CN110399638A - A method of flood and overflow time of origin are calculated according to meteorological data - Google Patents

A method of flood and overflow time of origin are calculated according to meteorological data Download PDF

Info

Publication number
CN110399638A
CN110399638A CN201910518533.1A CN201910518533A CN110399638A CN 110399638 A CN110399638 A CN 110399638A CN 201910518533 A CN201910518533 A CN 201910518533A CN 110399638 A CN110399638 A CN 110399638A
Authority
CN
China
Prior art keywords
rainfall
time
water level
data
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201910518533.1A
Other languages
Chinese (zh)
Inventor
杨燕
刘名运
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan Leisure Technology Co Ltd
Original Assignee
Hunan Leisure Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan Leisure Technology Co Ltd filed Critical Hunan Leisure Technology Co Ltd
Priority to CN201910518533.1A priority Critical patent/CN110399638A/en
Publication of CN110399638A publication Critical patent/CN110399638A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0635Risk analysis of enterprise or organisation activities
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/40Controlling or monitoring, e.g. of flood or hurricane; Forecasting, e.g. risk assessment or mapping

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Alarm Systems (AREA)

Abstract

The present invention relates to source of early warning technical fields, and a kind of method that flood and overflow time of origin are calculated according to meteorological data is disclosed, include the following steps 1) in the installation such as culvert, pond, reservoir and lake for needing to give warning in advance non-contact type ultrasonic water-level gauge.The method for calculating flood and overflow time of origin according to meteorological data, measurement is associated with SEA LEVEL VARIATION by different stage rainfall, the computation model of initialization can be established automatically by the initial data that the rainfall that accumulative truthful data acquire in real time and sort out six ranks generates, without manually going measurement to need the volume of zoning, by refining the minimum of computation unit time, rainfall water level improves the accuracy of calculating to calculate, the data of accumulation are more simultaneously, it is longer using the time, the accuracy of the data and precognition of calculating is higher, it does not need artificially to go to calibrate, the equipment overall cost is low, human input and maintenance cost are low.

Description

A method of flood and overflow time of origin are calculated according to meteorological data
Technical field
It is specially a kind of when calculating that flood and overflow occur according to meteorological data the present invention relates to source of early warning technical field Between method.
Background technique
Urban Flood Waterlogging is huge on city influence, and urban belt is given to come immeasurable loss, urban district waterlogging ponding, traffic It paralyses, house property is on the hazard, and water resource is contaminated, and disease is spread rapidly, and building facility is ruined, in some instances it may even be possible to be made At casualties, Freshets roar down from the mountains in remote city, impeded drainage, in addition to the waterlogging ponding of city, also will cause periphery farmland and village quilt It floods, crops Severe Reduction, cultivates livestock and people's lives and properties are on the hazard, cause serious financial consequences.
Urban Flood Waterlogging early warning system construction at present relatively lags behind, and the monitoring means that existing early warning system uses Spatial and temporal distributions that are not scientific enough, not accounting for the following rainfall, early warning resultant error is big, cannot really reflect Urban Flood Waterlogging feelings Condition has a significant impact to disaster-proof measures are formulated, a kind of urban flooding calamity proposed such as 109146140 A of Chinese patent CN Evil prediction technique can calculate the water accumulating volume of water catchment area following a period of time by weather forecast, and be realized by alarm threshold Early warning to Urban Flood Waterlogging facilitates city management personnel to formulate scheme of taking precautions against natural calamities accordingly, is directed to culvert underground pipe network at present Etc. on-line monitoring equipments and system it is very much, but a kind of reckoning in advance for establishing computation model based on general and autonomous learning The efficiently and accurately calculation method of time, the early warning of flood time and notice push are overflowed, so propose a kind of according to gas Image data calculates the method for flood and overflow time of origin to solve the problems, such as to propose among the above.
Summary of the invention
(1) the technical issues of solving
In view of the deficiencies of the prior art, flood and overflow time of origin are calculated according to meteorological data the present invention provides a kind of Method, have at low cost, the advantages such as accurate data degree is high, human input and maintenance cost are low solve at present for culvert There are many on-line monitoring equipments such as underground pipe network and system, but establish computation model based on general and autonomous learning without a kind of The problem of calculating the efficiently and accurately calculation method for overflowing time, the early warning of flood time and notice push in advance.
(2) technical solution
Above-mentioned at low cost to realize, accurate data degree height, human input and the low purpose of maintenance cost, the present invention provide as follows Technical solution: the problem to be solved in the present invention is to provide a kind of sides that flood and overflow time of origin are calculated according to meteorological data Method, comprising the following steps:
1) in the installation such as culvert, pond, reservoir and lake for needing to give warning in advance non-contact type ultrasonic water-level gauge, water level Meter by Internet of Things serial port module in real time by water level information at least minimum every five seconds once to server transport, it is accurate to improve Property water level single index maximum statistical unit no more than centimetre, the water-bed distance that initialization is arranged overflows the distance of horizontal plane, As dangerous level value;
2) be by the small-sized weather station or self-built small big atmosphere in the same region of installation and deployment same township gas As, by rainfall information, rainfall data needs once to submit drop in real time upwards in maximum time interval every five seconds in the information of station Rain information is 0.1 millimeter to improve accuracy maximum single index statistical unit;
3) by height above sea level measuring instrument, existing altitude database is obtained, sunykatuib analysis is carried out by computer, delineation is held in advance The region of easy ponding, chooses the region of limited installation and deployment early warning system, carries out the installation of source of early warning;
4) the self-built computation model stage is initialized, starts to acquire data for the first time when installation, in six different stages of experience After rainfall can by the different every 0.1 millimeter of rainfall bring SEA LEVEL VARIATION values of index couple, such as initial water level be L centimetres that One light rain starts to assume to refer to early warning water level as T centimetres then, and L centimetres of water level reaches T cm of water when calculating since rainfall The number of minutes consumed by position is obtained water level and time that the rainfall of the every 0.1mm of rainfall is promoted, can be extrapolated with this and reach danger Danger T water level need time, thus by this time be pushed to the interested regulatory authorities culvert different with citizen's advance notice, The specific time that the SEA LEVEL VARIATION speed of lake, river and cesspool etc. and the dangerous situation of different stage will occur, reach early warning Purpose;
5) position low to crucial height above sea level installs small-sized gun shaped video camera additional, is used for subsequent continuous calibration data.
Preferably, the rainfall of six different stages is respectively light rain, moderate rain, heavy rain, heavy rain, torrential rain in the step 4) And extra torrential rain.
Preferably, based on the calculation method that rainfall starts in the step 4) was started by the time for the rainfall for reaching 0.1mm It calculates.
Preferably, the SEA LEVEL VARIATION value of different rainfalls is set as R1, R2, R3, R4, R5 and R6 in the step 4), together When R indicate the every 0.1mm of the rainfall of the rank rainfall promoted water level and time ratio, then the spilling time be equal to (T-L) * R L centimetres of water level reaches the number of minutes consumed by T centimetres of water level when equal to since rainfall.
(3) beneficial effect
Compared with prior art, the present invention provides a kind of sides that flood and overflow time of origin are calculated according to meteorological data Method, have it is following the utility model has the advantages that
1, the method that flood and overflow time of origin are calculated according to meteorological data, by it is relatively current those pass through in advance The method for needing the specific sum of cubes space size in region of early warning is calculated, the method more bona fide cost is lower, and can be immediately According to the rainfall of real-time change carry out data adjustment, avoid rainfall variation when, early warning system prompting produce not in time Raw problem, by using contactless mini ultrasonic ranging from the low installation cost low-maintenance cost of mode equipment cost Low, equipment loss is also low, effectively increases the service life of equipment, while reducing maintenance cost, and avoids sundries in water The phenomenon that being influenced caused by distance-measuring equipment.
2, the method for calculating flood and overflow time of origin according to meteorological data, is needed by rainfall data in step 2) Once to submit real-time rainfall data in maximum time interval every five seconds upwards, not only on-line monitoring can also be mentioned accurately Preceding early warning is estimated with the risk that weather forecast carries out in advance is associated with, and survey is associated with SEA LEVEL VARIATION by different stage rainfall It is fixed, it can be first to establish automatically by adding up the initial data for the rainfall generation that truthful data acquire in real time and sort out six ranks The computation model of beginningization, without manually going measurement to need the volume of zoning, by refining minimum of computation unit Time, rainfall water level come calculate improve calculate accuracy, while accumulate data it is more, it is longer using the time, calculating The accuracy of data and precognition is higher, does not need artificially to go to calibrate, and the equipment whole design scheme is at low cost, accurate data degree High, human input and maintenance cost are low, and the loss of contactless water-level gauge is low, solve and exist at present for culvert underground pipe network etc. There are many line monitoring device and system, but overflow without a kind of reckoning in advance for establishing computation model based on general and autonomous learning The problem of efficiently and accurately calculation method of time, the early warning of flood time and notice push.
Detailed description of the invention
Fig. 1 is a kind of Method And Principle signal that flood and overflow time of origin are calculated according to meteorological data proposed by the present invention Figure;
Fig. 2 is a kind of method calculation formula that flood and overflow time of origin are calculated according to meteorological data proposed by the present invention Figure.
Specific embodiment
Below in conjunction with the embodiment of the present invention, technical solution in the embodiment of the present invention is clearly and completely retouched It states, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.Based on the present invention In embodiment, every other implementation obtained by those of ordinary skill in the art without making creative efforts Example, shall fall within the protection scope of the present invention.
A method of flood and overflow time of origin are calculated according to meteorological data, comprising the following steps:
1) in the installation such as culvert, pond, reservoir and lake for needing to give warning in advance non-contact type ultrasonic water-level gauge, water level Meter by Internet of Things serial port module in real time by water level information at least minimum every five seconds once to server transport, it is accurate to improve Property water level single index maximum statistical unit no more than centimetre, the water-bed distance that initialization is arranged overflows the distance of horizontal plane, As dangerous level value;
2) be by the small-sized weather station or self-built small big atmosphere in the same region of installation and deployment same township gas As, by rainfall information, rainfall data needs once to submit drop in real time upwards in maximum time interval every five seconds in the information of station Rain information is 0.1 millimeter to improve accuracy maximum single index statistical unit;
3) by height above sea level measuring instrument, existing altitude database is obtained, sunykatuib analysis is carried out by computer, delineation is held in advance The region of easy ponding, chooses the region of limited installation and deployment early warning system, carries out the installation of source of early warning;
4) the self-built computation model stage is initialized, starts to acquire data for the first time when installation, in six different stages of experience After rainfall can by the different every 0.1 millimeter of rainfall bring SEA LEVEL VARIATION values of index couple, such as initial water level be L centimetres that One light rain starts to assume to refer to early warning water level as T centimetres then, and L centimetres of water level reaches T cm of water when calculating since rainfall The number of minutes consumed by position is obtained water level and time that the rainfall of the every 0.1mm of rainfall is promoted, can be extrapolated with this and reach danger Danger T water level need time, thus by this time be pushed to the interested regulatory authorities culvert different with citizen's advance notice, The specific time that the SEA LEVEL VARIATION speed of lake, river and cesspool etc. and the dangerous situation of different stage will occur, reach early warning Purpose;
5) position low to crucial height above sea level installs small-sized gun shaped video camera additional, is used for subsequent continuous calibration data.
Embodiment one:
1) in the installation such as culvert, pond, reservoir and lake for needing to give warning in advance non-contact type ultrasonic water-level gauge, water level Meter by Internet of Things serial port module in real time by water level information at least minimum every five seconds once to server transport, it is accurate to improve Property water level single index maximum statistical unit no more than centimetre, the water-bed distance that initialization is arranged overflows the distance of horizontal plane, As dangerous level value;
2) be by the small-sized weather station or self-built small big atmosphere in the same region of installation and deployment same township gas As, by rainfall information, rainfall data needs once to submit drop in real time upwards in maximum time interval every five seconds in the information of station Rain information, acquisition rainfall grade are R1, are 0.1 millimeter to improve accuracy maximum single index statistical unit;
3) by height above sea level measuring instrument, existing altitude database is obtained, sunykatuib analysis is carried out by computer, delineation is held in advance The region of easy ponding, chooses the region of limited installation and deployment early warning system, carries out the installation of source of early warning;
4) the self-built computation model stage is initialized, starts to acquire data for the first time when installation, in six different stages of experience Can be by the different every 0.1 millimeter of rainfall bring SEA LEVEL VARIATION values of index couple after rainfall, such as initial water level is 100 centimetres That light rain starts to assume to refer to early warning water level as 200 centimetres then, and 100 centimetres of water levels reach when calculating since rainfall The number of minutes consumed by 200 centimetres of water levels, obtains the water level of the rainfall promotion of the every 0.1mm of rainfall and time R1 is 0.06, with This can extrapolate the time that 200 water levels for reaching dangerous need, so that this time is pushed to interested regulatory authorities and city The SEA LEVEL VARIATION speed of the different culvert of people's advance notice, lake, river and cesspool etc. and the dangerous situation of different stage will go out The existing specific time, achieve the purpose that early warning;
5) position low to crucial height above sea level installs small-sized gun shaped video camera additional, is used for subsequent continuous calibration data.
