JP2017021497A - 負荷実績データ判別装置、負荷予測装置、負荷実績データ判別方法及び負荷予測方法 - Google Patents
負荷実績データ判別装置、負荷予測装置、負荷実績データ判別方法及び負荷予測方法 Download PDFInfo
- Publication number
- JP2017021497A JP2017021497A JP2015137281A JP2015137281A JP2017021497A JP 2017021497 A JP2017021497 A JP 2017021497A JP 2015137281 A JP2015137281 A JP 2015137281A JP 2015137281 A JP2015137281 A JP 2015137281A JP 2017021497 A JP2017021497 A JP 2017021497A
- Authority
- JP
- Japan
- Prior art keywords
- load
- unit
- type
- similarity
- day
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Supply And Distribution Of Alternating Current (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
【解決手段】負荷実績データ判別装置は、類似度算出部102と、日種別判別部104を持つ。類似度算出部は、所定時間毎に管理対象の負荷を計測することによって取得された所定期間の負荷の推移を示す負荷パターンに基づいて、複数の負荷パターン間の類似度を取得し、類似度に基づいて日種別判別部は負荷パターンが得られた所定期間の種類を判別する。
【選択図】図1
Description
まず、第1の実施形態における負荷予測装置を備え、管理対象となるエネルギー機器を最適に運用するための運用システムの概略について説明する。
図1は、第1の実施形態における負荷予測装置を備える運用システムの構成例を示す図である。図1に示すように、運用システム1は、負荷予測装置10と、カレンダ情報記録部11と、入出力部12と、負荷実績収集部13と、気象情報収集部14と、機器計画部15と、運用パターン記録部16と、機器制御部17とを備える。また、運用システム1は、管理対象となるエネルギー機器の負荷を計測する負荷設備2、気象情報を提供する気象情報提供設備3、及び、管理対象となるエネルギー機器を含むエネルギー設備4と接続されている。
図2に示すように、カレンダ情報記録部11には、D1日・・・DS+2日・・・の各日における日種別の情報が設定されている。また、負荷予測装置10は、D1日に負荷実績データの蓄積を開始している。D1日の行に示すように、負荷実績データ記録部101にはD1日に対応する負荷パターン(日パターン)が記録され、判別結果記録部105にはD1日に対応する判別結果の日種別が記録される。D1日の翌日は、D2日の行に示すように、負荷実績データ記録部101にはD2日に対応する負荷パターンが記録され、判別結果記録部105にはD2日に対応する判定結果の日種別が記録され、日間類似度テーブル103にはD1日とD2日の負荷パターンの類似度の情報が記録される。
類似度算出部102は、対象日の間で、管理時間帯(30分間又は1時間等)毎の負荷パターンの類似度SIを以下の(式1)および(式2)の式を用いて算出する。
上記の(式2)で求めた類似度SIは、0に偏った正の確率分布となる。そこで、図3に示すとおり、類似度SIの確率分布を対数正規分布f(x)と仮定し、類似度SIの対数の正規分布f(log(x))を利用できるものとする。図3は、類似度SIの確率分布および類似度SIの対数の正規分布を示す図である。
日間の類似度は図2に示したように、対象期間S日間の範囲で日間類似度テーブル103に格納されている。そして、特異日でない日種別の類似度SIは、対象日と同じ日種別の類似度の分布と、その他の日種別の類似度の分布とに偏る傾向がある。よって、日種別判別部104は、類似度SIの最小値と最大値の中間値を利用して日種別を判別する。
類似度I<(類似度S−類似度1)/2
図4は、日種別判別部104における日種別の訂正処理を説明するための負荷パターンの具体例1を示す図である。図4において、縦軸は負荷量であり、横軸は時間帯である。
図5は、日種別判別部104における日種別の訂正処理を説明するための負荷パターンの具体例2を示す図である。図5に示すように、平日1〜平日5の負荷パターンは、各負荷パターン間において類似したパターンとなっている。また、休日1〜休日4の負荷パターンも、各負荷パターン間において類似したパターンとなっている。しかし、実線で示す平日6の負荷パターンは、平日1〜平日5の負荷パターンを比較すると、以下の点で異なる。平日6の負荷パターンは、負荷量の最大値が約2000であり、平日1〜平日5の負荷パターンは、負荷量の最大値が2500〜3200の範囲にふくまれている点で異なる。また、平日6の負荷パターンは、12:00過ぎくらいから下降が始まっているが、平日1〜平日5の負荷パターンは、16:00くらいから負荷量の下降が始まっている点で異なる。
図6は、負荷予測装置10における日種別の判別に関する動作を示すフロー図である。図6に示すように、ステップS100において、負荷実績データ記録部101は、負荷実績収集部13より、各時間帯の負荷実績データを受け取り、日付と関連付けて記録し、順次蓄積する。
