KR100653202B1 - operating method of toilet stool and floor-ring for the same - Google Patents

operating method of toilet stool and floor-ring for the same Download PDF

Info

Publication number
KR100653202B1
KR100653202B1 KR1020050048798A KR20050048798A KR100653202B1 KR 100653202 B1 KR100653202 B1 KR 100653202B1 KR 1020050048798 A KR1020050048798 A KR 1020050048798A KR 20050048798 A KR20050048798 A KR 20050048798A KR 100653202 B1 KR100653202 B1 KR 100653202B1
Authority
KR
South Korea
Prior art keywords
toilet
bottom ring
height
toilet bowl
main body
Prior art date
Application number
KR1020050048798A
Other languages
Korean (ko)
Other versions
KR20050067376A (en
Inventor
장재혁
Original Assignee
장재혁
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Family has litigation
First worldwide family litigation filed litigation Critical https://patents.darts-ip.com/?family=37258095&utm_source=google_patent&utm_medium=platform_link&utm_campaign=public_patent_search&patent=KR100653202(B1) "Global patent litigation dataset” by Darts-ip is licensed under a Creative Commons Attribution 4.0 International License.
Application filed by 장재혁 filed Critical 장재혁
Priority to KR1020050048798A priority Critical patent/KR100653202B1/en
Publication of KR20050067376A publication Critical patent/KR20050067376A/en
Application granted granted Critical
Publication of KR100653202B1 publication Critical patent/KR100653202B1/en

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E03WATER SUPPLY; SEWERAGE
    • E03DWATER-CLOSETS OR URINALS WITH FLUSHING DEVICES; FLUSHING VALVES THEREFOR
    • E03D11/00Other component parts of water-closets, e.g. noise-reducing means in the flushing system, flushing pipes mounted in the bowl, seals for the bowl outlet, devices preventing overflow of the bowl contents; devices forming a water seal in the bowl after flushing, devices eliminating obstructions in the bowl outlet or preventing backflow of water and excrements from the waterpipe
    • E03D11/13Parts or details of bowls; Special adaptations of pipe joints or couplings for use with bowls, e.g. provisions in bowl construction preventing backflow of waste-water from the bowl in the flushing pipe or cistern, provisions for a secondary flushing, for noise-reducing
    • E03D11/16Means for connecting the bowl to the floor, e.g. to a floor outlet

Landscapes

  • Health & Medical Sciences (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Hydrology & Water Resources (AREA)
  • Public Health (AREA)
  • Water Supply & Treatment (AREA)
  • Sanitary Device For Flush Toilet (AREA)

Abstract

본 발명은 양변기 시공방법에 관한 것이며, 보다 편리하게 시공 가능하고 설치 후 외관상 뛰어난 특징을 가지고 설치시 지면의 높낮이가 일정치 않아 수평이 맞지않는 상황에서도 설치가 가능토록 하는 시공방법이며, 이를 위해 배수관에 플랜지를 설치하는 플랜지결합단계와; 양변기 바닥부에 합성수지 재질로 이루어진 바닥링을 끼우고 제위치에 안착시킨 후, 양변기의 흔들림을 확인하는 가설치단계와; 상대적으로 높이가 낮은 부위에 상기 바닥링에 부착되어있는 높이조절편을 떼어 상기 바닥링의 상면에 삽입한 후 양변기와 바닥링을 재결합하는 높이보정단계와; 높이보정 후 양변기를 제위치에 두고 볼트로 지면에 고정시키는 마감단계;로 구성됨을 기술적 요지로 하는 양변기 시공방법에 관한것이다.The present invention relates to a toilet toilet construction method, which is more convenient construction and has an excellent appearance after installation and the installation method to be installed even in a situation where the height of the ground is not constant when the installation is not horizontal, drain pipe for this A flange coupling step of installing a flange on the flange; Inserting a bottom ring made of synthetic resin material in the bottom of the toilet seat and seated in place, the temporary installation step of checking the shaking of the toilet bowl; A height correction step of removing the height adjusting piece attached to the bottom ring at a relatively low portion and inserting the height adjusting piece into the upper surface of the bottom ring and then recombining the toilet bowl and the bottom ring; It is related to the construction method of the toilet with the technical gist of the; the finishing step of fixing the height to the ground with the bolt in place after the height correction.

양변기 시공방법 바닥링 가설치단계 흔들림 높이조절편 높이보정 Toilet bowl construction method Floor ring installation step Shake height adjustment piece Height correction

Description

양변기 시공방법 및 양변기 바닥링{operating method of toilet stool and floor-ring for the same}Operating method of toilet stool and floor-ring for the same}

도 1 - 본 발명에 따른 양변기 시공방법의 순서를 보여주는 개략적인 작업공정도.Figure 1-schematic work flow chart showing the sequence of the toilet construction method according to the invention.

도 2 - 바닥링의 바람직한 일 실시예를 보여주는 평면도.2-a plan view showing a preferred embodiment of the bottom ring;

도 3 - 바닥링의 또 다른 실시예에 대한 단면도. 3-cross-sectional view of another embodiment of a bottom ring.

<도면에 사용된 주요부호에 대한 설명><Description of Major Symbols Used in Drawings>

100 : 플랜지 200 : 바닥링100: flange 200: bottom ring

201 : 본체 202 : 끼움홈201: main body 202: fitting groove

203 : 흡수공 210 : 높이조절편203: absorber 210: height adjustment

215 : 분지아암215: branch arm

본 발명은 양변기 시공방법에 관련되는 것으로서, 특히 시공시 지면이 기울어져 있음으로 정확한 설치에 애로점이 있는 경우라도 간단하게 수평을 맞추어 신속한 설치가 가능토록 하는 양변기 시공방법에 관한 것이다. 또한 본 발명은 높 이조절편이 구비되는 양변기 바닥링에 관한 것이기도 하다.The present invention relates to a toilet construction method, and particularly relates to a toilet construction method that allows for quick installation by simply leveling even when there is a problem in the correct installation due to the inclination of the ground during construction. The present invention also relates to a toilet bottom ring is provided with a height adjustment piece.

일반적인 양변기 시공방법은 양변기의 배출구와 배수구를 맞춘 후 양변기를 볼트 등으로 지면에 고정시키도록 한다. 이 경우 지면이 경사져 있거나 특정부위에 함몰부가 있는 경우에는 해당지점에 시멘트 등을 이용하여 높이를 맞춘 후 설치토록 해야 한다.The general toilet construction method is to align the outlet and drain of the toilet and fix the toilet to the ground with a bolt or the like. In this case, if the ground is inclined or if there is a depression at a specific part, it should be installed after adjusting the height using cement etc.

그리고 이와 같은 시공방법의 경우 양변기를 안착시킨 후 양변기 저부와 지면과의 접촉부를 실리콘이나 백색시멘트로서 고정하여 마감처리 하는 것이 일반적이다.In the case of such a construction method, it is common to fix the finishing parts by fixing the contact portion between the bottom of the toilet and the ground with silicon or white cement after the toilet is settled.

상기와 같은 종래기술에서는 높이조절(수평맞춤)에 어려움이 있어 시공에 시간이 많이 소요되고 번거러운 점이 많았다. 그리고 시공 후 사용하다보면 실리콘이나 백색시멘트에 물때가 형성되어 미관이 나쁘며 쉽게 파손되는 경향이 있었다.In the prior art as described above, it is difficult to adjust the height (horizontal alignment), so the construction takes a lot of time and hassle. In addition, when used after construction, the scale was formed in silicon or white cement, resulting in bad aesthetics and easy breakage.

따라서 상기와 같은 문제점을 해결하기 위한 본 발명은 양변기를 시공함에 있어 양변기 바닥부에 별도의 바닥링을 두도록 하며, 또한 높이가 맞지않는 경우에는 바닥링에 구비되는 높이조절편으로서 높이보정을 한 후 시공할 수 있도록 하는 양변기 시공방법 및 이를 위한 양변기 바닥링을 제공하고자 한다.Therefore, the present invention for solving the above problems is to put a separate bottom ring in the bottom of the toilet in the construction of the toilet, and if the height does not fit after the height correction piece provided in the bottom ring To provide a toilet construction method and a toilet floor ring for the construction that can be constructed.

