JP2017197316A - Assembling method of construction machine - Google Patents

Assembling method of construction machine Download PDF

Info

Publication number
JP2017197316A
JP2017197316A JP2016087917A JP2016087917A JP2017197316A JP 2017197316 A JP2017197316 A JP 2017197316A JP 2016087917 A JP2016087917 A JP 2016087917A JP 2016087917 A JP2016087917 A JP 2016087917A JP 2017197316 A JP2017197316 A JP 2017197316A
Authority
JP
Japan
Prior art keywords
telescopic boom
middle sheave
rope
swing body
upper swing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2016087917A
Other languages
Japanese (ja)
Other versions
JP6653965B2 (en
Inventor
冨田 庸公
Yasukimi Tomita
庸公 冨田
浩司 高山
Koji Takayama
浩司 高山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Sharyo Ltd
Original Assignee
Nippon Sharyo Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Sharyo Ltd filed Critical Nippon Sharyo Ltd
Priority to JP2016087917A priority Critical patent/JP6653965B2/en
Publication of JP2017197316A publication Critical patent/JP2017197316A/en
Application granted granted Critical
Publication of JP6653965B2 publication Critical patent/JP6653965B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

PROBLEM TO BE SOLVED: To provide an assembling method of a construction machine which can move a middle sheave to a transportation position behind a superstructure and a connection position in front of the superstructure without requiring a separate crane or the like.SOLUTION: An assembling method of a construction machine includes in this order: a step of, when connecting a middle sheave and a pendant rope after connecting a telescopic boom to a superstructure, connecting the middle sheave at a transportation position and the pendant rope disposed at a base part of the telescopic boom with an auxiliary rope; a step of unwinding a derricking wire while extending the telescopic boom to move the middle sheave from the transportation position to a connection position on the telescopic boom; a step of removing the auxiliary rope; a step of shortening the telescopic boom to move a connection tool of the pendant rope to a position connecting to a connection part of the middle sheave; and a step of connecting the connection tool of the pendant rope and the connection part of the middle sheave.SELECTED DRAWING: Figure 1

Description

本発明は、建設機械の組立方法に関し、詳しくは、上部旋回体に、起伏ワイヤで起伏する伸縮ブームを装着した建設機械の組立方法に関する。   The present invention relates to a method for assembling a construction machine, and more particularly to a method for assembling a construction machine in which an upper swing body is provided with a telescopic boom that undulates with an undulation wire.

大型のクローラクレーンやアースドリルといった建設機械は、下部走行体及び上部旋回体からなるベースマシンの上部旋回体にブームを着脱可能に装着しており、輸送時には、上部旋回体からブームを取り外してベースマシンとは別々に輸送するようにしている。輸送前後にブームを着脱する際には、通常、重量物であるブームを大型クレーンで保持した状態でブームフートと上部旋回体のブームブラケットとを連結するフートピンを着脱することにより行われている。また、上部旋回体に伸縮ブームを着脱する方法として、特定のブームサポートを使用することで、大型クレーンを必要とせずに伸縮ブームを上部旋回体に着脱可能とした方法が知られている(例えば、特許文献1参照。)。   Construction machines such as large crawler cranes and earth drills have a boom detachably attached to the upper swing body of a base machine consisting of a lower traveling body and an upper swing body. They are transported separately from the machine. When attaching and detaching the boom before and after transportation, it is usually performed by attaching and detaching a foot pin that connects the boom foot and the boom bracket of the upper-part turning body while the heavy boom is held by a large crane. In addition, as a method of attaching and detaching the telescopic boom to and from the upper swing body, there is known a method in which the telescopic boom can be attached to and detached from the upper swing body without using a large crane by using a specific boom support (for example, , See Patent Document 1).

特開2015−124491号公報JP2015-124491A

上部旋回体に伸縮ブームを着脱する際、上部旋回体後方のガントリを介して繰り出される起伏ワイヤの先端に設けられているミドルシーブと、伸縮ブームに設けられているペンダントロープとを連結する際には、ミドルシーブを、上部旋回体後方の輸送位置と上部旋回体前方の連結位置とにそれぞれ移動させる必要がある。しかし、大型のクレーンやアースドリルの場合は、重量物であるミドルシーブを移動させるために、別のクレーンなどが必要になるという問題があった。   When detaching the telescopic boom from the upper swing body, when connecting the middle sheave provided at the tip of the undulation wire fed out through the gantry behind the upper swing body and the pendant rope provided on the telescopic boom It is necessary to move the middle sheave to the transport position behind the upper swing body and the connecting position in front of the upper swing body. However, in the case of a large crane or an earth drill, there is a problem that a separate crane or the like is required to move the heavy middle sheave.

そこで本発明は、ミドルシーブを、上部旋回体後方の輸送位置と上部旋回体前方の連結位置とに、別のクレーンなどを必要とせずに、移動させることができる建設機械の組立方法を提供することを目的としている。   Therefore, the present invention provides a construction machine assembling method capable of moving the middle sheave between the transport position behind the upper swing body and the connecting position in front of the upper swing body without requiring another crane or the like. It is an object.

上記目的を達成するため、本発明の建設機械の組立方法は、建設機械におけるベースマシンの上部旋回体に起伏可能に装着された伸縮ブームを、上部旋回体後方のガントリを介して繰り出される起伏ワイヤに設けられているミドルシーブに着脱可能に連結されたペンダントロープによって起伏させる建設機械の組立方法において、短縮状態にある伸縮ブームを前記上部旋回体に起伏可能に連結した後、上部旋回体上の輸送位置に配置されているミドルシーブと、伸縮ブームに取り付けられているペンダントロープとを連結する際に、輸送位置にあるミドルシーブと伸縮ブームの上に配置されたペンダントロープとを補助ロープで連結する段階と、伸縮ブームを伸長させながら起伏ワイヤを巻き出してミドルシーブを前記輸送位置から前記伸縮ブームの上の連結位置に移動させる段階と、前記補助ロープを取り外す段階と、伸縮ブームを短縮させてペンダントロープの連結具をミドルシーブの連結部に連結する位置に移動させる段階と、ペンダントロープの連結具とミドルシーブの連結部とを連結する段階とを順に行うことを特徴としている。   In order to achieve the above object, a construction machine assembly method according to the present invention provides a hoisting wire for extending an extendable boom that is mounted on an upper swing body of a base machine in a construction machine so as to be raised and lowered via a gantry behind the upper swing body. In a method for assembling a construction machine that undulates with a pendant rope that is detachably connected to a middle sheave provided in the vehicle, after a telescopic boom in a shortened state is movably connected to the upper revolving structure, the transportation on the upper revolving structure When connecting the middle sheave arranged at the position and the pendant rope attached to the telescopic boom, connecting the middle sheave at the transport position and the pendant rope arranged on the telescopic boom with an auxiliary rope; Unwinding the undulation wire while extending the telescopic boom, and retracting the middle sheave from the transport position Moving to a connecting position on the web, removing the auxiliary rope, shortening the telescopic boom and moving the pendant rope connector to a position to connect the middle sheave connector, The step of connecting the connecting tool and the connecting portion of the middle sheave is performed in order.

本発明の建設機械の組立方法によれば、重量物であるミドルシーブを、補助ロープを使用し、伸縮ブームの伸縮及び起伏ワイヤの巻出しを利用して輸送位置から連結位置に移動させるので、別のクレーンなどを使用せずにミドルシーブを輸送位置から連結位置に移動させることができる。また、各段階を逆に行うことにより、ペンダントロープから切り離したミドルシーブを連結位置から輸送位置に移動させることができる。   According to the construction method of the construction machine of the present invention, the middle sheave, which is a heavy object, is moved from the transport position to the connection position by using the auxiliary rope and using the expansion and contraction of the telescopic boom and the unwinding of the undulation wire. The middle sheave can be moved from the transport position to the connection position without using a crane or the like. Moreover, by performing each step in reverse, the middle sheave separated from the pendant rope can be moved from the connection position to the transport position.

本発明の建設機械の組立方法の一形態例を示すもので、上部旋回体に伸縮ブームを装着する準備段階を示す側面図である。FIG. 7 is a side view showing a preparation stage for mounting the telescopic boom to the upper swing body according to an embodiment of the construction method of the construction machine of the present invention. 同じく上部旋回体に伸縮ブームを装着した段階を示す側面図である。It is a side view showing the stage where the telescopic boom was similarly attached to the upper swing body. 同じく上部旋回体のガントリを起立させた段階を示す側面図である。It is a side view which shows the step which similarly raised the gantry of the upper revolving body. 同じく輸送位置にあるミドルシーブと伸縮ブームの基部に配置されたペンダントロープとを補助ロープで連結した段階を示す側面図である。It is a side view which shows the step which connected the middle sheave in a transportation position similarly, and the pendant rope arrange | positioned at the base of an expansion-contraction boom with the auxiliary rope. 同じくミドルシーブを輸送位置から連結位置に移動させた段階を示す側面図である。It is a side view which similarly shows the step which moved the middle sheave from the transport position to the connection position. 同じく補助ロープを取り外した段階を示す側面図である。It is a side view which similarly shows the step which removed the auxiliary rope. 同じく伸縮ブームを短縮させてペンダントロープの連結具をミドルシーブの連結部との連結位置に移動させてペンダントロープの連結具とミドルシーブの連結部とを連結部材で連結した段階を示す側面図である。Similarly, it is a side view showing a stage in which the telescopic boom is shortened and the pendant rope connector is moved to the connecting position with the middle sheave connecting portion to connect the pendant rope connecting device and the middle sheave connecting portion with the connecting member. 起伏ワイヤを巻き上げて伸縮ブームを起立させた建設機械の作業状態を示す側面図である。It is a side view which shows the working state of the construction machine which wound up the hoisting wire and stood the telescopic boom.

図1乃至図8は、建設機械の一つである大型のアースドリルに本発明を適用した一形態例を示している。本形態例に示すアースドリル11は、図8に示すように、クローラを備えた下部走行体12の上部に上部旋回体13を旋回可能に設けたベースマシン14と、前記上部旋回体13の前部に起伏可能に設けられたテレスコピック式の伸縮ブーム15と、伸縮ブーム15の先端部に装着されたトップシーブブロック16から垂下した主ワイヤ17にスイベル18を介して回転可能に吊持されたケリーバ19と、前記伸縮ブーム15の下部からフロントフレーム20やシリンダ21a,21bなどによって支持されたケリーバ回転駆動装置22と、伸縮ブーム15の後部側に設けられたバックストッパ23と、ケリーバ19の下端部に装着された掘削バケットや拡底バケット24とを備えている。   1 to 8 show an embodiment in which the present invention is applied to a large earth drill which is one of construction machines. As shown in FIG. 8, the earth drill 11 shown in this embodiment includes a base machine 14 in which an upper swing body 13 is pivotably provided on an upper part of a lower traveling body 12 provided with a crawler, and a front of the upper swing body 13. Telescopic boom 15 that can be raised and lowered at the top, and a kelly bar that is rotatably suspended via a swivel 18 on a main wire 17 that is suspended from a top sheave block 16 that is attached to the tip of the telescopic boom 15. 19, a kelly bar rotation drive device 22 supported by the front frame 20 and the cylinders 21a and 21b from the lower part of the telescopic boom 15, a back stopper 23 provided on the rear side of the telescopic boom 15, and a lower end part of the kelly bar 19 The excavation bucket and the bottom expansion bucket 24 attached to the are provided.

伸縮ブーム15の2段目最上部には、ペンダントロープ25の上端が連結されており、該ペンダントロープ25の下端には、ミドルシーブ26の連結部26aが着脱可能に連結される連結具25aが設けられている。ミドルシーブ26には、上部旋回体13に設置された起伏ウインチから巻き出された起伏ワイヤ27がガントリ28を介して巻回されている。また、トップシーブブロック16には、部材吊り上げ用の副ワイヤ29が掛け回されている。   The upper end of the second stage of the telescopic boom 15 is connected to the upper end of the pendant rope 25, and the lower end of the pendant rope 25 is provided with a connector 25 a to which the connecting part 26 a of the middle sheave 26 is detachably connected. It has been. The middle sheave 26 is wound with a undulation wire 27 unwound from a undulation winch installed on the upper swing body 13 via a gantry 28. Further, a sub-wire 29 for lifting the member is wound around the top sheave block 16.

アースドリル11による縦穴の形成は、起伏ウインチで起伏ワイヤ27を操作して伸縮ブーム15を所定角度に立ち上げるとともに、ケリーバ回転駆動装置22を所定位置に配置した状態で、ケリーバ回転駆動装置22でケリーバ19を回転させることによって掘削バケットや拡底バケット24を回転させながら地中に押し込んで掘削する工程と、掘削バケットや拡底バケット24を主ワイヤ17で引上げて掘削した土砂を掘削バケットや拡底バケット24から排出する工程とを交互に繰り返すことによって行われる。   The vertical hole is formed by the ground drill 11 by operating the hoisting wire 27 with a hoisting winch to raise the telescopic boom 15 to a predetermined angle and with the keriba rotary driving device 22 arranged at a predetermined position. The process of pushing the excavation bucket or the bottom expansion bucket 24 into the ground while rotating the kelly bar 19 and excavating the earth, and the earth and sand excavated by pulling up the excavation bucket or the bottom expansion bucket 24 with the main wire 17 are the excavation bucket or the bottom expansion bucket 24. And the step of discharging from the substrate are alternately repeated.

このようなアースドリル11を輸送する際には、重量や大きさに応じて複数に分解されてトレーラなどの複数の輸送車にそれぞれ積載される。重量物である伸縮ブーム15は、短縮状態にして上部旋回体13から取り外され、前記主副ワイヤ17,29や油圧配管などを取り外した状態で、トレーラの荷台上にブーム支持装置31を介して積載されて輸送される。ブーム支持装置31は、長方形状のベースフレーム32の四隅部に伸縮ブーム33をそれぞれ設けるとともに、ベースフレーム32の適宜な位置に伸縮ブーム15を固定するための固定部34a,34bを複数箇所に設けている。   When such an earth drill 11 is transported, it is disassembled into a plurality according to the weight and size and loaded on a plurality of transport vehicles such as trailers. The telescopic boom 15, which is a heavy object, is removed from the upper swing body 13 in a shortened state, and the main / sub wires 17, 29, hydraulic pipes, and the like are removed, and the boom support device 31 is placed on the trailer platform. It is loaded and transported. The boom support device 31 is provided with telescopic booms 33 at the four corners of a rectangular base frame 32, and with fixing portions 34a and 34b for fixing the telescopic boom 15 at appropriate positions on the base frame 32. ing.

図1に示すように、ブーム支持装置31によって伸縮ブーム15を輸送する際には、伸縮ブーム15の基端に設けられているブームフート15aをブーム支持装置31の後方に突出させた状態にする。さらに、ケリーバ回転駆動装置22から切り離したフロントフレーム20及びシリンダ21a,21bは、適宜な固定部34a,34bによってブーム支持装置31に固定し、上部旋回体13から切り離したバックストッパ23は、伸縮ブーム15の所定位置に固定する。   As shown in FIG. 1, when the telescopic boom 15 is transported by the boom support device 31, the boom foot 15 a provided at the base end of the telescopic boom 15 is made to protrude rearward from the boom support device 31. Further, the front frame 20 and the cylinders 21a and 21b separated from the Keriba rotation drive device 22 are fixed to the boom support device 31 by appropriate fixing portions 34a and 34b, and the back stopper 23 separated from the upper swing body 13 is an extendable boom. It is fixed at 15 predetermined positions.

また、ミドルシーブ26から取り外したペンダントロープ25は、伸縮ブーム15の上面に連結具25aを固定した状態にする。一方、上部旋回体13では、ガントリ28を折り畳んで固定ロッド28aで固定するとともに、ミドルシーブ26は、ガントリ28の前脚基端部に設けられているミドルシーブ固定部35にピンなどの固定部材を介して上部旋回体13の上に固定した状態にする。   Further, the pendant rope 25 removed from the middle sheave 26 is in a state in which the connector 25 a is fixed to the upper surface of the telescopic boom 15. On the other hand, in the upper swing body 13, the gantry 28 is folded and fixed by the fixing rod 28a, and the middle sheave 26 is fixed to the middle sheave fixing portion 35 provided at the base end portion of the front leg of the gantry 28 via a fixing member such as a pin. The state is fixed on the upper swing body 13.

輸送後に、上部旋回体13に伸縮ブーム15を連結する際には、ベースマシン14を伸縮ブーム15との連結位置に移動させ、上部旋回体13の油圧回路とブーム支持装置31の油圧回路とを油圧ホース36で接続した状態で伸縮ブーム33のシリンダを操作し、伸縮ブーム15を支持したブーム支持装置31をトレーラの荷台から降ろす。そして、下部走行体12の走行操作によって前後位置、上部旋回体13の旋回操作によって左右位置、伸縮ブーム33のシリンダ伸縮操作によって上下位置をそれぞれ調整してブームフート15aと上部旋回体13に設けたブラケット13aとを連結ピンによって起伏可能な状態に連結する。さらに、図2に示すように、バックストッパ23の先端を上部旋回体13に連結する。   When the telescopic boom 15 is connected to the upper swing body 13 after transportation, the base machine 14 is moved to the connection position with the telescopic boom 15 to connect the hydraulic circuit of the upper swing body 13 and the hydraulic circuit of the boom support device 31. The cylinder of the telescopic boom 33 is operated with the hydraulic hose 36 connected, and the boom support device 31 that supports the telescopic boom 15 is lowered from the trailer bed. A bracket provided on the boom foot 15a and the upper swing body 13 by adjusting the front and rear positions by the travel operation of the lower travel body 12, the left and right positions by the swing operation of the upper swing body 13, and the vertical position by the cylinder expansion and contraction operation of the telescopic boom 33, respectively. 13a is connected to the undulating state by a connecting pin. Further, as shown in FIG. 2, the tip of the back stopper 23 is connected to the upper swing body 13.

次に、図3に示すように、ガントリ28を起立させた後、図4に示すように、ミドルシーブ固定部35に固定されて輸送位置に配置されているミドルシーブ26の連結部26aと、伸縮ブーム15の上面の基部に配置されているペンダントロープ25の連結具25aとを補助ロープ37で連結する。また、伸縮ブーム操作用の油圧配管(図示せず)も接続する。   Next, as shown in FIG. 3, after the gantry 28 is erected, as shown in FIG. 4, the connecting portion 26a of the middle sheave 26 fixed to the middle sheave fixing portion 35 and disposed at the transport position, and the telescopic boom The auxiliary rope 37 connects the connecting tool 25 a of the pendant rope 25 arranged at the base of the upper surface 15. A hydraulic pipe (not shown) for operating the telescopic boom is also connected.

そして、図5に示すように、伸縮ブーム15を伸長させながら、起伏ウインチを操作して起伏ワイヤ27を巻き出し、伸縮ブーム15の基部上面に設けられている連結用支持部15bの上の連結位置にミドルシーブ26を移動させる。このとき、伸縮ブーム15の伸長操作と起伏ウインチによる起伏ワイヤ27の巻出し操作とを連携させて行うことにより、ミドルシーブ26を確実に連結位置に移動させることができ、ミドルシーブ26が落下したりするような事故を防止できる。   Then, as shown in FIG. 5, while the telescopic boom 15 is extended, the hoisting winch is operated to unwind the hoisting wire 27, and the connection on the connecting support 15 b provided on the upper surface of the base of the telescopic boom 15 is performed. The middle sheave 26 is moved to the position. At this time, by performing the extension operation of the telescopic boom 15 and the unwinding operation of the hoisting wire 27 by the hoisting winch, the middle sheave 26 can be reliably moved to the connecting position, and the middle sheave 26 falls. Such an accident can be prevented.

次に、図6に示すように、ミドルシーブ26とペンダントロープ25との間から補助ロープ37を取り外した後、伸縮ブーム15を短縮させてペンダントロープ25の連結具25aをミドルシーブ26の連結部26aに対して連結可能な位置に移動させる。最後に、図7に示すように、ペンダントロープ25の連結具25aとミドルシーブ26の連結部26aとを連結ピンによって連結することにより、起伏ワイヤ27と伸縮ブーム15とを、ミドルシーブ26及びペンダントロープ25を介して連結した状態にすることができる。   Next, as shown in FIG. 6, after removing the auxiliary rope 37 from between the middle sheave 26 and the pendant rope 25, the telescopic boom 15 is shortened so that the connecting tool 25 a of the pendant rope 25 is connected to the connecting portion 26 a of the middle sheave 26. Move to a connectable position. Finally, as shown in FIG. 7, the connecting wire 25 and the telescopic boom 15 are connected to the middle sheave 26 and the pendant rope 25 by connecting the connecting tool 25 a of the pendant rope 25 and the connecting portion 26 a of the middle sheave 26 with a connecting pin. It can be made the state connected via.

最後に、前記主副各ワイヤ17,29や油圧配管などを取り付け、ブーム支持装置31と伸縮ブーム15との固定状態を解除した後、起伏ウインチによって起伏ワイヤ27を巻き上げることにより、伸縮ブーム15を起立させることができる。さらに、主ワイヤ17や副ワイヤ29を使用してケリーバ回転駆動装置22などを取り付け、フロントフレーム20やシリンダ21a,21bを取り付けることにより、アースドリル11を、図8に示す作業状態にすることができる。   Finally, after attaching the main and sub wires 17, 29, hydraulic piping, etc., releasing the fixed state between the boom support device 31 and the telescopic boom 15, the hoisting wire 27 is wound up by a hoisting winch, whereby the telescopic boom 15 is removed. Can stand. Further, the earth drill 11 can be brought into the working state shown in FIG. 8 by attaching the Keriba rotary drive device 22 and the like using the main wire 17 and the sub wire 29 and attaching the front frame 20 and the cylinders 21a and 21b. it can.

アースドリル11を輸送状態にする際におけるミドルシーブ26の輸送位置への移動は、前記組立手順を逆に行えばよい。すなわち、ケリーバ回転駆動装置22や各ワイヤ17,29などを取り外し、起伏ワイヤ27を巻き出して短縮状態の伸縮ブーム15を倒してブーム支持装置31に支持させた後、更に起伏ワイヤ27を巻き出してミドルシーブ26を連結用支持部15bに降ろした状態にする。次に、ミドルシーブ26とペンダントロープ25との連結を解除し、伸縮ブーム15を適当量伸長させてからミドルシーブ26とペンダントロープ25とを補助ロープ37で連結する。   The middle sheave 26 may be moved to the transport position when the earth drill 11 is in the transport state by reversing the assembly procedure. That is, the kelly bar rotation driving device 22 and the wires 17 and 29 are removed, the hoisting wire 27 is unwound, the shortened telescopic boom 15 is tilted and supported by the boom support device 31, and then the hoisting wire 27 is further unwound. Thus, the middle sheave 26 is lowered to the connecting support portion 15b. Next, the connection between the middle sheave 26 and the pendant rope 25 is released, the telescopic boom 15 is extended by an appropriate amount, and then the middle sheave 26 and the pendant rope 25 are connected with the auxiliary rope 37.

そして、起伏ワイヤ27を巻き上げながら伸縮ブーム15を短縮させることにより、ミドルシーブ26を伸縮ブーム15上の連結位置から上部旋回体13の上の輸送位置に移動させることができる。その後、補助ロープ37を取り外してミドルシーブ26及びペンダントロープ25を所定位置にそれぞれ固定した後、ブーム支持装置31の伸縮ブーム33を操作して伸縮ブーム15を上部旋回体13から取り外す。   The middle sheave 26 can be moved from the connecting position on the telescopic boom 15 to the transport position on the upper swing body 13 by shortening the telescopic boom 15 while winding the hoisting wire 27. Thereafter, after the auxiliary rope 37 is removed and the middle sheave 26 and the pendant rope 25 are fixed at predetermined positions, the telescopic boom 33 of the boom support device 31 is operated to remove the telescopic boom 15 from the upper swing body 13.

このように、伸縮ブーム15の上部旋回体13への着脱に伴うミドルシーブ26とペンダントロープ25との連結や解除を、他のクレーンなどを必要とせずに、安全かつ容易に行うことが可能となる。   In this manner, the middle sheave 26 and the pendant rope 25 can be connected and released together with the attachment / detachment of the telescopic boom 15 to / from the upper swing body 13 safely and easily without requiring another crane or the like. .

なお、本発明は、前記アースドリルに限らず、伸縮ブームを起伏ワイヤで起伏させる構成を備えた各種建設機械に適用することができる。   In addition, this invention is applicable not only to the said earth drill but to various construction machines provided with the structure which raises / lowers an expansion-contraction boom with a raising / lowering wire.

11…アースドリル、12…下部走行体、13…上部旋回体、13a…ブラケット、14…ベースマシン、15…伸縮ブーム、15a…ブームフート、15b…連結用支持部、16…トップシーブブロック、17…主ワイヤ、18…スイベル、19…ケリーバ、20…フロントフレーム、21a,21b…シリンダ、22…ケリーバ回転駆動装置、23…バックストッパ、24…拡底バケット、25…ペンダントロープ、25a…連結具、26…ミドルシーブ、26a…連結部、27…起伏ワイヤ、28…ガントリ、28a…固定ロッド、29…副ワイヤ、31…ブーム支持装置、32…ベースフレーム、33…伸縮ブーム、34a,34b…固定部、35…ミドルシーブ固定部、36…油圧ホース、37…補助ロープ   DESCRIPTION OF SYMBOLS 11 ... Earth drill, 12 ... Lower traveling body, 13 ... Upper turning body, 13a ... Bracket, 14 ... Base machine, 15 ... Telescopic boom, 15a ... Boom foot, 15b ... Connection support part, 16 ... Top sheave block, 17 ... Main wire, 18 ... Swivel, 19 ... Keriba, 20 ... Front frame, 21a, 21b ... Cylinder, 22 ... Keriba rotary drive device, 23 ... Back stopper, 24 ... Bottom bottom bucket, 25 ... Pendant rope, 25a ... Connector, 26 DESCRIPTION OF SYMBOLS ... Middle sheave, 26a ... Connection part, 27 ... Unraveling wire, 28 ... Gantry, 28a ... Fixed rod, 29 ... Sub wire, 31 ... Boom support device, 32 ... Base frame, 33 ... Telescopic boom, 34a, 34b ... Fixed part, 35 ... Middle sheave fixing part, 36 ... Hydraulic hose, 37 ... Auxiliary rope

Claims (1)

建設機械におけるベースマシンの上部旋回体に起伏可能に装着された伸縮ブームを、上部旋回体後方のガントリを介して繰り出される起伏ワイヤに設けられているミドルシーブに着脱可能に連結されたペンダントロープによって起伏させる建設機械の組立方法において、短縮状態にある伸縮ブームを前記上部旋回体に起伏可能に連結した後、上部旋回体上の輸送位置に配置されているミドルシーブと、伸縮ブームに取り付けられているペンダントロープとを連結する際に、輸送位置にあるミドルシーブと伸縮ブームの上に配置されたペンダントロープとを補助ロープで連結する段階と、伸縮ブームを伸長させながら起伏ワイヤを巻き出してミドルシーブを前記輸送位置から前記伸縮ブームの上の連結位置に移動させる段階と、前記補助ロープを取り外す段階と、伸縮ブームを短縮させてペンダントロープの連結具をミドルシーブの連結部に連結する位置に移動させる段階と、ペンダントロープの連結具とミドルシーブの連結部とを連結する段階とを順に行うことを特徴とする建設機械の組立方法。   The telescopic boom mounted on the upper swing body of the base machine in a construction machine can be raised and lowered by a pendant rope removably connected to the middle sheave provided on the hoisting wire that is fed out through the gantry behind the upper swing body. In a method for assembling a construction machine, a middle sheave arranged at a transport position on the upper swing body after a telescopic boom in a shortened state is connected to the upper swing body so as to be raised and lowered, and a pendant attached to the telescopic boom When connecting the rope, the middle sheave in the transport position and the pendant rope placed on the telescopic boom are connected with an auxiliary rope, and the middle sheave is transported by unwinding the undulating wire while extending the telescopic boom. Moving from a position to a connecting position on the telescopic boom, and the auxiliary rope The step of removing, the step of shortening the telescopic boom and moving the pendant rope connector to the position where the middle sheave connector is connected, and the step of connecting the pendant rope connector and the middle sheave connector are sequentially performed. A method for assembling a construction machine.
JP2016087917A 2016-04-26 2016-04-26 Construction machine assembly method Active JP6653965B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2016087917A JP6653965B2 (en) 2016-04-26 2016-04-26 Construction machine assembly method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2016087917A JP6653965B2 (en) 2016-04-26 2016-04-26 Construction machine assembly method

Publications (2)

Publication Number Publication Date
JP2017197316A true JP2017197316A (en) 2017-11-02
JP6653965B2 JP6653965B2 (en) 2020-02-26

Family

ID=60238721

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2016087917A Active JP6653965B2 (en) 2016-04-26 2016-04-26 Construction machine assembly method

Country Status (1)

Country Link
JP (1) JP6653965B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020132353A (en) * 2019-02-19 2020-08-31 日本車輌製造株式会社 Wire rope tension jig and winding replacement method for wire rope using the same

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5550014U (en) * 1978-09-26 1980-04-01
US5484069A (en) * 1991-09-20 1996-01-16 The Manitowoc Company, Inc. Process for self-disassembling a crawler crane
JPH0848495A (en) * 1994-08-03 1996-02-20 Kobe Steel Ltd Jib of wheel type crane, and projection thereof
JP2014167198A (en) * 2013-02-28 2014-09-11 Nippon Sharyo Seizo Kaisha Ltd Earth drill
JP2014167197A (en) * 2013-02-28 2014-09-11 Nippon Sharyo Seizo Kaisha Ltd Earth drill

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS5550014U (en) * 1978-09-26 1980-04-01
US5484069A (en) * 1991-09-20 1996-01-16 The Manitowoc Company, Inc. Process for self-disassembling a crawler crane
JPH0848495A (en) * 1994-08-03 1996-02-20 Kobe Steel Ltd Jib of wheel type crane, and projection thereof
JP2014167198A (en) * 2013-02-28 2014-09-11 Nippon Sharyo Seizo Kaisha Ltd Earth drill
JP2014167197A (en) * 2013-02-28 2014-09-11 Nippon Sharyo Seizo Kaisha Ltd Earth drill

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2020132353A (en) * 2019-02-19 2020-08-31 日本車輌製造株式会社 Wire rope tension jig and winding replacement method for wire rope using the same
JP7269752B2 (en) 2019-02-19 2023-05-09 日本車輌製造株式会社 WIRE ROPE TENSION JIG AND METHOD FOR REWINDING WIRE ROPE USING THE SAME

Also Published As

Publication number Publication date
JP6653965B2 (en) 2020-02-26

Similar Documents

Publication Publication Date Title
JP6509016B2 (en) Boom mounting device
JP2007191286A (en) Crane and disassembling method for crane
JP2007230747A (en) Working method and working machine
JP6525717B2 (en) Boom attaching / detaching device and attaching / detaching method
US7213716B2 (en) Crane
KR20140139256A (en) pipe layer adjustable boom length
JP4835209B2 (en) Crane winch removal method and upper swing body
JP6653965B2 (en) Construction machine assembly method
JP4693713B2 (en) Earth drill
JP4946475B2 (en) Crane capable of mounting a hydraulic unit, and hydraulic working method and apparatus using the same
TWI740251B (en) Low-headroom excavator and assembly method thereof
JP2018048014A (en) Method for assembling mobile crane
JP6366312B2 (en) Construction machinery
JP5445403B2 (en) Counterweight desorption device for work machines
JP3782331B2 (en) Earth drill
JP6683087B2 (en) Mobile crane assembly method
JP3637173B2 (en) Excavator lifting device
JP2003056000A (en) High lift crane vehicle
JP6776740B2 (en) How to attach / detach the winch to the work machine and the main body of the work machine
JP4875974B2 (en) Jacking machine for construction machinery
JP6501660B2 (en) Crawler-type construction machine, method of removing crawler and method of transporting construction machine body
JP4224627B2 (en) Drilling rig
JP2022133055A (en) Earth drill machine, attachment, and attachment replacement method
JP2004293109A (en) Foundation pile execution device
JP2016216171A (en) Mobile crane, and method for erecting or lowering attachment of mobile crane

Legal Events

Date Code Title Description
A80 Written request to apply exceptions to lack of novelty of invention

Free format text: JAPANESE INTERMEDIATE CODE: A80

Effective date: 20160510

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20190304

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20191210

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20200128

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20200128

R150 Certificate of patent or registration of utility model

Ref document number: 6653965

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250