JP2016017900A - Method of exploring ahead of tunnel face - Google Patents
Method of exploring ahead of tunnel face Download PDFInfo
- Publication number
- JP2016017900A JP2016017900A JP2014142040A JP2014142040A JP2016017900A JP 2016017900 A JP2016017900 A JP 2016017900A JP 2014142040 A JP2014142040 A JP 2014142040A JP 2014142040 A JP2014142040 A JP 2014142040A JP 2016017900 A JP2016017900 A JP 2016017900A
- Authority
- JP
- Japan
- Prior art keywords
- vibration
- drill bit
- geophone
- drilling
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 30
- 238000005553 drilling Methods 0.000 claims abstract description 37
- 238000004458 analytical method Methods 0.000 claims abstract description 5
- 239000002245 particle Substances 0.000 claims abstract description 5
- 230000010355 oscillation Effects 0.000 claims description 10
- 238000004364 calculation method Methods 0.000 claims description 5
- 230000001133 acceleration Effects 0.000 description 7
- 238000009412 basement excavation Methods 0.000 description 2
- 239000002131 composite material Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000002360 preparation method Methods 0.000 description 2
- 230000000644 propagated effect Effects 0.000 description 2
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000000470 constituent Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 238000011002 quantification Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
- 230000002194 synthesizing effect Effects 0.000 description 1
Images
Landscapes
- Geophysics And Detection Of Objects (AREA)
Abstract
Description
本発明は、トンネル切羽前方探査方法に関する。 The present invention relates to a tunnel face front search method.
トンネルの施工では、計画や設計の段階において、地表踏査や地表面からの弾性波探査などの地盤調査を実施することで、事前に地山状況の予測を行っている。
ところが、地表面からの事前調査により、線状構造物であるトンネルの地山の状態を完全に把握することは困難であった。
In tunnel construction, ground conditions such as ground reconnaissance and elastic wave exploration from the ground surface are predicted in advance during the planning and design stages.
However, it was difficult to fully understand the state of the ground of the tunnel, which is a linear structure, by conducting a preliminary survey from the ground surface.
そのため、施工段階で切羽から切羽前方探査を行い、断層破砕帯(弱層)の可能性のある箇所の位置を特定する場合がある。
このようなトンネル切羽前方探査として、例えば、特許文献1には、切羽の前方に向けて先進ボーリングを行い、この先進ボーリング掘削時にドリルビットから発生する削孔振動の弾性波を利用する方法が開示されている。
For this reason, there is a case where the front of the face is searched from the face at the construction stage to identify the position of a possible fault crush zone (weak layer).
As such a tunnel face front exploration, for example,
かかるトンネル切羽前方探査では、受振器として3成分受振器を用いて入射方向を特定し、特定された方向の波の振幅を増幅することによって、信号を強調する場合がある。
この場合には、波動のXY成分、YZ成分、XZ成分を直交軸にプロットし、より大きな波の入射方向を、削孔振動による弾性波の入射方向と推定する、いわゆるパーティクルオービットに基づく解析方法を使用することで、入射方向を特定している。
In such a tunnel face front search, a signal may be emphasized by specifying an incident direction using a three-component receiver as a receiver and amplifying the amplitude of a wave in the specified direction.
In this case, the XY component, YZ component, and XZ component of the wave are plotted on the orthogonal axes, and the larger wave incident direction is estimated as the elastic wave incident direction due to drilling vibration. The incident direction is specified by using.
前記トンネル切羽前方探査では、先進ボーリングに使用するボーリングマシンからも振動が発振されている。
そのため、トンネル内またはトンネルの近傍に設けられた受振器は、ドリルビットから発振された削孔振動とともに、トンネル坑内のボーリングマシン等から発振された振動も受振してしまうおそれがある。
In the forward exploration of the tunnel face, vibration is also oscillated from a boring machine used for advanced boring.
Therefore, the geophone provided in the tunnel or in the vicinity of the tunnel may receive vibration generated from a boring machine or the like in the tunnel well as well as drilling vibration generated from the drill bit.
トンネル切羽前方探査において、ボーリングマシン等から発振されたノイズを含んだ状態でパーティクルオービットに基づく解析方法を採用すると、入射方向にずれが生じるおそれがある。 When the analysis method based on the particle orbit is used in the state where the noise is generated from the boring machine or the like in the tunnel front face search, there is a possibility that the incident direction is shifted.
このような観点から、本発明は、ノイズを除去して発振位置から受振器に到達する時間を精度よく求めることができるトンネル切羽前方探査方法を提案することを課題とする。 From such a point of view, an object of the present invention is to propose a tunnel face forward exploration method that can accurately obtain the time to reach the geophone from the oscillation position by removing noise.
前記課題を解決するために、本発明のトンネル切羽前方探査方法は、トンネルの切羽から前方に向けてドリルビットにより削孔するステップと、前記ドリルビットの削孔振動を前記トンネルの側方に配置された受振器により受振するステップと、前記削孔振動が前記受振器に到達する到達時間と前記ドリルビットから前記受振器までの距離とに基づいて弾性波速度を算出するステップとを備えており、前記受振器により受振した振動のパーティクルオービット解析に基づく波形入射ベクトルから、前記ドリルビットの位置から前記受振器の位置へ向う方向の振動成分を算出し、当該振動成分を利用して前記到達時間を算出することを特徴としている。 In order to solve the above problems, a tunnel face forward exploration method of the present invention includes a step of drilling with a drill bit forward from the face of the tunnel, and a drilling vibration of the drill bit arranged on a side of the tunnel. Receiving the vibration by the received geophone, and calculating the elastic wave velocity based on the arrival time for the drilling vibration to reach the geophone and the distance from the drill bit to the geophone. Calculating a vibration component in a direction from the position of the drill bit to the position of the geophone from the waveform incident vector based on the particle orbit analysis of the vibration received by the geophone, and using the vibration component, the arrival time It is characterized by calculating.
かかるトンネル切羽前方探査方法によれば、発振位置と受振位置との幾何学的関係から入射方向を特定するため、弾性波速度を高精度に算出することができる。
そのため、切羽前方の断層破砕帯の位置を高精度に確定することができる。
According to this tunnel face front exploration method, the incident direction is specified from the geometric relationship between the oscillation position and the receiving position, so that the elastic wave velocity can be calculated with high accuracy.
Therefore, the position of the fault crush zone in front of the face can be determined with high accuracy.
前記トンネル切羽前方探査方法は、前記ドリルビットから生じる削孔振動をボーリングマシンに取り付けたパイロットセンサーにより受振するステップをさらに含み、前記ドリルビットの削孔振動が前記受振器に到達するまでの到達時間を、前記パイロットセンサーで受振した波形と前記受振器で受振した波形との間で相互相関処理を行って算出した時間に、前記ドリルビットの削孔振動が前記パイロットセンサーに到達するまでの時間を加えることで算出するようにしてもよい。 The tunnel face front exploration method further includes a step of receiving a drilling vibration generated from the drill bit by a pilot sensor attached to a boring machine, and an arrival time until the drilling vibration of the drill bit reaches the geophone Is calculated by performing a cross-correlation process between the waveform received by the pilot sensor and the waveform received by the geophone, and the time until the drilling vibration of the drill bit reaches the pilot sensor is You may make it calculate by adding.
かかるトンネル切羽前方探査方法によれば、より高精度の弾性波速度を算出することが可能となる。 According to this tunnel face front search method, it is possible to calculate a more accurate elastic wave velocity.
なお、前記振動成分は、式1により算出するのが望ましい。
wR(t)=eB・w(t)=(eBx×wx(t)+eBy×wy(t)+eBz×wz(t))=|w(t)|cosφ(t) ・・・式1
ここで、wR:合成波形ベクトル
eB:削孔ビット方向の単位ベクトル (eBx,eBy,eBz)
w(t):時間tにおける3成分波形ベクトル(wx(t),wy(t),wz(t))
φ(t):ベクトルと波形ベクトルがなす角
Note that the vibration component is preferably calculated by
w R (t) = e B・ w (t) = (e B x × wx (t) + e B y × wy (t) + e B z × wz (t)) = | w (t) | cosφ (t )
Where w R : composite waveform vector
e B : Unit vector in the drilling bit direction (e B x, e B y, e B z)
w (t): Three-component waveform vector at time t (wx (t), wy (t), wz (t))
φ (t): Angle between vector and waveform vector
また、到達時間は、前記振動成分と前記ドリルビットの発振波に関して相互相関処理を行うことで算出すればよい。 The arrival time may be calculated by performing a cross-correlation process on the vibration component and the oscillation wave of the drill bit.
本発明のトンネル切羽前方探査方法によれば、発振位置から受振器に到達する時間を精度よく求めることができる。 According to the tunnel face forward exploration method of the present invention, the time to reach the geophone from the oscillation position can be obtained with high accuracy.
本実施形態では、図1の(a)に示すように、トンネル1の切羽2から先進ボーリング(ボーリング孔3の削孔)を行い、ドリルビット4から発生する削孔振動を震源とする弾性波探査を行うことで、切羽2前方の地山状況を推定するトンネル切羽前方探査方法について説明する。 In this embodiment, as shown in FIG. 1 (a), advanced boring is performed from the face 2 of the tunnel 1 (boring of the boring hole 3), and the elastic wave having the drilling vibration generated from the drill bit 4 as an epicenter. The tunnel face front exploration method for estimating the ground condition in front of the face 2 by performing the exploration will be described.
本実施形態のトンネル切羽前方探査方法は、準備ステップと、削孔ステップと、第一受振ステップと、第二受振ステップと、算出ステップとを備えている。 The tunnel face forward exploration method of the present embodiment includes a preparation step, a drilling step, a first vibration receiving step, a second vibration receiving step, and a calculation step.
準備ステップは、受振器7を設置するステップである。
本実施形態では、トンネル1の側壁から横方向(トンネルの軸方向と交差する方向)に受振孔6を形成し、この受振孔6に受振器7を設置する(図1の(a)参照)。
The preparation step is a step of installing the
In the present embodiment, a
なお、受振孔6の深さ(長さ)は限定されないが、本実施形態では、2m〜30mの範囲内(トンネル掘削作業に影響のでない範囲内)とする。また、受振孔6内での受振器7の取り付け位置は限定されないが、本実施形態では、受振孔6の底部(先端)に近い位置に設置する。
本実施形態では、受振器7として3成分加速度計を使用する。
In addition, although the depth (length) of the
In the present embodiment, a three-component accelerometer is used as the
受振器7の設置に伴い、ボーリングマシン8にパイロットセンサー9を取り付けておく。
パイロットセンサー9は、ロッド5を伝搬した振動(加速度または速度)を受振する装置であって、ボーリングマシン8のスイベル8aに取り付ける。なお、パイロットセンサー9を構成する機械は、振動を測定することが可能であれば限定されない。
With the installation of the
The
削孔ステップは、トンネル1の切羽2から前方に向けてボーリング孔3を削孔するステップである。
ボーリング孔3の削孔は、先端にドリルビット4が取り付けられたロッド5により行う。
The drilling step is a step of drilling the boring hole 3 from the face 2 of the
The boring hole 3 is drilled by a
本実施形態では、全長100m程度のボーリング孔3を削孔するものとするが、ボーリング孔3の深度(延長)は限定されない。 In the present embodiment, the boring hole 3 having a total length of about 100 m is drilled, but the depth (extension) of the boring hole 3 is not limited.
第一受振ステップは、ドリルビット4の削孔振動を受振器7により受振するステップである。受振器7は、地山の切削時の振動(加速度または速度)を受振する。
本実施形態では、受振器7による削孔振動の受振を削孔期間中に連続的に行う。
The first vibration receiving step is a step of receiving the drilling vibration of the drill bit 4 by the
In this embodiment, the vibration of the drilling vibration by the
第二受振ステップは、ドリルビット4の削孔振動をボーリングマシン8に取り付けたパイロットセンサー9により受振するステップである。
パイロットセンサー9は、地山切削時にロッド5を伝搬した振動(加速度または速度)を受振する。
本実施形態では、パイロットセンサー9による振動(加速度または速度)の受振を、削孔期間中に連続的に行う。
The second vibration receiving step is a step of receiving the drilling vibration of the drill bit 4 by the
The
In the present embodiment, vibration (acceleration or speed) received by the
算出ステップは、弾性波速度を算出するステップである。
弾性波速度は、削孔振動が受振器7に到達する到達時間と、ドリルビット4から受振器7までの距離Lとに基づいて算出する。すなわち、ドリルビット4からの波形が受振器7に到達する到達時間Tと、ドリルビット4から受振器7までの距離Lとを座標にプロットした傾きにより速度Vを求める(図1の(b)および(c)参照)。
The calculation step is a step of calculating the elastic wave velocity.
The elastic wave velocity is calculated based on the arrival time for drilling vibration to reach the
ドリルビット4から受振器7までの距離Lは、受振器7とドリルビット4との位置関係(削孔延長)により幾何学的に求めることができる。すなわち、受振器7からロッド5に至る垂線の長さをa、前記垂線とロッド5との交点からドリルビット4に至る線分の長さをbとすると、距離L=√(a2+b2)となる。
The distance L from the drill bit 4 to the
削孔振動の到達時間の算出は、まず、受振器7により受振した振動(加速度または速度)のパーティクルオービット解析に基づく波形入射ベクトルから、受振器7の位置からドリルビット4の位置へ向う方向の振動成分を算出する。
The calculation of the arrival time of the drilling vibration is performed in the direction from the waveform incident vector based on the particle orbit analysis of the vibration (acceleration or velocity) received by the
受振器7により受振した振動(3成分ベクトル)w(t)を図示すると、図2の(a)に示すように、ドリルビット4の方向(単位ベクトルeB)に一致しない。これは、受振器7が受振する振動(加速度または速度)が、トンネル1内のボーリングマシン8の機械ノイズ等を含んでことによる。
When the vibration (three-component vector) w (t) received by the
そのため、図2の(b)に示すように、ドリルビット4の方向(単位ベクトルeB)に3成分ベクトルw(t)を合成(投影)することで、振動成分を算出する。 Therefore, as shown in FIG. 2B, the vibration component is calculated by synthesizing (projecting) the three-component vector w (t) in the direction of the drill bit 4 (unit vector e B ).
このとき、振動成分は、式1を利用して算出する。
wR(t)=eB・w(t)=(eBx×wx(t)+eBy×wy(t)+eBz×wz(t))=|w(t)|cosφ(t) ・・・式1
ここで、wR:合成波形ベクトル
eB:削孔ビット方向の単位ベクトル (eBx,eBy,eBz)
w(t):時間tにおける3成分波形ベクトル(wx(t),wy(t),wz(t))
φ(t):ベクトルと波形ベクトルがなす角
At this time, the vibration component is calculated using
w R (t) = e B・ w (t) = (e B x × wx (t) + e B y × wy (t) + e B z × wz (t)) = | w (t) | cosφ (t )
Where w R : composite waveform vector
e B : Unit vector in the drilling bit direction (e B x, e B y, e B z)
w (t): Three-component waveform vector at time t (wx (t), wy (t), wz (t))
φ (t): Angle between vector and waveform vector
次に、この振動成分とドリルビット4の発振波に関して相互相関処理(波形の類似性の定量化)を行うことで到達時間を算出する(図3参照)。 Next, an arrival time is calculated by performing cross-correlation processing (quantification of waveform similarity) on the vibration component and the oscillation wave of the drill bit 4 (see FIG. 3).
ドリルビット4の削孔振動が受振器7に到達するまでの到達時間T2は、パイロットセンサー9で受振した波形と受振器7で受振した波形との間で相互相関処理を行って算出した時間(相互相関処理時間)Trに、ドリルビット4の削孔振動がロッド5を伝ってパイロットセンサー9に到達するまでの時間(ロッド伝搬時間)T1を加えることで算出する。
The arrival time T2 until the drilling vibration of the drill bit 4 reaches the
すなわち、図3に示すように、受振器7とパイロットセンサー9との両方で受振された類似する波形が、パイロットセンサー9において確認された時点から、受振器7において確認される時点までの差が相互相関処理時間Trとなる。
That is, as shown in FIG. 3, there is a difference between the time when the similar waveform received by both the
なお、ロッド伝搬時間T1は、パイロットセンサー9の波に対して、自己相関処理(自身の波形に対する類似性を定量化する処理)を行うことにより求める。
図3に示すように、パイロットセンサー9により類似する波形が確認される時間の周期がロッド伝搬時間T1の2倍となる。
The rod propagation time T1 is obtained by performing autocorrelation processing (processing for quantifying the similarity to the own waveform) on the
As shown in FIG. 3, the period of time when a similar waveform is confirmed by the
以上、本実施形態のトンネル切羽前方探査方法によれば、切羽前方の地山状況を高品質に把握することができる。
相互相関処理を行うことで、トンネル内の掘削機等から発振されるノイズを除去した状態で、ドリルビット4の削孔振動が受振器7に達する到達時間T2を高精度に算出することができる。到達時間T2が分かれば、距離Lを到達時間T2で除することで、弾性波速度を算出することができ、ひいては、地山状況を把握することができる。
As described above, according to the tunnel face front exploration method of the present embodiment, the ground condition in front of the face can be grasped with high quality.
By performing the cross-correlation process, it is possible to calculate the arrival time T2 when the drilling vibration of the drill bit 4 reaches the
また、発振位置と受振位置から距離を算出するため、穿孔区間の弾性波速度の精度が向上し、図1の(c)に示すように、弾性波速度により切羽前方の断層破砕帯に位置をより高精度に確定することができる。 In addition, since the distance is calculated from the oscillation position and the vibration receiving position, the accuracy of the elastic wave velocity in the drilling section is improved, and as shown in FIG. It can be determined with higher accuracy.
このように、本実施形態のトンネル切羽前方探査方法によれば、発振位置と受振位置との幾何学的な位置関係により、高精度に弾性波速度を算出するため、振幅の大きさにより入射方向を特定する従来のSWD法に比べて、精度が高い。 As described above, according to the tunnel face forward exploration method of the present embodiment, the elastic wave velocity is calculated with high accuracy based on the geometric positional relationship between the oscillation position and the receiving position. Compared with the conventional SWD method for specifying
以上、本発明の実施形態について説明したが本発明は、前述の実施形態に限られず、前記の各構成要素については、本発明の趣旨を逸脱しない範囲で、適宜変更が可能である。 Although the embodiments of the present invention have been described above, the present invention is not limited to the above-described embodiments, and the above-described constituent elements can be appropriately changed without departing from the spirit of the present invention.
例えば、受振器により測定した振動(加速度または速度)については、周波数処理を行い、ノイズであることが明らかなデータは除去しておくのが望ましい。 For example, for vibration (acceleration or velocity) measured by a geophone, it is desirable to perform frequency processing and remove data that is apparently noise.
受振孔の形成位置(切羽からの離れ)は限定されるものではなく、適宜設定すればよい。
また、ボーリング孔および受振孔の孔径は限定されない。
The formation position of the vibration receiving hole (separation from the face) is not limited and may be set as appropriate.
Moreover, the hole diameter of a boring hole and a receiving hole is not limited.
振動成分の算出方法は、前記実施形態で示した方法(式1を利用した方法)に限定されない。
また、到達時間は、必ずしもドリルビットの発振波に関して相互相関処理を行うことで算出する必要はない。
The calculation method of the vibration component is not limited to the method shown in the embodiment (a method using Formula 1).
The arrival time is not necessarily calculated by performing a cross-correlation process on the drill bit oscillation wave.
1 トンネル
2 切羽
3 ボーリング孔
4 ドリルビット
5 ロッド
6 受振孔
7 受振器
8 ボーリングマシン
9 パイロットセンサー
DESCRIPTION OF
Claims (3)
前記ドリルビットの削孔振動を前記トンネルの側方に配置された受振器により受振するステップと、
前記削孔振動が前記受振器に到達する到達時間と、前記ドリルビットから前記受振器までの距離とに基づいて弾性波速度を算出するステップと、を備えるトンネル切羽前方探査方法であって、
前記受振器により受振した振動のパーティクルオービット解析に基づく波形入射ベクトルから、前記ドリルビットの位置から前記受振器の位置へ向う方向の振動成分を算出し、当該振動成分を利用して前記到達時間を算出することを特徴とする、トンネル切羽前方探査方法。 A step of drilling with a drill bit toward the front from the face of the tunnel;
Receiving the drilling vibration of the drill bit by a geophone disposed on the side of the tunnel;
A tunnel face forward exploration method comprising: an arrival time for the drilling vibration to reach the geophone, and calculating an elastic wave velocity based on a distance from the drill bit to the geophone,
From a waveform incident vector based on particle orbit analysis of vibration received by the geophone, a vibration component in a direction from the drill bit position to the geophone position is calculated, and the arrival time is calculated using the vibration component. A method for exploring forward of a tunnel face, characterized by calculating.
前記ドリルビットの削孔振動が前記受振器に到達するまでの到達時間を、前記パイロットセンサーで受振した波形と前記受振器で受振した波形との間で相互相関処理を行って算出した時間に、前記ドリルビットの削孔振動が前記パイロットセンサーに到達するまでの時間を加えることで算出することを特徴とする、請求項1に記載のトンネル切羽前方探査方法。 Further comprising the step of receiving the drilling vibration generated from the drill bit by a pilot sensor attached to a boring machine,
The arrival time until the drilling vibration of the drill bit reaches the geophone is calculated by performing a cross-correlation process between the waveform received by the pilot sensor and the waveform received by the geophone, The tunnel face front exploration method according to claim 1, wherein the calculation is performed by adding a time until the drilling vibration of the drill bit reaches the pilot sensor.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014142040A JP6393100B2 (en) | 2014-07-10 | 2014-07-10 | Tunnel face forward exploration method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2014142040A JP6393100B2 (en) | 2014-07-10 | 2014-07-10 | Tunnel face forward exploration method |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2016017900A true JP2016017900A (en) | 2016-02-01 |
JP6393100B2 JP6393100B2 (en) | 2018-09-19 |
Family
ID=55233204
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2014142040A Active JP6393100B2 (en) | 2014-07-10 | 2014-07-10 | Tunnel face forward exploration method |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6393100B2 (en) |
Cited By (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108957521A (en) * | 2018-05-22 | 2018-12-07 | 石家庄铁道大学 | One kind is for tunnel method for forecasting advanced geology three-dimensional over long distances |
JP2019113514A (en) * | 2017-12-22 | 2019-07-11 | 株式会社奥村組 | Tunnel cut-out probe method |
CN110988978A (en) * | 2019-11-26 | 2020-04-10 | 山东大学 | Assembled vehicle-mounted seismic image detection system and method suitable for tunnel interior |
CN111485890A (en) * | 2020-04-08 | 2020-08-04 | 内蒙古金陶股份有限公司 | Tunneling method of roadway |
CN111505733A (en) * | 2020-04-30 | 2020-08-07 | 山东科技大学 | Multi-source heterogeneous information fusion analysis and dynamic prediction method for occurrence of special geologic body of underground engineering fractured rock mass |
JP2020144067A (en) * | 2019-03-08 | 2020-09-10 | 株式会社大林組 | Tunnel working face forward survey system and survey method of tunnel working face forward natural ground |
JP2021173105A (en) * | 2020-04-28 | 2021-11-01 | 株式会社大林組 | Swivel joint and tunnel face forward exploration system |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06273533A (en) * | 1993-03-19 | 1994-09-30 | Toda Constr Co Ltd | Forward probing system at stall |
JPH07325158A (en) * | 1993-02-05 | 1995-12-12 | Agip Spa | Method for preparing vertical seismic layer exploration |
JPH09501504A (en) * | 1994-04-28 | 1997-02-10 | エルフ・アキテーヌ・プロデユクシオン | Immediate acoustic logging at Sakui |
US5774418A (en) * | 1994-04-28 | 1998-06-30 | Elf Aquitaine Production | Method for on-line acoustic logging in a borehole |
JP2000170478A (en) * | 1998-12-07 | 2000-06-20 | Taisei Corp | Method for probing front of tunnel facing |
JP2014106075A (en) * | 2012-11-27 | 2014-06-09 | Fujita Corp | Method for geological survey during tunnel excavation |
JP2014106128A (en) * | 2012-11-28 | 2014-06-09 | Hazama Ando Corp | Method of measuring natural ground elastic wave velocity |
-
2014
- 2014-07-10 JP JP2014142040A patent/JP6393100B2/en active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH07325158A (en) * | 1993-02-05 | 1995-12-12 | Agip Spa | Method for preparing vertical seismic layer exploration |
US5511038A (en) * | 1993-02-05 | 1996-04-23 | Agip S.P.A. | Process and device for detecting seismic signals in order to obtain vertical seismic profiles during bore drilling operations |
JPH06273533A (en) * | 1993-03-19 | 1994-09-30 | Toda Constr Co Ltd | Forward probing system at stall |
JPH09501504A (en) * | 1994-04-28 | 1997-02-10 | エルフ・アキテーヌ・プロデユクシオン | Immediate acoustic logging at Sakui |
US5774418A (en) * | 1994-04-28 | 1998-06-30 | Elf Aquitaine Production | Method for on-line acoustic logging in a borehole |
JP2000170478A (en) * | 1998-12-07 | 2000-06-20 | Taisei Corp | Method for probing front of tunnel facing |
JP2014106075A (en) * | 2012-11-27 | 2014-06-09 | Fujita Corp | Method for geological survey during tunnel excavation |
JP2014106128A (en) * | 2012-11-28 | 2014-06-09 | Hazama Ando Corp | Method of measuring natural ground elastic wave velocity |
Cited By (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2019113514A (en) * | 2017-12-22 | 2019-07-11 | 株式会社奥村組 | Tunnel cut-out probe method |
CN108957521A (en) * | 2018-05-22 | 2018-12-07 | 石家庄铁道大学 | One kind is for tunnel method for forecasting advanced geology three-dimensional over long distances |
CN108957521B (en) * | 2018-05-22 | 2020-06-02 | 石家庄铁道大学 | Long-distance three-dimensional advanced geological prediction method for tunnel |
JP2020144067A (en) * | 2019-03-08 | 2020-09-10 | 株式会社大林組 | Tunnel working face forward survey system and survey method of tunnel working face forward natural ground |
JP7200013B2 (en) | 2019-03-08 | 2023-01-06 | 株式会社大林組 | Tunnel Face Forward Exploration System and Tunnel Face Forward Exploration Method |
CN110988978A (en) * | 2019-11-26 | 2020-04-10 | 山东大学 | Assembled vehicle-mounted seismic image detection system and method suitable for tunnel interior |
CN111485890A (en) * | 2020-04-08 | 2020-08-04 | 内蒙古金陶股份有限公司 | Tunneling method of roadway |
CN111485890B (en) * | 2020-04-08 | 2022-03-15 | 内蒙古金陶股份有限公司 | Tunneling method of roadway |
JP2021173105A (en) * | 2020-04-28 | 2021-11-01 | 株式会社大林組 | Swivel joint and tunnel face forward exploration system |
JP7404147B2 (en) | 2020-04-28 | 2023-12-25 | 株式会社大林組 | Swivel joint and tunnel face forward exploration system |
CN111505733A (en) * | 2020-04-30 | 2020-08-07 | 山东科技大学 | Multi-source heterogeneous information fusion analysis and dynamic prediction method for occurrence of special geologic body of underground engineering fractured rock mass |
Also Published As
Publication number | Publication date |
---|---|
JP6393100B2 (en) | 2018-09-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6393100B2 (en) | Tunnel face forward exploration method | |
KR101547508B1 (en) | Apparatus for predicting front geological features and the method thereof | |
JP6584010B2 (en) | Tunnel face forward exploration method | |
JP5985371B2 (en) | Geological exploration method during tunnel excavation | |
JP5839271B2 (en) | Tunnel face forward exploration method | |
JP2022000666A (en) | Pit face front investigation method | |
US10598563B2 (en) | Downhole acoustic source localization | |
JP2014106128A (en) | Method of measuring natural ground elastic wave velocity | |
US20090122644A1 (en) | Method and a System for Determining the Position of a Drill Bit | |
CN112415589A (en) | Tunnel TBM rock breaking seismic source advanced geological detection imaging method and system | |
JP2016075606A (en) | Elastic wave velocity measuring method | |
JP5940303B2 (en) | Tunnel face forward exploration method | |
JP2017049198A (en) | Working face front survey device and working face front survey method | |
AU2015222645B2 (en) | Method for locating seismic diffractors in subsurface formations from a wellbore | |
JP6258010B2 (en) | Elastic wave velocity measuring method and elastic wave velocity measuring system | |
US20120287757A1 (en) | Forward Looking Seismics From Drill-Bit | |
JP2011102706A (en) | Method and system for performing survey ahead of working face | |
Daku et al. | An algorithm for locating microseismic events | |
CA2924463C (en) | Downhole acoustic ranging utilizing gradiometric data | |
JP2008180676A (en) | Seismic wave depth transmission method using underground insertion pipe | |
JP6379261B2 (en) | Elastic wave velocity measuring method and elastic wave velocity measuring system | |
US9175558B2 (en) | Seismic navigation | |
JP6111107B2 (en) | Elastic wave exploration method | |
JP2010230689A (en) | Method for surveying natural ground | |
CN112946753B (en) | Near-surface stratum structure analysis system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20170418 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20180215 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20180220 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20180314 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20180814 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20180824 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6393100 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
R250 | Receipt of annual fees |
Free format text: JAPANESE INTERMEDIATE CODE: R250 |