JP2016017900A - Method of exploring ahead of tunnel face - Google Patents

Method of exploring ahead of tunnel face Download PDF

Info

Publication number
JP2016017900A
JP2016017900A JP2014142040A JP2014142040A JP2016017900A JP 2016017900 A JP2016017900 A JP 2016017900A JP 2014142040 A JP2014142040 A JP 2014142040A JP 2014142040 A JP2014142040 A JP 2014142040A JP 2016017900 A JP2016017900 A JP 2016017900A
Authority
JP
Japan
Prior art keywords
vibration
drill bit
geophone
drilling
tunnel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014142040A
Other languages
Japanese (ja)
Other versions
JP6393100B2 (en
Inventor
順民 山上
Masahito Yamagami
順民 山上
今井 博
Hiroshi Imai
博 今井
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Taisei Corp
Original Assignee
Taisei Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Taisei Corp filed Critical Taisei Corp
Priority to JP2014142040A priority Critical patent/JP6393100B2/en
Publication of JP2016017900A publication Critical patent/JP2016017900A/en
Application granted granted Critical
Publication of JP6393100B2 publication Critical patent/JP6393100B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a method of exploring ahead of a tunnel face, which allows for accurately acquiring vibration travel time from a vibration source to a receiver by removing noise.SOLUTION: A method of exploring ahead of a tunnel face comprises steps of: drilling a hole ahead of a face 2 of a tunnel 1 using a drill bit 4; receiving drilling vibration of the drill bit 4 by using a receiver 7 placed sideways from the tunnel 1; and computing elastic wave velocity on the basis of a travel time T which is taken for the drilling vibration to reach the receiver 7 and a distance from the drill bit 4 to the receiver 7. A vibration component in a direction from the drill bit 4 toward the receiver 7 is derived from a waveform incident vector based on a particle orbit analysis of the vibration received by the receiver 7, and the travel time T is computed by using the vibration component.SELECTED DRAWING: Figure 1

Description

本発明は、トンネル切羽前方探査方法に関する。   The present invention relates to a tunnel face front search method.

トンネルの施工では、計画や設計の段階において、地表踏査や地表面からの弾性波探査などの地盤調査を実施することで、事前に地山状況の予測を行っている。
ところが、地表面からの事前調査により、線状構造物であるトンネルの地山の状態を完全に把握することは困難であった。
In tunnel construction, ground conditions such as ground reconnaissance and elastic wave exploration from the ground surface are predicted in advance during the planning and design stages.
However, it was difficult to fully understand the state of the ground of the tunnel, which is a linear structure, by conducting a preliminary survey from the ground surface.

そのため、施工段階で切羽から切羽前方探査を行い、断層破砕帯(弱層)の可能性のある箇所の位置を特定する場合がある。
このようなトンネル切羽前方探査として、例えば、特許文献1には、切羽の前方に向けて先進ボーリングを行い、この先進ボーリング掘削時にドリルビットから発生する削孔振動の弾性波を利用する方法が開示されている。
For this reason, there is a case where the front of the face is searched from the face at the construction stage to identify the position of a possible fault crush zone (weak layer).
As such a tunnel face front exploration, for example, Patent Document 1 discloses a method of performing advanced boring toward the front of the face and utilizing elastic waves of drilling vibration generated from a drill bit during the advanced boring excavation. Has been.

かかるトンネル切羽前方探査では、受振器として3成分受振器を用いて入射方向を特定し、特定された方向の波の振幅を増幅することによって、信号を強調する場合がある。
この場合には、波動のXY成分、YZ成分、XZ成分を直交軸にプロットし、より大きな波の入射方向を、削孔振動による弾性波の入射方向と推定する、いわゆるパーティクルオービットに基づく解析方法を使用することで、入射方向を特定している。
In such a tunnel face front search, a signal may be emphasized by specifying an incident direction using a three-component receiver as a receiver and amplifying the amplitude of a wave in the specified direction.
In this case, the XY component, YZ component, and XZ component of the wave are plotted on the orthogonal axes, and the larger wave incident direction is estimated as the elastic wave incident direction due to drilling vibration. The incident direction is specified by using.

特開2000−170478号公報JP 2000-170478 A

前記トンネル切羽前方探査では、先進ボーリングに使用するボーリングマシンからも振動が発振されている。
そのため、トンネル内またはトンネルの近傍に設けられた受振器は、ドリルビットから発振された削孔振動とともに、トンネル坑内のボーリングマシン等から発振された振動も受振してしまうおそれがある。
In the forward exploration of the tunnel face, vibration is also oscillated from a boring machine used for advanced boring.
Therefore, the geophone provided in the tunnel or in the vicinity of the tunnel may receive vibration generated from a boring machine or the like in the tunnel well as well as drilling vibration generated from the drill bit.

トンネル切羽前方探査において、ボーリングマシン等から発振されたノイズを含んだ状態でパーティクルオービットに基づく解析方法を採用すると、入射方向にずれが生じるおそれがある。   When the analysis method based on the particle orbit is used in the state where the noise is generated from the boring machine or the like in the tunnel front face search, there is a possibility that the incident direction is shifted.

このような観点から、本発明は、ノイズを除去して発振位置から受振器に到達する時間を精度よく求めることができるトンネル切羽前方探査方法を提案することを課題とする。   From such a point of view, an object of the present invention is to propose a tunnel face forward exploration method that can accurately obtain the time to reach the geophone from the oscillation position by removing noise.

前記課題を解決するために、本発明のトンネル切羽前方探査方法は、トンネルの切羽から前方に向けてドリルビットにより削孔するステップと、前記ドリルビットの削孔振動を前記トンネルの側方に配置された受振器により受振するステップと、前記削孔振動が前記受振器に到達する到達時間と前記ドリルビットから前記受振器までの距離とに基づいて弾性波速度を算出するステップとを備えており、前記受振器により受振した振動のパーティクルオービット解析に基づく波形入射ベクトルから、前記ドリルビットの位置から前記受振器の位置へ向う方向の振動成分を算出し、当該振動成分を利用して前記到達時間を算出することを特徴としている。   In order to solve the above problems, a tunnel face forward exploration method of the present invention includes a step of drilling with a drill bit forward from the face of the tunnel, and a drilling vibration of the drill bit arranged on a side of the tunnel. Receiving the vibration by the received geophone, and calculating the elastic wave velocity based on the arrival time for the drilling vibration to reach the geophone and the distance from the drill bit to the geophone. Calculating a vibration component in a direction from the position of the drill bit to the position of the geophone from the waveform incident vector based on the particle orbit analysis of the vibration received by the geophone, and using the vibration component, the arrival time It is characterized by calculating.

かかるトンネル切羽前方探査方法によれば、発振位置と受振位置との幾何学的関係から入射方向を特定するため、弾性波速度を高精度に算出することができる。
そのため、切羽前方の断層破砕帯の位置を高精度に確定することができる。
According to this tunnel face front exploration method, the incident direction is specified from the geometric relationship between the oscillation position and the receiving position, so that the elastic wave velocity can be calculated with high accuracy.
Therefore, the position of the fault crush zone in front of the face can be determined with high accuracy.

前記トンネル切羽前方探査方法は、前記ドリルビットから生じる削孔振動をボーリングマシンに取り付けたパイロットセンサーにより受振するステップをさらに含み、前記ドリルビットの削孔振動が前記受振器に到達するまでの到達時間を、前記パイロットセンサーで受振した波形と前記受振器で受振した波形との間で相互相関処理を行って算出した時間に、前記ドリルビットの削孔振動が前記パイロットセンサーに到達するまでの時間を加えることで算出するようにしてもよい。   The tunnel face front exploration method further includes a step of receiving a drilling vibration generated from the drill bit by a pilot sensor attached to a boring machine, and an arrival time until the drilling vibration of the drill bit reaches the geophone Is calculated by performing a cross-correlation process between the waveform received by the pilot sensor and the waveform received by the geophone, and the time until the drilling vibration of the drill bit reaches the pilot sensor is You may make it calculate by adding.

かかるトンネル切羽前方探査方法によれば、より高精度の弾性波速度を算出することが可能となる。   According to this tunnel face front search method, it is possible to calculate a more accurate elastic wave velocity.

