JP2016125287A - Support metal fitting for beam bottom mold, joint part structure for pca beam, and construction method therefor - Google Patents
Support metal fitting for beam bottom mold, joint part structure for pca beam, and construction method therefor Download PDFInfo
- Publication number
- JP2016125287A JP2016125287A JP2015000844A JP2015000844A JP2016125287A JP 2016125287 A JP2016125287 A JP 2016125287A JP 2015000844 A JP2015000844 A JP 2015000844A JP 2015000844 A JP2015000844 A JP 2015000844A JP 2016125287 A JP2016125287 A JP 2016125287A
- Authority
- JP
- Japan
- Prior art keywords
- mold
- beam bottom
- formwork
- bottom mold
- joint part
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 239000002184 metal Substances 0.000 title claims abstract description 6
- 238000010276 construction Methods 0.000 title claims description 9
- 239000011178 precast concrete Substances 0.000 claims abstract description 10
- 238000009415 formwork Methods 0.000 claims description 39
- 239000004567 concrete Substances 0.000 claims description 9
- 239000000945 filler Substances 0.000 claims description 5
- 230000003014 reinforcing effect Effects 0.000 abstract 3
- 238000000034 method Methods 0.000 description 7
- 230000002787 reinforcement Effects 0.000 description 4
- 239000000463 material Substances 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 239000006260 foam Substances 0.000 description 2
- 230000000694 effects Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Landscapes
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
Abstract
Description
本発明は、プレキャストコンクリート(PCaと略記する、以下同じ)梁のセンタージョイント部における、梁底型枠用支持金具とPCa梁ジョイント部の構造とその構築方法に関するものである。 The present invention relates to a structure of a beam-bottom formwork support metal fitting and a PCa beam joint portion in a center joint portion of a precast concrete (abbreviated as PCa, hereinafter the same) beam and a construction method thereof.
従来、図4に示すように、PCa工法におけるPCa梁13,13のセンタージョイント部の形成には、図4に示すように、梁主筋等を機械式継手で接続した後、梁底および梁の左右側に型枠14と、前記梁底の型枠を支持させるためスラブ16から立設される支保工15とを設置して、前記型枠14内にコンクリートを打設して形成している。この従来例の先願として、特許文献1の図5,図6に示すPCa工法が知られている。
Conventionally, as shown in FIG. 4, in the formation of the center joint portion of the
しかし、従来の梁底型枠を支保工15に支持させて、梁底・左右側の型枠内にコンクリートを打設しPCa梁のセンタージョイント部を形成する工法では、支保工15の設置と、打設コンクリートの硬化後に、前記型枠撤去のために支保工15を撤去するという作業工程が発生する。また、センタージョイント部の下に前記支保工15が存在することで、作業員の移動や資材搬入出作業などにおいて他の作業の邪魔になるばかりで無く、近年の型枠大工の労務不足によって、型枠工事の作業工程が増えると全体工程の遅延の要因となるという課題がある。
However, in the construction method in which the conventional beam bottom formwork is supported by the
本発明に係る梁底型枠用支持金具と、PCa梁ジョイント部の構造とその構築方法は、このような課題を解決するために提案されたものである。 The beam-bottom formwork support metal fitting, the structure of the PCa beam joint portion and the construction method thereof according to the present invention have been proposed in order to solve such problems.
本発明に係る梁底型枠用支持金具の上記課題を解決して目的を達成するための要旨は、 プレキャストコンクリート梁のジョイント部における、間隙を置いて並設された梁下端筋に跨がって吊持されるように形成されたコ字形のセパレーター筋と、前記セパレーター筋の端部に螺着された型枠受け用のナットとからなることである。 The gist of the present invention for solving the above-mentioned problems of the beam bottom formwork support bracket according to the present invention is to straddle the beam bottom bars arranged in parallel with a gap in the joint portion of the precast concrete beam. A U-shaped separator bar formed so as to be suspended, and a mold receiving nut screwed to the end of the separator bar.
本発明に係るPCa梁ジョイント部の構造の要旨は、プレキャストコンクリート梁のジョイント部において、接続手段で接続された梁下端筋に、前記梁底型枠用支持金具が適宜間隔を置いて接続方向に配置されて吊持され、前記梁底型枠用支持金具によるナットの撤去部分に充填材が充填されていることである。 The gist of the structure of the PCa beam joint according to the present invention is that, in the joint portion of the precast concrete beam, the beam bottom formwork support fitting is appropriately spaced in the connection direction at the beam lower end bar connected by the connecting means. It is arrange | positioned and suspended and the filler is filled into the removal part of the nut by the said support member for beam bottom formwork.
