JP2018003481A - Replacement method for cushioning material of soundproof wall - Google Patents

Replacement method for cushioning material of soundproof wall Download PDF

Info

Publication number
JP2018003481A
JP2018003481A JP2016132970A JP2016132970A JP2018003481A JP 2018003481 A JP2018003481 A JP 2018003481A JP 2016132970 A JP2016132970 A JP 2016132970A JP 2016132970 A JP2016132970 A JP 2016132970A JP 2018003481 A JP2018003481 A JP 2018003481A
Authority
JP
Japan
Prior art keywords
side member
soundproof
plate
cushioning material
slide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2016132970A
Other languages
Japanese (ja)
Other versions
JP6736387B2 (en
Inventor
ちづる 嶋倉
Chizuru Shimakura
ちづる 嶋倉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
East Japan Railway Co
Original Assignee
East Japan Railway Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by East Japan Railway Co filed Critical East Japan Railway Co
Priority to JP2016132970A priority Critical patent/JP6736387B2/en
Publication of JP2018003481A publication Critical patent/JP2018003481A/en
Application granted granted Critical
Publication of JP6736387B2 publication Critical patent/JP6736387B2/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

PROBLEM TO BE SOLVED: To provide a replacement method for a cushioning material that enables replacement work for a cushioning material of a soundproof wall to be easily performed, even when there is no space outside a railway track for using a high lift work vehicle or a crane truck.SOLUTION: The replacement method for a cushioning material of a soundproof wall includes: a first step of forming a gap between top and bottom sound insulation board materials 12, 12; a second step of temporarily fixing a sliding-side member 21 to a support post 11, while inserting an insertion plate 23 into the gap; a third step of fixing a stationary-side member 25 to a position on a support post 11 below the sliding-side member 21; a fourth step of installing a jack 26 on a top surface of the stationary-side member 25; a fifth step of lifting the top sound insulation board material 12 using the jack 26 and through the insertion plate 23, after releasing the temporary fixing while keeping the sliding-side member 21 fitted on the support post 11; a sixth step of removing a cushioning material 13 remaining between the top and bottom sound insulation board materials 12, 12; and a seventh step of installing a new cushioning material 13N on a top surface of the bottom sound insulation board material 12.SELECTED DRAWING: Figure 5

Description

本発明は、防音壁における緩衝材の交換方法に関する。   The present invention relates to a method for replacing a cushioning material in a soundproof wall.

鉄道車両が軌道を走行することにより発生する騒音としては、車輪やレールの振動から発生する転動音、パンタグラフから発生する集電騒音、車体と空気流との作用から発生する車体空力音、高架橋等の構造物の振動から発生する構造物音等が挙げられる。このような騒音が線路外へ伝搬することを抑制すべく、軌道の側方には防音壁が設けられている。
例えば特許文献1に記載されたような防音壁は、複数枚の防音板材が、互いに間隔を空けて立設された複数の支柱間に亘って、上下方向に複数段に積み重ねられるようにして形成されている。また、防音壁を構成する上下の防音板材間には、これら防音板材同士の接触を防ぐ緩衝材が設けられる場合があり、このような緩衝材によって、防音板材同士の接触に起因する騒音の発生や破損を抑制できるようになっている。
Noise generated when a railway vehicle travels on a track includes rolling noise generated from vibration of wheels and rails, current collection noise generated from a pantograph, vehicle aerodynamic noise generated from the action of the vehicle body and airflow, viaduct The sound of the structure generated from the vibration of the structure such as In order to suppress such noise from propagating outside the track, a soundproof wall is provided on the side of the track.
For example, a soundproof wall as described in Patent Document 1 is formed such that a plurality of soundproof plate members are stacked in a plurality of stages in the vertical direction across a plurality of support columns standing upright apart from each other. Has been. In addition, a cushioning material that prevents contact between the soundproofing plate materials may be provided between the upper and lower soundproofing plate materials constituting the soundproofing wall, and such a cushioning material generates noise due to the contact between the soundproofing plate materials. And damage can be suppressed.

特開2005−60975号公報JP 2005-60975 A

ところで、上下の防音板材間に設けられた緩衝材は、常態的に上下の防音板材同士の衝突や衝撃を和らげる働きをしているため経年変化しやすく、定期的な交換作業が必要であった。緩衝材を交換するに当たっては防音板材を持ち上げる必要があり、防音板材を持ち上げる作業を、例えば線路外の側道から高所作業車やクレーン車を利用して行なっていた。しかしながら、線路外に高所作業車やクレーン車を使用できるスペースが確保できない場所では緩衝材の交換作業が困難であった。   By the way, the cushioning material provided between the upper and lower soundproofing plate materials normally works to relieve the collision and impact between the upper and lower soundproofing plate materials, so it is easy to change over time, and regular replacement work was necessary. . When replacing the cushioning material, it is necessary to lift the soundproofing plate material, and the work of lifting the soundproofing plate material is performed, for example, using an aerial work vehicle or a crane vehicle from a side road outside the track. However, it is difficult to replace the cushioning material in a place where it is not possible to secure a space where an aerial work vehicle or a crane vehicle can be used outside the track.

本発明の目的は、線路外に高所作業車やクレーン車を使用できるスペースが確保できない場所であっても、防音壁における緩衝材の交換作業を容易に行うことができる緩衝材の交換方法を提供することである。   An object of the present invention is to provide a cushioning material replacement method capable of easily performing cushioning material replacement work on a soundproof wall even in a place where a space for using an aerial work vehicle or a crane truck cannot be secured outside a railway track. Is to provide.

上記目的を達成するため、この発明は、
複数の防音板材が、前記防音板材の側端部が入り込む凹状の案内溝が形成され、互いに間隔を空けて立設された複数の支柱間に亘って設けられ、かつ緩衝材を介在させた状態で上下方向に積み重ねられて形成された防音壁における前記緩衝材の交換を行う方法であって、
前記上下方向に隣り合う防音板材間に隙間を空ける第1工程と、
前記隙間に差し込まれる差込プレートを有し、前記支柱の長さ方向に沿ってスライド可能なスライド側部材を、前記差込プレートを前記隙間に差し込みながら前記支柱に装着させた後に前記支柱に仮固定しておく第2工程と、
固定側部材を、前記支柱のうち前記スライド側部材の下方の位置に装着させて固定する第3工程と、
前記固定側部材の上面に、当該固定側部材と前記スライド側部材との間に位置するようにしてジャッキを設置する第4工程と、
前記スライド側部材を前記支柱に沿ってスライド可能な状態で装着させたまま仮固定を解除した後に、前記ジャッキによって、前記差込プレートを介して上側の前記防音板材を持ち上げる第5工程と、
前記上下方向に隣り合う防音板材間に残留している前記緩衝材を除去する第6工程と、
下側の前記防音板材の上面に新規の緩衝材を設ける第7工程と、を含むようにした。
In order to achieve the above object, the present invention provides:
A state in which a plurality of soundproof plate members are formed with a recessed guide groove into which a side end portion of the soundproof plate member is inserted, are provided between a plurality of support columns standing upright apart from each other, and a cushioning material is interposed In the method of exchanging the cushioning material in the soundproof wall formed by being stacked in the vertical direction,
A first step of opening a gap between the soundproof plate materials adjacent in the vertical direction;
A slide-side member that has an insertion plate to be inserted into the gap and is slidable along the length of the column is temporarily attached to the column after the insertion plate is inserted into the gap. A second step of fixing,
A third step of fixing and fixing the fixed side member at a position below the slide side member of the support;
A fourth step of installing a jack on the upper surface of the fixed side member so as to be positioned between the fixed side member and the slide side member;
A fifth step of lifting the soundproof plate material on the upper side through the insertion plate by the jack after releasing the temporary fixing while the slide side member is mounted in a slidable state along the column;
A sixth step of removing the buffer material remaining between the soundproof plate materials adjacent in the vertical direction;
And a seventh step of providing a new cushioning material on the upper surface of the lower soundproof plate material.

このような緩衝材の交換方法によれば、上下方向に隣り合う防音板材間に空けられた隙間に差込プレートを差し込んで、この差込プレートを有するスライド側部材を、支柱に沿って上方に持ち上げるだけで上側の防音板材を持ち上げることができ、緩衝材の交換作業を行うことができる。さらに、スライド側部材と固定側部材を支柱に装着させ、ジャッキを固定側部材とスライド側部材との間に設置するだけで緩衝材の交換作業を行なうことができるので、広い作業スペースを確保する必要がない。したがって、線路外に高所作業車やクレーン車を使用できるスペースが確保できない場所であっても、防音壁における緩衝材の交換作業を容易に行うことができる。   According to such a replacement method of the cushioning material, the insertion plate is inserted into the gap formed between the soundproof plate materials adjacent in the vertical direction, and the slide side member having this insertion plate is moved upward along the support column. It is possible to lift the upper soundproof plate simply by lifting it up, and to perform a buffer material replacement operation. Furthermore, the cushioning material can be replaced simply by attaching the slide side member and the fixed side member to the column and installing the jack between the fixed side member and the slide side member, thus ensuring a wide working space. There is no need. Therefore, even if it is a place which cannot secure the space which can use an aerial work vehicle or a crane vehicle outside a track, the exchange operation of the shock absorbing material in a soundproof wall can be performed easily.

また、望ましくは、前記第2工程から前記第4工程において、前記スライド側部材と前記固定側部材と前記ジャッキを、隣り合う前記支柱の双方に設置し、
前記第5工程において、前記上側の防音板材の両側端部を同時に等しい高さまで持ち上げるようにする。
このような緩衝材の交換方法によれば、上側の防音板材の両側端部を同時に等しい高さまで持ち上げるので、上側の防音板材をバランスよく、かつ安定的に持ち上げることができる。
Preferably, in the second step to the fourth step, the slide side member, the fixed side member, and the jack are installed on both of the adjacent columns,
In the fifth step, both end portions of the upper soundproof plate member are simultaneously lifted to the same height.
According to such a method of replacing the cushioning material, both end portions of the upper soundproof plate material are simultaneously lifted to the same height, so that the upper soundproof plate material can be lifted in a balanced and stable manner.

また、望ましくは、前記第5工程において、前記上側の防音板材を持ち上げた後に前記スライド側部材を前記支柱に仮固定し、さらに、前記ジャッキを取り外すとともに、前記固定側部材を下方に移動させ、
前記第7工程以降に、前記下側の防音板材を、前記スライド側部材とは異なる他のスライド側部材と、前記固定側部材および前記ジャッキを用いて持ち上げる工程をさらに含むようにする。
このような緩衝材の交換方法によれば、上側の防音板材を仮固定しておくスライド側部材とは異なる他のスライド側部材を用意しておけば、上側の防音板材の直下に位置する防音板材を持ち上げる際に、固定側部材およびジャッキを使い回すことができるので、緩衝材の交換作業に係るコストの低減を図ることができる。
Preferably, in the fifth step, the slide-side member is temporarily fixed to the column after the upper soundproof plate is lifted, and the jack is removed and the fixed-side member is moved downward.
After the seventh step, the method further includes a step of lifting the lower soundproof plate member using another slide side member different from the slide side member, the fixed side member, and the jack.
According to such a cushioning material replacement method, if another slide-side member different from the slide-side member for temporarily fixing the upper soundproof plate material is prepared, the soundproofing located directly below the upper soundproof plate material. When lifting the plate material, the fixed side member and the jack can be reused, so that the cost for replacing the cushioning material can be reduced.