なお、前記振動成分は、式1により算出するのが望ましい。

wR(t)=eB・w(t)=(eBx×wx(t)+eBy×wy(t)+eBz×wz(t))=|w(t)|cosφ(t) ・・・式1

ここで、wR:合成波形ベクトル
eB:削孔ビット方向の単位ベクトル (eBx,eBy,eBz)
w(t):時間tにおける3成分波形ベクトル(wx(t),wy(t),wz(t))
φ(t):ベクトルと波形ベクトルがなす角
Note that the vibration component is preferably calculated by Equation 1.

w R (t) = e B・ w (t) = (e B x × wx (t) + e B y × wy (t) + e B z × wz (t)) = | w (t) | cosφ (t ) Equation 1

Where w R : composite waveform vector
e B : Unit vector in the drilling bit direction (e B x, e B y, e B z)
w (t): Three-component waveform vector at time t (wx (t), wy (t), wz (t))
φ (t): Angle between vector and waveform vector

また、到達時間は、前記振動成分と前記ドリルビットの発振波に関して相互相関処理を行うことで算出すればよい。   The arrival time may be calculated by performing a cross-correlation process on the vibration component and the oscillation wave of the drill bit.

本発明のトンネル切羽前方探査方法によれば、発振位置から受振器に到達する時間を精度よく求めることができる。   According to the tunnel face forward exploration method of the present invention, the time to reach the geophone from the oscillation position can be obtained with high accuracy.

(a)は本実施形態に係るトンネル切羽前方探査方法の概念を模式的に示す平断面図、(b)は削孔振動の到達時間とドリルビットから受振器までの距離の関係を示すグラフ、(c)は弾性波速度とドリルビットから受振器までの距離の関係を示すグラフである。(A) is a plan sectional view schematically showing the concept of the tunnel face front exploration method according to the present embodiment, (b) is a graph showing the relationship between the arrival time of drilling vibration and the distance from the drill bit to the geophone, (C) is a graph showing the relationship between the elastic wave velocity and the distance from the drill bit to the geophone. (a)は受振器により受振した波形入射ベクトルのオービット図、(b)はドリルビット方向の振動成分を示すオービット図である。(A) is an orbit diagram of the waveform incident vector received by the geophone, and (b) is an orbit diagram showing the vibration component in the drill bit direction. 各設備と発振波の到達時間の関係を模式的に示す説明図である。It is explanatory drawing which shows typically the relationship between each equipment and the arrival time of an oscillation wave.

本実施形態では、図1の(a)に示すように、トンネル1の切羽2から先進ボーリング(ボーリング孔3の削孔)を行い、ドリルビット4から発生する削孔振動を震源とする弾性波探査を行うことで、切羽2前方の地山状況を推定するトンネル切羽前方探査方法について説明する。   In this embodiment, as shown in FIG. 1 (a), advanced boring is performed from the face 2 of the tunnel 1 (boring of the boring hole 3), and the elastic wave having the drilling vibration generated from the drill bit 4 as an epicenter. The tunnel face front exploration method for estimating the ground condition in front of the face 2 by performing the exploration will be described.

本実施形態のトンネル切羽前方探査方法は、準備ステップと、削孔ステップと、第一受振ステップと、第二受振ステップと、算出ステップとを備えている。   The tunnel face forward exploration method of the present embodiment includes a preparation step, a drilling step, a first vibration receiving step, a second vibration receiving step, and a calculation step.

準備ステップは、受振器7を設置するステップである。
本実施形態では、トンネル1の側壁から横方向(トンネルの軸方向と交差する方向)に受振孔6を形成し、この受振孔6に受振器7を設置する(図1の(a)参照)。
The preparation step is a step of installing the geophone 7.
In the present embodiment, a vibration receiving hole 6 is formed in the lateral direction (direction intersecting with the axial direction of the tunnel) from the side wall of the tunnel 1, and a vibration receiving device 7 is installed in the vibration receiving hole 6 (see FIG. 1A). .

なお、受振孔6の深さ(長さ)は限定されないが、本実施形態では、2m〜30mの範囲内(トンネル掘削作業に影響のでない範囲内)とする。また、受振孔6内での受振器7の取り付け位置は限定されないが、本実施形態では、受振孔6の底部(先端)に近い位置に設置する。
本実施形態では、受振器7として3成分加速度計を使用する。
In addition, although the depth (length) of the vibration receiving hole 6 is not limited, in this embodiment, it is set within a range of 2 m to 30 m (within a range not affecting tunnel excavation work). Moreover, although the attachment position of the geophone 7 in the vibration receiving hole 6 is not limited, in this embodiment, it installs in the position near the bottom part (tip) of the vibration receiving hole 6.
In the present embodiment, a three-component accelerometer is used as the geophone 7.

受振器7の設置に伴い、ボーリングマシン8にパイロットセンサー9を取り付けておく。
パイロットセンサー9は、ロッド5を伝搬した振動(加速度または速度)を受振する装置であって、ボーリングマシン8のスイベル8aに取り付ける。なお、パイロットセンサー9を構成する機械は、振動を測定することが可能であれば限定されない。
With the installation of the geophone 7, the pilot sensor 9 is attached to the boring machine 8.
The pilot sensor 9 is a device that receives vibration (acceleration or velocity) propagated through the rod 5, and is attached to the swivel 8 a of the boring machine 8. In addition, the machine which comprises the pilot sensor 9 will not be limited if vibration can be measured.

削孔ステップは、トンネル1の切羽2から前方に向けてボーリング孔3を削孔するステップである。
ボーリング孔3の削孔は、先端にドリルビット4が取り付けられたロッド5により行う。
The drilling step is a step of drilling the boring hole 3 from the face 2 of the tunnel 1 toward the front.
The boring hole 3 is drilled by a rod 5 having a drill bit 4 attached to the tip.

本実施形態では、全長100m程度のボーリング孔3を削孔するものとするが、ボーリング孔3の深度(延長)は限定されない。   In the present embodiment, the boring hole 3 having a total length of about 100 m is drilled, but the depth (extension) of the boring hole 3 is not limited.

第一受振ステップは、ドリルビット4の削孔振動を受振器7により受振するステップである。受振器7は、地山の切削時の振動(加速度または速度)を受振する。
本実施形態では、受振器7による削孔振動の受振を削孔期間中に連続的に行う。
The first vibration receiving step is a step of receiving the drilling vibration of the drill bit 4 by the vibration receiver 7. The geophone 7 receives vibration (acceleration or speed) when cutting natural ground.
In this embodiment, the vibration of the drilling vibration by the geophone 7 is continuously performed during the drilling period.

第二受振ステップは、ドリルビット4の削孔振動をボーリングマシン8に取り付けたパイロットセンサー9により受振するステップである。
パイロットセンサー9は、地山切削時にロッド5を伝搬した振動(加速度または速度)を受振する。
本実施形態では、パイロットセンサー9による振動(加速度または速度)の受振を、削孔期間中に連続的に行う。
The second vibration receiving step is a step of receiving the drilling vibration of the drill bit 4 by the pilot sensor 9 attached to the boring machine 8.
The pilot sensor 9 receives the vibration (acceleration or velocity) propagated through the rod 5 during ground cutting.
In the present embodiment, vibration (acceleration or speed) received by the pilot sensor 9 is continuously performed during the drilling period.

算出ステップは、弾性波速度を算出するステップである。
弾性波速度は、削孔振動が受振器7に到達する到達時間と、ドリルビット4から受振器7までの距離Lとに基づいて算出する。すなわち、ドリルビット4からの波形が受振器7に到達する到達時間Tと、ドリルビット4から受振器7までの距離Lとを座標にプロットした傾きにより速度Vを求める(図1の(b)および(c)参照)。
The calculation step is a step of calculating the elastic wave velocity.
The elastic wave velocity is calculated based on the arrival time for drilling vibration to reach the geophone 7 and the distance L from the drill bit 4 to the geophone 7. That is, the velocity V is obtained from the slope of the arrival time T when the waveform from the drill bit 4 reaches the geophone 7 and the distance L from the drill bit 4 to the geophone 7 plotted in coordinates ((b) of FIG. 1). And (c)).

ドリルビット4から受振器7までの距離Lは、受振器7とドリルビット4との位置関係(削孔延長)により幾何学的に求めることができる。すなわち、受振器7からロッド5に至る垂線の長さをa、前記垂線とロッド5との交点からドリルビット4に至る線分の長さをbとすると、距離L=√(a+b)となる。 The distance L from the drill bit 4 to the geophone 7 can be obtained geometrically by the positional relationship between the geophone 7 and the drill bit 4 (extended drilling). That is, if the length of the perpendicular line from the geophone 7 to the rod 5 is a and the length of the line segment from the intersection of the perpendicular line and the rod 5 to the drill bit 4 is b, the distance L = √ (a 2 + b 2 )

削孔振動の到達時間の算出は、まず、受振器7により受振した振動(加速度または速度)のパーティクルオービット解析に基づく波形入射ベクトルから、受振器7の位置からドリルビット4の位置へ向う方向の振動成分を算出する。   The calculation of the arrival time of the drilling vibration is performed in the direction from the waveform incident vector based on the particle orbit analysis of the vibration (acceleration or velocity) received by the geophone 7 to the position of the drill bit 4 from the location of the geophone 7. Calculate the vibration component.

受振器7により受振した振動(3成分ベクトル)w(t)を図示すると、図2の(a)に示すように、ドリルビット4の方向(単位ベクトルe)に一致しない。これは、受振器7が受振する振動(加速度または速度)が、トンネル1内のボーリングマシン8の機械ノイズ等を含んでことによる。 When the vibration (three-component vector) w (t) received by the geophone 7 is illustrated, it does not coincide with the direction of the drill bit 4 (unit vector e B ) as shown in FIG. This is because the vibration (acceleration or velocity) received by the geophone 7 includes mechanical noise of the boring machine 8 in the tunnel 1.

そのため、図2の(b)に示すように、ドリルビット4の方向(単位ベクトルe)に3成分ベクトルw(t)を合成(投影)することで、振動成分を算出する。 Therefore, as shown in FIG. 2B, the vibration component is calculated by synthesizing (projecting) the three-component vector w (t) in the direction of the drill bit 4 (unit vector e B ).

このとき、振動成分は、式1を利用して算出する。

wR(t)=eB・w(t)=(eBx×wx(t)+eBy×wy(t)+eBz×wz(t))=|w(t)|cosφ(t) ・・・式1

ここで、wR:合成波形ベクトル
eB:削孔ビット方向の単位ベクトル (eBx,eBy,eBz)
w(t):時間tにおける3成分波形ベクトル(wx(t),wy(t),wz(t))
φ(t):ベクトルと波形ベクトルがなす角
At this time, the vibration component is calculated using Equation 1.

w R (t) = e B・ w (t) = (e B x × wx (t) + e B y × wy (t) + e B z × wz (t)) = | w (t) | cosφ (t ) Equation 1

Where w R : composite waveform vector
e B : Unit vector in the drilling bit direction (e B x, e B y, e B z)
w (t): Three-component waveform vector at time t (wx (t), wy (t), wz (t))
φ (t): Angle between vector and waveform vector

次に、この振動成分とドリルビット4の発振波に関して相互相関処理(波形の類似性の定量化)を行うことで到達時間を算出する(図3参照)。   Next, an arrival time is calculated by performing cross-correlation processing (quantification of waveform similarity) on the vibration component and the oscillation wave of the drill bit 4 (see FIG. 3).

ドリルビット4の削孔振動が受振器7に到達するまでの到達時間T2は、パイロットセンサー9で受振した波形と受振器7で受振した波形との間で相互相関処理を行って算出した時間(相互相関処理時間)Trに、ドリルビット4の削孔振動がロッド5を伝ってパイロットセンサー9に到達するまでの時間(ロッド伝搬時間)T1を加えることで算出する。   The arrival time T2 until the drilling vibration of the drill bit 4 reaches the geophone 7 is calculated by performing a cross-correlation process between the waveform received by the pilot sensor 9 and the waveform received by the geophone 7 ( It is calculated by adding the time (rod propagation time) T1 until the drilling vibration of the drill bit 4 reaches the pilot sensor 9 through the rod 5 to the cross correlation processing time) Tr.

すなわち、図3に示すように、受振器7とパイロットセンサー9との両方で受振された類似する波形が、パイロットセンサー9において確認された時点から、受振器7において確認される時点までの差が相互相関処理時間Trとなる。   That is, as shown in FIG. 3, there is a difference between the time when the similar waveform received by both the geophone 7 and the pilot sensor 9 is confirmed by the pilot sensor 9 to the time when the geophone 7 is confirmed. This is the cross-correlation processing time Tr.

なお、ロッド伝搬時間T1は、パイロットセンサー9の波に対して、自己相関処理(自身の波形に対する類似性を定量化する処理)を行うことにより求める。
図3に示すように、パイロットセンサー9により類似する波形が確認される時間の周期がロッド伝搬時間T1の2倍となる。
The rod propagation time T1 is obtained by performing autocorrelation processing (processing for quantifying the similarity to the own waveform) on the pilot sensor 9 wave.
As shown in FIG. 3, the period of time when a similar waveform is confirmed by the pilot sensor 9 is twice the rod propagation time T1.

以上、本実施形態のトンネル切羽前方探査方法によれば、切羽前方の地山状況を高品質に把握することができる。
相互相関処理を行うことで、トンネル内の掘削機等から発振されるノイズを除去した状態で、ドリルビット4の削孔振動が受振器7に達する到達時間T2を高精度に算出することができる。到達時間T2が分かれば、距離Lを到達時間T2で除することで、弾性波速度を算出することができ、ひいては、地山状況を把握することができる。
As described above, according to the tunnel face front exploration method of the present embodiment, the ground condition in front of the face can be grasped with high quality.
By performing the cross-correlation process, it is possible to calculate the arrival time T2 when the drilling vibration of the drill bit 4 reaches the geophone 7 with high accuracy in a state where noise oscillated from the excavator or the like in the tunnel is removed. . If the arrival time T2 is known, the elastic wave velocity can be calculated by dividing the distance L by the arrival time T2, and as a result, the ground condition can be grasped.

また、発振位置と受振位置から距離を算出するため、穿孔区間の弾性波速度の精度が向上し、図1の(c)に示すように、弾性波速度により切羽前方の断層破砕帯に位置をより高精度に確定することができる。   In addition, since the distance is calculated from the oscillation position and the vibration receiving position, the accuracy of the elastic wave velocity in the drilling section is improved, and as shown in FIG. It can be determined with higher accuracy.

このように、本実施形態のトンネル切羽前方探査方法によれば、発振位置と受振位置との幾何学的な位置関係により、高精度に弾性波速度を算出するため、振幅の大きさにより入射方向を特定する従来のSWD法に比べて、精度が高い。   As described above, according to the tunnel face forward exploration method of the present embodiment, the elastic wave velocity is calculated with high accuracy based on the geometric positional relationship between the oscillation position and the receiving position. Compared with the conventional SWD method for specifying

以上、本発明の実施形態について説明したが本発明は、前述の実施形態に限られず、前記の各構成要素については、本発明の趣旨を逸脱しない範囲で、適宜変更が可能である。   Although the embodiments of the present invention have been described above, the present invention is not limited to the above-described embodiments, and the above-described constituent elements can be appropriately changed without departing from the spirit of the present invention.

例えば、受振器により測定した振動(加速度または速度)については、周波数処理を行い、ノイズであることが明らかなデータは除去しておくのが望ましい。   For example, for vibration (acceleration or velocity) measured by a geophone, it is desirable to perform frequency processing and remove data that is apparently noise.

受振孔の形成位置(切羽からの離れ)は限定されるものではなく、適宜設定すればよい。
また、ボーリング孔および受振孔の孔径は限定されない。
The formation position of the vibration receiving hole (separation from the face) is not limited and may be set as appropriate.
Moreover, the hole diameter of a boring hole and a receiving hole is not limited.

振動成分の算出方法は、前記実施形態で示した方法(式1を利用した方法)に限定されない。
また、到達時間は、必ずしもドリルビットの発振波に関して相互相関処理を行うことで算出する必要はない。
The calculation method of the vibration component is not limited to the method shown in the embodiment (a method using Formula 1).
The arrival time is not necessarily calculated by performing a cross-correlation process on the drill bit oscillation wave.

1 トンネル
2 切羽
3 ボーリング孔
4 ドリルビット
5 ロッド
6 受振孔
7 受振器
8 ボーリングマシン
9 パイロットセンサー
DESCRIPTION OF SYMBOLS 1 Tunnel 2 Face 3 Boring hole 4 Drill bit 5 Rod 6 Vibration receiving hole 7 Vibration receiving device 8 Boring machine 9 Pilot sensor

Claims (3)

トンネルの切羽から前方に向けてドリルビットにより削孔するステップと、
前記ドリルビットの削孔振動を前記トンネルの側方に配置された受振器により受振するステップと、
前記削孔振動が前記受振器に到達する到達時間と、前記ドリルビットから前記受振器までの距離とに基づいて弾性波速度を算出するステップと、を備えるトンネル切羽前方探査方法であって、
前記受振器により受振した振動のパーティクルオービット解析に基づく波形入射ベクトルから、前記ドリルビットの位置から前記受振器の位置へ向う方向の振動成分を算出し、当該振動成分を利用して前記到達時間を算出することを特徴とする、トンネル切羽前方探査方法。
A step of drilling with a drill bit toward the front from the face of the tunnel;
Receiving the drilling vibration of the drill bit by a geophone disposed on the side of the tunnel;
A tunnel face forward exploration method comprising: an arrival time for the drilling vibration to reach the geophone, and calculating an elastic wave velocity based on a distance from the drill bit to the geophone,
From a waveform incident vector based on particle orbit analysis of vibration received by the geophone, a vibration component in a direction from the drill bit position to the geophone position is calculated, and the arrival time is calculated using the vibration component. A method for exploring forward of a tunnel face, characterized by calculating.
前記ドリルビットから生じる削孔振動をボーリングマシンに取り付けたパイロットセンサーにより受振するステップをさらに含み、
前記ドリルビットの削孔振動が前記受振器に到達するまでの到達時間を、前記パイロットセンサーで受振した波形と前記受振器で受振した波形との間で相互相関処理を行って算出した時間に、前記ドリルビットの削孔振動が前記パイロットセンサーに到達するまでの時間を加えることで算出することを特徴とする、請求項1に記載のトンネル切羽前方探査方法。
Further comprising the step of receiving the drilling vibration generated from the drill bit by a pilot sensor attached to a boring machine,
The arrival time until the drilling vibration of the drill bit reaches the geophone is calculated by performing a cross-correlation process between the waveform received by the pilot sensor and the waveform received by the geophone, The tunnel face front exploration method according to claim 1, wherein the calculation is performed by adding a time until the drilling vibration of the drill bit reaches the pilot sensor.
前記振動成分と前記ドリルビットの発振波に関して相互相関処理を行うことで前記到達時間を算出することを特徴とする、請求項1または請求項2に記載のトンネル切羽前方探査方法。   The tunnel face forward exploration method according to claim 1, wherein the arrival time is calculated by performing a cross-correlation process on the vibration component and the oscillation wave of the drill bit.
JP2014142040A 2014-07-10 2014-07-10 Tunnel face forward exploration method Active JP6393100B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014142040A JP6393100B2 (en) 2014-07-10 2014-07-10 Tunnel face forward exploration method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014142040A JP6393100B2 (en) 2014-07-10 2014-07-10 Tunnel face forward exploration method

Publications (2)

Publication Number Publication Date
JP2016017900A true JP2016017900A (en) 2016-02-01
JP6393100B2 JP6393100B2 (en) 2018-09-19

Family

ID=55233204

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014142040A Active JP6393100B2 (en) 2014-07-10 2014-07-10 Tunnel face forward exploration method

Country Status (1)

Country Link
JP (1) JP6393100B2 (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108957521A (en) * 2018-05-22 2018-12-07 石家庄铁道大学 One kind is for tunnel method for forecasting advanced geology three-dimensional over long distances
JP2019113514A (en) * 2017-12-22 2019-07-11 株式会社奥村組 Tunnel cut-out probe method
CN110988978A (en) * 2019-11-26 2020-04-10 山东大学 Assembled vehicle-mounted seismic image detection system and method suitable for tunnel interior
CN111485890A (en) * 2020-04-08 2020-08-04 内蒙古金陶股份有限公司 Tunneling method of roadway
CN111505733A (en) * 2020-04-30 2020-08-07 山东科技大学 Multi-source heterogeneous information fusion analysis and dynamic prediction method for occurrence of special geologic body of underground engineering fractured rock mass
JP2020144067A (en) * 2019-03-08 2020-09-10 株式会社大林組 Tunnel working face forward survey system and survey method of tunnel working face forward natural ground
JP2021173105A (en) * 2020-04-28 2021-11-01 株式会社大林組 Swivel joint and tunnel face forward exploration system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06273533A (en) * 1993-03-19 1994-09-30 Toda Constr Co Ltd Forward probing system at stall
JPH07325158A (en) * 1993-02-05 1995-12-12 Agip Spa Method for preparing vertical seismic layer exploration
JPH09501504A (en) * 1994-04-28 1997-02-10 エルフ・アキテーヌ・プロデユクシオン Immediate acoustic logging at Sakui
US5774418A (en) * 1994-04-28 1998-06-30 Elf Aquitaine Production Method for on-line acoustic logging in a borehole
JP2000170478A (en) * 1998-12-07 2000-06-20 Taisei Corp Method for probing front of tunnel facing
JP2014106075A (en) * 2012-11-27 2014-06-09 Fujita Corp Method for geological survey during tunnel excavation
JP2014106128A (en) * 2012-11-28 2014-06-09 Hazama Ando Corp Method of measuring natural ground elastic wave velocity

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH07325158A (en) * 1993-02-05 1995-12-12 Agip Spa Method for preparing vertical seismic layer exploration
US5511038A (en) * 1993-02-05 1996-04-23 Agip S.P.A. Process and device for detecting seismic signals in order to obtain vertical seismic profiles during bore drilling operations
JPH06273533A (en) * 1993-03-19 1994-09-30 Toda Constr Co Ltd Forward probing system at stall
JPH09501504A (en) * 1994-04-28 1997-02-10 エルフ・アキテーヌ・プロデユクシオン Immediate acoustic logging at Sakui
US5774418A (en) * 1994-04-28 1998-06-30 Elf Aquitaine Production Method for on-line acoustic logging in a borehole
JP2000170478A (en) * 1998-12-07 2000-06-20 Taisei Corp Method for probing front of tunnel facing
JP2014106075A (en) * 2012-11-27 2014-06-09 Fujita Corp Method for geological survey during tunnel excavation
JP2014106128A (en) * 2012-11-28 2014-06-09 Hazama Ando Corp Method of measuring natural ground elastic wave velocity

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019113514A (en) * 2017-12-22 2019-07-11 株式会社奥村組 Tunnel cut-out probe method
CN108957521A (en) * 2018-05-22 2018-12-07 石家庄铁道大学 One kind is for tunnel method for forecasting advanced geology three-dimensional over long distances
CN108957521B (en) * 2018-05-22 2020-06-02 石家庄铁道大学 Long-distance three-dimensional advanced geological prediction method for tunnel
JP2020144067A (en) * 2019-03-08 2020-09-10 株式会社大林組 Tunnel working face forward survey system and survey method of tunnel working face forward natural ground
JP7200013B2 (en) 2019-03-08 2023-01-06 株式会社大林組 Tunnel Face Forward Exploration System and Tunnel Face Forward Exploration Method
CN110988978A (en) * 2019-11-26 2020-04-10 山东大学 Assembled vehicle-mounted seismic image detection system and method suitable for tunnel interior
CN111485890A (en) * 2020-04-08 2020-08-04 内蒙古金陶股份有限公司 Tunneling method of roadway
CN111485890B (en) * 2020-04-08 2022-03-15 内蒙古金陶股份有限公司 Tunneling method of roadway
JP2021173105A (en) * 2020-04-28 2021-11-01 株式会社大林組 Swivel joint and tunnel face forward exploration system
JP7404147B2 (en) 2020-04-28 2023-12-25 株式会社大林組 Swivel joint and tunnel face forward exploration system
CN111505733A (en) * 2020-04-30 2020-08-07 山东科技大学 Multi-source heterogeneous information fusion analysis and dynamic prediction method for occurrence of special geologic body of underground engineering fractured rock mass

Also Published As

Publication number Publication date
JP6393100B2 (en) 2018-09-19

Similar Documents

Publication Publication Date Title
JP6393100B2 (en) Tunnel face forward exploration method
KR101547508B1 (en) Apparatus for predicting front geological features and the method thereof
JP6584010B2 (en) Tunnel face forward exploration method
JP5985371B2 (en) Geological exploration method during tunnel excavation
JP5839271B2 (en) Tunnel face forward exploration method
JP2022000666A (en) Pit face front investigation method
US10598563B2 (en) Downhole acoustic source localization
JP2014106128A (en) Method of measuring natural ground elastic wave velocity
US20090122644A1 (en) Method and a System for Determining the Position of a Drill Bit
CN112415589A (en) Tunnel TBM rock breaking seismic source advanced geological detection imaging method and system
JP2016075606A (en) Elastic wave velocity measuring method
JP5940303B2 (en) Tunnel face forward exploration method
JP2017049198A (en) Working face front survey device and working face front survey method
AU2015222645B2 (en) Method for locating seismic diffractors in subsurface formations from a wellbore
JP6258010B2 (en) Elastic wave velocity measuring method and elastic wave velocity measuring system
US20120287757A1 (en) Forward Looking Seismics From Drill-Bit
JP2011102706A (en) Method and system for performing survey ahead of working face
Daku et al. An algorithm for locating microseismic events
CA2924463C (en) Downhole acoustic ranging utilizing gradiometric data
JP2008180676A (en) Seismic wave depth transmission method using underground insertion pipe
JP6379261B2 (en) Elastic wave velocity measuring method and elastic wave velocity measuring system
US9175558B2 (en) Seismic navigation
JP6111107B2 (en) Elastic wave exploration method
JP2010230689A (en) Method for surveying natural ground
CN112946753B (en) Near-surface stratum structure analysis system and method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170418

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180215

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20180220

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20180314

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180814

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180824

R150 Certificate of patent or registration of utility model

Ref document number: 6393100

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250