상술한 바와 같은 목적달성을 위한 본 발명은, 배수관에 플랜지를 설치하는 플랜지결합단계와; 양변기 바닥부에 합성수지 재질로 이루어진 바닥링을 끼우고 제위치에 안착시킨 후, 양변기의 흔들림을 확인하는 가설치단계와; 상대적으로 높이 가 낮은 부위에 상기 바닥링에 부착되어있는 높이조절편을 떼어 상기 바닥링의 상면에 삽입한 후 양변기와 바닥링을 재결합하는 높이보정단계와; 높이보정 후 양변기를 제위치에 두고 볼트로 지면에 고정시키는 마감단계;로 구성됨을 요지로 하는 양변기 시공방법에 관한 것이다.The present invention for achieving the object as described above, the flange coupling step of installing a flange on the drain pipe; Inserting a bottom ring made of synthetic resin material in the bottom of the toilet seat and seated in place, the temporary installation step of checking the shaking of the toilet bowl; A height correction step of removing the height adjusting piece attached to the bottom ring at a relatively low portion and inserting the height adjusting piece into the upper surface of the bottom ring and then recombining the toilet bowl and the bottom ring; It relates to a toilet construction method of the summary consisting of; finishing step of fixing the height to the ground with bolts in place after height correction.

그리고 본 발명은, 하부로부터 상부로 점차 그 폭이 줄어드는 형상이며 트랙형으로 연결되어져 있는 본체와; 상기 본체의 상부에는 양변기의 하부를 끼울수 있도록 함몰된 끼움홈과; 상기 본체의 내측방향으로 본체로 부터 돌출되는 분지아암의 좌우로 대칭되게 다수개가 연결되는 높이조절편;으로 구성됨을 특징으로 하는 양변기 바닥링에 관한 것이다.And the present invention, the body gradually reduced in width from the bottom to the top and is connected in a track shape; A fitting groove recessed in the upper portion of the main body so as to fit the lower portion of the toilet bowl; It relates to a toilet bottom ring, characterized in that consisting of; height adjustment piece is symmetrically connected to the left and right of the branch arm protruding from the main body in the inner direction of the main body.

또한, 상기 본체는 폭 방향으로 내외부를 관통하는 흡수공이 구비되는 것을 특징으로 하는 양변기 바닥링에 관한 것이다.In addition, the main body relates to a toilet bottom ring, characterized in that the absorption hole penetrating the inner and outer portions in the width direction is provided.

한편, 상기 본체는 그 내부에 길이방향으로 다수의 흡수공이 구비되는 것을 특징으로 하는 양변기 바닥링에 관한 것이기도 하다.On the other hand, the main body also relates to a toilet bottom ring, characterized in that a plurality of absorption holes are provided in the longitudinal direction therein.

이하에서 본 발명에 따른 양변기 시공방법 및 이에 사용되는 양변기 바닥링에 대해 보다 상세히 설명하기로 하며, 첨부되는 도면들은 본 발명의 바람직한 실시예를 보여준다.Hereinafter, a toilet construction method and a toilet floor ring to be used in accordance with the present invention will be described in more detail, the accompanying drawings show a preferred embodiment of the present invention.

먼저, 도1은 본 발명에 따른 양변기 시공방법의 순서를 보여주는 개략적인 작업공정도를 나타낸다.First, Figure 1 shows a schematic work flow chart showing the sequence of the toilet construction method according to the present invention.

본 발명에 따른 양변기 시공방법은, 크게 플랜지결합단계(Ⅰ)와, 가설치단계(Ⅱ), 높이보정단계(Ⅲ) 및 마감단계(Ⅳ)로 이루어진다.The toilet construction method according to the present invention comprises a flange coupling step (I), a temporary installation step (II), a height correction step (III) and a finishing step (IV).

플랜지결합단계(Ⅰ)는 배수관(10)에 준비된 플랜지(100)를 맞추어 끼워 넣고 볼트를 이용하여 지면에 고정토록 하는 작업이다. 바람직하게는 상기 플랜지(100)를 배수관(10)에 끼울때 악취나 소음이 새지않도록 하기위해 상호간에 밀착고정되도록 상기 플랜지(100)의 외주면에 고무재질의 패킹(101)을 설치토록 한다.Flange coupling step (I) is a work to fit the flange 100 prepared in the drain pipe 10 to be fixed to the ground by using a bolt. Preferably, the rubber packing 101 is installed on the outer circumferential surface of the flange 100 so that the flange 100 is fixed in close contact with each other to prevent odor or noise from leaking when the flange 100 is inserted into the drain pipe 10.

