retaining wall
floor board
floor
support
bleacher seat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2016139142A
Other languages
Japanese (ja)
Other versions
JP6478947B2 (en
Inventor
キヨシ 若林
Kiyoshi Wakabayashi
キヨシ 若林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Luxe & Design Co Ltd
Original Assignee
Luxe & Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Luxe & Design Co Ltd filed Critical Luxe & Design Co Ltd
Priority to JP2016139142A priority Critical patent/JP6478947B2/en
Publication of JP2018009374A publication Critical patent/JP2018009374A/en
Application granted granted Critical
Publication of JP6478947B2 publication Critical patent/JP6478947B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a repair structure of the bleachers, a repair method of the bleachers and a component for bleacher repair in which a burden can be reduced temporally, economically and environmentally concerning the bleachers of a structure including a forward retaining wall and a rearward retaining wall on a slope.SOLUTION: A repair structure 100 of the bleachers includes an erection body 101 erected between a forward retaining wall 91 and a rearward retaining wall 92. The erection body 101 is constituted of a first erection body 102 formed by extending a body part 102b in the direction being perpendicular from a plate-like mounting part 102a, and a second erection body 103 formed by extending two plate-like connection parts 103b in the direction being perpendicular from a plate-like mounting part 103a. The second erection body 103 is configured such that a mounting position can be adjusted to the body part 102b of the first erection body 102. The erection body 101 is provided by making two floor plate struts 106 stand up on the body part 102b, and these two floor plate struts 106 support a floor plate 94 through a floor plate support 110.SELECTED DRAWING: Figure 1

Description

本発明は、傾斜した土地の斜面上に設けた観覧席の改修に用いられる観覧席の改修構造、観覧席の改修方法および観覧席改修用部品に関する。   The present invention relates to a structure for repairing a bleacher seat used for repairing a bleacher seat provided on a slope of an inclined land, a method for repairing a bleacher seat, and a part for repairing a bleacher seat.

従来から、モータスポーツを行うサーキット、スポーツ競技を行う運動場または演劇を行う演劇場などにおいては、多数の観客が座って観覧するための観覧席(スタンド)が設けられている。近年、使用期間が所定の年月に達して改修工事が必要な観覧席が散見されるようになっている。この場合、観覧席の改修工事には、多大な時間およびコストが必要になるため、観覧席の既存の構成部分のうちで引き続き使用可能な部分については可能な限り引き続き使用に供することが時間的、経済的および環境負荷的な負担を軽減する上で極めて好ましい。   2. Description of the Related Art Conventionally, in a circuit for performing motor sports, an athletic field for performing sports competitions, or a theater for performing theaters, a seat (stand) for a large number of spectators to sit and view has been provided. In recent years, the use period has reached a predetermined date, and some bleachers need to be repaired. In this case, the renovation work for the bleachers requires a lot of time and cost, so it is time-consuming to continue to use as much of the existing components of the seats as possible. It is extremely preferable in reducing the burden on the economy and the environment.

近年、改修工事が必要な観覧席として、図8および図9にそれぞれ示すような傾斜地における斜面に形成された観覧席90がある。この観覧席90は、傾斜地における斜面の傾斜方向(図示矢印方向)に対して直交する方向に沿って互いに平行に延びるコンクリート製の前方擁壁91および後方擁壁92上に床板94が設けられるとともに、この床板94上に複数の座席95が設けられて構成されている。この場合、前方擁壁91および後方擁壁92は、前記傾斜方向に延びるコンクリート製の連結壁93によって所定の間隔を介して互いに連結されており、平面視で格子形状を構成している(図9参照)。なお、図9においては、床板94の図示を省略している。   In recent years, there is a bleacher seat 90 formed on a slope on an inclined ground as shown in FIGS. 8 and 9 as a bleacher seat that requires renovation work. The bleacher seat 90 is provided with a floor plate 94 on a concrete front retaining wall 91 and a rear retaining wall 92 that extend in parallel to each other along a direction orthogonal to an inclination direction (an arrow direction in the drawing) of an inclined surface on an inclined ground. A plurality of seats 95 are provided on the floor plate 94. In this case, the front retaining wall 91 and the rear retaining wall 92 are connected to each other at a predetermined interval by a concrete connecting wall 93 extending in the inclined direction, and form a lattice shape in plan view (FIG. 9). In addition, illustration of the floor board 94 is abbreviate | omitted in FIG.

そして、このような斜面に前方擁壁91および後方擁壁92を備える構造の観覧席の改修工事についても時間的、経済的および環境負荷的に負担の少ない改修方法が望まれるが、現時点において適当な改修方法具は提案されていない。このような背景から、本発明の発明者は、斜面に前方擁壁91および後方擁壁92を備える構造の観覧席について時間的、経済的および環境負荷的に負担の軽減できる観覧席改修用部品および観覧席の改修方法を新たに見出したものである。したがって、記載すべき先行技術文献はない。   And, for the renovation work of the bleacher seat having the structure including the front retaining wall 91 and the rear retaining wall 92 on such a slope, a repair method with less burden on time, economy and environmental load is desired. No renovation tool has been proposed. In view of such a background, the inventor of the present invention is a seat repair part that can reduce the burden in terms of time, economics, and environmental load on a seat with a structure including a front retaining wall 91 and a rear retaining wall 92 on a slope. And a new method for renovating bleachers. Therefore, there is no prior art document to be described.

本発明は上記問題に対処するためなされたもので、その目的は、斜面に前方擁壁および後方擁壁を備える構造の観覧席について時間的、経済的および環境負荷的に負担の軽減できる観覧席の改修構造、観覧席の改修方法および観覧席改修用部品を提供することにある。   The present invention has been made to cope with the above-mentioned problems, and the purpose of the present invention is to provide a bleacher seat that can reduce the burden in terms of time, economy, and environmental load regarding a bleacher seat having a front retaining wall and a rear retaining wall on a slope. It is to provide a renovation structure, a method for renovating a bleacher, and a part for renovating a bleacher.

上記目的を達成するため、本発明の特徴は、斜面の傾斜方向に対して直交する方向に沿って互いに平行に延びる前方擁壁および後方擁壁上に床板が設けられるとともに同床板上に複数の座席が設けられた構成の既存の観覧席を改修した観覧席の改修構造であって、前方擁壁および後方擁壁の各壁面間に地面から浮いた状態で架設される架設体と、架設体に支持されて床板を下方から支持する床板支柱とを備えることにある。   In order to achieve the above object, a feature of the present invention is that a floor plate is provided on a front retaining wall and a rear retaining wall that extend in parallel to each other along a direction orthogonal to the inclination direction of the slope, and a plurality of floor plates are provided on the floor plate. A renovation structure of a bleacher seat, which is a modification of an existing bleacher seat with a seat, and is constructed between a front retaining wall and a rear retaining wall in a state of floating from the ground, and a construction body And a floor board column that supports the floor board from below.

このように構成した本発明の特徴によれば、観覧席の改修構造は、前方擁壁および後方擁壁の各壁面間に架設されて床板を支える架設体を備えているため、既存の構造体である前方擁壁および後方擁壁を有効活用して観覧席を改修することができ改修工事に掛かる時間的、経済的および環境負荷的な負担を軽減することができる。また、本発明に係る観覧席の改修構造は、架設体が前方擁壁および後方擁壁の各壁面間に浮いた状態で設けられて床板を支持するため、前方擁壁と後方擁壁との間の床面または地面の地耐力が脆弱であっても前方擁壁および後方擁壁を活かして観覧席を改修することができる。   According to the feature of the present invention configured as described above, the retrofitting structure of the bleacher seat includes an erected body that is constructed between the front retaining wall and the rear retaining wall and supports the floor plate. The front retaining wall and the rear retaining wall can be effectively utilized to repair the bleachers, and the time, economical and environmental burdens for the repair work can be reduced. In addition, the retrofitting structure of the bleacher seat according to the present invention is provided in a state where the installation body is floated between the respective walls of the front retaining wall and the rear retaining wall to support the floor plate. Even if the floor surface or the ground bearing capacity between them is weak, the bleachers can be renovated using the front retaining wall and the rear retaining wall.

また、本発明の他の特徴は、前記観覧席の改修構造において、さらに、床板支柱と床板との間に設けられて前方擁壁および後方擁壁に沿って延びて床板を支持する床板支持体を備え、床板支持体は、同床板支持体の下方に複数配置された架設体からそれぞれ延びる床板支柱によって支持されていることにある。   Another feature of the present invention is that in the retrofit structure for the auditorium, a floor plate support that is provided between the floor column support and the floor plate and extends along the front retaining wall and the rear retaining wall to support the floor plate. The floorboard support is supported by floorboard struts respectively extending from a plurality of installation bodies arranged below the floorboard support.

