JP2019045290A - River water level prediction system - Google Patents

River water level prediction system Download PDF

Info

Publication number
JP2019045290A
JP2019045290A JP2017168378A JP2017168378A JP2019045290A JP 2019045290 A JP2019045290 A JP 2019045290A JP 2017168378 A JP2017168378 A JP 2017168378A JP 2017168378 A JP2017168378 A JP 2017168378A JP 2019045290 A JP2019045290 A JP 2019045290A
Authority
JP
Japan
Prior art keywords
water level
river
flow rate
rainfall
prediction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2017168378A
Other languages
Japanese (ja)
Other versions
JP6707500B2 (en
Inventor
望 高倉
Nozomi Takakura
望 高倉
一則 柴野
Kazunori Shibano
一則 柴野
山田 正
Tadashi Yamada
正 山田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chuo University
Tokyu Construction Co Ltd
Original Assignee
Chuo University
Tokyu Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chuo University, Tokyu Construction Co Ltd filed Critical Chuo University
Priority to JP2017168378A priority Critical patent/JP6707500B2/en
Publication of JP2019045290A publication Critical patent/JP2019045290A/en
Application granted granted Critical
Publication of JP6707500B2 publication Critical patent/JP6707500B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A50/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE in human health protection, e.g. against extreme weather

Landscapes

  • Emergency Alarm Devices (AREA)
  • Alarm Systems (AREA)

Abstract

To provide a river water level prediction system having a higher safety in consideration of a prediction error.SOLUTION: A river water level prediction system 1 predicts a change in a river water level by localized torrential downpour into a medium sized-river, and includes: a river basin information part 2 for dividing an object river basin into a mesh state and determining an outflow rate and a flood arrival time; a raining information processing part 3 for acquiring raining information of an object river basin and extracting the same as raining amount data; river information part 4 for acquiring a water level flow curve which is a relation between the water level at a prediction point for predicting a river water level and a flow rate; a flow rate analysis part 51 for inputting the flow rate and the flood arrival time as well as the raining amount data into a conceptual model and performing a flow rate prediction; a water level calculation part 52 for calculating the river water level from a result of the flow rate prediction and the water level flow rate curve; and an output part 6 for outputting the river water level calculated by the water level calculation part as the river water level curve.SELECTED DRAWING: Figure 1

Description

本発明は、中小河川の集中豪雨による河川水位の変化を予測する河川水位予測システムに関するものである。   The present invention relates to a river water level prediction system that predicts changes in river water level due to heavy rainfall in small and medium-sized rivers.

近年、局所的な集中豪雨によって、急激に中小河川の水位が上昇し、洪水となって氾濫が起きることが頻発しており、円滑な水防活動や避難活動のためにも、正確に河川水位の予測が行えるシステムの開発が望まれている。   In recent years, local torrential rains have caused the water levels of small and medium rivers to rise rapidly, causing frequent flooding and flooding, and even for smooth flood control and evacuation activities, river water levels Development of a system capable of prediction is desired.

特許文献1−3及び非特許文献1には、いわゆる中小河川を対象とした降雨洪水予測システムや情報配信システムが開示されている。特に都市型の河川は、非特許文献1にも開示されているように、対象河川流域への降水からの洪水到達時間が短く、水位上昇速度も速いため、短時間で解析を行えるように様々な手法が開発されている。   Patent Documents 1-3 and Non-Patent Document 1 disclose a rainfall flood forecasting system and an information distribution system for so-called small and medium rivers. In particular, urban rivers, as disclosed in Non-Patent Document 1, have a short flood arrival time from the precipitation to the target river basin and a high rate of rising water level, so various analyzes can be made in a short time. Methods have been developed.

特開2002−107462号公報Japanese Patent Application Laid-Open No. 2002-107462 特開2012−194738号公報JP 2012-194738 A 特開2008−50903号公報JP, 2008-50903, A

周郷友義、「特集/雨水管理の最先端技術(その2:水位) 東京都における洪水予報」、VOL.105 水循環 貯留と浸透、公益社団法人雨水貯留浸透技術協会、2017年7月7日、p.19-22Toshiyoshi Shugo, "Special Feature: Cutting-edge technology for rainwater management (2: Water level) Flood forecast in Tokyo," VOL. 105 Water circulation Storage and penetration, Association for Rainwater Infiltration Technology, July 7, 2017 p .19-22

しかしながら、短時間で解析を行うための単純化された流出解析モデルでは、高精度の予測を行うことは難しい。また、短い時間の予測となると、予測誤差の影響も大きくなる。例えば、安全側に考えて、洪水が到達する最も早い時間と水位を予測した場合に、それよりも遅い時間により大きな水位上昇が起きることがある。   However, with a simplified runoff analysis model for analysis in a short time, it is difficult to make high-accuracy predictions. In addition, in the case of short time prediction, the influence of the prediction error also increases. For example, considering the safety side and predicting the earliest time and water level to be reached by a flood, a larger water level rise may occur at a later time.

そこで、本発明は、予測誤差を考慮してより安全性の高い河川水位予測システムを提供することを目的としている。   Then, an object of the present invention is to provide a safer river water level prediction system in consideration of a prediction error.

前記目的を達成するために、本発明の河川水位予測システムは、中小河川の集中豪雨による河川水位の変化を予測する河川水位予測システムであって、対象河川流域をメッシュ状に分割するとともにメッシュごとの流出率及び洪水到達時間を決定する河川流域情報部と、前記対象河川流域の降雨量情報を取得するとともに降雨量データとして抽出する降雨情報処理部と、前記河川水位の予測をする予測地点の水位と流量の関係である水位流量曲線を求める河川情報部と、流出解析モデルに前記流出率及び洪水到達時間並びに前記降雨量データを入力して流量予測を行う流量解析部と、前記流量予測の結果と前記水位流量曲線とから河川水位を算出する水位算出部と、前記水位算出部で算出された河川水位を河川水位曲線として出力する出力部とを備え、前記洪水到達時間は、メッシュごとに幅を持って設定され、前記流量解析部では少なくとも洪水到達時間が早くなるモデルと遅くなるモデルの2通りの流量予測が行われるとともに、前記出力部には少なくとも2通りの河川水位曲線が出力されることを特徴とする。   In order to achieve the above object, a river water level prediction system of the present invention is a river water level prediction system that predicts a change in river water level due to heavy rainfall in small and medium rivers. River basin information unit that determines the runoff rate and flood arrival time, a rainfall information processing unit that acquires rainfall amount information of the target river basin and extracts it as rainfall data, and a prediction point that predicts the river water level A river information unit for obtaining a water level flow curve which is a relationship between water level and flow rate; a flow rate analysis unit for performing flow rate prediction by inputting the outflow rate and flood arrival time and the rainfall amount data to an outflow analysis model; A water level calculation unit that calculates a river level from the result and the water level flow curve, and an output unit that outputs the river level calculated by the water level calculation unit as a river level curve The flood arrival time is set with a width for each mesh, and the flow rate analysis unit performs at least two types of flow rate prediction: a model for quickening the flood arrival time and a model for slowing the flood, and the output unit Is characterized in that at least two river level curves are output.

ここで、前記出力部には、河川水位の閾値が設定されており、予測された前記河川水位曲線のいずれかが前記閾値を超える場合に報知を行う報知手段を有する構成にすることが好ましい。   Here, it is preferable that in the output unit, a threshold value of the river water level is set, and the output unit includes notification means for notifying when any of the predicted river water level curves exceeds the threshold value.