また、望ましくは、前記上側の防音板材は、上下に隣り合う複数の防音板材を含んでおり、前記第5工程では、当該複数の防音板材を同時に持ち上げるようにする。
このような緩衝材の交換方法によれば、上側の防音板材は、上下に隣り合う複数の防音板材を含んでおり、第5工程では、当該複数の防音板材を同時に持ち上げることができるので、上下方向に積み重なる防音板材同士の間の緩衝材のうち、交換が必要な箇所の緩衝材だけを交換することができる。
Desirably, the upper soundproof plate material includes a plurality of soundproof plate materials adjacent to each other in the upper and lower sides, and in the fifth step, the plurality of soundproof plate materials are simultaneously lifted.
According to such a cushioning material replacement method, the upper soundproof plate material includes a plurality of soundproof plate materials adjacent to each other in the upper and lower sides, and in the fifth step, the plurality of soundproof plate materials can be lifted simultaneously. Of the cushioning material between the soundproof plate members stacked in the direction, only the cushioning material at a location that needs to be replaced can be exchanged.

また、望ましくは、前記上側の防音板材に含まれた前記上下に隣り合う複数の防音板材のうち、下側に位置する防音板材を下ろした後に、当該下側に位置する防音板材の上面に新規の緩衝材を設ける工程をさらに含むようにする。
このような緩衝材の交換方法によれば、上下に隣り合う複数の防音板材をいっぺんに持ち上げてから、その下側の防音板材を下ろして緩衝材の交換を行うことになるため、緩衝材を交換する手順のパターンを増やすことができる。これによって、緩衝材の交換作業における自由度が増すので、より一層、緩衝材の交換作業が行いやすくなる。
Desirably, after lowering the soundproof plate material located on the lower side of the plurality of soundproof plate materials adjacent to each other in the upper and lower sides included in the upper soundproof plate material, the upper surface of the soundproof plate material located on the lower side is newly provided. A step of providing the cushioning material.
According to such a cushioning material replacement method, the plurality of soundproofing plates adjacent to each other up and down are lifted together, and then the lowering soundproofing plate material is lowered to replace the cushioning material. You can increase the pattern of procedures. This increases the degree of freedom in the cushioning material replacement operation, making it easier to perform the cushioning material replacement operation.

また、望ましくは、前記支柱は、ウェブと、二つのフランジを有する形鋼材であり、
前記案内溝は、前記ウェブと前記二つのフランジによって囲まれた溝部であり、
前記スライド側部材および前記固定側部材は、前記フランジを把持するようにして前記支柱に装着されているようにする。
このような緩衝材の交換方法によれば、支柱が、ウェブと、二つのフランジを有する形鋼材であるため、防音板材の側端部が入り込む凹状の案内溝と、スライド側部材および固定側部材を装着させる部分を同時に確保できる。さらに、スライド側部材および固定側部材は、フランジを把持するようにして支柱に装着されているので、引っ掛かりやすく脱落しにくい。
Preferably, the support column is a steel having a web and two flanges,
The guide groove is a groove portion surrounded by the web and the two flanges,
The slide side member and the fixed side member are mounted on the support so as to grip the flange.
According to such a cushioning material replacement method, since the support column is a shaped steel member having a web and two flanges, the concave guide groove into which the side end portion of the soundproof plate member enters, the slide side member, and the fixed side member The part to install can be secured at the same time. Furthermore, since the slide-side member and the fixed-side member are attached to the support so as to grip the flange, they are easily caught and difficult to fall off.

また、望ましくは、前記スライド側部材および前記固定側部材は、自身を貫通して前記フランジに接するボルトをそれぞれ有しており、
前記ボルトを締めることによって前記スライド側部材を前記支柱に仮固定し、
前記ボルトを締めることによって前記固定側部材を前記支柱に固定するようにする。
このような緩衝材の交換方法によれば、ボルトを締めることによってスライド側部材を支柱に仮固定し、ボルトを締め付けることによって固定側部材を支柱に固定するので、ボルトの締め回しで固定強度を調整できることになる。そのため、スライド側部材および固定側部材を支柱に対して設置する作業が容易であり、上側の防音板材をジャッキアップする際もスライド側部材を仮固定していたボルトを緩めるだけで済み、緩衝材の交換作業を進めやすくなる。また、ボルトの締め付けによってスライド側部材および固定側部材を支柱に固定できるので、これらスライド側部材および固定側部材を、支柱における任意の高さ位置に仮固定・固定することができる。
Preferably, the slide-side member and the fixed-side member each have a bolt that penetrates itself and contacts the flange,
Temporarily fixing the slide side member to the column by tightening the bolt,
The fixed side member is fixed to the support column by tightening the bolt.
According to such a replacement method of the cushioning material, the slide-side member is temporarily fixed to the support by tightening the bolt, and the fixed-side member is fixed to the support by tightening the bolt. You can adjust it. Therefore, it is easy to install the slide-side member and the fixed-side member on the column, and even when jacking up the upper soundproof plate material, it is only necessary to loosen the bolt that temporarily fixed the slide-side member. It will be easier to proceed with replacement work. Further, since the slide side member and the fixed side member can be fixed to the column by tightening the bolts, the slide side member and the fixed side member can be temporarily fixed and fixed at an arbitrary height position on the column.

本発明によれば、線路外に高所作業車やクレーン車を使用できるスペースが確保できない場所であっても、防音壁における緩衝材の交換作業を容易に行うことができる。   ADVANTAGE OF THE INVENTION According to this invention, even if it is a place which cannot ensure the space which can use an aerial work vehicle and a crane vehicle outside a track | line, the replacement | exchange operation | work of the shock absorbing material in a soundproof wall can be performed easily.

(a)は防音壁が設けられた線路を示す概略図であり、(b)は防音壁を示す斜視図である。(A) is the schematic which shows the track | line in which the soundproof wall was provided, (b) is a perspective view which shows a soundproof wall. 第一昇降機を示す正面図である。It is a front view which shows a 1st elevator. 第一昇降機を示す平面図である。It is a top view which shows a 1st elevator. 第一昇降機を示す側面図である。It is a side view which shows a 1st elevator. 第一昇降機を用いた緩衝材の交換方法を説明するための図である。It is a figure for demonstrating the replacement | exchange method of the shock absorbing material using a 1st elevator. 第二昇降機を示す正面図である。It is a front view which shows a 2nd elevator. 第二昇降機を示す平面図である。It is a top view which shows a 2nd elevator. 第二昇降機を示す側面図である。It is a side view which shows a 2nd elevator. 第二昇降機を用いた緩衝材の交換方法を説明するための図である。It is a figure for demonstrating the replacement | exchange method of the shock absorbing material using a 2nd elevator.

以下、図面を参照して本発明の実施の形態について説明する。ただし、以下に述べる実施形態には、本発明を実施するために技術的に好ましい種々の限定が付されているが、本発明の技術的範囲を以下の実施形態および図示例に限定するものではない。   Embodiments of the present invention will be described below with reference to the drawings. However, the embodiments described below are provided with various technically preferable limitations for carrying out the present invention. However, the technical scope of the present invention is not limited to the following embodiments and illustrated examples. Absent.

〔防音壁10の説明〕
図1(a)において符号1は、線路を示す。この線路1は高架橋2の上に設けられたものであり、レールや枕木を備えた軌道3の側方には、線路外への騒音の伝搬を抑制する防音壁10が設けられている。また、この防音壁10は、線路1の延在方向に沿って連続して設けられている。
[Description of the sound barrier 10]
In FIG. 1A, reference numeral 1 indicates a line. The track 1 is provided on the viaduct 2, and a soundproof wall 10 that suppresses the propagation of noise to the outside of the track is provided on the side of the track 3 including rails and sleepers. The sound barrier 10 is continuously provided along the extending direction of the track 1.

防音壁10は、図1(a),(b)に示すように、複数の防音板材12が、互いに間隔を空けて立設された複数の支柱11,11間に亘って設けられ、かつ緩衝材13を介在させた状態で上下方向に積み重ねられて形成されている。
また、本実施形態における防音壁10は、その上端部に、軌道3側に突出する防音天井部14をさらに備えている。
As shown in FIGS. 1 (a) and 1 (b), the soundproof wall 10 is provided with a plurality of soundproof plate members 12 extending between a plurality of support pillars 11 and 11 which are erected at intervals. It is formed by being stacked in the vertical direction with the material 13 interposed.
In addition, the soundproof wall 10 in the present embodiment further includes a soundproof ceiling portion 14 that protrudes toward the track 3 at the upper end thereof.

支柱11は、防音板材12側の面の長さ方向に沿って、防音板材12の側端部が入り込む凹状の案内溝11cが形成されたものであり、本実施形態においては、ウェブ11aと、二つのフランジ11b,11bを有する形鋼材(本実施形態ではH形鋼)が採用されている。
また、支柱11の下端部には、ベースプレートと複数のリブとを有する幅広なベース部11dが一体的に設けられており、高架橋2の床部2aに対して固定されている。
The support column 11 is formed with a concave guide groove 11c into which the side end portion of the soundproof plate member 12 enters along the length direction of the surface on the soundproof plate member 12 side. In this embodiment, the web 11a, A shape steel material having two flanges 11b and 11b (in this embodiment, an H-section steel) is employed.
In addition, a wide base portion 11 d having a base plate and a plurality of ribs is integrally provided at the lower end portion of the column 11 and is fixed to the floor portion 2 a of the viaduct 2.

防音板材12は、プレストレスト・コンクリート(prestressed concrete)製の板材、すなわちPC板であり、線路1の延在方向に沿って互いに間隔を空けて立設された二本の支柱11,11間に亘って設けられている。さらに、本実施形態においては、三枚の防音板材12が、緩衝材13を介在させた状態で上下方向に積み重ねられている。   The soundproof plate 12 is a plate made of prestressed concrete, that is, a PC plate, and extends between two struts 11 and 11 erected at intervals from each other along the extending direction of the track 1. Is provided. Furthermore, in this embodiment, the three soundproof board | plate materials 12 are piled up and down with the buffer material 13 interposed.

また、防音板材12は、線路外側のフランジ11bに寄せて配置されている。
防音板材12の厚さ寸法は、案内溝11cの幅寸法(すなわち、ウェブ11aの幅寸法であって、かつ二つのフランジ11b,11b間の間隔)よりも薄く設定されている。このため、案内溝11cに入り込んだ防音板材12と線路側のフランジ11bとの間には隙間が形成されるが、この隙間には、図4に示すように間隔保持具15が設けられており、防音板材12を線路外側に寄せて配置できるようになっている。この間隔保持具15は、防音板材12を昇降させる際には取り外されるものとする。
The soundproof plate 12 is disposed close to the flange 11b outside the track.
The thickness dimension of the soundproof plate 12 is set to be thinner than the width dimension of the guide groove 11c (that is, the width dimension of the web 11a and the distance between the two flanges 11b and 11b). For this reason, a gap is formed between the soundproof plate 12 that has entered the guide groove 11c and the flange 11b on the track side, and a gap holder 15 is provided in this gap as shown in FIG. The soundproof plate 12 can be arranged close to the outside of the track. The spacing holder 15 is removed when the soundproof plate 12 is raised and lowered.

また、上下方向に積み重ねられた三枚の防音板材12のうち、下段の防音板材12の下端コーナー部には、支柱11におけるベース部11dに対応する切欠部12aが形成されている(図6参照)。   Of the three soundproof plate members 12 stacked in the vertical direction, a notch portion 12a corresponding to the base portion 11d of the column 11 is formed at the lower corner portion of the lower soundproof plate member 12 (see FIG. 6). ).

緩衝材13は、上下方向に積み重ねられた防音板材12,12同士の間に介在するものであり、本実施形態においてはゴム製の長尺板材が採用されている。
また、本実施形態においては、三枚の防音板材12のうち下段の防音板材12と、高架橋2の床部2aとの間にも介在するように設けられている。
The buffer material 13 is interposed between the soundproof plate materials 12 and 12 stacked in the vertical direction, and in this embodiment, a long rubber plate material is used.
Moreover, in this embodiment, it is provided so that it may also interpose between the soundproof board material 12 of the lower stage among the three soundproof board materials 12, and the floor part 2a of the viaduct 2.

防音天井部14は、上段の防音板材12の上端部から線路1側に向かって水平に突出するように設けられている。
防音天井部14は、防音板材12と同様にPC板からなる天井板材14aと、支柱11における線路1側のフランジ11bの上端部に固定され、天井板材14aを支持するブラケット14bと、を有する。
ブラケット14bは、図1(b)に示すように、断面逆T字状に形成された本体部を有し、逆T字の中央垂直部を境にして一方側と他方側に天井板材14aの側端部を載せることができるようになっている。
The soundproof ceiling portion 14 is provided so as to protrude horizontally from the upper end portion of the upper soundproof plate member 12 toward the line 1 side.
The soundproof ceiling portion 14 includes a ceiling plate material 14a made of a PC board, like the soundproof plate material 12, and a bracket 14b that is fixed to the upper end portion of the flange 11b on the track 1 side of the column 11 and supports the ceiling plate material 14a.
As shown in FIG. 1 (b), the bracket 14b has a body portion formed in an inverted T-shaped cross section, and the ceiling plate member 14a is formed on one side and the other side of the center vertical portion of the inverted T-shape. The side end can be placed.

〔第一昇降機20および第二昇降機30の説明〕
第一昇降機20は、複数の防音板材12のうち最下段を除く防音板材12を昇降させることができるものであり、スライド側部材21と、固定側部材25と、ジャッキ26と、固定用ボルトB1と、調整用ボルトB2と、を備える。
なお、防音板材12を昇降させる際は、一対の第一昇降機20が必要であり、一方の第一昇降機20が防音板材12の左側に配置され、他方の第一昇降機20が防音板材12の右側に配置される。
[Description of the first elevator 20 and the second elevator 30]
The first elevator 20 is capable of moving up and down the soundproof plate 12 excluding the lowest step among the plurality of soundproof plates 12, and includes a slide side member 21, a fixed side member 25, a jack 26, and a fixing bolt B1. And an adjustment bolt B2.
In addition, when raising / lowering the soundproof board | plate material 12, a pair of 1st elevator 20 is required, one 1st elevator 20 is arrange | positioned on the left side of the soundproof board | plate material 12, and the other 1st elevator 20 is the right side of the soundproof board | plate material 12. Placed in.

第二昇降機30は、複数の防音板材12のうち最下段から最上段にかけての全ての防音板材12をいっぺんに昇降させることができるものであり、ジャッキ31と、ジャッキ用アタッチメント32と、を備える。
なお、防音板材12を昇降させる際は、一対の第二昇降機30が必要であり、一方の第二昇降機30が防音板材12の左側に配置され、他方の第二昇降機30が防音板材12の右側に配置される。
The second elevator 30 can raise and lower all the soundproof plate members 12 from the lowest to the highest step among the plurality of soundproof plate members 12, and includes a jack 31 and a jack attachment 32.
In addition, when raising / lowering the soundproof board | plate material 12, a pair of 2nd elevators 30 are required, one 2nd elevator 30 is arrange | positioned on the left side of the soundproof board | plate material 12, and the other second elevator 30 is the right side of the soundproof board | plate material 12. Placed in.

第一昇降機20におけるスライド側部材21は、支柱11に装着させられる装着部22と、上下方向に隣り合う防音板材12,12間に差し込まれる差込プレート23と、ジャッキ26の上端部を受ける受部24を有する。   The slide-side member 21 in the first elevator 20 receives a mounting portion 22 to be mounted on the support column 11, an insertion plate 23 inserted between the soundproof plate members 12, 12 adjacent in the vertical direction, and an upper end portion of the jack 26. Part 24.

スライド側部材21における装着部22は、対称的に形成された左右の分割体を備えて分割可能に構成されており、支柱11における線路1側のフランジ11bに装着させられる。左右の分割体は、鋼板を折曲したり接合したりして適宜加工することによって形成されている。
そして、装着部22における左右の分割体の双方は、フランジ11bへの装着時に当該フランジ11bの幅方向側端部に引っ掛けられる引掛部22aと、左右の分割体の間隔を調整するための間隔調整部22bと、をそれぞれ備える。
The mounting portion 22 in the slide-side member 21 is configured to be split including left and right divided bodies formed symmetrically, and is mounted on the flange 11 b on the track 1 side in the column 11. The left and right divided bodies are formed by bending or joining steel plates and appropriately processing them.
Then, both the left and right divided bodies in the mounting portion 22 are adjusted to adjust the distance between the hooking portion 22a hooked to the end in the width direction of the flange 11b and the left and right divided bodies when mounted on the flange 11b. Part 22b.

左右の各分割体における引掛部22aは、フランジ11bの線路1側の面(正面)から側端面を介して、裏面側に回り込むようにして形成されている。
引掛部22aのうち正面側に位置する部位には、当該部位を貫通する固定用ボルトB1が設けられている。なお、引掛部22aにおける正面側の部位には、固定用ボルトB1が通される通孔が形成されているとともに、当該通孔に対応したボルト穴を有するナットが接合されている。
そして、固定用ボルトB1が、線路1側のフランジ11bの正面に接するまで締め付けられて捩じ込まれることによって、引掛部22aを支柱11に対して仮固定することができる。
The hook portion 22a in each of the left and right divided bodies is formed so as to wrap around from the surface (front surface) on the line 1 side of the flange 11b to the back surface side via the side end surface.
A fixing bolt B1 penetrating the part is provided at a part located on the front side of the hook portion 22a. Note that a through hole through which the fixing bolt B1 is passed is formed at a front side portion of the hook portion 22a, and a nut having a bolt hole corresponding to the through hole is joined.
Then, the hooking portion 22a can be temporarily fixed to the column 11 by tightening and screwing the fixing bolt B1 until it comes into contact with the front surface of the flange 11b on the line 1 side.

左右の各分割体における間隔調整部22bは、引掛部22aにおける正面側の部位の端部から線路1側に突出して形成されている。当該間隔調整部22bには調整用ボルトB2が通される通孔が形成されている。
そして、左側の分割体における間隔調整部22bと、右側の分割体における間隔調整部22bは、スライド側部材21を支柱11に装着させた状態において互いに対向しており、向かい合う通孔に調整用ボルトB2を通し、ナットを設けることによって接合することができる。また、調整用ボルトB2の締め付け具合に応じて、左右の分割体における間隔調整部22b,22b同士の間隔を狭めたり広げたりすることができる。これによって、左右の分割体同士の間隔を狭めたり広げたりすることができる。そのため、左右の分割体同士の間隔を狭めることで、左右の分割体における引掛部22a,22aをフランジ11bの側端部に引っ掛けることができるので、スライド側部材21を、フランジ11bを把持するようにして支柱11に装着させることができる。反対に、左右の分割体同士の間隔を広げることで、左右の分割体における引掛部22a,22aをフランジ11bの側端部から取り外し、スライド側部材21を支柱11から取り外すことができる。
The interval adjusting portion 22b in each of the left and right divided bodies is formed so as to protrude from the end portion of the front portion of the hook portion 22a toward the line 1 side. A through hole through which the adjusting bolt B2 is passed is formed in the interval adjusting portion 22b.
And the space | interval adjustment part 22b in the division body on the left side and the space | interval adjustment part 22b in the division body on the right side oppose each other in the state which attached the slide side member 21 to the support | pillar 11, and it is an adjustment bolt to an opposing through-hole. It can join by providing a nut through B2. Moreover, according to the tightening condition of the adjusting bolt B2, the interval between the interval adjusting portions 22b and 22b in the left and right divided bodies can be narrowed or widened. Thereby, the interval between the left and right divided bodies can be narrowed or widened. Therefore, by narrowing the interval between the left and right divided bodies, the hook portions 22a and 22a in the left and right divided bodies can be hooked on the side end portions of the flange 11b, so that the slide side member 21 is gripped by the flange 11b. And can be attached to the column 11. Conversely, by widening the interval between the left and right divided bodies, the hook portions 22a and 22a in the left and right divided bodies can be removed from the side end portions of the flange 11b, and the slide-side member 21 can be removed from the column 11.

スライド側部材21における差込プレート23は、装着部22における引掛部22aの側面上端部に接合されて固定されている。すなわち、この差込プレート23は、引掛部22aの側面上端部に接合固定される固定部23aと、この固定部23aの上端部から線路外側に突出する差込プレート本体23bと、からなる。
また、差込プレート23は、装着部22における左右の分割体のうちいずれか一方に接合されている。すなわち、スライド側部材21が、持ち上げる防音板材12の左側に配置されるものであるか、右側に配置されるものであるかで接合箇所が異なる。図2,図3に示すような、防音板材12の右側に配置されるスライド側部材21の場合、差込プレート23は、装着部22における左側の分割体に接合されている。つまり、防音板材12の左右に配置される一対のスライド側部材21,21は、差込プレート23が対称的な配置となるように形成されている(後述する受部24も同様)。
The insertion plate 23 in the slide-side member 21 is joined and fixed to the upper end portion of the side surface of the hooking portion 22 a in the mounting portion 22. That is, the insertion plate 23 includes a fixing portion 23a that is bonded and fixed to the upper end portion of the side surface of the hook portion 22a, and an insertion plate body 23b that protrudes outward from the upper end portion of the fixing portion 23a.
Further, the insertion plate 23 is joined to either one of the left and right divided bodies in the mounting portion 22. That is, the joint location differs depending on whether the slide-side member 21 is disposed on the left side or the right side of the soundproof plate member 12 to be lifted. In the case of the slide side member 21 arranged on the right side of the soundproof plate member 12 as shown in FIGS. 2 and 3, the insertion plate 23 is joined to the left divided body in the mounting portion 22. That is, the pair of slide side members 21 and 21 arranged on the left and right of the soundproof plate member 12 are formed so that the insertion plate 23 is symmetrically arranged (the same applies to the receiving portion 24 described later).