図7は、異常検出部108が異常値を検出する処理を説明するための負荷パターンの具体例3を示す図である。図7に示すように、休日1〜休日4の負荷パターンは、各負荷パターン間において類似したパターンとなっている。しかし、実線で示す休日5の負荷パターンは、21:00〜23:00の時間帯の数値が異常な値となっている。異常検出部108は、日種別情報106から参照した、対象日の日種別に対応する統計値に基づいて、休日5の負荷パターンにおける21:00以降の負荷量を異常値として検出する。
図8は、異常検出部108が異常値を検出する処理を説明するための負荷パターンの具体例4を示す図である。図8に示すように、11:00頃までは時間帯毎のバラツキが大きく、14:00以降はバラツキが小さくなっている。同じ日種別となる負荷パターンが少ない場合は、時間帯毎のバラツキが大きくなることがある。
次に、第2の実施形態として、当日の負荷実績データの推移を監視して、日種別を判別する機能を有する負荷予測装置について説明する。
図10は、第2の実施形態における負荷予測装置の構成例を示す図である。図10に示すように、負荷予測装置10aは、図1に示す負荷予測装置10と比較して、予測用負荷パターン抽出部107aと、乖離検出部114とを備える点で異なり、その他の構成は同じである。よって、同じ構成のものには、図1と同一の符号を付与し、説明を省略する。また、図10に示していないが、負荷予測装置10aを含む運用システムは、図1に示した運用システム1と同様の構成である。
また、上記のプログラムは、前述した機能の一部を実現するためのものであってもよい。さらに、上記のプログラムは、前述した機能をコンピューターシステムにすでに記録されているプログラムとの組み合わせで実現できるもの、いわゆる差分ファイル(差分プログラム)であってもよい。また、クラウドコンピューティングを利用して運用システム1を構築してもよい。
Claims (10)
- 所定時間毎に管理対象の負荷を計測することによって取得された所定期間の負荷の推移を示す負荷パターンに基づいて、複数の負荷パターン間の類似度を取得する類似度取得部と、
前記類似度取得部が取得した前記類似度に基づいて、前記負荷パターンが得られた前記所定期間の種類を判別する種類判別部と、
を備える負荷実績データ判別装置。 - 前記種類判別部は、自身が判別した種類と、予め前記所定期間毎に設定された種類とが異なる場合には、予め設定された種類を自身が判別した種類に訂正する
請求項1に記載の負荷実績データ判別装置。 - 所定時間毎に管理対象の負荷を計測することによって取得された所定期間の負荷の推移を示す負荷パターンに基づいて、複数の負荷パターン間の類似度を取得する類似度取得部と、
前記類似度取得部が取得した前記類似度に基づいて、前記負荷パターンが得られた前記所定期間の種類を判別する種類判別部と、
前記種類判別部における種類の判別結果を、前記所定期間を特定する情報に関連付けて記録する判別結果記録部と、
前記判別結果記録部に記録された前記判別結果に基づいて、前記負荷を予測するために利用される複数の負荷パターンを前記判別結果の種類と関連付けて抽出する抽出部と、
を備える負荷予測装置。 - 前記種類判別部は、複数の前記負荷パターンから前記種類毎の統計値を取得し、
前記種類判別部が取得した前記統計値を格納する統計値格納部と、
前記統計値格納部より取得した前記統計値に基づいて、前記負荷パターンの異常値を検出する異常検出部と、
を更に備える請求項3に記載の負荷予測装置。 - 前記異常検出部は、検出した異常値を前記統計値に基づいて修正する請求項4に記載の負荷予測装置。
- 前記判別結果記録部から参照した前記種類と、予め前記所定期間毎に設定された種類とが異なる場合に、利用者へ通知を行う通知部を、
更に備える請求項3から5のいずれか一項に記載の負荷予測装置。 - 前記統計値格納部より、前記所定期間の種類が同じで、かつ、現在の直前の時間帯に対応する統計値を取得して、前記直前の時間帯までの負荷パターンが、上記統計値から予測される範囲から乖離したことを検出する乖離検出部を
更に備える請求項4又は請求項5に記載の負荷予測装置。 - 前記乖離検出部は、前記乖離を検出した場合に、前記直前の時間帯までの負荷パターンに基づいて、正しい種類を推定する請求項7に記載の負荷予測装置。
- 所定時間毎に管理対象の負荷を計測することによって取得された所定期間の負荷の推移を示す負荷パターンに基づいて、複数の負荷パターン間の類似度を取得する類似度取得ステップと、
前記類似度取得ステップにおいて取得した前記類似度に基づいて、前記負荷パターンが得られた前記所定期間の種類を判別する種類判別ステップと、
を有する負荷実績データ判別方法。 - 所定時間毎に管理対象の負荷を計測することによって取得された所定期間の負荷の推移を示す負荷パターンに基づいて、複数の負荷パターン間の類似度を取得する類似度取得ステップと、
前記類似度取得ステップにおいて取得した前記類似度に基づいて、前記負荷パターンが得られた前記所定期間の種類を判別する種類判別ステップと、
前記種類判別ステップにおける種類の判別結果を、前記所定期間を特定する情報に関連付けて判別結果記録部に記録する判別結果記録ステップと、
前記判別結果記録部に記録された前記判別結果に基づいて、前記負荷を予測するために利用される複数の負荷パターンを前記判別結果の種類と関連付けて抽出する抽出ステップと、