このように構成した本発明の他の特徴によれば、観覧席の改修構造は、複数の架設体からそれぞれ延びる床板支柱が床板支持体にそれぞれ連結されているため、各床板支柱の高さ調整および床板への連結作業が容易になるとともに調整作業を正確に行うことができる。また、床板支持体は、前方擁壁および後方擁壁に沿って線状または面状に接触して支持する場合には、床板を安定的に支持することができるとともに床板の構成を簡単化して軽量化することができる。   According to another feature of the present invention configured as described above, the retrofit structure of the bleacher seat is configured such that the floorboard support columns respectively extending from the plurality of erection bodies are connected to the floorboard support body, so that the height adjustment of each floorboard support column is performed. Further, the connecting work to the floor board becomes easy and the adjusting work can be performed accurately. In addition, the floorboard support can stably support the floorboard and simplify the configuration of the floorboard when it is supported in linear or planar contact along the front retaining wall and the rear retaining wall. The weight can be reduced.

また、本発明の他の特徴は、前記観覧席の改修構造において、さらに、前方擁壁および後方擁壁のうちの少なくとも一方の壁面と床板支持体との間に架設されるサイド架設体を備えることにある。   According to another aspect of the present invention, in the retrofitting structure for the auditorium, a side erection body is provided between at least one of the front retaining wall and the rear retaining wall and the floor plate support. There is.

このように構成した本発明の他の特徴によれば、観覧席の改修構造は、前方擁壁および後方擁壁のうちの少なくとも一方の壁面と床板支持体との間に架設されるサイド架設体を備えているため、床板支持体を安定化させて床板を安定的に支持することができる。なお、サイド架設体は、床板支持体と前方擁壁および/または後方擁壁との間で両者を押し合うまたは引っ張り合うように設けることができる。   According to another feature of the present invention configured as described above, the retrofit structure of the bleacher seat has a side erection body constructed between at least one wall surface of the front retaining wall and the rear retaining wall and the floor plate support. Therefore, the floor board support can be stabilized and the floor board can be stably supported. In addition, a side erection body can be provided so that both may be pressed or pulled between a floor board support body and a front retaining wall and / or a rear retaining wall.

また、本発明の他の特徴は、前記観覧席の改修構造において、床材支持体は、床板内に埋設される埋設体を備えることにある。   Another feature of the present invention resides in that, in the retrofitting structure of the auditorium, the floor material support includes an embedded body embedded in the floor plate.

このように構成した本発明の他の特徴によれば、観覧席の改修構造は、床材支持体が記床板内に埋設される埋設体を備えているため、床板をより強硬かつ安定的に支持することができる。   According to another feature of the present invention configured as described above, the retrofitting structure of the bleacher seat includes an embedded body in which the floor material support is embedded in the recording floor board, so that the floor board is made stronger and more stable. Can be supported.

また、本発明の他の特徴は、観覧席の改修構造において、さらに、互いに隣り合う床板支持体を互いに連結する支持体連結具を備えることにある。   In addition, another feature of the present invention is that, in the refurbishment structure of the auditorium, there is further provided a support body connecting tool for connecting adjacent floor board supports to each other.

このように構成した本発明の他の特徴によれば、観覧席の改修構造は、互いに隣り合う床板支持体を互いに連結する支持体連結具を備えているため、床板支持体同士を互いに連結してより強固かつ安定的に床板を支持することができる。   According to another feature of the present invention configured as described above, the retrofitting structure of the bleacher seat includes the support body connecting tool that connects the floor board supports adjacent to each other, and thus connects the floor board supports to each other. Thus, the floor board can be supported more firmly and stably.

また、本発明の他の特徴は、観覧席の改修構造において、架設体は、前方擁壁の壁面に固定される端部と後方擁壁の壁面に固定される端部との間の長さが伸縮自在であることにある。   Another feature of the present invention is that, in the retrofitting structure of the auditorium, the length of the installation body is between the end fixed to the wall of the front retaining wall and the end fixed to the wall of the rear retaining wall. Is that it is telescopic.

このように構成した本発明の他の特徴によれば、観覧席の改修構造は、架設体が前方擁壁の壁面に固定される端部と後方擁壁の壁面に固定される端部との間の長さが伸縮自在に構成されているため、前方擁壁と後方擁壁との間隔が互いに異なる複数種類の擁壁間において共通して用いることができるとともに、一対の前方擁壁と後方擁壁においても場所によって間隔が異なる場合であっても架設体の長さを適宜調節することにより確実に設置することができる。特に、改修が必要な観覧席を構成する前方擁壁および後方擁壁は、波打ちなどの変形によって部分的に間隔が変化していることがあるため、架設体の長さが調節できることは極めて有益である。   According to another feature of the present invention configured as described above, the retrofit structure of the bleacher seat includes an end portion where the installation body is fixed to the wall surface of the front retaining wall and an end portion which is fixed to the wall surface of the rear retaining wall. Since the length between them can be expanded and contracted, the front retaining wall and the rear retaining wall can be used in common among a plurality of types of retaining walls, and the pair of front retaining walls and the rear Even in the case of the retaining wall having different intervals depending on the location, it can be reliably installed by appropriately adjusting the length of the erection body. In particular, it is extremely beneficial to be able to adjust the length of the erection body because the front and rear retaining walls that make up the bleachers that need to be refurbished may be partially spaced due to deformation such as undulations. It is.

また、本発明は、観覧席の改修構造の発明として実施できるばかりでなく、観覧席の改修方法および観覧席改修用部品の発明としてもそれぞれ実施できるものである。   In addition, the present invention can be implemented not only as an invention of a structure for repairing a bleacher seat, but also as an invention of a method for repairing a seat and a part for a seat seat repair.

具体的には、観覧席の改修方法は、斜面の傾斜方向に対して直交する方向に沿って互いに平行に延びる前方擁壁および後方擁壁上に床板が設けられるとともに同床板上に複数の座席が設けられた構成の既存の観覧席の改修方法であって、前方擁壁および後方擁壁上に設けられた床板を取り除く床板除去工程と、床板が取り除かれた前方擁壁および後方擁壁の各壁面間に地面から浮いた状態で架設体を架設する架設体設置工程と、架設体上に床板支柱を介して床板を配置する床板配置工程とを含むようにすればよい。   Specifically, the method for renovating the auditorium is that a floor plate is provided on a front retaining wall and a rear retaining wall that extend in parallel to each other along a direction orthogonal to the inclined direction of the slope, and a plurality of seats are provided on the floor plate. A method for renovating an existing bleacher seat having a structure in which a floor board removing process for removing a floor board provided on the front retaining wall and the rear retaining wall, and a front retaining wall and a rear retaining wall from which the floor board has been removed are provided. What is necessary is just to make it include the construction body installation process which constructs a construction body in the state which floated from the ground between each wall surface, and the floor board arrangement | positioning process which arrange | positions a floor board on a construction body via a floor board support | pillar.

また、観覧席改修用部品は、斜面の傾斜方向に対して直交する方向に沿って互いに平行に延びる前方擁壁および後方擁壁上に床板が設けられるとともに同床板上に複数の座席が設けられた構成の既存の観覧席の改修に用いられる観覧席改修用部品であって、前方擁壁および後方擁壁の各壁面間に地面から浮いた状態で架設される架設体と、架設体に支持されて床板を下方から支持する床板支柱とを備えるとよい。これによれば、観覧席の改修方法および観覧席改修用部品は、上記観覧席の改修構造と同様の作用効果を期待することができる。   In addition, the part for repairing the auditorium is provided with a floor plate on the front retaining wall and the rear retaining wall extending in parallel with each other along a direction orthogonal to the inclination direction of the slope, and a plurality of seats are provided on the floor plate. Parts for renovation of an existing bleacher seat with the above structure, which are installed between the front retaining wall and the rear retaining wall in a state of floating from the ground, and supported by the construction body It is good to provide the floor-plate support | pillar which is done and supports a floor-plate from the downward direction. According to this, the method for repairing the seat and the parts for repairing the seat can be expected to have the same effects as the structure for repairing the seat.

本発明の一実施形態に係る観覧席の改修構造の内部構成の概略を示すために床板を除いた状態で部分的に示す平面図である。It is a top view partially shown in the state except a floor board, in order to show the outline of the internal structure of the repair structure of the bleacher seat which concerns on one Embodiment of this invention. 図1に示す2−2線から見た観覧席の改修構造の断面図である。It is sectional drawing of the repair structure of the bleacher seat seen from the 2-2 line shown in FIG. 図1に示す3−3線から見た観覧席の改修構造の断面図である。It is sectional drawing of the repair structure of the bleacher seat seen from the 3-3 line shown in FIG. 図1に示す観覧席の改修構造で使用される架設体を構成する第1架設体の外観構成の概略を示しており、(A)は第1架設体の平面図であり、(B)は第1架設体の正面図であり、(C)は第1架設体の側面図である。The outline structure of the 1st installation body which comprises the installation body used with the repair structure of the bleacher seat shown in FIG. 1 is shown, (A) is a top view of a 1st installation body, (B) It is a front view of a 1st installation body, (C) is a side view of a 1st installation body. 図1に示す観覧席の改修構造で使用される架設体を構成する第2架設体の外観構成の概略を示しており、(A)は第2架設体の平面図であり、(B)は第2架設体の正面図であり、(C)は第2架設体の側面図である。The outline structure of the 2nd installation body which comprises the installation body used with the repair structure of the bleacher seat shown in FIG. 1 is shown, (A) is a top view of a 2nd installation body, (B) is It is a front view of a 2nd installation body, (C) is a side view of a 2nd installation body. 図1に示す観覧席の改修構造で使用される床板支持体、サイド架設体、埋設体、の外観構成の概略を示しており、(A)は床板支持体の平面図であり、(B)は床板支持体の正面図である。FIG. 2 shows an outline of the external structure of a floor board support body, a side erection body, and an embedded body used in the structure for repairing a bleacher seat shown in FIG. 1, (A) is a plan view of the floor board support body, and FIG. FIG. 3 is a front view of a floor board support. 本発明の一実施形態に係る観覧席の改修方法の主要な工程の流れを示すフローチャートである。It is a flowchart which shows the flow of the main processes of the repair method of the bleacher seat which concerns on one Embodiment of this invention. 従来の観覧席の内部構成を部分的に示す断面図である。It is sectional drawing which shows partially the internal structure of the conventional bleachers. 図8に示す観覧席の内部構成の概略を床板を除いた状態で部分的に示す平面図である。It is a top view which shows partially the outline of the internal structure of the bleacher seat shown in FIG. 8 in the state which excluded the floor board.

以下、本発明に係る観覧席の改修構造および観覧席の改修方法の一実施形態について図面を参照しながら説明する。図1は、本発明の一実施形態に係る観覧席の改修構造100の内部構成の概略を示すために床板94を除いた状態で部分的に示す平面図である。図2は、図1に示す2−2線から見た観覧席の改修構造100の断面図である。また、図3は、図1に示す3−3線から見た観覧席の改修構造100の断面図である。なお、本明細書において参照する各図は、本発明の理解を容易にするために一部の構成要素を誇張して表わすなど模式的に表している。このため、各構成要素間の寸法や比率などは異なっていることがある。   DESCRIPTION OF THE PREFERRED EMBODIMENTS Hereinafter, an embodiment of a bleacher seat repair structure and a seat seat repair method according to the present invention will be described with reference to the drawings. FIG. 1 is a plan view partially showing a state in which a floor board 94 is removed in order to show an outline of an internal configuration of a structure for retrofitting a bleacher seat 100 according to an embodiment of the present invention. FIG. 2 is a cross-sectional view of the retrofit structure 100 for the auditorium as viewed from line 2-2 shown in FIG. FIG. 3 is a cross-sectional view of the retrofit structure 100 for the auditorium as viewed from the line 3-3 shown in FIG. Note that each drawing referred to in the present specification is schematically represented by exaggerating some of the components in order to facilitate understanding of the present invention. For this reason, the dimension, ratio, etc. between each component may differ.

(既存の観覧席90の構成)
まず、本発明に係る観覧席の改修構造100を説明する前に、改修工事の対象となる既存の観覧席90について説明する。観覧席90は、図8および図9にそれぞれ示すように、傾斜地IGにおける斜面に沿って形成されており、前方擁壁91および後方擁壁92を備えている。
(Configuration of existing seat 90)
First, before explaining the structure for renovation of a bleacher seat 100 according to the present invention, an existing bleacher seat 90 to be subjected to renovation work will be described. As shown in FIGS. 8 and 9, the bleacher seat 90 is formed along the slope in the inclined ground IG, and includes a front retaining wall 91 and a rear retaining wall 92.

前方擁壁91および後方擁壁92は、床板94を支持するためのコンクリート製の構造体であり、傾斜地IGの斜面からそれぞれ起立した状態で傾斜地IGの斜面の傾斜方向(図示矢印方向)に対して直交する横方向に沿って互いに平行に延びて形成されている。この場合、前方擁壁91および後方擁壁92の前後関係は、傾斜地IGにおける斜面の傾斜方向に対して相対的なものであり、前方擁壁91は後方擁壁92に対して傾斜地IGにおける斜面の傾斜方向の下側に位置している。   The front retaining wall 91 and the rear retaining wall 92 are concrete structures for supporting the floor board 94, and stand up from the slope of the slope IG with respect to the slope direction of the slope of the slope IG (arrow direction shown in the drawing). Are formed so as to extend in parallel with each other along the orthogonal transverse direction. In this case, the front-rear relationship between the front retaining wall 91 and the rear retaining wall 92 is relative to the slope direction of the slope in the sloped land IG, and the front retaining wall 91 is sloped in the sloped ground IG with respect to the rear retaining wall 92. It is located on the lower side of the tilt direction.

これらの前方擁壁91および後方擁壁92は、連結壁93で互いに連結されている。連結壁93は、前方擁壁91と後方擁壁92とを互いに連結するためのコンクリート製の構造体であり、前記横方向において所定の間隔で傾斜地IGの斜面からそれぞれ起立した状態で形成されている。この場合、連結壁93は、前方擁壁91の上面と後方擁壁92の上面とを繋ぐ傾斜面で構成することもできるが、本実施形態においては、前方擁壁91の上面と同じ高さに形成されている。これらの前方擁壁91、後方擁壁92および連結壁93は、一体的に形成されており、平面視において格子状に形成されている。   The front retaining wall 91 and the rear retaining wall 92 are connected to each other by a connecting wall 93. The connecting wall 93 is a concrete structure for connecting the front retaining wall 91 and the rear retaining wall 92 to each other, and is formed in a state of standing from the slope of the inclined ground IG at a predetermined interval in the lateral direction. Yes. In this case, the connecting wall 93 can be configured by an inclined surface that connects the upper surface of the front retaining wall 91 and the upper surface of the rear retaining wall 92, but in the present embodiment, is the same height as the upper surface of the front retaining wall 91. Is formed. The front retaining wall 91, the rear retaining wall 92, and the connecting wall 93 are integrally formed, and are formed in a lattice shape in plan view.

床板94は、座席95を支持するとともに座席95の周囲の床面を構成するコンクリート製の構造体であり、平板状に形成されている。この床板94は、前方擁壁91および連結壁93の各上面に載置された状態で、前方擁壁91の上面、連結壁93の上面および後方擁壁92の側面にそれぞれ固着されている。座席95は、観覧者が座る腰掛けであり、床板94の上面に図示しないボルトによって固定されている。また、1つの前方擁壁91、1つの後方擁壁92および2つの連結壁93で囲まれた方形の領域内には、傾斜地IGの地面を覆って防湿するためのモルタル製のカバー体96が形成されている。   The floor board 94 is a concrete structure that supports the seat 95 and constitutes a floor surface around the seat 95, and is formed in a flat plate shape. The floor plate 94 is fixed to the upper surface of the front retaining wall 91, the upper surface of the connecting wall 93, and the side surface of the rear retaining wall 92 while being placed on the upper surfaces of the front retaining wall 91 and the connecting wall 93. The seat 95 is a stool on which a viewer sits, and is fixed to the upper surface of the floor board 94 with a bolt (not shown). Further, in a rectangular region surrounded by one front retaining wall 91, one rear retaining wall 92, and two connecting walls 93, a cover body 96 made of mortar for covering the ground of the inclined ground IG and preventing moisture is provided. Is formed.

(観覧席の改修構造100の構成)
観覧席の改修構造(以下、単に「改修構造」と呼ぶことがある)100は、架設体101を備えている。架設体101は、前方擁壁91と後方擁壁92との間に架設されて床板94を支持するための金属製の部品であり、主として、第1架設体102および第2架設体103を備えて構成されている。
(Structure of the redemption structure 100 for the bleachers)
A renovation structure for a bleacher seat (hereinafter, simply referred to as a “renovation structure”) 100 includes a construction body 101. The erection body 101 is a metal part that is erected between the front retaining wall 91 and the rear retaining wall 92 and supports the floor plate 94, and mainly includes a first erection body 102 and a second erection body 103. Configured.

第1架設体102は、図4(A)〜(C)にそれぞれ示すように、前方擁壁91の壁面および後方擁壁92の壁面のうちの一方の壁面に取り付けられる部品であり、主として、取付部102a、胴部102bおよびリブ102eによって構成されている。取付部102aは、前方擁壁91の壁面または後方擁壁92の壁面に対して取付ボルト104を介して取り付けられる部分であり、平板状に形成されている。   As shown in FIGS. 4A to 4C, the first installation body 102 is a component attached to one of the wall surfaces of the front retaining wall 91 and the rear retaining wall 92, It is comprised by the attaching part 102a, the trunk | drum 102b, and the rib 102e. The attachment portion 102a is a portion that is attached to the wall surface of the front retaining wall 91 or the wall surface of the rear retaining wall 92 via the attachment bolt 104, and is formed in a flat plate shape.

胴部102bは、前方擁壁91と後方擁壁92との間に架設されるとともに床板94からの荷重を受ける部分であり、取付部102aに対して直交する方向に延びて形成されている。より具体的には、胴部102bは、長尺の金属板の幅方向両側部分をそれぞれ折り曲げて図示下方に向かって開口する断面コ字状に形成されている。また、胴部102bは、前方擁壁91と後方擁壁92との各壁面間の距離よりも短い長さに形成されている。   The trunk portion 102b is a portion that is provided between the front retaining wall 91 and the rear retaining wall 92 and that receives a load from the floor plate 94, and is formed to extend in a direction orthogonal to the mounting portion 102a. More specifically, the body portion 102b is formed in a U-shaped cross-section that is bent downward on both sides in the width direction of a long metal plate and opens downward in the figure. Moreover, the trunk | drum 102b is formed in length shorter than the distance between each wall surface of the front retaining wall 91 and the back retaining wall 92. As shown in FIG.

この胴部102bには、上面中央部に床板支柱106を取り付けるための2つの取付孔102cがそれぞれ形成されている。また、胴部102bは、一方の端部が取付部102aに溶接により固着されているとともに、他方の端部側における2つの側面部にそれぞれ3つずつ位置決め孔102dがそれぞれ形成されている。リブ102eは、取付部102aと胴部102bとを強固に一体化するための板状の部品であり、取付部102aおよび胴部102bにそれぞれ溶接されている。なお、胴部102bは、断面コ字状以外の形状、例えば、平板状、筒状または中実の棒状に構成してもよいことは当然である。また、図4(A)〜(C)においては、胴部102bの中央部分の一部を省略して示している。   In the trunk portion 102b, two attachment holes 102c for attaching the floor column support 106 are formed in the center portion of the upper surface. In addition, one end of the trunk portion 102b is fixed to the mounting portion 102a by welding, and three positioning holes 102d are formed in each of two side portions on the other end side. The rib 102e is a plate-like component for firmly integrating the attachment portion 102a and the body portion 102b, and is welded to the attachment portion 102a and the body portion 102b, respectively. It should be noted that the body portion 102b may be configured in a shape other than the U-shaped cross section, for example, a flat plate shape, a cylindrical shape, or a solid rod shape. 4A to 4C, a part of the central portion of the body portion 102b is omitted.

第2架設体103は、図5(A)〜(C)にそれぞれ示すように、前方擁壁91の壁面および後方擁壁92の壁面のうちの他方の壁面に取り付けられる部品であり、主として、取付部103aおよび連結部103bによって構成されている。取付部103aは、取付部102aと同様に、後方擁壁92の壁面または前方擁壁91の壁面に対して取付ボルト104を介して取り付けられる部分であり、平板状に形成されている。   As shown in FIGS. 5A to 5C, the second erected body 103 is a component attached to the other wall surface of the wall surface of the front retaining wall 91 and the wall surface of the rear retaining wall 92. It is comprised by the attachment part 103a and the connection part 103b. The attachment portion 103a is a portion that is attached to the wall surface of the rear retaining wall 92 or the wall surface of the front retaining wall 91 via the attachment bolts 104 in the same manner as the attachment portion 102a, and is formed in a flat plate shape.

連結部103bは、第1架設体102の胴部102bに連結される部分であり、取付部103aに対して直交する方向に延びる2つの板状体で構成されている。この場合、2つの連結部103bは、胴部102bの両側に配置されて2つの側面にそれぞれ面接触する間隔を介して設けられている。これらの2つの連結部103bには、胴部102bの位置決め孔102dに対向するそれぞれ対向する位置に長孔103cがそれぞれ形成されている。   The connection part 103b is a part connected with the trunk | drum 102b of the 1st installation body 102, and is comprised by the two plate-shaped bodies extended in the direction orthogonal to the attachment part 103a. In this case, the two connecting portions 103b are disposed on both sides of the body portion 102b and are provided at intervals in surface contact with the two side surfaces. In these two connecting portions 103b, elongated holes 103c are formed at positions facing the positioning holes 102d of the body portion 102b.

長孔103cは、胴部102bの先端部に対して第2架設体103の取付位置を胴部102bの長手方向に変更可能な状態で取り付けるための貫通孔である。すなわち、架設体101は、3つの位置決め孔102dのうちの少なくとも1つに対して長孔103cの任意の位置で位置決めして連結ボルト105で連結し固定することにより長手方向の長さを所望する長さに調節することができる。   The long hole 103c is a through hole for attaching the attachment position of the second erected body 103 to the distal end portion of the trunk portion 102b in a state where the attachment position can be changed in the longitudinal direction of the trunk portion 102b. That is, the installation body 101 is desired to have a length in the longitudinal direction by positioning at any position of the long hole 103c with respect to at least one of the three positioning holes 102d, and connecting and fixing with the connecting bolt 105. Can be adjusted to length.

床板支柱106は、架設体101上で床板94を支持するための部品であり、金属製の棒体の両端部にそれぞれナットがネジ嵌合して構成されている。この床板支柱106は、本実施形態においては1つの架設体101に2つ設けられており、それぞれ一方(図示下方)の端部が前記第1架設体102の胴部102bに取付孔102cをそれぞれ介して連結されるとともに、他方(図示上側)の端部が中間板107を介して床板支持体110に連結されている。   The floor board support | pillar 106 is a part for supporting the floor board 94 on the installation body 101, and is comprised by screwing a nut to the both ends of a metal rod, respectively. In this embodiment, two floor plate columns 106 are provided in one installation body 101, and one end (lower side in the drawing) has an attachment hole 102c in the body 102b of the first installation body 102, respectively. The other end (the upper side in the figure) is connected to the floor board support 110 via the intermediate board 107.

中間板107は、床板支柱106を床板支持体110に連結するための金属製の部品であり、平面視で方形の板状体で構成されている。この中間板107は、中央部分に床板支柱106が貫通して取り付けられているとともに、縁部分が床板支持体110の支持本体111にビスによって取り付けられている。   The intermediate plate 107 is a metal part for connecting the floor plate support 106 to the floor plate support 110, and is formed of a rectangular plate-like body in plan view. The intermediate plate 107 has a floor plate support 106 penetratingly attached to a central portion thereof, and an edge portion of the intermediate plate 107 is attached to a support body 111 of the floor plate support 110 by screws.

床板支持体110は、複数の架設体101の各床板支柱106が連結されて床板94を支持する部品であり、金属材を枠状に組んで構成されている。より具体的には、床板支持体110は、図6(A),(B)にそれぞれ示すように、主として、2つの支持本体111および4つの連結体112を備えて構成されている。   The floor board support 110 is a component that supports the floor board 94 by connecting the floor board columns 106 of the plurality of installation bodies 101, and is configured by assembling metal materials in a frame shape. More specifically, as shown in FIGS. 6 (A) and 6 (B), the floor board support 110 is mainly configured by including two support bodies 111 and four connecting bodies 112.

支持本体111は、複数の架設体101の各床板支柱106が連結されて床板94を支持する部分であり、2つの金属製の板材がそれぞれ前方擁壁91および後方擁壁92に沿って互いに平行に延びて形成されている。本実施形態においては、支持本体111は、2つのハット形鋼によって構成されている。ここで、ハット形鋼は、長尺の鋼板を長手方向に沿って折り曲げることにより断面形状をハット(鍔付き帽子)の形に成形した鋼材である。これらの支持本体111は、互いに隣接する2つの連結壁93の間隔よりも短い長さに形成されている。なお、支持本体111は、ハット形鋼以外の形状、平板状、筒状または中実の棒状に形成されていてもよいことは当然である。   The support body 111 is a portion that supports the floor plate 94 by connecting the floor plate columns 106 of the plurality of installation bodies 101, and two metal plate members are parallel to each other along the front retaining wall 91 and the rear retaining wall 92, respectively. It is extended and formed. In the present embodiment, the support body 111 is composed of two hat-shaped steels. Here, the hat-shaped steel is a steel material in which a cross-sectional shape is formed into a hat (hatched hat) shape by bending a long steel plate along the longitudinal direction. These support bodies 111 are formed to have a length shorter than the interval between the two connecting walls 93 adjacent to each other. Needless to say, the support body 111 may be formed in a shape other than the hat-shaped steel, a flat plate shape, a cylindrical shape, or a solid rod shape.

