JP2018207721A - Group control system, power management system, power storage system, transmission method, program - Google Patents

Group control system, power management system, power storage system, transmission method, program Download PDF

Info

Publication number
JP2018207721A
JP2018207721A JP2017113244A JP2017113244A JP2018207721A JP 2018207721 A JP2018207721 A JP 2018207721A JP 2017113244 A JP2017113244 A JP 2017113244A JP 2017113244 A JP2017113244 A JP 2017113244A JP 2018207721 A JP2018207721 A JP 2018207721A
Authority
JP
Japan
Prior art keywords
power
storage system
management system
power storage
request
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2017113244A
Other languages
Japanese (ja)
Inventor
工藤 貴弘
Takahiro Kudo
貴弘 工藤
篠崎 聡
Satoshi Shinozaki
聡 篠崎
杉本 敏
Satoshi Sugimoto
敏 杉本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Panasonic Intellectual Property Management Co Ltd
Original Assignee
Panasonic Intellectual Property Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Panasonic Intellectual Property Management Co Ltd filed Critical Panasonic Intellectual Property Management Co Ltd
Priority to JP2017113244A priority Critical patent/JP2018207721A/en
Priority to PCT/JP2018/018575 priority patent/WO2018225457A1/en
Publication of JP2018207721A publication Critical patent/JP2018207721A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J13/00Circuit arrangements for providing remote indication of network conditions, e.g. an instantaneous record of the open or closed condition of each circuitbreaker in the network; Circuit arrangements for providing remote control of switching means in a power distribution network, e.g. switching in and out of current consumers by using a pulse code signal carried by the network
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/28Arrangements for balancing of the load in a network by storage of energy
    • H02J3/32Arrangements for balancing of the load in a network by storage of energy using batteries with converting means
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J3/00Circuit arrangements for ac mains or ac distribution networks
    • H02J3/38Arrangements for parallely feeding a single network by two or more generators, converters or transformers
    • HELECTRICITY
    • H02GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
    • H02JCIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
    • H02J7/00Circuit arrangements for charging or depolarising batteries or for supplying loads from batteries
    • H02J7/34Parallel operation in networks using both storage and other dc sources, e.g. providing buffering
    • H02J7/35Parallel operation in networks using both storage and other dc sources, e.g. providing buffering with light sensitive cells
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B70/00Technologies for an efficient end-user side electric power management and consumption
    • Y02B70/30Systems integrating technologies related to power network operation and communication or information technologies for improving the carbon footprint of the management of residential or tertiary loads, i.e. smart grids as climate change mitigation technology in the buildings sector, including also the last stages of power distribution and the control, monitoring or operating management systems at local level
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02BCLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
    • Y02B90/00Enabling technologies or technologies with a potential or indirect contribution to GHG emissions mitigation
    • Y02B90/20Smart grids as enabling technology in buildings sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E40/00Technologies for an efficient electrical power generation, transmission or distribution
    • Y02E40/70Smart grids as climate change mitigation technology in the energy generation sector
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S10/00Systems supporting electrical power generation, transmission or distribution
    • Y04S10/12Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation
    • Y04S10/123Monitoring or controlling equipment for energy generation units, e.g. distributed energy generation [DER] or load-side generation the energy generation units being or involving renewable energy sources
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/12Energy storage units, uninterruptible power supply [UPS] systems or standby or emergency generators, e.g. in the last power distribution stages
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y04INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
    • Y04SSYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
    • Y04S20/00Management or operation of end-user stationary applications or the last stages of power distribution; Controlling, monitoring or operating thereof
    • Y04S20/20End-user application control systems
    • Y04S20/242Home appliances

Abstract

To provide a group control system capable of transmitting a piece of information relevant to a power storage system between the group control system and a power management system.SOLUTION: A first group control system server 12a is connected to a first power management system server 14a which controls the operation of a power storage system and a second power management system server 14b. A generation part 414 generates a piece of information relevant to a request for the power storage system. The transmission part 416 is configured to transmit the information generated by the generation part 414 to at least one of the first power management system server 14a and the second power management system server 14b. The information relevant to the request for the power storage system includes a piece of information relevant to an adjustment request on the power storage system.SELECTED DRAWING: Figure 3

Description

本発明は、電力を管理する群管理システム、電力管理システム、蓄電システム、送信方法、プログラムに関する。   The present invention relates to a group management system, a power management system, a power storage system, a transmission method, and a program for managing power.

電力管理システムでは、需要家に設置された機器が制御装置によって制御される。機器は、例えば、太陽電池、蓄電池、燃料電池等の分散電源、家電機器を含む。このような制御装置は、上位のスマートサーバに接続される。スマートサーバは、複数の需要家を統括的に管理する(例えば、特許文献1参照)。   In the power management system, a device installed in a consumer is controlled by a control device. Devices include, for example, distributed power sources such as solar cells, storage batteries, and fuel cells, and home appliances. Such a control device is connected to a host smart server. The smart server comprehensively manages a plurality of consumers (see, for example, Patent Document 1).

特開2014−33591号公報JP 2014-33591 A

需要家において電力系統に接続された蓄電システムは電力管理システムによって制御されているが、さらに複数の電力管理システムが群管理システムによって制御される場合、群管理システムから蓄電システムを制御できる方が好ましい。そのためには、群管理システムと電力管理システムとの間において、蓄電システムに関する情報を伝送することが必要になる。   The power storage system connected to the power grid in the consumer is controlled by the power management system. However, when a plurality of power management systems are controlled by the group management system, it is preferable that the power storage system can be controlled from the group management system. . For this purpose, it is necessary to transmit information about the power storage system between the group management system and the power management system.

本発明はこうした状況に鑑みなされたものであり、その目的は、群管理システムと電力管理システムとの間において蓄電システムに関する情報を伝送する技術を提供することにある。   This invention is made | formed in view of such a condition, The objective is to provide the technique which transmits the information regarding an electrical storage system between a group management system and a power management system.

上記課題を解決するために、本発明のある態様の群管理システムは、蓄電システムの動作を制御する複数の電力管理システムに接続される群管理システムであって、蓄電システムに対する要求に関する情報を生成する生成部と、生成部において生成した情報を複数の電力管理システムの少なくとも1つに送信する送信部とを備える。蓄電システムに対する要求に関する情報は、蓄電システムにおける調整の要求に関する情報を含む。   In order to solve the above-described problem, a group management system according to an aspect of the present invention is a group management system connected to a plurality of power management systems that control operations of a power storage system, and generates information related to a request for the power storage system. A generating unit that transmits the information generated in the generating unit to at least one of the plurality of power management systems. The information regarding the request | requirement with respect to an electrical storage system contains the information regarding the request | requirement of adjustment in an electrical storage system.

本発明の別の態様は、電力管理システムである。この電力管理システムは、群管理システムに接続される複数の電力管理システムのうちの1つの電力管理システムであって、蓄電システムに対する要求に関する情報を群管理システムから受信する受信部と、受信部において受信した情報をもとに、蓄電システムの動作を制御する処理部とを備える。蓄電システムに対する要求に関する情報は、蓄電システムにおける調整の要求に関する情報を含む。   Another aspect of the present invention is a power management system. The power management system is one of a plurality of power management systems connected to the group management system, and includes a reception unit that receives information on a request for the power storage system from the group management system, and a reception unit And a processing unit that controls the operation of the power storage system based on the received information. The information regarding the request | requirement with respect to an electrical storage system contains the information regarding the request | requirement of adjustment in an electrical storage system.

本発明のさらに別の態様は、蓄電システムである。この蓄電システムは、群管理システムに接続される複数の電力管理システムのうちの1つの電力管理システムに接続される蓄電システムであって、本蓄電システムに対する要求に関する情報を電力管理システムから受信する受信部と、受信部において受信した情報をもとに、本蓄電システムの動作を制御する処理部とを備える。本蓄電システムに対する要求に関する情報は、本蓄電システムにおける調整の要求に関する情報を含む。   Yet another embodiment of the present invention is a power storage system. This power storage system is a power storage system connected to one of the plurality of power management systems connected to the group management system, and receives information related to a request for this power storage system from the power management system And a processing unit that controls the operation of the power storage system based on the information received by the receiving unit. The information regarding the request | requirement with respect to this electrical storage system contains the information regarding the request | requirement of adjustment in this electrical storage system.

本発明のさらに別の態様は、送信方法である。この方法は、蓄電システムの動作を制御する複数の電力管理システムに接続される群管理システムにおける送信方法であって、蓄電システムに対する要求に関する情報を生成するステップと、生成した情報を複数の電力管理システムの少なくとも1つに送信するステップとを備える。蓄電システムに対する要求に関する情報は、蓄電システムにおける調整の要求に関する情報を含む。   Yet another embodiment of the present invention is a transmission method. This method is a transmission method in a group management system connected to a plurality of power management systems that control the operation of a power storage system, and includes a step of generating information related to a request for the power storage system, and the generated information as a plurality of power management Transmitting to at least one of the systems. The information regarding the request | requirement with respect to an electrical storage system contains the information regarding the request | requirement of adjustment in an electrical storage system.

なお、以上の構成要素の任意の組合せ、本発明の表現を方法、装置、システム、コンピュータプログラム、またはコンピュータプログラムを記録した記録媒体などの間で変換したものもまた、本発明の態様として有効である。   Note that any combination of the above-described components, the expression of the present invention converted between a method, an apparatus, a system, a computer program, or a recording medium on which the computer program is recorded are also effective as an aspect of the present invention. is there.

本発明によれば、群管理システムと電力管理システムとの間において蓄電システムに関する情報を伝送できる。   ADVANTAGE OF THE INVENTION According to this invention, the information regarding an electrical storage system can be transmitted between a group management system and a power management system.

実施例1に係るVPPシステムの構成を示す図である。1 is a diagram illustrating a configuration of a VPP system according to Embodiment 1. FIG. 図1の需要家の構成を示す図である。It is a figure which shows the structure of the consumer of FIG. 図1の第1群管理システムサーバ、第1電力管理システムサーバ、第2電力管理システムサーバの構成を示す図である。It is a figure which shows the structure of the 1st group management system server of FIG. 1, a 1st power management system server, and a 2nd power management system server. 図4(a)−(i)は、図2の群管理システムサーバにおいて使用されるメッセージのフォーマットを示す図である。FIGS. 4A to 4I are diagrams showing message formats used in the group management system server of FIG. 図3の第1電力管理システムサーバの処理概要を示す図である。It is a figure which shows the process outline | summary of the 1st power management system server of FIG. 図6(a)−(f)は、図2の群管理システムサーバにおいて使用される別のメッセージのフォーマットを示す図である。FIGS. 6A to 6F are diagrams showing other message formats used in the group management system server of FIG. 図7(a)−(d)は、図1のVPPシステムにおける電力管理システムサーバの様々な配置を示す図である。FIGS. 7A to 7D are diagrams showing various arrangements of the power management system server in the VPP system of FIG. 図1のVPPシステムにおける処理手順を示すシーケンス図である。It is a sequence diagram which shows the process sequence in the VPP system of FIG. 図9(a)−(b)は、実施例2に係る電力管理システムサーバの処理概要を示す図である。FIGS. 9A to 9B are diagrams illustrating an outline of processing performed by the power management system server according to the second embodiment. 図10(a)−(d)は、実施例2に係る群管理システムサーバにおいて使用されるメッセージのフォーマットを示す図である。FIGS. 10A to 10D are diagrams illustrating message formats used in the group management system server according to the second embodiment. 実施例3における電力需要の変動を示す図である。It is a figure which shows the fluctuation | variation of the electric power demand in Example 3. FIG. 実施例3に係る電力管理システムサーバにおいて定義される変動速度を示す図である。It is a figure which shows the fluctuation speed defined in the power management system server which concerns on Example 3. FIG. 図13(a)−(d)は、実施例3に係る群管理システムサーバにおいて使用されるメッセージのフォーマットを示す図である。FIGS. 13A to 13D are diagrams illustrating message formats used in the group management system server according to the third embodiment. 図14(a)−(c)は、実施例4に係る群管理システムサーバにおいて使用されるメッセージのフォーマットを示す図である。FIGS. 14A to 14C are diagrams illustrating message formats used in the group management system server according to the fourth embodiment. 実施例4に係るVPPシステムにおける処理手順を示すシーケンス図である。FIG. 10 is a sequence diagram illustrating a processing procedure in a VPP system according to a fourth embodiment.

(実施例1)
本発明の実施例を具体的に説明する前に、実施例の基礎となった知見を説明する。実施例は、点在する小規模な太陽光発電システム、蓄電システム、燃料電池システム等の機器と、電力の需要抑制を統合して制御するVPP(Virtual Power Plant)に関する。VPPは、太陽光発電システム、蓄電システム、燃料電池システム等の機器をネットワークを介して制御することによって、これらを1つの発電所のようにまとめて機能させる。ここで、太陽光発電システム、蓄電システム、燃料電池システム等の機器は各需要家に設置される。需要家は、電力会社等からの電力の供給を受けている施設であり、例えば、住宅、事務所、店舗、工場、公園などである。このような需要家における機器は電力管理システムによって制御される。電力管理システムは、需要家における電力の消費量が大きい時間帯において蓄電システムを放電させたり、電力系統の電気料金が安価である夜間において蓄電システムを充電させたりする。
Example 1
Before specifically describing the embodiments of the present invention, the knowledge that forms the basis of the embodiments will be described. The embodiment relates to VPP (Virtual Power Plant) that integrates and controls devices such as small-scale photovoltaic power generation systems, power storage systems, fuel cell systems, and the like, and power demand control. The VPP controls devices such as a photovoltaic power generation system, a power storage system, and a fuel cell system via a network, thereby causing them to function as a single power plant. Here, devices such as a photovoltaic power generation system, a power storage system, and a fuel cell system are installed in each consumer. The consumer is a facility that is supplied with electric power from an electric power company or the like, such as a house, an office, a store, a factory, or a park. Such consumer equipment is controlled by a power management system. The power management system discharges the power storage system during a time period when the amount of power consumed by the consumer is large, or charges the power storage system at night when the electricity charge of the power system is low.

複数の電力管理システムは、群管理システムに接続される。また、群管理システムは、複数の群管理システムを統合するアグリゲータである上位システムに接続される。上位システムと群管理システムに、需要家に設置された蓄電システム等の機器を加えたものがVPPに相当する。上位システムは、市場で、あるいは事業者と相対契約で電力を取引する。また、上位システムは、電力取引市場や電力会社の送配電部門、小売電気事業者等に集約した調整力を提供する。そのため、上位システムは、市場あるいは各事業者に提供する調整力を決定し、調整力を各群管理システムに配分する。各群管理システムは、さらに調整力を各需要家に配分する。これより、群管理システムは、上位システムからの要求に応じて売電あるいは買電するように、複数の電力管理システムのそれぞれに対して制御を指示する。例えば、群管理システムは、発電所において発電される電力が逼迫する場合、蓄電システムを放電させたり、需要家における電力消費を抑制させたりするように制御することを電力管理システムに要求する。なお、上位システムが存在しない場合、VPPは群管理システムと機器を含み、群管理システムは市場で、あるいは事業者と相対契約で電力を取引する。   The plurality of power management systems are connected to the group management system. The group management system is connected to a host system that is an aggregator that integrates a plurality of group management systems. VPP is a combination of a host system and a group management system with devices such as a power storage system installed in a consumer. The host system trades electric power in the market or with a contract with a business operator. In addition, the host system provides a coordinating power concentrated in the power trading market, the power transmission / distribution department of the power company, the retail electric utility, and the like. Therefore, the host system determines the adjustment power to be provided to the market or each business operator, and distributes the adjustment power to each group management system. Each group management system further distributes adjustment power to each consumer. Thus, the group management system instructs each of the plurality of power management systems to perform control so as to sell or buy power in response to a request from the host system. For example, the group management system requests the power management system to perform control so as to discharge the power storage system or suppress power consumption in the consumer when the power generated at the power plant is tight. When there is no host system, the VPP includes a group management system and devices, and the group management system trades electric power in the market or with a contract with a business operator.

群管理システムに複数の電力管理システムが接続され、各電力管理システムに1つ以上の蓄電システムが接続されることによって、これらは階層的に配置されている。このような配置において、群管理システムが、蓄電システムの状況を考慮せずに各電力管理システムに要求を出力した場合、電力管理システムが要求に応じた処理を実行できない場合がある。例えば、群管理システムから要求された放電量が蓄電システムに蓄えられていない場合である。その際、電力管理システムは、要求に応じた処理を実行できないことを群管理システムに報告するが、このような処理が増加すると、処理の効率が低下する。   A plurality of power management systems are connected to the group management system, and one or more power storage systems are connected to each power management system, so that these are arranged hierarchically. In such an arrangement, when the group management system outputs a request to each power management system without considering the state of the power storage system, the power management system may not be able to execute processing according to the request. For example, this is a case where the amount of discharge requested from the group management system is not stored in the power storage system. At that time, the power management system reports to the group management system that the processing according to the request cannot be performed. However, if such processing increases, the processing efficiency decreases.

このような効率の低下を抑制するためには、群管理システムから各電力管理システムに、蓄電システムに対する要求を送信することが望ましい。一方、そのような処理の前提として、蓄電システムに関する情報が群管理システムに集められる必要がある。これらを実現するために、群管理システムと電力管理システムとの間において蓄電システムに関する情報を伝送する構成が求められる。   In order to suppress such a decrease in efficiency, it is desirable to transmit a request for the power storage system from the group management system to each power management system. On the other hand, as a premise of such processing, information related to the power storage system needs to be collected in the group management system. In order to realize these, a configuration for transmitting information on the power storage system between the group management system and the power management system is required.

図1は、実施例1に係るVPPシステム100の構成を示す。VPPシステム100は、上位システムサーバ10、群管理システムサーバ12と総称される第1群管理システムサーバ12a、第2群管理システムサーバ12b、第M群管理システムサーバ12m、電力管理システムサーバ14と総称される第1電力管理システムサーバ14a、第2電力管理システムサーバ14b、第N電力管理システムサーバ14nを含む。ここで、第1電力管理システムサーバ14aは第1需要家16aに設置され、第2電力管理システムサーバ14bは第2需要家16bに設置され、第N電力管理システムサーバ14nは第N需要家16nに設置され、第1需要家16a、第2需要家16b、第N需要家16nは需要家16と総称される。なお、群管理システムサーバ12の数は「M」に限定されず、電力管理システムサーバ14と需要家16の数は「N」に限定されない。   FIG. 1 shows a configuration of a VPP system 100 according to the first embodiment. The VPP system 100 is generically referred to as a first group management system server 12a, a second group management system server 12b, an Mth group management system server 12m, and a power management system server 14 collectively referred to as a host system server 10 and a group management system server 12. First power management system server 14a, second power management system server 14b, and Nth power management system server 14n. Here, the first power management system server 14a is installed in the first consumer 16a, the second power management system server 14b is installed in the second consumer 16b, and the Nth power management system server 14n is the Nth consumer 16n. The first consumer 16a, the second consumer 16b, and the Nth consumer 16n are collectively referred to as the consumer 16. The number of group management system servers 12 is not limited to “M”, and the number of power management system servers 14 and consumers 16 is not limited to “N”.

需要家16は、例えば、一戸建ての住宅、マンションなどの集合住宅、コンビニエンスストアまたはスーパーマーケットなどの店舗、ビルなどの商用施設、工場であり、前述のごとく、電力会社等からの電力の供給を受けている施設である。需要家16には、空調機器(エアコン)、テレビジョン受信装置(テレビ)、照明装置、蓄電システム、ヒートポンプ給湯機等の機器が設置される。これらの機器は、電力事業者等の電力系統に接続されることによって、商用電力の供給を受けて、電力を消費する。機器として、電力使用の削減量が比較的大きいと想定されるものが有用であるが、削減量があまり大きくないと想定されるものであってもよい。なお、機器に、太陽電池システム、燃料電池システム等の再生可能エネルギー発電装置が含まれてもよい。   The consumer 16 is, for example, a detached house, an apartment house such as a condominium, a store such as a convenience store or a supermarket, a commercial facility such as a building, and a factory. It is a facility. The consumer 16 is installed with devices such as an air conditioner (air conditioner), a television receiver (television), a lighting device, a power storage system, and a heat pump water heater. These devices are connected to an electric power system of an electric power company or the like, thereby receiving commercial power and consuming electric power. Although it is useful to use a device that is assumed to have a relatively large reduction in power usage, it may be assumed that the reduction is not so large. The device may include a renewable energy power generation device such as a solar cell system or a fuel cell system.

電力管理システムサーバ14は、電力管理システムの処理を実行するためのコンピュータであり、例えば、需要家16内に設置される。電力管理システムサーバ14は、例えば、HEMS(Home Energy Management System)コントローラとしての機能を有する。そのため、電力管理システムサーバ14は、HAN(Home Area Network)により需要家16内の各種機器と通信可能であり、これらの機器を制御する。電力管理システムサーバ14は、蓄電システムの動作、例えば、放電、充電を制御する。また、電力管理システムサーバ14は、需要家16に設置された機器と電力系統との間の連系を制御してもよい。電力管理システムサーバ14は、停電時に機器と電力系統との間を解列し、復電時に機器と電力系統との間を連系する。   The power management system server 14 is a computer for executing processing of the power management system, and is installed in the customer 16, for example. The power management system server 14 has a function as, for example, a HEMS (Home Energy Management System) controller. Therefore, the power management system server 14 can communicate with various devices in the customer 16 by HAN (Home Area Network), and controls these devices. The power management system server 14 controls the operation of the power storage system, for example, discharging and charging. Further, the power management system server 14 may control the interconnection between the equipment installed in the consumer 16 and the power system. The power management system server 14 disconnects the device and the power system at the time of a power failure, and connects the device and the power system at the time of power recovery.

群管理システムサーバ12は、群管理システムの処理を実行するためのコンピュータである。群管理システムサーバ12は、複数の電力管理システムサーバ14を接続することによって、複数の電力管理システムサーバ14を管理する。その結果、群管理システムサーバ12は、複数の電力管理システムサーバ14のそれぞれに接続される複数の機器を統括的に管理する。複数の群管理システムサーバ12は、上位システムサーバ10に接続される。上位システムサーバ10は、アグリゲータである上位システムの処理を実行するためのコンピュータである。前述のごとく、上位システムと群管理システムを含むVPPは、市場で、あるいは事業者と相対契約で電力を取引しており、上位システムサーバ10は、契約に応じた要求を群管理システムサーバ12に出力する。なお、1つの群管理システムサーバ12が複数の上位システムサーバ10に接続されてもよい。   The group management system server 12 is a computer for executing processing of the group management system. The group management system server 12 manages the plurality of power management system servers 14 by connecting the plurality of power management system servers 14. As a result, the group management system server 12 comprehensively manages a plurality of devices connected to each of the plurality of power management system servers 14. The plurality of group management system servers 12 are connected to the host system server 10. The host system server 10 is a computer for executing processing of a host system that is an aggregator. As described above, the VPP including the host system and the group management system trades power in the market or with a contractor through a relative contract, and the host system server 10 sends a request corresponding to the contract to the group management system server 12. Output. One group management system server 12 may be connected to a plurality of higher system servers 10.

このような構成によって、電力需要が逼迫する場合、群管理システムサーバ12は、蓄電システムから放電した電力を需要家16内で消費させたり、需要家16内での電力消費を抑制させたりするように電力管理システムサーバ14を制御する。また、需要家16内の再生可能エネルギー発電装置での発電が増加し、余剰の電力が増加する場合、群管理システムサーバ12は、蓄電システムへの充電を増やしたり、需要家16内での需要を増大させたりするように電力管理システムサーバ14を制御する。   With such a configuration, when the power demand is tight, the group management system server 12 consumes the power discharged from the power storage system in the consumer 16 or suppresses the power consumption in the consumer 16. The power management system server 14 is controlled. In addition, when the power generation by the renewable energy power generation apparatus in the customer 16 increases and surplus power increases, the group management system server 12 increases the charge to the power storage system or the demand in the customer 16 The power management system server 14 is controlled so as to increase the power consumption.

図2は、需要家16の構成を示す。需要家16には、電力系統30、スマートメータ32、分電盤34、負荷36、太陽電池システム38、蓄電システム40、電力管理システムサーバ14、例えば第1電力管理システムサーバ14aが設置される。また、太陽電池システム38は、PV(Photovoltaics)200、PV用DC(Direct Current)/DC202、PV用DC/AC(Alternating Current)204を含み、蓄電システム40は、SB(Storage Battery)210、SB用DC/DC212、双方向DC/ACインバータ214、制御装置216を含み、制御装置216は、受信部400、処理部402を含む。さらに、第1電力管理システムサーバ14aには、ネットワーク18を介して群管理システムサーバ12、例えば第1群管理システムサーバ12aが接続される。なお、第1電力管理システムサーバ14aには、ネットワーク18を介して第2群管理システムサーバ12bが接続されてもよい。   FIG. 2 shows the configuration of the customer 16. The customer 16 is provided with a power system 30, a smart meter 32, a distribution board 34, a load 36, a solar cell system 38, a power storage system 40, a power management system server 14, for example, a first power management system server 14a. The solar cell system 38 includes a PV (Photovoltaics) 200, a PV DC (Direct Current) / DC202, and a PV DC / AC (Alternating Current) 204. The power storage system 40 includes an SB (Storage Battery) 210, an SB. DC / DC 212, bidirectional DC / AC inverter 214, and control device 216. The control device 216 includes a receiving unit 400 and a processing unit 402. Further, a group management system server 12, for example, the first group management system server 12 a is connected to the first power management system server 14 a via the network 18. The second power management system server 12b may be connected to the first power management system server 14a via the network 18.

スマートメータ32は、電力系統30に接続され、デジタル式の電力量計である。スマートメータ32は、電力系統30から入ってくる潮流の電力量と、電力系統30へ出て行く逆潮流の電力量とを計測可能である。スマートメータ32は、通信機能を有し、電力管理システムサーバ14と通信可能である。   The smart meter 32 is connected to the power system 30 and is a digital watt hour meter. The smart meter 32 can measure the power amount of the tidal current entering from the power system 30 and the power amount of the reverse power flowing out to the power system 30. The smart meter 32 has a communication function and can communicate with the power management system server 14.

PV200は、太陽電池であり、再生可能エネルギー発電装置である。PV200は、光起電力効果を利用し、光エネルギーを直接電力に変換する。太陽電池として、シリコン太陽電池、化合物半導体などを素材にした太陽電池、色素増感型(有機太陽電池)等が使用される。PV200は、PV用DC/DC202に接続され、発電した直流電力をPV用DC/DC202に出力する。   PV200 is a solar cell and is a renewable energy power generation device. The PV 200 uses the photovoltaic effect to convert light energy directly into electric power. As the solar cell, a silicon solar cell, a solar cell made of a compound semiconductor, a dye-sensitized type (organic solar cell), or the like is used. The PV 200 is connected to the PV DC / DC 202 and outputs the generated DC power to the PV DC / DC 202.

PV用DC/DC202は、DC−DCコンバータであり、PV200から出力される直流電力を、所望の電圧値の直流電力に変換し、変換した直流電力をPV用DC/AC204に出力する。PV用DC/DC202は、例えば、昇圧チョッパで構成される。PV用DC/DC202は、PV200の出力電力が最大になるようMPPT(Maximum Power Point Tracking)制御される。PV用DC/AC204は、DC−ACインバータであり、PV用DC/DC202から出力される直流電力を交流電力に変換し、交流電力を配電線42に出力する。   PV DC / DC 202 is a DC-DC converter, which converts DC power output from PV 200 into DC power having a desired voltage value, and outputs the converted DC power to PV DC / AC 204. The PV DC / DC 202 is constituted by, for example, a boost chopper. The PV DC / DC 202 is subjected to MPPT (Maximum Power Point Tracking) control so that the output power of the PV 200 is maximized. The DC / AC 204 for PV is a DC-AC inverter, converts the DC power output from the DC / DC 202 for PV into AC power, and outputs the AC power to the distribution line 42.

配電線42は、スマートメータ32と分電盤34とを結ぶとともに、それらの間における交点Pから分岐してPV用DC/AC204も結ぶ。分電盤34は、配電線42に接続されるとともに、負荷36を接続する。分電盤34は、負荷36に電力を供給する。負荷36は、配電線42を介して供給される電力を消費する機器である。負荷36は、冷蔵庫、エアコン、照明等の機器を含む。ここでは、分電盤34に1つの負荷36が接続されているが、分電盤34に複数の負荷36が接続されてもよい。   The distribution line 42 connects the smart meter 32 and the distribution board 34, branches from the intersection P between them, and also connects the DC / AC 204 for PV. The distribution board 34 is connected to the distribution line 42 and to the load 36. The distribution board 34 supplies power to the load 36. The load 36 is a device that consumes electric power supplied via the distribution line 42. The load 36 includes devices such as a refrigerator, an air conditioner, and lighting. Here, one load 36 is connected to the distribution board 34, but a plurality of loads 36 may be connected to the distribution board 34.

SB210は、電力を充放電可能な蓄電池であり、リチウムイオン蓄電池、ニッケル水素蓄電池、鉛蓄電池、電気二重層キャパシタ、リチウムイオンキャパシタ等を含む。SB210はSB用DC/DC212に接続される。SB用DC/DC212は、DC−DCコンバータであり、SB210側の直流電力と、双方向DC/ACインバータ214側の直流電力との間の変換を実行する。   The SB 210 is a storage battery capable of charging and discharging electric power, and includes a lithium ion storage battery, a nickel hydride storage battery, a lead storage battery, an electric double layer capacitor, a lithium ion capacitor, and the like. The SB 210 is connected to the DC / DC 212 for SB. The DC / DC 212 for SB is a DC-DC converter, and performs conversion between the DC power on the SB 210 side and the DC power on the bidirectional DC / AC inverter 214 side.

双方向DC/ACインバータ214は、SB用DC/DC212と分電盤34との間に接続される。双方向DC/ACインバータ214は、分電盤34からの交流電力を直流電力に変換し、変換した直流電力をSB用DC/DC212に出力する。また、双方向DC/ACインバータ214は、SB用DC/DC212からの直流電力を交流電力に変換し、変換した交流電力を分電盤34に出力する。つまり、双方向DC/ACインバータ214によってSB210は充放電される。このような双方向DC/ACインバータ214の制御は制御装置216によってなされる。ここで、PV200、PV用DC/DC202、PV用DC/AC204は一体的に形成されてもよく、その場合であっても、太陽電池システム38と呼ぶものとする。また、SB210、SB用DC/DC212、双方向DC/ACインバータ214、制御装置216は1つの筐体に格納されてもよく、その場合であっても、これを蓄電システム40と呼ぶものとする。   The bidirectional DC / AC inverter 214 is connected between the SB DC / DC 212 and the distribution board 34. The bidirectional DC / AC inverter 214 converts AC power from the distribution board 34 into DC power, and outputs the converted DC power to the SB DC / DC 212. The bidirectional DC / AC inverter 214 converts the DC power from the SB DC / DC 212 into AC power and outputs the converted AC power to the distribution board 34. That is, the SB 210 is charged and discharged by the bidirectional DC / AC inverter 214. Such control of the bidirectional DC / AC inverter 214 is performed by the control device 216. Here, the PV 200, the PV DC / DC 202, and the PV DC / AC 204 may be integrally formed, and even in that case, they are referred to as the solar cell system 38. Further, the SB 210, the SB DC / DC 212, the bidirectional DC / AC inverter 214, and the control device 216 may be stored in one housing, and even in this case, this is referred to as the power storage system 40. .

第1電力管理システムサーバ14aは、HAN等のネットワークを介して、スマートメータ32、太陽電池システム38、蓄電システム40に接続され、それぞれと通信可能である。以下では、第1電力管理システムサーバ14aと太陽電池システム38との間の通信、第1電力管理システムサーバ14aとスマートメータ32との間の通信は説明を省略する。また、第1電力管理システムサーバ14aは、ネットワーク18を介して第1群管理システムサーバ12a、第2群管理システムサーバ12bにも接続される。群管理システムサーバ12と電力管理システムサーバ14における処理および通信を説明するために、ここでは、図3を使用する。   The first power management system server 14a is connected to the smart meter 32, the solar cell system 38, and the power storage system 40 via a network such as HAN, and can communicate with each of them. Hereinafter, the communication between the first power management system server 14a and the solar cell system 38 and the communication between the first power management system server 14a and the smart meter 32 are omitted. The first power management system server 14 a is also connected to the first group management system server 12 a and the second group management system server 12 b via the network 18. In order to explain the processing and communication in the group management system server 12 and the power management system server 14, FIG. 3 is used here.

図3は、第1群管理システムサーバ12a、第1電力管理システムサーバ14a、第2電力管理システムサーバ14bの構成を示す。ここでは、一例として、図1のごとく、第1群管理システムサーバ12aに第1電力管理システムサーバ14aと第2電力管理システムサーバ14bが接続されている場合を示す。第1群管理システムサーバ12aは、受信部410、処理部412、生成部414、送信部416を含む。第1電力管理システムサーバ14aは、サービス連携部300、制御部302を含み、サービス連携部300は、受信部510、処理部512、生成部514、送信部516を含む。第2電力管理システムサーバ14bは第1電力管理システムサーバ14aと同一の構成を有する。以下では、説明を明瞭にするために、第1電力管理システムサーバ14aのサービス連携部300、制御部302を単に「サービス連携部300」、「制御部302」ということもある。以下では、これらの構成を(1)調整量の収集、(2)調整の指示の順に説明する。   FIG. 3 shows the configuration of the first group management system server 12a, the first power management system server 14a, and the second power management system server 14b. Here, as an example, as shown in FIG. 1, a case is shown in which the first power management system server 14a and the second power management system server 14b are connected to the first group management system server 12a. The first group management system server 12a includes a reception unit 410, a processing unit 412, a generation unit 414, and a transmission unit 416. The first power management system server 14a includes a service cooperation unit 300 and a control unit 302. The service cooperation unit 300 includes a reception unit 510, a processing unit 512, a generation unit 514, and a transmission unit 516. The second power management system server 14b has the same configuration as the first power management system server 14a. Hereinafter, for clarity of explanation, the service cooperation unit 300 and the control unit 302 of the first power management system server 14a may be simply referred to as “service cooperation unit 300” and “control unit 302”. In the following, these configurations will be described in the order of (1) collection of adjustment amounts and (2) adjustment instructions.

(1)調整量の収集
第1群管理システムサーバ12aの生成部414は、需要家80外からの要求に対する蓄電システム40の調整量に関する情報を送信する機能の有無に関する情報を第1電力管理システムサーバ14aに要求するためのメッセージを生成する。図1のごとく、第1電力管理システムサーバ14aは第1需要家16aに設置されている。第1需要家16aにおいては、図2のように負荷36が設置されているので、蓄電システム40に蓄えられた電力は負荷36において使用される。ここでは、負荷36のために放電あるいは充電すべき電力量あるいは電力を「第1需要家16a内消費」という。また、蓄電システム40が放電あるいは充電可能な電力量あるいは電力から、第1需要家16a内消費を除いた電力量あるいは電力が前述の「需要家80外からの要求に対する蓄電システム40の調整量」に相当する。
(1) Collection of Adjustment Amount The generation unit 414 of the first group management system server 12a provides information on the presence or absence of a function for transmitting information related to the adjustment amount of the power storage system 40 in response to a request from outside the customer 80 in the first power management system. A message for requesting the server 14a is generated. As shown in FIG. 1, the first power management system server 14a is installed in the first consumer 16a. Since the load 36 is installed in the first consumer 16 a as shown in FIG. 2, the electric power stored in the power storage system 40 is used in the load 36. Here, the amount of power or power to be discharged or charged for the load 36 is referred to as “consumption in the first consumer 16a”. Further, the amount of electric power or electric power excluding consumption within the first consumer 16a from the amount of electric power that can be discharged or charged by the electric storage system 40 or the electric power is the above-mentioned “adjustment amount of the electric storage system 40 with respect to a request from outside the customer 80”. It corresponds to.

第1電力管理システムサーバ14aは、制御装置216と通信することによって、「第1需要家16a内消費」と「需要家80外からの要求に対する蓄電システム40の調整量」とを把握している。一方、このような「需要家80外からの要求に対する蓄電システム40の調整量」を群管理システムサーバ12に送信する機能を有する電力管理システムサーバ14もあれば、送信の機能を有さない電力管理システムサーバ14もある。第1群管理システムサーバ12aは、第1電力管理システムサーバ14aがそのような情報の送信機能を有するか否かを確認するために、生成部414は、前述のメッセージを生成する。   The first power management system server 14a grasps the “consumption within the first consumer 16a” and the “adjustment amount of the power storage system 40 in response to a request from outside the consumer 80” by communicating with the control device 216. . On the other hand, if there is a power management system server 14 having a function of transmitting the “adjustment amount of the power storage system 40 with respect to a request from outside the customer 80” to the group management system server 12, there is also a power having no transmission function. There is also a management system server 14. In order for the first group management system server 12a to check whether or not the first power management system server 14a has such an information transmission function, the generation unit 414 generates the aforementioned message.