また、前記メッシュは、1辺が250m以下であることが好ましい。さらに、前記出力部には、前記降雨量情報を表示する雨量表示領域と、前記予測された河川水位曲線を表示する予測水位表示領域とが隣接して設けられる構成とすることができる。   The mesh preferably has a side of 250 m or less. Further, in the output unit, a rainfall display area for displaying the rainfall amount information and a predicted water level display area for displaying the predicted river level curve may be provided adjacent to each other.

このように構成された本発明の河川水位予測システムは、対象河川流域の降雨量情報から流出解析モデルによって流量予測を行う際に、少なくとも洪水到達時間が早くなるモデルと遅くなるモデルの2通りの流量予測を行う。   The river water level prediction system according to the present invention configured as described above has two models, ie, a model in which at least the flood arrival time is quicker and a model in which it is delayed, when the flow rate is predicted by the runoff analysis model from rainfall information of the target river basin. Make a flow rate forecast.

このため、予測誤差があったとしても、洪水到達時間と水位の両方について複数のモデルを考慮することが可能になるので、より安全性の高い河川水位の予測とすることができる。   Therefore, even if there is a prediction error, it is possible to consider a plurality of models for both the flood arrival time and the water level, and therefore it is possible to predict the river water level with higher safety.

また、出力部に河川水位の閾値が設定されていて、予測された河川水位曲線のいずれかが閾値を超える場合に報知を行う報知手段を有していれば、水位上昇が起きる可能性が高い状況のときに、管理者は見落とすことなく警戒体制に移行することができる。さらに、メッシュの1辺が250m以下であれば、より精度の高い予測を行うことができるようになる。   In addition, if the threshold value of the river water level is set in the output unit, and if any of the predicted river water level curves exceeds the threshold value, the water level increase is likely to occur. In the event of a situation, the manager can shift to alerting without missing. Furthermore, if one side of the mesh is 250 m or less, prediction with higher accuracy can be performed.

そして、出力部に雨量表示領域と予測水位表示領域とが隣接して設けられていれば、リアルタイムの降雨量情報と比較しながら予測された河川水位曲線を見ることができるので、さらに安全側の判断をするなど対応に幅を持たせることができるようになる。   Then, if the rainfall display area and the predicted water level display area are provided adjacent to each other in the output unit, the predicted river water level curve can be viewed while comparing with the real-time rainfall amount information. It will be possible to give the response a wide range, such as making a decision.

本発明の実施の形態の河川水位予測システムの構成及び処理の流れを示した説明図である。It is explanatory drawing which showed the flow of a structure and process of the river water level prediction system of embodiment of this invention. 対象河川流域をメッシュ状に分割した一例を示した図である。It is a figure showing an example which divided an object river basin into mesh shape. ピーク河川水位と洪水到達時間との関係を示した図である。It is the figure which showed the relationship between the peak river water level and the flood arrival time. 水位流量曲線(H−Q曲線)の一例を示した図である。It is the figure which showed an example of the water level flow curve (HQ curve). 降雨量データと河川水位曲線とを上下に並べて示すとともに、ピーク河川水位の発生時間が異なる2つのモデルの予測結果の一例を示した図である。It is the figure which showed an example of the prediction result of two models from which precipitation time data and a river water level curve are arranged side by side up and down, and the generation time of a peak river water level differs. 雨量表示領域と予測水位表示領域とが隣接して表示された出力部の一例を示した図である。It is a figure showing an example of an output part where a rainfall display area and a predicted water level display area were displayed adjacent to each other.

以下、本発明の実施の形態について図面を参照して説明する。図1は、本実施の形態の河川水位予測システム1の構成及び処理の流れを示した説明図である。   Hereinafter, embodiments of the present invention will be described with reference to the drawings. FIG. 1 is an explanatory view showing the configuration and process flow of a river level prediction system 1 according to the present embodiment.

本実施の形態の河川水位予測システム1は、中小河川の集中豪雨による河川水位の変化を予測することを目的にしている。ここで、「中小河川」とは、流域面積が小さく、貯留現象を考慮する必要のない河川をいう。例えば、流域面積が800km2程度以下の河川、都市型の河川などが含まれる。 The river level prediction system 1 according to the present embodiment aims to predict changes in the river level due to heavy rainfall in small and medium-sized rivers. Here, "medium and small rivers" means rivers with a small basin area and which do not need to consider storage phenomena. For example, rivers with a basin area of approximately 800 km 2 or less, urban rivers, etc. are included.

また、「集中豪雨」は、降雨強度20mm/h以上の降雨を対象とし、特に降雨強度50mm/h以上の降雨が対象河川流域に降れば、河川水位予測システム1による予測は必ず行われることになる。   In addition, “intensive torrential rainfall” targets rainfall with a rainfall intensity of 20 mm / h or more, and especially if rainfall with a rainfall intensity of 50 mm / h or more falls on the target river basin, prediction by the river water level prediction system 1 will always be performed Become.

河川水位予測システム1は、図1に示すように、河川流域情報部2と、降雨情報処理部3と、河川情報部4と、解析部5(流量解析部51,水位算出部52)と、出力部6(画面出力部61,報知手段となるアラート部62)とによって主に構成される。また、実際の河川水位を観測させる観測部7を設けることもできる。   As shown in FIG. 1, the river level prediction system 1 includes a river basin information unit 2, a rainfall information processing unit 3, a river information unit 4 and an analysis unit 5 (flow rate analysis unit 51, water level calculation unit 52), It is mainly comprised by the output part 6 (The screen output part 61, the alert part 62 used as alerting | reporting means). Moreover, the observation part 7 which observes the actual river water level can also be provided.

まず、河川流域情報部2では、対象河川流域をメッシュ状に分割する。図2には、中小河川である対象河川21の流域22(対象河川流域)をメッシュ状に分割した一例を示した。   First, in the river basin information unit 2, the target river basin is divided into meshes. FIG. 2 shows an example in which the watershed 22 (target river basin) of the target river 21 which is a medium or small river is divided into meshes.

流域22は、河川水位の予測を行う予測地点24の水位に影響を与える降雨になるエリアが設定される。例えば、予測地点24の半径10km以内で、河川水位に影響を与える降水が降る範囲を、流域22に設定することができる。   The basin 22 is set as an area which is a rainfall that affects the water level at the prediction point 24 where the river water level is predicted. For example, within a radius of 10 km of the prediction point 24, a range in which precipitation affecting the river water level can be set can be set as the basin 22.

流域22を分割するメッシュ23は、例えば1辺が250mの正方形のメッシュとすることができる。すなわち、流域22の全域が、1辺250m四方のメッシュ23,・・・によって分割されることになる。   The mesh 23 which divides the basin 22 can be, for example, a square mesh having a side of 250 m. That is, the whole area of the basin 22 is divided by meshes 250, 250 m square per side.

各メッシュ23には、それぞれ流出率(流出係数)が設定される。流出率は、地形や土地の利用状況によって異なる値が設定され、舗装された地表面が多く且つ下水道からの放流も多い一般都市部であれば0.8-0.9(一般市街地0.8,密集市街地0.9)、畑や原野であれば0.6、水田であれば0.7などが設定される。   An outflow rate (outflow coefficient) is set to each mesh 23. The runoff rate is set to a different value depending on the topography and land use conditions, and it is 0.8-0.9 (general urban area 0.8, dense urban area 0.9) in general urban areas where there are many paved ground surfaces and there are many releases from sewers, If it is a field or a field, 0.6 is set if it is 0.6, if it is a paddy field.