Embodiment two:
1) in the installation such as culvert, pond, reservoir and lake for needing to give warning in advance non-contact type ultrasonic water-level gauge, water level Meter by Internet of Things serial port module in real time by water level information at least minimum every five seconds once to server transport, it is accurate to improve Property water level single index maximum statistical unit no more than centimetre, the water-bed distance that initialization is arranged overflows the distance of horizontal plane, As dangerous level value;
2) be by the small-sized weather station or self-built small big atmosphere in the same region of installation and deployment same township gas As, by rainfall information, rainfall data needs once to submit drop in real time upwards in maximum time interval every five seconds in the information of station Rain information, acquisition rainfall grade are R3, are 0.1 millimeter to improve accuracy maximum single index statistical unit;
3) by height above sea level measuring instrument, existing altitude database is obtained, sunykatuib analysis is carried out by computer, delineation is held in advance The region of easy ponding, chooses the region of limited installation and deployment early warning system, carries out the installation of source of early warning;
4) the self-built computation model stage is initialized, starts to acquire data for the first time when installation, in six different stages of experience Can be by the different every 0.1 millimeter of rainfall bring SEA LEVEL VARIATION values of index couple after rainfall, such as initial water level is 100 centimetres That light rain starts to assume to refer to early warning water level as 200 centimetres then, and 100 centimetres of water levels reach when calculating since rainfall The number of minutes consumed by 200 centimetres of water levels, obtains the water level of the rainfall promotion of the every 0.1mm of rainfall and time R3 is 0.03, with This can extrapolate the time that 200 water levels for reaching dangerous need, so that this time is pushed to interested regulatory authorities and city The SEA LEVEL VARIATION speed of the different culvert of people's advance notice, lake, river and cesspool etc. and the dangerous situation of different stage will go out The existing specific time, achieve the purpose that early warning;
5) position low to crucial height above sea level installs small-sized gun shaped video camera additional, is used for subsequent continuous calibration data.
Embodiment three:
1) in the installation such as culvert, pond, reservoir and lake for needing to give warning in advance non-contact type ultrasonic water-level gauge, water level Meter by Internet of Things serial port module in real time by water level information at least minimum every five seconds once to server transport, it is accurate to improve Property water level single index maximum statistical unit no more than centimetre, the water-bed distance that initialization is arranged overflows the distance of horizontal plane, As dangerous level value;
2) be by the small-sized weather station or self-built small big atmosphere in the same region of installation and deployment same township gas As, by rainfall information, rainfall data needs once to submit drop in real time upwards in maximum time interval every five seconds in the information of station Rain information, acquisition rainfall grade are R6, are 0.1 millimeter to improve accuracy maximum single index statistical unit;
3) by height above sea level measuring instrument, existing altitude database is obtained, sunykatuib analysis is carried out by computer, delineation is held in advance The region of easy ponding, chooses the region of limited installation and deployment early warning system, carries out the installation of source of early warning;
4) the self-built computation model stage is initialized, starts to acquire data for the first time when installation, in six different stages of experience Can be by the different every 0.1 millimeter of rainfall bring SEA LEVEL VARIATION values of index couple after rainfall, such as initial water level is 100 centimetres That light rain starts to assume to refer to early warning water level as 200 centimetres then, and 100 centimetres of water levels reach when calculating since rainfall The number of minutes consumed by 200 centimetres of water levels, obtains the water level of the rainfall promotion of the every 0.1mm of rainfall and time R6 is 0.17, with This can extrapolate the time that 200 water levels for reaching dangerous need, so that this time is pushed to interested regulatory authorities and city The SEA LEVEL VARIATION speed of the different culvert of people's advance notice, lake, river and cesspool etc. and the dangerous situation of different stage will go out The existing specific time, achieve the purpose that early warning;
5) position low to crucial height above sea level installs small-sized gun shaped video camera additional, is used for subsequent continuous calibration data.
The beneficial effects of the present invention are: the method for calculating flood and overflow time of origin according to meteorological data, passes through phase To it is current those need by calculating in advance the method for the specific sum of cubes space size in region of early warning, the method is truer Cost is lower, and the adjustment that data are carried out according to the rainfall of real-time change that can be instant, when avoiding rainfall variation, early warning System alert is led to the problem of not in time, by using contactless mini ultrasonic ranging from the low peace of mode equipment cost It is at low cost to dress up this low-maintenance, equipment loss is also low, the service life of equipment is effectively increased, while reducing maintenance cost, And avoid the phenomenon that sundries is influenced caused by distance-measuring equipment in water.
Also, the method for calculating flood and overflow time of origin according to meteorological data, passes through rainfall data in step 2) It needs once to submit real-time rainfall data upwards in maximum time interval every five seconds, not only on-line monitoring can also be accurate Give warning in advance and be associated with the risk that weather forecast carries out in advance and estimate, be associated with by different stage rainfall with SEA LEVEL VARIATION Measurement can be established automatically by the initial data that the rainfall that accumulative truthful data acquire in real time and sort out six ranks generates The computation model of initialization, without manually going measurement to need the volume of zoning, by refining minimum of computation list Position the time, rainfall water level come calculate improve calculate accuracy, while accumulate data it is more, it is longer using the time, calculate Data and precognition accuracy it is higher, do not need artificially to go to calibrate, the equipment whole design scheme is at low cost, accurate data degree High, human input and maintenance cost are low, and the loss of contactless water-level gauge is low, solve and exist at present for culvert underground pipe network etc. There are many line monitoring device and system, but overflow without a kind of reckoning in advance for establishing computation model based on general and autonomous learning The problem of efficiently and accurately calculation method of time, the early warning of flood time and notice push.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (4)

1. a kind of method for calculating flood and overflow time of origin according to meteorological data, which comprises the following steps:
1) in the installation such as culvert, pond, reservoir and lake for needing to give warning in advance non-contact type ultrasonic water-level gauge, water-level gauge is logical Cross Internet of Things serial port module in real time by water level information at least minimum every five seconds once to server transport, to improve accuracy water For the maximum statistical unit of position single index no more than centimetre, the water-bed distance that initialization is arranged overflows the distance of horizontal plane, as Dangerous level value;
2) be by the small-sized weather station or self-built small big atmosphere in the same region of installation and deployment same township weather station By rainfall information in information, rainfall data needs once real-time rainfall to be submitted to believe upwards in maximum time interval every five seconds Breath is 0.1 millimeter to improve accuracy maximum single index statistical unit;
3) by height above sea level measuring instrument, existing altitude database is obtained, sunykatuib analysis is carried out by computer, delineation is easy product in advance The region of water chooses the region of limited installation and deployment early warning system, carries out the installation of source of early warning;
4) the self-built computation model stage is initialized, starts to acquire data for the first time when installation, in the rainfall for undergoing six different stages Later can by the different every 0.1 millimeter of rainfall bring SEA LEVEL VARIATION value of index couple, such as initial water level be L centimetres that Light rain starts to assume to refer to early warning water level as T centimetres then, and L centimetres of water level reaches T centimetres of water level institute when calculating since rainfall The number of minutes of consumption is obtained water level and time that the rainfall of the every 0.1mm of rainfall is promoted, can be extrapolated with this and reach danger The time that T water level needs, so that this time is pushed to the interested regulatory authorities culvert different with citizen's advance notice, lake The specific time that the SEA LEVEL VARIATION speed of pool, river and cesspool etc. and the dangerous situation of different stage will occur, reach early warning Purpose;
5) position low to crucial height above sea level installs small-sized gun shaped video camera additional, is used for subsequent continuous calibration data.
2. the method according to claim 1 for calculating flood and overflow time of origin according to meteorological data, which is characterized in that The rainfall of six different stages is respectively light rain, moderate rain, heavy rain, heavy rain, torrential rain and extra torrential rain in the step 4).
3. the method according to claim 1 for calculating flood and overflow time of origin according to meteorological data, which is characterized in that The calculation method that rainfall starts in the step 4) is started to calculate by the time for the rainfall for reaching 0.1mm.
4. the method according to claim 1 or 2 for calculating flood and overflow time of origin according to meteorological data, feature exist In the SEA LEVEL VARIATION value of different rainfalls being set as R1, R2, R3, R4, R5 and R6 in the step 4), while R indicates the rank The every 0.1mm of rainfall rainfall promoted water level and time ratio, then the spilling time be equal to (T-L) * R be equal to since rainfall When L centimetres of water level reach the number of minutes consumed by T centimetres of water level.
CN201910518533.1A 2019-06-15 2019-06-15 A method of flood and overflow time of origin are calculated according to meteorological data Pending CN110399638A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910518533.1A CN110399638A (en) 2019-06-15 2019-06-15 A method of flood and overflow time of origin are calculated according to meteorological data

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910518533.1A CN110399638A (en) 2019-06-15 2019-06-15 A method of flood and overflow time of origin are calculated according to meteorological data

Publications (1)

Publication Number Publication Date
CN110399638A true CN110399638A (en) 2019-11-01

Family

ID=68324081

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910518533.1A Pending CN110399638A (en) 2019-06-15 2019-06-15 A method of flood and overflow time of origin are calculated according to meteorological data

Country Status (1)

Country Link
CN (1) CN110399638A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111476676A (en) * 2020-04-02 2020-07-31 中国水利水电科学研究院 Intelligent classification and classification scheduling method for small town watershed
CN112506994A (en) * 2020-12-07 2021-03-16 广东电网有限责任公司电力科学研究院 Power equipment flood hidden danger point monitoring and early warning method and related device
CN112799154A (en) * 2020-12-28 2021-05-14 恒瑞通(福建)信息技术有限公司 Ecological environment big data prediction and early warning method and terminal
CN113742818A (en) * 2021-08-12 2021-12-03 中交第四航务工程勘察设计院有限公司 Multi-factor composite early warning and forecasting method for municipal road water accumulation
CN113969888A (en) * 2021-09-14 2022-01-25 华翔翔能科技股份有限公司 Device and method for controlling water pump to start and stop by using water level
CN114463946A (en) * 2022-01-11 2022-05-10 探路者(上海)数字技术有限公司 Intelligent flood early warning system and method
CN114821974A (en) * 2022-05-06 2022-07-29 雷浩伟 Rainstorm early warning monitoring method and system for remote mountainous area
CN117131810A (en) * 2023-10-26 2023-11-28 长沙市规划勘测设计研究院 Rain and flood regulation and storage simulation system and method based on system dynamics

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103559775A (en) * 2013-11-12 2014-02-05 武汉大学 Urban flood disaster early warning system and method
CN109146140A (en) * 2018-07-25 2019-01-04 佛山科学技术学院 A kind of Urban Flood Waterlogging prediction technique
CN109186706A (en) * 2018-08-24 2019-01-11 南京昊控软件技术有限公司 A method of for the early warning of Urban Storm Flood flooding area
CN109767027A (en) * 2018-11-30 2019-05-17 深圳春沐源控股有限公司 Reservoir water percolating capacity prediction technique and device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103559775A (en) * 2013-11-12 2014-02-05 武汉大学 Urban flood disaster early warning system and method
CN109146140A (en) * 2018-07-25 2019-01-04 佛山科学技术学院 A kind of Urban Flood Waterlogging prediction technique
CN109186706A (en) * 2018-08-24 2019-01-11 南京昊控软件技术有限公司 A method of for the early warning of Urban Storm Flood flooding area
CN109767027A (en) * 2018-11-30 2019-05-17 深圳春沐源控股有限公司 Reservoir water percolating capacity prediction technique and device

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李承惠等: "灌区水盐监测预报理论与实践", 黄河水利出版社 *

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111476676A (en) * 2020-04-02 2020-07-31 中国水利水电科学研究院 Intelligent classification and classification scheduling method for small town watershed
CN111476676B (en) * 2020-04-02 2023-11-21 中国水利水电科学研究院 Classification, classification and classification intelligent scheduling method for small river basin in town
CN112506994A (en) * 2020-12-07 2021-03-16 广东电网有限责任公司电力科学研究院 Power equipment flood hidden danger point monitoring and early warning method and related device
CN112799154A (en) * 2020-12-28 2021-05-14 恒瑞通(福建)信息技术有限公司 Ecological environment big data prediction and early warning method and terminal
CN112799154B (en) * 2020-12-28 2023-05-16 恒瑞通(福建)信息技术有限公司 Ecological environment big data prediction and early warning method and terminal
CN113742818A (en) * 2021-08-12 2021-12-03 中交第四航务工程勘察设计院有限公司 Multi-factor composite early warning and forecasting method for municipal road water accumulation
WO2023016036A1 (en) * 2021-08-12 2023-02-16 中交第四航务工程勘察设计院有限公司 Multi-factor composite early warning and forecasting method for municipal road ponding
CN113969888A (en) * 2021-09-14 2022-01-25 华翔翔能科技股份有限公司 Device and method for controlling water pump to start and stop by using water level
CN114463946A (en) * 2022-01-11 2022-05-10 探路者(上海)数字技术有限公司 Intelligent flood early warning system and method
CN114821974A (en) * 2022-05-06 2022-07-29 雷浩伟 Rainstorm early warning monitoring method and system for remote mountainous area
CN117131810A (en) * 2023-10-26 2023-11-28 长沙市规划勘测设计研究院 Rain and flood regulation and storage simulation system and method based on system dynamics
CN117131810B (en) * 2023-10-26 2024-01-26 长沙市规划勘测设计研究院 Rain and flood regulation and storage simulation system and method based on system dynamics

Similar Documents

Publication Publication Date Title
CN110399638A (en) A method of flood and overflow time of origin are calculated according to meteorological data
CN108460483B (en) Quantitative inversion method for natural river flow
Ran et al. Application of an automated LSPIV system in a mountainous stream for continuous flood flow measurements
CN106023530A (en) Heavy rain type diluted debris flow monitoring, forecast and early warning device and method
JP2008050903A (en) Flood prediction method and flood prediction system
Miller et al. Numerical prediction of precipitation and river flow over the Russian River watershed during the January 1995 California storms
Ramly et al. Flood estimation for SMART control operation using integrated radar rainfall input with the HEC-HMS model
CN114021766A (en) Urban water safety prediction method based on Internet of things and big data
Panganiban et al. Rain water level information with flood warning system using flat clustering predictive technique
Velázquez et al. An evaluation of the Canadian global meteorological ensemble prediction system for short-term hydrological forecasting
Nguyen et al. Design of an automatic hydro-meteorological observation network for a real-time flood warning system: a case study of Vu Gia-Thu Bon river basin, Vietnam
Verstraten et al. Sensitivity of Australian roof drainage structures to design rainfall variability and climatic change
CN112904458B (en) Hydrological forecasting method and system for super-seepage-full-storage mixed runoff yield mode
Stancu et al. Climate change adaptation in urban areas. Case study for the Tineretului area in Bucharest
Caster et al. Variability in rainfall at monitoring stations and derivation of a long-term rainfall intensity record in the Grand Canyon region, Arizona, USA
Acierto et al. Development of a hydrological telemetry system in Bago River
KR101595951B1 (en) System and method for alerting disaster in smart phone
Vieux et al. Rainfall accuracy considerations using radar and rain gauge networks for rainfall-runoff monitoring
Melón-Nava et al. Snowfall events in the Cantabrian Mountains of northwestern Spain: WRF multiphysics ensemble assessment based on ground and multi-satellite observations
CN103400337A (en) Method for determining early-warning index of mountain torrent disaster in small watershed
CN111141539A (en) Wisdom evaluation system of sponge facility effect under artificial rainfall situation
Durga Rao et al. Application of satellite—based rainfall products and SRTM DEM in hydrological modelling of Brahmaputra basin
CN117852449B (en) Fine ponding treatment method based on large-scale city rainstorm waterlogging model
Siwila et al. Climate change impact investigation on hydro-meteorological extremes on Zambia’s Kabompo catchment
Cea et al. Using integrated hydrological-hydraulic modelling and global data sources to analyse the February 2023 floods in the Umbeluzi catchment (Mozambique)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20191101