그리고 상기 플랜지(100)의 상면에는 완충패드(102)가 놓여지며 양변기를 설치할 시에 상기 완충패드의 내경속으로 양변기의 배출구가 삽입된다.And the buffer pad 102 is placed on the upper surface of the flange 100 and the outlet of the toilet is inserted into the inner speed of the buffer pad when installing the toilet.

본 발명에 사용되는 플랜지는 비단 도시된 것에 한정되는 것은 아니며, 공지의 플랜지를 사용할 수 있고, 그 외 소음저감을 위해 수단이 구비되는 것도 적용할 수 있다.The flange used in the present invention is not limited to the illustrated one, but a known flange can be used, and other means may be applied in which a means is provided for noise reduction.

이어서 두번째 과정으로서 양변기의 흔들림을 확인하는 가설치단계(Ⅱ)가 이루어진다. 이를 위해 양변기 바닥부에 합성수지 재질의 바닥링(200)을 끼워 고정시키도록 하며, 이후 양변기를 설치위치에 안착시키도록 한다. 양변기를 설치될 제위치에 놓은 후에는 수평이 맞는지를 확인하게 된다.Subsequently, a temporary installation step (II) is performed to check shaking of the toilet as a second process. To this end, the bottom ring 200 made of a synthetic resin material is fixed to the bottom of the toilet, and then the toilet is seated in an installation position. After the toilet is in place, it will be checked for horizontality.

보통 양변기가 설치되는 욕실은 배수를 위해 지면이 경사져 있다. 따라서 양변기를 수평으로 설치키 위해서는 지면에 고정하기 전에 흔들림이 없는지를 확인하는 것이다. 이 과정을 통해 특정부위가 낮으면 높이를 맞추어 수평을 유지할 수 있도록 해야 한다.Usually bathrooms with toilets are sloped for drainage. Therefore, to install both toilets horizontally is to check that there is no shaking before fixing to the ground. Through this process, if a certain part is low, it should be leveled and leveled.

이상과 같이 양변기의 높이(수평유지)를 맞추기 위해서 다음단계로 높이보정단계(Ⅲ)가 수행된다.In order to match the height (horizontal maintenance) of the toilet as described above, the height correction step (III) is performed in the next step.

높이보정단계(Ⅲ)는 상기 가설치단계(Ⅱ)에서 확인된 상대적으로 낮은 부위 에 상기 바닥링(200)에 부착되어 있는 높이조절편(210)을 떼어 바닥링(200)의 상면에 삽입한 후 양변기와 바닥링을 재결합하는 것으로 높이보정을 하게 된다.In the height correction step (III), the height adjusting piece 210 attached to the bottom ring 200 is removed and inserted into the upper surface of the bottom ring 200 at the relatively low part identified in the temporary installation step (II). After recombining the toilet bowl and the bottom ring is the height correction.

상기 높이조절편(210)은 바닥링(200)의 내측에 돌출되게 다수개가 부착되어져 있으며, 보정될 높이와 위치에 따라 그 개수와 설치위치를 결정하게 된다. 높이조절편이 구비되는 바닥링에 대해서는 후술하기로 한다.The height adjusting piece 210 is attached to a plurality of protruding inside the bottom ring 200, and determines the number and installation position according to the height and position to be corrected. The bottom ring is provided with a height adjustment piece will be described later.

높이보정이 완료된 후 마지막 단계로서 마감단계(Ⅳ)가 수행되며, 이것은 높이보정이 이루어진 양변기를 설치위치에 놓고 지면에 고정시키는 것이다. 양변기의 고정은 플랜지결합단계에서 플랜지 결합에 사용된 볼트를 이용하여 너트로서 결합 고정시키도록 한다.After the height correction is completed, the finishing step (IV) is carried out as a final step. This is to fix the height-corrected toilet to the installation position and fix it to the ground. Fixing the toilet is to be fixed as a nut using the bolt used in the flange coupling step in the flange coupling step.

상기와 같은 연속적인 과정을 통해 양변기를 손쉽게 시공할 수 있게 된다.The toilet can be easily installed through the continuous process as described above.

이하에서는 본 발명에 따른 양변기 시공방법에 사용되는 바닥링에 대해 보다 상세히 설명하기로 한다.Hereinafter, the bottom ring used in the toilet construction method according to the present invention will be described in more detail.

도2는 상기 바닥링의 바람직한 일 실시예를 보여주는 평면도에 해당되며, 도3은 또 다른 실시예에 대한 단면도를 나타낸다.Figure 2 corresponds to a plan view showing one preferred embodiment of the bottom ring, Figure 3 shows a cross-sectional view of another embodiment.