また、各メッシュ23には、それぞれ洪水到達時間も設定される。この「洪水到達時間」は、あるメッシュ23に降った降雨が予測地点24に達するまでに要する時間となる。   In addition, flood arrival time is also set to each mesh 23 respectively. This “flood arrival time” is the time required for the rainfall falling on a certain mesh 23 to reach the predicted point 24.

本実施の形態の河川水位予測システム1では、各メッシュ23において、洪水到達時間が幅を持って設定される。例えば、洪水到達時間の最も早い時間と最も遅い時間の2つの時間が、メッシュごとに設定される。   In the river level prediction system 1 of the present embodiment, the flood arrival time is set with a width in each mesh 23. For example, two times, the earliest time and the latest time of flood arrival time, are set for each mesh.

ここで、図3に、ピーク河川水位と洪水到達時間との関係を示した。図示したプロットは、この流域22にある3地点(A地点、B地点、C地点(図2参照))の観測値と、実用推定式による推定値を示している。   Here, FIG. 3 shows the relationship between the peak river water level and the flood arrival time. The illustrated plot shows the observed values at three points (point A, point B and point C (see FIG. 2)) in the watershed 22 and the estimated values by the practical estimation formula.

この図を見るとわかるように、洪水到達時間は、20-60分の間に幅を持って分散している。また、プロットに基づいて最小二乗法によって引かれた直線はほぼ水平であり、洪水到達時間が遅いケースがピーク河川水位になる可能性があることを示している。   As can be seen from this figure, the flood arrival time is dispersed with a width between 20 and 60 minutes. Moreover, the straight line drawn by the least squares method based on the plot is almost horizontal, which indicates that the case of late flood arrival time may become the peak river level.

そこで、洪水到達時間が最も早い時間に設定されたモデル(早達モデル611)と、洪水到達時間が最も遅い時間に設定されたモデル(遅達モデル612)とを構築する(図5,6参照)。   Therefore, a model (the early delivery model 611) in which the flood arrival time is set to the earliest time and a model (the late delivery model 612) in which the flood arrival time is set to the latest time are constructed (see FIGS. ).

一方、降雨情報処理部3では、流域22の降雨量情報を取得する。降雨量情報としては、気象庁から数値予報による降雨量情報を得ることができる。例えば、降水ナウキャストであれば、1km四方の解像度で降水の短期予報を得ることができる。   On the other hand, the rainfall information processing unit 3 acquires rainfall amount information of the basin 22. As rainfall information, rainfall information by numerical forecast can be obtained from the Meteorological Agency. For example, in the case of precipitation nowcasting, it is possible to obtain a short-term forecast of precipitation at a resolution of 1 km square.

さらには、高解像度降水ナウキャストであれば、250m四方の解像度で降水の短期予報を得ることができる。すなわち、メッシュ23を250mの正方形とすることで、高解像度降水ナウキャストによって降雨量が得られる範囲と一致させることができる。   Furthermore, in the case of high resolution precipitation nowcasting, it is possible to obtain a short-term forecast of precipitation at a resolution of 250 m square. That is, by setting the mesh 23 to a 250 m square, it can be made to coincide with the range in which the amount of rainfall can be obtained by high resolution precipitation nowcasting.

そこで、高解像度降水ナウキャストの降雨量情報から、流域22のメッシュ23,・・・に該当する降雨量データを、降雨情報処理部3によって抽出する。この降雨情報処理部3による降雨量データの抽出は、例えば現況時間後1時間、現況時間前3時間及び洪水到達時間に対して行われる。   Therefore, the rainfall information processing unit 3 extracts rainfall data corresponding to the mesh 23 of the basin 22 from the rainfall information of the high resolution precipitation nowcast. The extraction of rainfall data by the rainfall information processing unit 3 is performed, for example, one hour after the current time, three hours before the current time, and the flood arrival time.

また、河川情報部4では、予め河川水位の予測をする予測地点24の水位Hと流量Qの関係である水位流量曲線(H−Q曲線)を求めておく。図4に、水位流量曲線(H−Q曲線)の一例を示した。   Further, in the river information unit 4, a water level flow curve (H-Q curve) which is a relationship between the water level H of the prediction point 24 where the river water level is predicted and the flow rate Q is obtained in advance. An example of a water level flow curve (HQ curve) is shown in FIG.

この水位流量曲線(H−Q曲線)は、予測地点24の河川と洪水の影響を受ける限られた範囲(限定範囲)を決定して作成される。ここでは、図2に示した流域22が限定範囲となる。限定範囲の河道41においては、河積(河道41の断面積)、河川勾配、径深、マニングの粗度係数を決定する。ここで、河積及び径深は、河川水位411によって変動する。   This water level flow curve (HQ curve) is created by determining the limited range (limited range) affected by the river of the prediction point 24 and the flood. Here, the basin 22 shown in FIG. 2 is a limited range. The river area (the cross-sectional area of the river 41), the river gradient, the depth of the river, the roughness coefficient of Manning are determined in the river 41 of the limited range. Here, the riverbed and the depth change depending on the river water level 411.

図4では、河川水位増加量Hと流量Qとの関係を示した。このような水位流量曲線(H−Q曲線)を予め作成しておくことで、流量予測の結果を直ぐに河川水位に置き換えることができるようになる。   In FIG. 4, the relationship between the river water level increase amount H and the flow rate Q is shown. By preparing such a water level flow curve (H-Q curve) in advance, it becomes possible to immediately replace the result of flow rate prediction with the river water level.

そして、流域22に所定値以上の降雨があると、解析部5の流量解析部51によって、流出解析モデルによる予測地点24の流量予測が行われる。流出解析モデルは、流域22に降る降雨から出力される河川流量を直接的に算出できる概念モデルが、入力情報や演算負荷を低減できることから好ましい。本実施の形態の河川水位予測システム1では、流出解析モデルとして、合成合理式を使用する。   Then, when there is rainfall above the predetermined value in the basin 22, the flow rate analysis unit 51 of the analysis unit 5 predicts the flow rate of the prediction point 24 by the outflow analysis model. The runoff analysis model is preferably a conceptual model that can directly calculate the river flow output from the rainfall falling in the basin 22 because it can reduce input information and calculation load. In the river level prediction system 1 of the present embodiment, a combined rational equation is used as a runoff analysis model.

合成合理式は、実務レベルにおける中小河川や下水道の計画に多く用いられている流出解析モデルである。合成合理式では、対象河川流域を小流域に分割して、流域の平均降雨量から流出率と洪水到達時間を考慮して合理式で求められた小流域のそれぞれのピーク流量を合成して、予測地点24の流量を予測する方法である。   The synthetic rational formula is a runoff analysis model that is often used for planning small and medium-sized rivers and sewers at the practical level. In the synthetic rational formula, the target river basin is divided into small basins, and the peak discharge of each of the small basins obtained by the rational formula is calculated from the average rainfall of the basin considering the runoff rate and the flood arrival time, This is a method of predicting the flow rate of the prediction point 24.