連結体112は、2つの支持本体111を互いに連結するための部分であり、金属製の板材が2つの支持本体111間に所定の間隔を介して架設されている。本実施形態においては、連結体112は、L字形鋼によって構成されている。ここで、L字形鋼は、長尺の鋼板を長手方向に沿って折り曲げることにより断面形状をL字の形に成形した鋼材である。これらの4つの連結体112は、2つの支持本体111に対して溶接によって固着されている。なお、連結体112は、L字形鋼以外の形状、平板状、筒状または中実の棒状に形成されていてもよいことは当然である。   The connection body 112 is a part for connecting the two support bodies 111 to each other, and a metal plate material is installed between the two support bodies 111 with a predetermined interval. In this embodiment, the connection body 112 is comprised with L-shaped steel. Here, the L-shaped steel is a steel material whose cross-sectional shape is formed into an L shape by bending a long steel plate along the longitudinal direction. These four coupling bodies 112 are fixed to the two support bodies 111 by welding. Of course, the coupling body 112 may be formed in a shape other than L-shaped steel, a flat plate shape, a cylindrical shape, or a solid rod shape.

この床板支持体110には、サイド架設体113、埋設体114および弾性体115がそれぞれ取り付けられている。サイド架設体113は、床板支持体110を安定化させるための部品であり、金属製の棒体の両端部にそれぞれナットがネジ嵌合して構成されている。このサイド架設体113は、2つの支持本体111に2つずつ設けられており、それぞれ一方の端部が支持本体111に連結されるとともに、他方の端部が前方擁壁91の壁面または後方擁壁92の壁面に押し付けられている。   Side support body 113, embedded body 114, and elastic body 115 are attached to floor board support body 110, respectively. The side erection body 113 is a part for stabilizing the floor board support body 110, and is configured by screwing nuts to both ends of a metal bar. Two side support bodies 113 are provided on each of two support main bodies 111, one end of which is connected to the support main body 111, and the other end is a wall surface of the front retaining wall 91 or a rear support. It is pressed against the wall surface of the wall 92.

埋設体114は、床板支持体110と床板94とを強固に連結するために床板94の内部に埋設される部品であり、金属製の棒体の両端部にそれぞれナットがネジ嵌合して構成されている。この埋設体114は、支持本体111の両端部分にそれぞれ起立した状態で2つずつ設けられており、一方の端部が支持本体111に連結されるとともに他方の端部が床板94の埋設孔94a内にて封止栓94bによって埋設されている。   The embedded body 114 is a component embedded in the floor plate 94 in order to firmly connect the floor plate support 110 and the floor plate 94, and is configured by nuts screwed to both ends of a metal bar. Has been. Two embedded bodies 114 are provided in a standing state at both end portions of the support main body 111, one end is connected to the support main body 111 and the other end is an embedded hole 94 a of the floor plate 94. It is buried in the inside by a sealing plug 94b.

弾性体115は、支持本体111と床板94との間に配置されて床板94を弾性的に支持するための部品であり、方形板状のゴム材で構成されている。この弾性体115は、床板支柱106の上方における支持本体111上に図示しない両面テープで固定されている。   The elastic body 115 is a part for elastically supporting the floor board 94, which is disposed between the support body 111 and the floor board 94, and is made of a rectangular plate-like rubber material. The elastic body 115 is fixed on the support body 111 above the floor board support 106 with a double-sided tape (not shown).

また、改修構造100の横方向に互いに隣り合う床板支持体110間には、2つの支持体連結具116が設けられている。支持体連結具116は、改修構造100の横方向に互いに隣り合う床板支持体110同士を互いに連結するための部品であり、金属製の板状体で構成されている。これらの2つの支持体連結具116は、それぞれ両端部が互いに隣接し合う床板支持体110の端部にビスによって取り付けられている。   In addition, two support body connection tools 116 are provided between floor board supports 110 adjacent to each other in the lateral direction of the repair structure 100. The support body connection tool 116 is a part for connecting the floor board support bodies 110 adjacent to each other in the lateral direction of the repair structure 100, and is formed of a metal plate-like body. These two support body couplers 116 are attached to the end portions of the floor board support body 110 whose both end portions are adjacent to each other by screws.

(観覧席の改修構造100を用いた改修方法)
次に、上記改修構造100を用いた観覧席90の改修方法について図7を参照しながら説明する。まず、作業者は、第1工程として、既存の観覧席90を構成する床板94を除去する。具体的には、作業者は、既存の観覧席90から座席95を撤去した後、前方擁壁91、後方擁壁92および連結壁93に固着した床板94を除去する。この場合、作業者は、はつり機を用いて床板94を破砕して除去するはつり作業によって床板94を除去することができる。この第1工程における床板94の除去工程が、本発明に係る床板除去工程に相当する。
(Renovation method using the renovation structure 100 for bleachers)
Next, a method of repairing the bleacher seat 90 using the repair structure 100 will be described with reference to FIG. First, an operator removes the floor board 94 which comprises the existing bleacher seat 90 as a 1st process. Specifically, the worker removes the seat 95 from the existing seat 90, and then removes the floor plate 94 fixed to the front retaining wall 91, the rear retaining wall 92, and the connecting wall 93. In this case, the operator can remove the floor board 94 by the hanging work of crushing and removing the floor board 94 using a suspension machine. The removal process of the floor board 94 in the first process corresponds to the floor board removal process according to the present invention.

なお、作業者は、床板94を破砕することなく前方擁壁91、後方擁壁92および連結壁93から撤去できる場合には、必ずしも床板94をはつり作業によって除去する必要はない。また、作業者は、床板94の除去作業によって前方擁壁91の上面が水平でなくなった場合には、コンクリートやモルタルを盛ることで前方擁壁91の上面を水平にしておく。また、作業者は、既存の連結壁93をそのまま残してもよいし、前方擁壁91の高さよりも低い高さまで除去、または連結壁93の全てを除去してもよい。本実施形態においては、作業者は、既存の連結壁93を前方擁壁91の高さよりも低い高さまで除去する。   In addition, when an operator can remove the floor board 94 from the front retaining wall 91, the rear retaining wall 92, and the connection wall 93 without crushing, it is not always necessary to remove the floor board 94 by the hanging work. Further, when the upper surface of the front retaining wall 91 is not horizontal due to the removal work of the floor board 94, the worker keeps the upper surface of the front retaining wall 91 horizontal by depositing concrete or mortar. Further, the operator may leave the existing connecting wall 93 as it is, remove it to a height lower than the height of the front retaining wall 91, or remove all of the connecting wall 93. In the present embodiment, the operator removes the existing connecting wall 93 to a height lower than the height of the front retaining wall 91.

次に、作業者は、第2工程として、架設体101を設置する。具体的には、作業者は、架設体101を用意して第1架設体102を前方擁壁91の壁面または後方擁壁92の壁面に取付ボルト104を介して取り付けた後、第2架設体103を後方擁壁92の壁面または前方擁壁91の壁面に取付ボルト104を介して取り付ける。この場合、作業者は、第1架設体102および第2架設体103をカバー体96に接触させずに浮いた状態で取り付ける。また、作業者は、第2架設体103の2つの連結部103b間に第1架設体102の胴部102bを挿し込んだ状態で第1架設体102および第2架設体103をそれぞれ前方擁壁91および後方擁壁92にそれぞれ取り付ける。   Next, an operator installs the erection body 101 as a second step. Specifically, the operator prepares the erection body 101, attaches the first erection body 102 to the wall surface of the front retaining wall 91 or the wall surface of the rear retaining wall 92 via the mounting bolt 104, and then attaches the second erection body. 103 is attached to the wall surface of the rear retaining wall 92 or the wall surface of the front retaining wall 91 via mounting bolts 104. In this case, the worker attaches the first erection body 102 and the second erection body 103 in a floating state without contacting the cover body 96. In addition, the operator holds the first erected body 102 and the second erected body 103 in front of the front retaining wall in a state in which the body 102b of the first erected body 102 is inserted between the two connecting portions 103b of the second erected body 103. 91 and the rear retaining wall 92, respectively.

