JP2017002464A5 - - Google Patents
Download PDFInfo
- Publication number
- JP2017002464A5 JP2017002464A5 JP2015113875A JP2015113875A JP2017002464A5 JP 2017002464 A5 JP2017002464 A5 JP 2017002464A5 JP 2015113875 A JP2015113875 A JP 2015113875A JP 2015113875 A JP2015113875 A JP 2015113875A JP 2017002464 A5 JP2017002464 A5 JP 2017002464A5
- Authority
- JP
- Japan
- Prior art keywords
- tube
- ground
- injection
- radius
- material slurry
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000002347 injection Methods 0.000 claims description 19
- 239000007924 injection Substances 0.000 claims description 19
- 239000002002 slurry Substances 0.000 claims description 14
- 230000001133 acceleration Effects 0.000 claims description 13
- 239000000463 material Substances 0.000 claims description 13
- 239000002689 soil Substances 0.000 claims description 3
- 238000003756 stirring Methods 0.000 claims description 3
- 238000001514 detection method Methods 0.000 claims 2
- 238000010276 construction Methods 0.000 claims 1
Description
地盤中に固化材スラリーを噴射して地盤を切削すると共に固化材スラリーと改良対象土を混合攪拌して改良体を造成しながら改良体の改良半径を確認する装置は、固化材スラリーが噴射されるノズルを有する注入管が地盤に挿入される位置から、予め設定された設計改良半径だけ離れた位置において地盤に挿入するように設けられた1つまたは複数の到達管と、到達管に生じる加速度を検知する検知器と、検知器によって検知された加速度を記録する記録計とを備える。
固化材スラリーが噴射されるノズルを有する注入管が地盤に挿入される位置から、予め設定された設計改良半径だけ離れた位置以外において地盤に挿入するように設けられた少なくとも1つの別の到達管と、少なくとも1つの別の到達管に設けられ、少なくとも1つの別の到達管に生じる加速度を検知する検知器とをさらに備えてもよい。
到達管は注入管と同一の管状部材であってもよい。
検知器は、到達管または別の到達管の地盤よりも上方の位置に着脱自在に固定されてもよい。
The device that checks the radius of improvement of the improved body while injecting the solidified material slurry into the ground to cut the ground and mixing and stirring the solidified material slurry and the soil to be improved while checking the improved radius of the improved body. One or a plurality of arrival tubes provided to be inserted into the ground at a position separated by a predetermined design improvement radius from the position at which the injection tube having the nozzle is inserted into the ground, and acceleration generated in the arrival tube And a recorder for recording the acceleration detected by the detector.
At least one other access pipe provided to be inserted into the ground at a position other than the position where the injection pipe having the nozzle into which the solidifying material slurry is injected is inserted into the ground at a predetermined design improvement radius. And a detector that is provided in at least one other access tube and detects acceleration generated in the at least one other access tube.
The access tube may be the same tubular member as the injection tube.
The detector may be detachably fixed at a position above the ground of the arrival tube or another arrival tube.
Claims (9)
前記固化材スラリーが噴射されるノズルを有する注入管が地盤に挿入される位置から、予め設定された設計改良半径だけ離れた位置に1つまたは複数の到達管を地盤に挿入するように設けるステップと、
該到達管に、該到達管に生じる加速度を検知する検知器を設けるステップと、
前記注入管を地盤中に挿入した後、前記注入管を回転させつつ引き上げながら前記ノズルから前記固化材スラリーを噴射するステップと、
前記注入管を引き上げる間、前記到達管に生じる加速度を検知するステップと、
検知された加速度に基づいて、造成中の改良体の改良半径が前記設計改良半径に達しているか否かを判定するステップと
を含む方法。 A method of confirming the improved radius of the improved body while injecting the solidified material slurry into the ground to cut the ground and mixing and stirring the solidified material slurry and the improvement target soil,
A step of providing one or a plurality of reaching pipes in the ground at a position separated by a predetermined design improvement radius from a position at which the injection pipe having a nozzle for injecting the solidifying material slurry is inserted into the ground; When,
Providing the access tube with a detector for detecting acceleration generated in the access tube;
After inserting the injection tube into the ground, injecting the solidified material slurry from the nozzle while pulling up while rotating the injection tube;
Detecting the acceleration generated in the access tube while the injection tube is pulled up;
Determining whether the improvement radius of the improvement body being built has reached the design improvement radius based on the sensed acceleration.
前記注入管を再び地盤中に挿入し、前記注入管を引き上げながら前記ノズルから前記固化材スラリーを噴射するステップと、
前記注入管を引き上げる間、前記到達管の加速度を検知するステップと、
検知された加速度に基づいて、造成中の改良体の改良半径が前記設計改良半径に達しているか否かを判定するステップと
を行う、請求項1に記載の方法。 When it is determined that the improvement radius of the improvement body under construction does not reach the design improvement radius, after stopping the injection of the solidified slurry and the pulling up of the injection pipe,
Inserting the injection tube into the ground again and injecting the solidified material slurry from the nozzle while pulling up the injection tube;
Detecting the acceleration of the reach tube while pulling up the injection tube;
The method according to claim 1, further comprising: determining whether the improvement radius of the improvement body being built has reached the design improvement radius based on the detected acceleration.
t=30B/[π・(r+B/2)・a]
で表されるt未満の間隔であり、
ここで、B[m]は前記注入管から前記到達管を見たときの該到達管の幅[m]であり、r[m]は前記注入管から前記到達管までの距離であり、a[rpm]は前記注入管の回転の回転数である、請求項1または2に記載の方法。 The detector detects the acceleration at a fixed detection time interval, and the fixed detection time interval is:
t = 30B / [π · (r + B / 2) · a]
An interval less than t expressed by
Here, B [m] is the width [m] of the arrival tube when the arrival tube is viewed from the injection tube, r [m] is the distance from the injection tube to the arrival tube, and a The method according to claim 1 or 2, wherein [rpm] is the number of rotations of the injection tube.
該少なくとも1つの別の到達管に、該少なくとも1つの別の到達管に生じる加速度を検知する検知器を設けるステップと
をさらに含む、請求項1〜3のいずれか一項に記載の方法。 Providing at least one other reaching pipe in addition to a position away from a position where the injection pipe having the nozzle through which the solidifying material slurry is injected is inserted into the ground by a preset design improvement radius;
The method according to any one of claims 1 to 3, further comprising the step of providing the at least one other access tube with a detector that detects an acceleration generated in the at least one other access tube.
前記固化材スラリーが噴射されるノズルを有する注入管が地盤に挿入される位置から、予め設定された設計改良半径だけ離れた位置において地盤に挿入するように設けられた1つまたは複数の到達管と、
該到達管に生じる加速度を検知する検知器と、
該検知器によって検知された前記加速度を記録する記録計と
を備える装置。 A device for confirming the improved radius of the improved body while jetting the solidified material slurry into the ground to cut the ground and mixing and stirring the solidified material slurry and the soil to be improved while forming the improved body,
One or a plurality of reaching pipes provided to be inserted into the ground at a position separated from a position where the injection pipe having the nozzle for injecting the solidifying material slurry is inserted into the ground by a predetermined design improvement radius. When,
A detector for detecting acceleration generated in the access pipe;
And a recorder for recording the acceleration detected by the detector.
該少なくとも1つの別の到達管に設けられ、該少なくとも1つの別の到達管に生じる加速度を検知する検知器と
をさらに備える、請求項6に記載の装置。 At least one other arrival provided to be inserted into the ground at a position other than the position where the injection pipe having the nozzle through which the solidifying material slurry is injected is inserted into the ground at a predetermined design improvement radius. Tube,
The apparatus according to claim 6, further comprising a detector provided in the at least one other access tube and detecting an acceleration generated in the at least one other access tube.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015113875A JP6564247B2 (en) | 2015-06-04 | 2015-06-04 | How to check the radius of improvement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015113875A JP6564247B2 (en) | 2015-06-04 | 2015-06-04 | How to check the radius of improvement |
Publications (3)
Publication Number | Publication Date |
---|---|
JP2017002464A JP2017002464A (en) | 2017-01-05 |
JP2017002464A5 true JP2017002464A5 (en) | 2018-07-19 |
JP6564247B2 JP6564247B2 (en) | 2019-08-21 |
Family
ID=57751596
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2015113875A Active JP6564247B2 (en) | 2015-06-04 | 2015-06-04 | How to check the radius of improvement |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6564247B2 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP6850624B2 (en) * | 2017-02-13 | 2021-03-31 | 大成建設株式会社 | Construction status confirmation method of high-pressure injection agitator and construction method of ground improvement body using this method |
CN107893409B (en) | 2017-04-17 | 2019-04-26 | 中交第一航务工程局有限公司 | A kind of penetratinghardpan sets the method for processing foundation of foundation structure object |
JP6886860B2 (en) * | 2017-05-26 | 2021-06-16 | 東興ジオテック株式会社 | Method of confirming the range of ground improvement in the high-pressure injection stirring method |
JP2020159478A (en) * | 2019-03-27 | 2020-10-01 | 日本電産株式会社 | Torque limiter, geared motor, drive mechanism and robot |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH01315517A (en) * | 1988-06-15 | 1989-12-20 | Furonto Eng Kk | Foundation improvement material injection method and device thereof |
JPH03286017A (en) * | 1990-03-31 | 1991-12-17 | Fudo Constr Co Ltd | Hardened body forming device |
JP2542333B2 (en) * | 1993-06-28 | 1996-10-09 | 佐野 猛 | Method and apparatus for detecting improved state of improved column in high-pressure injection stirring method |
JP3235927B2 (en) * | 1993-12-22 | 2001-12-04 | 鹿島建設株式会社 | Super high pressure injection type ground improvement method |
JP4721268B2 (en) * | 2004-07-12 | 2011-07-13 | 前田建設工業株式会社 | Improved diameter measuring device and improved diameter measuring method |
JP5110943B2 (en) * | 2007-04-09 | 2012-12-26 | ライト工業株式会社 | Method and apparatus for grasping improved state of improved body by high-pressure injection injection method |
JP4886921B2 (en) * | 2007-10-24 | 2012-02-29 | 前田建設工業株式会社 | Effective diameter confirmation method of ground improvement body |
US8690486B2 (en) * | 2008-11-21 | 2014-04-08 | Uretek Usa, Inc. | Method and device for measuring underground pressure |
JP2011226250A (en) * | 2010-04-01 | 2011-11-10 | Maeda Corp | Quality control method for soil improvement body, measuring method and measuring rod |
JP5459034B2 (en) * | 2010-04-15 | 2014-04-02 | 株式会社大林組 | Construction range confirmation system and construction range confirmation method for ground improvement body |
JP5542593B2 (en) * | 2010-09-14 | 2014-07-09 | 三信建設工業株式会社 | Ground cutting condition monitoring method and monitoring device in high-pressure jet agitation method |
-
2015
- 2015-06-04 JP JP2015113875A patent/JP6564247B2/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2017002464A5 (en) | ||
WO2018054107A1 (en) | Soil layered-settlement magnet ring and soil layered-settlement monitoring device | |
US10012041B2 (en) | Drill rod tallying system and method | |
WO2018031471A3 (en) | High frequency ac-powered drain cleaning and inspection apparatus & methods | |
WO2012174034A3 (en) | Methods and apparatus for determining downhole parameters | |
CN102635117B (en) | On-off type grouting front end device | |
EP2819382A3 (en) | Water leak sensor management method, water leak sensor performing the same and storage media storing the same | |
WO2015004214A3 (en) | In situ accelerometer calibration | |
JP6564247B2 (en) | How to check the radius of improvement | |
RU2018139429A (en) | DEVICE AND METHOD FOR CONTROL OF FLEXIBLE PIPE COLUMN | |
FR3030743B1 (en) | SYSTEM FOR EVALUATING THE CONDITION OF A TIRE WITH A DEVICE FOR DETECTING THE MEANING SENSE | |
WO2015051313A3 (en) | Floating device running tool | |
CN104181010A (en) | Cereal sampler capable of achieving multilevel sampling in transverse direction and longitudinal direction | |
JP2012103212A (en) | Underground radar | |
US20140182842A1 (en) | Method of injection fluid monitoring | |
ZA201009038B (en) | Method and device for detecting deposits comprising at least one ferromagnetic material on or near the external wall of a tube | |
JP2015111109A (en) | Detection method of magnetic matter and magnetic sensor | |
EP2698697A3 (en) | Method of searching for playback location of multimedia application and electronic device thereof | |
JP5357065B2 (en) | Deviation direction detecting device and drilling method of tip bit in drilling machine | |
KR101239692B1 (en) | Device for measuring hydraulic conductivity and method thereof | |
JP2014202051A (en) | Insertion tool for electric pole hole excavation pipe and pipe insertion method | |
JP5498925B2 (en) | Displacement measuring device for ground or rock | |
FR2937156B1 (en) | METHOD AND DEVICE FOR MONITORING THE NAVIGATION CAPACITY OF AN AIRCRAFT DURING A FLOATING PHASE CLOSE TO THE SOIL. | |
JP2008274688A (en) | Buried device | |
CN107761786B (en) | A kind of mounting process for deep embeded type soil pressure cell |