流量解析部51では、河川流域情報部2から各メッシュ23,・・・の流出率及び洪水到達時間を取得するとともに、降雨情報処理部3から各メッシュ23,・・・の降雨量データを取得して解析を行う。   The flow rate analysis unit 51 acquires the outflow rate and the flood arrival time of each mesh 23, ... from the river basin information unit 2, and acquires the rainfall amount data of each mesh 23, ... from the rainfall information processing unit 3 Analysis.

流量解析部51では、洪水到達時間が早くなる早達モデル611と遅くなる遅達モデル612の2通りの解析が行われるので、2通りの流量予測が算出されることになる。   In the flow rate analysis unit 51, two types of analysis of the early delivery model 611 in which the flood arrival time is early and the late delivery model 612 in which the flood arrival time is late are performed, so two flow rate predictions are calculated.

そして、算出された流量予測に対しては、水位算出部52において河川水位の予測として算出される。すなわち、予測された流量を河川情報部4の水位流量曲線(H−Q曲線)によって河川水位に置き換えることで、河川予測水位を算出することができる。   And with respect to the calculated flow volume prediction, it is calculated in the water level calculation part 52 as prediction of a river water level. That is, the predicted river flow can be calculated by replacing the predicted flow with the river water level using the water flow curve (HQ curve) of the river information unit 4.

ここで、流量予測は経時値として得られるため、河川予測水位も経時値として算出されて河川水位曲線としてグラフ化することができる。図5に、予測された河川水位曲線の一例を示した。   Here, since the flow rate prediction is obtained as an elapsed time value, the river predicted water level can also be calculated as an elapsed time value and graphed as a river water level curve. An example of the predicted river level curve is shown in FIG.

この図5では、上段に降雨量データが示され、下段に河川水位の経時変化が示されている。ここで、降雨量データは、M1エリア、M2エリア、M3エリア、M4エリア及びM5エリアの5つのエリアと、加重平均で示されている。この5つのエリアは、合成合理式で対象河川流域を分割する小流域に相当し、本実施の形態では流域22を5つのエリア(小流域)に分割したことを例示している。   In FIG. 5, rainfall data are shown in the upper part, and temporal changes in river water level are shown in the lower part. Here, the rainfall amount data is shown as a weighted average with five areas of M1 area, M2 area, M3 area, M4 area and M5 area. These five areas correspond to small basins that divide the target river basin according to the synthetic rational formula, and in the present embodiment, exemplifying that the basin 22 is divided into five areas (small basins).

そして図5の下段には、ピーク河川水位の発生時間が早いモデルとなる早達モデル611の予測結果と、ピーク河川水位の発生時間が遅いモデルとなる遅達モデル612の予測結果とを、河川水位曲線にして示している。   And in the lower part of FIG. 5, the predicted results of the early delivery model 611, which is a model for which the peak river water generation time is early, and the predicted results of the late delivery model 612, which is a model for which the peak river water generation time is late, are It is shown as a water level curve.

また、比較のために、予測地点24で観測部7によって計測された実際の河川水位を観測値として示している。この観測値との比較によれば、この降雨のケースでは、早達モデル611の予測結果の方が近い予測ができたと言える。   Moreover, the actual river water level measured by the observation part 7 in the prediction point 24 is shown as an observation value for comparison. According to the comparison with this observation value, it can be said that in this case of rainfall, the prediction result of the express delivery model 611 is closer.

図6は、出力部6の一例を示している。出力部6は、コンピュータのモニタ画面や専用端末画面などが該当する。また、プリンタを出力部とすることもできる。   FIG. 6 shows an example of the output unit 6. The output unit 6 corresponds to a monitor screen or a dedicated terminal screen of a computer. Also, a printer can be used as an output unit.

この出力部6には、雨量表示領域6aと、それに隣接する予測水位表示領域6bと、風速情報表示領域6cと、発表情報表示領域6dと、数値情報表示領域6eとが設けられている。   The output unit 6 is provided with a rainfall display area 6a, a predicted water level display area 6b adjacent thereto, a wind speed information display area 6c, a presentation information display area 6d, and a numerical information display area 6e.

雨量表示領域6aには、気象庁から定期的に得られる高解像度降水ナウキャストの表示が出力される。また、風速情報表示領域6c及び発表情報表示領域6dには、同じく気象庁から得られる地上と上空の風速情報と、警報や注意報などの気象庁が発表する情報が表示される。発表情報表示領域6dは、注意報の場合は黄色で表示させ、警報の場合は赤色で表示させることもできる。   In the rainfall display area 6a, a display of high resolution precipitation nowcast obtained periodically from the Meteorological Agency is output. In the wind speed information display area 6c and the presentation information display area 6d, the wind speed information on the ground and the sky obtained similarly from the Japan Meteorological Agency and the information announced by the Meteorological Agency such as an alarm and a warning are displayed. The announcement information display area 6d can be displayed in yellow in the case of a warning, or in red in the case of an alarm.

一方、予測水位表示領域6bには、画面出力部61として、2通りの河川水位曲線が出力される。ここでは、早達モデル611による河川水位曲線と遅達モデル612による河川水位曲線とが出力されている。この河川水位曲線の予測は、最長でも5分間隔で更新される。   On the other hand, two river water level curves are output as the screen output unit 61 in the predicted water level display area 6b. Here, a river water level curve by the early delivery model 611 and a river water level curve by the late delivery model 612 are output. The forecast of the river level curve is updated at intervals of up to 5 minutes.

この2通りの河川水位曲線の予測に対して、画面出力部61には、2つの河川水位の閾値も表示される。ここで、水位が低い方の閾値を1次管理値621(例えば2.2m)とし、水位が高い方の閾値を2次管理値622(例えば3.5m)とする。   With respect to the prediction of the two river level curves, the screen output unit 61 also displays two river level thresholds. Here, the lower threshold of the water level is a primary control value 621 (for example, 2.2 m), and the higher threshold of the water level is a secondary management value 622 (for example, 3.5 m).

そして、予測された河川水位曲線のピーク河川水位が、1次管理値621以下であれば、報知手段となるアラート部62には、「河川水位アラートなし」の表示がされる。   Then, if the peak river level of the predicted river level curve is equal to or less than the primary management value 621, the alert unit 62 serving as a notification means displays "No river level alert".

これに対して、予測された2通りの河川水位曲線のいずれかのピーク河川水位が1次管理値621を超えた場合は、アラート部62には、「注意」の表示がされるとともに、登録されている携帯端末にアラートメールによる発報がされる。   On the other hand, when the peak river water level of one of the two predicted river water level curves exceeds the primary management value 621, the alert unit 62 displays "Warning" and is registered. The alert message is sent to the mobile terminal that has been

さらに、予測された2通りの河川水位曲線のいずれかのピーク河川水位が2次管理値622を超えた場合は、アラート部62には、「危険」の表示がされるとともに、現場に設置された回転灯が点滅し、携帯端末にはアラートメールの発信がされる。   Furthermore, when the peak river level of either of the two predicted river level curves exceeds the secondary control value 622, the alert unit 62 displays "danger" and is installed at the site. The rotating light flashes and an alert mail is sent to the mobile terminal.

ここで、河川水位曲線の水位の値は、数値情報表示領域6eからも読み取ることができる。この数値情報表示領域6eには、観測部7によって計測された現時点の河川水位の観測値と、現時点から1時間先までの複数の予測値が、数値として表示される。   Here, the value of the water level of the river water level curve can also be read from the numerical information display area 6e. In the numerical information display area 6e, the observed value of the river water level at the current time measured by the observation unit 7 and a plurality of predicted values one hour ahead from the current time are displayed as numerical values.

次に、本実施の形態の河川水位予測システム1の運用について説明する。   Next, the operation of the river level prediction system 1 of the present embodiment will be described.

まず、河川水位を監視する予測地点24を決め、その予測地点24の河川水位に影響を与える降雨となる対象河川流域を流域22として設定する(図2参照)。この流域22に対しては、降雨情報処理部3で取得可能な降雨量データの解像度などを参照して、メッシュ23,・・・による分割を行う。   First, a prediction point 24 for monitoring the river water level is determined, and a target river basin serving as rainfall affecting the river water level of the prediction point 24 is set as the water basin 22 (see FIG. 2). The watershed 22 is divided by the mesh 23 with reference to the resolution of the rainfall amount data that can be acquired by the rainfall information processing unit 3 and the like.

続いて、分割されたメッシュ23,・・・に対しては、河川流域情報部2において、それぞれに流出率と予測地点24までの洪水到達時間の設定を行う。ここで、洪水到達時間は、早達モデル611用の早い時間と、遅達モデル612用の遅い時間の設定を行う。   Subsequently, with respect to the divided meshes 23, ..., in the river basin information unit 2, the setting of the runoff rate and the flood arrival time to the predicted point 24 is performed respectively. Here, for the flood arrival time, an early time for the express delivery model 611 and a late time for the late delivery model 612 are set.

一方、河川情報部4では、予測地点24の限定範囲の河道41における水位流量曲線(H−Q曲線)を求めておく。また、予測地点24には、観測部7として水位計などを設置して、河川水位予測システム1に取り込める状態にしておく。   On the other hand, in the river information unit 4, the water level flow curve (HQ curve) in the channel 41 of the limited range of the prediction point 24 is obtained. In addition, a water level gauge or the like is installed as the observation unit 7 at the prediction point 24 so that the river water level prediction system 1 can be captured.

そして、これらの初期条件が揃った時点で、コンピュータにインストール又はクラウド上に記憶された河川水位予測システム1の運用プログラムを起動させる。以下で説明する各処理は、コンピュータを機能させる命令によって実行される。   Then, when these initial conditions are met, the operation program of the river level prediction system 1 installed in the computer or stored on the cloud is activated. Each process described below is executed by an instruction that causes a computer to function.

河川水位予測システム1の運用が開始されると、例えば5分以内の間隔で、降雨情報処理部3に気象庁から降雨量情報が取得され、降雨量データとして抽出される。この取得された降雨量情報は、出力部6となるモニタ画面の雨量表示領域6aに表示される。雨量表示領域6aには、3時間前から1時間先までの雨雲レーダ画像が表示される。   When the operation of the river level prediction system 1 is started, rainfall information is acquired from the Meteorological Agency to the rainfall information processing unit 3 at intervals of, for example, five minutes, and extracted as rainfall data. The acquired rainfall amount information is displayed on the rainfall display area 6 a of the monitor screen which is the output unit 6. Rainfall radar images from three hours ago to one hour ahead are displayed in the rainfall display area 6a.

また、流量解析部51では、抽出された降雨量データと、河川流域情報部2から取り込まれたメッシュ23,・・・ごとの流出率及び洪水到達時間に基づいて、早達モデル611と遅達モデル612による予測地点24における流量予測が行われる。   In the flow rate analysis unit 51, on the basis of the extracted rainfall amount data and the outflow rate and flood arrival time for each of the meshes 23,... Flow prediction is performed at the prediction point 24 by the model 612.

この予測された2通りの流量は、河川情報部4から取り込まれた水位流量曲線(H−Q曲線)によって河川予測水位に変換され、出力部6となるモニタ画面の予測水位表示領域6bに表示される。予測水位表示領域6bには、2時間前(又は3時間前)から1時間先までの2本の河川水位曲線(611,612)が表示される。   The two predicted flow rates are converted into river predicted water levels by the water level flow curve (H-Q curve) fetched from the river information unit 4 and displayed in the predicted water level display area 6b of the monitor screen that becomes the output unit 6 Be done. In the predicted water level display area 6b, two river water level curves (611, 612) from two hours ago (or three hours ago) to one hour ahead are displayed.

ここで、予測水位表示領域6bには、予測された2本の河川水位曲線(611,612)の他に、1次管理値621と2次管理値622とが表示される。また、観測部7によって計測された現時点までの河川水位の観測値も併せて表示することができる。   Here, in the predicted water level display area 6b, in addition to the two predicted river level curves (611, 612), a primary management value 621 and a secondary management value 622 are displayed. Moreover, the observation value of the river water level to the present time measured by the observation part 7 can also be displayed collectively.

予測された2本の河川水位曲線のいずれのピーク河川水位も1次管理値621を超えない場合は、そのまま所定の間隔で、降雨量情報の取得から河川水位の予測までの処理が繰り返される。   When none of the peak river levels of the two predicted river level curves exceeds the primary management value 621, the processing from acquisition of rainfall information to prediction of the river level is repeated at predetermined intervals.

一方、予測されたいずれかのピーク河川水位が1次管理値621を超えた場合は、出力部6となるモニタ画面のアラート部62に「注意」の表示がされるとともに、管理者の携帯電話などにアラートメールが発信される。   On the other hand, when any of the predicted peak river levels exceeds the primary management value 621, "Attention" is displayed on the alert unit 62 of the monitor screen serving as the output unit 6, and the manager's mobile phone Alert emails are sent to

さらに、予測されたいずれかのピーク河川水位が2次管理値622を超えた場合は、出力部6となるモニタ画面のアラート部62に「危険」の表示がされるとともに、管理者の携帯電話などにアラートメールが発信される。また、回転灯を作動させて、多くの人に視覚的な注意喚起を行わせることもできる。   Furthermore, when any of the predicted peak river levels exceeds the secondary management value 622, "danger" is displayed on the alert unit 62 of the monitor screen that is the output unit 6, and the manager's mobile phone Alert emails are sent to In addition, turning lights can be activated to make many people give visual reminders.

次に、本実施の形態の河川水位予測システム1の作用について説明する。   Next, the operation of the river level prediction system 1 of the present embodiment will be described.

このように構成された本実施の形態の河川水位予測システム1は、対象河川流域となる流域22の降雨量情報から、合成合理式のような流出解析モデルによって流量予測を行う際に、少なくとも洪水到達時間が早くなる早達モデル611と遅くなる遅達モデル612との2通りの流量予測を行う。   The river level prediction system 1 according to the present embodiment configured as described above is at least a flood when the flow rate is predicted by the runoff analysis model such as the synthetic rational formula from the rainfall amount information of the basin 22 which is the target river basin. Two flow rate predictions are performed: an early delivery model 611 that the arrival time is earlier and a late delivery model 612 that is the late arrival time.

このため、実際の河川水位の上昇と異なる予測誤差があったとしても、洪水到達時間と水位の両方について複数のモデル(611,612)を考慮するので、より安全性の高い河川水位の予測及び管理をすることができる。   For this reason, even if there are actual river water elevations and different prediction errors, multiple models (611, 612) are considered for both flood arrival time and water level, and therefore the safer river water level prediction and Can manage.