次いで、作業者は、2組の位置決め孔102dと長孔103cとにそれぞれ連結ボルト105を貫通させて締め付けることにより、第1架設体102と第2架設体103とを互いに固定的に連結する。これにより、作業者は、架設体101を前方擁壁91と後方擁壁92との間に宙に浮いた状態で取り付けることができる。   Next, the operator firmly connects the first erected body 102 and the second erected body 103 to each other by tightening the connecting bolts 105 through the two sets of positioning holes 102d and the long holes 103c. Thereby, the worker can attach the construction body 101 in a state of floating in the air between the front retaining wall 91 and the rear retaining wall 92.

次いで、作業者は、2つの床板支柱106を用意して胴部102bの取付孔102cにそれぞれ取り付ける。これにより、2つの床板支柱106は、架設体101における胴部102bの上面から上方に起立した状態で設けられる。この第2工程における架設体101を取り付ける工程が、本発明に係る架設体設置工程に相当する。   Next, the operator prepares two floor board struts 106 and attaches them to the attachment holes 102c of the trunk portion 102b. Thereby, the two floor board support | pillars 106 are provided in the state which stood up from the upper surface of the trunk | drum 102b in the construction body 101. As shown in FIG. The step of attaching the erection body 101 in the second step corresponds to the erection body installation step according to the present invention.

次に、作業者は、第3工程として、床板支持体110を設置する。具体的には、作業者は、中間板107を床板支持体110に対応する数だけ用意してこれらの中間板107を各床板支柱106の上端部に仮止め状態で取り付ける。次いで、作業者は、床板支持体110を用意して中間板107に載置した後、各床板支柱106上の中間板107の高さを調整することで床板支持体110の高さおよび水平を位置決めする。この場合、作業者は、前方擁壁91の上面の高さと支持本体111の高さが一致するように床板支持体110の高さを調節する。   Next, an operator installs the floor board support body 110 as a 3rd process. Specifically, the operator prepares the intermediate plates 107 corresponding to the floor plate support 110 and attaches these intermediate plates 107 to the upper ends of the floor plate columns 106 in a temporarily fixed state. Next, the operator prepares the floor board support 110 and places it on the intermediate board 107, and then adjusts the height of the intermediate board 107 on each floor board column 106 to adjust the height and level of the floor board support 110. Position. In this case, the operator adjusts the height of the floor board support 110 so that the height of the upper surface of the front retaining wall 91 matches the height of the support body 111.

次いで、作業者は、サイド架設体113および埋設体114をそれぞれ4つずつ用意して床板支持体110にそれぞれ取り付ける。具体的には、作業者は、2つのサイド架設体113を支持本体111と前方擁壁91との間に取り付けるとともに、残余の2つのサイド架設体113を支持本体111と後方擁壁92との間に取り付ける。この場合、4つのサイド架設体113は、前方擁壁91および後方擁壁92の各壁面を押し付ける状態で取り付けられる。これにより、床板支持体110は、架設体101上で安定的に設置される。   Next, the operator prepares four side erected bodies 113 and four embedded bodies 114 and attaches them to the floor board support 110 respectively. Specifically, the operator attaches the two side construction bodies 113 between the support body 111 and the front retaining wall 91 and attaches the remaining two side construction bodies 113 to the support body 111 and the rear retaining wall 92. Install in between. In this case, the four side construction bodies 113 are attached in a state in which the respective wall surfaces of the front retaining wall 91 and the rear retaining wall 92 are pressed. Thereby, the floor board support body 110 is stably installed on the construction body 101.

また、作業者は、2つの埋設体114を支持本体111の一方の端部側の上面に取り付けるとともに、残余の2つの埋設体114を支持本体111の他方の端部側の上面に取り付ける。この場合、作業者は、各埋設体114の先端部が床板支持体110上に載置される床板94の上面未満に位置するように各埋設体114の高さを調節する。   The operator attaches the two embedded bodies 114 to the upper surface on one end side of the support body 111 and attaches the remaining two embedded bodies 114 to the upper surface on the other end side of the support body 111. In this case, the operator adjusts the height of each embedded body 114 so that the front end portion of each embedded body 114 is positioned below the upper surface of the floor board 94 placed on the floor board support 110.

この床板支持体110の設置作業は、床板94を設置する全ての前方擁壁91および後方擁壁92間について行なわれる。そして、作業者は、連結体112を用意して互いに隣接する床板支持体110同士間に連結体112を架設して互いに連結する。   The installation work of the floor board support 110 is performed between all the front retaining walls 91 and the rear retaining walls 92 on which the floor board 94 is installed. And an operator prepares the coupling body 112, constructs the coupling body 112 between the floor board support bodies 110 which mutually adjoin, and connects mutually.

次に、作業者は、第4工程として、床板94を設置する。具体的には、作業者は、弾性体115、敷板117、受けボルト118および床板94をそれぞれ用意する。ここで、敷板117は、前方擁壁91と床板94との間に配置されて床板94からの荷重の緩衝材となる部品であり、樹脂材を長尺に延びる板状に形成して構成されている。この敷板117は、前方擁壁91の上面に2つの敷板117が平行に並んだ状態で配置されて図示しない接着剤で前方擁壁91の上面および床板94の下面に固定される。また、敷板117は、本実施形態においては、弾性体115よりも若干薄く形成されている。なお、図1においては、敷板117の図示を省略している。   Next, an operator installs the floor board 94 as a 4th process. Specifically, the operator prepares the elastic body 115, the floor plate 117, the receiving bolt 118, and the floor plate 94, respectively. Here, the floor plate 117 is a component that is disposed between the front retaining wall 91 and the floor plate 94 and serves as a buffer material for the load from the floor plate 94, and is configured by forming a resin material into a plate shape that extends in a long length. ing. The floor plate 117 is disposed in a state where two floor plates 117 are arranged in parallel on the upper surface of the front retaining wall 91, and is fixed to the upper surface of the front retaining wall 91 and the lower surface of the floor plate 94 with an adhesive (not shown). Further, the floor plate 117 is formed slightly thinner than the elastic body 115 in the present embodiment. In FIG. 1, the floor plate 117 is not shown.

また、受けボルト118は、後方擁壁92と床板94との間に充填されるモルタル材からなる隙間埋め材119の引っ掛かりとなる部品であり、雄ネジが形成された金属製の棒体にナットがネジ嵌合して構成されている。この受けボルト118は、作業者によって後方擁壁92における床板94が対向する部分の下部部分に後方擁壁92に沿って複数設置される。   The receiving bolt 118 is a part that becomes a catch of the gap filling material 119 made of a mortar material filled between the rear retaining wall 92 and the floor plate 94, and a nut is attached to a metal rod body on which a male screw is formed. Is configured by screw fitting. A plurality of the receiving bolts 118 are installed along the rear retaining wall 92 at the lower part of the portion of the rear retaining wall 92 where the floor plate 94 faces.

また、床板94は、予め別工程で製作しておく。具体的には、床板94は、コンクリート材を板状に成形して製作される。なお、この床板94は、既存の床板94が引き続き使用可能であれば、引き続き継続して使用しても構わない。これらの場合、床板94には、埋設体114に対応する位置に貫通孔状の埋設孔94aが形成される。   Moreover, the floor board 94 is manufactured in a separate process in advance. Specifically, the floor board 94 is manufactured by molding a concrete material into a plate shape. The floor plate 94 may be continuously used as long as the existing floor plate 94 can be used continuously. In these cases, a through hole-like embedded hole 94 a is formed in the floor plate 94 at a position corresponding to the embedded body 114.

作業者は、弾性体115を床板支持体110の支持本体111上に配置するとともに、敷板117を前方擁壁91の上面に配置した後、これらの上に床板94を配置する。この場合、作業者は、床板94の埋設孔94a内に埋設体114を挿入するとともに、後方擁壁92の壁面と床板94の後端面との間に隙間を形成して床板94を配置する。   An operator arrange | positions the elastic body 115 on the support main body 111 of the floor board support body 110, and after arrange | positioning the floor board 117 on the upper surface of the front retaining wall 91, arrange | positions the floor board 94 on these. In this case, the operator inserts the embedded body 114 into the embedded hole 94 a of the floor board 94 and arranges the floor board 94 by forming a gap between the wall surface of the rear retaining wall 92 and the rear end face of the floor board 94.

次いで、作業者は、床板94の埋設孔94a内にモルタル材を充填して埋設体114の先端部を封止栓94bによって埋設するとともに、後方擁壁92の壁面と床板94の後端面との間の隙間内にモルタル材を充填して隙間埋め材119を形成する。これにより、床板94は、前方擁壁91および床板支持体110によって支持された状態で設置される。なお、作業者は、受けボルト118および隙間埋め材119を設けず、後方擁壁92の壁面に床板94の後端面直接突き当てて床板94を設置することもできる。   Next, the worker fills the embedding hole 94a of the floor board 94 with a mortar material and embeds the leading end of the embedding body 114 with the sealing plug 94b, and connects the wall surface of the rear retaining wall 92 and the rear end face of the floor board 94 to each other. A gap filling material 119 is formed by filling a mortar material in the gap therebetween. Thereby, the floor board 94 is installed in the state supported by the front retaining wall 91 and the floor board support body 110. Note that the operator can install the floor plate 94 by directly abutting the rear end surface of the floor plate 94 against the wall surface of the rear retaining wall 92 without providing the receiving bolt 118 and the gap filling material 119.

次に、作業者は、第5工程として、座席95を設置する。具体的には、作業者は、新規の座席95を用意した後、床板94上に図示しないボルトを用いて座席95を固定する。この場合、座席95は、既存の座席95が引き続き使用可能であれば、引き続き継続して使用しても構わない。これにより、観覧席の改修構造100が完成する。なお、作業者は、床板94が直接座面を構成する場合には、座席95の設置作業を省略することができる。   Next, the worker installs the seat 95 as the fifth step. Specifically, the operator prepares a new seat 95 and then fixes the seat 95 on the floor board 94 using a bolt (not shown). In this case, the seat 95 may be continuously used as long as the existing seat 95 is still usable. Thereby, the repair structure 100 of the bleachers is completed. The worker can omit the installation work of the seat 95 when the floor board 94 directly constitutes a seating surface.

上記作動説明からも理解できるように、上記実施形態によれば、観覧席の改修構造100は、前方擁壁91および後方擁壁92の各壁面間に架設されて床板を支える架設体101を備えているため、既存の構造体である前方擁壁91および後方擁壁92を有効活用して観覧席90を改修することができ改修工事に掛かる時間的、経済的および環境負荷的な負担を軽減することができる。また、本発明に係る観覧席改修構造は、架設体101が前方擁壁91および後方擁壁92の各壁面間に浮いた状態で設けられて床板94を支持するため、前方擁壁91と後方擁壁92との間の床面または地面の地耐力が脆弱であっても前方擁壁91および後方擁壁92を活かして観覧席90を改修することができる。   As can be understood from the above description of the operation, according to the above embodiment, the retrofit structure 100 for the auditorium is provided with the erection body 101 that is laid between the wall surfaces of the front retaining wall 91 and the rear retaining wall 92 and supports the floor plate. Therefore, it is possible to renovate the bleacher seat 90 by effectively utilizing the front retaining wall 91 and the rear retaining wall 92 which are existing structures, thereby reducing the time, economic and environmental burden of the renovation work. can do. In addition, in the bleacher seat repair structure according to the present invention, the installation body 101 is provided in a state of floating between the wall surfaces of the front retaining wall 91 and the rear retaining wall 92 and supports the floor plate 94. Even if the ground strength between the retaining wall 92 and the ground surface is weak, the front seat wall 91 and the rear retaining wall 92 can be utilized to repair the bleacher seat 90.

さらに、本発明の実施にあたっては、上記実施形態に限定されるものではなく、本発明の目的を逸脱しない限りにおいて種々の変更が可能である。   Furthermore, in carrying out the present invention, the present invention is not limited to the above embodiment, and various modifications can be made without departing from the object of the present invention.

例えば、上記実施形態においては、架設体101は、第1架設体102と第2架設体103とで構成した。この場合、架設体101は、第1架設体102に取付孔102cを設けるとともに、第2架設体103は長孔103cを設けた。これにより、架設体101は、長さ(取付部102aと取付部103aとの間隔)を伸縮自在に構成でき、前方擁壁91と後方擁壁92との間隔が種々存在しても長さ調整により対応することができる。しかし、架設体101は、第1架設体102と第2架設体103とを一体的に構成して長さ調整不能に構成することもできる。   For example, in the above-described embodiment, the erection body 101 includes the first erection body 102 and the second erection body 103. In this case, the installation body 101 is provided with the mounting hole 102c in the first installation body 102, and the second installation body 103 is provided with the long hole 103c. As a result, the construction body 101 can be configured such that the length (the interval between the attachment portion 102a and the attachment portion 103a) can be expanded and contracted, and the length can be adjusted even if there are various intervals between the front retaining wall 91 and the rear retaining wall 92. Can respond. However, the erection body 101 may be configured such that the first erection body 102 and the second erection body 103 are integrally configured so that the length cannot be adjusted.

また、上記実施形態においては、観客席の改修構造100は、床板支持体110を備えて構成した。すなわち、観客席の改修構造100は、床板支柱106が床板支持体110を介して床板94を間接的に支持するように構成した。しかし、観客席の改修構造100は、床板支柱106が直接床板94を支持するように構成することもできる。これによれば、観客席の改修構造100は、構成を簡単化できるとともに床板支持体110の設置工程を省略することができる。この場合、観客席の改修構造100は、少なくともサイド架設体113および支持体連結具116を省略することができる。   Moreover, in the said embodiment, the repair structure 100 of the auditorium was comprised including the floor board support body 110. FIG. In other words, the audience seat renovation structure 100 is configured such that the floor plate support 106 indirectly supports the floor plate 94 via the floor plate support 110. However, the audience seat refurbishment structure 100 may be configured such that the floorboard column 106 directly supports the floorboard 94. According to this, the retrofit structure 100 for the auditorium can simplify the configuration and omit the installation process of the floor board support 110. In this case, the audience seat repair structure 100 can omit at least the side erection body 113 and the support body coupling tool 116.

IG…傾斜地、
90…観覧席、91…前方擁壁、92…後方擁壁、93…連絡壁、94…床板、94a…埋設孔、94b…封止栓、95…座席、96…カバー体、
100…観覧席の改修構造、101…架設体、102…第1架設体、102a…取付部、102b…胴部、102c…取付孔、102d…位置決め孔、102e…リブ、103…第2架設体、103a…取付部、103b…連結部、103c…長孔、104…取付ボルト、105…連結ボルト、106…床板支柱、107…中間板、
110…床板支持体、111…支持本体、112…連結体、113…サイド架設体、114…埋設体、115…弾性体、116…支持体連結具、117…敷板、118…受けボルト、119…隙間埋め材。
IG ... Slope,
90 ... bleacher seat, 91 ... front retaining wall, 92 ... rear retaining wall, 93 ... communication wall, 94 ... floor plate, 94a ... buried hole, 94b ... sealing plug, 95 ... seat, 96 ... cover body,
DESCRIPTION OF SYMBOLS 100 ... Renovation structure of bleachers, 101 ... Installation body, 102 ... 1st installation body, 102a ... Attachment part, 102b ... trunk | drum, 102c ... Installation hole, 102d ... Positioning hole, 102e ... Rib, 103 ... 2nd installation body , 103a ... mounting portion, 103b ... connecting portion, 103c ... long hole, 104 ... mounting bolt, 105 ... connecting bolt, 106 ... floor plate column, 107 ... intermediate plate,
DESCRIPTION OF SYMBOLS 110 ... Floor board support body, 111 ... Support main body, 112 ... Connection body, 113 ... Side construction body, 114 ... Embedded body, 115 ... Elastic body, 116 ... Support body connection tool, 117 ... Base plate, 118 ... Receiving bolt, 119 ... Gap filling material.

Claims (8)

斜面の傾斜方向に対して直交する方向に沿って互いに平行に延びる前方擁壁および後方擁壁上に床板が設けられるとともに同床板上に複数の座席が設けられた構成の既存の観覧席を改修した観覧席の改修構造であって、
前記前方擁壁および前記後方擁壁の各壁面間に地面から浮いた状態で架設される架設体と、
前記架設体に支持されて前記床板を下方から支持する床板支柱とを備えることを特徴とする観覧席の改修構造。
Refurbish an existing bleachers with a floorboard on the front and rear retaining walls that extend parallel to each other in a direction perpendicular to the slope of the slope, and multiple seats on the floorboard The renovation structure of the bleachers,
A erected body that is erected between the front retaining wall and the rear retaining wall in a state of floating from the ground;
A renovation structure for a bleacher seat, comprising: a floor plate support which is supported by the installation body and supports the floor plate from below.
請求項1に記載した観覧席の改修構造において、さらに、
前記床板支柱と前記床板との間に設けられて前記前方擁壁および前記後方擁壁に沿って延びて前記床板を支持する床板支持体を備え、
前記床板支持体は、
同床板支持体の下方に複数配置された前記架設体からそれぞれ延びる前記床板支柱によって支持されていることを特徴とする観覧席の改修構造。
In the renovation structure of the bleacher seat according to claim 1,
A floor board support provided between the floor board column and the floor board and extending along the front retaining wall and the rear retaining wall to support the floor board;
The floor board support is
A renovation structure for a bleacher seat, which is supported by the floor plate support extending respectively from the plurality of installation bodies arranged below the floor plate support.
請求項2に記載した観覧席の改修構造において、さらに、
前記前方擁壁および前記後方擁壁のうちの少なくとも一方の壁面と前記床板支持体との間に架設されるサイド架設体を備えることを特徴とする観覧席の改修構造。
In the refurbishment structure of the bleacher seat according to claim 2,
A renovation structure for a bleacher seat, comprising a side erection body constructed between at least one wall surface of the front retaining wall and the rear retaining wall and the floor plate support.
請求項2または請求項3のうちのいずれか1つに記載した観覧席の改修構造において、
前記床材支持体は、
前記床板内に埋設される埋設体を備えることを特徴とする観覧席の改修構造。
In the refurbishment structure of the bleacher seat according to any one of claims 2 and 3,
The flooring support is
A retrofit structure for a bleacher seat, comprising an embedded body embedded in the floor board.
請求項2ないし請求項4のうちのいずれか1つに記載した観覧席の改修構造において、さらに、
互いに隣り合う前記床板支持体を互いに連結する支持体連結具を備えることを特徴とする観覧席の改修構造。
In the renovation structure of the bleacher seat according to any one of claims 2 to 4,
A renovation structure of a bleacher seat, comprising a support body connecting tool for connecting the floor board supports adjacent to each other.
請求項1ないし請求項5のうちのいずれか1つに記載した観覧席の改修構造において、
前記架設体は、
前記前方擁壁の壁面に固定される端部と前記後方擁壁の壁面に固定される端部との間の長さが伸縮自在であることを特徴とする観覧席の改修構造。
In the refurbishment structure of the bleacher seat according to any one of claims 1 to 5,
The installation body is
A repair structure for a bleacher seat, wherein a length between an end portion fixed to the wall surface of the front retaining wall and an end portion fixed to the wall surface of the rear retaining wall is extendable.
斜面の傾斜方向に対して直交する方向に沿って互いに平行に延びる前方擁壁および後方擁壁上に床板が設けられるとともに同床板上に複数の座席が設けられた構成の既存の観覧席の改修方法であって、
前記前方擁壁および前記後方擁壁上に設けられた前記床板を取り除く床板除去工程と、
前記床板が取り除かれた前記前方擁壁および前記後方擁壁の各壁面間に地面から浮いた状態で架設体を架設する架設体設置工程と、
前記架設体上に床板支柱を介して前記床板を配置する床板配置工程とを含むことを特徴とする観覧席の改修方法。
Renovation of an existing bleachers with a structure in which a floor board is provided on the front and rear retaining walls extending in parallel to each other along a direction perpendicular to the inclined direction of the slope, and a plurality of seats are provided on the floor board. A method,
A floor board removing step of removing the floor board provided on the front retaining wall and the rear retaining wall;
A construction body installation step of constructing a construction body in a state of floating from the ground surface between the wall surfaces of the front retaining wall and the rear retaining wall from which the floor plate has been removed;
A method for refurbishing a bleacher seat, comprising: a floorboard arrangement step of arranging the floorboard on a floor through a floorboard column.
斜面の傾斜方向に対して直交する方向に沿って互いに平行に延びる前方擁壁および後方擁壁上に床板が設けられるとともに同床板上に複数の座席が設けられた構成の既存の観覧席の改修に用いられる観覧席改修用部品であって、
前記前方擁壁および前記後方擁壁の各壁面間に地面から浮いた状態で架設される架設体と、
前記架設体に支持されて前記床板を下方から支持する床板支柱とを備えることを特徴とする観覧席改修用部品。
Renovation of an existing bleachers with a structure in which a floor board is provided on the front and rear retaining walls extending in parallel to each other along a direction perpendicular to the inclined direction of the slope, and a plurality of seats are provided on the floor board. Parts for repairing bleachers used in
A erected body that is erected between the front retaining wall and the rear retaining wall in a state of floating from the ground;
A bleacher seat refurbishment part, comprising: a floor column support that is supported by the installation body and supports the floor plate from below.
JP2016139142A 2016-07-14 2016-07-14 Structure of renovation of bleachers, method of refurbishment of bleachers and parts for renovation Active JP6478947B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016139142A JP6478947B2 (en) 2016-07-14 2016-07-14 Structure of renovation of bleachers, method of refurbishment of bleachers and parts for renovation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016139142A JP6478947B2 (en) 2016-07-14 2016-07-14 Structure of renovation of bleachers, method of refurbishment of bleachers and parts for renovation

Publications (2)

Publication Number Publication Date
JP2018009374A true JP2018009374A (en) 2018-01-18
JP6478947B2 JP6478947B2 (en) 2019-03-06

Family

ID=60994220

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016139142A Active JP6478947B2 (en) 2016-07-14 2016-07-14 Structure of renovation of bleachers, method of refurbishment of bleachers and parts for renovation

Country Status (1)

Country Link
JP (1) JP6478947B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020139281A (en) * 2019-02-27 2020-09-03 鹿島建設株式会社 Seat changing method for auditorium seat

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62220634A (en) * 1986-03-24 1987-09-28 三井建設株式会社 Construction of stepped concrete floor
JPH07247709A (en) * 1994-03-03 1995-09-26 Nikken Sekkei Ltd Air conditioning structure of seats in ascending arrangement
JPH1075849A (en) * 1996-09-03 1998-03-24 Naoki Kumagai Sand guard bench and retaining wall
JP2001108290A (en) * 1999-10-04 2001-04-20 Takenaka Komuten Co Ltd Floor structure for spectator seats in tiers
US20090272042A1 (en) * 2009-03-24 2009-11-05 Stadium Savers, Ltd. Tiered seating system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS62220634A (en) * 1986-03-24 1987-09-28 三井建設株式会社 Construction of stepped concrete floor
JPH07247709A (en) * 1994-03-03 1995-09-26 Nikken Sekkei Ltd Air conditioning structure of seats in ascending arrangement
JPH1075849A (en) * 1996-09-03 1998-03-24 Naoki Kumagai Sand guard bench and retaining wall
JP2001108290A (en) * 1999-10-04 2001-04-20 Takenaka Komuten Co Ltd Floor structure for spectator seats in tiers
US20090272042A1 (en) * 2009-03-24 2009-11-05 Stadium Savers, Ltd. Tiered seating system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020139281A (en) * 2019-02-27 2020-09-03 鹿島建設株式会社 Seat changing method for auditorium seat
JP7132152B2 (en) 2019-02-27 2022-09-06 鹿島建設株式会社 How to change seats in spectator seats

Also Published As

Publication number Publication date
JP6478947B2 (en) 2019-03-06

Similar Documents

Publication Publication Date Title
JP4715610B2 (en) Construction method inside tunnel
KR101588593B1 (en) Temporary bridge construction method
JP4686369B2 (en) Double floor structure
JP3881210B2 (en) Tunnel floor slab construction method and tunnel
JP6478947B2 (en) Structure of renovation of bleachers, method of refurbishment of bleachers and parts for renovation
JP6860167B2 (en) How to build Box Culvert and Box Culvert
KR101839087B1 (en) Foundation pad for water tank which is easy to control the height and construction method of prefabricated water tank using the same
KR100653202B1 (en) operating method of toilet stool and floor-ring for the same
JP4070566B2 (en) Tunnel block continuous construction method
JP3181195U (en) Slope placement steps and slope placement steps
JP2017061803A (en) Positioning jig for anchor bolt for column, and construction method for steel column base part
EP3411544B1 (en) Service pit and method for assembling and installing the service pit
JP6055212B2 (en) Reinforced earth wall construction method
JP5912194B1 (en) Construction method of wooden building and basic member used in the construction method
CN104060784B (en) Without column full glass console model handrail base
JP3971420B2 (en) Balcony railing
KR101231779B1 (en) Extended precast concrete panel and construction method of it
JP6164479B2 (en) Underground pit structure
JP6998653B2 (en) Construction method of step floor support legs and step floor structure using them
JP6998681B2 (en) Construction method of step floor support legs and step floor structure using them
JP4219653B2 (en) Floor repair method
JP6427814B2 (en) Tunnel construction method, invert construction method, and formwork apparatus
JP6881873B2 (en) Narrow part slip foam construction method
KR20140046328A (en) The soundproof wall of reinforce rib post and link by welded insertion method
JP4126312B2 (en) Floor board construction method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20180329

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20181225

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20190108

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20190205

R150 Certificate of patent or registration of utility model

Ref document number: 6478947

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250