本発明に係るPCa梁ジョイント部の構築方法の要旨は、前記本発明に係る梁底型枠用支持金具を形成し、プレキャストコンクリート梁を対向させて配設した後に、該対向したプレキャストコンクリート梁のジョイント部における梁下端筋を少なくとも接続し、間隔を置いて並設された前記梁下端筋に跨がって載置させて前記梁底型枠用支持金具を吊持させ、前記梁底型枠用支持金具に梁底型枠を取り付けるとともに該梁底型枠用支持金具を介して前記梁下端筋に梁底型枠を支持させ、前記ジョイント部の左右側方に梁側型枠を取り付けて支持させ、前記ジョイント部の梁底型枠および梁側型枠で形成される型枠内にコンクリートを打設することである。 The gist of the construction method of the PCa beam joint portion according to the present invention is to form the beam-bottom formwork support bracket according to the present invention, arrange the precast concrete beams facing each other, and then arrange the facing precast concrete beams. The beam bottom formwork is formed by connecting at least the beam bottom reinforcement in the joint portion and placing the beam bottom formwork support brackets on the beam bottom reinforcement arranged in parallel with a gap therebetween. A beam bottom mold is attached to the support bracket for the beam, and the beam bottom mold is supported by the beam bottom reinforcement via the beam bottom mold support bracket, and the beam side mold is attached to the left and right sides of the joint portion. It is made to support, and concrete is cast in the form formed by the beam bottom formwork and the beam side formwork of the joint part.
本発明の梁底型枠用支持金具と、PCa梁ジョイント部の構造とその構築方法によれば、梁底型枠を梁底型枠用支持金具を介して梁下端筋で支持して、従来の支保工が不要となるので、型枠工事の作業工程を短縮して労務不足への対応が可能となり、結果的に全体工程の短縮に貢献すると言う優れた効果を奏するものである。 According to the beam-bottom formwork support bracket, the structure of the PCa beam joint and the construction method thereof according to the present invention, the beam-bottom formwork is supported by the beam lower end bar via the beam-bottom formwork support bracket. Therefore, the work process of the formwork can be shortened to cope with labor shortage, resulting in an excellent effect of contributing to the shortening of the entire process.
図1に示すように、本発明に係る梁底型枠用支持金具1を梁下端筋4に吊持させて、梁底型枠6を支持させるようにしたものである。
As shown in FIG. 1, a beam bottom mold support 1 according to the present invention is suspended from a beam
前記梁底型枠用支持金具1は、図2(A),(B)に示すように、PCa梁(図4参照)13,13のセンタージョイント部における、間隙を置いて並設された梁下端筋4,4に跨がって吊持されるように形成されたコ字形のセパレーター筋2と、該セパレーター筋2の端部に螺着された型枠受け用の型枠受用ナット3とからなる。
As shown in FIGS. 2 (A) and 2 (B), the beam bottom mold support bracket 1 is a beam arranged in parallel with a gap in the center joint portion of the PCa beams (see FIG. 4) 13 and 13. A U-shaped
前記セパレーター筋2は、コ字形に形成されて、隣接する前記梁下端筋4,4に跨がって載置されるが、図1に示すように、隣接する2本の梁下端筋ばかりで無く、間に1本若しくは複数本の梁下端筋を置いて、その両側の梁下端筋4,4に跨がって掛けるような大きさのコ字形に形成しても良い。
The
前記型枠受用ナット3は、例えば、Pコーンや六角座金などである。これは、コンクリート体表面の仕上げの相違により選択されるものである。
The
上記梁底型枠用支持金具1を使用したセンタージョイント部の構造は、図1乃至図2(A),(B)に示すように、機械式継手(図示せず)などの接続手段で接続された梁下端筋4,4に跨がって吊持され、前記梁底型枠用支持金具1が前記梁下端筋4の接続方向(長手方向)に適宜間隔を置いて配置される。図3に示すように、前記梁底型枠用支持金具1による型枠受用ナット3の撤去跡11aには、充填材12が充填されている。
As shown in FIGS. 1 to 2A and 2B, the structure of the center joint portion using the beam bottom mold support 1 is connected by a connecting means such as a mechanical joint (not shown). The beam bottom formwork support bracket 1 is hung across the beam
また、このセンタージョイント部の形成方法としては、例えば、図2に示す前記梁底型枠用支持金具1を形成する。PCa梁13,13を対向させて柱等に架設し支保工で支持させた後に、該対向したPCa梁13,13のセンタージョイント部における梁上端筋、梁下端筋4を機械式継手などで接続して配筋する。
Moreover, as a formation method of this center joint part, for example, the beam-bottom mold support bracket 1 shown in FIG. 2 is formed. After the PCa beams 13 and 13 are opposed to each other and installed on a pillar and supported by a support, the beam upper and
間隔を置いて並設された前記梁下端筋4,4に跨がって載置させて前記梁底型枠用支持金具1を、例えば2箇所から3箇所に吊持させる。型枠受用ナット3が、Pコーンであれば該Pコーンに、フォームタイ(登録商標)3bにおけるねじ棒3aを螺着させて、該ねじ棒3aとPコーンの型枠受用ナット3とを、セパレーター筋2の端部のネジ部に螺着させる。
The beam-bottom form support bracket 1 is suspended from, for example, two to three by placing the beam bottom struts 4 and 4 arranged side by side at intervals. If the
前記梁底型枠用支持金具1に梁底型枠6を取り付けて、端太材7を互いに直交させて支持させて、フォームタイ(登録商標)3bにおける締付金具8とナット9とで固定する。
The beam-bottom mold 6 is attached to the beam-bottom mold support bracket 1, and the end
次に、図1に示すように、前記センタージョイント部の左右側方に梁側型枠10を取り付けて支持させる。なお、前記梁底型枠6と梁側型枠10とは、いずれが先に構築されても良く、特にその順番を限定するものではない。そして、PCa梁13の対向した端面と、前記センタージョイント部の梁底型枠6および梁側型枠10,10で形成される型枠内にコンクリートを打設する。
Next, as shown in FIG. 1, a beam-
図3に示すように、前記打設したコンクリート11が所要の強度を発現したら、梁底・梁側の型枠6,10をそれぞれ撤去する。そして、前記梁底型枠用支持金具1の型枠受用ナット3であるPコーンの凹部状の撤去跡11aに、モルタル等の充填材12を充填する。
As shown in FIG. 3, when the cast concrete 11 exhibits the required strength, the beam bottom and
このように、PCa梁ジョイント部の構築方法によってセンタージョイント部が構築される。このセンタージョイント部においては、その下に支保工15が設置されないので、作業員の移動・通過および資材搬入出作業が容易となり、前記支保工15の設置作業、撤去作業も不要となる。
Thus, the center joint part is constructed by the construction method of the PCa beam joint part. In the center joint portion, the
1 梁底型枠用支持金具、
2 セパレーター筋、
3 型枠受用ナット、 3a ねじ棒、
3b フォームタイ(登録商標)、
4 梁下端筋、
5 あばら筋(スターラップ)、
6 梁底型枠、
7 端太材、
8 締付金具、
9 ナット、
10 梁側型枠、
11 コンクリート、
11a 撤去跡、
12 充填材、
13 PCa梁、
14 型枠、
15 支保工(サポート)、
16 スラブ。
1 Support bracket for beam bottom formwork,
2 Separator streaks,
3 Formwork receiving nut, 3a Screw rod,
3b Form tie (registered trademark),
4 Beam bottom reinforcement,
5 Stirrup, stirrup
6 Beam bottom formwork,
7 End thick wood,
8 Fastening bracket,
9 nuts,
10 Beam side formwork,
11 Concrete,
11a Removal trace,
12 Filler,
13 PCa beams,
14 formwork,
15 Support work (support),
16 Slab.
Claims (3)
前記セパレーター筋の端部に螺着された型枠受け用のナットとからなること、
を特徴とする梁底型枠用支持金具。 In the joint part of the precast concrete beam, a U-shaped separator bar formed so as to be suspended across the beam lower bar lined in parallel with a gap,
A nut for receiving a mold screwed to an end of the separator line,
Supporting bracket for beam bottom formwork characterized by
を特徴とするPCa梁ジョイント部の構造。 In the joint part of the precast concrete beam, the beam bottom formwork support metal fitting according to claim 1 is arranged in the connection direction at an appropriate interval and suspended from the beam lower end bars connected by the connection means, and the beam Filler is filled in the removed part of the nut by the support bracket for the bottom mold,
PCa beam joint structure characterized by
プレキャストコンクリート梁を対向させて配設した後に、
該対向したプレキャストコンクリート梁のジョイント部における梁下端筋を少なくとも接続し、
間隔を置いて並設された前記梁下端筋に跨がって載置させて前記梁底型枠用支持金具を吊持させ、
前記梁底型枠用支持金具に梁底型枠を取り付け該梁底型枠用支持金具を介して前記梁下端筋に梁底型枠を支持させ、
前記ジョイント部の左右側方に梁側型枠を取り付けて支持させ、
前記ジョイント部の梁底型枠および梁側型枠で形成される型枠内にコンクリートを打設すること、
を特徴とするPCa梁ジョイント部の構築方法。 Forming the beam bottom formwork support bracket according to claim 1,
After placing precast concrete beams facing each other,
Connecting at least the beam bottom bars in the joints of the opposed precast concrete beams;
The beam-bottom formwork support bracket is suspended by placing it across the beam lower end bars arranged in parallel at intervals,
The beam bottom mold is attached to the beam bottom mold support bracket, and the beam bottom mold is supported by the beam bottom line via the beam bottom mold support bracket.