図4(a)−(i)は、群管理システムサーバ12において使用されるメッセージのフォーマットを示す図である。図4(a)のごとく、メッセージでは、メッセージ種別のフィールドに続いてデータのフィールドが配置される。メッセージ種別のフィールドは、メッセージの種別を示し、データのフィールドは、通知してほしいデータを示す。ここでは、例えば、メッセージ種別のフィールドが送信機能有無要求を示し、データのフィールドが「需要家80外からの要求に対する蓄電システム40の調整量に関する情報を送信する機能の有無」を示す。図4(b)−(i)は後述し、図3に戻る。生成部414は、送信機能有無要求のメッセージを送信部416に出力する。送信部416は、送信機能有無要求のメッセージを第1電力管理システムサーバ14aに送信する。   FIGS. 4A to 4I are diagrams showing message formats used in the group management system server 12. As shown in FIG. 4A, in the message, a data field is arranged after the message type field. The message type field indicates the message type, and the data field indicates the data to be notified. Here, for example, the message type field indicates a transmission function presence / absence request, and the data field indicates “the presence / absence of a function for transmitting information related to the adjustment amount of the power storage system 40 in response to a request from outside the customer 80”. 4 (b)-(i) will be described later, and the processing returns to FIG. The generation unit 414 outputs a transmission function presence / absence request message to the transmission unit 416. The transmission unit 416 transmits a transmission function presence / absence request message to the first power management system server 14a.

サービス連携部300の受信部510は、送信機能有無要求のメッセージを受信する。処理部512は、メッセージ種別のフィールドをもとに送信機能有無要求であることを認識し、データのフィールドをもとに、「需要家80外からの要求に対する蓄電システム40の調整量を送信する機能の有無」を通知すべきであることを認識する。ここでは、送信機能があるとする。これに続いて、生成部514は、送信機能有無要求に応答するためのメッセージを生成する。メッセージのフォーマットは図4(b)のように示され、メッセージ種別のフィールドには送信機能有無応答が示され、データのフィールドには送信機能有が示される。一方、図4(c)は送信機能がない場合のメッセージのフォーマットを示す。メッセージ種別のフィールドは図4(b)と同一であり、データのフィールドには送信機能無が示される。図3に戻る。生成部514は、送信機能有無応答のメッセージを送信部516に出力する。送信部516は、送信機能有無応答のメッセージを第1群管理システムサーバ12aに送信する。   The receiving unit 510 of the service cooperation unit 300 receives a message indicating the presence / absence of a transmission function. The processing unit 512 recognizes that the transmission function presence / absence request is based on the message type field, and, based on the data field, “transmits the adjustment amount of the power storage system 40 in response to a request from outside the customer 80. Recognize that “function presence / absence” should be notified. Here, it is assumed that there is a transmission function. Following this, the generation unit 514 generates a message for responding to the transmission function presence / absence request. The format of the message is shown as in FIG. 4B, the message type field indicates a transmission function presence / absence response, and the data field indicates that the transmission function is present. On the other hand, FIG. 4C shows a message format when there is no transmission function. The message type field is the same as in FIG. 4B, and the data field indicates no transmission function. Returning to FIG. The generation unit 514 outputs a transmission function presence / absence response message to the transmission unit 516. The transmitting unit 516 transmits a transmission function presence / absence response message to the first group management system server 12a.

第1群管理システムサーバ12aの受信部410は、送信機能有無応答のメッセージを第1電力管理システムサーバ14aから受信する。これは、需要家80外からの要求に対する蓄電システム40の調整量に関する情報を送信する機能の有無に関する情報を受信することに相当する。処理部412は、メッセージ種別のフィールドをもとに送信機能有無応答であることを認識し、データのフィールドをもとに、第1電力管理システムサーバ14aに送信機能が備えられていることを認識する。処理部412において、第1電力管理システムサーバ14aが送信機能を有していることを認識した場合、生成部414は、需要家80外からの要求に対する蓄電システム40の調整量に関する情報を第1電力管理システムサーバ14aに要求するためのメッセージを生成する。メッセージのフォーマットは図4(a)と同じであるが、メッセージ種別のフィールドには調整量要求が示され、データのフィールドには、需要家80外からの要求に対する蓄電システム40の調整量が示される。生成部414は、調整量要求のメッセージを送信部416に出力する。送信部416は、調整量要求のメッセージを第1電力管理システムサーバ14aに送信する。   The receiving unit 410 of the first group management system server 12a receives a transmission function presence / absence response message from the first power management system server 14a. This corresponds to receiving information on the presence or absence of a function for transmitting information on the adjustment amount of the power storage system 40 in response to a request from outside the customer 80. The processing unit 412 recognizes that there is a transmission function presence / absence response based on the message type field, and recognizes that the first power management system server 14a has a transmission function based on the data field. To do. When the processing unit 412 recognizes that the first power management system server 14a has a transmission function, the generation unit 414 first stores information on the adjustment amount of the power storage system 40 in response to a request from outside the customer 80. A message for requesting the power management system server 14a is generated. The format of the message is the same as in FIG. 4A, but the adjustment amount request is shown in the message type field, and the adjustment amount of the power storage system 40 for the request from outside the customer 80 is shown in the data field. It is. The generation unit 414 outputs an adjustment amount request message to the transmission unit 416. The transmission unit 416 transmits an adjustment amount request message to the first power management system server 14a.

サービス連携部300の受信部510は、調整量要求のメッセージを受信する。処理部512は、メッセージ種別のフィールドをもとに調整量要求であることを認識し、データのフィールドをもとに、「需要家80外からの要求に対する蓄電システム40の調整量」を通知すべきであることを認識する。これに続く処理部512の処理を説明するために、ここでは図5を使用する。図5は、第1電力管理システムサーバ14aの処理概要を示す。ここでは、図2のごとく、第1電力管理システムサーバ14aが第1群管理システムサーバ12aに接続されながら、第2群管理システムサーバ12bにも接続される状況を想定する。また、説明を明瞭にするために、「第1需要家16a内消費」等における電力量あるいは電力を無次元の値で代表させる。例えば、第1電力管理システムサーバ14aにおいて管理する蓄電システム40のポテンシャルは「100」と示される。また、第1需要家16a内消費は「40」であるとされる。さらに、第1電力管理システムサーバ14aは第2群管理システムサーバ12bとの間で「20」の調整を契約しているとする。以下では、このような契約を「第2群管理システム契約」という。   The receiving unit 510 of the service cooperation unit 300 receives the adjustment amount request message. The processing unit 512 recognizes that the request is for an adjustment amount based on the message type field, and notifies the “adjustment amount of the power storage system 40 for a request from outside the customer 80” based on the data field. Recognize that it should be. In order to describe the subsequent processing of the processing unit 512, FIG. 5 is used here. FIG. 5 shows a processing outline of the first power management system server 14a. Here, as shown in FIG. 2, a situation is assumed in which the first power management system server 14a is connected to the second group management system server 12b while being connected to the first group management system server 12a. In order to clarify the explanation, the amount of power or power in “consumption in the first consumer 16a” or the like is represented by a dimensionless value. For example, the potential of the power storage system 40 managed by the first power management system server 14a is indicated as “100”. Further, the consumption within the first consumer 16a is assumed to be “40”. Furthermore, it is assumed that the first power management system server 14a contracts with the second group management system server 12b for adjustment of “20”. Hereinafter, such a contract is referred to as a “second group management system contract”.

このように、処理部512は、蓄電システム40のポテンシャル「100」、第1需要家16a内消費「40」、第2群管理システム契約「20」を管理する。処理部512は、需要家80外からの要求に対する蓄電システム40の調整量として、第1群管理システムサーバ12aに対して蓄電システム40が提供可能な調整量を算出する。具体的には、蓄電システム40のポテンシャル「100」から、第1需要家16a内消費「40」と第2群管理システム契約「20」を減算することによって「40」が算出される。図3に戻る。   As described above, the processing unit 512 manages the potential “100” of the power storage system 40, the consumption “40” in the first consumer 16a, and the second group management system contract “20”. The processing unit 512 calculates an adjustment amount that can be provided by the power storage system 40 to the first group management system server 12a as an adjustment amount of the power storage system 40 in response to a request from outside the customer 80. Specifically, “40” is calculated by subtracting the consumption “40” in the first consumer 16a and the second group management system contract “20” from the potential “100” of the power storage system 40. Returning to FIG.

これに続いて、生成部514は、調整量要求に応答するためのメッセージを生成する。メッセージのフォーマットは図4(d)のように示され、メッセージ種別のフィールドには調整量応答が示され、データのフィールドには、第1群管理システムサーバ12aに対して蓄電システム40が提供可能な調整量「40」が示される。この調整量は、蓄電システム40が放電あるいは充電可能な値として示される。なお、放電あるいは充電可能な値は、電力量(kWh)、電力(kW)を単位として示されてもよい。また、放電は2kWまで可能であるが、充電は1.5kWまで可能であるように、調整可能量が充電側と放電側で異なってもよい。図3に戻る。生成部514は、調整量応答のメッセージを送信部516に出力する。送信部516は、調整量応答のメッセージを第1群管理システムサーバ12aに送信する。   Following this, the generation unit 514 generates a message for responding to the adjustment amount request. The message format is as shown in FIG. 4 (d), the adjustment type response is shown in the message type field, and the power storage system 40 can be provided to the first group management system server 12a in the data field. An adjustment amount “40” is indicated. This adjustment amount is indicated as a value that can be discharged or charged by the power storage system 40. In addition, the value which can be discharged or charged may be shown in units of electric energy (kWh) and electric power (kW). Moreover, although the discharge is possible up to 2 kW, the adjustable amount may be different between the charge side and the discharge side so that the charge is possible up to 1.5 kW. Returning to FIG. The generation unit 514 outputs an adjustment amount response message to the transmission unit 516. The transmission unit 516 transmits an adjustment amount response message to the first group management system server 12a.

第1群管理システムサーバ12aの受信部410は、調整量応答のメッセージを第1電力管理システムサーバ14aから受信する。これは、蓄電システム40に関する情報として、需要家80外からの要求に対する蓄電システム40の調整量に関する情報を受信することに相当する。処理部412は、メッセージ種別のフィールドをもとに調整量応答であることを認識し、データのフィールドをもとに、第1群管理システムサーバ12aに対して蓄電システム40が提供可能な調整量が「40」であることを認識する。これまで説明した処理は、第2電力管理システムサーバ14bに対しても同様になされる。そのため、処理部412は、第1群管理システムサーバ12aに対して、第1電力管理システムサーバ14aの蓄電システム40が提供可能な調整量と、第2電力管理システムサーバ14bの蓄電システム40が提供可能な調整量とを管理する。   The receiving unit 410 of the first group management system server 12a receives an adjustment amount response message from the first power management system server 14a. This is equivalent to receiving information on the amount of adjustment of the power storage system 40 in response to a request from outside the customer 80 as information on the power storage system 40. The processing unit 412 recognizes that the response is an adjustment amount response based on the message type field, and the adjustment amount that the power storage system 40 can provide to the first group management system server 12a based on the data field. Is “40”. The processing described so far is similarly performed for the second power management system server 14b. Therefore, the processing unit 412 provides the first group management system server 12a with the adjustment amount that the power storage system 40 of the first power management system server 14a can provide and the power storage system 40 of the second power management system server 14b. Manage possible adjustments.

これまでの説明において、「需要家80外からの要求に対する蓄電システム40の調整量」として、「第1群管理システムサーバ12aに対して蓄電システム40が提供可能な調整量」が調整量応答のメッセージに含まれる。調整量応答のメッセージに含まれる「需要家80外からの要求に対する蓄電システム40の調整量」は別の情報でもよい。以下では、別の情報を示す。   In the description so far, the “adjustment amount that the power storage system 40 can provide to the first group management system server 12a” is “adjustment amount of the power storage system 40 in response to a request from outside the customer 80”. Included in the message. The “adjustment amount of the power storage system 40 for a request from outside the customer 80” included in the adjustment amount response message may be other information. Other information is shown below.

(A)需要家80外からの要求に対する蓄電システム40の調整量に関する情報として、第1電力管理システムサーバ14a以外に対して蓄電システム40が提供する調整量に関する情報が使用されてもよい。前述の例の場合、これは第1需要家16a内消費「40」と第2群管理システム契約「20」とに相当する。この場合のメッセージのフォーマットは図4(e)のように示される。データのフィールドには、蓄電システム40のポテンシャル「100」と、第1電力管理システムサーバ14a以外に対して蓄電システム40が提供する調整量「40」、「20」が含まれる。第1群管理システムサーバ12aの処理部412は、蓄電システム40のポテンシャル「100」から、第1需要家16a内消費「40」と第2群管理システム契約「20」を減算することによって「40」を算出する。   (A) As the information related to the adjustment amount of the power storage system 40 in response to a request from outside the customer 80, information related to the adjustment amount provided by the power storage system 40 other than the first power management system server 14a may be used. In the case of the above example, this corresponds to the consumption “40” in the first consumer 16a and the second group management system contract “20”. The message format in this case is shown in FIG. The data field includes the potential “100” of the power storage system 40 and the adjustment amounts “40” and “20” provided by the power storage system 40 other than the first power management system server 14a. The processing unit 412 of the first group management system server 12a subtracts “40” in the first consumer 16a and the second group management system contract “20” from the potential “100” of the power storage system 40 to obtain “40”. Is calculated.

(B)需要家80外からの要求に対する蓄電システム40の調整量に関する情報として、第1電力管理システムサーバ14aからの要求に対する蓄電システム40の調整不可能量が使用されてもよい。前述の例の場合、これは、第1需要家16a内消費「40」と第2群管理システム契約「20」とを加算した「60」に相当する。この場合のメッセージのフォーマットは図4(f)のように示される。データのフィールドには、蓄電システム40のポテンシャル「100」と、第1電力管理システムサーバ14aからの要求に対する蓄電システム40の調整不可能量「60」が含まれる。第1群管理システムサーバ12aの処理部412は、蓄電システム40のポテンシャル「100」から、第1電力管理システムサーバ14aからの要求に対する蓄電システム40の調整不可能量「60」を減算することによって「40」を算出する。   (B) As the information regarding the adjustment amount of the power storage system 40 with respect to a request from outside the customer 80, an unadjustable amount of the power storage system 40 with respect to a request from the first power management system server 14a may be used. In the case of the above-described example, this corresponds to “60” obtained by adding the consumption “40” in the first consumer 16a and the second group management system contract “20”. The message format in this case is shown in FIG. The data field includes a potential “100” of the power storage system 40 and an unadjustable amount “60” of the power storage system 40 in response to a request from the first power management system server 14a. The processing unit 412 of the first group management system server 12a subtracts the uncontrollable amount “60” of the power storage system 40 for the request from the first power management system server 14a from the potential “100” of the power storage system 40. 40 "is calculated.

(C)第1電力管理システムサーバ14aは、蓄電システム40において調整不可能である場合、需要家80外からの要求に対する蓄電システム40の調整量に関する情報において、調整不可能を示してもよい。この場合のメッセージのフォーマットは図4(g)のように示される。データのフィールドには、調整不可能に関する情報が含まれる。
(D)需要家80外からの要求に対する蓄電システム40の調整量に関する情報において、蓄電システム40が充電あるいは放電を実行可能な時間が示されてもよい。この場合のメッセージのフォーマットは図4(h)のように示される。データのフィールドには、調整可能量「40」と、蓄電システム40が充電あるいは放電を実行可能な時間「12:00−14:00」が含まれる。
(C) When the power storage system 40 cannot adjust the first power management system server 14a, the first power management system server 14a may indicate that adjustment is not possible in the information regarding the adjustment amount of the power storage system 40 with respect to a request from outside the customer 80. The message format in this case is shown in FIG. The data field contains information about non-adjustment.
(D) In the information regarding the adjustment amount of the power storage system 40 in response to a request from the outside of the customer 80, a time during which the power storage system 40 can perform charging or discharging may be indicated. The message format in this case is shown in FIG. The data field includes an adjustable amount “40” and a time “12: 00-14: 00” during which the power storage system 40 can perform charging or discharging.

(E)需要家80外からの要求に対する蓄電システム40の調整量に関する情報において、蓄電システム40が充電あるいは放電を実行不可能な時間が示されてもよい。この場合のメッセージのフォーマットは図4(i)のように示される。データのフィールドには、調整不可能に関する情報と、蓄電システム40が充電あるいは放電を実行不可能な時間「12:00−14:00」が含まれる。
なお、(A)〜(E)の情報は、第2電力管理システムサーバ14bにおいて使用されてもよい。
(E) The information regarding the adjustment amount of the power storage system 40 in response to a request from outside the customer 80 may indicate a time during which the power storage system 40 cannot perform charging or discharging. The format of the message in this case is as shown in FIG. The data field includes information regarding non-adjustment and a time “12: 00-14: 00” during which the power storage system 40 cannot perform charging or discharging.
The information (A) to (E) may be used in the second power management system server 14b.

(2)調整の指示
処理部412は、上位システムサーバ10からの要求に応じて、需要家80外からの要求に対する蓄電システム40の調整量をもとに、蓄電システム40に対する要求を生成する。蓄電システム40に対する要求は、例えば、蓄電システム40における調整の要求であり、放電あるいは充電を指示する。処理部412は、蓄電システム40における調整の要求を生成部414に出力する。
(2) Adjustment Instruction The processing unit 412 generates a request for the power storage system 40 based on the adjustment amount of the power storage system 40 in response to a request from outside the customer 80 in response to a request from the host system server 10. The request for the power storage system 40 is, for example, a request for adjustment in the power storage system 40 and instructs discharging or charging. The processing unit 412 outputs a request for adjustment in the power storage system 40 to the generation unit 414.