상기 바닥링(200)은 크게 본체(201)와 끼움홈(202)과 높이조절편(210)으로 구성되며, 상기 본체(201)는 트랙형의 형태를 가지며 전체가 연결되어져 있고 하부는 넓고 상부는 좁도록 성형된다. 즉, 하부로부터 상부로 점차 그 폭이 줄어드며, 상기 본체의 상부에는 양변기의 하부를 끼울 수 있도록 함몰된 끼움홈(202)이 형성된다. 상기 끼움홈은 도시된 바와 같이 상단부가 뾰족하게 내측으로 기울어진 형상이므로 양변기와 결합시 밀착이 가능하게 된다.The bottom ring 200 is composed of a main body 201, the fitting groove 202 and the height adjusting piece 210, the main body 201 has a track-like form, the whole is connected, the lower part is wide and the upper part Is shaped to be narrow. That is, the width gradually decreases from the lower portion to the upper portion, and the upper portion of the main body has a recessed fitting groove 202 formed to fit the lower portion of the toilet. Since the fitting groove is inclined inwardly inclined to the upper end as shown, it is possible to be in close contact with the toilet.

그리고 상기 본체(201)의 전후방향 내측부에 본체로 부터 돌출되는 분지아암(215)이 형성되며 상기 분지아암(215)의 좌우로 다수개의 높이조절편(210)이 대칭되게 부착되어져 있다. 상기 바닥링은 고무재질을 이용하여 사출성형되며 사출성형시 상기 높이조절편도 일체로 사출되도록 한다.A branch arm 215 protruding from the main body is formed at the front and rear inner side of the main body 201, and a plurality of height adjusting pieces 210 are symmetrically attached to the left and right sides of the branch arm 215. The bottom ring is injection molded using a rubber material, and the height adjusting piece is integrally injected during injection molding.

이처럼, 본 발명에 따른 바닥링의 경우에 높이조절편이 구비됨으로서 상술한 바와 같은 시공과정에서 지면의 불균일로 인해 양변기를 수평으로 맞추고자 할 시에 상기 높이조절편을 필요한 개수만큼 떼내어 바닥링 상부 끼움홈에 삽입함으로서 양변기의 수평을 맞출수 있게 된다.As such, in the case of the bottom ring according to the present invention, the height adjusting piece is provided so that the height adjusting piece is removed as many times as necessary in the construction process as described above due to the unevenness of the ground. By inserting into the fitting groove, the toilet can be leveled.

이하, 본 발명에 따른 상기 바닥링의 또 다른 실시예에 대해 설명하기로 한다.Hereinafter, another embodiment of the bottom ring according to the present invention will be described.

도3의 에이(a)에 보이는 것처럼, 바닥링(200)을 이루는 본체(201)에 가로방향(폭방향)으로 내외부를 관통하는 흡수공(203)이 연속적으로 구비될 수 있다. 상기 흡수공은 충격흡수 기능을 보조하는 역할을 한다.As shown in a (a) of FIG. 3, the absorption hole 203 penetrating the inside and the outside in the horizontal direction (width direction) may be continuously provided in the main body 201 constituting the bottom ring 200. The absorption hole serves to assist the shock absorption function.

또한, 비이(b)와 같이 상기 본체(201)의 내부에 길이방향으로 다수개의 흡수공(203)을 형성시킬 수도 있다. 이것 역시 충격흡수를 목적으로 구비되는 것이다.In addition, a plurality of absorption holes 203 may be formed in the longitudinal direction inside the main body 201 as in the beam b. This is also provided for the purpose of shock absorption.

상술한 바와 같은 구성에 따른 본 발명에 의하면, 양변기 시공시 바닥의 불균일이 있더라도 높이조절편을 이용하여 간편하고 신속하게 대처하여 시공이 가능하며, 따라서 시공능률이 향상된다는 효과가 있고, 바닥링의 고무재질로 제작되므 로 원하는 색상의 것으로 제작가능하여 외관을 보다 돋보이게 할 수 있다는 효과가 있다.According to the present invention according to the configuration as described above, even if there is a non-uniformity of the floor at the time of construction of the toilet, it is possible to easily and quickly cope with the construction using the height adjustment piece, thus improving the construction efficiency, the effect of the bottom ring Since it is made of a rubber material, it can be manufactured in a desired color, thereby making the appearance more attractive.

또한, 상기 바닥링을 사용하는 시공방법에 의하면 바닥링이 파손되지 않기때문에 내구성이 좋고, 물때가 끼이더라도 쉽게 제거할 수 있어 청소등이 간편하다는 효과도 있다.In addition, according to the construction method using the bottom ring is because the bottom ring is not damaged, the durability is good, and even if the scale is stuck, there is also an effect that the cleaning is easy.

그리고 충격흡수가 잘 이루어지므로 양변기가 손상될 염려도 줄일 수 있다는 효과도 있다.And because the shock absorption is made well, there is an effect that can reduce the risk of damage to the toilet.

Claims (4)

배수관에 플랜지를 설치하는 플랜지결합단계와;A flange coupling step of installing a flange on the drain pipe; 양변기 바닥부에 합성수지 재질로 이루어진 바닥링을 끼우고 제위치에 안착시킨 후, 양변기의 흔들림을 확인하는 가설치단계와;Inserting a bottom ring made of synthetic resin material in the bottom of the toilet seat and seated in place, the temporary installation step of checking the shaking of the toilet bowl; 상대적으로 높이가 낮은 부위에 상기 바닥링에 부착되어있는 높이조절편을 떼어 상기 바닥링의 상면에 삽입한 후 양변기와 바닥링을 재결합하는 높이보정단계와;A height correction step of removing the height adjusting piece attached to the bottom ring at a relatively low portion and inserting the height adjusting piece into the upper surface of the bottom ring and then recombining the toilet bowl and the bottom ring; 높이보정 후 양변기를 제위치에 두고 너트로 지면에 고정시키는 마감단계;로 구성됨을 특징으로 하는 양변기 시공방법.Toilet bowl construction method characterized in that consisting of; finishing step of fixing the height to the ground with a nut in place after the height correction. 하부로부터 상부로 점차 그 폭이 줄어드는 형상이며 트랙형으로 연결되어져 있는 본체와;A main body connected in a track shape, the width of which gradually decreases from the bottom to the top; 상기 본체의 상부에는 양변기의 하부를 끼울수 있도록 함몰된 끼움홈과;A fitting groove recessed in the upper portion of the main body so as to fit the lower portion of the toilet bowl; 상기 본체의 내측방향으로 본체로부터 돌출되는 분지아암의 좌우로 대칭되게 다수개가 연결되는 높이조절편;으로 구성됨을 특징으로 하는 양변기 바닥링.The toilet bowl bottom ring, characterized in that consisting of; height adjustment piece is connected symmetrically to the left and right of the branch arm protruding from the main body in the inner direction of the main body. 제2항에 있어서, 상기 본체는,The method of claim 2, wherein the main body, 폭 방향으로 내외부를 관통하는 흡수공이 구비되는 것을 특징으로 하는 양변기 바닥링.Toilet bowl bottom ring characterized in that the absorption hole is provided penetrating the inner and outer portions in the width direction. 제2항에 있어서, 상기 본체는,The method of claim 2, wherein the main body, 그 내부에 길이방향으로 다수의 흡수공이 구비되는 것을 특징으로 하는 양변기 바닥링.Toilet bowl bottom ring, characterized in that a plurality of absorption holes are provided in the longitudinal direction therein.
KR1020050048798A 2005-06-08 2005-06-08 operating method of toilet stool and floor-ring for the same KR100653202B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020050048798A KR100653202B1 (en) 2005-06-08 2005-06-08 operating method of toilet stool and floor-ring for the same

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020050048798A KR100653202B1 (en) 2005-06-08 2005-06-08 operating method of toilet stool and floor-ring for the same

Publications (2)

Publication Number Publication Date
KR20050067376A KR20050067376A (en) 2005-07-01
KR100653202B1 true KR100653202B1 (en) 2006-12-01

Family

ID=37258095

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020050048798A KR100653202B1 (en) 2005-06-08 2005-06-08 operating method of toilet stool and floor-ring for the same

Country Status (1)

Country Link
KR (1) KR100653202B1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100948619B1 (en) 2009-06-11 2010-03-18 (주)도기산업기술연구소 Mold for toilet stool with adjusting-high apparatus
KR100999859B1 (en) 2010-01-20 2010-12-09 장재웅 Floor material for toilet bowl
KR101002630B1 (en) 2008-04-11 2010-12-21 (주)도기산업기술연구소 A toilet bowl having illumination apparatus
JP2019143420A (en) * 2018-02-23 2019-08-29 株式会社Lixil Floor-standing toilet

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09125507A (en) * 1995-10-27 1997-05-13 Inax Corp Remodeling method of stool bottom cover and stool for dew proofing and installation working method of stool
JP2001049724A (en) 1999-08-06 2001-02-20 Sumitomo Forestry Co Ltd Dew drop receiving seat for toilet
KR200262166Y1 (en) 2001-09-04 2002-03-18 (주) 뷰티플라이프 ring for installing toilet stool
KR200287957Y1 (en) 2000-10-12 2002-09-05 페브 에스.에이. Sealing gasket for water closet

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH09125507A (en) * 1995-10-27 1997-05-13 Inax Corp Remodeling method of stool bottom cover and stool for dew proofing and installation working method of stool
JP2001049724A (en) 1999-08-06 2001-02-20 Sumitomo Forestry Co Ltd Dew drop receiving seat for toilet
KR200287957Y1 (en) 2000-10-12 2002-09-05 페브 에스.에이. Sealing gasket for water closet
KR200262166Y1 (en) 2001-09-04 2002-03-18 (주) 뷰티플라이프 ring for installing toilet stool

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR101002630B1 (en) 2008-04-11 2010-12-21 (주)도기산업기술연구소 A toilet bowl having illumination apparatus
KR100948619B1 (en) 2009-06-11 2010-03-18 (주)도기산업기술연구소 Mold for toilet stool with adjusting-high apparatus
KR100999859B1 (en) 2010-01-20 2010-12-09 장재웅 Floor material for toilet bowl
JP2019143420A (en) * 2018-02-23 2019-08-29 株式会社Lixil Floor-standing toilet
JP7093146B2 (en) 2018-02-23 2022-06-29 株式会社Lixil Floor-standing toilet

Also Published As

Publication number Publication date
KR20050067376A (en) 2005-07-01

Similar Documents

Publication Publication Date Title
US6571406B2 (en) Supporting body for a shower tub
KR100653202B1 (en) operating method of toilet stool and floor-ring for the same
KR101907111B1 (en) Wood block module with height level adjustable and shock absorbing type
US6644670B2 (en) Sealing gaskets for water closets
US3466676A (en) Pool structure
KR200480256Y1 (en) Base for balusters
KR101779819B1 (en) Setting height adjusting type trench
JP6478947B2 (en) Structure of renovation of bleachers, method of refurbishment of bleachers and parts for renovation
KR20100034374A (en) Railing support for bridge having folding structure
KR100491759B1 (en) pedestal for installing toilet stool
KR100465195B1 (en) Frame for toilet bowl
EP1344874A2 (en) Methods and devices at a gully having fixing means for an extension ring
KR20140052190A (en) Modularized assembly for supporting toilet bowl seat
CZ9904037A3 (en) Shaft covering
KR100999859B1 (en) Floor material for toilet bowl
KR100985990B1 (en) Concrete waterway
KR20100000414U (en) Bottom tools for a toilet stool
KR200372314Y1 (en) A toilet bowl assembly
KR200341018Y1 (en) A mold for drainage
KR100451679B1 (en) The closing construction method and device of a toilet bowl
KR101163932B1 (en) Belt type tools for toilet bowl
KR102374328B1 (en) clip type deck lode with reinforced rigidity of natural wood and installation Method Thereof
KR20100034373A (en) Railing support for bridge having folding structure
KR101002631B1 (en) Apparatus for adjusting height of toilet stool
KR200261919Y1 (en) Round sewer pipe structure of a road

Legal Events

Date Code Title Description
A201 Request for examination
E701 Decision to grant or registration of patent right
GRNT Written decision to grant
FPAY Annual fee payment

Payment date: 20130527

Year of fee payment: 7

FPAY Annual fee payment

Payment date: 20140526

Year of fee payment: 8

FPAY Annual fee payment

Payment date: 20160526

Year of fee payment: 10

FPAY Annual fee payment

Payment date: 20170526

Year of fee payment: 11

FPAY Annual fee payment

Payment date: 20180806

Year of fee payment: 12

R401 Registration of restoration
LAPS Lapse due to unpaid annual fee