を有する負荷予測方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015137281A JP6625839B2 (ja) | 2015-07-08 | 2015-07-08 | 負荷実績データ判別装置、負荷予測装置、負荷実績データ判別方法及び負荷予測方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015137281A JP6625839B2 (ja) | 2015-07-08 | 2015-07-08 | 負荷実績データ判別装置、負荷予測装置、負荷実績データ判別方法及び負荷予測方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2017021497A true JP2017021497A (ja) | 2017-01-26 |
JP6625839B2 JP6625839B2 (ja) | 2019-12-25 |
Family
ID=57889600
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2015137281A Active JP6625839B2 (ja) | 2015-07-08 | 2015-07-08 | 負荷実績データ判別装置、負荷予測装置、負荷実績データ判別方法及び負荷予測方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6625839B2 (ja) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2018156468A (ja) * | 2017-03-17 | 2018-10-04 | 株式会社東芝 | 乖離判断装置、日種別判別装置、予測装置、プログラム、および乖離判断方法 |
JP2018206172A (ja) * | 2017-06-07 | 2018-12-27 | 株式会社Nttファシリティーズ | 電力需要予測装置、電力需要予測方法およびプログラム |
CN112909936A (zh) * | 2021-02-04 | 2021-06-04 | 中国神华能源股份有限公司国华电力分公司 | 火电机组运行状态的监测方法、装置和系统 |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5812539A (ja) * | 1981-07-10 | 1983-01-24 | 株式会社明電舎 | 配電系統の負荷パタ−ン決定方式 |
JPH07306846A (ja) * | 1994-05-13 | 1995-11-21 | Nippon Telegr & Teleph Corp <Ntt> | 時系列データ予測方法 |
JP2001188772A (ja) * | 1999-12-28 | 2001-07-10 | Ishikawajima Harima Heavy Ind Co Ltd | プラントの需要予測方法及びその装置 |
JP2004320963A (ja) * | 2003-04-21 | 2004-11-11 | Hitachi Ltd | 電力負荷推定方法,装置及び電力料金請求方法 |
JP2006011715A (ja) * | 2004-06-24 | 2006-01-12 | Tokyo Electric Power Co Inc:The | 資源消費量の推定方法及び装置 |
WO2011046228A1 (ja) * | 2009-10-15 | 2011-04-21 | 日本電気株式会社 | システム運用管理装置、システム運用管理方法、及びプログラム記憶媒体 |
-
2015
- 2015-07-08 JP JP2015137281A patent/JP6625839B2/ja active Active
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5812539A (ja) * | 1981-07-10 | 1983-01-24 | 株式会社明電舎 | 配電系統の負荷パタ−ン決定方式 |
JPH07306846A (ja) * | 1994-05-13 | 1995-11-21 | Nippon Telegr & Teleph Corp <Ntt> | 時系列データ予測方法 |
JP2001188772A (ja) * | 1999-12-28 | 2001-07-10 | Ishikawajima Harima Heavy Ind Co Ltd | プラントの需要予測方法及びその装置 |
JP2004320963A (ja) * | 2003-04-21 | 2004-11-11 | Hitachi Ltd | 電力負荷推定方法,装置及び電力料金請求方法 |
JP2006011715A (ja) * | 2004-06-24 | 2006-01-12 | Tokyo Electric Power Co Inc:The | 資源消費量の推定方法及び装置 |
WO2011046228A1 (ja) * | 2009-10-15 | 2011-04-21 | 日本電気株式会社 | システム運用管理装置、システム運用管理方法、及びプログラム記憶媒体 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2018156468A (ja) * | 2017-03-17 | 2018-10-04 | 株式会社東芝 | 乖離判断装置、日種別判別装置、予測装置、プログラム、および乖離判断方法 |
JP2018206172A (ja) * | 2017-06-07 | 2018-12-27 | 株式会社Nttファシリティーズ | 電力需要予測装置、電力需要予測方法およびプログラム |
CN112909936A (zh) * | 2021-02-04 | 2021-06-04 | 中国神华能源股份有限公司国华电力分公司 | 火电机组运行状态的监测方法、装置和系统 |