また、出力部6に河川水位の閾値(621,622)が設定されていて、閾値を予測された河川水位曲線(611,612)のいずれかが超える場合に報知を行う報知手段(アラート部62、アラートメール発報、回転灯などによる情報伝達機能)を有していれば、水位上昇が起きる可能性が高い状況のときに、管理者は見落とすことなく警戒体制に確実に移行することができる。   In addition, the threshold (621, 622) of the river water level is set in the output unit 6, and informing means (alert unit 62) performs notification when any of the predicted river level curves (611, 612) exceeds the threshold. If there is a notification transmission function (alert email notification, rotating light, etc.), the administrator can shift to a vigilant system without overlooking in situations where the water level is likely to rise. .

例えば、早達モデル611の予測に従えば、より早い時点で水防活動や避難活動を開始できるが、早達モデル611のピーク河川水位では1次管理値621を超えない場合、報知がされず水防活動等の開始には繋がらない。これに対して、早達モデル611のピーク河川水位が1次管理値621を超えない場合でも遅達モデル612のピーク河川水位が閾値を超える場合があるため、早達モデル611の予測だけでは充分でない場合も、遅達モデル612の予測を加えることで、水防活動等を安全側で開始できるようになり、より安全性の高い管理を行うことができるようになる。   For example, according to the prediction of the express delivery model 611, it is possible to start flood control activities and evacuation activities at an earlier time, but when the peak river level of the express delivery model 611 does not exceed the primary management value 621, notification is not given and the flood control It does not lead to the start of activities. On the other hand, even if the peak river level of the express delivery model 611 does not exceed the primary management value 621, the peak river level of the late delivery model 612 may exceed the threshold, so prediction by the express delivery model 611 is sufficient. Even if not, by adding the prediction of the late delivery model 612, it becomes possible to start the flood control activity etc. on the safe side, and it becomes possible to carry out more secure management.

また、観測部7によって実際に水位上昇が計測されてから水防活動等を開始した場合では、10分程度で危険水位に達することがあるため、避難するしかできないことがある。これに対して、精度の高い河川水位の予測ができていれば、建設現場であれば資機材の撤去の時間が確保できるなど、安全性が高いうえに損害の少ない有用な管理を行うことができるようになる。   In addition, in the case where the flood control activity or the like is started after the water level rise is actually measured by the observation unit 7, the dangerous water level may be reached in about 10 minutes, so that only evacuation may be possible. On the other hand, if the river water level can be predicted with high accuracy, construction sites can secure time for removing materials and materials, and perform useful management with high safety and little damage. become able to.

また、早達モデル611と遅達モデル612の2通りの予測がされていれば、局所的な集中豪雨が止んだ後に、河川水位が平時に戻る時間の予想がし易くなり、安全が担保された状態で迅速に避難解除や回復措置の行動に移行することができるようになる。   In addition, if there are two predictions, the early delivery model 611 and the late delivery model 612, it will be easier to predict the time when the river water level will return during peace after local heavy rainfall ceases, ensuring security. It will be possible to quickly shift to evacuation and recovery actions in a state of

さらに、メッシュ23,・・・の1辺が250m以下で、高解像度降水ナウキャストのように狭い範囲の詳細な降雨量情報が取得できる環境になれば、より精度の高い河川水位の予測を行うことができる。   Furthermore, if the environment is such that one side of mesh 23, ... is 250m or less and detailed rainfall information in a narrow range can be acquired like high resolution precipitation nowcast, river water level prediction will be performed with higher accuracy. be able to.

そして、出力部6に雨量表示領域6aと予測水位表示領域6bとが隣接して設けられていれば、リアルタイムの降雨量情報と比較しながら予測された河川水位曲線を見ることができる。この場合は、例えばアラート部62の表示に関わらず、管理者が降雨量情報を見ながら予測の補完を行うことができるようになるので、さらに安全側の判断をするなど対応に幅を持たせることができる。   Then, if the rainfall display area 6 a and the predicted water level display area 6 b are provided adjacent to each other in the output unit 6, the predicted river water level curve can be viewed while comparing with the real-time rainfall amount information. In this case, regardless of the display of the alert unit 62, for example, the manager can complement the prediction while looking at the rainfall amount information, so that it is possible to have a wider response, such as making a judgment on the safe side. be able to.

さらには、出力部6のモニタ画面に、雨量表示領域6a及び予測水位表示領域6bに加えて、風速情報表示領域6cや気象庁からの発表情報表示領域6dが設けられていれば、管理者はより多くの情報から総合的な判断を行うことができるようになる。   Furthermore, in addition to the rainfall display area 6a and the predicted water level display area 6b, if the wind speed information display area 6c and the presentation information display area 6d from the Japan Meteorological Agency are provided on the monitor screen of the output unit 6, the administrator It will be possible to make a comprehensive judgment from a lot of information.

以上、図面を参照して、本発明の実施の形態を詳述してきたが、具体的な構成は、この実施の形態に限らず、本発明の要旨を逸脱しない程度の設計的変更は、本発明に含まれる。   As mentioned above, although the embodiment of the present invention has been described in detail with reference to the drawings, the specific configuration is not limited to this embodiment, and the design change to the extent not departing from the gist of the present invention Included in the invention.

例えば、前記実施の形態では、早達モデル611と遅達モデル612の2通りの河川水位曲線の予測を行う場合について説明したが、これに限定されるものではなく、3通り以上の河川水位曲線の予測を行って表示させることもできる。   For example, although the above embodiment has described the case of predicting the two river level curves of the early delivery model 611 and the late delivery model 612, the present invention is not limited to this, and three or more river level curves are described. Can also be displayed and displayed.

また、前記実施の形態では、流出解析モデルとして合成合理式を例に説明したが、これに限定されるものではなく、タンクモデル、単位図法などを流出解析モデルとすることもできる。   Moreover, in the said embodiment, although the synthetic | combination rational formula was demonstrated to the example as a runoff analysis model, it is not limited to this, A tank model, a unit map method, etc. can also be used as a runoff analysis model.

さらに、前記実施の形態では、流域22を1辺が250mの正方形のメッシュ23,・・・に分割する場合について説明したが、これに限定されるものではなく、1辺が250mより大きい、例えば1辺が1km四方のメッシュに分割することもできる。   Furthermore, although the said embodiment demonstrated the case where the basin 22 was divided | segmented into the square mesh 23, ... of which one side is 250 m, it is not limited to this, for example, one side is larger than 250 m, for example It is also possible to divide one side into a 1-km square mesh.

1 河川水位予測システム
2 河川流域情報部
21 対象河川(中小河川)
22 流域(対象河川流域)
23 メッシュ
24 予測地点
3 降雨情報処理部
4 河川情報部
411 河川水位
5 解析部
51 流量解析部
52 水位算出部
6 出力部
6a 雨量表示領域
6b 予測水位表示領域
61 画面出力部
611 早達モデル(洪水到達時間が早くなるモデル)
612 遅達モデル(洪水到達時間が遅くなるモデル)
62 アラート部(報知手段)
621 1次管理値(閾値)
622 2次管理値(閾値)
1 River water level prediction system 2 River basin information part 21 target river (medium and small rivers)
22 basin (target river basin)
23 mesh 24 prediction point 3 rainfall information processing unit 4 river information unit 411 river water level 5 analysis unit 51 flow rate analysis unit 52 water level calculation unit 6 output unit 6 a rainfall display area 6 b predicted water level display area 61 screen output unit 611 early delivery model (flood Model with faster arrival time)
612 Delayed delivery model (flood arrival time delayed model)
62 Alert section (informing means)
621 Primary management value (threshold)
622 Secondary control value (threshold)

Claims (4)

中小河川の集中豪雨による河川水位の変化を予測する河川水位予測システムであって、
対象河川流域をメッシュ状に分割するとともにメッシュごとの流出率及び洪水到達時間を決定する河川流域情報部と、
前記対象河川流域の降雨量情報を取得するとともに降雨量データとして抽出する降雨情報処理部と、
前記河川水位の予測をする予測地点の水位と流量の関係である水位流量曲線を求める河川情報部と、
流出解析モデルに前記流出率及び洪水到達時間並びに前記降雨量データを入力して流量予測を行う流量解析部と、
前記流量予測の結果と前記水位流量曲線とから河川水位を算出する水位算出部と、
前記水位算出部で算出された河川水位を河川水位曲線として出力する出力部とを備え、
前記洪水到達時間は、メッシュごとに幅を持って設定され、前記流量解析部では少なくとも洪水到達時間が早くなるモデルと遅くなるモデルの2通りの流量予測が行われるとともに、前記出力部には少なくとも2通りの河川水位曲線が出力されることを特徴とする河川水位予測システム。
A river water level prediction system that predicts changes in river water level due to heavy rainfall in small and medium-sized rivers.
A river basin information unit that divides the target river basin into meshes and determines the runoff rate and flood arrival time for each mesh;
A rainfall information processing unit that acquires rainfall information of the target river basin and extracts it as rainfall data;
A river information unit for obtaining a water level flow curve which is a relationship between the water level and the flow rate at a prediction point where the river water level is predicted;
A flow rate analysis unit that estimates the flow rate by inputting the runoff rate, the flood arrival time, and the rainfall amount data to a runoff analysis model;
A water level calculation unit that calculates a river water level from the flow rate prediction result and the water level flow curve;
An output unit that outputs the river water level calculated by the water level calculation unit as a river water level curve;
The flood arrival time is set with a width for each mesh, and the flow rate analysis unit performs two types of flow rate predictions, a model in which the flood arrival time is earlier and a model in which the delay is slower, and at least the output unit A river level prediction system characterized in that two river level curves are output.
前記出力部には、河川水位の閾値が設定されており、予測された前記河川水位曲線のいずれかが前記閾値を超える場合に報知を行う報知手段を有することを特徴とする請求項1に記載の河川水位予測システム。   The threshold value of the river water level is set to the said output part, It has an alerting | reporting means which alert | reports, when either of the estimated said river water level curves exceeds the said threshold value. River water level forecasting system. 前記メッシュは、1辺が250m以下であることを特徴とする請求項1又は2に記載の河川水位予測システム。   The river level prediction system according to claim 1 or 2, wherein one side of the mesh is 250 m or less. 前記出力部には、前記降雨量情報を表示する雨量表示領域と、前記予測された河川水位曲線を表示する予測水位表示領域とが隣接して設けられることを特徴とする請求項1乃至3のいずれか1項に記載の河川水位予測システム。   The rainfall display area for displaying the rainfall amount information and the predicted water level display area for displaying the predicted river level curve are provided adjacent to each other in the output unit. The river level forecasting system described in any one of the items.
JP2017168378A 2017-09-01 2017-09-01 River water level prediction system Active JP6707500B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2017168378A JP6707500B2 (en) 2017-09-01 2017-09-01 River water level prediction system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017168378A JP6707500B2 (en) 2017-09-01 2017-09-01 River water level prediction system

Publications (2)

Publication Number Publication Date
JP2019045290A true JP2019045290A (en) 2019-03-22
JP6707500B2 JP6707500B2 (en) 2020-06-10

Family

ID=65815622

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017168378A Active JP6707500B2 (en) 2017-09-01 2017-09-01 River water level prediction system

Country Status (1)

Country Link
JP (1) JP6707500B2 (en)

Cited By (21)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110377868A (en) * 2019-06-20 2019-10-25 河海大学 A kind of dynamic water system extracting method based on real-time rain condition
CN110553631A (en) * 2019-08-22 2019-12-10 中山大学 water level measurement series error analysis method about water level flow relation
CN110570031A (en) * 2019-08-23 2019-12-13 河海大学 Method for predicting river channel split ratio of two-stage branched river network in plain
CN111008362A (en) * 2019-11-13 2020-04-14 广东省水文局韶关水文分局 Dynamic rainfall discrimination method for starting and stopping calculation of flood forecast
CN111143498A (en) * 2019-12-25 2020-05-12 中国电建集团中南勘测设计研究院有限公司 Small river flood forecasting method
CN111814407A (en) * 2020-07-28 2020-10-23 安徽沃特水务科技有限公司 Flood forecasting method based on big data and deep learning
JP2020187105A (en) * 2019-05-13 2020-11-19 特定非営利活動法人防災・災害ボランティア かわせみ Flood das(flood dangerous area display method)
CN112381285A (en) * 2020-11-12 2021-02-19 中国科学院空天信息创新研究院 Flood inundation prediction method based on remote sensing
WO2021171730A1 (en) * 2020-02-25 2021-09-02 Arithmer株式会社 Information processing method, program, information processing device, and model generation method
JP2021135999A (en) * 2020-02-25 2021-09-13 Arithmer株式会社 Information processing method, program, information processor and model generation method
CN113916318A (en) * 2021-08-31 2022-01-11 福建枋洋水利投资发展有限公司 Dam safety monitoring method based on water regime monitoring
CN114111730A (en) * 2021-11-19 2022-03-01 河南省鹤壁水文水资源勘测局 Method and system for predicting downstream hydrological information
CN114821974A (en) * 2022-05-06 2022-07-29 雷浩伟 Rainstorm early warning monitoring method and system for remote mountainous area
CN115165466A (en) * 2022-07-07 2022-10-11 北京奥达清环境检测有限公司 Water taking system of automatic river channel monitoring water station
CN115421217A (en) * 2022-07-27 2022-12-02 中国科学院地理科学与资源研究所 Rainfall forecast information-based flood process and type forecast method thereof
CN116011687A (en) * 2023-03-30 2023-04-25 山东锋士信息技术有限公司 Flood forecasting method, system and medium based on Copula function
JP7355305B1 (en) 2022-04-19 2023-10-03 株式会社ガリレオ Water level measurement system
CN117433604A (en) * 2023-10-24 2024-01-23 重庆市三峡生态环境技术创新中心有限公司 Urban waterlogging early warning system and method based on double-factor judgment logic
WO2024025210A1 (en) * 2022-07-27 2024-02-01 배재대학교 산학협력단 Flood level prediction model management system
CN117807510A (en) * 2024-02-29 2024-04-02 中国一冶集团有限公司 River network dynamic partitioning method and system combining multi-source data processing
CN118094178A (en) * 2024-04-28 2024-05-28 中国安能集团第二工程局有限公司 Water flow prediction method and system after barrier lake burst

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102328326B1 (en) * 2021-07-26 2021-11-18 대한민국 (관리부서 : 환경부 국립환경과학원장) Hydraulic hydrology analysis device applied with distributed model for advanced water quality prediction

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002269656A (en) * 2001-03-12 2002-09-20 Foundation Of River & Basin Integrated Communications Japan River information provision system
JP2003014868A (en) * 2001-06-28 2003-01-15 Foundation Of River & Basin Integrated Communications Japan System for providing predictive information of flood
JP2003066161A (en) * 2001-08-21 2003-03-05 Foundation Of River & Basin Integrated Communications Japan Generation system for drainage area information
JP2004197554A (en) * 2002-12-03 2004-07-15 Foundation Of River & Basin Integrated Communications Japan Real time dynamic flooding simulation system

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2002269656A (en) * 2001-03-12 2002-09-20 Foundation Of River & Basin Integrated Communications Japan River information provision system
JP2003014868A (en) * 2001-06-28 2003-01-15 Foundation Of River & Basin Integrated Communications Japan System for providing predictive information of flood
JP2003066161A (en) * 2001-08-21 2003-03-05 Foundation Of River & Basin Integrated Communications Japan Generation system for drainage area information
JP2004197554A (en) * 2002-12-03 2004-07-15 Foundation Of River & Basin Integrated Communications Japan Real time dynamic flooding simulation system

Cited By (30)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020187105A (en) * 2019-05-13 2020-11-19 特定非営利活動法人防災・災害ボランティア かわせみ Flood das(flood dangerous area display method)
CN110377868B (en) * 2019-06-20 2023-06-20 河海大学 Dynamic water system extraction method based on real-time rain condition
CN110377868A (en) * 2019-06-20 2019-10-25 河海大学 A kind of dynamic water system extracting method based on real-time rain condition
CN110553631A (en) * 2019-08-22 2019-12-10 中山大学 water level measurement series error analysis method about water level flow relation
CN110570031A (en) * 2019-08-23 2019-12-13 河海大学 Method for predicting river channel split ratio of two-stage branched river network in plain
CN111008362A (en) * 2019-11-13 2020-04-14 广东省水文局韶关水文分局 Dynamic rainfall discrimination method for starting and stopping calculation of flood forecast
CN111008362B (en) * 2019-11-13 2023-06-02 广东省水文局韶关水文分局 Dynamic rainfall judging method for flood forecast starting and stopping calculation
CN111143498A (en) * 2019-12-25 2020-05-12 中国电建集团中南勘测设计研究院有限公司 Small river flood forecasting method
CN111143498B (en) * 2019-12-25 2023-04-18 中国电建集团中南勘测设计研究院有限公司 Small river flood forecasting method
WO2021171730A1 (en) * 2020-02-25 2021-09-02 Arithmer株式会社 Information processing method, program, information processing device, and model generation method
JP2021135999A (en) * 2020-02-25 2021-09-13 Arithmer株式会社 Information processing method, program, information processor and model generation method
CN111814407A (en) * 2020-07-28 2020-10-23 安徽沃特水务科技有限公司 Flood forecasting method based on big data and deep learning
CN111814407B (en) * 2020-07-28 2023-10-13 安徽沃特水务科技有限公司 Flood forecasting method based on big data and deep learning
CN112381285A (en) * 2020-11-12 2021-02-19 中国科学院空天信息创新研究院 Flood inundation prediction method based on remote sensing
CN112381285B (en) * 2020-11-12 2024-06-07 中国科学院空天信息创新研究院 Flood inundation prediction method based on remote sensing
CN113916318A (en) * 2021-08-31 2022-01-11 福建枋洋水利投资发展有限公司 Dam safety monitoring method based on water regime monitoring
CN114111730A (en) * 2021-11-19 2022-03-01 河南省鹤壁水文水资源勘测局 Method and system for predicting downstream hydrological information
JP2023158916A (en) * 2022-04-19 2023-10-31 株式会社ガリレオ Water level measurement system
JP7355305B1 (en) 2022-04-19 2023-10-03 株式会社ガリレオ Water level measurement system
CN114821974A (en) * 2022-05-06 2022-07-29 雷浩伟 Rainstorm early warning monitoring method and system for remote mountainous area
CN115165466B (en) * 2022-07-07 2024-01-23 北京奥达清环境检测有限公司 Water intake system of river course automatic monitoring water station
CN115165466A (en) * 2022-07-07 2022-10-11 北京奥达清环境检测有限公司 Water taking system of automatic river channel monitoring water station
CN115421217A (en) * 2022-07-27 2022-12-02 中国科学院地理科学与资源研究所 Rainfall forecast information-based flood process and type forecast method thereof
WO2024025210A1 (en) * 2022-07-27 2024-02-01 배재대학교 산학협력단 Flood level prediction model management system
CN116011687B (en) * 2023-03-30 2023-08-11 山东锋士信息技术有限公司 Flood forecasting method, system and medium based on Copula function
CN116011687A (en) * 2023-03-30 2023-04-25 山东锋士信息技术有限公司 Flood forecasting method, system and medium based on Copula function
CN117433604A (en) * 2023-10-24 2024-01-23 重庆市三峡生态环境技术创新中心有限公司 Urban waterlogging early warning system and method based on double-factor judgment logic
CN117807510A (en) * 2024-02-29 2024-04-02 中国一冶集团有限公司 River network dynamic partitioning method and system combining multi-source data processing
CN117807510B (en) * 2024-02-29 2024-05-28 中国一冶集团有限公司 River network dynamic partitioning method and system combining multi-source data processing
CN118094178A (en) * 2024-04-28 2024-05-28 中国安能集团第二工程局有限公司 Water flow prediction method and system after barrier lake burst

Also Published As

Publication number Publication date
JP6707500B2 (en) 2020-06-10

Similar Documents

Publication Publication Date Title
JP2019045290A (en) River water level prediction system
JP6954425B2 (en) Disaster prediction method, disaster prediction system, and disaster prediction program
Silvestro et al. A hydrological analysis of the 4 November 2011 event in Genoa
JP2008050903A (en) Flood prediction method and flood prediction system
WO2021129680A1 (en) Snowmelt flood prediction method and apparatus, electronic device, and storage medium
CN108107488B (en) Urban waterlogging early warning method
Nakakita et al. Early Detection of Baby‐Rain‐Cell Aloft in a Severe Storm and Risk Projection for Urban Flash Flood
JP2023026680A (en) System for estimating time of occurrence of landslide
JP2009300311A (en) Flood prediction support device and method for supporting prediction of flood
WO2019073937A1 (en) Risk evaluation system
Lombardo et al. On the use of radar reflectivity for estimation of the areal reduction factor
Acosta-Coll et al. Early warning system for detection of urban pluvial flooding hazard levels in an ungauged basin
KR20160110035A (en) System for predict accident
CN117057616A (en) Water conservancy monitoring method and system based on digital twin
Allen et al. Glacial lake outburst flood hazard under current and future conditions: worst-case scenarios in a transboundary Himalayan basin
JP2014006605A (en) Warning system
CN105279903B (en) A kind of mountain torrents debris flow early-warning method based on monitoring pore water pressure
Corral et al. Advances in radar-based flood warning systems. The EHIMI system and the experience in the Besòs flash-flood pilot basin
JP2022130912A (en) Disaster mitigation system for short-time strong rain
CN109146140A (en) A kind of Urban Flood Waterlogging prediction technique
Dale et al. Review of recent advances in UK operational hydrometeorology
JP6084332B1 (en) Earth and sand disaster prediction system
CN114048693A (en) Method and device for early warning of gale disaster
JP2015049199A (en) Presentation data accumulation system, display device, presentation data providing method, and program
JP2018003473A (en) Sewer monitoring system and sewer monitoring program

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190613

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200415

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200512

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200520

R150 Certificate of patent or registration of utility model

Ref document number: 6707500

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250