生成部414は、蓄電システム40における調整を第1電力管理システムサーバ14aに要求するためのメッセージを生成する。図6(a)−(f)は、群管理システムサーバ12において使用される別のメッセージのフォーマットを示す。図6(a)において、メッセージ種別のフィールドには調整要求が示され、データのフィールドには放電量α増加が示される。これは、蓄電システム40からの放電の増加指示であるといえ、増加の大きさαも示されている。なお、蓄電システム40からの放電の減少指示であってもよく、減少の大きさが示されてもよい。   The generation unit 414 generates a message for requesting the first power management system server 14a to adjust the power storage system 40. FIGS. 6A to 6F show other message formats used in the group management system server 12. In FIG. 6A, an adjustment request is shown in the message type field, and an increase in the discharge amount α is shown in the data field. This is an instruction to increase the discharge from the power storage system 40, and the magnitude α of the increase is also shown. In addition, the instruction | indication of reduction of the discharge from the electrical storage system 40 may be sufficient, and the magnitude | size of reduction may be shown.

さらに、蓄電システム40における充電の増加指示あるいは減少指示であってもよく、増加あるいは減少の大きさが示されてもよい。また、調整要求のメッセージのフォーマットは図6(b)のように示されてもよい。データのフィールドには放電量α増加と「12:00−14:00」が示される。これによって、蓄電システム40が充電あるいは放電を実行すべき時間に関する情報も示される。図3に戻る。生成部414は、調整要求のメッセージを送信部416に出力する。送信部416は、調整要求のメッセージを第1電力管理システムサーバ14aに送信する。   Further, it may be an instruction to increase or decrease charging in the power storage system 40, and the magnitude of increase or decrease may be indicated. The format of the adjustment request message may be as shown in FIG. In the data field, an increase in the discharge amount α and “12: 00-14: 00” are shown. Thereby, the information regarding the time when the power storage system 40 should perform charging or discharging is also shown. Returning to FIG. The generation unit 414 outputs an adjustment request message to the transmission unit 416. The transmission unit 416 transmits an adjustment request message to the first power management system server 14a.

サービス連携部300の受信部510は、調整要求のメッセージを受信する。処理部512は、メッセージ種別のフィールドをもとに調整要求であることを認識し、データのフィールドをもとに、「放電量α増加」となるように蓄電システム40を制御することを認識する。処理部512は、制御部302を介して、「放電量α増加」となるように蓄電システム40を制御する。制御部302は、需要家16に設置された機器、例えば、スマートメータ32、太陽電池システム38、蓄電システム40との連携を実現するための処理を実行する。連携によって、制御部302は、機器から情報を収集したり、機器を制御したりする。ここで、制御部302と各機器との間の通信は、所定のプロトコルにしたがった方式でなされる。所定のプロトコルは、例えば、「ECHONET Lite」、「ECHONET」である。しかしながら、所定のプロトコルはこれらに限定されない。   The receiving unit 510 of the service cooperation unit 300 receives the adjustment request message. The processing unit 512 recognizes that the adjustment request is based on the message type field, and recognizes that the power storage system 40 is controlled so that “the discharge amount α increases” based on the data field. . The processing unit 512 controls the power storage system 40 through the control unit 302 so that “the discharge amount α increases”. The control unit 302 executes processing for realizing cooperation with devices installed in the customer 16, for example, the smart meter 32, the solar cell system 38, and the power storage system 40. Through the cooperation, the control unit 302 collects information from the device and controls the device. Here, communication between the control unit 302 and each device is performed by a method according to a predetermined protocol. The predetermined protocol is, for example, “ECHONET Lite” or “ECHONET”. However, the predetermined protocol is not limited to these.

図2における制御装置216の受信部400は、蓄電システム40における調整の要求に関するメッセージを第1電力管理システムサーバ14aから受信する。当該メッセージのフォーマットは、図4(a)と同じであってもよい。処理部402は、受信部400において受信したメッセージをもとに、蓄電システム40の動作を制御する。制御には公知の技術が使用されればよいので、ここでは説明を省略する。なお、処理部402による制御によって、蓄電システム40における調整、つまり放電あるいは充電が完了した場合、制御装置216は、調整完了のメッセージを第1電力管理システムサーバ14aに送信してもよい。図3に戻る。   The receiving unit 400 of the control device 216 in FIG. 2 receives a message regarding an adjustment request in the power storage system 40 from the first power management system server 14a. The format of the message may be the same as that in FIG. The processing unit 402 controls the operation of the power storage system 40 based on the message received by the receiving unit 400. Since a known technique may be used for the control, the description is omitted here. In addition, when adjustment in the power storage system 40, that is, discharging or charging is completed by the control of the processing unit 402, the control device 216 may transmit a message of adjustment completion to the first power management system server 14a. Returning to FIG.

処理部512における処理が完了した場合、生成部514は、蓄電システム40の制御実績を第1群管理システムサーバ12aに報告するためのメッセージを生成する。メッセージのフォーマットは図6(c)のように示される。メッセージ種別のフィールドには調整報告が示され、データのフィールドには調整完了が示される。一方、制御装置216による制御によって、蓄電システム40における調整が完了しなかった場合、生成部514は、蓄電システム40が調整不可能である通知を第1群管理システムサーバ12aに報告するためのメッセージを生成する。メッセージのフォーマットは図6(d)のように示される。データのフィールドには調整不可能が示される。   When the processing in the processing unit 512 is completed, the generation unit 514 generates a message for reporting the control performance of the power storage system 40 to the first group management system server 12a. The format of the message is shown as in FIG. An adjustment report is shown in the message type field, and the completion of adjustment is shown in the data field. On the other hand, when the adjustment in the power storage system 40 is not completed by the control by the control device 216, the generation unit 514 reports a notification that the power storage system 40 cannot be adjusted to the first group management system server 12a. Is generated. The format of the message is shown as in FIG. The data field indicates non-adjustable.

なお、制御装置216による制御によって、蓄電システム40における調整が完了しなかった場合、生成部514は、蓄電システム40が調整可能な内容を第1群管理システムサーバ12aに報告するためのメッセージを生成してもよい。メッセージのフォーマットは図6(e)−(f)のように示される。図6(e)のデータのフィールドには、調整不可能が示されるとともに、放電量βであれば可能であることが示される。なおβ<αである。図6(f)のデータのフィールドには、調整不可能が示されるとともに、15:00−17:00であれば可能であることが示される。生成部514は、調整報告のメッセージを送信部516に出力する。送信部516は、調整報告のメッセージを第1群管理システムサーバ12aに送信する。   When the adjustment in the power storage system 40 is not completed by the control by the control device 216, the generation unit 514 generates a message for reporting the contents that can be adjusted by the power storage system 40 to the first group management system server 12a. May be. The message format is shown in FIGS. 6 (e)-(f). The data field of FIG. 6 (e) indicates that adjustment is impossible and that the discharge amount β is possible. Note that β <α. The data field of FIG. 6 (f) indicates that adjustment is not possible, and that it is possible if it is 15: 00-17: 00. The generation unit 514 outputs an adjustment report message to the transmission unit 516. The transmission unit 516 transmits an adjustment report message to the first group management system server 12a.

第1群管理システムサーバ12aの受信部410は、調整報告のメッセージを第1電力管理システムサーバ14aから受信する。処理部412は、メッセージ種別のフィールドをもとに調整報告であることを認識し、データのフィールドをもとに、調整完了、調整不可能、蓄電システム40が調整可能な内容等を認識する。これまで説明した処理は、第2電力管理システムサーバ14bに対しても同様になされる。そのため、処理部412は、第1群管理システムサーバ12aと第2群管理システムサーバ12bのそれぞれに対して、蓄電システム40に対する調整を要求する。   The receiving unit 410 of the first group management system server 12a receives an adjustment report message from the first power management system server 14a. The processing unit 412 recognizes that the report is an adjustment report based on the message type field, and recognizes completion of adjustment, adjustment impossible, contents that can be adjusted by the power storage system 40, and the like based on the data field. The processing described so far is similarly performed for the second power management system server 14b. Therefore, the processing unit 412 requests adjustment of the power storage system 40 to each of the first group management system server 12a and the second group management system server 12b.

本開示における装置、システム、または方法の主体は、コンピュータを備えている。このコンピュータがプログラムを実行することによって、本開示における装置、システム、または方法の主体の機能が実現される。コンピュータは、プログラムにしたがって動作するプロセッサを主なハードウェア構成として備える。プロセッサは、プログラムを実行することによって機能を実現することができれば、その種類は問わない。プロセッサは、半導体集積回路(IC)、またはLSI(Large Scale Integration)を含む1つまたは複数の電子回路で構成される。複数の電子回路は、1つのチップに集積されてもよいし、複数のチップに設けられてもよい。複数のチップは1つの装置に集約されていてもよいし、複数の装置に備えられていてもよい。プログラムは、コンピュータが読み取り可能なROM、光ディスク、ハードディスクドライブなどの非一時的記録媒体に記録される。プログラムは、記録媒体に予め格納されていてもよいし、インターネット等を含む広域通信網を介して記録媒体に供給されてもよい。   The subject of the apparatus, system, or method in the present disclosure includes a computer. When the computer executes the program, the main function of the apparatus, system, or method according to the present disclosure is realized. The computer includes a processor that operates according to a program as a main hardware configuration. The processor may be of any type as long as the function can be realized by executing the program. The processor includes one or a plurality of electronic circuits including a semiconductor integrated circuit (IC) or an LSI (Large Scale Integration). The plurality of electronic circuits may be integrated on one chip or provided on a plurality of chips. The plurality of chips may be integrated into one device, or may be provided in a plurality of devices. The program is recorded on a non-transitory recording medium such as a ROM, an optical disk, or a hard disk drive that can be read by a computer. The program may be stored in advance in a recording medium, or may be supplied to the recording medium via a wide area communication network including the Internet.

これまでは、電力管理システムサーバ14が需要家16に配置されているとしている。しかしながら、電力管理システムサーバ14の配置はこれに限定されない。ここでは、電力管理システムサーバ14の様々な配置を説明する。図7(a)−(d)は、VPPシステム100における電力管理システムサーバ14の様々な配置を示す。図7(a)は、電力管理システムサーバ14が需要家16に配置される場合であり、これまでと同一である。図7(b)は、電力管理システムサーバ14のうちのサービス連携部300と制御部302とが別々の装置として構成され、制御部302だけが需要家16に配置され、サービス連携部300は需要家16外に配置される場合である。   Until now, it is assumed that the power management system server 14 is arranged in the customer 16. However, the arrangement of the power management system server 14 is not limited to this. Here, various arrangements of the power management system server 14 will be described. 7A to 7D show various arrangements of the power management system server 14 in the VPP system 100. FIG. FIG. 7A shows a case where the power management system server 14 is arranged in the customer 16 and is the same as before. In FIG. 7B, the service cooperation unit 300 and the control unit 302 of the power management system server 14 are configured as separate devices, and only the control unit 302 is arranged in the customer 16. This is a case where it is arranged outside the house 16.

図7(c)は、電力管理システムサーバ14が需要家16外に配置され、需要家16にGW(Gateway)20が配置される場合である。ここで、電力管理システムサーバ14とGW20が接続されるとともに、GW20には、図示しない機器が接続される。図7(d)は、電力管理システムサーバ14の機能が群管理システムサーバ12に含まれ、需要家16にGW20が配置される場合である。ここで、群管理システムサーバ12とGW20が接続されるとともに、GW20には、図示しない機器が接続される。   FIG. 7C shows a case where the power management system server 14 is arranged outside the customer 16 and a GW (Gateway) 20 is arranged in the customer 16. Here, the power management system server 14 and the GW 20 are connected, and a device (not shown) is connected to the GW 20. FIG. 7D shows a case where the function of the power management system server 14 is included in the group management system server 12 and the GW 20 is arranged at the customer 16. Here, the group management system server 12 and the GW 20 are connected, and a device (not shown) is connected to the GW 20.

以上の構成によるVPPシステム100の動作を説明する。図8は、VPPシステム100における処理手順を示すシーケンス図である。第1群管理システムサーバ12aは送信機能有無要求のメッセージを第1電力管理システムサーバ14aに送信する(S10)。第1電力管理システムサーバ14aは送信機能有無応答のメッセージを第1群管理システムサーバ12aに送信する(S12)。第1群管理システムサーバ12aは調整量要求のメッセージを第1電力管理システムサーバ14aに送信する(S14)。第1電力管理システムサーバ14aは調整量応答のメッセージを第1群管理システムサーバ12aに送信する(S16)。   The operation of the VPP system 100 configured as above will be described. FIG. 8 is a sequence diagram showing a processing procedure in the VPP system 100. The first group management system server 12a transmits a transmission function presence / absence request message to the first power management system server 14a (S10). The first power management system server 14a transmits a transmission function presence / absence response message to the first group management system server 12a (S12). The first group management system server 12a transmits an adjustment amount request message to the first power management system server 14a (S14). The first power management system server 14a transmits an adjustment amount response message to the first group management system server 12a (S16).

第1群管理システムサーバ12aは送信機能有無要求のメッセージを第2電力管理システムサーバ14bに送信する(S18)。第2電力管理システムサーバ14bは送信機能有無応答のメッセージを第1群管理システムサーバ12aに送信する(S20)。第1群管理システムサーバ12aは調整量要求のメッセージを第2電力管理システムサーバ14bに送信する(S22)。第2電力管理システムサーバ14bは調整量応答のメッセージを第1群管理システムサーバ12aに送信する(S24)。   The first group management system server 12a transmits a transmission function presence / absence request message to the second power management system server 14b (S18). The second power management system server 14b transmits a transmission function presence / absence response message to the first group management system server 12a (S20). The first group management system server 12a transmits an adjustment amount request message to the second power management system server 14b (S22). The second power management system server 14b transmits an adjustment amount response message to the first group management system server 12a (S24).

第1群管理システムサーバ12aは、調整要求のメッセージを第1電力管理システムサーバ14aに送信し(S26)、調整要求のメッセージを第2電力管理システムサーバ14bに送信する(S28)。第1電力管理システムサーバ14aは調整報告のメッセージを第1群管理システムサーバ12aに送信し(S30)、第2電力管理システムサーバ14bは調整報告のメッセージを第1群管理システムサーバ12aに送信する(S32)。   The first group management system server 12a transmits an adjustment request message to the first power management system server 14a (S26), and transmits an adjustment request message to the second power management system server 14b (S28). The first power management system server 14a transmits an adjustment report message to the first group management system server 12a (S30), and the second power management system server 14b transmits an adjustment report message to the first group management system server 12a. (S32).

本実施例によれば、電力管理システムサーバ14に要求を送信する前に、蓄電システム40に関する情報を電力管理システムサーバ14から受信するので、群管理システムサーバ12と電力管理システムサーバ14との間において蓄電システム40に関する情報を伝送できる。また、蓄電システム40に関する情報に、需要家16外からの要求に対する蓄電システム40の調整量に関する情報が含められるので、調整を指示するために必要な情報を収集できる。また、需要家16外からの要求に対する蓄電システム40の調整量に関する情報に、本群管理システムサーバ12に対して蓄電システム40が提供可能な調整量に関する情報が含められるので、処理を簡易にできる。また、需要家16外からの要求に対する蓄電システム40の調整量に関する情報に、本群管理システムサーバ12以外に対して蓄電システム40が提供する調整量に関する情報が含められるので、構成の自由度を向上できる。また、需要家16外からの要求に対する蓄電システム40の調整量に関する情報に、本群管理システムサーバ12からの要求に対する蓄電システム40の調整不可能量に関する情報が含められるので、構成の自由度を向上できる。   According to the present embodiment, the information about the power storage system 40 is received from the power management system server 14 before the request is transmitted to the power management system server 14, and therefore, between the group management system server 12 and the power management system server 14. The information regarding the power storage system 40 can be transmitted. In addition, since information related to the power storage system 40 includes information related to the adjustment amount of the power storage system 40 in response to a request from outside the consumer 16, information necessary for instructing adjustment can be collected. In addition, since the information related to the adjustment amount of the power storage system 40 in response to a request from outside the consumer 16 includes information related to the adjustment amount that the power storage system 40 can provide to the main group management system server 12, the processing can be simplified. . In addition, since the information related to the adjustment amount of the power storage system 40 in response to a request from the outside of the customer 16 includes information related to the adjustment amount provided by the power storage system 40 to other than the main group management system server 12, the degree of freedom of configuration can be increased. Can be improved. Further, since the information related to the adjustment amount of the power storage system 40 in response to a request from the outside of the customer 16 includes the information related to the non-adjustable amount of the power storage system 40 in response to the request from the main group management system server 12, the degree of freedom in configuration is improved. it can.

また、需要家16外からの要求に対する蓄電システム40の調整量に関する情報が、蓄電システム40が放電あるいは充電可能な値として示されるので、処理を簡易にできる。また、需要家16外からの要求に対する蓄電システム40の調整量に関する情報に、要求に対して調整不可能である通知が含められるので、これに続く処理を実行できる。また、需要家16外からの要求に対する蓄電システム40の調整量に関する情報に、蓄電システム40が充電あるいは放電を実行可能な時間に関する情報が含められるので、これに続く処理を実行できる。   Moreover, since the information regarding the adjustment amount of the power storage system 40 in response to a request from outside the customer 16 is indicated as a value that the power storage system 40 can be discharged or charged, the processing can be simplified. In addition, since the notification regarding the adjustment amount of the power storage system 40 with respect to the request from the outside of the consumer 16 includes the notification that the request cannot be adjusted, the subsequent processing can be executed. Moreover, since the information regarding the adjustment amount of the power storage system 40 in response to a request from the outside of the customer 16 includes information regarding the time during which the power storage system 40 can perform charging or discharging, the subsequent processing can be executed.

また、需要家16外からの要求に対する蓄電システム40の調整量に関する情報に、蓄電システム40が充電あるいは放電を実行不可能な時間に関する情報が含められるので、これに続く処理を実行できる。また、需要家16外からの要求に対する蓄電システム40の調整量に関する情報を送信する機能の有無に関する情報を受信するので、これに続く処理を実行できる。また、需要家16外からの要求に対する蓄電システム40の調整量に関する情報を送信する機能を有していることに関する情報を受信してから、蓄電システム40の調整量に関する情報を要求するための情報を送信するので、処理の効率を向上できる。また、蓄電システム40に関する情報として、需要家16外からの要求に対する蓄電システム40の調整量に関する情報を送信するので、群管理システムサーバ12と電力管理システムサーバ14との間において蓄電システム40に関する情報を伝送できる。   In addition, since the information related to the adjustment amount of the power storage system 40 in response to a request from outside the customer 16 includes information related to the time during which the power storage system 40 cannot perform charging or discharging, the subsequent processing can be executed. Moreover, since the information regarding the presence or absence of the function which transmits the information regarding the adjustment amount of the electrical storage system 40 with respect to the request | requirement from the consumer 16 outside is received, the process which follows this can be performed. In addition, information for requesting information regarding the adjustment amount of the power storage system 40 after receiving information regarding the function of transmitting information regarding the adjustment amount of the power storage system 40 in response to a request from outside the consumer 16 , The processing efficiency can be improved. Moreover, since the information regarding the adjustment amount of the electrical storage system 40 with respect to the request | requirement from the consumer 16 is transmitted as information regarding the electrical storage system 40, the information regarding the electrical storage system 40 between the group management system server 12 and the electric power management system server 14 Can be transmitted.