Attach and support the beam-side formwork on the left and right sides of the joint,
Placing concrete in a mold formed by a beam bottom mold and a beam side mold of the joint part;
The construction method of the PCa beam joint part characterized by these.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015000844A JP6379045B2 (en) | 2015-01-06 | 2015-01-06 | Structure of beam-bottom formwork support bracket and PCa beam joint and its construction method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015000844A JP6379045B2 (en) | 2015-01-06 | 2015-01-06 | Structure of beam-bottom formwork support bracket and PCa beam joint and its construction method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2016125287A true JP2016125287A (en) | 2016-07-11 |
JP6379045B2 JP6379045B2 (en) | 2018-08-22 |
Family
ID=56359060
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2015000844A Active JP6379045B2 (en) | 2015-01-06 | 2015-01-06 | Structure of beam-bottom formwork support bracket and PCa beam joint and its construction method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6379045B2 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2017222060A1 (en) | 2016-06-24 | 2017-12-28 | 矢崎総業株式会社 | Vehicle circuit structure |
CN108222266A (en) * | 2018-01-23 | 2018-06-29 | 宁波建工工程集团有限公司 | Steel Reinforced Concrete Composite Beams hang mould pouring construction structure and its construction method |
DE112017003145T5 (en) | 2016-06-24 | 2019-03-14 | Yazaki Corporation | VEHICLE CIRCUIT STRUCTURE |
DE112017003155T5 (en) | 2016-06-24 | 2019-03-14 | Yazaki Corporation | CIRCUIT BODY FOR VEHICLE |
DE112017003126T5 (en) | 2016-06-24 | 2019-05-09 | Yazaki Corporation | Vehicle circuit structure |
JP2020133300A (en) * | 2019-02-21 | 2020-08-31 | 三井ホームコンポーネント株式会社 | Anchor installation frame and beam construction method |
CN114135038A (en) * | 2021-11-26 | 2022-03-04 | 江西建邦建设集团有限公司 | Steel bar truss building carrier plate with supporting seat |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5153715U (en) * | 1974-10-21 | 1976-04-24 | ||
JPS5940U (en) * | 1982-06-21 | 1984-01-05 | 日綜産業株式会社 | Installation device for large pull members in shoring |
JPH06317015A (en) * | 1993-05-10 | 1994-11-15 | Fujita Corp | Method of assembling beam formwork |
JPH07292855A (en) * | 1994-04-25 | 1995-11-07 | Maeda Corp | Steel encased reinforcing concrete girder |
JPH10325173A (en) * | 1997-05-27 | 1998-12-08 | Kobayashi Jun | Construction method of beam, beam formwork device, and cap for side plate |
-
2015
- 2015-01-06 JP JP2015000844A patent/JP6379045B2/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5153715U (en) * | 1974-10-21 | 1976-04-24 | ||
JPS5940U (en) * | 1982-06-21 | 1984-01-05 | 日綜産業株式会社 | Installation device for large pull members in shoring |
JPH06317015A (en) * | 1993-05-10 | 1994-11-15 | Fujita Corp | Method of assembling beam formwork |
JPH07292855A (en) * | 1994-04-25 | 1995-11-07 | Maeda Corp | Steel encased reinforcing concrete girder |
JPH10325173A (en) * | 1997-05-27 | 1998-12-08 | Kobayashi Jun | Construction method of beam, beam formwork device, and cap for side plate |
Cited By (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE112017003121T5 (en) | 2016-06-24 | 2019-05-09 | Yazaki Corporation | Vehicle circuit structure |
DE112017003153T5 (en) | 2016-06-24 | 2019-03-14 | Yazaki Corporation | VEHICLE CIRCUIT STRUCTURE |
WO2017222060A1 (en) | 2016-06-24 | 2017-12-28 | 矢崎総業株式会社 | Vehicle circuit structure |
DE112017003140T5 (en) | 2016-06-24 | 2019-02-28 | Yazaki Corporation | Vehicle circuit structure |
DE112017003126T5 (en) | 2016-06-24 | 2019-05-09 | Yazaki Corporation | Vehicle circuit structure |
DE112017003145T5 (en) | 2016-06-24 | 2019-03-14 | Yazaki Corporation | VEHICLE CIRCUIT STRUCTURE |
DE112017003155T5 (en) | 2016-06-24 | 2019-03-14 | Yazaki Corporation | CIRCUIT BODY FOR VEHICLE |
DE112017003134B4 (en) | 2016-06-24 | 2023-03-16 | Yazaki Corporation | VEHICLE CIRCUIT STRUCTURE |
DE112017003121B4 (en) | 2016-06-24 | 2023-03-09 | Yazaki Corporation | vehicle circuit structure |
WO2017222059A1 (en) | 2016-06-24 | 2017-12-28 | 矢崎総業株式会社 | Vehicle circuit structure |
DE112017003134T5 (en) | 2016-06-24 | 2019-04-04 | Yazaki Corporation | VEHICLE CIRCUIT STRUCTURE |
DE112017003153B4 (en) | 2016-06-24 | 2023-02-02 | Yazaki Corporation | VEHICLE CIRCUIT STRUCTURE |
DE112017003155B4 (en) | 2016-06-24 | 2023-01-19 | Yazaki Corporation | CIRCUIT BODY FOR VEHICLE |
CN108222266A (en) * | 2018-01-23 | 2018-06-29 | 宁波建工工程集团有限公司 | Steel Reinforced Concrete Composite Beams hang mould pouring construction structure and its construction method |
JP7195175B2 (en) | 2019-02-21 | 2022-12-23 | 三井ホームコンポーネント株式会社 | Anchor installation frame, anchor assembly and beam construction method |
JP2020133300A (en) * | 2019-02-21 | 2020-08-31 | 三井ホームコンポーネント株式会社 | Anchor installation frame and beam construction method |
CN114135038A (en) * | 2021-11-26 | 2022-03-04 | 江西建邦建设集团有限公司 | Steel bar truss building carrier plate with supporting seat |
Also Published As
Publication number | Publication date |
---|---|
JP6379045B2 (en) | 2018-08-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6379045B2 (en) | Structure of beam-bottom formwork support bracket and PCa beam joint and its construction method | |
CN105888108B (en) | Built-in positioning prefabricated component reinforced concrete shear wall and construction method | |
KR101327781B1 (en) | Expansion joint having length-adjustable anchors and method for installing the same | |
KR20180045140A (en) | The structure of non-binding dismantling formwork beams and deck plates without the need to secure jobs | |
JP2013530322A (en) | REINFORCING METHOD AND REINFORCING DEVICE FOR REINFORCING AND WEIGHTING FLOOR AND ROOF FRAME STRUCTURE | |
CN108678193B (en) | Post-cast strip and construction method thereof | |
JP2008127873A (en) | Block out flask, and recess forming method using the same | |
CN103603491A (en) | Beam plate post-cast strip template support frame and erection method thereof | |
CN106285002A (en) | Cast-in-place walls difference of height tool-type hoisting die construction method | |
JP2014190116A (en) | Construction method of concrete slab | |
JP6310362B2 (en) | A hanging bracket that fixes the floor slab formwork to the main girder. | |
CN105297957A (en) | Prefabricated filled wallboard and mounting method thereof | |
CN103291000A (en) | Tool type steel bar support and construction method for suspending floor slab hogging-moment steel bars | |
JP4025793B2 (en) | Reinforcing methods and structures for concrete structures. | |
JP6473670B2 (en) | Structural restoration method | |
CN104878926A (en) | Suspended template system construction method and turnover brackets | |
KR200466393Y1 (en) | Pre-setting apparatus for expansion joint | |
KR101303547B1 (en) | Arrangement apparatus make straight the lower part of aluminium form for revetment | |
JP2019044362A (en) | Construction method of src beam and formwork support structure of src beam | |
CN105442628A (en) | Construction method for cantilever foundation side wall heavy embedded part | |
JP6529379B2 (en) | Invert formwork | |
JP7371315B2 (en) | Precast floor slab construction method | |
JP6471056B2 (en) | Structural restoration method | |
KR20160000005A (en) | reinforcing expansion joint for wide concrete slab by using steel plate and reinforcing method of construction using the same for wide concrete slab | |
KR20140140954A (en) | Steel concrete composite girder bridge and construction method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20170830 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20180627 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20180703 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180730 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6379045 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |