 23b ... female screw, 24 ... flat portion, 25 ... flat portion, 26 ... outer peripheral edge, 26a ... peripheral surface, 27 ... inner peripheral edge, 27a ... peripheral surface, 28 ... Fixing hole, 29: Tool hole, 30: Screw, DESCRIPTION OF SYMBOLS 1 ... Construction assistance tool, 32 ... Base sheet, 32a ... Peeling surface, 33 ... Label, 34 ... Insertion hole, 34a ... Line contact part, 35 ... Exposed part, 36 ... Shield part, 37 ... Ejection jig, 38 ... Main body , 40 ... chain, 41 ... tool, 42 ... body bar, 42a ... pin, 43 ... movable bar, 43a ... pin.

Claims (2)

固定具が挿通される固定用孔を周方向に間隔をおいて複数有する円板状のフランジが継手本体の端部に螺合され、前記端部に対する前記フランジの螺合位置を変更可能であり、前記複数の前記固定用孔のうち、前記継手本体に対する前記フランジの前記螺合位置に対応した一部の前記固定用孔を用いて施工面に固定され、前記フランジの前記螺合位置に対応しない残りの前記固定用孔は前記固定に用いない管継手の施工方法であって、
前記固定に用いる前記固定用孔と前記固定に用いない前記固定用孔とをそれぞれ特定する特定工程と、
前記固定に用いる前記固定用孔に前記固定具を挿通して前記フランジを前記施工面に固定する固定工程と、
前記固定に用いない前記固定用孔を遮蔽部材で遮蔽する遮蔽工程と、
前記固定に用いた前記固定具を露出させた状態でかつ前記固定に用いない前記固定用孔を前記遮蔽部材にて遮蔽した状態で行う前記固定の確認工程と
を有する管継手の施工方法。
A disk-shaped flange having a plurality of fixing holes into which the fixing tool is inserted at a circumferential interval is screwed to an end of the joint body, and a screwing position of the flange with respect to the end can be changed. Of the plurality of fixing holes, a part of the fixing holes corresponding to the screwing position of the flange with respect to the joint body is fixed to a work surface using a part of the fixing holes, and corresponds to the screwing position of the flange. The remaining fixing holes are not used in the fixing method of the pipe joint,
A specifying step of specifying each of the fixing hole used for the fixing and the fixing hole not used for the fixing,
A fixing step of inserting the fixing tool into the fixing hole used for the fixing and fixing the flange to the construction surface,
A shielding step of shielding the fixing hole not used for the fixing with a shielding member,
Confirming the fixation in a state where the fixing tool used for the fixation is exposed and the fixing hole not used for the fixation is shielded by the shielding member.
固定具が挿通される固定用孔と工具を掛けるための工具用穴とを有するフランジが継手本体に螺合された管継手の施工方法であって、
前記工具によって前記工具用穴を介して前記フランジを前記継手本体に螺合する螺合工程と、
前記固定具によって前記固定用孔を介して前記フランジを施工面に固定する固定工程と、
前記工具用穴を遮蔽部材で遮蔽する遮蔽工程と、
前記固定具を露出させた状態でかつ前記工具用穴を前記遮蔽部材にて遮蔽した状態で行う前記固定の確認工程と
を有する管継手の施工方法。

A method for installing a pipe joint in which a flange having a fixing hole through which a fixing tool is inserted and a tool hole for hanging a tool is screwed into a joint body,
A screwing step of screwing the flange to the joint body through the tool hole by the tool,
A fixing step of fixing the flange to a construction surface via the fixing hole by the fixing tool,
A shielding step of shielding the tool hole with a shielding member,
A fixing confirmation step performed in a state where the fixing tool is exposed and the tool hole is shielded by the shielding member.

JP2018126537A 2018-07-03 2018-07-03 Construction method of pipe fittings Active JP7066109B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2018126537A JP7066109B2 (en) 2018-07-03 2018-07-03 Construction method of pipe fittings

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2018126537A JP7066109B2 (en) 2018-07-03 2018-07-03 Construction method of pipe fittings

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2018111191A Division JP7067292B2 (en) 2018-06-11 2018-06-11 Pipe fittings

Publications (2)

Publication Number Publication Date
JP2019215070A true JP2019215070A (en) 2019-12-19
JP7066109B2 JP7066109B2 (en) 2022-05-13

Family

ID=68918043

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2018126537A Active JP7066109B2 (en) 2018-07-03 2018-07-03 Construction method of pipe fittings

Country Status (1)

Country Link
JP (1) JP7066109B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002121795A (en) * 2000-10-12 2002-04-26 Tabuchi Corp Waterproof pan
JP2002167987A (en) * 2000-11-30 2002-06-11 Tostem Corp Unit room
US7185670B1 (en) * 2005-06-03 2007-03-06 Chiu-Chih Chung Wall faucet
JP2009203648A (en) * 2008-02-26 2009-09-10 Panasonic Electric Works Bath & Life Co Ltd Irrotational implement
JP2015086956A (en) * 2013-10-31 2015-05-07 未来工業株式会社 Arrangement jig, arrangement device and arrangement method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002121795A (en) * 2000-10-12 2002-04-26 Tabuchi Corp Waterproof pan
JP2002167987A (en) * 2000-11-30 2002-06-11 Tostem Corp Unit room
US7185670B1 (en) * 2005-06-03 2007-03-06 Chiu-Chih Chung Wall faucet
JP2009203648A (en) * 2008-02-26 2009-09-10 Panasonic Electric Works Bath & Life Co Ltd Irrotational implement
JP2015086956A (en) * 2013-10-31 2015-05-07 未来工業株式会社 Arrangement jig, arrangement device and arrangement method

Also Published As

Publication number Publication date
JP7066109B2 (en) 2022-05-13

Similar Documents

Publication Publication Date Title
GB2208902A (en) Tapping fluid supply pipes
JPS628570B2 (en)
JP2019215070A (en) Construction method of pipe joint
KR101677667B1 (en) Pipe fixture
JP2019215013A (en) Pipe joint
JP2019215071A (en) Construction auxiliary tool for pipe joint
KR101310491B1 (en) A unit and method for quick-installation of a faucet
JP3153782B2 (en) Article mounting structure
JPH026398B2 (en)
WO2018000541A1 (en) Unmanned shipborne pipeline maintenance device
CA1313533C (en) Block heater for robotic installation
KR20160004511U (en) Device of pipe holder for ordinary piping
JP2017145939A (en) Connection structure of piercing tool
US3815209A (en) Installation tool for flush mounted inserts
JP3142116B2 (en) Fixing structure of faucet mounting adapter
US6496565B2 (en) X-ray fluorescence analysis apparatus
JP4376603B2 (en) Water meter unit
CN215371274U (en) Quick fixing buckle for water outlet elbow of faucet
DK178551B1 (en) Push coupling
NO20150818A1 (en) Procedure and system for mounting the gasket
JP4503278B2 (en) Water meter unit
CN115324171A (en) Connecting assembly for fixing table-board faucet and mounting method
GB2525256A (en) A tap body attachment
JP2019007324A (en) Faucet mounting mechanism and method for mounting faucet
JP2020106069A (en) Method for removing branch pipe and removal tool

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20201223

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20211013

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20211021

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211209

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20220328

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20220410

R150 Certificate of patent or registration of utility model

Ref document number: 7066109

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150