また、蓄電システム40に対する要求に関する情報を複数の電力管理システムサーバ14の少なくとも1つに送信するので、群管理システムサーバ12と電力管理システムサーバ14との間において蓄電システム40に関する情報を伝送できる。また、蓄電システム40に対する要求に関する情報に、蓄電システム40における調整の要求に関する情報を含めるので、蓄電システム40の調整を電力管理システムサーバ14に要求できる。また、蓄電システム40の調整が電力管理システムサーバ14に要求されるので、蓄電システム40の調整の効率を向上できる。また、蓄電システム40からの出力の増加指示あるいは減少指示に関する情報を送信するので、出力の増加あるいは減少を直接指示できる。また、蓄電システム40からの出力の増加指示あるいは減少指示に関する情報に、増加あるいは減少の大きさに関する情報を含めるので、大きさを直接指示できる。また、蓄電システム40における調整の要求に関する情報に、蓄電システム40が充電あるいは放電を実行すべき時間に関する情報を含めるので、蓄電システム40における調整の効率をさらに向上できる。   Moreover, since the information regarding the request | requirement with respect to the electrical storage system 40 is transmitted to at least 1 of the some power management system server 14, the information regarding the electrical storage system 40 can be transmitted between the group management system server 12 and the power management system server 14. Moreover, since the information regarding the request | requirement with respect to the electrical storage system 40 includes the information regarding the adjustment request | requirement in the electrical storage system 40, the adjustment of the electrical storage system 40 can be requested | required of the electric power management system server 14. FIG. In addition, since the power management system server 14 is required to adjust the power storage system 40, the efficiency of adjustment of the power storage system 40 can be improved. In addition, since the information related to the output increase instruction or the decrease instruction from the power storage system 40 is transmitted, the output increase or decrease can be directly instructed. Further, since the information related to the increase or decrease instruction of the output from the power storage system 40 includes the information related to the increase or decrease, the size can be directly specified. In addition, since the information related to the adjustment request in the power storage system 40 includes information related to the time when the power storage system 40 should perform charging or discharging, the efficiency of adjustment in the power storage system 40 can be further improved.

また、蓄電システム40の制御実績に関する情報を電力管理システムサーバ14から受信するので、蓄電システム40の動作状態を把握できる。また、蓄電システム40の動作状態が把握されるので、これに続く処理の精度を向上できる。また、蓄電システム40が調整不可能である通知を電力管理システムサーバ14から受信するので、新たな指示を実行できる。また、蓄電システム40が調整可能な内容を電力管理システムサーバ14から受信するので、新たな指示を実行できる。また、蓄電システム40に対する要求に関する情報として、蓄電システム40における調整の要求に関する情報を受信するので、群管理システムサーバ12と電力管理システムサーバ14との間において蓄電システム40に関する情報を伝送できる。また、本蓄電システム40に対する要求に関する情報として、本蓄電システム40における調整の要求に関する情報を受信するので、要求に応じた動作を制御できる。   Moreover, since the information regarding the control performance of the electrical storage system 40 is received from the power management system server 14, the operating state of the electrical storage system 40 can be grasped. Moreover, since the operation state of the electrical storage system 40 is grasped | ascertained, the precision of the process which follows this can be improved. Moreover, since the notification that the power storage system 40 cannot be adjusted is received from the power management system server 14, a new instruction can be executed. Moreover, since the content which can be adjusted by the electrical storage system 40 is received from the power management system server 14, a new instruction can be executed. Moreover, since the information regarding the request | requirement of adjustment in the electrical storage system 40 is received as information regarding the request | requirement with respect to the electrical storage system 40, the information regarding the electrical storage system 40 can be transmitted between the group management system server 12 and the electric power management system server 14. Moreover, since the information regarding the request | requirement of adjustment in this electrical storage system 40 is received as information regarding the request | requirement with respect to this electrical storage system 40, the operation | movement according to a request | requirement is controllable.

本発明の一態様の概要は、次の通りである。
[項目1−1]
蓄電システム40の動作を制御する複数の電力管理システムサーバ14に接続される群管理システムサーバ12であって、
蓄電システム40に対する要求に関する情報を生成する生成部414と、
前記生成部414において生成した情報を前記複数の電力管理システムサーバ14の少なくとも1つに送信する送信部416とを備え、
前記蓄電システム40に対する要求に関する情報は、前記蓄電システム40における調整の要求に関する情報を含むことを特徴とする群管理システムサーバ12。
The outline of one embodiment of the present invention is as follows.
[Item 1-1]
A group management system server 12 connected to a plurality of power management system servers 14 for controlling the operation of the power storage system 40;
A generating unit 414 that generates information about a request to the power storage system 40;
A transmission unit 416 that transmits the information generated in the generation unit 414 to at least one of the plurality of power management system servers 14;
The group management system server 12, wherein the information regarding the request for the power storage system 40 includes information regarding a request for adjustment in the power storage system 40.

[項目1−2]
前記蓄電システム40における調整の要求に関する情報は、前記蓄電システム40からの出力の増加指示あるいは減少指示に関する情報を含むことを特徴とする項目1−1に記載の群管理システムサーバ12。
[項目1−3]
前記蓄電システム40からの出力の増加指示あるいは減少指示に関する情報は、増加あるいは減少の大きさに関する情報を含むことを特徴とする項目1−2に記載の群管理システムサーバ12。
[項目1−4]
前記蓄電システム40における調整の要求に関する情報は、前記蓄電システム40が充電あるいは放電を実行すべき時間に関する情報を含むことを特徴とする項目1−1に記載の群管理システムサーバ12。
[Item 1-2]
The group management system server 12 according to item 1-1, wherein the information related to the adjustment request in the power storage system 40 includes information related to an increase instruction or a decrease instruction of an output from the power storage system 40.
[Item 1-3]
The group management system server 12 according to item 1-2, wherein the information related to the increase instruction or decrease instruction of the output from the power storage system 40 includes information related to the magnitude of increase or decrease.
[Item 1-4]
The group management system server 12 according to item 1-1, wherein the information related to the adjustment request in the power storage system 40 includes information related to a time at which the power storage system 40 should perform charging or discharging.

[項目1−7]
前記蓄電システム40における調整の要求に関する情報が前記送信部416から送信された後、前記蓄電システム40の制御実績に関する情報を前記電力管理システムサーバ14から受信する受信部410をさらに備えることを特徴とする項目1から5のいずれか1項に記載の群管理システムサーバ12。
[項目1−8]
前記蓄電システム40における調整の要求に関する情報が前記送信部416から送信された後、前記蓄電システム40が調整不可能である通知を前記電力管理システムサーバ14から受信する受信部410をさらに備えることを特徴とする項目1−1から1−5のいずれか1項に記載の群管理システムサーバ12。
[項目1−9]
前記蓄電システム40における調整の要求に関する情報が前記送信部416から送信された後、前記蓄電システム40が調整可能な内容を前記電力管理システムサーバ14から受信する受信部410をさらに備えることを特徴とする項目1−1から1−5のいずれか1項に記載の群管理システムサーバ12。
[Item 1-7]
The information processing apparatus further includes a receiving unit 410 that receives, from the power management system server 14, information related to a control result of the power storage system 40 after information related to an adjustment request in the power storage system 40 is transmitted from the transmission unit 416. 6. The group management system server 12 according to any one of items 1 to 5.
[Item 1-8]
It further includes a receiving unit 410 that receives from the power management system server 14 a notification that the power storage system 40 cannot be adjusted after information related to the adjustment request in the power storage system 40 is transmitted from the transmission unit 416. The group management system server 12 according to any one of items 1-1 to 1-5, which is characterized.
[Item 1-9]
The information processing apparatus further includes a receiving unit 410 that receives from the power management system server 14 contents that can be adjusted by the power storage system 40 after information related to an adjustment request in the power storage system 40 is transmitted from the transmission unit 416. The group management system server 12 according to any one of items 1-1 to 1-5.

[項目1−10]
群管理システムサーバ12に接続される複数の電力管理システムサーバ14のうちの1つの電力管理システムサーバ14であって、
蓄電システム40に対する要求に関する情報を前記群管理システムサーバ12から受信する受信部510と、
前記受信部510において受信した情報をもとに、前記蓄電システム40の動作を制御する処理部512とを備え、
前記蓄電システム40に対する要求に関する情報は、前記蓄電システム40における調整の要求に関する情報を含むことを特徴とする電力管理システムサーバ14。
[項目1−11]
群管理システムサーバ12に接続される複数の電力管理システムサーバ14のうちの1つの電力管理システムサーバ14に接続される蓄電システム40であって、
本蓄電システム40に対する要求に関する情報を前記電力管理システムサーバ14から受信する受信部400と、
前記受信部400において受信した情報をもとに、本蓄電システム40の動作を制御する処理部402とを備え、
本蓄電システム40に対する要求に関する情報は、本蓄電システム40における調整の要求に関する情報を含むことを特徴とする蓄電システム40。
[Item 1-10]
A power management system server 14 of a plurality of power management system servers 14 connected to the group management system server 12,
A receiving unit 510 that receives information related to a request to the power storage system 40 from the group management system server 12;
A processing unit 512 that controls the operation of the power storage system 40 based on the information received by the receiving unit 510;
The information regarding the request | requirement with respect to the said electrical storage system 40 contains the information regarding the request | requirement of adjustment in the said electrical storage system 40, The power management system server 14 characterized by the above-mentioned.
[Item 1-11]
A power storage system 40 connected to one of the plurality of power management system servers 14 connected to the group management system server 12,
A receiving unit 400 that receives information about a request for the power storage system 40 from the power management system server 14;
A processing unit 402 for controlling the operation of the power storage system 40 based on the information received by the receiving unit 400;
The information regarding the request for the power storage system 40 includes information regarding a request for adjustment in the power storage system 40.

[項目1−12]
蓄電システム40の動作を制御する複数の電力管理システムサーバ14に接続される群管理システムサーバ12における送信方法であって、
蓄電システム40に対する要求に関する情報を生成するステップと、
生成した情報を前記複数の電力管理システムサーバ14の少なくとも1つに送信するステップとを備え、
前記蓄電システム40に対する要求に関する情報は、前記蓄電システム40における調整の要求に関する情報を含むことを特徴とする送信方法。
[項目1−13]
蓄電システム40の動作を制御する複数の電力管理システムサーバ14に接続される群管理システムサーバ12におけるプログラムであって、
蓄電システム40に対する要求に関する情報を生成するステップと、
生成した情報を前記複数の電力管理システムサーバ14の少なくとも1つに送信するステップとを備え、
前記蓄電システム40に対する要求に関する情報は、前記蓄電システム40における調整の要求に関する情報を含むことをコンピュータに実行させるためのプログラム。
[Item 1-12]
A transmission method in the group management system server 12 connected to a plurality of power management system servers 14 that control the operation of the power storage system 40,
Generating information relating to a request to the power storage system 40;
Transmitting the generated information to at least one of the plurality of power management system servers 14,
The information regarding the request | requirement with respect to the said electrical storage system 40 contains the information regarding the request | requirement of adjustment in the said electrical storage system 40, The transmission method characterized by the above-mentioned.
[Item 1-13]
A program in the group management system server 12 connected to the plurality of power management system servers 14 for controlling the operation of the power storage system 40,
Generating information relating to a request to the power storage system 40;
Transmitting the generated information to at least one of the plurality of power management system servers 14,
A program for causing a computer to execute that information related to a request for the power storage system 40 includes information related to a request for adjustment in the power storage system 40.

[項目2−1]
需要家16に設置された蓄電システム40の動作を制御する電力管理システムサーバ14に接続される群管理システムサーバ12であって、
前記電力管理システムサーバ14に要求を送信する前に、蓄電システム40に関する情報を前記電力管理システムサーバ14から受信する受信部410と、
前記受信部410において受信した情報をもとに処理を実行する処理部412とを備え、
前記蓄電システム40に関する情報は、前記需要家16外からの要求に対する蓄電システム40の調整量に関する情報を含むことを特徴とする群管理システムサーバ12。
[項目2−2]
前記需要家16外からの要求に対する蓄電システム40の調整量に関する情報は、本群管理システムサーバ12に対して蓄電システム40が提供可能な調整量に関する情報を含むことを特徴とする項目2−1に記載の群管理システムサーバ12。
[項目2−3]
前記需要家16外からの要求に対する蓄電システム40の調整量に関する情報は、本群管理システムサーバ12以外に対して蓄電システム40が提供する調整量に関する情報を含むことを特徴とする項目2−1に記載の群管理システムサーバ12。
[項目2−4]
前記需要家16外からの要求に対する蓄電システム40の調整量に関する情報は、本群管理システムサーバ12からの要求に対する蓄電システム40の調整不可能量に関する情報を含むことを特徴とする項目2−1に記載の群管理システムサーバ12。
[Item 2-1]
A group management system server 12 connected to a power management system server 14 that controls the operation of a power storage system 40 installed in a consumer 16,
A receiver 410 that receives information about the power storage system 40 from the power management system server 14 before transmitting a request to the power management system server 14;
A processing unit 412 that executes processing based on information received by the receiving unit 410;
The group management system server 12, wherein the information related to the power storage system 40 includes information related to an adjustment amount of the power storage system 40 in response to a request from outside the consumer 16.
[Item 2-2]
The information on the adjustment amount of the power storage system 40 in response to a request from outside the consumer 16 includes information on the adjustment amount that the power storage system 40 can provide to the main group management system server 12. The group management system server 12 described in the above.
[Item 2-3]
The information regarding the adjustment amount of the power storage system 40 in response to a request from outside the consumer 16 includes information regarding the adjustment amount provided by the power storage system 40 to other than the main group management system server 12. The group management system server 12 described in the above.
[Item 2-4]
Item 2-1 characterized in that the information related to the adjustment amount of the power storage system 40 in response to a request from the outside of the customer 16 includes information related to an unadjustable amount of the power storage system 40 in response to a request from the main group management system server 12. The group management system server 12 described.

[項目2−5]
前記需要家16外からの要求に対する蓄電システム40の調整量に関する情報は、蓄電システム40が放電あるいは充電可能な値として示されることを特徴とする項目2−1から2−4のいずれか1項に記載の群管理システムサーバ12。
[項目2−6]
前記需要家16外からの要求に対する蓄電システム40の調整量に関する情報は、要求に対して調整不可能である通知を含むことを特徴とする項目2−1から2−5のいずれか1項に記載の群管理システムサーバ12。
[項目2−7]
前記需要家16外からの要求に対する蓄電システム40の調整量に関する情報は、前記蓄電システム40が充電あるいは放電を実行可能な時間に関する情報を含むことを特徴とする項目2−1から2−6のいずれか1項に記載の群管理システムサーバ12。
[Item 2-5]
Any one of items 2-1 to 2-4, wherein the information related to the adjustment amount of the power storage system 40 in response to a request from outside the customer 16 is indicated as a value that allows the power storage system 40 to be discharged or charged. The group management system server 12 described in the above.
[Item 2-6]
Any one of items 2-1 to 2-5, wherein the information related to the adjustment amount of the power storage system 40 with respect to a request from outside the consumer 16 includes a notification that the request cannot be adjusted. The group management system server 12 described.
[Item 2-7]
Items 2-1 to 2-6, wherein the information related to the adjustment amount of the power storage system 40 in response to a request from outside the customer 16 includes information related to a time during which the power storage system 40 can perform charging or discharging. The group management system server 12 according to any one of the above.

[項目2−8]
前記需要家16外からの要求に対する蓄電システム40の調整量に関する情報は、前記蓄電システム40が充電あるいは放電を実行不可能な時間に関する情報を含むことを特徴とする項目2−1から2−6のいずれか1項に記載の群管理システムサーバ12。
[項目2−11]
前記受信部410は、前記需要家16外からの要求に対する蓄電システム40の調整量に関する情報を送信する機能の有無に関する情報を前記電力管理システムサーバ14から受信することを特徴とする項目2−1から2−10のいずれかに記載の群管理システムサーバ12。
[項目2−12]
前記受信部410において、前記需要家16外からの要求に対する蓄電システム40の調整量に関する情報を送信する機能を有していることに関する情報を受信してから、前記需要家16外からの要求に対する蓄電システム40の調整量に関する情報を要求するための情報を送信する送信部416をさらに備えることを特徴とする項目2−11に記載の群管理システムサーバ12。
[Item 2-8]
Items 2-1 to 2-6, wherein the information related to the adjustment amount of the power storage system 40 in response to a request from outside the customer 16 includes information related to a time during which the power storage system 40 cannot perform charging or discharging. The group management system server 12 according to any one of the above.
[Item 2-11]
The receiving unit 410 receives, from the power management system server 14, information related to the presence or absence of a function for transmitting information related to the adjustment amount of the power storage system 40 in response to a request from outside the customer 16. To the group management system server 12 according to any one of 2-10.
[Item 2-12]
The receiving unit 410 receives information related to having a function of transmitting information related to the adjustment amount of the power storage system 40 in response to a request from outside the consumer 16, and then responds to a request from outside the consumer 16. Item 13. The group management system server 12 according to Item 2-11, further comprising a transmission unit 416 that transmits information for requesting information on the adjustment amount of the power storage system 40.

[項目2−15]
需要家16に設置された蓄電システム40の動作を制御するとともに、群管理システムサーバ12に接続される電力管理システムサーバ14であって、
蓄電システム40に関する情報を生成する生成部514と、
前記生成部514において生成した情報を前記群管理システムサーバ12に送信する送信部516とを備え、
前記蓄電システム40に関する情報は、前記需要家16外からの要求に対する前記蓄電システム40の調整量に関する情報を含むことを特徴とする電力管理システムサーバ14。
[項目2−16]
需要家16に設置された蓄電システム40の動作を制御する電力管理システムサーバ14に接続される群管理システムサーバ12における受信方法あって、
前記電力管理システムサーバ14に要求を送信する前に、蓄電システム40に関する情報を前記電力管理システムサーバ14から受信するステップと、
受信した情報をもとに処理を実行するステップとを備え、
前記蓄電システム40に関する情報は、前記需要家16外からの要求に対する蓄電システム40の調整量に関する情報を含むことを特徴とする受信方法。
[項目2−17]
需要家16に設置された蓄電システム40の動作を制御する電力管理システムサーバ14に接続される群管理システムサーバ12におけるプログラムあって、
前記電力管理システムサーバ14に要求を送信する前に、蓄電システム40に関する情報を前記電力管理システムサーバ14から受信するステップと、
受信した情報をもとに処理を実行するステップとを備え、
前記蓄電システム40に関する情報は、前記需要家16外からの要求に対する蓄電システム40の調整量に関する情報を含むことをコンピュータに実行させるためのプログラム。
[Item 2-15]
A power management system server 14 that controls the operation of the power storage system 40 installed in the consumer 16 and is connected to the group management system server 12.
A generating unit 514 that generates information regarding the power storage system 40;
A transmission unit 516 that transmits the information generated in the generation unit 514 to the group management system server 12;
The power management system server 14, wherein the information related to the power storage system 40 includes information related to an adjustment amount of the power storage system 40 in response to a request from outside the consumer 16.
[Item 2-16]
There is a reception method in the group management system server 12 connected to the power management system server 14 that controls the operation of the power storage system 40 installed in the consumer 16,
Receiving information about the power storage system 40 from the power management system server 14 before transmitting a request to the power management system server 14;
And executing a process based on the received information,
The information regarding the said electrical storage system 40 contains the information regarding the adjustment amount of the electrical storage system 40 with respect to the request | requirement from the said consumer 16 outside, The receiving method characterized by the above-mentioned.
[Item 2-17]
There is a program in the group management system server 12 connected to the power management system server 14 that controls the operation of the power storage system 40 installed in the consumer 16,
Receiving information about the power storage system 40 from the power management system server 14 before transmitting a request to the power management system server 14;
And executing a process based on the received information,
The program for making a computer perform the information regarding the said electrical storage system 40 including the information regarding the adjustment amount of the electrical storage system 40 with respect to the request | requirement from the said consumer 16 outside.

(実施例2)
次に、実施例2を説明する。実施例2は、実施例1と同様にVPPに関する。実施例2は、調整量応答のメッセージに含まれる「需要家80外からの要求に対する蓄電システム40の調整量」に関する情報の別の例を説明する。実施例2に係るVPPシステム100、需要家16、第1群管理システムサーバ12a、第1電力管理システムサーバ14a、第2電力管理システムサーバ14bの構成は図1、図2、図3と同様のタイプである。ここでは、実施例1との差異を中心に説明する。
(Example 2)
Next, Example 2 will be described. The second embodiment relates to VPP as in the first embodiment. In the second embodiment, another example of information related to “the adjustment amount of the power storage system 40 with respect to a request from outside the customer 80” included in the adjustment amount response message will be described. The configurations of the VPP system 100, the customer 16, the first group management system server 12a, the first power management system server 14a, and the second power management system server 14b according to the second embodiment are the same as those in FIGS. Type. Here, it demonstrates centering on the difference with Example 1. FIG.

図9(a)−(b)は、実施例2に係る電力管理システムサーバ14の処理概要を示す。図9(a)は、電力管理システムサーバ14によって管理される蓄電システム40の放電と充電の概要を示す。ここでは、放電も充電もしてない状態を原点「0」とし、原点から上に向く方向を「放電」とし、原点から下に向く方向を「充電」とする。また、放電において上に行くほど放電量が増加し、充電において下に行くほど充電量が増加する。放電量が「X1」の状態において放電量を増加することは、「X1」の状態から上に進むことに相当し、放電量が「X1」の状態において放電量を減少することは、「X1」の状態から下に進むことに相当する。また、充電量が「Y1」の状態において充電量を減少することは、「Y1」の状態から上に進むことに相当し、充電量が「Y1」の状態において充電量を増加することは、「Y1」の状態から下に進むことに相当する。   FIGS. 9A to 9B illustrate an outline of processing performed by the power management system server 14 according to the second embodiment. FIG. 9A shows an outline of discharging and charging of the power storage system 40 managed by the power management system server 14. Here, a state in which neither discharge nor charging is performed is defined as an origin “0”, a direction upward from the origin is “discharge”, and a direction downward from the origin is “charge”. Further, the discharge amount increases as it goes upward in discharging, and the charge amount increases as it goes down in charging. Increasing the discharge amount when the discharge amount is “X1” corresponds to progressing upward from the “X1” state, and decreasing the discharge amount when the discharge amount is “X1” indicates that “X1” Is equivalent to proceeding downward from the state of "." Further, decreasing the charge amount when the charge amount is “Y1” corresponds to proceeding upward from the “Y1” state, and increasing the charge amount when the charge amount is “Y1” This corresponds to proceeding downward from the state of “Y1”.

電力系統30の電力が逼迫する場合、放電量が「X1」の状態であれば、放電量を増加することが好ましい。また、電力系統30の電力が逼迫する場合、充電量が「Y1」の状態であれば、充電量を減少することが好ましい。つまり、このような状況において、上に進むように、放電量を増加することと充電量を減少することとは、同様の効果を有する。そのため、電力系統30の電力が逼迫する場合に、放電量を増加できなければ、充電量を減少させればよいことになる。一方、充電量を減少できなければ、放電量を増加させればよいことになる。   When the power of the power system 30 is tight, it is preferable to increase the discharge amount if the discharge amount is in the state of “X1”. In addition, when the power of the power system 30 is tight, it is preferable to reduce the charge amount if the charge amount is in the “Y1” state. That is, in such a situation, increasing the discharge amount and decreasing the charge amount so as to progress upward have the same effect. Therefore, when the power of the power system 30 is tight, if the discharge amount cannot be increased, the charge amount may be decreased. On the other hand, if the charge amount cannot be decreased, the discharge amount may be increased.

また、電力系統30の電力が余る場合、放電量が「X1」の状態であれば、放電量を減少することが好ましい。また、電力系統30の電力が余る場合、充電量が「Y1」の状態であれば、充電量を増加することが好ましい。つまり、このような状況において、下に進むように、放電量を減少することと充電量を増加することとは、同様の効果を有する。そのため、電力系統30の電力が余る場合に、放電量を減少できなければ、充電量を増加させればよいことになる。一方、充電量を増加できなければ、放電量を減少させればよいことになる。   Moreover, when the electric power of the electric power grid | system 30 is surplus, if the discharge amount is a state of "X1," it is preferable to reduce the discharge amount. Moreover, when the electric power of the electric power grid | system 30 is surplus, if a charge amount is a state of "Y1," it is preferable to increase a charge amount. That is, in such a situation, decreasing the discharge amount and increasing the charge amount so as to proceed downward have the same effect. Therefore, if the electric power of the electric power system 30 remains, if the discharge amount cannot be reduced, the charge amount may be increased. On the other hand, if the charge amount cannot be increased, the discharge amount may be decreased.

このような状況を図3の第1群管理システムサーバ12aに知らせるために、サービス連携部300の生成部514は、調整量要求に応答するためのメッセージを生成する。図10(a)−(d)は、実施例2に係る群管理システムサーバ12において使用されるメッセージのフォーマットを示す。図10(a)においてメッセージ種別のフィールドには調整量応答が示され、データのフィールドには、充電量Aは減少可能であるが、放電量は増加不可能であることが示される。また、図10(b)において、データのフィールドには、放電量Bは減少可能であるが、充電量は増加不可能であることが示される。これらより、需要家80外からの要求に対する蓄電システム40の調整量に関する情報は、蓄電システム40が充電可能であるか否かに関する情報と、蓄電システム40が放電可能であるか否かに関する情報であるといえる。   In order to notify the first group management system server 12a in FIG. 3 of such a situation, the generation unit 514 of the service cooperation unit 300 generates a message for responding to the adjustment amount request. 10A to 10D show message formats used in the group management system server 12 according to the second embodiment. In FIG. 10A, the message type field indicates an adjustment amount response, and the data field indicates that the charge amount A can be reduced, but the discharge amount cannot be increased. In FIG. 10B, the data field indicates that the discharge amount B can be reduced, but the charge amount cannot be increased. Accordingly, the information regarding the adjustment amount of the power storage system 40 in response to a request from outside the customer 80 is information regarding whether or not the power storage system 40 can be charged and information regarding whether or not the power storage system 40 can be discharged. It can be said that there is.

図9(b)は、電力管理システムサーバ14によって管理される需要家16における売電と買電の概要を示す。これまで説明した放電は、売電が増えること、あるいは買電が減ることに相当する。例えば、負荷36の消費電力が3kWであり、太陽電池システム38での発電が0kWであることによって、買電が3kWである場合に、放電すれば買電が減る。また、負荷36の消費電力が1kWであり、太陽電池システム38での発電が2kWであることによって、売電が1kWである場合に、放電すれば売電が増える。同様に、充電は、売電が減ること、あるいは買電が増えることに相当する。そのため、電力系統30の電力が逼迫する場合に、売電量を増加できなければ、買電量を減少させればよいことになる。一方、買電量を減少できなければ、売電量を増加させればよいことになる。また、電力系統30の電力が余る場合に、売電量を減少できなければ、買電量を増加させればよいことになる。一方、買電量を増加できなければ、売電量を減少させればよいことになる。   FIG. 9B shows an outline of power selling and power purchase in the customer 16 managed by the power management system server 14. The discharge described so far corresponds to an increase in power sales or a decrease in power purchase. For example, if the power consumption of the load 36 is 3 kW and the power generation in the solar cell system 38 is 0 kW, and the power purchase is 3 kW, the power purchase will be reduced if it is discharged. In addition, since the power consumption of the load 36 is 1 kW and the power generation in the solar cell system 38 is 2 kW, when the power sale is 1 kW, the power sale increases if it is discharged. Similarly, charging corresponds to a decrease in power sales or an increase in power purchase. Therefore, when the power of the power system 30 is tight, if the amount of power sold cannot be increased, the amount of power purchased may be decreased. On the other hand, if the amount of power purchased cannot be reduced, the amount of power sold may be increased. In addition, when the power of the power system 30 is surplus, if the amount of power sold cannot be reduced, the amount of power purchased may be increased. On the other hand, if the power purchase amount cannot be increased, the power sale amount may be decreased.

このような状況を図3の第1群管理システムサーバ12aに知らせるために、サービス連携部300の生成部514は、調整量要求に応答するためのメッセージを生成する。図10(c)においてデータのフィールドには、買電量Cは減少可能であるが、売電量は増加不可能であることが示される。また、図10(d)において、データのフィールドには、売電量Dは減少可能であるが、買電量は増加不可能であることが示される。これらより、需要家80外からの要求に対する蓄電システム40の調整量に関する情報は、需要家16が買電可能であるか否かに関する情報と、需要家16が売電可能であるか否かに関する情報であるといえる。   In order to notify the first group management system server 12a in FIG. 3 of such a situation, the generation unit 514 of the service cooperation unit 300 generates a message for responding to the adjustment amount request. In FIG. 10C, the data field indicates that the power purchase amount C can be reduced, but the power sale amount cannot be increased. In FIG. 10D, the data field indicates that the power sale amount D can be reduced, but the power purchase amount cannot be increased. From these, the information regarding the adjustment amount of the power storage system 40 in response to a request from outside the customer 80 relates to information about whether or not the customer 16 can purchase power and whether or not the customer 16 can sell power. It can be said that it is information.

図3のサービス連携部300の生成部514は、調整量応答のメッセージを送信部516に出力する。送信部516は、調整量応答のメッセージを第1群管理システムサーバ12aに送信する。第1群管理システムサーバ12aの受信部410は、調整量応答のメッセージを第1電力管理システムサーバ14aから受信する。処理部412は、データのフィールドに含まれた情報をもとに、蓄電システム40に対する要求を生成する。   The generation unit 514 of the service cooperation unit 300 in FIG. 3 outputs an adjustment amount response message to the transmission unit 516. The transmission unit 516 transmits an adjustment amount response message to the first group management system server 12a. The receiving unit 410 of the first group management system server 12a receives an adjustment amount response message from the first power management system server 14a. The processing unit 412 generates a request for the power storage system 40 based on information included in the data field.

本実施例によれば、蓄電システム40が充電可能であるか否かに関する情報と、前記蓄電システム40が放電可能であるか否かに関する情報とを受信するので、蓄電システム40の状態を詳細に知ることができる。また、蓄電システム40の状態を詳細に知るので、蓄電システム40に対する制御の精度を向上できる。また、需要家16が買電可能であるか否かに関する情報と、需要家16が売電可能であるか否かに関する情報とを受信するので、需要家16の状態を詳細に知ることができる。また、蓄電システム40の状態を詳細に知るので、蓄電システム40に対する制御の精度を向上できる。   According to this embodiment, the information regarding whether or not the power storage system 40 can be charged and the information regarding whether or not the power storage system 40 can be discharged are received. I can know. Further, since the state of the power storage system 40 is known in detail, the control accuracy for the power storage system 40 can be improved. Moreover, since the information regarding whether the consumer 16 can purchase power and the information regarding whether the consumer 16 can sell power are received, the state of the consumer 16 can be known in detail. . Further, since the state of the power storage system 40 is known in detail, the control accuracy for the power storage system 40 can be improved.

本発明の一態様の概要は、次の通りである。
[項目2−9]
前記需要家16外からの要求に対する蓄電システム40の調整量に関する情報は、前記蓄電システム40が充電可能であるか否かに関する情報と、前記蓄電システム40が放電可能であるか否かに関する情報とを含むことを特徴とする項目2−1から2−8のいずれか1項に記載の群管理システムサーバ12。
[項目2−10]
前記需要家16外からの要求に対する蓄電システム40の調整量に関する情報は、前記需要家16が買電可能であるか否かに関する情報と、前記需要家16が売電可能であるか否かに関する情報とを含むことを特徴とする項目2−1から2−8のいずれか1項に記載の群管理システムサーバ12。
The outline of one embodiment of the present invention is as follows.
[Item 2-9]
Information on the adjustment amount of the power storage system 40 in response to a request from outside the customer 16 includes information on whether or not the power storage system 40 can be charged, and information on whether or not the power storage system 40 can be discharged. The group management system server 12 according to any one of items 2-1 to 2-8, including:
[Item 2-10]
The information regarding the adjustment amount of the power storage system 40 in response to a request from outside the consumer 16 relates to information about whether or not the consumer 16 can purchase power and whether or not the consumer 16 can sell power. The group management system server 12 according to any one of items 2-1 to 2-8, including information.

(実施例3)
次に、実施例3を説明する。実施例3は、これまでと同様にVPPに関する。電力管理システムは、電力需要の変動に応じて、需要家に設置された蓄電システム等の電力の消費量あるいは供給量を変更可能な機器を制御する。ここで、電力系統における電力需要の変動は、変動周期が互いに異なった微少変動分、短周期成分、長周期成分の合成によって示される。なお、これらの合成の割合は状況に応じて異なる。一方、機器における電力の変動速度、つまり電力の消費量あるいは供給量を変更する速度は、機器の種類に応じて異なる。そのため、電力需要の変動に適した機器を制御すべきある。例えば、電力需要の変動において変動周期の短い微少変動分が支配的である場合、電力の変動速度が高速な機器を制御すべきである。
Example 3
Next, Example 3 will be described. Example 3 relates to VPP as before. The power management system controls devices that can change the power consumption or supply amount, such as a power storage system installed in a consumer, in accordance with fluctuations in power demand. Here, the fluctuation in the power demand in the power system is indicated by the combination of the minute fluctuation, the short-period component, and the long-period component having different fluctuation periods. Note that the ratio of these synthesis varies depending on the situation. On the other hand, the fluctuation speed of the power in the device, that is, the speed of changing the power consumption or supply amount varies depending on the type of the device. Therefore, equipment suitable for fluctuations in power demand should be controlled. For example, when a minute fluctuation with a short fluctuation cycle is dominant in fluctuations in power demand, a device with a high power fluctuation speed should be controlled.

このような制御を可能にするために、実施例3に係る電力管理システムは、変動量応答のメッセージを送信する場合に、各機器における電力の変動速度に関するメッセージも送信する。実施例3に係るVPPシステム100、需要家16、第1群管理システムサーバ12a、第1電力管理システムサーバ14a、第2電力管理システムサーバ14bの構成は図1、図2、図3と同様のタイプである。ここでは、これまでとの差異を中心に説明する。   In order to enable such control, the power management system according to the third embodiment also transmits a message regarding the power fluctuation speed in each device when transmitting the fluctuation amount response message. The configurations of the VPP system 100, the customer 16, the first group management system server 12a, the first power management system server 14a, and the second power management system server 14b according to the third embodiment are the same as those in FIGS. Type. Here, it demonstrates centering on the difference from before.

図11は、実施例3における電力需要の変動を示す。横軸は時間を示し、縦軸は電力需要を示す。微少変動分700は数十秒程度の変動周期を有し、短周期成分702は数分程度の変動周期を有し、長周期成分704は数十分程度の変動周期を有する。つまり、微少変動分700の変動周期が最も短く、長周期成分704の変動周期が最も長い。総需要変動706は実際の電力需要の変動であり、微少変動分700から長周期成分704の合成によって示される。なお、総需要変動706における微少変動分700から長周期成分704の合成の割合は状況に応じて異なる。例えば、微少変動分700が支配的になることもあれば、長周期成分704が支配的になることもある。   FIG. 11 shows fluctuations in power demand in the third embodiment. The horizontal axis indicates time, and the vertical axis indicates power demand. The minute fluctuation 700 has a fluctuation period of about several tens of seconds, the short period component 702 has a fluctuation period of about several minutes, and the long period component 704 has a fluctuation period of about several tens of minutes. That is, the fluctuation period of the minute fluctuation 700 is the shortest, and the fluctuation period of the long-period component 704 is the longest. The total demand fluctuation 706 is an actual power demand fluctuation, and is indicated by combining the long period component 704 from the minute fluctuation 700. Note that the ratio of the combination of the long period component 704 to the minute fluctuation 700 in the total demand fluctuation 706 varies depending on the situation. For example, the minute fluctuation 700 may be dominant, and the long period component 704 may be dominant.

図12は、実施例3に係る電力管理システムサーバ14において定義される変動速度を示す。機器における電力の変動速度に関する情報は、変動速度に応じて複数段階規定される。ここでは、ガバナ・フリー機能、自動周波数制御機能、運転基準集力制御機能の3段階が規定される。また、ガバナ・フリー機能には値「1」が対応づけられ、自動周波数制御機能には値「2」が対応づけられ、運転基準出力制御機能には値「3」が対応づけられる。なお、ガバナ・フリー機能、自動周波数制御機能、運転基準集力制御機能については説明を省略するが、ガバナ・フリー方式による電力の変動速度は、前述の微少変動分700にも追従可能である。自動周波数制御方式による電力の変動速度は、ガバナ・フリー方式による電力の変動速度よりも遅く、短周期成分702に追従可能であるが、微少変動分700に追従不可能である。運転基準出力制御方式による電力の変動速度は、自動周波数制御方式による電力の変動速度よりも遅く、長周期成分704に追従可能であるが、短周期成分702に追従不可能である。   FIG. 12 shows the fluctuation speed defined in the power management system server 14 according to the third embodiment. Information relating to the fluctuation speed of power in the device is defined in a plurality of stages according to the fluctuation speed. Here, three stages are defined: a governor free function, an automatic frequency control function, and an operation reference power collection control function. Further, the value “1” is associated with the governor free function, the value “2” is associated with the automatic frequency control function, and the value “3” is associated with the operation reference output control function. The governor-free function, the automatic frequency control function, and the operation reference power collection control function are not described here, but the power fluctuation speed according to the governor-free system can follow the minute fluctuation 700 described above. The fluctuation speed of the electric power by the automatic frequency control method is slower than the fluctuation speed of the electric power by the governor-free method, and can follow the short period component 702, but cannot follow the minute fluctuation 700. The power fluctuation speed according to the operation reference output control system is slower than the power fluctuation speed according to the automatic frequency control system, and can follow the long-period component 704 but cannot follow the short-period component 702.

図3の第1群管理システムサーバ12aの生成部414は、蓄電システム40における電力の変動速度を第1電力管理システムサーバ14aに要求するためのメッセージを生成する。このメッセージは、例えば、調整量要求のメッセージを生成するタイミングに近いタイミングで生成される。メッセージのフォーマットは、図4(a)と同様である。メッセージ種別のフィールドには変動速度要求が示され、データのフィールドには変動速度が示される。生成部414は、変動速度要求のメッセージを送信部416に出力する。送信部416は、調整要求のメッセージを第1電力管理システムサーバ14aに送信する。   The generation unit 414 of the first group management system server 12a in FIG. 3 generates a message for requesting the first power management system server 14a for the power fluctuation rate in the power storage system 40. This message is generated at a timing close to the timing of generating the adjustment amount request message, for example. The message format is the same as in FIG. The message type field indicates the variable speed request, and the data field indicates the variable speed. The generation unit 414 outputs a variable speed request message to the transmission unit 416. The transmission unit 416 transmits an adjustment request message to the first power management system server 14a.

サービス連携部300の受信部510は、変動速度要求のメッセージを受信する。処理部512は、メッセージ種別のフィールドをもとに変動速度要求であることを認識し、データのフィールドをもとに、蓄電システム40の変動速度を通知すべきであることを認識する。これに続いて、生成部514は、変動速度要求に応答するためのメッセージを生成する。   The receiving unit 510 of the service cooperation unit 300 receives the message of the fluctuation speed request. The processing unit 512 recognizes that the request is for a changing speed based on the message type field, and recognizes that the changing speed of the power storage system 40 should be notified based on the data field. Following this, the generation unit 514 generates a message for responding to the variable speed request.

図13(a)−(d)は、実施例3に係る群管理システムサーバ12において使用されるメッセージのフォーマットを示す。図13(a)において、メッセージ種別のフィールドには変動速度応答が示される。データのフィールドには、第1電力管理システムサーバ14aに接続された蓄電システム40の変動速度に関する情報が示される。蓄電システム40に、ガバナ・フリー機能、自動周波数制御機能、運転基準集力制御機能がいずれも備えられていれば、データのフィールドには「1、2、3」が示される。つまり、データのフィールドに「1」があるか否かはガバナ・フリー機能の有無を示しており、「2」があるか否かは自動周波数制御機能の有無を示しており、「3」があるか否かは運転基準出力制御機能の有無を示す。   FIGS. 13A to 13D show message formats used in the group management system server 12 according to the third embodiment. In FIG. 13A, the message type field indicates a variable speed response. In the data field, information on the fluctuation speed of the power storage system 40 connected to the first power management system server 14a is shown. If the power storage system 40 is provided with a governor free function, an automatic frequency control function, and an operation reference power collection control function, “1, 2, 3” is displayed in the data field. That is, whether or not “1” is present in the data field indicates the presence or absence of the governor free function, and whether or not “2” is present indicates the presence or absence of the automatic frequency control function, and “3” indicates Whether or not it exists indicates the presence or absence of an operation reference output control function.

ここで、データのフィールドに複数の値が挿入される場合、データのフィールドには、複数段階のそれぞれに対する優先順位に関する情報も含まれてもよい。前述のごとく、蓄電システム40は、ガバナ・フリー機能、自動周波数制御機能、運転基準集力制御機能がいずれも備えられているとする。ここで、変動速度が速い機能を使用するほどVPPから得られる報酬が多くなるとの契約がVPPとの間でなされている場合、蓄電システム40のガバナ・フリー機能が優先して使用されるべきである。これに対応するために、データのフィールドには優先順位に関する情報も含まれる。例えば、図13(b)のごとく、値「1」の後に優先順位「(1)」が追加される。一方、変動速度の遅い機能を優先的に使用させたい場合、値「3」の後に優先順位「(1)」が追加される。   Here, when a plurality of values are inserted into the data field, the data field may also include information regarding the priority order for each of the plurality of stages. As described above, it is assumed that the power storage system 40 is provided with a governor-free function, an automatic frequency control function, and an operation reference power collection control function. Here, when a contract is made with the VPP that the reward obtained from the VPP increases as the function having a higher fluctuation speed is used, the governor-free function of the power storage system 40 should be used with priority. is there. In order to cope with this, the data field also includes information on the priority order. For example, as shown in FIG. 13B, the priority “(1)” is added after the value “1”. On the other hand, when it is desired to preferentially use a function with a slow fluctuation speed, the priority “(1)” is added after the value “3”.

図13(c)は、蓄電システム40に、自動周波数制御機能、運転基準集力制御機能が備えられている場合の変動速度応答のメッセージのフォーマットを示す。データのフィールドには「2、3」が示される。図13(d)は、蓄電システム40に、運転基準集力制御機能だけが備えられている場合の変動速度応答のメッセージのフォーマットを示す。データのフィールドには「3」が示される。   FIG. 13C shows the format of a variable speed response message when the power storage system 40 is provided with an automatic frequency control function and an operation reference power collection control function. “2, 3” is shown in the data field. FIG. 13 (d) shows a message format of the fluctuation speed response when the power storage system 40 is provided with only the operation reference power collection control function. “3” is shown in the data field.

生成部514は、変動速度応答のメッセージを送信部516に出力する。送信部516は、変動速度応答のメッセージを第1群管理システムサーバ12aに送信する。第1群管理システムサーバ12aの受信部410は、変動速度応答のメッセージを第1電力管理システムサーバ14aから受信する。処理部412は、データのフィールドに含まれた情報をもとに、蓄電システム40に対する要求を生成する。   The generation unit 514 outputs a variable speed response message to the transmission unit 516. The transmission unit 516 transmits a variable speed response message to the first group management system server 12a. The receiving unit 410 of the first group management system server 12a receives a variable speed response message from the first power management system server 14a. The processing unit 412 generates a request for the power storage system 40 based on information included in the data field.

本実施例によれば、蓄電システム40における電力の変動速度に関する情報が含まれたメッセージを受信するので、蓄電システム40における電力の変動速度を収集できる。蓄電システム40における電力の変動速度が収集されるので、電力需要の変動速度に適した制御を実行できる。また、蓄電システム40における電力の変動速度に関する情報は、ガバナ・フリー機能の有無に関する情報を含むので、微少変動分700に対応できるか否かを認識できる。また、蓄電システム40における電力の変動速度に関する情報は、自動周波数制御機能の有無に関する情報を含むので、短周期成分702に対応できるか否かを認識できる。また、蓄電システム40における電力の変動速度に関する情報は、運転基準出力制御機能の有無に関する情報を含むので、長周期成分704に対応できるか否かを認識できる。   According to this embodiment, since the message including the information regarding the power fluctuation speed in the power storage system 40 is received, the power fluctuation speed in the power storage system 40 can be collected. Since the fluctuation speed of power in the power storage system 40 is collected, control suitable for the fluctuation speed of power demand can be executed. Moreover, since the information regarding the power fluctuation speed in the power storage system 40 includes information regarding the presence or absence of the governor-free function, it can be recognized whether or not the minute fluctuation 700 can be handled. Moreover, since the information regarding the power fluctuation speed in the power storage system 40 includes information regarding the presence or absence of the automatic frequency control function, it can be recognized whether or not the short period component 702 can be handled. Moreover, since the information regarding the fluctuation speed of the electric power in the electrical storage system 40 includes information regarding the presence or absence of the operation reference output control function, it can be recognized whether or not the long-period component 704 can be handled.

また、蓄電システム40における電力の変動速度に関する情報は、変動速度に応じて規定された複数段階の少なくとも1つを示すので、メッセージに含まれるデータ量を低減できる。また、蓄電システム40における電力の変動速度に関する情報は、複数段階のそれぞれに対する優先順位に関する情報を含むので、優先的に使用させたい蓄電システム40を知らせることができる。   Moreover, since the information regarding the power fluctuation speed in the power storage system 40 indicates at least one of a plurality of stages defined according to the speed of fluctuation, the amount of data included in the message can be reduced. Moreover, since the information regarding the fluctuation speed of the electric power in the power storage system 40 includes information regarding the priority order for each of the plurality of stages, it is possible to notify the power storage system 40 to be preferentially used.

本発明の一態様の概要は、次の通りである。
[項目2−13]
前記蓄電システム40に関する情報は、前記蓄電システム40における電力の変動速度に関する情報を含むことを特徴とする項目2−1に記載の群管理システムサーバ12。
[項目2−14]
前記蓄電システム40に関する情報は、前記蓄電システム40における電力の変動速度の優先順位に関する情報を含むことを特徴とする項目2−13に記載の群管理システムサーバ12。
The outline of one embodiment of the present invention is as follows.
[Item 2-13]
The group management system server 12 according to item 2-1, wherein the information related to the power storage system 40 includes information related to a power fluctuation speed in the power storage system 40.
[Item 2-14]
The group management system server 12 according to Item 2-13, wherein the information related to the power storage system 40 includes information related to a priority order of power fluctuation rates in the power storage system 40.

(実施例4)
次に、実施例4を説明する。実施例4は、これまでと同様にVPPに関する。これまで、調整要求のメッセージにおけるデータのフィールドに、蓄電システム40が充電あるいは放電を実行すべき時間に関する情報が示される場合を説明した。しかしながら、蓄電システム40が充電あるいは放電を実行すべき時間ではなく、蓄電システム40が充電あるいは放電を実行可能な時間を含めてもよい。この場合、充電あるいは放電を実際に実行する時間は、電力管理システムサーバ14によって決定される。このように電力管理システムサーバ14が自律的に動作する場合、予定よりも多くの数の電力管理システムサーバ14が蓄電システム40に放電を実行させる状況も発生しうる。そのような状況の発生を抑制するために、群管理システムサーバ12は、電力管理システムサーバ14に対して、蓄電システム40に放電を禁止させることを指示する。実施例4に係るVPPシステム100、需要家16、第1群管理システムサーバ12a、第1電力管理システムサーバ14a、第2電力管理システムサーバ14bの構成は図1、図2、図3と同様のタイプである。ここでは、これまでとの差異を中心に説明する。
(Example 4)
Next, Example 4 will be described. Example 4 relates to VPP as before. So far, the description has been given of the case where the data field in the adjustment request message indicates information related to the time when the power storage system 40 should perform charging or discharging. However, not the time when the power storage system 40 should perform charging or discharging, but the time during which the power storage system 40 can perform charging or discharging may be included. In this case, the time for actually executing charging or discharging is determined by the power management system server 14. When the power management system server 14 operates autonomously in this manner, a situation may occur in which a larger number of power management system servers 14 than planned cause the power storage system 40 to perform discharge. In order to suppress the occurrence of such a situation, the group management system server 12 instructs the power management system server 14 to prohibit the power storage system 40 from discharging. The configurations of the VPP system 100, the customer 16, the first group management system server 12a, the first power management system server 14a, and the second power management system server 14b according to the fourth embodiment are the same as those in FIGS. Type. Here, it demonstrates centering on the difference from before.

図3の生成部414は、蓄電システム40における調整を第1電力管理システムサーバ14aに要求するためのメッセージを生成する。図14(a)−(c)は、実施例4に係る群管理システムサーバ12において使用されるメッセージのフォーマットを示す。図14(a)において、メッセージ種別のフィールドには調整要求が示され、データのフィールドには放電量α可能と「12:00−18:00のうちの1時間」が示される。これによって、蓄電システム40が充電あるいは放電を実行可能な時間も示される。図14(b)−(c)は後述し、図3に戻る。生成部414は、調整要求のメッセージを送信部416に出力する。送信部416は、調整要求のメッセージを第1電力管理システムサーバ14aに送信する。   The generation unit 414 in FIG. 3 generates a message for requesting the first power management system server 14a to adjust the power storage system 40. FIGS. 14A to 14C show message formats used in the group management system server 12 according to the fourth embodiment. In FIG. 14A, the message type field indicates an adjustment request, and the data field indicates a discharge amount α possible and “1 hour from 12:00 to 18:00”. This also indicates the time during which the power storage system 40 can perform charging or discharging. FIGS. 14B to 14C will be described later, and the description returns to FIG. The generation unit 414 outputs an adjustment request message to the transmission unit 416. The transmission unit 416 transmits an adjustment request message to the first power management system server 14a.

サービス連携部300の受信部510は、調整要求のメッセージを受信する。処理部512は、メッセージ種別のフィールドをもとに調整要求であることを認識し、データのフィールドをもとに、「12:00−18:00のうちの1時間」において「放電量α可能」であることを認識する。処理部512は、制御部302を介して、蓄電システム40等から予め収集した情報をもとに、例えば13:00から放電を開始することを決定する。これに続いて、生成部514は、調整開始を知らせるためのメッセージを生成する。   The receiving unit 510 of the service cooperation unit 300 receives the adjustment request message. The processing unit 512 recognizes that the adjustment request is based on the message type field, and based on the data field, “discharge amount α is possible in“ 1 hour from 12:00 to 18:00 ”. ”. The processing unit 512 determines to start discharging from, for example, 13:00 based on information collected in advance from the power storage system 40 or the like via the control unit 302. Following this, the generation unit 514 generates a message for informing the start of adjustment.

メッセージのフォーマットは図14(b)のように示され、メッセージ種別のフィールドには調整開始が示され、データのフィールドには、13:00から放電が開始されることが示される。そのため、調整開始のメッセージには、充電あるいは放電の実行開始に関する情報が含まれる。ここでは、説明を明瞭にするために、放電の実行開始を一例として説明するが、充電の実行開始でも同様の処理がなされればよい。図3に戻る。生成部514は、調整開始のメッセージを送信部516に出力する。送信部516は、調整開始のメッセージを第1群管理システムサーバ12aに送信する。   The message format is shown in FIG. 14B, the message type field indicates the start of adjustment, and the data field indicates that the discharge starts from 13:00. For this reason, the adjustment start message includes information related to the start of charging or discharging. Here, in order to clarify the explanation, the execution start of discharge will be described as an example, but the same processing may be performed even at the start of charge execution. Returning to FIG. The generation unit 514 outputs an adjustment start message to the transmission unit 516. The transmission unit 516 transmits an adjustment start message to the first group management system server 12a.

第1群管理システムサーバ12aの受信部410は、調整開始のメッセージを第1電力管理システムサーバ14aから受信する。処理部412は、メッセージ種別のフィールドをもとに調整開始であることを認識し、データのフィールドをもとに、13:00から放電が開始されることを認識する。これまで説明した処理は、第2電力管理システムサーバ14b等に対しても同様になされる。そのため、処理部412は、複数の電力管理システムサーバ14から放電の実行開始に関する情報を取得する。ここで、同一の時間帯に放電を実行する蓄電システム40の数がしきい値よりも多い場合に、不要な放電を抑制するために、処理部412は、少なくとも1つの電力管理システムサーバ14に放電の実行を禁止させることを決定する。例えば、調整量応答のメッセージの受信時刻が遅い方の電力管理システムサーバ14から順に、放電を実行禁止させるための電力管理システムサーバ14が選択される。   The receiving unit 410 of the first group management system server 12a receives an adjustment start message from the first power management system server 14a. The processing unit 412 recognizes that the adjustment is started based on the message type field, and recognizes that the discharge is started from 13:00 based on the data field. The processing described so far is similarly performed on the second power management system server 14b and the like. Therefore, the processing unit 412 acquires information related to the start of discharge from the plurality of power management system servers 14. Here, when the number of power storage systems 40 that perform discharge in the same time zone is larger than the threshold value, the processing unit 412 sends at least one power management system server 14 to suppress unnecessary discharge. Decide to prohibit the discharge. For example, the power management system server 14 for prohibiting the discharge is selected in order from the power management system server 14 having the later reception time of the adjustment amount response message.

生成部414は、充電あるいは放電を実行禁止させるためのメッセージを生成する。メッセージのフォーマットは図14(c)のように示され、メッセージ種別のフィールドには調整要求が示され、データのフィールドには放電禁止が示される。なお、充電を禁止させる場合には、データのフィールドに充電禁止が示される。図3に戻る。生成部414は、調整要求のメッセージを送信部416に出力する。送信部416は、処理部412において選択された電力管理システムサーバ14に対して、調整要求のメッセージを送信する。これを受信した電力管理システムサーバ14は放電を実行しない。   The generation unit 414 generates a message for prohibiting execution of charging or discharging. The format of the message is shown as in FIG. 14C, an adjustment request is shown in the message type field, and discharge prohibition is shown in the data field. When charging is prohibited, charging is prohibited in the data field. Returning to FIG. The generation unit 414 outputs an adjustment request message to the transmission unit 416. The transmission unit 416 transmits an adjustment request message to the power management system server 14 selected by the processing unit 412. Receiving this, the power management system server 14 does not perform discharging.

以上の構成によるVPPシステム100の動作を説明する。図15は、実施例4に係るVPPシステム100における処理手順を示すシーケンス図である。第1群管理システムサーバ12aは調整要求のメッセージを第1電力管理システムサーバ14aに送信する(S50)。第1群管理システムサーバ12aは調整要求のメッセージを第2電力管理システムサーバ14bに送信する(S52)。第1群管理システムサーバ12aは調整要求のメッセージを第3電力管理システムサーバ14cに送信する(S54)。   The operation of the VPP system 100 configured as above will be described. FIG. 15 is a sequence diagram illustrating a processing procedure in the VPP system 100 according to the fourth embodiment. The first group management system server 12a transmits an adjustment request message to the first power management system server 14a (S50). The first group management system server 12a transmits an adjustment request message to the second power management system server 14b (S52). The first group management system server 12a transmits an adjustment request message to the third power management system server 14c (S54).

第1電力管理システムサーバ14aは調整開始のメッセージを第1群管理システムサーバ12aに送信する(S56)。第2電力管理システムサーバ14bは調整開始のメッセージを第1群管理システムサーバ12aに送信する(S58)。第3電力管理システムサーバ14cは調整開始のメッセージを第1群管理システムサーバ12aに送信する(S60)。第1群管理システムサーバ12aは調整要求(禁止)のメッセージを第3電力管理システムサーバ14cに送信する(S62)。第1電力管理システムサーバ14aは調整報告のメッセージを第1群管理システムサーバ12aに送信する(S64)。第2電力管理システムサーバ14bは調整報告のメッセージを第1群管理システムサーバ12aに送信する(S66)。   The first power management system server 14a transmits an adjustment start message to the first group management system server 12a (S56). The second power management system server 14b transmits an adjustment start message to the first group management system server 12a (S58). The third power management system server 14c transmits an adjustment start message to the first group management system server 12a (S60). The first group management system server 12a transmits an adjustment request (prohibition) message to the third power management system server 14c (S62). The first power management system server 14a transmits an adjustment report message to the first group management system server 12a (S64). The second power management system server 14b transmits an adjustment report message to the first group management system server 12a (S66).

本実施例によれば、蓄電システム40における調整の要求に関する情報に、蓄電システム40が充電あるいは放電を実行可能な時間に関する情報を含めるので、充電あるいは放電を実行する時間を蓄電システム40に決めさせることができる。また、充電あるいは放電を実行する時間を蓄電システム40に決めさせるので、蓄電システム40にとって都合のよいタイミングに充電あるいは放電を実行させることができる。また、充電あるいは放電の実行開始に関する情報を受信するので、蓄電システム40が充電あるいは放電を実行するタイミングを知ることができる。また、同一のタイミングにおいて、充電あるいは放電を実行開始する蓄電システム40が多ければ、充電あるいは放電の実行禁止に関する情報を送信するので、充電あるいは放電を実行する蓄電システム40の数が多くなりすぎることを抑制できる。   According to the present embodiment, the information related to the adjustment request in the power storage system 40 includes information related to the time during which the power storage system 40 can perform charging or discharging, so that the power storage system 40 determines the time for performing charging or discharging. be able to. In addition, since the power storage system 40 determines the time for executing charging or discharging, the charging or discharging can be executed at a timing convenient for the power storage system 40. Moreover, since the information regarding the start of execution of charging or discharging is received, it is possible to know the timing at which the power storage system 40 executes charging or discharging. In addition, if there are many power storage systems 40 that start charging or discharging at the same timing, information on prohibition of charging or discharging is transmitted, so that the number of power storage systems 40 that perform charging or discharging becomes too large. Can be suppressed.

本発明の一態様の概要は、次の通りである。
[項目1−5]
前記蓄電システム40における調整の要求に関する情報は、前記蓄電システム40が充電あるいは放電を実行可能な時間に関する情報を含むことを特徴とする項目1−1に記載の群管理システムサーバ12。
[項目1−6]
前記蓄電システム40が充電あるいは放電を実行可能な時間に関する情報が前記送信部416から送信された後、充電あるいは放電の実行開始に関する情報を前記電力管理システムサーバ14から受信する受信部410をさらに備え、
前記送信部416は、前記充電あるいは放電の実行開始に関する情報の内容に応じて、充電あるいは放電の実行禁止に関する情報を前記電力管理システムサーバ14に送信することを特徴とする項目1−5に記載の群管理システムサーバ12。
The outline of one embodiment of the present invention is as follows.
[Item 1-5]
The group management system server 12 according to item 1-1, wherein the information related to the adjustment request in the power storage system 40 includes information related to a time during which the power storage system 40 can perform charging or discharging.
[Item 1-6]
The information processing apparatus further includes a receiving unit 410 that receives information related to the start of execution of charging or discharging from the power management system server 14 after information related to the time when the power storage system 40 can perform charging or discharging is transmitted from the transmitting unit 416. ,
Item 1-5, wherein the transmission unit 416 transmits information on prohibition of execution of charging or discharging to the power management system server 14 in accordance with the content of information on the start of execution of charging or discharging. Group management system server 12.

以上、本発明を実施例をもとに説明した。この実施例は例示であり、それらの各構成要素あるいは各処理プロセスの組合せにいろいろな変形例が可能なこと、またそうした変形例も本発明の範囲にあることは当業者に理解されるところである。   In the above, this invention was demonstrated based on the Example. This embodiment is an exemplification, and it will be understood by those skilled in the art that various modifications can be made to each of those constituent elements or combinations of processing processes, and such modifications are also within the scope of the present invention. .

実施例3において、機器における電力の変動速度に関する情報として、ガバナ・フリー機能、自動周波数制御機能、運転基準集力制御機能の3段階が規定される。しかしながらこれに限らず例えば、3段階の内容はこれに限定されず、さらに3段階とは異なった数の段階が規定されてもよい。あるいは複数の段階が規定されず、機器における電力の変動速度が直接示されてもよい。本変形例によれば、構成の自由度を拡張できる。   In the third embodiment, three stages of a governor-free function, an automatic frequency control function, and an operation reference power collection control function are defined as information regarding the power fluctuation speed in the device. However, the present invention is not limited to this. For example, the contents of the three stages are not limited to this, and a number of stages different from the three stages may be defined. Alternatively, a plurality of stages may not be defined, and the power fluctuation speed in the device may be directly indicated. According to this modification, the degree of freedom of configuration can be expanded.

10 上位システムサーバ、 12 群管理システムサーバ(群管理システム)、 14 電力管理システムサーバ(電力管理システム)、 16 需要家、 18 ネットワーク、 20 GW、 30 電力系統、 32 スマートメータ、 34 分電盤、 36 負荷、 38 太陽電池システム、 40 蓄電システム、 42 配電線、 100 VPPシステム、 200 PV、 202 PV用DC/DC、 204 PV用DC/AC、 210 SB、 212 SB用DC/DC、 214 双方向DC/ACインバータ、 216 制御装置、 300 サービス連携部、 302 制御部、 400 受信部、 402 処理部、 410 受信部、 412 処理部、 414 生成部、 416 送信部、 510 受信部、 512 処理部、 514 生成部、 516 送信部。   10 host system server, 12 group management system server (group management system), 14 power management system server (power management system), 16 customer, 18 network, 20 GW, 30 power system, 32 smart meter, 34 distribution board, 36 load, 38 solar cell system, 40 power storage system, 42 distribution line, 100 VPP system, 200 PV, 202 DC / DC for PV, 204 DC / AC for PV, 210 SB, 212 DC / DC for SB, 214 bidirectional DC / AC inverter, 216 control device, 300 service cooperation unit, 302 control unit, 400 reception unit, 402 processing unit, 410 reception unit, 412 processing unit, 414 generation unit, 416 transmission unit, 510 reception unit, 512 processing unit, 51 4 generator, 516 transmitter.

Claims (13)

蓄電システムの動作を制御する複数の電力管理システムに接続される群管理システムであって、
蓄電システムに対する要求に関する情報を生成する生成部と、
前記生成部において生成した情報を前記複数の電力管理システムの少なくとも1つに送信する送信部とを備え、
前記蓄電システムに対する要求に関する情報は、前記蓄電システムにおける調整の要求に関する情報を含むことを特徴とする群管理システム。
A group management system connected to a plurality of power management systems for controlling the operation of the power storage system,
A generator for generating information related to a request for the power storage system;
A transmission unit that transmits information generated in the generation unit to at least one of the plurality of power management systems;
The group management system, wherein the information related to the request for the power storage system includes information related to a request for adjustment in the power storage system.
前記蓄電システムにおける調整の要求に関する情報は、前記蓄電システムからの出力の増加指示あるいは減少指示に関する情報を含むことを特徴とする請求項1に記載の群管理システム。   The group management system according to claim 1, wherein the information related to the adjustment request in the power storage system includes information related to an increase instruction or a decrease instruction of an output from the power storage system. 前記蓄電システムからの出力の増加指示あるいは減少指示に関する情報は、増加あるいは減少の大きさに関する情報を含むことを特徴とする請求項2に記載の群管理システム。   The group management system according to claim 2, wherein the information related to the increase instruction or the decrease instruction of the output from the power storage system includes information related to the magnitude of the increase or decrease. 前記蓄電システムにおける調整の要求に関する情報は、前記蓄電システムが充電あるいは放電を実行すべき時間に関する情報を含むことを特徴とする請求項1に記載の群管理システム。   The group management system according to claim 1, wherein the information related to the adjustment request in the power storage system includes information related to a time at which the power storage system should perform charging or discharging. 前記蓄電システムにおける調整の要求に関する情報は、前記蓄電システムが充電あるいは放電を実行可能な時間に関する情報を含むことを特徴とする請求項1に記載の群管理システム。   The group management system according to claim 1, wherein the information related to the adjustment request in the power storage system includes information related to a time during which the power storage system can perform charging or discharging. 前記蓄電システムが充電あるいは放電を実行可能な時間に関する情報が前記送信部から送信された後、充電あるいは放電の実行開始に関する情報を前記電力管理システムから受信する受信部をさらに備え、
前記送信部は、前記充電あるいは放電の実行開始に関する情報の内容に応じて、充電あるいは放電の実行禁止に関する情報を前記電力管理システムに送信することを特徴とする請求項5に記載の群管理システム。
After the information related to the time when the power storage system can perform charging or discharging is transmitted from the transmission unit, the information processing system further includes a receiving unit that receives information about the start of execution of charging or discharging from the power management system,
6. The group management system according to claim 5, wherein the transmission unit transmits information on prohibition of execution of charging or discharging to the power management system in accordance with the content of information on the start of execution of charging or discharging. .
前記蓄電システムにおける調整の要求に関する情報が前記送信部から送信された後、前記蓄電システムの制御実績に関する情報を前記電力管理システムから受信する受信部をさらに備えることを特徴とする請求項1から5のいずれか1項に記載の群管理システム。   6. The information processing apparatus according to claim 1, further comprising: a receiving unit that receives, from the power management system, information related to a control result of the power storage system after information related to an adjustment request in the power storage system is transmitted from the transmission unit. The group management system according to any one of the above. 前記蓄電システムにおける調整の要求に関する情報が前記送信部から送信された後、前記蓄電システムが調整不可能である通知を前記電力管理システムから受信する受信部をさらに備えることを特徴とする請求項1から5のいずれか1項に記載の群管理システム。   The information processing apparatus according to claim 1, further comprising: a receiving unit that receives, from the power management system, a notification that the power storage system cannot be adjusted after information related to an adjustment request in the power storage system is transmitted from the transmission unit. The group management system according to any one of 1 to 5. 前記蓄電システムにおける調整の要求に関する情報が前記送信部から送信された後、前記蓄電システムが調整可能な内容を前記電力管理システムから受信する受信部をさらに備えることを特徴とする請求項1から5のいずれか1項に記載の群管理システム。   6. The information processing apparatus according to claim 1, further comprising: a receiving unit that receives, from the power management system, information that can be adjusted by the power storage system after information related to a request for adjustment in the power storage system is transmitted from the transmission unit. The group management system according to any one of the above. 群管理システムに接続される複数の電力管理システムのうちの1つの電力管理システムであって、
蓄電システムに対する要求に関する情報を前記群管理システムから受信する受信部と、
前記受信部において受信した情報をもとに、前記蓄電システムの動作を制御する処理部とを備え、
前記蓄電システムに対する要求に関する情報は、前記蓄電システムにおける調整の要求に関する情報を含むことを特徴とする電力管理システム。
One power management system of a plurality of power management systems connected to the group management system,
A receiving unit that receives information on a request for the power storage system from the group management system;
Based on the information received in the receiving unit, a processing unit that controls the operation of the power storage system,
The information regarding the request | requirement with respect to the said electrical storage system contains the information regarding the request | requirement of adjustment in the said electrical storage system.
群管理システムに接続される複数の電力管理システムのうちの1つの電力管理システムに接続される蓄電システムであって、
本蓄電システムに対する要求に関する情報を前記電力管理システムから受信する受信部と、
前記受信部において受信した情報をもとに、本蓄電システムの動作を制御する処理部とを備え、
本蓄電システムに対する要求に関する情報は、本蓄電システムにおける調整の要求に関する情報を含むことを特徴とする蓄電システム。
A power storage system connected to one of the plurality of power management systems connected to the group management system,
A receiving unit for receiving information on a request for the power storage system from the power management system;
Based on the information received in the receiving unit, a processing unit for controlling the operation of the power storage system,
The information regarding the request | requirement with respect to this electrical storage system contains the information regarding the request | requirement of adjustment in this electrical storage system, The electrical storage system characterized by the above-mentioned.
蓄電システムの動作を制御する複数の電力管理システムに接続される群管理システムにおける送信方法であって、
蓄電システムに対する要求に関する情報を生成するステップと、
生成した情報を前記複数の電力管理システムの少なくとも1つに送信するステップとを備え、
前記蓄電システムに対する要求に関する情報は、前記蓄電システムにおける調整の要求に関する情報を含むことを特徴とする送信方法。
A transmission method in a group management system connected to a plurality of power management systems that control the operation of a power storage system,
Generating information about a request for a storage system;
Transmitting the generated information to at least one of the plurality of power management systems,
The information regarding the request | requirement with respect to the said electrical storage system contains the information regarding the request | requirement of adjustment in the said electrical storage system, The transmission method characterized by the above-mentioned.
蓄電システムの動作を制御する複数の電力管理システムに接続される群管理システムにおけるプログラムであって、
蓄電システムに対する要求に関する情報を生成するステップと、
生成した情報を前記複数の電力管理システムの少なくとも1つに送信するステップとを備え、
前記蓄電システムに対する要求に関する情報は、前記蓄電システムにおける調整の要求に関する情報を含むことをコンピュータに実行させるためのプログラム。
A program in a group management system connected to a plurality of power management systems that control the operation of a power storage system,
Generating information about a request for a storage system;
Transmitting the generated information to at least one of the plurality of power management systems,
A program for causing a computer to execute that information related to a request for the power storage system includes information related to a request for adjustment in the power storage system.
JP2017113244A 2017-06-08 2017-06-08 Group control system, power management system, power storage system, transmission method, program Pending JP2018207721A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
JP2017113244A JP2018207721A (en) 2017-06-08 2017-06-08 Group control system, power management system, power storage system, transmission method, program
PCT/JP2018/018575 WO2018225457A1 (en) 2017-06-08 2018-05-14 Group management system, power management system, power storage system, transmission method and program

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2017113244A JP2018207721A (en) 2017-06-08 2017-06-08 Group control system, power management system, power storage system, transmission method, program

Publications (1)

Publication Number Publication Date
JP2018207721A true JP2018207721A (en) 2018-12-27

Family

ID=64567432

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2017113244A Pending JP2018207721A (en) 2017-06-08 2017-06-08 Group control system, power management system, power storage system, transmission method, program

Country Status (2)

Country Link
JP (1) JP2018207721A (en)
WO (1) WO2018225457A1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020090881A1 (en) 2018-11-02 2020-05-07 昭和電工株式会社 Oil-in-water-type skin external agent

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US9263893B2 (en) * 2011-02-25 2016-02-16 Panasonic Intellectual Property Management Co., Ltd. Electricity storage device, electricity storage control method, management device, management method, and electricity storage system
JP6420188B2 (en) * 2015-03-17 2018-11-07 積水化学工業株式会社 Power management system, power management method and program
JP6520462B2 (en) * 2015-06-26 2019-05-29 株式会社明電舎 Operation plan creation device for distributed energy system and operation plan creation method
JP6585454B2 (en) * 2015-10-02 2019-10-02 株式会社日立製作所 Power demand management apparatus and power demand management method for communication equipment

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2020090881A1 (en) 2018-11-02 2020-05-07 昭和電工株式会社 Oil-in-water-type skin external agent

Also Published As

Publication number Publication date
WO2018225457A1 (en) 2018-12-13

Similar Documents

Publication Publication Date Title
US9489701B2 (en) Adaptive energy management system
US20130166084A1 (en) System, method and controller for managing and controlling a micro-grid
Colson et al. Improving sustainability of hybrid energy systems part II: Managing multiple objectives with a multiagent system
JP2014103704A (en) Control method, control program and control device
KR20160098883A (en) Control device for eneregy storage system and opreating method thereof
WO2018225458A1 (en) Group management system, power management system, receiving method and program
JP5917292B2 (en) Power management apparatus, power management system, and power management method
WO2020012834A1 (en) Control system and control method
WO2018225457A1 (en) Group management system, power management system, power storage system, transmission method and program
WO2018225456A1 (en) Power management system, apparatus, reception method, and program
JP2019118211A (en) Control command system
WO2019117071A1 (en) Group management system, power control device, transmission method, and program
JP7108876B2 (en) Group management system, power control device, transmission method, program
WO2018225455A1 (en) Power management system, power storage system, transmission method, and program
JP7117546B2 (en) Power control device, power control method
JP7016060B2 (en) Control system, control method, program
WO2019131227A1 (en) Power control device, power control method, and program
WO2020012835A1 (en) Control system and control method
JP2018207629A (en) Power management system, fuel cell system, reception method and program
JP7065393B2 (en) Power control device, power control method, program
JP6827205B2 (en) Group management system, power control device, power storage system
WO2021053871A1 (en) Control system and control method
JPWO2018052117A1 (en) POWER MANAGEMENT METHOD, POWER MANAGEMENT SERVER, LOCAL CONTROL DEVICE, AND POWER MANAGEMENT SYSTEM
JP6807550B2 (en) Power management system, power conversion system, program
Guo et al. Stochastic optimal scheduling for DC-linked multi-microgrids in distribution networks

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20180417