JP2017110440A - Construction jig for large-sized building material, and construction method of large-sized building material using construction jig for large-sized building material - Google Patents

Construction jig for large-sized building material, and construction method of large-sized building material using construction jig for large-sized building material Download PDF

Info

Publication number
JP2017110440A
JP2017110440A JP2015246788A JP2015246788A JP2017110440A JP 2017110440 A JP2017110440 A JP 2017110440A JP 2015246788 A JP2015246788 A JP 2015246788A JP 2015246788 A JP2015246788 A JP 2015246788A JP 2017110440 A JP2017110440 A JP 2017110440A
Authority
JP
Japan
Prior art keywords
building material
large building
jig
construction
receiving member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2015246788A
Other languages
Japanese (ja)
Other versions
JP6788343B2 (en
Inventor
黒田 宏
Hiroshi Kuroda
宏 黒田
勝浩 森川
Katsuhiro Morikawa
勝浩 森川
正剛 武宮
Masatake Takemiya
正剛 武宮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Daiwa House Industry Co Ltd
Original Assignee
Daiwa House Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Daiwa House Industry Co Ltd filed Critical Daiwa House Industry Co Ltd
Priority to JP2015246788A priority Critical patent/JP6788343B2/en
Publication of JP2017110440A publication Critical patent/JP2017110440A/en
Application granted granted Critical
Publication of JP6788343B2 publication Critical patent/JP6788343B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

PROBLEM TO BE SOLVED: To provide a jig capable of moving a large-sized building material (especially, large-sized tile cladding) to a construction position with no damage, for safe and easy construction by a small number of persons.SOLUTION: A construction jig for a large-sized building material includes a placement member which is L-like when viewed from a side, for placing a lower end part of a large-sized building material, a receiving member in which an upper end part of the large-sized building material is rested, and a connection member for connecting the placement member to the receiving member.SELECTED DRAWING: Figure 1

Description

本発明は、大型建材(特に、大型のタイル外装材)を施工するための治具に関するものであり、詳しくは建材を破損させることなく施工位置まで移動させることができ、また少人数で安全かつ容易に施工することができる大型建材用施工治具に関するものである。また、この大型建材用施工治具を用いた大型建材の施工方法に関するものである。   The present invention relates to a jig for constructing a large building material (particularly, a large tile exterior material). Specifically, the construction material can be moved to a construction position without damaging the building material, and can be safely used by a small number of people. The present invention relates to a construction jig for large building materials that can be easily constructed. Moreover, it is related with the construction method of the large sized building material using this construction tool for large sized materials.

近年、意匠性の高さや工期を短縮できることなどから外装材の大型化が行われており、このような大型の外装材を施工するための治具や施工方法が各種開発されている。特に、タイルタイプの外装材(磁器質陶板)については、近年、更に大型化が進んでおり、係る外装材を施工するための治具や施工方法を開発する必要が生じている。   In recent years, exterior materials have been increased in size because of their high designability and shortening of the construction period, and various jigs and construction methods for constructing such large exterior materials have been developed. In particular, tile-type exterior materials (porcelain porcelain plates) have been further increased in size in recent years, and it has become necessary to develop jigs and construction methods for constructing such exterior materials.

従前においても、特許文献1や2において開示されているとおり、大型の外装材を施工するための治具が開発されているが、これらの治具はタイル外装材の施工後の剥離防止(特許文献1)や、壁面にタイル外装材を取り付ける際の位置決め作業の向上や施工後の剥離防止(特許文献2)を目的とするものとなっている。   Conventionally, as disclosed in Patent Documents 1 and 2, jigs for constructing large exterior materials have been developed. These jigs are used to prevent peeling after construction of tile exterior materials (patents). Document 1) and the purpose of improving positioning work when attaching a tile exterior material to a wall surface and preventing peeling after construction (Patent Document 2).

しかしながら、大型の外装材は寸法が大きい故に重量も大きいものとなるため、施工位置に移動する作業や実際に施工位置に取り付ける作業に設備や労力を要するものとなっている。また、寸法が大きい故に、係る作業時に破損が生じやすいものとなっている。つまり、大型の外装材を施工する際において最も注意を要する段階(工程)は、大型の外装材を施工位置に移動する段階(工程)や実際に施工位置に取り付ける段階(工程)となっているのである。
従って、大型の外装材を施工するための治具や施工方法においては、大型の外装材を施工位置に移動する段階(工程)や実際に施工位置に取り付ける段階(工程)において有用なものであることが重要となってくる。
However, since a large-sized exterior material is large in weight because of its large size, equipment and labor are required for the operation of moving to the construction position or the operation of actually attaching to the construction position. In addition, since the dimensions are large, breakage tends to occur during such work. In other words, the stage (process) that requires the most attention when constructing a large exterior material is the stage (process) that moves the large exterior material to the construction position or the stage (process) that is actually attached to the construction position. It is.
Therefore, in the jig and construction method for constructing a large exterior material, it is useful at the stage of moving the large exterior material to the construction position (process) and at the stage of actually attaching it to the construction position (process). It becomes important.

ここで、特許文献3には、昇降可能な作業構台を設けて、係る作業構台に外装資材を載せて施工位置まで上昇させるとともに、作業構台内において外装資材を組み立てて施工する外装施工方法が開示されている。   Here, Patent Document 3 discloses an exterior construction method in which a work gantry that can be moved up and down is provided, the exterior material is placed on the work gantry and raised to a construction position, and the exterior material is assembled and constructed in the work gantry. Has been.

特開平4−108950号公報JP-A-4-108950 特開平5−148973号公報JP-A-5-148773 特開平6−185209号公報JP-A-6-185209

しかしながら、特許文献3の施工方法は作業構台内において外装資材を組み立てることを前提としているものとなっており、用いられる作業構台も単なる昇降棚であり、大型の外装材をそのまま載せて施工位置まで破損などを生じることなく安全に上昇させることが極めて困難なものとなっている。   However, the construction method of Patent Document 3 is based on the premise that an exterior material is assembled in a work gantry, and the work gantry used is also a simple lifting shelf, and a large exterior material is placed as it is to the construction position. It is extremely difficult to raise safely without causing damage.

今般、本発明者らは、鋭意検討を行った結果、特定の構成とすることによって、大型建材(特に、大型のタイル外装材)を破損させることなく施工位置まで移動させることができ、また少人数で安全かつ容易に施工することができる治具を開発するに至った。   As a result of intensive studies, the present inventors have been able to move a large building material (particularly, a large tile exterior material) to a construction position without damaging it by using a specific configuration. We have developed a jig that can be safely and easily constructed by a large number of people.

本発明は、上記した従来の問題点に鑑みてなされたものであって、大型建材(特に、大型のタイル外装材)を破損させることなく施工位置まで移動させることができ、また少人数で安全かつ容易に施工することができる治具を提供することを目的とするものである。また、この大型建材用施工治具を用いた大型建材の施工方法を提供することを目的とするものである。   The present invention has been made in view of the above-described conventional problems, and can move a large building material (particularly, a large tile exterior material) to a construction position without damaging it. And it aims at providing the jig which can be constructed easily. Moreover, it aims at providing the construction method of the large sized building material using this construction jig for large sized building materials.

上記目的を達成するために、本発明に係る大型建材用施工治具は、大型建材の下端部を載置するための側面視L字状の載置部材と、大型建材の上端部を立て掛けるための受け部材と、載置部材と受け部材を連結する連結部材を備えることを特徴とする。   In order to achieve the above-mentioned object, the construction tool for large building materials according to the present invention leans on the L-shaped placement member for placing the lower end portion of the large building material and the upper end portion of the large building material. And a connecting member for connecting the mounting member and the receiving member.

本発明の請求項2に係る大型建材の施工方法は、大型建材の下端部を載置するための載置部材と、大型建材の上端部を立て掛けるための受け部材と、載置部材と受け部材を連結する連結部材を備える第1治具を用いて、大型建材を大型建材の正面側を受け部材に向けて載置部材に載せる第1工程と、挟持機能を有する第2治具を用いて、大型建材の上端部と受け部材および/または大型建材の下端部と載置部材を挟持する第2工程と、第1治具に載せた大型建材を移動する第3工程と、大型建材を第1治具に載せた状態で大型建材の下端部を壁面の施工位置に当接する第4工程と、第2治具を除去し、大型建材を受け部材から壁面に倒すことによって、大型建材の上端部を壁面の施工位置に当接する第5工程を備えることを特徴とする。   The construction method of the large building material according to claim 2 of the present invention includes a mounting member for mounting the lower end portion of the large building material, a receiving member for leaning the upper end portion of the large building material, a mounting member and the receiving member Using a first jig including a connecting member for connecting the large building material, a first step of placing the large building material on the mounting member toward the front member of the large building material, and a second jig having a clamping function The second step of sandwiching the upper end of the large building material and the receiving member and / or the lower end of the large building material and the mounting member, the third step of moving the large building material placed on the first jig, and the large building material 4th process which contacts the lower end part of a large-sized building material to the construction position of a wall surface in the state put on 1 jig | tool, and the upper end of a large-sized building material by removing a 2nd jig | tool and defeating a large building material from a member to a wall surface It has the 5th process which contacts a part to the construction position of a wall surface, It is characterized by the above-mentioned.

本発明の請求項3に係る大型建材の施工方法は、第4工程に替えて、上辺板部と中辺板部と下辺板部から構成される側面視クランク状の板状部材と、上辺板部および/または下辺板部に連結した、同一方向に突設する2つの挿入部材と、上辺板部および/または下辺板部に設けた、2つの挿入部材の間隔を変更する間隔変更部材を備える第3治具を用いて、大型建材の施工位置の下端部に存在する壁パネルの階間の隙間に第3治具を挿入するとともに、間隔変更部材を用いて第3治具を仮固定する治具仮固定工程と、大型建材を第1治具に載せた状態で大型建材の下端部を挿入部材に降ろした後、大型建材の下端部を挿入部材上で滑らせて壁面の施工位置に誘導し当接する誘導工程とを備えることを特徴とする。   A construction method for a large building material according to claim 3 of the present invention replaces the fourth step with a crank-like plate-like member formed from an upper side plate portion, a middle side plate portion and a lower side plate portion, and an upper side plate. Two insertion members connected in the same direction and projecting in the same direction, and an interval changing member for changing the interval between the two insertion members provided in the upper side plate portion and / or the lower side plate portion. Using the third jig, the third jig is inserted into the gap between the floors of the wall panel at the lower end of the construction position of the large building material, and the third jig is temporarily fixed using the interval changing member. Jig temporary fixing process and after lowering the lower end of the large building material onto the insertion member with the large building material placed on the first jig, the lower end of the large building material is slid on the insertion member to the construction position of the wall surface. And a guiding process for guiding and abutting.

本発明に係る大型建材用施工治具によれば、側面視L字状の載置部材と受け部材と連結部材を備えているので、大型建材(特に、大型のタイル外装材)を破損させることなく施工位置まで移動させることができる。   According to the construction jig for large building materials according to the present invention, since the mounting member, the receiving member, and the connecting member that are L-shaped in side view are provided, large building materials (particularly, large tile exterior materials) are damaged. It can be moved to the construction position without any problems.

本発明の請求項2に係る大型建材の施工方法によれば、本発明に係る大型建材用施工治具(第1治具)を用いた第1工程と、挟持機能を有する第2治具を用いて、大型建材の上端部と受け部材および/または大型建材の下端部と載置部材を挟持する第2工程と、第1治具に載せた大型建材を移動する第3工程と、大型建材を第1治具に載せた状態で大型建材の下端部を壁面の施工位置に当接する第4工程と、第2治具を除去し、大型建材を受け部材から壁面に倒すことによって、大型建材の上端部を壁面の施工位置に当接する第5工程を備えているので、大型建材(特に、大型のタイル外装材)を破損させることなく、少人数で安全かつ容易に施工することができる。   According to the construction method of the large-scale building material according to claim 2 of the present invention, the first step using the large-sized building material construction jig (first jig) according to the present invention and the second jig having a clamping function. A second step of sandwiching the upper end of the large building material and the receiving member and / or the lower end of the large building material and the mounting member, a third step of moving the large building material placed on the first jig, and the large building material. The fourth step of abutting the lower end portion of the large building material with the construction position of the wall surface with the first jig placed on the first jig, and removing the second jig and tilting the large building material from the receiving member to the wall surface, Since the 5th process which contact | abuts the upper end part of a wall surface to the construction position of a wall surface is provided, it can construct safely and easily by a small number of people, without damaging a large-sized building material (especially large-sized tile exterior material).

本発明の請求項3に係る大型建材の施工方法によれば、第4工程に替えて、第3治具を用いた治具仮固定工程と、第1治具に載せた状態の大型建材の下端部を第3治具の挿入部材上で滑らせて壁面の施工位置に誘導し当接する誘導工程とを備えているので、多層階において大型建材(特に、大型のタイル外装材)を施工する際にも建材を破損させることなく、少人数で安全かつ容易に施工することができる。   According to the construction method of the large building material according to claim 3 of the present invention, instead of the fourth step, the jig temporary fixing step using the third jig, and the large building material placed on the first jig Since the lower end is slid on the insertion member of the third jig to guide and contact the construction position of the wall surface, a large building material (particularly, a large tile exterior material) is constructed on the multilayer floor. Even when the building material is not damaged, it can be safely and easily constructed by a small number of people.

本発明に係る大型建材用施工治具を示す模式図である。It is a schematic diagram which shows the construction jig for large sized building materials which concerns on this invention. 本発明に係る大型建材の施工方法の第1工程を示す模式図である。It is a schematic diagram which shows the 1st process of the construction method of the large sized building material which concerns on this invention. 本発明に係る大型建材の施工方法の第2工程を示す模式図である。It is a schematic diagram which shows the 2nd process of the construction method of the large sized building material which concerns on this invention. 本発明に係る大型建材の施工方法に用いる第2治具を示す模式図である。It is a schematic diagram which shows the 2nd jig | tool used for the construction method of the large sized building material which concerns on this invention. 本発明に係る大型建材の施工方法の第3工程を示す模式図である。It is a schematic diagram which shows the 3rd process of the construction method of the large sized building material which concerns on this invention. 本発明に係る大型建材の施工方法の第4工程を示す模式図である。It is a schematic diagram which shows the 4th process of the construction method of the large sized building material which concerns on this invention. 本発明に係る大型建材の施工方法の第5工程を示す模式図である。It is a schematic diagram which shows the 5th process of the construction method of the large sized building material which concerns on this invention. 本発明に係る大型建材の施工方法の治具仮固定工程を示す模式図である。It is a schematic diagram which shows the jig | tool temporary fixing process of the construction method of the large sized building material which concerns on this invention. 本発明に係る大型建材の施工方法に用いる第3治具を示す模式図である。It is a schematic diagram which shows the 3rd jig | tool used for the construction method of the large sized building material which concerns on this invention. 本発明に係る大型建材の施工方法の誘導工程を示す模式図である。It is a schematic diagram which shows the induction | guidance | derivation process of the construction method of the large sized building material which concerns on this invention.

本発明の実施形態を図面に基づいて説明する。なお、以下に述べる実施形態は本発明を具体化した一例に過ぎず、本発明の技術的範囲を限定するものでない。   Embodiments of the present invention will be described with reference to the drawings. The embodiment described below is merely an example embodying the present invention, and does not limit the technical scope of the present invention.

まず、本発明に係る大型建材用施工治具の構成を図1に基づいて説明する。図1は本発明に係る大型建材用施工治具を示す模式図である。   First, the structure of the construction tool for large building materials according to the present invention will be described with reference to FIG. FIG. 1 is a schematic diagram showing a construction jig for large building materials according to the present invention.

図1に示すとおり、本発明に係る大型建材用施工治具1は、大型建材の下端部を載置するための載置部材2を下端部に設け、大型建材の上端部を立て掛けるための受け部材3を上端部に設け、載置部材2と受け部材3を連結する連結部材4を設けた、正面視I字状の構造となっている。   As shown in FIG. 1, the construction jig 1 for large building materials according to the present invention is provided with a placing member 2 for placing the lower end portion of the large building material at the lower end portion, and a receiver for leaning the upper end portion of the large building material. The member 3 is provided at the upper end portion, and the connecting member 4 for connecting the mounting member 2 and the receiving member 3 is provided, and has an I-shaped structure in front view.

ここで、載置部材2については、大型建材の下端部を載置する際に作業がし易くなることから、図1に示すように側面視においてL字状の形状とすることが好ましい。一方、受け部材3の形状については特に限定されず、図1に示すように側面視において逆L字状の形状としても良いし、単なる板状の形状などそれ以外の各種の形状を採用することもできる。また、連結部材4の形状についても特に限定されず、図1に示すように棒状の形状としても良いし、単なる板状の形状などそれ以外の各種の形状を採用することもできる。   Here, the mounting member 2 is preferably L-shaped in a side view as shown in FIG. 1 because the work is facilitated when the lower end portion of the large building material is mounted. On the other hand, the shape of the receiving member 3 is not particularly limited, and may be an inverted L shape in a side view as shown in FIG. 1, or various other shapes such as a simple plate shape may be adopted. You can also. Further, the shape of the connecting member 4 is not particularly limited, and may be a rod shape as shown in FIG. 1, or various other shapes such as a simple plate shape may be employed.

また、載置部材2、受け部材3、連結部材4には、吊り下げ用の把手部またはフックを設けることもできる。例えば、図1に示すように受け部材3の上端部に吊り下げ用の把手部5を設けた構造などを挙げることができる。   Further, the placing member 2, the receiving member 3, and the connecting member 4 can be provided with a handle or hook for hanging. For example, as shown in FIG. 1, the structure which provided the handle part 5 for suspension in the upper end part of the receiving member 3 can be mentioned.

また、載置部材2、受け部材3、連結部材4には、大型建材を載置する際や立て掛ける際の大型建材の破損を防止するための緩衝材(図示せず)を取り付けることもできる。   In addition, the mounting member 2, the receiving member 3, and the connecting member 4 may be provided with a cushioning material (not shown) for preventing damage to the large building material when the large building material is placed or stood.

なお、載置部材2、受け部材3、連結部材4の材質については特に限定されるものではなく、金属、プラスチック、木材など各種の材質を用いることができる。   In addition, the material of the mounting member 2, the receiving member 3, and the connecting member 4 is not particularly limited, and various materials such as metal, plastic, and wood can be used.

連結部材4については、さらに載置部材2と受け部材3との距離を調節する調整手段6を設けることもできる。
なお、調整手段6の構造としては載置部材2と受け部材3との距離を調節することができるものであれば特に限定されるものではないが、例えば、受け部材3をボルト止めするためのボルト通し孔(6a、6b)を連結部材4の上方部に数箇所設けた構造などを挙げることができる。
そして、高さ方向の寸法が大きい大型建材を施工する場合には、図1(a)に示すように連結部材4の最上部に設けたボルト通し孔(6a)に予めボルト通し孔(図示せず)を設けた受け部材3の孔を合せた後にボルトを通してナット止めし、高さ方向の寸法が小さい大型建材を施工する場合には、図1(b)に示すように連結部材4の最上部よりも下方に設けた孔(6b)に受け部材3のボルト通し孔(図示せず)を合せた後にボルトを通してナット止めすることによって、載置部材2と受け部材3との距離を調節する方法などを挙げることができる。
For the connecting member 4, an adjusting means 6 that adjusts the distance between the mounting member 2 and the receiving member 3 can be further provided.
The structure of the adjusting means 6 is not particularly limited as long as the distance between the mounting member 2 and the receiving member 3 can be adjusted. For example, for adjusting the receiving member 3 with a bolt. A structure in which several bolt holes (6a, 6b) are provided in the upper part of the connecting member 4 can be exemplified.
And when constructing a large building material having a large dimension in the height direction, as shown in FIG. 1 (a), a bolt through hole (not shown) is provided in advance in a bolt through hole (6a) provided at the uppermost portion of the connecting member 4. 1), after fitting the holes of the receiving member 3 with the bolts, the nuts are passed through the bolts, and when constructing a large building material having a small height dimension, as shown in FIG. The distance between the mounting member 2 and the receiving member 3 is adjusted by fitting a bolt through hole (not shown) of the receiving member 3 to a hole (6b) provided below the upper portion and then fastening the nut through the bolt. The method etc. can be mentioned.

次に、上記のように構成された大型建材用施工治具の動作(本発明に係る大型建材の施工方法)および作用を説明する。図2は本発明に係る大型建材の施工方法の第1工程を示す模式図であり、図3は本発明に係る大型建材の施工方法の第2工程を示す模式図であり、図4は本発明に係る大型建材の施工方法に用いる第2治具を示す模式図であり、図5は 本発明に係る大型建材の施工方法の第3工程を示す模式図であり、図6は本発明に係る大型建材の施工方法の第4工程を示す模式図であり、図7は本発明に係る大型建材の施工方法の第5工程を示す模式図である。   Next, the operation | movement (construction method of the large building material which concerns on this invention) and effect | action of the construction jig for large building materials comprised as mentioned above are demonstrated. FIG. 2 is a schematic diagram showing the first step of the construction method for large building materials according to the present invention, FIG. 3 is a schematic diagram showing the second step of the construction method for large building materials according to the present invention, and FIG. It is a schematic diagram which shows the 2nd jig | tool used for the construction method of the large-sized building material which concerns on invention, FIG. 5 is a schematic diagram which shows the 3rd process of the construction method of the large-sized building material which concerns on this invention, FIG. It is a schematic diagram which shows the 4th process of the construction method of the large sized building material which concerns, and FIG. 7 is a schematic diagram which shows the 5th process of the construction method of the large sized building material which concerns on this invention.

(第1工程)
まず、施工する大型建材7を横倒しにして、係る状態の大型建材7の両端を作業者が必要に応じて補助治具(図示せず)などを用いて持ち上げて載置部材2の近くまで移動させる。
次に、作業者が大型建材7を立ち上げて、図2に示すように大型建材7の正面側が受け部材3に向くように(大型建材7の裏面7aが開放されるように)大型建材7の下端部を載置部材2上に載置する。なおこの際、必要に応じて、大型建材7の裏面(施工面)に接着剤を塗布しておくこともできる。
(First step)
First, the large building material 7 to be constructed is laid down, and the operator lifts both ends of the large building material 7 in such a state by using an auxiliary jig (not shown) or the like as necessary and moves it to the vicinity of the mounting member 2. Let
Next, the worker starts up the large building material 7 and the large building material 7 so that the front side of the large building material 7 faces the receiving member 3 as shown in FIG. 2 (so that the back surface 7a of the large building material 7 is opened). Is placed on the placement member 2. At this time, an adhesive may be applied to the back surface (construction surface) of the large building material 7 as necessary.

(第2工程)
次に、大型建材7の上端部を受け部材3に立て掛け、図3に示すように挟持機能を有する第2治具8を用いて、大型建材7の上端部と受け部材3を挟持、すなわち大型建材7を第1治具1(本発明に係る大型建材用施工治具1)に固定する。なお、図3においては大型建材7の上端部と受け部材3を挟持しているが、これに限定されるものではなく、必要に応じて、大型建材の下端部と載置部材を挟持しても良いし、大型建材の下端部と上端部の両方を載置部材および受け部材で挟持してもよい。
(Second step)
Next, the upper end portion of the large building material 7 is leaned against the receiving member 3, and the upper end portion of the large building material 7 and the receiving member 3 are clamped using the second jig 8 having a clamping function as shown in FIG. The building material 7 is fixed to the first jig 1 (the construction jig 1 for large building materials according to the present invention). In addition, in FIG. 3, although the upper end part of the large sized building material 7 and the receiving member 3 are clamped, it is not limited to this, The lower end part of a large sized building material and a mounting member are clamped as needed. Alternatively, both the lower end and the upper end of the large building material may be sandwiched between the placing member and the receiving member.

(第2治具)
ここで、第2工程において用いる第2治具としては、挟持機能を有するものであれば構造は特に限定されず、例えば図4に示すようなコの字状の本体部9と締付ボルト部10と押さえ部11を備えるクランプ12などを挙げることができる。
(Second jig)
Here, the structure of the second jig used in the second step is not particularly limited as long as it has a clamping function. For example, a U-shaped main body portion 9 and a fastening bolt portion as shown in FIG. 10 and the clamp 12 provided with the holding | suppressing part 11 can be mentioned.

(第3工程)
次に、大型建材7を載せた第1治具1を施工位置まで移動する。ここで、大型建材7は第1治具1に載せられており、さらに第2治具8によって第1治具1に固定されていることから、破損させることなく施工位置まで移動させることができることになる。
なお、移動手段については特に限定されないが、図5に示すように足場13に横桟14を取り付け、この横桟14に簡易ウインチ15を設置する手段を採用すれば、簡易ウインチ15のフック16を第1治具1の把手部5に引っ掛けるだけで、大掛かりな設備を用いることなく、第1治具1を吊り上げたり、横桟14に沿って横移動したりすることで大型建材7を施工位置まで移動することができるので好適である。
(Third step)
Next, the first jig 1 on which the large building material 7 is placed is moved to the construction position. Here, since the large building material 7 is mounted on the first jig 1 and is fixed to the first jig 1 by the second jig 8, it can be moved to the construction position without being damaged. become.
The moving means is not particularly limited. However, as shown in FIG. 5, if a means for attaching a horizontal beam 14 to the scaffold 13 and installing a simple winch 15 on the horizontal beam 14 is adopted, the hook 16 of the simple winch 15 is attached. By simply hooking on the handle portion 5 of the first jig 1, the large construction material 7 can be installed by lifting the first jig 1 or moving along the cross rail 14 without using a large facility. It is suitable because it can be moved up to.

(第4工程)
次に、壁面17内における大型建材7の施工位置に接着剤を塗布した後、図6に示すように大型建材7を第1治具1に載せた状態で載置部材2の下端部を差し入れることによって大型建材7の下端部を壁面17の施工位置に当接する。
(4th process)
Next, after applying an adhesive to the construction position of the large building material 7 in the wall surface 17, the lower end of the mounting member 2 is inserted with the large building material 7 placed on the first jig 1 as shown in FIG. 6. In this way, the lower end portion of the large building material 7 is brought into contact with the construction position of the wall surface 17.

(第5工程)
次に、大型建材7の上端部と載置部材2を挟持していた第2治具8を除去して、図7に示すように大型建材7を受け部材3から壁面17に倒すことによって、大型建材7の上端部を壁面17の施工位置に当接(接着)し、施工を完了する。なおこの際、除去した第2治具8を用いて、十分な接着強度が発現するまで大型建材7の上端部や下端部と壁面17とを挟持することもできる。
(5th process)
Next, by removing the second jig 8 sandwiching the upper end portion of the large building material 7 and the mounting member 2, as shown in FIG. 7, the large building material 7 is tilted from the member 3 to the wall surface 17. The upper end portion of the large building material 7 is brought into contact (adhesion) with the construction position of the wall surface 17 to complete the construction. At this time, the removed second jig 8 can be used to sandwich the upper end or lower end of the large building material 7 and the wall surface 17 until sufficient adhesive strength is exhibited.

従って、本発明に係る大型建材の施工方法は、本発明に係る大型建材用施工治具(第1治具1)を用いていることから、大型建材(特に、大型のタイル外装材)を破損させることなく、少人数で安全かつ容易に施工することができることになる。
また、大型建材の下端部が常に載置部材上に載置された状態で施工作業が行われることになることから、施工中に大型建材が落下することを防止することができ、安全かつ容易に施工することができることになる。
Therefore, since the construction method for large building materials according to the present invention uses the construction jig for large building materials (first jig 1) according to the present invention, the large building materials (particularly large tile exterior materials) are damaged. Therefore, it can be safely and easily constructed by a small number of people.
In addition, since the construction work is performed with the lower end of the large building material always placed on the placing member, it is possible to prevent the large building material from falling during construction, and it is safe and easy. It will be possible to construct.

なお、上記は本発明に係る大型建材の施工方法の基本動作であるが、本発明に係る大型建材の施工方法はこれに限定されるものでなく、例えば多層階において大型建材を施工する場合には、第4工程に替えて別の工程を行うこともできる。図8は本発明に係る大型建材の施工方法の治具仮固定工程を示す模式図であり、図9は本発明に係る大型建材の施工方法に用いる第3治具を示す模式図であり、図10は本発明に係る大型建材の施工方法の誘導工程を示す模式図である。   The above is the basic operation of the construction method of the large building material according to the present invention, but the construction method of the large building material according to the present invention is not limited to this, for example, when constructing a large building material on a multilayer floor Can perform another step instead of the fourth step. FIG. 8 is a schematic diagram showing a jig temporary fixing step of a construction method for a large building material according to the present invention, and FIG. 9 is a schematic diagram showing a third jig used in the construction method for a large building material according to the present invention, FIG. 10 is a schematic diagram showing the induction process of the construction method for large building materials according to the present invention.

まず、第1工程から第3工程までを行う。   First, the first to third steps are performed.

(治具仮固定工程)
次に、第4工程に替えて、板状部材18と2つの挿入部材19(19a、19b)と間隔変更部材20を備える第3治具21を用いて、図8に示すように大型建材7の施工位置の下端部に存在する壁パネル22の階間の隙間23に第3治具21を挿入し、間隔変更部材20を用いて挿入部材19(19a、19b)の間隔を拡げることによって第3治具21を仮固定する。
(Jig temporary fixing process)
Next, instead of the fourth step, a large building material 7 as shown in FIG. 8 is used by using a third jig 21 including a plate-like member 18, two insertion members 19 (19 a, 19 b), and a distance changing member 20. The third jig 21 is inserted into the gap 23 between the floors of the wall panel 22 existing at the lower end of the construction position, and the interval change member 20 is used to widen the interval between the insertion members 19 (19a, 19b). 3 Temporarily fix the jig 21.

(第3治具)
ここで、第3工程において用いる第3治具としては、壁パネルの階間の隙間に仮固定できるものであれば構造は特に限定されないが、図9に示すように上辺板部18aと中辺板部18bと下辺板部18cから構成される側面視クランク状の板状部材18と、上辺板部18aに連結した同一方向に突設する2つの挿入部材19(19a、19b)と、上辺板部18aに設けた2つの挿入部材の間隔を変更する間隔変更部材20(図9においては挿入ボルトを採用)を備えるものを用いれば、後記する誘導工程をスムースに行うことができるので好適である。
(3rd jig)
Here, the structure of the third jig used in the third step is not particularly limited as long as it can be temporarily fixed in the gap between the floors of the wall panel, but the upper side plate portion 18a and the middle side as shown in FIG. A plate-like member 18 having a crank shape in side view composed of a plate portion 18b and a lower side plate portion 18c, two insertion members 19 (19a, 19b) projecting in the same direction connected to the upper side plate portion 18a, and an upper side plate It is preferable to use a member provided with a distance changing member 20 (an insertion bolt is used in FIG. 9) that changes the distance between two insertion members provided in the portion 18a, since the guidance process described later can be performed smoothly. .

(誘導工程)
次に、図10(a)、(b)に示すように大型建材7を第1治具1に載せた状態で大型建材7の下端部を、階間の隙間23に仮固定した第3治具21の挿入部材19aに降ろし、大型建材7の下端部を挿入部材19a上で滑らせることによって大型建材7を壁面17の施工位置に誘導する。
そして、その後は第5工程を行うことによって大型建材7の施工を完了する。
(Guidance process)
Next, as shown in FIGS. 10 (a) and 10 (b), in the state where the large building material 7 is placed on the first jig 1, the lower end of the large building material 7 is temporarily fixed in the gap 23 between the floors. The large building material 7 is guided to the construction position of the wall surface 17 by being lowered onto the insertion member 19a of the tool 21 and sliding the lower end portion of the large building material 7 on the insertion member 19a.
Then, the construction of the large building material 7 is completed by performing the fifth step.

従って、多層階において大型建材を施工する場合においても、第3治具を用いることによって大型建材(特に、大型のタイル外装材)を破損させることなく、少人数で安全かつ容易に施工することができることになる。
また、大型建材の下端部が常に載置部材上または挿入部材上に載置された状態で施工作業が行われることになることから、施工中に大型建材が落下することをより効果的に防止することができ、多層階において大型建材を施工する場合においても安全かつ容易に施工することができることになる。
Therefore, even when constructing large building materials on multi-story floors, it is possible to construct safely and easily with a small number of people without damaging large building materials (particularly large tile exterior materials) by using the third jig. It will be possible.
In addition, since the construction work is performed with the lower end of the large building material always placed on the mounting member or the insertion member, it is more effectively prevented that the large building material falls during construction. Therefore, even when a large building material is constructed on a multi-story floor, it can be constructed safely and easily.

本発明の大型建材用施工治具は、大型建材(特に、大型のタイル外装材)の施工に用いることができる。   The construction jig for large building materials of the present invention can be used for construction of large building materials (particularly, large tile exterior materials).

1 大型建材用施工治具(第1治具)
2 載置部材
3 受け部材
4 連結部材
5 把手部
6 調整手段
6a ボルト通し孔(調整手段)
6b ボルト通し孔(調整手段)
7 大型建材
7a 裏面(大型建材)
8 第2治具
9 本体部
10 締付ボルト部
11 押さえ部
12 クランプ
13 足場
14 横桟
15 簡易ウインチ
16 フック
17 壁面
18 板状部材
18a 上辺板部(板状部材)
18b 中辺板部(板状部材)
18c 下辺板部(板状部材)
19 挿入部材
20 間隔変更部材
21 第3治具
22 壁パネル
23 階間の隙間
1 Construction jig for large building materials (first jig)
2 Mounting member 3 Receiving member 4 Connecting member 5 Handle portion 6 Adjusting means 6a Bolt through hole (adjusting means)
6b Bolt hole (adjustment means)
7 Large building material 7a Back side (large building material)
8 Second jig 9 Main body part 10 Clamping bolt part 11 Holding part 12 Clamp 13 Scaffolding 14 Horizontal beam 15 Simple winch 16 Hook 17 Wall surface 18 Plate member 18a Upper side plate part (plate member)
18b Middle side plate (plate member)
18c Lower side plate (plate member)
19 Inserting member 20 Spacing changing member 21 Third jig 22 Wall panel 23 Clearance between floors

Claims (3)

大型建材の下端部を載置するための側面視L字状の載置部材と、大型建材の上端部を立て掛けるための受け部材と、前記載置部材と前記受け部材を連結する連結部材を備えることを特徴とする大型建材用施工治具。
A side-viewing L-shaped mounting member for mounting the lower end portion of the large building material, a receiving member for leaning the upper end portion of the large building material, and a connecting member for connecting the mounting member and the receiving member. This is a construction tool for large building materials.
大型建材の施工方法であって、
大型建材の下端部を載置するための載置部材と、大型建材の上端部を立て掛けるための受け部材と、前記載置部材と前記受け部材を連結する連結部材を備える第1治具を用いて、大型建材を前記大型建材の正面側を前記受け部材に向けて前記載置部材に載せる第1工程と、
挟持機能を有する第2治具を用いて、前記大型建材の上端部と前記受け部材および/または前記大型建材の下端部と前記載置部材を挟持する第2工程と、
前記第1治具に載せた前記大型建材を移動する第3工程と、
前記大型建材を前記第1治具に載せた状態で前記大型建材の下端部を壁面の施工位置に当接する第4工程と、
前記第2治具を除去し、前記大型建材を前記受け部材から前記壁面に倒すことによって、前記大型建材の上端部を壁面の施工位置に当接する第5工程を備えることを特徴とする大型建材の施工方法。
A construction method for large building materials,
Using a first jig comprising a mounting member for mounting the lower end of the large building material, a receiving member for leaning the upper end of the large building material, and a connecting member for connecting the mounting member and the receiving member A first step of placing the large building material on the mounting member with the front side of the large building material facing the receiving member;
A second step of clamping the upper end portion of the large building material and the receiving member and / or the lower end portion of the large building material and the mounting member using a second jig having a clamping function;
A third step of moving the large building material placed on the first jig;
A fourth step of contacting the lower end of the large building material with the construction position of the wall surface with the large building material placed on the first jig;
A large building material comprising a fifth step of removing the second jig and bringing the large building material into contact with the construction position of the wall surface by tilting the large building material from the receiving member onto the wall surface. Construction method.
前記第4工程に替えて、
上辺板部と中辺板部と下辺板部から構成される側面視クランク状の板状部材と、前記上辺板部および/または前記下辺板部に連結した、同一方向に突設する2つの挿入部材と、前記上辺板部および/または前記下辺板部に設けた、前記2つの挿入部材の間隔を変更する間隔変更部材を備える第3治具を用いて、大型建材の施工位置の下端部に存在する壁パネルの階間の隙間に前記第3治具を挿入するとともに、前記間隔変更部材を用いて前記第3治具を仮固定する治具仮固定工程と、
前記大型建材を前記第1治具に載せた状態で前記大型建材の下端部を前記挿入部材に降ろした後、前記大型建材の下端部を前記挿入部材上で滑らせて壁面の施工位置に誘導し当接する誘導工程とを備えることを特徴とする請求項2に記載の大型建材の施工方法。
Instead of the fourth step,
A crank-like plate-like member composed of an upper side plate portion, a middle side plate portion, and a lower side plate portion, and two insertions projecting in the same direction connected to the upper side plate portion and / or the lower side plate portion Using a member and a third jig provided on the upper side plate portion and / or the lower side plate portion and having a gap changing member that changes the gap between the two insertion members, at the lower end of the construction position of the large building material A jig temporary fixing step of inserting the third jig into a gap between floors of existing wall panels and temporarily fixing the third jig using the interval changing member;
After lowering the lower end portion of the large building material onto the insertion member with the large building material placed on the first jig, the lower end portion of the large building material is slid on the insertion member and guided to the construction position on the wall surface. A construction method for a large-scale building material according to claim 2, further comprising a guiding step that comes into contact with each other.
JP2015246788A 2015-12-17 2015-12-17 Construction jig for large building materials and construction method for large building materials using this construction jig for large building materials Active JP6788343B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2015246788A JP6788343B2 (en) 2015-12-17 2015-12-17 Construction jig for large building materials and construction method for large building materials using this construction jig for large building materials

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2015246788A JP6788343B2 (en) 2015-12-17 2015-12-17 Construction jig for large building materials and construction method for large building materials using this construction jig for large building materials

Publications (2)

Publication Number Publication Date
JP2017110440A true JP2017110440A (en) 2017-06-22
JP6788343B2 JP6788343B2 (en) 2020-11-25

Family

ID=59081193

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2015246788A Active JP6788343B2 (en) 2015-12-17 2015-12-17 Construction jig for large building materials and construction method for large building materials using this construction jig for large building materials

Country Status (1)

Country Link
JP (1) JP6788343B2 (en)

Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1621650A (en) * 1926-01-22 1927-03-22 Dennis N Angel Ashlar-setting clamp
US3540753A (en) * 1969-01-27 1970-11-17 Derrick S Hanson Hand truck
JPS5582232U (en) * 1978-11-30 1980-06-06
US4600348A (en) * 1984-07-09 1986-07-15 Pettit Earl O Panel hoist
JPH1046824A (en) * 1996-08-07 1998-02-17 Taisei Corp Jig for moving and installing glass window
JPH1087238A (en) * 1996-09-12 1998-04-07 Hitachi Building Syst Co Ltd Panel mounting device and mounting method for elevator car
JP2000045531A (en) * 1998-07-31 2000-02-15 Chikaraya:Kk Hanging tool for wall panel
US6244810B1 (en) * 2000-02-18 2001-06-12 Guadalupe Reyes Drywall handyman
FR2888599A1 (en) * 2005-07-13 2007-01-19 Yves Chevalier Concrete panel transporting and placing device for e.g. building field, has track chassis in which forks of hoisting engine slide and formed by plate, axles for fixation of jack and handling rail, and positioning chassis fixed on sling
US20080273953A1 (en) * 2007-05-01 2008-11-06 Depaul Construction Company Modular wall transport device
JP2014055488A (en) * 2012-09-14 2014-03-27 Tsutomu Togo Fixture for rectangular panel material

Patent Citations (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US1621650A (en) * 1926-01-22 1927-03-22 Dennis N Angel Ashlar-setting clamp
US3540753A (en) * 1969-01-27 1970-11-17 Derrick S Hanson Hand truck
JPS5582232U (en) * 1978-11-30 1980-06-06
US4600348A (en) * 1984-07-09 1986-07-15 Pettit Earl O Panel hoist
JPH1046824A (en) * 1996-08-07 1998-02-17 Taisei Corp Jig for moving and installing glass window
JPH1087238A (en) * 1996-09-12 1998-04-07 Hitachi Building Syst Co Ltd Panel mounting device and mounting method for elevator car
JP2000045531A (en) * 1998-07-31 2000-02-15 Chikaraya:Kk Hanging tool for wall panel
US6244810B1 (en) * 2000-02-18 2001-06-12 Guadalupe Reyes Drywall handyman
FR2888599A1 (en) * 2005-07-13 2007-01-19 Yves Chevalier Concrete panel transporting and placing device for e.g. building field, has track chassis in which forks of hoisting engine slide and formed by plate, axles for fixation of jack and handling rail, and positioning chassis fixed on sling
US20080273953A1 (en) * 2007-05-01 2008-11-06 Depaul Construction Company Modular wall transport device
JP2014055488A (en) * 2012-09-14 2014-03-27 Tsutomu Togo Fixture for rectangular panel material

Also Published As

Publication number Publication date
JP6788343B2 (en) 2020-11-25

Similar Documents

Publication Publication Date Title
JP6211027B2 (en) Elevator hoistway work floor apparatus and elevator hoistway work floor apparatus installation method
US11598106B2 (en) Platform for assembling elevator equipment
WO2008068483B1 (en) Safety system
JP5280980B2 (en) Panel floating jig and panel moving method
JP2017110440A (en) Construction jig for large-sized building material, and construction method of large-sized building material using construction jig for large-sized building material
CN215368358U (en) Balcony faces limit protective structure convenient to installation
CN215043028U (en) Steel sheet stacking device for steel construction processing
KR20190142913A (en) Workbench support device
JP2008179469A (en) Guide rail arranging method in elevator device
JP4855311B2 (en) Precast erection method
JP4160609B2 (en) Master rope fixture
KR20060107874A (en) Guide device for a climbing typed construction frame
JP2007113193A (en) Lifting method for pc floor slab and hanging tool used therein
JP7278071B2 (en) Fittings hanger and fitting method
JP5059567B2 (en) Wall panel assembly apparatus and wall panel assembly method
KR100901016B1 (en) Safety bracket to external wall scaffolding for a structure
JP2004346601A (en) Hanger for unit panel, and unit panel construction method
CN106968373B (en) Glass fixture for mounting ultrahigh-sitting type full-glass curtain wall and mounting method
JP6388040B2 (en) Building plate lifting tool
JP2017043938A (en) Panel and work platform fitted with the same
CN210598201U (en) Lower support structure and prefabricated part fine tuning tool
JP2013133644A (en) Attaching jig for wall material and construction method of wall material using the same
KR200389401Y1 (en) Guide device for a climbing typed construction frame
JP2012067521A (en) Guide member for vertical pipe construction and vertical pipe construction method
CN210490285U (en) Cable bridge frame

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20181203

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20190910

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20190924

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20191115

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20200324

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20200507

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20201020

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20201030

R150 Certificate of patent or registration of utility model

Ref document number: 6788343

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250