スライド側部材21における受部24は、スライド側部材21の下端部と、ジャッキ26の上端部との間に介在し、ジャッキ26の上端部を受けるものである。
受部24は山形のアングル材であり、一方の片はスライド側部材21とジャッキ26との間に挟み込まれ、他方の片は、正面視において、ジャッキ26に対して差込プレート23のある側とは反対側に位置している(図2において右側)。受部24が、このように他方の片を備えて構成されることにより、ジャッキ26の位置ずれを抑制できるようになっている。
なお、受部24は、装着部22における左右の分割体のいずれか一方の下端面に接合されていてもよいし、単にスライド側部材21とジャッキ26との間に挟み込まれて用いられてもよい。
The receiving portion 24 in the slide side member 21 is interposed between the lower end portion of the slide side member 21 and the upper end portion of the jack 26 and receives the upper end portion of the jack 26.
The receiving portion 24 is a mountain-shaped angle member, and one piece is sandwiched between the slide side member 21 and the jack 26, and the other piece is the side where the insertion plate 23 is located with respect to the jack 26 in a front view. (The right side in FIG. 2). Since the receiving portion 24 is configured to include the other piece in this manner, the positional deviation of the jack 26 can be suppressed.
In addition, the receiving part 24 may be joined to the lower end surface of one of the left and right divided bodies in the mounting part 22, or may be used simply by being sandwiched between the slide side member 21 and the jack 26. Good.

第一昇降機20における固定側部材25は、スライド側部材21における装着部22と同様に構成されている。すなわち、当該固定側部材25は、対称的に形成された左右の分割体を備えて分割可能に構成されており、左右の各分割体が、支柱11における線路1側のフランジ11bに引っ掛けられる引掛部25aと、左右の分割体の間隔を調整するための間隔調整部25bと、をそれぞれ備えている。また、固定側部材25は、固定用ボルトB1によって支柱11に固定することができ、調整用ボルトB2によって左右の分割体の間隔を調整することができるようになっている。   The fixed side member 25 in the first elevator 20 is configured similarly to the mounting portion 22 in the slide side member 21. In other words, the fixed-side member 25 includes a left and right divided body formed symmetrically, and can be divided. The left and right divided bodies are hooked to be hooked on the flange 11b on the line 1 side of the column 11. Each includes a portion 25a and an interval adjusting unit 25b for adjusting the interval between the left and right divided bodies. Further, the fixed side member 25 can be fixed to the support 11 by the fixing bolt B1, and the interval between the left and right divided bodies can be adjusted by the adjusting bolt B2.

スライド側部材21におけるジャッキ26として油圧ジャッキが採用されている。なお、防音板材12の左右に一対の第一昇降機20を設ける場合には、当該ジャッキ26も防音板材12の左右それぞれに配置されることになるが、これら左右のジャッキ26,26を制御装置に接続し、当該制御装置によって同時に昇降動作をできるようにしてもよい。
ジャッキ26はベース部26aを備え、このベース部26aは、固定側部材25における引掛部25a,25aの上端面と、間隔調整部25b,25bの上端面に設置されている。
A hydraulic jack is employed as the jack 26 in the slide side member 21. In addition, when providing a pair of 1st elevators 20 in the right and left of the soundproof board | plate material 12, the said jack 26 will also be arrange | positioned at the right and left of the soundproof board | plate material 12, respectively. They may be connected and can be moved up and down simultaneously by the control device.
The jack 26 includes a base portion 26a. The base portion 26a is installed on the upper end surfaces of the hooking portions 25a and 25a and the upper end surfaces of the interval adjusting portions 25b and 25b.

第二昇降機30におけるジャッキ31は、高架橋2の床部2aに設置されて使用されるものであり、その上端部に、ジャッキ用アタッチメント32が取り付けられている。   The jack 31 in the second elevator 30 is used by being installed on the floor portion 2a of the viaduct 2, and a jack attachment 32 is attached to the upper end portion thereof.

第二昇降機30におけるジャッキ用アタッチメント32は、最下段の防音板材12を持ち上げるためのものであり、取付プレート33と、連結プレート34と、差込プレート35と、を備える。
取付プレート33は、ジャッキ31の上端部に取り付けられており、ジャッキ31の上端面の面積よりも広く、かつ平面視において矩形状に形成されている。
連結プレート34は、取付プレート33における防音板材12側端部に接合されるとともに差込プレート35に接合された山形のアングル材であり、取付プレート33と差込プレート35とを連結している。なお、この連結プレート34は、図7に示すように、取付プレート33における防音板材12側端部の下面コーナー部に接合されている。
差込プレート35は、最下段の防音板材12と高架橋2の床部2aとの間に形成される隙間に差し込まれるものであり、連結プレート34の下端部における端面に接合固定されている。
また、差込プレート35は、連結プレート34の下端部における端面に接合固定される固定部35aと、この固定部35aの上端部から線路外側に突出する差込プレート本体35bと、からなる。
The jack attachment 32 in the second elevator 30 is for lifting the lowermost soundproof plate 12, and includes a mounting plate 33, a connecting plate 34, and an insertion plate 35.
The attachment plate 33 is attached to the upper end portion of the jack 31, is larger than the area of the upper end surface of the jack 31, and is formed in a rectangular shape in plan view.
The connecting plate 34 is a mountain-shaped angle member that is joined to the sound insulating plate 12 side end of the mounting plate 33 and joined to the insertion plate 35, and connects the mounting plate 33 and the insertion plate 35. As shown in FIG. 7, the connecting plate 34 is joined to the lower surface corner of the mounting plate 33 at the end of the soundproof plate 12.
The insertion plate 35 is inserted into a gap formed between the lowermost soundproof plate member 12 and the floor portion 2 a of the viaduct 2, and is bonded and fixed to the end surface of the lower end portion of the connection plate 34.
The insertion plate 35 includes a fixing portion 35a that is bonded and fixed to the end surface of the lower end portion of the connection plate 34, and an insertion plate body 35b that protrudes outward from the upper end portion of the fixing portion 35a.

〔緩衝材の交換方法の説明〕
以上のように構成された第一昇降機20および第二昇降機30によって緩衝材13を交換することができる。
[Explanation of how to replace the cushioning material]
The cushioning material 13 can be replaced by the first elevator 20 and the second elevator 30 configured as described above.

まず、第一昇降機20によって緩衝材13を交換する方法について説明する。第一昇降機20のみによって緩衝材13を交換するパターンは複数あり、以下、これら複数パターンの交換方法について詳細に説明する。
なお、本実施形態における複数の防音板材12は上述のように三枚である。さらに、左右対称的に形成された第一昇降機20,20が、防音板材12の左右両側にある隣り合う支柱11,11の双方に設けられるものとする。
First, a method for replacing the cushioning material 13 by the first elevator 20 will be described. There are a plurality of patterns for exchanging the cushioning material 13 only by the first elevator 20, and a method for exchanging these plural patterns will be described in detail below.
In addition, the some soundproof board | plate material 12 in this embodiment is three as mentioned above. Furthermore, the 1st elevators 20 and 20 formed symmetrically shall be provided in both the adjacent support | pillars 11 and 11 in the right-and-left both sides of the soundproof board | plate material 12. As shown in FIG.

(第一昇降機20を用いた場合の第一パターン)
第一パターンは、図5(a)から図5(f)までの手順を、アルファベット順に進めていった場合のものである。
緩衝材13を交換する場合は、最初に、図5(a)に示すように、防音天井部14の天井板材14aをブラケット14bに沿って移動させ、防音板材12をジャッキアップできる空間を形成する。
続いて、持ち上げたい上段の防音板材12を、工具(例えばバール)を用いて僅かに持ち上げて、当該上段の防音板材12とその直下に位置する中段の防音板材12との間に、差込プレート23を差込可能な隙間を形成する。
(First pattern when the first elevator 20 is used)
The first pattern is a case where the procedure from FIG. 5A to FIG. 5F is advanced in alphabetical order.
When replacing the cushioning material 13, first, as shown in FIG. 5A, the ceiling plate material 14 a of the soundproof ceiling portion 14 is moved along the bracket 14 b to form a space in which the soundproof plate material 12 can be jacked up. .
Subsequently, the upper soundproof plate 12 to be lifted is slightly lifted by using a tool (for example, a bar), and the insertion plate is interposed between the upper soundproof plate 12 and the middle soundproof plate 12 positioned immediately below the upper soundproof plate 12. A gap into which 23 can be inserted is formed.

続いて、図2〜図4に示すように、第一昇降機20を支柱11に取り付ける。
より詳細には、第一昇降機20のうち、まずはスライド側部材21を支柱11に装着させる。
スライド側部材21は、装着部22が左右に分割可能であるため、調整用ボルトB2を緩めて、左右の分割体の間隔を広げておき、その状態で支柱11の線路1側に位置するフランジ11bに被せる。この時、同時に、差込プレート23を、工具を用いて形成された前記隙間に差し込む。
そして、調整用ボルトB2を締めて左右の分割体の間隔を狭める。これによって、引掛部22a,22aがフランジ11bの側端部に引っ掛かった状態となり、装着部22を、フランジ11bを把持するようにして支柱11に装着させることができる。
その後、固定用ボルトB1の先端がフランジ11bに接するまで当該固定用ボルトB1を締めて、スライド側部材21を支柱11に仮固定する。ここでの仮固定は、スライド側部材21がガタつかない程度でよいものとする。
Subsequently, as shown in FIGS. 2 to 4, the first elevator 20 is attached to the column 11.
More specifically, in the first elevator 20, first, the slide side member 21 is attached to the column 11.
Since the mounting part 22 can be divided into left and right parts, the slide side member 21 loosens the adjustment bolt B2, widens the distance between the left and right divided bodies, and in that state, the flange located on the line 1 side 11b. At the same time, the insertion plate 23 is inserted into the gap formed using a tool.
Then, the adjustment bolt B2 is tightened to narrow the interval between the left and right divided bodies. Thus, the hooking portions 22a and 22a are hooked on the side end portions of the flange 11b, and the mounting portion 22 can be mounted on the support column 11 so as to grip the flange 11b.
Thereafter, the fixing bolt B1 is tightened until the tip of the fixing bolt B1 contacts the flange 11b, and the slide side member 21 is temporarily fixed to the support column 11. The temporary fixing here may be such that the slide side member 21 does not rattle.

続いて、固定側部材25を支柱11に装着させる。固定側部材25は、上述のようにスライド側部材21における装着部22と同様の構成であるため、装着部22と同様の手順で支柱11に装着させることができる。
なお、固定側部材25は、スライド側部材21の下方であって、これら固定側部材25とスライド側部材21との間にジャッキ26を設けることができる程度の間隔を空けた位置に固定する。また、固定側部材25は、ジャッキ26によるジャッキアップの土台となるため、固定用ボルトB1をきつく締めて、支柱11に対して強固に固定する。
Subsequently, the fixed side member 25 is attached to the column 11. Since the fixed side member 25 has the same configuration as the mounting portion 22 in the slide side member 21 as described above, the fixed side member 25 can be mounted on the column 11 in the same procedure as the mounting portion 22.
Note that the fixed side member 25 is fixed below the slide side member 21 and at a position with a space enough to allow the jack 26 to be provided between the fixed side member 25 and the slide side member 21. Further, since the fixed side member 25 serves as a base for jacking up by the jack 26, the fixing bolt B <b> 1 is tightened to be firmly fixed to the column 11.

続いて、固定側部材25の上端面にジャッキ26を設置する。また、ジャッキ26は、その上端部とスライド側部材21の下端面との間に受部24が介在する状態となるように設置する。ジャッキ26の上端部がスライド側部材21(受部24)まで到達していない場合には、ジャッキ26を伸長させて、スライド側部材21(受部24)まで到達させておくことが好ましい。   Subsequently, the jack 26 is installed on the upper end surface of the fixed side member 25. Further, the jack 26 is installed so that the receiving portion 24 is interposed between the upper end portion thereof and the lower end surface of the slide side member 21. When the upper end portion of the jack 26 does not reach the slide side member 21 (receiving portion 24), the jack 26 is preferably extended to reach the slide side member 21 (receiving portion 24).

続いて、スライド側部材21を仮固定していた固定用ボルトB1を緩めて、スライド側部材21の仮固定状態を解除し、一対の第一昇降機20,20における双方のジャッキ26,26を同時に伸長させて、図5(b)に示すように、上段の防音板材12をジャッキアップする。
その後、上段の防音板材12をジャッキアップさせた位置で、スライド側部材21における固定用ボルトB1を締めて、スライド側部材21を支柱11に再度仮固定する。ここでの仮固定は、上段の防音板材12が落下することを防ぐために強固に行うものとする。
Subsequently, the fixing bolt B1 that temporarily fixed the slide side member 21 is loosened, the temporarily fixed state of the slide side member 21 is released, and both jacks 26 and 26 in the pair of first elevators 20 and 20 are simultaneously connected. The upper soundproof plate 12 is jacked up as shown in FIG.
Thereafter, at the position where the upper soundproof plate 12 is jacked up, the fixing bolt B1 in the slide side member 21 is tightened, and the slide side member 21 is temporarily fixed to the column 11 again. Temporary fixing here shall be performed firmly in order to prevent the soundproof board | plate material 12 of the upper stage falling.

スライド側部材21を支柱11に再度仮固定した後は、ジャッキ26を取り除き、固定側部材25の固定状態を解除する。
そして、この固定側部材25を、中段の防音板材12をジャッキアップさせるのに好適な位置まで支柱11に沿って下方にスライドさせ、当該好適な位置で固定用ボルトB1を締めて支柱11に再度固定する。
After the slide side member 21 is temporarily fixed to the support 11 again, the jack 26 is removed and the fixed state of the fixed side member 25 is released.
Then, the fixed side member 25 is slid downward along the column 11 to a position suitable for jacking up the middle-stage soundproof plate member 12, and the fixing bolt B1 is tightened to the column 11 again at the suitable position. Fix it.

続いて、持ち上げたい中段の防音板材12を、工具を用いて僅かに持ち上げて、当該中段の防音板材12と直下の下段の防音板材12との間に、差込プレート23を差込可能な隙間を形成する。
続いて、支柱11に再度仮固定された前記スライド側部材21とは異なる他のスライド側部材21Aを支柱11に装着させる。この時、同時に、差込プレート23を、工具を用いて形成された前記隙間に差し込む。そして、調整用ボルトB2と固定用ボルトB1を適宜締めて、他のスライド側部材21Aを支柱11に仮固定する。
続いて、当該他のスライド側部材21Aと、再固定した固定側部材25との間に、取り外したジャッキ26を設置する。
続いて、他のスライド側部材21Aを仮固定していた固定用ボルトB1を緩めて、スライド側部材21の仮固定状態を解除し、図5(c)に示すように、ジャッキ26によって中段の防音板材12をジャッキアップする。
そして、ジャッキ26によって中段の防音板材12を持ち上げた状態のまま既設の緩衝材13を取り除き、図5(d)に示すように、下段の防音板材12の上面に新規の緩衝材13Nを設ける。
Subsequently, the middle soundproof plate 12 to be lifted is lifted slightly by using a tool, and a gap in which the insertion plate 23 can be inserted between the middle soundproof plate 12 and the lower soundproof plate 12 immediately below. Form.
Subsequently, another slide side member 21 </ b> A different from the slide side member 21 temporarily fixed to the support 11 is attached to the support 11. At the same time, the insertion plate 23 is inserted into the gap formed using a tool. Then, the adjustment bolt B2 and the fixing bolt B1 are appropriately tightened to temporarily fix the other slide side member 21A to the support column 11.
Subsequently, the removed jack 26 is installed between the other slide side member 21 </ b> A and the fixed side member 25 that has been re-fixed.
Subsequently, the fixing bolt B1 that temporarily fixed the other slide side member 21A is loosened to release the temporarily fixed state of the slide side member 21, and as shown in FIG. Jack up the soundproof board 12.
Then, the existing shock-absorbing material 13 is removed while the middle soundproof plate 12 is lifted by the jack 26, and a new shock-absorbing material 13N is provided on the upper surface of the lower soundproof plate 12 as shown in FIG.

続いて、図5(d)に示すように、ジャッキ26によって中段の防音板材12をジャッキダウンさせ、下段の防音板材12と中段の防音板材12との間に、新規の緩衝材13Nを挟み込むようにする。この時、工具を使って下段の防音板材12と中段の防音板材12との間に隙間を形成しておき、他のスライド側部材21Aを取り外して差込プレート23を抜き取る。その後、工具を外して、中段の防音板材12を完全に下ろすようにする。
中段の防音板材12をジャッキダウンした後に、中段の防音板材12の上面にある緩衝材13を取り除き、中段の防音板材12の上面に新規の緩衝材13Nを設ける。
Subsequently, as shown in FIG. 5D, the middle soundproof plate 12 is jacked down by the jack 26 so that the new shock absorbing material 13N is sandwiched between the lower soundproof plate 12 and the middle soundproof plate 12. To. At this time, a gap is formed between the lower soundproof plate member 12 and the middle soundproof plate member 12 using a tool, the other slide side member 21A is removed, and the insertion plate 23 is removed. Thereafter, the tool is removed, and the middle soundproof plate 12 is completely lowered.
After jacking down the middle soundproof plate 12, the shock absorber 13 on the upper surface of the middle soundproof plate 12 is removed, and a new shock absorber 13N is provided on the upper surface of the middle soundproof plate 12.

中段の防音板材12をジャッキダウンした後は、ジャッキ26を取り除き、他のスライド側部材21Aを支柱11から完全に取り外し、固定側部材25の固定状態を解除する。そして、この固定側部材25を、上段の防音板材12をジャッキダウンさせるのに好適な位置まで支柱11に沿って上方にスライドさせ、当該好適な位置で固定用ボルトB1を締めて支柱11に再度固定する。   After the middle soundproof plate 12 is jacked down, the jack 26 is removed, the other slide side member 21A is completely removed from the column 11, and the fixed state of the fixed side member 25 is released. Then, the fixed side member 25 is slid upward along the support column 11 to a position suitable for jacking down the upper soundproof plate member 12, and the fixing bolt B1 is tightened at the preferable position to fix the support member 11 again. Fix it.

続いて、再固定した固定側部材25と、上段の防音板材12を支えていた前記スライド側部材21との間に、取り外したジャッキ26を設置する。
続いて、スライド側部材21を仮固定していた固定用ボルトB1を緩めて、スライド側部材21の仮固定状態を解除し、上段の防音板材12をジャッキ26および固定側部材25によって一旦受けた状態とし、その後、図5(e)に示すように、ジャッキ26によって中段の防音板材12をジャッキダウンさせる。そして、工具を使って中段の防音板材12と上段の防音板材12との間に隙間を形成しておき、スライド側部材21を取り外して差込プレート23を抜き取る。その後、工具を外して、上段の防音板材12を完全に下ろすようにする。これによって、中段の防音板材12と上段の防音板材12との間に、新規の緩衝材13Nを挟み込むことができる。
Subsequently, the removed jack 26 is installed between the fixed side member 25 that has been re-fixed and the slide side member 21 that has supported the upper soundproof plate 12.
Subsequently, the fixing bolt B1 that temporarily fixed the slide side member 21 is loosened, the temporarily fixed state of the slide side member 21 is released, and the upper soundproof plate 12 is once received by the jack 26 and the fixed side member 25. Then, as shown in FIG. 5 (e), the middle soundproof plate 12 is jacked down by the jack 26. Then, a gap is formed between the middle soundproof plate member 12 and the upper soundproof plate member 12 using a tool, the slide side member 21 is removed, and the insertion plate 23 is removed. Thereafter, the tool is removed, and the upper soundproof plate 12 is completely lowered. As a result, the new shock-absorbing material 13N can be sandwiched between the middle soundproof plate 12 and the upper soundproof plate 12.

その後は、図5(f)に示すように、防音天井部14の天井板材14aをブラケット14bに沿って移動させ、天井板材14aを元の位置に戻す。
以上のようにして、上段の防音板材12と中段の防音板材12との間と、中段の防音板材12と下段の防音板材12との間の緩衝材13を、新規の緩衝材13Nに交換することができる。
After that, as shown in FIG. 5 (f), the ceiling plate member 14a of the soundproof ceiling 14 is moved along the bracket 14b, and the ceiling plate member 14a is returned to the original position.
As described above, the buffer material 13 between the upper soundproof plate 12 and the middle soundproof plate 12 and between the middle soundproof plate 12 and the lower soundproof plate 12 is replaced with a new buffer 13N. be able to.

(第一昇降機20を用いた場合の第二パターン)
この第二パターンは、上段の防音板材12のみを持ち上げて、上段の防音板材12と中段の防音板材12との間の緩衝材13を新規の緩衝材13Nに交換するパターンである。
すなわち、この第二パターンは、図5(a)の手順から、図5(b)の手順と、図5(e)の手順を経て、図5(f)の手順に至る流れで行われる。
なお、各工程で行われる作業は、第一パターンで説明した手順を適宜踏襲して行われるものとする。
このような第二パターンによれば、固定側部材25とジャッキ26の付け替えを行う必要がなく、最も上方の位置にある緩衝材13の交換を行うことができる。
(Second pattern when the first elevator 20 is used)
The second pattern is a pattern in which only the upper soundproof plate 12 is lifted and the shock absorber 13 between the upper soundproof plate 12 and the middle soundproof plate 12 is replaced with a new shock absorber 13N.
That is, the second pattern is performed in the flow from the procedure in FIG. 5A to the procedure in FIG. 5F through the procedure in FIG. 5B and the procedure in FIG. 5E.
In addition, the work performed in each process shall be performed by following the procedure described in the first pattern as appropriate.
According to such a second pattern, it is not necessary to replace the stationary member 25 and the jack 26, and the cushioning material 13 at the uppermost position can be replaced.

(第一昇降機20を用いた場合の第三パターン)
この第三パターンは、中段の防音板材12から上段の防音板材12の二枚の防音板材12をいっぺんに持ち上げて、中段の防音板材12と下段の防音板材12との間の緩衝材13を新規の緩衝材13Nに交換するパターンである。
緩衝材13を交換した後は、上段および中段の防音板材12の防音板材12を同時に下ろす手順を経て、図5(f)の手順に至る流れで行われる。
なお、各工程で行われる作業は、第一パターンで説明した手順を適宜踏襲して行われるものとする。
このような第三パターンによれば、固定側部材25とジャッキ26の付け替えを行う必要がなく、中間の位置にある緩衝材13の交換を行うことができる。
(Third pattern when using the first elevator 20)
In the third pattern, the two soundproofing plate materials 12 of the middle soundproofing plate material 12 and the upper soundproofing plate material 12 are lifted together to provide a new cushioning material 13 between the middle soundproofing plate material 12 and the lower soundproofing plate material 12. This is a pattern for replacing the buffer material 13N.
After the cushioning material 13 is replaced, the procedure is performed in the flow up to the procedure of FIG. 5F through the procedure of simultaneously lowering the soundproof plate 12 of the upper and middle soundproof plate 12.
In addition, the work performed in each process shall be performed by following the procedure described in the first pattern as appropriate.
According to such a third pattern, it is not necessary to replace the stationary member 25 and the jack 26, and the cushioning material 13 at an intermediate position can be replaced.

(第一昇降機20を用いた場合の第四パターン)
この第四パターンは、まず、中段の防音板材12から上段の防音板材12の二枚の防音板材12を他のスライド側部材21Aによっていっぺんに持ち上げて、中段の防音板材12と下段の防音板材12との間の緩衝材13を新規の緩衝材13Nに交換する。その後、上段の防音板材12をスライド側部材21によって支柱11に仮固定してから、中段の防音板材12をジャッキダウンし、上段の防音板材12と中段の防音板材12との間の緩衝材13を新規の緩衝材13Nに交換するパターンである。
緩衝材13を交換した後は、上段の防音板材12の防音板材12を下ろす手順を経て、図5(f)の手順に至る流れで行われる。
すなわち、この第四パターンは、中段の防音板材12と上段の防音板材12をいっぺんに持ち上げる他のスライド側部材21Aと、上段の防音板材12を支柱11に仮固定するためのスライド側部材21とが必要となる。
なお、各工程で行われる作業は、第一パターンで説明した手順を適宜踏襲して行われるものとする。
このような第四パターンによれば、第一パターンとは異なる手順で、中段の防音板材12と下段の防音板材12との間の緩衝材13と、上段の防音板材12と中段の防音板材12との間の緩衝材13の交換作業を行なうことができる。
(Fourth pattern when using the first elevator 20)
In the fourth pattern, first, the two soundproofing plate materials 12 from the middle soundproofing plate material 12 to the upper soundproofing plate material 12 are lifted together by another slide side member 21A, and the middle soundproofing plate material 12 and the lower soundproofing plate material 12 The cushioning material 13 in between is replaced with a new cushioning material 13N. Thereafter, the upper soundproof plate 12 is temporarily fixed to the column 11 by the slide-side member 21, and then the middle soundproof plate 12 is jacked down, and the shock absorber 13 between the upper soundproof plate 12 and the middle soundproof plate 12. Is replaced with a new cushioning material 13N.
After the cushioning material 13 is replaced, the procedure is performed in a flow up to the procedure of FIG. 5F through the procedure of lowering the soundproof plate 12 of the upper soundproof plate 12.
That is, the fourth pattern includes the other sound-proof plate member 12A for lifting the soundproof plate material 12 on the middle stage and the soundproof plate material 12 on the upper stage together, and the slide-side member 21 for temporarily fixing the soundproof plate material 12 on the upper stage to the column 11. Necessary.
In addition, the work performed in each process shall be performed by following the procedure described in the first pattern as appropriate.
According to the fourth pattern, the buffer material 13 between the middle soundproof plate 12 and the lower soundproof plate 12, the upper soundproof plate 12 and the middle soundproof plate 12 are different from the first pattern. The cushioning material 13 can be exchanged between the two.

(第二昇降機30を用いた場合の第五パターン)
次に、第二昇降機30によって緩衝材13を交換する方法について説明する。第二昇降機30のみによって緩衝材13を交換するパターンは一つであり、以下、当該一つのパターン(以下、第五パターン)による緩衝材13の交換方法について詳細に説明する。
なお、本実施形態における複数の防音板材12は上述のように三枚である。さらに、左右対称的に形成された第二昇降機30,30が、防音壁10の左右両側にあるものとする。
(Fifth pattern when the second elevator 30 is used)
Next, a method for replacing the cushioning material 13 by the second elevator 30 will be described. There is one pattern for exchanging the cushioning material 13 only by the second elevator 30. Hereinafter, a method for exchanging the cushioning material 13 by the one pattern (hereinafter, fifth pattern) will be described in detail.
In addition, the some soundproof board | plate material 12 in this embodiment is three as mentioned above. Furthermore, it is assumed that the second elevators 30, 30 formed symmetrically on the left and right sides are on the left and right sides of the soundproof wall 10.

第五パターンは、図9(a)から図9(d)までの手順を、アルファベット順に進めていった場合のものである。
緩衝材13を交換する場合は、最初に、図9(a)に示すように、防音天井部14の天井板材14aをブラケット14bに沿って移動させ、防音板材12をジャッキアップできる空間を形成する。
続いて、持ち上げたい下段の防音板材12を、工具(例えばバール)もしくは図示しない他のジャッキを用いて僅かに持ち上げて、当該下段の防音板材12と高架橋2の床部2aとの間に、差込プレート35を差込可能な隙間を形成する。
なお、図示しない他のジャッキを用いる場合は、下段の防音板材12に形成された切欠部12aに、他のジャッキ用のアタッチメントを差し込んで利用する。
The fifth pattern is a case where the procedure from FIG. 9A to FIG. 9D is advanced in alphabetical order.
When replacing the cushioning material 13, first, as shown in FIG. 9A, the ceiling plate material 14 a of the soundproof ceiling portion 14 is moved along the bracket 14 b to form a space in which the soundproof plate material 12 can be jacked up. .
Subsequently, the lower soundproof board 12 to be lifted is slightly lifted using a tool (for example, bar) or another jack (not shown), and the difference between the lower soundproof board 12 and the floor 2a of the viaduct 2 is different. A gap into which the insertion plate 35 can be inserted is formed.
When other jacks (not shown) are used, other jack attachments are inserted into the notches 12a formed in the lower soundproof plate 12 and used.

続いて、図6〜図8に示すように、第二昇降機30を高架橋2の床部2aに設置する。
より詳細には、ジャッキ用アタッチメント32が取り付けられたジャッキ31を、高架橋2の床部2aに設置する。この時、同時に、ジャッキ用アタッチメント32における差込プレート35を、下段の防音板材12と高架橋2の床部2aとの間の前記隙間に差し込むようにする。
そして、一対の第二昇降機30,30における双方のジャッキ31を同時に伸長させて、図9(b)に示すように、三枚の防音板材12をいっぺんにジャッキアップする。そして、ジャッキ31によって三枚の防音板材12を持ち上げた状態のまま既設の緩衝材13を取り除く。
そして、ジャッキ31によって三枚の防音板材12を持ち上げた状態のまま、下段の防音板材12と高架橋2の床部2aとの間に新規の緩衝材13Nを設ける。
Subsequently, as shown in FIGS. 6 to 8, the second elevator 30 is installed on the floor 2 a of the viaduct 2.
More specifically, the jack 31 to which the jack attachment 32 is attached is installed on the floor 2 a of the viaduct 2. At the same time, the insertion plate 35 in the jack attachment 32 is inserted into the gap between the lower soundproof plate 12 and the floor portion 2a of the viaduct 2.
And both the jacks 31 in a pair of 2nd elevators 30 and 30 are extended simultaneously, and as shown in FIG.9 (b), the three soundproof board | plate materials 12 are jacked up collectively. Then, the existing cushioning material 13 is removed while the three soundproof plate members 12 are lifted by the jack 31.
And the new shock absorbing material 13N is provided between the lower soundproofing board material 12 and the floor part 2a of the viaduct 2 with the three soundproofing board materials 12 lifted by the jack 31.

続いて、図9(c)に示すように、ジャッキ31によって三枚の防音板材12をジャッキダウンさせ、下段の防音板材12と高架橋2の床部2aとの間に、新規の緩衝材13Nを挟み込むようにする。この時、上述のような工具もしくは他のジャッキを使って下段の防音板材12と高架橋2の床部2aとの間に隙間を形成しておき、ジャッキ31およびジャッキ用アタッチメント32を取り外して差込プレート35を抜き取る。その後、工具もしくは他のジャッキを外して、三枚の防音板材12を完全に下ろすようにする。   Subsequently, as shown in FIG. 9 (c), the three soundproof plate members 12 are jacked down by the jack 31, and a new cushioning material 13N is placed between the lower soundproof plate member 12 and the floor 2a of the viaduct 2. Try to pinch. At this time, a gap is formed between the lower soundproof plate 12 and the floor 2a of the viaduct 2 using the above-described tool or another jack, and the jack 31 and the jack attachment 32 are removed and inserted. The plate 35 is extracted. Thereafter, the tool or other jack is removed, and the three soundproof plate members 12 are completely lowered.

その後は、図9(d)に示すように、防音天井部14の天井板材14aをブラケット14bに沿って移動させ、天井板材14aを元の位置に戻す。
以上のようにして、上段の防音板材12と高架橋2の床部2aとの間の緩衝材13を、新規の緩衝材13Nに交換することができる。
このような第五パターンによれば、複数の防音板材12をいっぺんに持ち上げて、下段の防音板材12と高架橋2の床部2aとの間の、最も下方に位置する緩衝材13の交換作業を行なうことができる。
Thereafter, as shown in FIG. 9 (d), the ceiling plate material 14a of the soundproof ceiling portion 14 is moved along the bracket 14b, and the ceiling plate material 14a is returned to the original position.
As described above, the cushioning material 13 between the upper soundproof plate 12 and the floor portion 2a of the viaduct 2 can be replaced with a new cushioning material 13N.
According to such a fifth pattern, the plurality of soundproof plate members 12 are lifted all at once, and the lowermost shock absorber 13 is exchanged between the lower soundproof plate member 12 and the floor portion 2a of the viaduct 2. be able to.

次に、第一昇降機20と第二昇降機30の双方を用いて緩衝材13を交換する方法について説明する。第一昇降機20および第二昇降機30によって緩衝材13を交換するパターンは複数あり、以下、これら複数パターンの交換方法について詳細に説明する。
なお、本実施形態における複数の防音板材12は上述のように三枚である。また、左右対称的に形成された第一昇降機20,20が、防音板材12の左右両側にある隣り合う支柱11,11の双方に設けられるものとする。さらに、左右対称的に形成された第二昇降機30,30が、防音壁10の左右両側にあるものとする。
Next, a method for replacing the cushioning material 13 using both the first elevator 20 and the second elevator 30 will be described. There are a plurality of patterns for exchanging the cushioning material 13 by the first elevator 20 and the second elevator 30. Hereinafter, a method for exchanging these plural patterns will be described in detail.
In addition, the some soundproof board | plate material 12 in this embodiment is three as mentioned above. Moreover, the 1st elevators 20 and 20 formed symmetrically shall be provided in both the adjacent support | pillars 11 and 11 in the both right and left sides of the sound-insulation board | plate material 12. As shown in FIG. Furthermore, it is assumed that the second elevators 30, 30 formed symmetrically on the left and right sides are on the left and right sides of the soundproof wall 10.

(第一昇降機20および第二昇降機30を用いた場合の第六パターン)
この第六パターンは、まず、第一昇降機20によって、上段の防音板材12のみを持ち上げた後、もしくは、中段の防音板材12と上段の防音板材12を持ち上げた後に、第二昇降機30によって下段の防音板材12を持ち上げる。そして、下段の防音板材12と高架橋2の床部2aとの間の緩衝材13を新規の緩衝材13Nに交換した後に、各防音板材12,12間の緩衝材13を新規の緩衝材13Nに適宜交換するパターンである。
なお、中段の防音板材12と上段の防音板材12を持ち上げる場合は、これら中段および上段の防音板材12をいっぺんに持ち上げてもよいし、他のスライド側部材21Aを用意して順次持ち上げてもよい。
また、第一昇降機20によって持ち上げられた防音板材12は、第二昇降機30によって下段の防音板材12を持ち上げる前に仮固定しておく必要がある。
さらに、中段の防音板材12と上段の防音板材12を順次下ろす場合は、他のスライド側部材21Aを用いる必要がある。
その他、各工程で行われる作業は、第一パターンおよび第五パターンで説明した手順を適宜踏襲して行われるものとする。
このような第六パターンによれば、第一昇降機20と第二昇降機30を用いて、防音壁10における全ての緩衝材13の交換作業を行うことができる。
(Sixth pattern when the first elevator 20 and the second elevator 30 are used)
In the sixth pattern, first, only the upper soundproof plate 12 is lifted by the first elevator 20 or after the middle soundproof plate 12 and the upper soundproof plate 12 are lifted, the second lift 30 lowers the lower pattern. The soundproof board 12 is lifted. And after exchanging the shock absorbing material 13 between the lower soundproofing plate material 12 and the floor 2a of the viaduct 2 with a new shock absorbing material 13N, the shock absorbing material 13 between the soundproofing plate materials 12, 12 is changed to the new shock absorbing material 13N. It is a pattern to exchange as appropriate.
When the middle soundproof plate member 12 and the upper soundproof plate member 12 are lifted, the middle and upper soundproof plate members 12 may be lifted together, or another slide side member 21A may be prepared and lifted sequentially.
In addition, the soundproof plate 12 lifted by the first elevator 20 needs to be temporarily fixed before the second soundproof plate 12 is lifted by the second lift 30.
Furthermore, when lowering the middle soundproof plate member 12 and the upper soundproof plate member 12 sequentially, it is necessary to use another slide side member 21A.
In addition, the work performed in each process shall be performed appropriately following the procedure described in the first pattern and the fifth pattern.
According to such a 6th pattern, the replacement | exchange operation | work of all the buffer materials 13 in the soundproof wall 10 can be performed using the 1st elevator 20 and the 2nd elevator 30. FIG.

(第一昇降機20および第二昇降機30を用いた場合の第七パターン)
この第七パターンは、まず、第二昇降機30によって、下段の防音板材12から上段の防音板材12にかけての三枚の防音板材12をいっぺんに持ち上げた後に、第一昇降機20によって、中段および上段の防音板材12もしくは上段の防音板材12のみを仮固定しておく。そして、下段の防音板材12と高架橋2の床部2aとの間の緩衝材13を新規の緩衝材13Nに交換した後に、第二昇降機30によって下段の防音板材12を下ろす。その後、仮固定していた防音板材12を、第一昇降機20によって下ろしつつ、各防音板材12,12間の緩衝材13を新規の緩衝材13Nに適宜交換するパターンである。
なお、中段の防音板材12と上段の防音板材12を順次下ろす場合は、他のスライド側部材21Aを用いる必要がある。
その他、各工程で行われる作業は、第一パターンおよび第五パターンで説明した手順を適宜踏襲して行われるものとする。
このような第七パターンによれば、第一昇降機20と第二昇降機30を用いて、第六パターンとは異なる手順で防音壁10における全ての緩衝材13の交換作業を行うことができる。
(Seventh pattern when the first elevator 20 and the second elevator 30 are used)
In the seventh pattern, first, the second elevator 30 lifts up the three soundproof plate members 12 from the lower soundproof plate member 12 to the upper soundproof plate member 12 at the same time, and then the first elevator 20 raises the middle and upper soundproof members. Only the plate 12 or the upper soundproof plate 12 is temporarily fixed. And after changing the shock absorbing material 13 between the lower soundproof board | plate material 12 and the floor part 2a of the viaduct 2 to the new shock absorbing material 13N, the lower soundproof board | plate material 12 is lowered | hung with the 2nd elevator 30. FIG. Thereafter, while the soundproof plate 12 that has been temporarily fixed is lowered by the first elevator 20, the buffer 13 between the soundproof plates 12 and 12 is appropriately replaced with a new buffer 13 </ b> N.
When lowering the middle soundproof plate 12 and the upper soundproof plate 12 sequentially, it is necessary to use another slide side member 21A.
In addition, the work performed in each process shall be performed appropriately following the procedure described in the first pattern and the fifth pattern.
According to such a 7th pattern, the replacement | exchange operation | work of all the buffer materials 13 in the soundproof wall 10 can be performed in the procedure different from a 6th pattern using the 1st elevator 20 and the 2nd elevator 30. FIG.

なお、本実施形態においては上述のように複数のパターンで緩衝材13を交換する方法について説明したが、基本的には、第一パターンおよび第五パターンで説明した手順を適宜踏襲して行われるものとする。したがって、例えば防音壁10を構成する防音板材12の枚数が本実施形態とは異なり、各防音板材12の上げ下ろしパターンが増えたとしても確実に対応することができ、緩衝材13の交換作業を円滑に行うことができる。   In the present embodiment, the method of exchanging the cushioning material 13 in a plurality of patterns as described above has been described, but basically, the procedure described in the first pattern and the fifth pattern is appropriately followed. Shall. Therefore, for example, the number of the soundproof plate members 12 constituting the soundproof wall 10 is different from that of the present embodiment, and even if the number of raising / lowering patterns of the soundproof plate members 12 is increased, it can be dealt with reliably, and the replacement work of the shock absorbers 13 can be performed smoothly Can be done.

以上のような本実施の形態によれば、上下方向に隣り合う防音板材12,12間に空けられた隙間に差込プレート23を差し込んで、この差込プレート23を有するスライド側部材21を、支柱11に沿って上方にジャッキアップするだけで上側の防音板材12を持ち上げることができ、緩衝材13の交換作業を行うことができる。さらに、スライド側部材21と固定側部材25を支柱11に装着させ、ジャッキ26を固定側部材25とスライド側部材21との間に設置するだけで緩衝材13の交換作業を行なうことができるので、広い作業スペースを確保する必要がない。したがって、線路1外に高所作業車やクレーン車を使用できるスペースが確保できない場所であっても、防音壁10における緩衝材13の交換作業を容易に行うことができる。   According to the present embodiment as described above, the insertion plate 23 is inserted into the gap formed between the soundproof plate members 12 adjacent to each other in the vertical direction, and the slide side member 21 having the insertion plate 23 is The upper soundproof plate 12 can be lifted simply by jacking up along the support 11, and the cushioning material 13 can be replaced. Furthermore, the cushioning member 13 can be replaced simply by mounting the slide side member 21 and the fixed side member 25 on the support column 11 and installing the jack 26 between the fixed side member 25 and the slide side member 21. There is no need to secure a wide working space. Therefore, even if it is a place where the space which can use an aerial work vehicle and a crane vehicle cannot be ensured outside the track 1, the exchange work of the shock absorbing material 13 in the soundproof wall 10 can be performed easily.

また、一対の第一昇降機20,20によって防音板材12の両側端部を同時に等しい高さまで持ち上げるので、防音板材12をバランスよく、かつ安定的に持ち上げることができる。   Moreover, since the both side edge part of the soundproof board | plate material 12 is simultaneously raised to the same height by a pair of 1st elevators 20 and 20, the soundproof board | plate material 12 can be lifted with sufficient balance and stably.

また、上段の防音板材12を仮固定しておくスライド側部材21とは異なる他のスライド側部材21Aを用意しておけば、中段の防音板材12をジャッキアップする際に、固定側部材25およびジャッキ26を使い回すことができるので、緩衝材13の交換作業に係るコストの低減を図ることができる。   Further, if another slide side member 21A different from the slide side member 21 for temporarily fixing the upper soundproof plate member 12 is prepared, when the middle soundproof plate member 12 is jacked up, the fixed side member 25 and Since the jack 26 can be reused, the cost associated with the replacement work of the cushioning material 13 can be reduced.

また、第一昇降機20,20によって中段および上段の防音板材12,12を同時にジャッキアップできることになるため、上下方向に積み重なる防音板材12,12同士の間の緩衝材13のうち、交換が必要な箇所の緩衝材13だけを交換することができる。   In addition, since the middle and upper soundproof plate materials 12 and 12 can be jacked up simultaneously by the first elevators 20 and 20, the buffer material 13 between the soundproof plate materials 12 and 12 stacked in the vertical direction needs to be replaced. Only the cushioning material 13 at the location can be exchanged.

また、中段および上段の防音板材12,12をいっぺんに持ち上げてから、中段の防音板材12をジャッキダウンして緩衝材13の交換を行うことができるため、緩衝材13を交換する手順のパターンを増やすことができる。これによって、緩衝材13の交換作業における自由度が増すので、より一層、緩衝材13の交換作業が行いやすくなる。   Further, since the middle and upper soundproof plate members 12 and 12 can be lifted together and then the middle soundproof plate member 12 can be jacked down to replace the shock absorber 13, the pattern of procedures for replacing the shock absorber 13 is increased. be able to. As a result, the degree of freedom in the replacement work of the cushioning material 13 is increased, so that the replacement work of the cushioning material 13 is further facilitated.

また、支柱11が、ウェブ11aと、二つのフランジ11b,11bを有する形鋼材であるため、防音板材12の側端部が入り込む凹状の案内溝11cと、スライド側部材21および固定側部材25を装着させる部分を同時に確保できる。さらに、スライド側部材21および固定側部材25は、フランジ11bを把持するようにして支柱11に装着されているので、引っ掛かりやすく脱落しにくい。   Moreover, since the support | pillar 11 is the shape steel material which has the web 11a and the two flanges 11b and 11b, the concave guide groove 11c into which the side edge part of the sound-insulation board material 12 penetrates, the slide side member 21, and the fixed side member 25 are provided. The part to be installed can be secured at the same time. Furthermore, since the slide side member 21 and the fixed side member 25 are attached to the support column 11 so as to grip the flange 11b, they are easily caught and are not easily dropped off.

また、固定用ボルトB1を締めることによってスライド側部材21を支柱11に仮固定し、固定用ボルトB1を締めることによって固定側部材25を支柱11に固定するので、固定用ボルトB1の締め回しで固定強度を調整できることになる。そのため、スライド側部材21および固定側部材25を支柱11に対して設置する作業が容易であり、防音板材12をジャッキアップする際もスライド側部材21を仮固定していた固定用ボルトB1を緩めるだけで済み、緩衝材13の交換作業を進めやすくなる。また、固定用ボルトB1の締め付けによってスライド側部材21および固定側部材25を支柱11に固定できるので、これらスライド側部材21および固定側部材25を、支柱11における任意の高さ位置に仮固定・固定することができる。   Further, the slide-side member 21 is temporarily fixed to the column 11 by tightening the fixing bolt B1, and the fixed-side member 25 is fixed to the column 11 by tightening the fixing bolt B1, so that the fixing bolt B1 is tightened. The fixing strength can be adjusted. Therefore, it is easy to install the slide-side member 21 and the fixed-side member 25 with respect to the support column 11, and when the soundproof plate 12 is jacked up, the fixing bolt B1 that temporarily fixed the slide-side member 21 is loosened. It is easy to proceed with the replacement work of the cushioning material 13. Further, since the slide side member 21 and the fixed side member 25 can be fixed to the column 11 by tightening the fixing bolt B1, the slide side member 21 and the fixed side member 25 are temporarily fixed at arbitrary height positions on the column 11. Can be fixed.

1 線路
2 高架橋
2a 床部
3 軌道
10 防音壁
11 支柱
11a ウェブ
11b フランジ
11c 案内溝
12 防音板材
13 緩衝材
13N 新規の緩衝材
14 防音天井部
20 第一昇降機
21 スライド側部材
21A 他のスライド側部材
22 装着部
22a 引掛部
22b 間隔調整部
23 差込プレート
25 固定側部材
26 ジャッキ
30 第二昇降機
B1 固定用ボルト
B2 調整用ボルト
DESCRIPTION OF SYMBOLS 1 Track 2 Viaduct 2a Floor part 3 Track 10 Soundproof wall 11 Support | pillar 11a Web 11b Flange 11c Guide groove 12 Soundproof board material 13 Buffer material 13N New buffer material 14 Soundproof ceiling part 20 First elevator 21 Slide side member 21A Other slide side members 22 mounting part 22a hooking part 22b interval adjusting part 23 insertion plate 25 fixing side member 26 jack 30 second elevator B1 fixing bolt B2 adjusting bolt

Claims (7)

複数の防音板材が、前記防音板材の側端部が入り込む凹状の案内溝が形成され、互いに間隔を空けて立設された複数の支柱間に亘って設けられ、かつ緩衝材を介在させた状態で上下方向に積み重ねられて形成された防音壁における前記緩衝材の交換を行う方法であって、
前記上下方向に隣り合う防音板材間に隙間を空ける第1工程と、
前記隙間に差し込まれる差込プレートを有し、前記支柱の長さ方向に沿ってスライド可能なスライド側部材を、前記差込プレートを前記隙間に差し込みながら前記支柱に装着させた後に前記支柱に仮固定しておく第2工程と、
固定側部材を、前記支柱のうち前記スライド側部材の下方の位置に装着させて固定する第3工程と、
前記固定側部材の上面に、当該固定側部材と前記スライド側部材との間に位置するようにしてジャッキを設置する第4工程と、
前記スライド側部材を前記支柱に沿ってスライド可能な状態で装着させたまま仮固定を解除した後に、前記ジャッキによって、前記差込プレートを介して上側の前記防音板材を持ち上げる第5工程と、
前記上下方向に隣り合う防音板材間に残留している前記緩衝材を除去する第6工程と、
下側の前記防音板材の上面に新規の緩衝材を設ける第7工程と、を含むことを特徴とする防音壁における緩衝材の交換方法。
A state in which a plurality of soundproof plate members are formed with a recessed guide groove into which a side end portion of the soundproof plate member is inserted, are provided between a plurality of support columns standing upright apart from each other, and a cushioning material is interposed In the method of exchanging the cushioning material in the soundproof wall formed by being stacked in the vertical direction,
A first step of opening a gap between the soundproof plate materials adjacent in the vertical direction;
A slide-side member that has an insertion plate to be inserted into the gap and is slidable along the length of the column is temporarily attached to the column after the insertion plate is inserted into the gap. A second step of fixing,
A third step of fixing and fixing the fixed side member at a position below the slide side member of the support;
A fourth step of installing a jack on the upper surface of the fixed side member so as to be positioned between the fixed side member and the slide side member;
A fifth step of lifting the soundproof plate material on the upper side through the insertion plate by the jack after releasing the temporary fixing while the slide side member is mounted in a slidable state along the column;
A sixth step of removing the buffer material remaining between the soundproof plate materials adjacent in the vertical direction;
A seventh step of providing a new cushioning material on the upper surface of the lower soundproofing plate material, and a method of replacing the cushioning material in the soundproof wall.
前記第2工程から前記第4工程において、前記スライド側部材と前記固定側部材と前記ジャッキを、隣り合う前記支柱の双方に設置し、
前記第5工程において、前記上側の防音板材の両側端部を同時に等しい高さまで持ち上げることを特徴とする請求項1に記載の防音壁における緩衝材の交換方法。
In the second step to the fourth step, the slide side member, the fixed side member, and the jack are installed on both of the adjacent columns.
The method for replacing a cushioning material in a soundproof wall according to claim 1, wherein in the fifth step, both end portions of the upper soundproof plate material are simultaneously lifted to the same height.
前記第5工程において、前記上側の防音板材を持ち上げた後に前記スライド側部材を前記支柱に仮固定し、さらに、前記ジャッキを取り外すとともに、前記固定側部材を下方に移動させ、
前記第7工程以降に、前記下側の防音板材を、前記スライド側部材とは異なる他のスライド側部材と、前記固定側部材および前記ジャッキを用いて持ち上げる工程をさらに含むことを特徴とする請求項1または2に記載の防音壁における緩衝材の交換方法。
In the fifth step, the slide-side member is temporarily fixed to the column after lifting the upper soundproof plate, and further, the jack is removed and the fixed-side member is moved downward.
The method further includes a step of lifting the lower soundproof plate member using the other slide side member different from the slide side member, the fixed side member and the jack after the seventh step. Item 3. A method for replacing a cushioning material in a soundproof wall according to item 1 or 2.
前記上側の防音板材は、上下に隣り合う複数の防音板材を含んでおり、前記第5工程では、当該複数の防音板材を同時に持ち上げることを特徴とする請求項1から3のいずれか一項に記載の防音壁における緩衝材の交換方法。   The said upper soundproof board material contains the several soundproof board material adjacent to the upper and lower sides, In the said 5th process, the said several soundproof board material is lifted simultaneously, The said any one of Claim 1 to 3 characterized by the above-mentioned. The method for replacing the cushioning material in the soundproof wall. 前記上側の防音板材に含まれた前記上下に隣り合う複数の防音板材のうち、下側に位置する防音板材を下ろした後に、当該下側に位置する防音板材の上面に新規の緩衝材を設ける工程をさらに含むことを特徴とする請求項4に記載の防音壁における緩衝材の交換方法。   Among the plurality of adjacent soundproof plate materials included in the upper soundproof plate material, after lowering the soundproof plate material located on the lower side, a new cushioning material is provided on the upper surface of the soundproof plate material located on the lower side The method for replacing a cushioning material in a soundproof wall according to claim 4, further comprising a step. 前記支柱は、ウェブと、二つのフランジを有する形鋼材であり、
前記案内溝は、前記ウェブと前記二つのフランジによって囲まれた溝部であり、
前記スライド側部材および前記固定側部材は、前記フランジを把持するようにして前記支柱に装着されていることを特徴とする請求項1から5のいずれか一項に記載の防音壁における緩衝材の交換方法。
The strut is a section steel having a web and two flanges,
The guide groove is a groove portion surrounded by the web and the two flanges,
The cushioning material for a soundproof wall according to any one of claims 1 to 5, wherein the slide-side member and the fixed-side member are attached to the support so as to grip the flange. method of exchange.
前記スライド側部材および前記固定側部材は、自身を貫通して前記フランジに接するボルトをそれぞれ有しており、
前記ボルトを締めることによって前記スライド側部材を前記支柱に仮固定し、
前記ボルトを締めることによって前記固定側部材を前記支柱に固定することを特徴とする請求項1から6のいずれか一項に記載の防音壁における緩衝材の交換方法。
The slide side member and the fixed side member each have a bolt that penetrates itself and contacts the flange,
Temporarily fixing the slide side member to the column by tightening the bolt,
The method for replacing a cushioning material in a soundproof wall according to any one of claims 1 to 6, wherein the fixed side member is fixed to the support column by tightening the bolt.
JP2016132970A 2016-07-05 2016-07-05 How to replace the cushioning material in the soundproof wall Expired - Fee Related JP6736387B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016132970A JP6736387B2 (en) 2016-07-05 2016-07-05 How to replace the cushioning material in the soundproof wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016132970A JP6736387B2 (en) 2016-07-05 2016-07-05 How to replace the cushioning material in the soundproof wall

Publications (2)

Publication Number Publication Date
JP2018003481A true JP2018003481A (en) 2018-01-11
JP6736387B2 JP6736387B2 (en) 2020-08-05

Family

ID=60947624

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016132970A Expired - Fee Related JP6736387B2 (en) 2016-07-05 2016-07-05 How to replace the cushioning material in the soundproof wall

Country Status (1)

Country Link
JP (1) JP6736387B2 (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018188913A (en) * 2017-05-10 2018-11-29 新中央工業株式会社 Reinforcing fitting for sound insulation panel and method for reinforcing sound insulation panel
JP7317681B2 (en) 2019-11-25 2023-07-31 Jfe建材株式会社 panel lifter
JP7317682B2 (en) 2019-11-25 2023-07-31 Jfe建材株式会社 Panel replacement method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4938035U (en) * 1972-07-03 1974-04-04
JPH0494309U (en) * 1990-12-28 1992-08-17
JP2004346533A (en) * 2003-05-20 2004-12-09 Sekisui Chem Co Ltd Mounting construction method for wall panel
JP2013129513A (en) * 2011-12-22 2013-07-04 Niwata Kensetsu:Kk Tool for jack and manufacturing method for tool for jack

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS4938035U (en) * 1972-07-03 1974-04-04
JPH0494309U (en) * 1990-12-28 1992-08-17
JP2004346533A (en) * 2003-05-20 2004-12-09 Sekisui Chem Co Ltd Mounting construction method for wall panel
JP2013129513A (en) * 2011-12-22 2013-07-04 Niwata Kensetsu:Kk Tool for jack and manufacturing method for tool for jack

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2018188913A (en) * 2017-05-10 2018-11-29 新中央工業株式会社 Reinforcing fitting for sound insulation panel and method for reinforcing sound insulation panel
JP7317681B2 (en) 2019-11-25 2023-07-31 Jfe建材株式会社 panel lifter
JP7317682B2 (en) 2019-11-25 2023-07-31 Jfe建材株式会社 Panel replacement method

Also Published As

Publication number Publication date
JP6736387B2 (en) 2020-08-05

Similar Documents

Publication Publication Date Title
KR101300073B1 (en) Lifting device for girder
JP5989549B2 (en) Passenger conveyor
JP2018003481A (en) Replacement method for cushioning material of soundproof wall
JP5769961B2 (en) Construction method and removal method of structure
JP5421143B2 (en) Overhead crane installation equipment
JP7265967B2 (en) Cantilever device for bridge construction and bridge construction and demolition method
JP5940404B2 (en) Construction method of beam members
JP6271247B2 (en) Construction girder and construction method of construction girder
JP6320242B2 (en) How to install temporary pillars
JP6493322B2 (en) Floor slab replacement device and floor slab replacement method
JP6520533B2 (en) Overhead crane support device and load receiving member
JP6688856B2 (en) Vibration control structure
JP2009091087A (en) Guide rail supporting structure of elevator
JP5898057B2 (en) Elevator load bearing beam holding device
JP6002063B2 (en) Elevator
JP6370167B2 (en) Raising tool and raising method
KR20130131540A (en) Prop for rail loading and peripheral device of overhead slewing crane girder
JP6885888B2 (en) Scaffolding installation method and scaffolding installation structure
JP5638443B2 (en) Lifting system
JP6411832B2 (en) Temporary beam connecting member and structure construction method
JP6922130B2 (en) Construction method of steel materials on the outer wall of a building
JP6504824B2 (en) Construction method of damping structure
JP6459417B2 (en) Elevator control panel fixing device
JP2012180198A (en) Elevator cage installation device
JP6984795B1 (en) How to install the elevator installation work floor device and the elevator installation work floor device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190605

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20200323

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200331

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200413

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200616

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200715

R150 Certificate of patent or registration of utility model

Ref document number: 6736387

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

LAPS Cancellation because of no payment of annual fees