JP2017084346A - 発電機運転計画作成装置、発電機運転計画作成方法、プログラム、データ及び発電機制御装置 - Google Patents
発電機運転計画作成装置、発電機運転計画作成方法、プログラム、データ及び発電機制御装置 Download PDFInfo
- Publication number
- JP2017084346A JP2017084346A JP2016183416A JP2016183416A JP2017084346A JP 2017084346 A JP2017084346 A JP 2017084346A JP 2016183416 A JP2016183416 A JP 2016183416A JP 2016183416 A JP2016183416 A JP 2016183416A JP 2017084346 A JP2017084346 A JP 2017084346A
- Authority
- JP
- Japan
- Prior art keywords
- generator
- operation plan
- article
- cost
- fuel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E40/00—Technologies for an efficient electrical power generation, transmission or distribution
- Y02E40/70—Smart grids as climate change mitigation technology in the energy generation sector
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
【解決手段】本発明の実施形態に係る発電機運転計画作成装置は、第2消費目標値と発電機の稼働により消費される物品の消費量との逸脱度合を示す逸脱コストと、前記消費量における物品コストと、に基づき発電機の運転計画を作成する運転計画作成部を備える。前記物品コストは、前記物品に係るコストを示す。前記第2消費目標値は、前記物品コストに基づき算出された前記物品の第1消費目標値を、前記物品の在庫制約に基づく期間において、前記在庫制約を満たすように補正することにより算出される。
【選択図】図1
Description
図1は、本発明の実施形態に係る発電機運転計画作成装置の概略構成の一例を示すブロック図である。図1に示された発電機運転計画作成装置1は、電力需要データ格納部11と、発電機運転データ(実績データ)格納部12と、条件格納部13と、燃料基地データ格納部14と、最経済計画線作成部15と、燃料消費目標線作成部16と、運転計画作成部17と、運転計画格納部18を備える。発電機運転計画作成装置1は、電力需要予測システム2と、発電機運転データ取得システム3と、入出力装置4と、通信インタフェース又はデバイスインタフェースなどにより、直接又は間接的に接続され、データの送受が可能とする。
図4(A)に、燃料基地における燃料の累積消費量のグラフを示す。図4(B)に、用いられるペナルティ関数を示す。図4では、F、M、Sの3種類のペナルティ関数を用いることとする。ペナルティ関数は、前述のとおり、燃料消費量が燃料消費量上限又は燃料消費量上限に近づくほど、ペナルティ関数の値の絶対値が増加するが、その増加量が異なる。増加量が最小なのがF、2番目に小さいのがM、最大なのがSである。
11 電力需要データ格納部
12 発電機運転データ格納部
13 条件格納部
14 燃料基地データ格納部
15 最経済計画線作成部
16 燃料消費目標線作成部
17 運転計画作成部
18 運転計画格納部
2 電力需要予測システム
3 発電機運転データ取得システム
4 入出力装置
5 コンピュータ装置
51 プロセッサ
52 主記憶装置
53 補助記憶装置
54 ネットワークインタフェース
55 デバイスインタフェース
6 外部装置
Claims (16)
- 発電機の稼働により消費される物品に係るコストを示す物品コストに基づき算出された前記物品の第1消費目標値を、前記物品の在庫制約に基づく期間において、前記在庫制約を満たすように補正することにより算出された第2消費目標値と、前記物品の消費量との逸脱度合を示す逸脱コストと、
前記消費量における前記物品コストと、
に基づき、前記発電機の運転計画を作成する運転計画作成部
を備える発電機運転計画作成装置。 - 前記在庫制約は、前記物品の消費量の下限値又は上限値又はその両方であり、
前記期間は、前記在庫制約が変動しない期間である
請求項1に記載の発電機運転計画作成装置。 - 前記逸脱コストは、
前記物品の前記消費量と、前記第2消費目標値と、の差分である逸脱量に基づき算出される
請求項1又は2に記載の発電機運転計画作成装置。 - 前記物品の消費量が前記在庫制約に近づくほど、前記逸脱コストの増加量が大きくなる
請求項1ないし3のいずれか一項に記載の発電機運転計画作成装置。 - 前記在庫制約に基づく期間の終期に近づくほど、前記逸脱コストの増加量が大きくなる
請求項1ないし4のいずれか一項に記載の発電機運転計画作成装置。 - 前記物品の消費量が第2の下限値に近づくほど、前記逸脱コストの増加量が大きくなる請求項1ないし5のいずれか一項に記載の発電機運転計画作成装置。
- 前記在庫制約と、前記第1消費目標値と、前記第2消費目標値と、前記発電機の運転計画との少なくとも1つに関するデータ又はグラフを、画像として表示又はファイルとして出力する出力部
をさらに備える請求項1ないし6のいずれか一項に記載の発電機運転計画作成装置。 - 前記在庫制約は、前記物品を蓄える基地の在庫の上下限の変更計画と、前記基地に蓄えられる前記物品の運搬計画のいずれか又は両方に基づき、生成される
請求項1ないし7のいずれか一項に記載の発電機運転計画作成装置。 - 前記運転計画作成部は、
前記逸脱コストと前記物品コストの総和が小さいほど、前記発電機の運転計画をより適切と判断する
請求項1ないし8のいずれか一項に記載の発電機運転計画作成装置。 - 前記物品コストに基づき、前記物品の第1消費目標値を算出する第1算出部と、
前記在庫制約に基づき、前記在庫制約を満たすように補正することにより第2消費目標値を算出する第2算出部と、
をさらに備える請求項1ないし9のいずれか一項に記載の発電機運転計画作成装置。 - 前記第1消費目標値は、
前記物品コストに、需要家から電力を購入するコストを加えた総合コストに基づき算出される
請求項1ないし10のいずれか一項に記載の発電機運転計画作成装置。 - 前記第2消費目標値は、
前記発電機の稼働により生じる生成物の在庫制約も満たすように算出される
請求項1ないし11のいずれか一項に記載の発電機運転計画作成装置。 - 発電機の稼働により消費される物品に係るコストを示す物品コストに基づき、前記物品の第1消費目標値を算出する第1算出ステップと、
前記物品の在庫制約に基づく期間において、前記在庫制約を満たすように補正することにより第2消費目標値を算出する第2算出ステップと、
前記第2消費目標値と、前記物品の消費量との逸脱度合を示す逸脱コストと、前記消費量における前記物品コストと、に基づき、前記発電機の運転計画に係るデータを作成する運転計画作成ステップと、
を備える発電機運転計画作成方法。 - 発電機の稼働により消費される物品に係るコストを示す物品コストに基づき、前記物品の第1消費目標値を算出する第1算出ステップと、
前記物品の在庫制約に基づく期間において、前記在庫制約を満たすように補正することにより第2消費目標値を算出する第2算出ステップと、
前記第2消費目標値と、前記物品の消費量との逸脱度合を示す逸脱コストと、前記消費量における前記物品コストと、に基づき、前記発電機の運転計画に係るデータを作成する運転計画作成ステップと、
をコンピュータに実行させるためのプログラム。 - 前記発電機を一意に示す識別情報と、前記在庫制約に基づく期間における前記発電機の出力電力値を示す計画情報と、が対応付けられた
請求項14に記載のプログラムにより作成されたデータ。 - 請求項15に記載の前記データに基づき、前記計画情報を満たすように、前記識別情報に示された前記発電機を制御する
発電機制御装置。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015215028 | 2015-10-30 | ||
JP2015215028 | 2015-10-30 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2017084346A true JP2017084346A (ja) | 2017-05-18 |
JP6661501B2 JP6661501B2 (ja) | 2020-03-11 |
Family
ID=58710930
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2016183416A Active JP6661501B2 (ja) | 2015-10-30 | 2016-09-20 | 発電機運転計画作成装置、発電機運転計画作成方法、プログラム、データ及び発電機制御装置 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6661501B2 (ja) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019067066A (ja) * | 2017-09-29 | 2019-04-25 | 川崎重工業株式会社 | 廃棄物処理計画演算方法および廃棄物処理計画演算装置 |
US10937112B2 (en) | 2018-08-17 | 2021-03-02 | Kabushiki Kaisha Toshiba | System, method and device for creating a power generation plan in a power generation system |
US11054798B2 (en) | 2018-06-04 | 2021-07-06 | Kabushiki Kaisha Toshiba | Operation planning system, method and device for generating an operation plan using multiple planning devices |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11299099A (ja) * | 1998-04-08 | 1999-10-29 | Toshiba Corp | 発電運転管理システム |
JP2004238180A (ja) * | 2003-02-07 | 2004-08-26 | Osaka Gas Co Ltd | Lng船運用管理方法およびシステム |
JP2007058760A (ja) * | 2005-08-26 | 2007-03-08 | Mitsubishi Electric Corp | エネルギー取引支援システム及びエネルギー取引支援プログラム |
JP5106708B1 (ja) * | 2011-12-06 | 2012-12-26 | 中国電力株式会社 | 電力需要計画調整装置、方法及びプログラム |
US20170213302A1 (en) * | 2016-01-27 | 2017-07-27 | Mitsubishi Electric Corporation | Energy supply and demand planning device and energy supply and demand planning program |
-
2016
- 2016-09-20 JP JP2016183416A patent/JP6661501B2/ja active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11299099A (ja) * | 1998-04-08 | 1999-10-29 | Toshiba Corp | 発電運転管理システム |
JP2004238180A (ja) * | 2003-02-07 | 2004-08-26 | Osaka Gas Co Ltd | Lng船運用管理方法およびシステム |
JP2007058760A (ja) * | 2005-08-26 | 2007-03-08 | Mitsubishi Electric Corp | エネルギー取引支援システム及びエネルギー取引支援プログラム |
JP5106708B1 (ja) * | 2011-12-06 | 2012-12-26 | 中国電力株式会社 | 電力需要計画調整装置、方法及びプログラム |
US20170213302A1 (en) * | 2016-01-27 | 2017-07-27 | Mitsubishi Electric Corporation | Energy supply and demand planning device and energy supply and demand planning program |
JP2017134556A (ja) * | 2016-01-27 | 2017-08-03 | 三菱電機株式会社 | エネルギー需給計画装置およびエネルギー需給計画プログラム |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019067066A (ja) * | 2017-09-29 | 2019-04-25 | 川崎重工業株式会社 | 廃棄物処理計画演算方法および廃棄物処理計画演算装置 |
JP7075194B2 (ja) | 2017-09-29 | 2022-05-25 | 川崎重工業株式会社 | 廃棄物処理計画演算方法および廃棄物処理計画演算装置 |
US11054798B2 (en) | 2018-06-04 | 2021-07-06 | Kabushiki Kaisha Toshiba | Operation planning system, method and device for generating an operation plan using multiple planning devices |
US10937112B2 (en) | 2018-08-17 | 2021-03-02 | Kabushiki Kaisha Toshiba | System, method and device for creating a power generation plan in a power generation system |
Also Published As
Publication number | Publication date |
---|---|
JP6661501B2 (ja) | 2020-03-11 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8706311B2 (en) | Electric power demand/supply planning apparatus and method for the same | |
Mosa et al. | Energy management system of low voltage dc microgrid using mixed-integer nonlinear programing and a global optimization technique | |
Chen | Fix-and-optimize and variable neighborhood search approaches for multi-level capacitated lot sizing problems | |
You et al. | Integrated multi‐echelon supply chain design with inventories under uncertainty: MINLP models, computational strategies | |
Dahlgren et al. | Small modular infrastructure | |
Morales et al. | Scenario reduction for futures market trading in electricity markets | |
Nowak et al. | A stochastic integer programming model for incorporating day-ahead trading of electricity into hydro-thermal unit commitment | |
Correa-Posada et al. | Security-constrained model for integrated power and natural-gas system | |
CN104102212A (zh) | 一种钢铁企业中煤气和蒸汽系统的调度方法、设备和系统 | |
JP2019144897A (ja) | ガスエネルギー需給システムの最適化装置及び最適化プログラム | |
JP2017187932A (ja) | エネルギー需給計画策定装置及びエネルギー需給計画策定プログラム | |
JP6661501B2 (ja) | 発電機運転計画作成装置、発電機運転計画作成方法、プログラム、データ及び発電機制御装置 | |
JP6513039B2 (ja) | エネルギー需給計画装置およびエネルギー需給計画プログラム | |
Gardi et al. | Local search for mixed-integer nonlinear optimization: a methodology and an application | |
CN109978233A (zh) | 一种考虑中长期电量交易合同的日前优化调度方法及系统 | |
Zsiborács et al. | The reliability of photovoltaic power generation scheduling in seventeen European countries | |
Quelhas et al. | Nodal prices in an integrated energy system | |
Allen et al. | A multi‐period integrated planning and scheduling approach for developing energy systems | |
Varganova et al. | Improving Efficiency of Electric Energy System and Grid Operating Modes: Review of Optimization Techniques | |
Zhou et al. | Joint capacity planning and distribution network optimization of coal supply chains under uncertainty | |
JP6668209B2 (ja) | 計画作成装置、計画作成方法、プログラム、データ及び発電機制御装置 | |
Dovì et al. | Mathematical methods for the multi-criteria optimization of structure and management of energy efficient gas supply chains | |
JP5191341B2 (ja) | Lng管理システムおよびlng管理プログラム | |
JP2009129229A (ja) | 温室効果ガス排出量算出システム、算出方法および、温室効果ガス排出権取引システム、取引方法 | |
Farajiamiri et al. | Multi-objective optimization of renewable fuel supply chains regarding cost, land use, and water use |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20180904 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20190725 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20190730 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20190820 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20200114 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20200212 |
|
R151 | Written notification of patent or utility model registration |
Ref document number: 6661501 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R151 |