Also Published As
Publication number | Publication date |
---|---|
JP6625839B2 (ja) | 2019-12-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107871190B (zh) | 一种业务指标监控方法及装置 | |
US10248528B2 (en) | System monitoring method and apparatus | |
EP3249483B1 (en) | Information processing device and information processing method | |
US9465387B2 (en) | Anomaly diagnosis system and anomaly diagnosis method | |
CN112188531B (zh) | 异常检测方法、装置、电子设备及计算机存储介质 | |
CN109740648B (zh) | 电力负荷异常数据识别方法、装置和计算机设备 | |
JP5855036B2 (ja) | 設備点検順位設定装置 | |
WO2021005943A1 (ja) | 故障確率評価システムおよびその方法 | |
US9600391B2 (en) | Operations management apparatus, operations management method and program | |
US11609830B2 (en) | Method for investigating a functional behavior of a component of a technical installation, computer program, and computer-readable storage medium | |
JP2016095751A (ja) | 異常機器特定プログラム、異常機器特定方法、及び、異常機器特定装置 | |
JP6625839B2 (ja) | 負荷実績データ判別装置、負荷予測装置、負荷実績データ判別方法及び負荷予測方法 | |
JP2016085589A (ja) | 障害予測装置、障害予測システム、及びプログラム | |
US20140052413A1 (en) | Data processing system, data processing method, and program | |
CN113988723A (zh) | 一种基于用电数据异常分析的用户行为锁定方法和系统 | |
KR101960755B1 (ko) | 미취득 전력 데이터 생성 방법 및 장치 | |
JP6502062B2 (ja) | 通信品質予測装置及び通信品質予測プログラム | |
CN111737233A (zh) | 数据监控方法及装置 | |
JP2019067462A (ja) | 情報処理装置、配達成否予測方法及び配達成否予測プログラム | |
US11989014B2 (en) | State estimation apparatus, method, and non-transitory computer readable medium | |
CN113343479A (zh) | 设备使用寿命的计算方法和装置 | |
JPWO2018083720A1 (ja) | 異常分析方法、プログラムおよびシステム | |
CN110520807B (zh) | 信息处理装置、信息处理方法以及存储介质 | |
JP6937142B2 (ja) | 乖離判断装置、日種別判別装置、予測装置、プログラム、および乖離判断方法 | |
WO2009090944A1 (ja) | ルールベース管理システム、ルールベース管理方法およびルールベース管理用プログラム |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A711 | Notification of change in applicant |
Free format text: JAPANESE INTERMEDIATE CODE: A711 Effective date: 20170912 Free format text: JAPANESE INTERMEDIATE CODE: A712 Effective date: 20170912 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20180316 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20190222 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20190305 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20190507 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20191029 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20191128 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6625839 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |