CN105297957A - Prefabricated filled wallboard and mounting method thereof - Google Patents

Prefabricated filled wallboard and mounting method thereof Download PDF

Info

Publication number
CN105297957A
CN105297957A CN201510652109.8A CN201510652109A CN105297957A CN 105297957 A CN105297957 A CN 105297957A CN 201510652109 A CN201510652109 A CN 201510652109A CN 105297957 A CN105297957 A CN 105297957A
Authority
CN
China
Prior art keywords
panel
prefabricated
wallboard
hole
filled
Prior art date
Application number
CN201510652109.8A
Other languages
Chinese (zh)
Inventor
吴晓东
赵业荣
丁二虎
叶庆德
刘云鹏
Original Assignee
安徽同济建设集团有限责任公司
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 安徽同济建设集团有限责任公司 filed Critical 安徽同济建设集团有限责任公司
Priority to CN201510652109.8A priority Critical patent/CN105297957A/en
Publication of CN105297957A publication Critical patent/CN105297957A/en

Links

Abstract

The invention provides a prefabricated filled wallboard and a mounting method thereof. A plurality of holes are formed in a wall of the wallboard, a distance between the edge of each hole and the edge of the wallboard is at least 20 mm, embedded parts are arranged in the wall, a distance between each embedded part and the edge of each hole is at least 30 mm, and two outer sides, along the length direction, of the wallboard are provided with convex blocks and concave grooves matched with the convex blocks respectively. The mounting method includes: hoisting the prefabricated filled wallboard to a mounting position of a structural floor slab by hoisting the embedded parts on the prefabricated filled wallboard, and arranging a wood wedge at a position where the prefabricated filled wallboard contacts with the structural floor slab; connecting the prefabricated filled wallboard with the structural floor slab through an inclined strut; filling cement mortar at a position where the prefabricated filled wallboard is connected with the structural floor slab to enable the bottom of the prefabricated filled wallboard to be bedded thoroughly, and removing the wood wedge after strength of the cement mortar meets requirements to complete mounting of the prefabricated filled wallboard. By the prefabricated filled wallboard, the problem that an existing filled wallboard is high in mounting cost and the problem that a joint between the filled wallboard and a main structure cannot be treated reliably after the filled wallboard is mounted are solved.

Description

Prefabricated filled-in panel and mounting method thereof
Technical field
The invention belongs to building wall board technical field, be specifically related to a kind of prefabricated filled-in panel and mounting method thereof.
Background technology
In current building industry modernization, infilled wall carries out after main structure construction completes.Prefabricated filled-in panel is transported to each work plane by people's goods elevator, manpower, installs and is spliced to form filled wall.Because be subject to the restriction of means of transportation and mounting means, the construction cost of filled wall and construction quality are difficult to be controlled.Mainly there is following problem: 1. filled-in panel need through repeatedly having bad luck, and just can be transported to the scope of operation, cost of transportation is higher, and prefabricated panel easily causes damage in transportation; 2. the size of filled-in panel is restricted, and rely on manpower to install completely, installation cost is very high; 3. the seam between filled-in panel and agent structure cannot reliable treatments, there is major quality hidden danger; 4. the size of filled-in panel is limited, and cause the piece between a large amount of prefabricated panel to need process, installation cost is higher.
Summary of the invention
High for solving existing filled-in panel installation cost, after installing, seam between filled-in panel and agent structure cannot the problem such as reliable treatments, the present invention proposes a kind of prefabricated filled-in panel, this prefabricated panel by presetting embedded part in body of wall, facilitate wallboard and by lifting mode prefabricated panel be transported to the position needing to install, then by the lower installing hole above prefabricated panel can easily by this wall-panels supports on structure floor.
Technical scheme of the present invention is achieved in that
A kind of prefabricated filled-in panel, some holes are provided with in the body of wall of described wallboard, panel edges at least 20mm described in the Edge Distance of described hole, also embedded part is provided with in described body of wall, the edge at least 30mm of described embedded part distance described hole, described wallboard along its length two outside the groove that is respectively arranged with projection and matches with described projection; The length of described hole all extends along the short transverse of described wallboard; Also be provided with installing hole and lower installing hole in described body of wall, described upper installing hole and described lower installing hole all pass described body of wall along the width of described wallboard.
Further, some described holes discharge a row along the length direction of described wallboard, and be embedded with gauze wire cloth in the described body of wall between described hole and described panel edges, described gauze wire cloth is arranged along the length direction of described wallboard.
Further, some described holes discharge two rows along the length direction of described wallboard, are respectively first row hole and second row hole; Be embedded with gauze wire cloth in described body of wall between described hole and described panel edges, be also provided with described gauze wire cloth between described first row hole and described second row hole, described gauze wire cloth is arranged along the length direction of described wallboard.
Another object of the present invention is to provide a kind of mounting method of prefabricated infill panel, comprises the following steps:
1) first by the embedded part on hoisting prefabricated filled-in panel, prefabricated filled-in panel lifting is needed to structure floor the position of installing, and the bottom of prefabricated filled-in panel and structure floor contact site are provided with timber wedge, adjust prefabricated filled-in panel to elevation location and check guarantee that verticality meets the requirements;
2) then by bolt, channel-section steel is fixed on the lower installing hole of described prefabricated filled-in panel, described structure floor is provided with structure floor embedded part, and on described structure floor embedded part correspondence position positioning marking, welding full flight screw, by diagonal brace, described prefabricated infill panel is connected with described structure floor, one end of described diagonal brace is connected with described channel-section steel, and its other end is connected with described full flight screw;
3) at described prefabricated infill panel and described structure floor junction filling concrete mortar, described prefabricated filled-in panel base part seat slurry is enriched, after strength of cement mortar meets the demands, then removes described timber wedge, namely complete the installation of described prefabricated infill panel.
Further, binding reinforcing bars is carried out at the top being also included in described prefabricated filled-in panel and construction formwork is installed.
Further, by the part exposing body of wall of described embedded part together with reinforcing bar binding, the upper installing hole of described prefabricated filled-in panel is provided with Screw arbor with nut at both-ends, by described Screw arbor with nut at both-ends, described construction formwork is installed the top of described prefabricated panel.
Prefabricated panel of the present invention, by presetting embedded part in body of wall, is facilitated wallboard and by lifting mode prefabricated panel is transported to the position needing to install, then by the lower installing hole above prefabricated panel can easily by this wall-panels supports on structure floor.Further, the channel-section steel that the lower installing hole of prefabricated panel of the present invention is fixedly installed above can play the effect of baffle plate, after after first prefabricated filled-in panel is installed, second prefabricated filled-in panel only need be winched to described installation position by embedded part by second prefabricated filled-in panel following closely when mounted, owing to there being the supporting role of the first prefabricated filled-in panel, diagonal brace and structure floor is now no longer needed to support.
Accompanying drawing explanation
In order to be illustrated more clearly in the embodiment of the present invention or technical scheme of the prior art, be briefly described to the accompanying drawing used required in embodiment or description of the prior art below, apparently, accompanying drawing in the following describes is only some embodiments of the present invention, for those of ordinary skill in the art, under the prerequisite not paying creative work, other accompanying drawing can also be obtained according to these accompanying drawings.
Fig. 1 is the top view of the prefabricated filled-in panel of embodiment 1;
Fig. 2 is the A-A sectional view of Fig. 1;
Fig. 3 is the B-B sectional view of Fig. 1;
Fig. 4 is the top view of the prefabricated filled-in panel of embodiment 2;
Fig. 5 is prefabricated infill panel scheme of installation.
Accompanying drawing indicates: 1, body of wall, and 2, hole, 3, embedded part, 4, gauze wire cloth, 5, upper installing hole, 6, lower installing hole, 7, projection, 8, groove, 101, structure floor, 102, timber wedge, 103, channel-section steel, 104, structure floor embedded part, 105, full flight screw, 106, diagonal brace, 107, Screw arbor with nut at both-ends, 108, construction formwork.
Detailed description of the invention
Below in conjunction with the accompanying drawing in the embodiment of the present invention, be clearly and completely described the technical scheme in the embodiment of the present invention, obviously, described embodiment is only the present invention's part embodiment, instead of whole embodiments.Based on the embodiment in the present invention, those of ordinary skill in the art, not making the every other embodiment obtained under creative work prerequisite, belong to the scope of protection of the invention.
Embodiment 1
Referring to figs. 1 through 3, a kind of prefabricated filled-in panel, is provided with 5 holes 2 in the body of wall 1 of wallboard.These 5 holes 2 discharge a row along the length direction of wallboard, and the Edge Distance panel edges of hole 2 is 25mm-35mm.The length of hole 2 all extends along the short transverse of wallboard.Be embedded with gauze wire cloth 4 in body of wall 1 between hole 2 and panel edges, this gauze wire cloth 4 is arranged along the length direction of wallboard.Also be provided with embedded part 3 in body of wall 1, embedded part 3 is 35mm-40mm apart from the edge of hole 2.Wallboard along its length two outside the groove 8 that is respectively arranged with projection 7 and matches with projection 7.Installing hole 5 and lower installing hole 6 is also provided with in body of wall 1.Upper installing hole 5 and lower installing hole 6 all pass body of wall 1 along the width of wallboard.
Embodiment 2
With reference to Fig. 4, identical with the prefabricated filled-in panel structure of embodiment 1, difference is: the quantity of hole 2 is 14, and is divided into 2 row's arrangements, is respectively first row hole and second row hole.Also described gauze wire cloth 4 is provided with between first row hole and second row hole.
The mounting method of prefabricated filled-in panel:
With reference to Fig. 5, comprise the following steps:
1) first by the embedded part 3 on hoisting prefabricated filled-in panel, prefabricated filled-in panel lifting is needed to structure floor 101 position of installing, and the bottom of prefabricated filled-in panel and structure floor 101 contact site are provided with timber wedge 102, adjust prefabricated filled-in panel to elevation location and check guarantee that verticality meets the requirements;
2) then by bolt, channel-section steel 103 is fixed on the lower installing hole 6 of prefabricated filled-in panel, structure floor 101 is provided with structure floor embedded part 104, and on structure floor embedded part 104 correspondence position positioning marking, welding full flight screw 105, by diagonal brace 106, prefabricated infill panel is connected with structure floor 101, one end of diagonal brace 106 is connected with channel-section steel 103, and its other end is connected with full flight screw 105;
3) at prefabricated infill panel and structure floor 101 junction filling concrete mortar, prefabricated filled-in panel base part seat is starched and enriches, after strength of cement mortar meets the demands, then remove timber wedge 102, namely complete the installation of prefabricated infill panel.
Further, by the part exposing body of wall of embedded part 3 together with reinforcing bar binding, the upper installing hole 5 of prefabricated filled-in panel is provided with Screw arbor with nut at both-ends 107, by Screw arbor with nut at both-ends 107, construction formwork 108 is installed the top of prefabricated panel.After construction formwork 108 installation, carry out concrete building, and carry out maintenance in time.
The foregoing is only preferred embodiment of the present invention, not in order to limit the present invention, within the spirit and principles in the present invention all, any amendment done, equivalent replacement, improvement etc., all should be included within protection scope of the present invention.

Claims (6)

1. a prefabricated filled-in panel, it is characterized in that, some holes are provided with in the body of wall of described wallboard, panel edges at least 20mm described in the Edge Distance of described hole, also embedded part is provided with in described body of wall, the edge at least 30mm of described embedded part distance described hole, described wallboard along its length two outside the groove that is respectively arranged with projection and matches with described projection; The length of described hole all extends along the short transverse of described wallboard; Also be provided with installing hole and lower installing hole in described body of wall, described upper installing hole and described lower installing hole all pass described body of wall along the width of described wallboard.
2. prefabricated filled-in panel according to claim 1, it is characterized in that, some described holes discharge a row along the length direction of described wallboard, and be embedded with gauze wire cloth in the described body of wall between described hole and described panel edges, described gauze wire cloth is arranged along the length direction of described wallboard.
3. prefabricated filled-in panel according to claim 1, is characterized in that, some described holes discharge two rows along the length direction of described wallboard, are respectively first row hole and second row hole; Be embedded with gauze wire cloth in described body of wall between described hole and described panel edges, be also provided with described gauze wire cloth between described first row hole and described second row hole, described gauze wire cloth is arranged along the length direction of described wallboard.
4. the mounting method of the prefabricated filled-in panel as described in claims 1 to 3, is characterized in that, comprise the following steps:
1) first by the embedded part on hoisting prefabricated filled-in panel, prefabricated filled-in panel lifting is needed to structure floor the position of installing, and the bottom of prefabricated filled-in panel and structure floor contact site are provided with timber wedge, adjust prefabricated filled-in panel to elevation location and check guarantee that verticality meets the requirements;
2) then by bolt, channel-section steel is fixed on the lower installing hole of described prefabricated filled-in panel, described structure floor is provided with structure floor embedded part, and on described structure floor embedded part correspondence position positioning marking, welding full flight screw, by diagonal brace, described prefabricated infill panel is connected with described structure floor, one end of described diagonal brace is connected with described channel-section steel, and its other end is connected with described full flight screw;
3) at described prefabricated infill panel and described structure floor junction filling concrete mortar, described prefabricated filled-in panel base part seat slurry is enriched, after strength of cement mortar meets the demands, then removes described timber wedge, namely complete the installation of described prefabricated infill panel.
5. the mounting method of prefabricated filled-in panel according to claim 4, is characterized in that, binding reinforcing bars is carried out at the top being also included in described prefabricated filled-in panel and construction formwork is installed.
6. the mounting method of prefabricated filled-in panel according to claim 5, it is characterized in that, by the part exposing body of wall of described embedded part together with reinforcing bar binding, the upper installing hole of described prefabricated filled-in panel is provided with Screw arbor with nut at both-ends, by described Screw arbor with nut at both-ends, described construction formwork is installed the top of described prefabricated panel.
CN201510652109.8A 2015-10-08 2015-10-08 Prefabricated filled wallboard and mounting method thereof CN105297957A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201510652109.8A CN105297957A (en) 2015-10-08 2015-10-08 Prefabricated filled wallboard and mounting method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201510652109.8A CN105297957A (en) 2015-10-08 2015-10-08 Prefabricated filled wallboard and mounting method thereof

Publications (1)

Publication Number Publication Date
CN105297957A true CN105297957A (en) 2016-02-03

Family

ID=55195708

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201510652109.8A CN105297957A (en) 2015-10-08 2015-10-08 Prefabricated filled wallboard and mounting method thereof

Country Status (1)

Country Link
CN (1) CN105297957A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105587128A (en) * 2016-02-22 2016-05-18 北京六建集团有限责任公司 Special fixture for mounting wallboard with heat insulation structure and mounting method for first-layer wallboard with heat insulation structure
CN107447890A (en) * 2017-09-10 2017-12-08 中国二十二冶集团有限公司 Wall is integral prefabricated inside assembly concrete shear wall structure and construction method
CN109138447A (en) * 2018-10-11 2019-01-04 厦门市建筑科学研究院集团股份有限公司 The method that a kind of installation of vertical member and horizontal joint sit slurry

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2268071Y (en) * 1996-12-18 1997-11-19 张昆仑 Prefabricated hollow ribbed wallboard
CN2616597Y (en) * 2003-05-29 2004-05-19 张启俭 Embedded light partition board
US20120222384A1 (en) * 2004-07-15 2012-09-06 Thermoformed Block Corp. System for the Placement of Modular Fill Material Forming Co-Joined Assemblies
CN102791936A (en) * 2010-05-20 2012-11-21 日本环境制造株式会社 Building unit for concrete structure and method of executing construction using said building unit
US20130333316A1 (en) * 2012-06-19 2013-12-19 Jesse Westaby Form System With Lath Covering
CN104652830A (en) * 2015-01-27 2015-05-27 安徽同济建设集团有限责任公司 Construction method for building of prefabricated slab floor and prefabricated wall plate
CN204676879U (en) * 2015-04-02 2015-09-30 中国建筑第八工程局有限公司 Model sheetinstallat structure
CN205116552U (en) * 2015-10-08 2016-03-30 安徽同济建设集团有限责任公司 Prefabricated wallboard of packing

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2268071Y (en) * 1996-12-18 1997-11-19 张昆仑 Prefabricated hollow ribbed wallboard
CN2616597Y (en) * 2003-05-29 2004-05-19 张启俭 Embedded light partition board
US20120222384A1 (en) * 2004-07-15 2012-09-06 Thermoformed Block Corp. System for the Placement of Modular Fill Material Forming Co-Joined Assemblies
CN102791936A (en) * 2010-05-20 2012-11-21 日本环境制造株式会社 Building unit for concrete structure and method of executing construction using said building unit
US20130333316A1 (en) * 2012-06-19 2013-12-19 Jesse Westaby Form System With Lath Covering
CN104652830A (en) * 2015-01-27 2015-05-27 安徽同济建设集团有限责任公司 Construction method for building of prefabricated slab floor and prefabricated wall plate
CN204676879U (en) * 2015-04-02 2015-09-30 中国建筑第八工程局有限公司 Model sheetinstallat structure
CN205116552U (en) * 2015-10-08 2016-03-30 安徽同济建设集团有限责任公司 Prefabricated wallboard of packing

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
宋玉普: "《全国一、二级注册结构工程师专业考试教程》", 28 February 2013, 机械工业出版社 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105587128A (en) * 2016-02-22 2016-05-18 北京六建集团有限责任公司 Special fixture for mounting wallboard with heat insulation structure and mounting method for first-layer wallboard with heat insulation structure
CN107447890A (en) * 2017-09-10 2017-12-08 中国二十二冶集团有限公司 Wall is integral prefabricated inside assembly concrete shear wall structure and construction method
CN109138447A (en) * 2018-10-11 2019-01-04 厦门市建筑科学研究院集团股份有限公司 The method that a kind of installation of vertical member and horizontal joint sit slurry

Similar Documents

Publication Publication Date Title
WO2016129826A1 (en) Safety-enhanced pc truss wall structure, and underground-structure construction method using same
CN202227476U (en) High-altitude large-span overhung corridor-type reinforced concrete structure
CN102444203A (en) High-altitude long-span overhanging corridor type reinforced concrete structure and construction method
CN103741792A (en) Whole assembly frame system and construction method thereof
GB2115031A (en) Cast floors
CN102713106B (en) Method and device for strengthening and lightening floor and roof framing
CN104453197B (en) High Large Cantilever concrete structural steel shape supports platform
CN103089004A (en) Combination frame module, component frame module and tool set structure and installing and dismantling method thereof
CN203867216U (en) Detachable steel frame supporting structure for ultra-high-rise building cantilevered plate
CN105464244A (en) Prefabricated integrated shear wall construction method
CN105152032A (en) Installing method for bridge crane in enclosed environment workshop
CN102392536B (en) Construction method for long-span hanging vestibule type template support system
CN103711201A (en) Large-span prestressed concrete beam board frame structural system
CN105888108B (en) Built-in positioning prefabricated component reinforced concrete shear wall and construction method
CN102635128A (en) Foundation slab post-cast strip waterproof steel plate combined structure and bracing method thereof
ES2350191T3 (en) Prelosa autoportante.
JP2008274637A (en) Construction method for continuous viaduct
CN102134907B (en) Construction method of steel bar truss floor support plate
JP2019526004A (en) Precast concrete formwork, floor system, and construction method
CN205875473U (en) Built -in location prefab reinforced concrete shear wall
CN104895314A (en) Truss platform for high and large space top plate concrete construction
CN101781878B (en) Integral lifting template of main pylon of single-pylon cable-stayed bridge without dorsal cables and lifting construction method thereof
US9506266B2 (en) Concrete deck with lateral force resisting system
CN103469949A (en) Prefabricated composite floor slab and floor slab layer as well as construction method
CN107090975B (en) Formwork erecting construction method for ultrahigh large-span concrete cast-in-place beam bailey truss

Legal Events

Date Code Title Description
PB01 Publication
C06 Publication
SE01 Entry into force of request for substantive examination
C10 Entry into substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20160203

RJ01 Rejection of invention patent application after publication