CN109146140A - A kind of Urban Flood Waterlogging prediction technique - Google Patents

A kind of Urban Flood Waterlogging prediction technique Download PDF

Info

Publication number
CN109146140A
CN109146140A CN201810824811.1A CN201810824811A CN109146140A CN 109146140 A CN109146140 A CN 109146140A CN 201810824811 A CN201810824811 A CN 201810824811A CN 109146140 A CN109146140 A CN 109146140A
Authority
CN
China
Prior art keywords
water
catchment area
region
ponding
water catchment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810824811.1A
Other languages
Chinese (zh)
Inventor
张彩霞
胡绍林
王向东
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Foshan University
Original Assignee
Foshan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Foshan University filed Critical Foshan University
Priority to CN201810824811.1A priority Critical patent/CN109146140A/en
Publication of CN109146140A publication Critical patent/CN109146140A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/04Forecasting or optimisation specially adapted for administrative or management purposes, e.g. linear programming or "cutting stock problem"
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A90/00Technologies having an indirect contribution to adaptation to climate change
    • Y02A90/10Information and communication technologies [ICT] supporting adaptation to climate change, e.g. for weather forecasting or climate simulation

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Economics (AREA)
  • Tourism & Hospitality (AREA)
  • Human Resources & Organizations (AREA)
  • Theoretical Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Development Economics (AREA)
  • General Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • Quality & Reliability (AREA)
  • Game Theory and Decision Science (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Operations Research (AREA)
  • Educational Administration (AREA)
  • Health & Medical Sciences (AREA)
  • General Health & Medical Sciences (AREA)
  • Primary Health Care (AREA)
  • Alarm Systems (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of Urban Flood Waterlogging prediction techniques, comprising: step 1 carries out charge for remittance Division to city based on geographic information data;Step 2, the water capacity for calculating water catchment area;Step 3 is based on weather forecast, calculates the water accumulating volume of water catchment area following a period of time;Step 4, when the water accumulating volume of water catchment area be greater than alarm threshold when, issue flood warning.The water accumulating volume of water catchment area following a period of time can be calculated by weather forecast, and the early warning to Urban Flood Waterlogging is realized by alarm threshold, and city management personnel is facilitated to formulate scheme of taking precautions against natural calamities accordingly.The present invention can be used in Urban Flood Waterlogging management.

Description

A kind of Urban Flood Waterlogging prediction technique
Technical field
The present invention relates to city management technical field, in particular to a kind of Urban Flood Waterlogging prediction technique.
Background technique
Flood damage is always the natural calamity for perplexing human social development, with the propulsion of urbanization, the flood in city Diaster prevention and control becomes the project of city manager's growing interest.The management of flood at present generally by detection river, Lake, inspection shaft water level determine the means of Flood prevention disaster.But this method has certain hysteresis quality, city pipe Reason personnel are difficult to adjust control strategy in time, so that city is easy to happen flood, therefore, how to predict and alert city flood Damage caused by waterlogging evil, is the problem of city management personnel extremely pay close attention to.
Summary of the invention
The object of the present invention is to provide a kind of predictable and alarm Urban Flood Waterlogging methods.
The solution that the present invention solves its technical problem is: a kind of Urban Flood Waterlogging prediction technique, comprising:
Step 1 carries out charge for remittance Division to city based on geographic information data;
Step 2, the water capacity for calculating water catchment area;
Step 3 is based on weather forecast, calculates the water accumulating volume of water catchment area following a period of time;
Step 4, when the water accumulating volume of water catchment area be greater than alarm threshold when, issue flood warning.
Further, in step 2, the calculation method of the water capacity of water catchment area includes:
Water catchment area is divided into several ponding regions by step 2.1;
The basic water level of step 2.2, periodic measurement ponding region;
Step 2.3, the region area that ponding region is obtained based on geographic information data;
Step 2.4, the warning line for setting out ponding region in advance based on urban planning;
Step 2.5 passes through calculation formula: (lt-l0) * S=W obtains the water capacity of ponding region;Wherein, lt is ponding The warning line in region, l0 are the basic water level of ponding region, and S is the region area of ponding region, and S is the water capacity of ponding region Amount;
Step 2.6 obtains the water capacity of water catchment area according to the water capacity of ponding region.
Further, in step 3, it is based on weather forecast, calculates the sub-step of the water accumulating volume of water catchment area following a period of time Include:
Step 3.1 is based on weather forecast, and the spatial and temporal distributions of rainfall in following a period of time are predicted using random theory;
Step 3.2, calculating drop into the rainfall of water catchment area within following a period of time;
Step 3.4, the water flow for obtaining outflow water catchment area;
Rainfall is subtracted water flow and obtains the water accumulating volume of water catchment area by step 3.5.
Further, the random theory includes Monte Carlo method or point collocation.
The beneficial effects of the present invention are: the water accumulating volume of water catchment area following a period of time can be calculated by weather forecast, and The early warning to Urban Flood Waterlogging is realized by alarm threshold, and city management personnel is facilitated to formulate scheme of taking precautions against natural calamities accordingly.
Detailed description of the invention
To describe the technical solutions in the embodiments of the present invention more clearly, make required in being described below to embodiment Attached drawing is briefly described.Obviously, described attached drawing is a part of the embodiments of the present invention, rather than is all implemented Example, those skilled in the art without creative efforts, can also be obtained according to these attached drawings other designs Scheme and attached drawing.
Fig. 1 is the step flow chart of the method for the present invention.
Specific embodiment
It is carried out below with reference to technical effect of the embodiment and attached drawing to design of the invention, specific structure and generation clear Chu is fully described by, to be completely understood by the purpose of the present invention, feature and effect.Obviously, described embodiment is this hair Bright a part of the embodiment, rather than whole embodiments, based on the embodiment of the present invention, those skilled in the art are not being paid Other embodiments obtained, belong to the scope of protection of the invention under the premise of creative work.In addition, be previously mentioned in text All connection/connection relationships not singly refer to that component directly connects, and referring to can be added deduct according to specific implementation situation by adding Few couple auxiliary, to form more preferably coupling structure.Each technical characteristic in the invention, in not conflicting conflict Under the premise of can be with combination of interactions.
Embodiment 1, with reference to Fig. 1, a kind of Urban Flood Waterlogging prediction technique, comprising:
Step 1 carries out charge for remittance Division to city based on geographic information data;
Step 2, the water capacity for calculating water catchment area;
Step 3 is based on weather forecast, calculates the water accumulating volume of water catchment area following a period of time;
Step 4, when the water accumulating volume of water catchment area be greater than alarm threshold when, issue flood warning.
As optimization, in step 2, the calculation method of the water capacity of water catchment area includes:
Water catchment area is divided into several ponding regions by step 2.1;
The basic water level of step 2.2, periodic measurement ponding region;
Step 2.3, the region area that ponding region is obtained based on geographic information data;
Step 2.4, the warning line for setting out ponding region in advance based on urban planning;
Step 2.5 passes through calculation formula: (lt-l0) * S=W obtains the water capacity of ponding region;Wherein, lt is ponding The warning line in region, l0 are the basic water level of ponding region, and S is the region area of ponding region, and S is the water capacity of ponding region Amount;
Step 2.6 obtains the water capacity of water catchment area according to the water capacity of ponding region.
As optimization, in step 3, it is based on weather forecast, calculates the sub-step of the water accumulating volume of water catchment area following a period of time Suddenly include:
Step 3.1 is based on weather forecast, and the spatial and temporal distributions of rainfall in following a period of time are predicted using random theory; Wherein, the random theory includes Monte Carlo method or point collocation.
Step 3.2, calculating drop into the rainfall of water catchment area within following a period of time;
Step 3.4, the water flow for obtaining outflow water catchment area;
Rainfall is subtracted water flow and obtains the water accumulating volume of water catchment area by step 3.5.
City is divided into several water catchment areas, city can intuitively be known by doing so by geographic information data by the present invention City's water flows through region.Meanwhile the water capacity of water catchment area is obtained by statistics and calculation, by the water capacity of obtained water catchment area Amount, so that it may know the water capacity in entire city, and the water capacity based on entire city, according to the requirement of urban planning, in advance Set alarm threshold.When rainfall comes interim, be based on weather forecast, it is 1 hour following using random theory prediction, 2 hours, 6 hours, 12 hours and 24 hours probable maximum precipitation amounts, and calculate separately 1 hour, 2 hours, 6 hours, 12 hours and 24 hours following Corresponding return period P, construct rainfall in 1 hour, 2 hours, 6 hours, 12 hours and 24 hours following respectively according to return period P Journey line model;Charge for remittance will be dropped within 1 hour, 2 hours, 6 hours, 12 hours and 24 hours according to rainfall line model calculating future The rainfall in area.Meanwhile the water flow of outflow water catchment area can be obtained by the way that the water ga(u)ge of the water outlet of water catchment area is arranged in Amount, thus, water flow, which is subtracted, using rainfall obtains the water accumulating volume of water catchment area.When the water accumulating volume of water catchment area is greater than alarm threshold When, the danger that city occurs flood has been turned out, city management personnel's system can have been facilitated by issuing flood warning Fixed scheme of taking precautions against natural calamities accordingly.
The invention can calculate the water accumulating volume of water catchment area following a period of time by weather forecast, and pass through Police sports Value realizes the early warning to Urban Flood Waterlogging, and city management personnel is facilitated to formulate scheme of taking precautions against natural calamities accordingly.
Better embodiment of the invention is illustrated above, but the invention is not limited to the implementation Example, those skilled in the art can also make various equivalent modifications on the premise of without prejudice to spirit of the invention or replace It changes, these equivalent variation or replacement are all included in the scope defined by the claims of the present application.

Claims (4)

1. a kind of Urban Flood Waterlogging prediction technique characterized by comprising
Step 1 carries out charge for remittance Division to city based on geographic information data;
Step 2, the water capacity for calculating water catchment area;
Step 3 is based on weather forecast, calculates the water accumulating volume of water catchment area following a period of time;
Step 4, when the water accumulating volume of water catchment area be greater than alarm threshold when, issue flood warning.
2. a kind of Urban Flood Waterlogging prediction technique according to claim 1, which is characterized in that in step 2, water catchment area The calculation method of water capacity include:
Water catchment area is divided into several ponding regions by step 2.1;
The basic water level of step 2.2, periodic measurement ponding region;
Step 2.3, the region area that ponding region is obtained based on geographic information data;
Step 2.4, the warning line for setting out ponding region in advance based on urban planning;
Step 2.5 passes through calculation formula: (lt-l0) * S=W obtains the water capacity of ponding region;Wherein, lt is ponding region Warning line, l0 be ponding region basic water level, S be ponding region region area, S be ponding region water capacity;
Step 2.6 obtains the water capacity of water catchment area according to the water capacity of ponding region.
3. a kind of Urban Flood Waterlogging prediction technique according to claim 2, which is characterized in that in step 3, be based on day Gas forecast, the sub-step for calculating the water accumulating volume of water catchment area following a period of time include:
Step 3.1 is based on weather forecast, and the spatial and temporal distributions of rainfall in following a period of time are predicted using random theory;
Step 3.2, calculating drop into the rainfall of water catchment area within following a period of time;
Step 3.4, the water flow for obtaining outflow water catchment area;
Rainfall is subtracted water flow and obtains the water accumulating volume of water catchment area by step 3.5.
4. a kind of Urban Flood Waterlogging prediction technique according to claim 3, which is characterized in that the random theory includes Monte Carlo method or point collocation.
CN201810824811.1A 2018-07-25 2018-07-25 A kind of Urban Flood Waterlogging prediction technique Pending CN109146140A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810824811.1A CN109146140A (en) 2018-07-25 2018-07-25 A kind of Urban Flood Waterlogging prediction technique

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810824811.1A CN109146140A (en) 2018-07-25 2018-07-25 A kind of Urban Flood Waterlogging prediction technique

Publications (1)

Publication Number Publication Date
CN109146140A true CN109146140A (en) 2019-01-04

Family

ID=64797730

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810824811.1A Pending CN109146140A (en) 2018-07-25 2018-07-25 A kind of Urban Flood Waterlogging prediction technique

Country Status (1)

Country Link
CN (1) CN109146140A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110399638A (en) * 2019-06-15 2019-11-01 湖南闲暇科技有限公司 A method of flood and overflow time of origin are calculated according to meteorological data
CN112382091A (en) * 2020-11-11 2021-02-19 北京世纪高通科技有限公司 Road water accumulation early warning method and device
CN115293469A (en) * 2022-10-10 2022-11-04 山脉科技股份有限公司 Urban flood control and drainage risk prediction method

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103116695A (en) * 2013-01-16 2013-05-22 吴立新 Urban area water logging flood processing simulation method based on CD-TIN
CN103559775A (en) * 2013-11-12 2014-02-05 武汉大学 Urban flood disaster early warning system and method
CN105067072A (en) * 2015-07-27 2015-11-18 湖南大麓管道工程有限公司 Water-level rising early-warning system and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103116695A (en) * 2013-01-16 2013-05-22 吴立新 Urban area water logging flood processing simulation method based on CD-TIN
CN103559775A (en) * 2013-11-12 2014-02-05 武汉大学 Urban flood disaster early warning system and method
CN105067072A (en) * 2015-07-27 2015-11-18 湖南大麓管道工程有限公司 Water-level rising early-warning system and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110399638A (en) * 2019-06-15 2019-11-01 湖南闲暇科技有限公司 A method of flood and overflow time of origin are calculated according to meteorological data
CN112382091A (en) * 2020-11-11 2021-02-19 北京世纪高通科技有限公司 Road water accumulation early warning method and device
CN115293469A (en) * 2022-10-10 2022-11-04 山脉科技股份有限公司 Urban flood control and drainage risk prediction method
CN115293469B (en) * 2022-10-10 2022-12-27 山脉科技股份有限公司 Urban flood control and drainage risk prediction method

Similar Documents

Publication Publication Date Title
Lu et al. Vulnerability analysis of transportation network under scenarios of sea level rise
Trung et al. Vulnerability to flood in the Vietnamese Mekong Delta: mapping and uncertainty assessment
WO2021129680A1 (en) Snowmelt flood prediction method and apparatus, electronic device, and storage medium
JP2019045290A (en) River water level prediction system
CN109146140A (en) A kind of Urban Flood Waterlogging prediction technique
Lee et al. Assessment of sewer flooding model based on ensemble quantitative precipitation forecast
Zhang et al. Risk assessment of earth dam overtopping and its application research
Aziz Rainfall-runoff modeling of the trans-boundary Kabul River basin using Integrated Flood Analysis System (IFAS)
Ming-Hsu et al. Assessing water resources vulnerability and resilience of southern Taiwan to climate change
KR101497100B1 (en) Prediction methods and apparatus of flood risk index for roads considering real-time accumulation rainfall
Jang et al. A probabilistic model for real‐time flood warning based on deterministic flood inundation mapping
Yi et al. Opportunity knocks but just once: Impact of infrastructure investment decision on climate adaptation to flood events
Ahumada et al. Effect of climate change on drinking water supply in Santiago de Chile
Tun et al. Flood prediction system for middle region of Myanmar
Yasmin et al. Effectiveness of tidal control gates in flood-prone areas during high tide appearances
Mavalankar Lessons from massive floods of 2006 in Surat City: A framework for application of MS/OR techniques to improve dam management to prevent flood
Štěpánková et al. The assessment of level of flash floods threat of urbanised areas.
Smythe et al. Flood forecast mapping sans modelling
Nohara et al. Decision support for preliminary release of reservoir for flood control using ECMWF medium-range ensemble rainfall forecast
Dassanayake et al. Coastal flood risk: the importance of intangible losses and their integration
Francesch-Huidobro Governance of climate change in coastal cities: The example of Hong Kong
Anderson et al. Ten years of stochastic water supply modeling by Lower Colorado River Authority of Texas
Sutanto et al. Early Warnings for Drought in Europe
Pashovkina et al. Modeling extreme flood characteristics at two mountainous watersheds of Russia with contrasting conditions using historical pluviograph data
Shanono et al. EFFECT OF RESERVOIR UTILIZATION AND OTHER ANTHROPOGENIC ACTIVITIES ON THE HADEJIA RIVER VALLEY FLOODS: A REVIEW

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination