JP2016010282A - Temporary placing table and power cable terminal end construction method - Google Patents

Temporary placing table and power cable terminal end construction method Download PDF

Info

Publication number
JP2016010282A
JP2016010282A JP2014131081A JP2014131081A JP2016010282A JP 2016010282 A JP2016010282 A JP 2016010282A JP 2014131081 A JP2014131081 A JP 2014131081A JP 2014131081 A JP2014131081 A JP 2014131081A JP 2016010282 A JP2016010282 A JP 2016010282A
Authority
JP
Japan
Prior art keywords
power cable
temporary
cone
conductor
holding member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014131081A
Other languages
Japanese (ja)
Other versions
JP6313135B2 (en
Inventor
幸夫 石濱
Yukio Ishihama
幸夫 石濱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TEKKU C KK
C Tech Corp
Original Assignee
TEKKU C KK
C Tech Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TEKKU C KK, C Tech Corp filed Critical TEKKU C KK
Priority to JP2014131081A priority Critical patent/JP6313135B2/en
Publication of JP2016010282A publication Critical patent/JP2016010282A/en
Application granted granted Critical
Publication of JP6313135B2 publication Critical patent/JP6313135B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Electric Cable Installation (AREA)
  • Cable Accessories (AREA)

Abstract

PROBLEM TO BE SOLVED: To eliminate the need for a worker to hold a cone holding member at a predetermined height while it is necessary to hold the cone holding member at the predetermined height in a power cable terminal end construction.SOLUTION: A temporary placing table 1 is a table for temporarily placing the cone holding member in the power cable terminal end construction. The temporary placing table includes: a plurality of fixed parts 30 which are fixed to a plurality of supporting insulators 210; a temporary placing table part 10 including a table part through-hole 12b through which a power cable 110 can be inserted, and a temporary placing surface 12a for temporarily placing the cone holding member; and leg parts 20 for holding the temporary placing table part at the predetermined height with respect to the fixed parts.

Description

本発明は、電力ケーブル終端部工事に用いられる仮置き台、及び電力ケーブル終端部工事方法に関する。   The present invention relates to a temporary table used for power cable terminal construction and a power cable terminal construction method.

例えば、変電所には、高圧の電力ケーブルが複数本接続されている。各電力ケーブルの終端部では、後述の電力ケーブル終端部構造を組み立てるための電力ケーブル終端部工事が施され、後述のがい管が立設されている。   For example, a plurality of high-voltage power cables are connected to a substation. At the terminal portion of each power cable, a power cable terminal portion construction for assembling a power cable terminal portion structure which will be described later is performed, and a below-described insulator pipe is erected.

特許文献1には、一般的な電力ケーブル終端部構造が開示されている。この電力ケーブル終端部構造において、電力ケーブルの終端部の先端では電力ケーブル内部の導体が露出され、この導体の先端には導体引出部材が接続されている。電力ケーブルの終端部の基端側には、絶縁性のコーン部材(ゴムストレスコーン)および、コーン部材の電界を緩和するためのコーン保持部材(エポキシ座)が装着されている。なお、電力ケーブルの終端部、導体引出部材、コーン部材、コーン保持部材は、立設されたがい管の内部に配置されている。   Patent Document 1 discloses a general power cable termination structure. In this power cable terminal part structure, the conductor inside the power cable is exposed at the tip of the terminal part of the power cable, and a conductor drawing member is connected to the tip of this conductor. An insulating cone member (rubber stress cone) and a cone holding member (epoxy seat) for relaxing the electric field of the cone member are mounted on the proximal end side of the terminal portion of the power cable. Note that the end portion of the power cable, the conductor drawing member, the cone member, and the cone holding member are disposed inside the standing pipe.

ところで、電力ケーブルが大径の場合、電力ケーブルの導体に接続される導体引出部材の接続部分が、コーン保持部材における電力ケーブルを挿通させるための保持部材貫通孔の径よりも大きくなることがある。この場合、電力ケーブル終端部工事の手順として、コーン保持部材を電力ケーブルに装着させた後で電力ケーブルの導体に導体引出部材を接続する必要がある。従来の電力ケーブル終端部工事では、コーン保持部材を電力ケーブルに装着させた後、作業者がコーン保持部材を所定の高さに保持した状態で、他の作業者が電力ケーブルの導体に導体引出部材を接続することで対応している。   By the way, when the power cable has a large diameter, the connecting portion of the conductor drawing member connected to the conductor of the power cable may be larger than the diameter of the holding member through-hole for inserting the power cable in the cone holding member. . In this case, it is necessary to connect the conductor drawing member to the conductor of the power cable after attaching the cone holding member to the power cable as a procedure for the construction of the power cable terminal portion. In conventional power cable terminal construction, after the cone holding member is attached to the power cable, another operator pulls out the conductor to the conductor of the power cable while the operator holds the cone holding member at a predetermined height. It corresponds by connecting the members.

特開2011−259558号公報JP 2011-259558 A

従来の電力ケーブル終端部工事の方法によって大径の電力ケーブルに対応する場合、電力ケーブルの導体に導体引出部材を接続する間、作業者はコーン保持部材を所定の高さに保持することを強いられ、その分、他の作業を行うことができない。また、コーン保持部材は非常に重量が大きい(例えば5〜6kg程度)ため、コーン保持部材を所定の高さに保持することで作業者に大きな負担がかかる。   When dealing with a large-diameter power cable by a conventional power cable terminal construction method, an operator is strongly required to hold the cone holding member at a predetermined height while connecting the conductor drawing member to the conductor of the power cable. Therefore, no other work can be done. Further, since the cone holding member is very heavy (for example, about 5 to 6 kg), a heavy burden is imposed on the operator by holding the cone holding member at a predetermined height.

本発明は、このような課題を解決しようとするものであって、その目的は、電力ケーブル終端部工事においてコーン保持部材を所定高さで保持することが必要な間、作業者がコーン保持部材を所定の高さで保持することを不要とすることである。   The present invention is intended to solve such a problem, and an object of the present invention is to allow the operator to hold the cone holding member at a predetermined height in the construction of the power cable terminal portion. Is not required to be held at a predetermined height.

本発明は、前述の目的を達成するためのもので、以下のように構成されている。本発明の仮置き台は、基台の下から引き上げられて少なくとも導体の周囲が絶縁層にて被われた電力ケーブルの終端部において、この電力ケーブルの終端部の外周に、絶縁体で形成されて電力ケーブルを挿通可能なコーン貫通孔を有するコーン部材と、絶縁体で形成されて電力ケーブルを挿通可能な貫通孔であってコーン部材を収容可能な形状を有する貫通孔である保持部材貫通孔を有するコーン保持部材と、が装着され、コーン部材とコーン保持部材とが装着された電力ケーブルの終端部における導体の先端に、導電体で形成された導体引出部材が接続され、コーン部材とコーン保持部材とが装着され、かつ、導体引出部材が接続された電力ケーブルの終端部の外周を被うように、絶縁体で形成されて電力ケーブルを挿通可能な貫通孔であってコーン保持部材を収容可能な形状を有する貫通孔であるがい管貫通孔を有するがい管が被せられ、少なくともがい管が、基台に固定された複数の支持がいしに対して固定されて基台に対して立った状態である立設状態となるように固定され、かつ、がい管の先端部に、導体の先端に接続された導体引出部材が固定された状態とする、電力ケーブル終端部工事において、コーン保持部材を一時的に仮置きするための仮置き台である。仮置き台は、複数の支持がいしに対して固定される複数の固定部と、電力ケーブルを挿通可能な台部貫通孔を有してコーン保持部材を一時的に仮置きするための仮置き面を有する仮置き台部と、固定部に対して仮置き台部を所定高さに保持する脚部と、を有する。   The present invention is for achieving the above-mentioned object, and is configured as follows. The temporary placing stand of the present invention is formed of an insulator on the outer periphery of the end portion of the power cable at the end portion of the power cable that is pulled up from below the base and covered at least around the conductor with an insulating layer. And a cone member having a cone through hole into which the power cable can be inserted, and a holding member through hole which is a through hole formed of an insulator and into which the power cable can be inserted and which can accommodate the cone member A conductor holding member formed of a conductor is connected to the end of the conductor at the terminal end of the power cable to which the cone member and the cone holding member are attached. A through hole that is formed of an insulator and can be inserted into the power cable so as to cover the outer periphery of the terminal end of the power cable to which the holding member is attached and the conductor drawing member is connected. A pierced pipe having a shape that can accommodate the cone holding member and having a pipe through hole, and at least the garment pipe is fixed to a plurality of support insulators fixed to the base. Power cable terminal construction that is fixed so that it is in an erected state, and the conductor lead-out member connected to the tip of the conductor is fixed to the tip of the insulator pipe The temporary holding table for temporarily placing the cone holding member. The temporary placement table has a plurality of fixing portions fixed to a plurality of support insulators and a base portion through-hole through which a power cable can be inserted, and a temporary placement surface for temporarily placing a cone holding member And a leg portion that holds the temporary placement table portion at a predetermined height with respect to the fixed portion.

さらに好ましくは、仮置き台をつぎのような構成とすることである。まず、複数の支持がいしのそれぞれが、上方に突出するピンを有している。そして、仮置き台の固定部のそれぞれが、支持がいしのピンを挿通可能なピン貫通孔を有し、当該ピン貫通孔に支持がいしのピンが挿通されることで、支持がいしに対して位置決めされて固定される。   More preferably, the temporary table is configured as follows. First, each of the plurality of support insulators has a pin protruding upward. Each of the fixing portions of the temporary placement table has a pin through-hole through which a support insulator pin can be inserted, and the support insulator pin is inserted into the pin through-hole so that the pin is positioned with respect to the support insulator. Fixed.

さらに好ましくは、仮置き台をつぎのような構成とすることである。仮置き台の脚部は、互いに交差する第1支持脚と第2支持脚とが一対で構成され、第1支持脚の一方端には、第1支持脚に対して仮置き台部を回動可能に支持する回動接続機構が設けられている。第2支持脚の一方端には、第2支持脚に対して仮置き台部を係止状態あるいは係止解除状態とすることが可能な係止機構が設けられている。そして、第1支持脚と第2支持脚とはこれらの両支持脚が交差する箇所を支点として互いに回動可能に支持されている。   More preferably, the temporary table is configured as follows. The leg portion of the temporary table is composed of a pair of a first support leg and a second support leg that intersect each other, and the temporary support table portion is rotated with respect to the first support leg at one end of the first support leg. A pivoting connection mechanism is provided that is movably supported. At one end of the second support leg, there is provided a locking mechanism capable of bringing the temporary mounting base portion into the locked state or the unlocked state with respect to the second support leg. And the 1st support leg and the 2nd support leg are supported so that rotation is mutually possible for the point which these both support legs cross as a fulcrum.

さらに好ましくは、仮置き台の仮置き台部には、仮置き面の縁部の一部から台部貫通孔に至る切欠空間部が形成されていることである。   More preferably, the temporary placement table portion of the temporary placement table is formed with a notch space portion extending from a part of the edge of the temporary placement surface to the platform through hole.

さらに好ましくは、仮置き台における台部貫通孔の内径は、コーン部材の外形よりも大きい寸法に設定されていることである。   More preferably, the inner diameter of the base part through-hole in the temporary mounting base is set to be larger than the outer shape of the cone member.

さらに好ましくは、仮置き台の仮置き面にゴムシートが張られていることである。   More preferably, a rubber sheet is stretched on the temporary placement surface of the temporary placement table.

本発明の電力ケーブル終端部工事方法は、前述の仮置き台を用いた電力ケーブル終端部工事方法である。電力ケーブル終端部工事方法は、電力ケーブルの終端部を加工して、先端側から導体と絶縁層とを所定の寸法で露出させるケーブル加工ステップと、電力ケーブルの終端部の外周にコーン部材を装着するコーン部材装着ステップと、仮置き台の固定部を支持がいしに対して固定する仮置き台固定ステップと、コーン部材を装着した電力ケーブルの終端部の外周にコーン保持部材を装着するコーン保持部材装着ステップと、電力ケーブルの終端部に装着したコーン保持部材を仮置き台の仮置き面上に仮置きする仮置きステップと、コーン保持部材を仮置き台の仮置き面上に仮置きした状態で、電力ケーブルの終端部における導体の先端に導体引出部材を接続する導体接続ステップと、導体の先端に導体引出部材を接続した電力ケーブルの終端部の外周を被うようにがい管を被せるがい管装着ステップと、電力ケーブルの終端部にがい管を被せた状態で、仮置き台の固定部を支持がいしから取外す仮置き台取外しステップと、電力ケーブルの終端部にがい管を被せた状態でがい管を基台に対して立設状態となるように支持がいしに対して固定するがい管固定ステップと、支持がいしに対して固定したがい管の先端部に、導体引出部材を固定する導体固定ステップと、を有する。   The power cable terminal part construction method of the present invention is a power cable terminal part construction method using the above-mentioned temporary table. The power cable termination construction method consists of a cable machining step that processes the termination of the power cable and exposes the conductor and insulating layer with a predetermined dimension from the tip side, and a cone member is attached to the outer periphery of the termination of the power cable A cone member mounting step, a temporary table fixing step for fixing the fixing portion of the temporary table to the support insulator, and a cone holding member for mounting the cone holding member on the outer periphery of the terminal portion of the power cable to which the cone member is mounted A mounting step, a temporary placing step for temporarily placing the cone holding member attached to the terminal portion of the power cable on the temporary placing surface of the temporary placing table, and a state in which the cone holding member is temporarily placed on the temporary placing surface of the temporary placing table A conductor connecting step for connecting the conductor leading member to the conductor tip at the terminal end of the power cable, and a power cable terminal portion connecting the conductor leading member to the conductor tip A step of attaching a garment tube so as to cover the outer periphery, a step of removing a temporary cradle, and a step of removing the fixing portion of the temporary cradle from the support insulator in a state where the end of the power cable is covered with a garment tube, and the power cable The insulator tube fixing step for fixing the insulator tube to the support insulator so that the insulator tube stands upright with respect to the base in the state where the insulator tube is covered with the end portion of the insulator, and the tip end portion of the insulator tube fixed to the support insulator And a conductor fixing step for fixing the conductor drawing member.

本発明の仮置き台では、固定部に対して、コーン保持部材を一時的に仮置きするための仮置き台部が所定高さに保持される。このことから、例えば、電力ケーブルが大径の場合に要求される、電力ケーブルにコーン保持部材を装着させた後に電力ケーブルの導体に導体引出部材を接続する作業や、その後、電力ケーブルにがい管を被せる作業において、コーン保持部材を仮置き台部で所定高さに保持できる。そのため、電力ケーブル終端工事においてコーン保持部材を所定高さで保持することが必要な間、作業者がコーン保持部材を所定の高さで保持することが不要とされ、その分、作業者はコーン保持部材を保持する負担が軽減されるとともに他の作業に専念することができ、工事の施工効率が上がる。   In the temporary placing table of the present invention, the temporary placing table part for temporarily placing the cone holding member temporarily is held at a predetermined height with respect to the fixed part. For this reason, for example, when the power cable has a large diameter, the work of connecting the conductor drawing member to the conductor of the power cable after attaching the cone holding member to the power cable, and then the insulator for the power cable. In the operation of covering, the cone holding member can be held at a predetermined height by the temporary placing table. Therefore, it is unnecessary for the operator to hold the cone holding member at the predetermined height while it is necessary to hold the cone holding member at the predetermined height in the power cable termination work. The burden of holding the holding member is reduced, and other work can be concentrated, thereby improving the construction efficiency.

本発明の仮置き台では、固定部が、がい管を固定するための支持がいしを利用して位置きめされることから、仮置き台専用の位置決め部材を基台側に新たに設ける必要がない。そのため、電力ケーブル終端工事の設備コストが抑えられる。また、本発明の仮置き台では支持がいしを介して仮置き台を確実に基台に固定することができる。   In the temporary placement table of the present invention, the fixing portion is positioned using a support insulator for fixing the insulation tube, so that there is no need to newly provide a positioning member dedicated to the temporary placement table on the base side. . Therefore, the equipment cost for power cable termination work can be reduced. Moreover, in the temporary mounting table of this invention, a temporary mounting table can be reliably fixed to a base via a support insulator.

本発明の仮置き台では、第1支持脚と仮置き台部とが回動接続機構にて接続され、第2支持脚と仮置き台部とが係止機構にて係止状態あるいは係止解除状態となるように構成され、第1支持脚と第2支持脚とが互いに回動可能に支持されている。これによって、仮置き台は、支持がいしから取外された際コンパクトに折りたたむことができる(図21参照)ので、収納時や持ち運び時に便利である。   In the temporary table of the present invention, the first support leg and the temporary table are connected by the rotation connection mechanism, and the second support leg and the temporary table are locked or locked by the locking mechanism. It is comprised so that it may be in a cancellation | release state, and the 1st support leg and the 2nd support leg are supported so that rotation is mutually possible. As a result, the temporary table can be folded compactly when the support is removed from the insulator (see FIG. 21), which is convenient for storage and carrying.

本発明の仮置き台では、仮置き面の縁部の一部から台部貫通孔に至る切欠空間部が形成されている。このことから、仮置き台は、電力ケーブルが切欠空間部を通じて台部貫通孔に位置するように前進させることができ(図5,6,15,16参照)、また、電力ケーブルが切欠空間部を通じて仮置き台から外れた位置にくるように後退させることができる(図9,10,15,16参照)。そのため、電力ケーブル終端工事において仮置き台を利用しても電力ケーブルを動かす必要はなく、工事の各作業工程に影響がない。   In the temporary placing table of the present invention, a notch space is formed from a part of the edge of the temporary placing surface to the base through hole. From this, the temporary placing stand can be advanced so that the power cable is positioned in the base through hole through the notch space (see FIGS. 5, 6, 15, and 16), and the power cable is notched in the notch space. It can be made to retreat so as to come to a position off the temporary table (see FIGS. 9, 10, 15, and 16). For this reason, even if a temporary table is used in power cable termination work, there is no need to move the power cable, and there is no influence on each work process of the work.

本発明の仮置き台では、台部貫通孔の内径が、コーン部材の外形よりも大きい寸法に設定されている。このことから、例えば仮置き面にコーン保持部材を仮置きした状態で、台部貫通孔を通じてコーン部材を下からコーン保持部材の保持部材貫通孔に配置させることができる。この作業の間、作業者はコーン保持部材を所定の高さで保持することが不要であり、その分、他の作業に専念することができる。そのため、電力ケーブル終端工事の施工効率が上がる。   In the temporary placing table of the present invention, the inner diameter of the base part through hole is set to be larger than the outer shape of the cone member. From this, for example, in a state where the cone holding member is temporarily placed on the temporary placement surface, the cone member can be arranged from below through the holding member through hole of the cone holding member through the base portion through hole. During this work, the worker does not need to hold the cone holding member at a predetermined height, and can devote himself to other work accordingly. Therefore, the construction efficiency of the power cable termination work is increased.

本発明の仮置き台では、仮置き面にゴムシートが張られている。そのため、仮置き面に仮置きされたコーン保持部材の損傷を防止できる。   In the temporary placement table of the present invention, a rubber sheet is stretched on the temporary placement surface. Therefore, damage to the cone holding member temporarily placed on the temporary placement surface can be prevented.

本発明の電力ケーブル終端部工事方法では、コーン保持部材を電力ケーブルに装着した後、コーン保持部材を仮置き面に仮置きした状態で電力ケーブルの導体に導体引出部材を接続し、また、がい管を電力ケーブルに被せる。そのため、これらの作業の間、作業者がコーン保持部材を所定の高さで保持することが不要とされ、その分、作業者は他の作業に専念することができ、工事の施工効率が上がる。   In the power cable terminal portion construction method of the present invention, after the cone holding member is attached to the power cable, the conductor drawing member is connected to the conductor of the power cable in a state where the cone holding member is temporarily placed on the temporary placement surface. Put the tube over the power cable. Therefore, during these operations, it is unnecessary for the operator to hold the cone holding member at a predetermined height, and accordingly, the operator can concentrate on other operations, and the construction efficiency of the work increases. .

電力ケーブル終端部構造を一部断面によって表した側面図。The side view which represented the electric power cable termination | terminus part structure by the partial cross section. 電力ケーブルの断面図。Sectional drawing of an electric power cable. 加工処理された電力ケーブルの終端部の斜視図。The perspective view of the termination | terminus part of the processed electric power cable. 仮置き台を用いた電力ケーブル終端部工事方法の一工程を一部断面によって表した側面図。The side view which represented one process of the process of the electric power cable termination | terminus part construction method using a temporary placing stand by the cross section. 仮置き台を用いた電力ケーブル終端部工事方法における図4につづく工程を一部断面によって表した側面図。The side view which represented the process following FIG. 4 in the electric power cable terminal part construction method using a temporary placing stand by the partial cross section. 仮置き台を用いた電力ケーブル終端部工事方法における図5につづく工程を一部断面によって表した側面図。The side view which represented the process following FIG. 5 in the electric power cable terminal part construction method using a temporary placing stand by the partial cross section. 仮置き台を用いた電力ケーブル終端部工事方法における図6につづく工程を一部断面によって表した側面図。The side view which represented the process following FIG. 6 in the electric power cable terminal part construction method using a temporary placing stand by the partial cross section. 仮置き台を用いた電力ケーブル終端部工事方法における図7につづく工程を一部断面によって表した側面図。The side view which represented the process following FIG. 7 in the electric power cable terminal part construction method using a temporary placing stand by the partial cross section. 仮置き台を用いた電力ケーブル終端部工事方法における図8につづく工程を一部断面によって表した側面図。The side view which represented the process following FIG. 8 in the electric power cable terminal part construction method using a temporary placing stand by the partial cross section. 仮置き台を用いた電力ケーブル終端部工事方法における図9につづく工程を一部断面によって表した側面図。The side view which represented the process following FIG. 9 in the electric power cable termination | terminus part construction method using a temporary placing stand with the partial cross section. 仮置き台を用いた電力ケーブル終端部工事方法における図10につづく工程を一部断面によって表した側面図。The side view which represented the process following FIG. 10 in the electric power cable terminal part construction method using a temporary placing stand by the partial cross section. 仮置き台を用いた電力ケーブル終端部工事方法における図11につづく工程を一部断面によって表した側面図。The side view which represented the process following FIG. 11 in the electric power cable termination | terminus part construction method using a temporary placing stand with the partial cross section. 仮置き台を用いた電力ケーブル終端部工事方法における図12につづく工程を一部断面によって表した側面図。The side view which represented the process following FIG. 12 in the electric power cable terminal part construction method using a temporary placing stand by the partial cross section. 仮置き台を用いた電力ケーブル終端部工事方法における図13につづく工程を一部断面によって表した側面図。The side view which represented the process following FIG. 13 in the electric power cable termination | terminus part construction method using a temporary stand with a partial cross section. 支持がいしに対して固定された仮置き台及び仮置き台の周囲の斜視図。The perspective view of the circumference | surroundings of the temporary placement stand fixed with respect to the support insulator and a temporary placement stand. 図15をXVI方向から視た上面図。The top view which looked at FIG. 15 from the XVI direction. 図15をXVII方向から視た正面図。The front view which looked at FIG. 15 from the XVII direction. 支持がいしから取外された状態の仮置き台の側面図。The side view of the temporary placing stand of the state removed from the support insulator. 図18の状態から第2支持脚に対する仮置き台部の係止を解除した状態の仮置き台の側面図。FIG. 19 is a side view of the temporary placement table in a state where the lock of the temporary placement table portion with respect to the second support leg is released from the state of FIG. 18. 図19の状態から第2支持脚を第1支持脚に対して回動させた状態の仮置き台の側面図。The side view of the temporary mounting stand of the state which rotated the 2nd support leg with respect to the 1st support leg from the state of FIG. 仮置き台の折りたたみ状態を表した側面図。The side view showing the folding state of the temporary placing stand.

以下、本発明を実施するための形態を、図面を用いて説明する。   Hereinafter, embodiments for carrying out the present invention will be described with reference to the drawings.

<電力ケーブル終端部構造(図1)と電力ケーブルの終端部(図2,3)>
後述する電力ケーブル終端部工事の完了状態である電力ケーブル終端部構造100(図1参照)を、電力ケーブル110の終端部の構成(図2,3参照)と併せて説明する。図1に示す電力ケーブル終端部構造100は、基台200の上に引き上げられた電力ケーブル110の終端部(図3参照)と、電力ケーブル110の終端部を被うようにして配置されたがい管120と、がい管120の内部に配置されたコーン部材130とコーン保持部材140と、を含んで構成されている。基台200は、地上あるいは鉄塔上に配置されている。
<Power cable termination structure (FIG. 1) and power cable termination (FIGS. 2 and 3)>
The power cable termination structure 100 (see FIG. 1), which is a completed state of the power cable termination construction described later, will be described together with the configuration of the termination portion of the power cable 110 (see FIGS. 2 and 3). A power cable termination structure 100 shown in FIG. 1 includes a termination pipe (see FIG. 3) of a power cable 110 that is pulled up on a base 200 and a ribbon pipe that is disposed so as to cover the termination section of the power cable 110. 120, and a cone member 130 and a cone holding member 140 disposed in the inside of the insulator tube 120. The base 200 is arranged on the ground or on a steel tower.

電力ケーブル110は、例えば、中心の導体112を被覆する絶縁層114の外側にシールド線116、シース118等が設けられた構成となっている(図2参照)。なお、電力ケーブル110の断面構造は、図2の例に示す構造に限定されるものではない。電力ケーブル110の終端部においては、電力ケーブル110が段階的に剥かれた状態に加工処理されており(図3参照)、先端側から順に導体112、絶縁層114、シールド線116等が所定の長さで露出している。   The power cable 110 has, for example, a configuration in which a shield wire 116, a sheath 118, and the like are provided outside an insulating layer 114 that covers a central conductor 112 (see FIG. 2). The cross-sectional structure of the power cable 110 is not limited to the structure shown in the example of FIG. At the terminal portion of the power cable 110, the power cable 110 is processed so as to be peeled off in stages (see FIG. 3), and the conductor 112, the insulating layer 114, the shield wire 116, etc. Exposed in length.

がい管120は、絶縁体(例えばセラミックス)で形成され、がい管貫通孔120aを有する(図1参照)。がい管貫通孔120aは、電力ケーブル110を挿通可能であり、かつ、コーン部材130およびコーン保持部材140を収容可能な形状である。   The insulator tube 120 is formed of an insulator (for example, ceramics) and has an insulator tube through hole 120a (see FIG. 1). The insulator through-hole 120a has a shape into which the power cable 110 can be inserted and the cone member 130 and the cone holding member 140 can be accommodated.

コーン部材130は、絶縁体(例えばゴム)で形成され、コーン貫通孔130aを有する(図1参照)。コーン貫通孔130aは、電力ケーブル110を挿通可能である。コーン部材130の形状は紡錘状である。   The cone member 130 is formed of an insulator (for example, rubber) and has a cone through hole 130a (see FIG. 1). The cone through hole 130a can be inserted through the power cable 110. The cone member 130 has a spindle shape.

コーン保持部材140は、絶縁体(例えばエポキシ樹脂)で形成され、保持部材貫通孔140aを有する(図1参照)。保持部材貫通孔140aは、電力ケーブル110を挿通可能であり、かつ、コーン部材130を収容可能な形状である。コーン保持部材140は、上方にしぼんだ略円筒上に形成され、フランジ部140bを有する。   The cone holding member 140 is formed of an insulator (for example, epoxy resin) and has a holding member through hole 140a (see FIG. 1). The holding member through hole 140a has a shape into which the power cable 110 can be inserted and the cone member 130 can be accommodated. The cone holding member 140 is formed on a substantially cylinder that is dented upward and has a flange portion 140b.

電力ケーブル終端部構造100における各部材の組付き状態について詳しく説明する。がい管120は、基台200に固定された計4個の支持がいし210によって、基台200に対して立った状態である立設状態に固定されている(図1参照)。なお、図1においては2個の支持がいしのみが見えている。計4個の支持がいし210は、電力ケーブル110の軸心を中心に、平面視で矩形状に配置されている。   The assembled state of each member in the power cable termination structure 100 will be described in detail. The insulator tube 120 is fixed in an upright state in which the insulator tube 120 stands with respect to the base 200 by a total of four support insulators 210 fixed to the base 200 (see FIG. 1). In FIG. 1, only two support insulators are visible. A total of four support insulators 210 are arranged in a rectangular shape in plan view around the axis of the power cable 110.

がい管120の内部には、絶縁油Fが充填されている(図1参照)。がい管120の下端部においては、電力ケーブル110の絶縁層114の外周にコーン部材130が装着されている。そして、このコーン部材130を被うようにしてコーン保持部材140が装着されている。コーン部材130の下方にはコーン部材圧縮装置150が設けられている。コーン部材130は、コーン部材圧縮装置150によって、コーン保持部材140の保持部材貫通孔140aの内面に対して適切な圧力で押し付けられている。コーン部材圧縮装置150は、保護金物160で被われている。保護金物160の内部においては、シールド線116がコーン部材圧縮装置150に接続されている。   Insulating oil F is filled in the inside of the insulator tube 120 (see FIG. 1). A cone member 130 is attached to the outer periphery of the insulating layer 114 of the power cable 110 at the lower end portion of the insulator tube 120. A cone holding member 140 is mounted so as to cover the cone member 130. A cone member compression device 150 is provided below the cone member 130. The cone member 130 is pressed against the inner surface of the holding member through hole 140 a of the cone holding member 140 by the cone member compression device 150 with an appropriate pressure. The cone member compression device 150 is covered with a protective hardware 160. Inside the protective hardware 160, the shield wire 116 is connected to the cone member compression device 150.

がい管120の上端部においては、電力ケーブル110の導体112の先端に導体引出部材170が接続されている(図1参照)。導体引出部材170は、電力ケーブル110の導体112の先端を接続するための円筒状の接続部170aを備え、図1に示す状態においてはこの接続部170aが外側から圧縮された状態で導体112の先端に固定されている。導体引出部材170の接続部170aから電力ケーブル110の絶縁層114の上端部にかけては、絶縁油Fが電力ケーブル110の内部に入り込むのを防ぐための絶縁テープPが巻きつけられている。なお、電力ケーブル100の導体112に接続された導体引出部材170の接続部170aの径は、コーン保持部材140の保持部材貫通孔140aの径よりも大きい場合がある。   At the upper end of the insulator tube 120, a conductor extraction member 170 is connected to the tip of the conductor 112 of the power cable 110 (see FIG. 1). The conductor lead-out member 170 includes a cylindrical connection portion 170a for connecting the tip of the conductor 112 of the power cable 110. In the state shown in FIG. 1, the connection portion 170a is compressed from the outside and the conductor 112 It is fixed at the tip. An insulating tape P for preventing the insulating oil F from entering the inside of the power cable 110 is wound around the connecting portion 170 a of the conductor drawing member 170 and the upper end portion of the insulating layer 114 of the power cable 110. The diameter of the connecting portion 170a of the conductor lead member 170 connected to the conductor 112 of the power cable 100 may be larger than the diameter of the holding member through hole 140a of the cone holding member 140.

導体引出部材170は上部金物180,185を介してがい管120の上端部に固定されている(図1参照)。導体引出部材170の先端は、上部金物180,185の上方に配置された上部シールド190を貫通している。導体引出部材170は導電体で形成され、その先端が架空線等に電気的に接続される。   The conductor lead-out member 170 is fixed to the upper end portion of the garment tube 120 via upper metal parts 180 and 185 (see FIG. 1). The leading end of the conductor lead-out member 170 passes through an upper shield 190 disposed above the upper hardware 180 and 185. The conductor lead-out member 170 is formed of a conductor, and its tip is electrically connected to an overhead wire or the like.

<電力ケーブル終端部工事の作業工程(図1乃至14参照)>
電力ケーブル終端部構造100(図1参照)を組み立てるための工事である電力ケーブル終端部工事の工程(電力ケーブル終端部工事方法)を主として図1乃至14によって説明する。なお、図1乃至14においては、がい管120、コーン部材圧縮装置150、上部金物180,185、上部シールド190が断面によって表されている。図1および図10乃至14においては、コーン保持部材140が断面によって表されている。図1および図13,14においては、保護金物160が断面によって表されている。
<Working process for power cable terminal construction (see FIGS. 1 to 14)>
The power cable terminal part construction process (power cable terminal part construction method), which is the work for assembling the power cable terminal part structure 100 (see FIG. 1), will be mainly described with reference to FIGS. 1 to 14, the insulator tube 120, the cone member compression device 150, the upper hardware 180 and 185, and the upper shield 190 are represented by sections. 1 and 10 to 14, the cone holding member 140 is represented by a cross section. 1 and 13 and 14, the protective hardware 160 is represented by a cross section.

電力ケーブル終端部工事では、後で詳しく説明する仮置き台1(図15乃至17参照)が用いられる。仮置き台1は、各支持がいし210に対して固定される固定部30と、コーン保持部材140を仮置きするための仮置き台部10と、仮置き台部10を固定部30に対して所定高さに保持する脚部20(第1支持脚22および第2支持脚24)とを備えている(図15参照)。仮置き台部10は仮置き面12aと台部貫通孔12bと切欠空間部12cとを備えている。   In the construction of the power cable terminal portion, a temporary table 1 (see FIGS. 15 to 17), which will be described in detail later, is used. The temporary placement table 1 includes a fixed portion 30 fixed to each support insulator 210, a temporary placement table portion 10 for temporarily placing the cone holding member 140, and the temporary placement table portion 10 with respect to the fixed portion 30. Leg portions 20 (first support legs 22 and second support legs 24) that are held at a predetermined height are provided (see FIG. 15). The temporary placement table 10 includes a temporary placement surface 12a, a table portion through hole 12b, and a notch space portion 12c.

以下、電力ケーブル終端部工事方法を説明する。まず、電力ケーブル110の終端部を基台貫通孔200aから引き上げて加工し、先端側から順に導体112、絶縁層114、シールド線116等を所定の寸法で露出させる(図3参照)。また、基台200に各支持がいし210を固定する(図4参照)。電力ケーブル110の終端部を加工して先端側から導体112、絶縁層114、シールド線116等を露出させる工程が本発明の「ケーブル加工ステップ」に相当する。なお、引き上げられた電力ケーブル110は、図示しない規制手段によって上下方向に延びた状態に維持され、かつ、下方に下がらないように規制される。   Hereinafter, a method for constructing the power cable terminal will be described. First, the terminal portion of the power cable 110 is lifted and processed from the base through hole 200a, and the conductor 112, the insulating layer 114, the shield wire 116, and the like are exposed with predetermined dimensions in order from the distal end side (see FIG. 3). Moreover, each support insulator 210 is fixed to the base 200 (refer FIG. 4). The process of processing the terminal portion of the power cable 110 to expose the conductor 112, the insulating layer 114, the shield wire 116, and the like from the front end corresponds to the “cable processing step” of the present invention. The pulled up power cable 110 is maintained in a vertically extending state by a not-illustrated restricting unit and is regulated so as not to be lowered downward.

つづいて、電力ケーブル110の終端部に対して、保護金物160とコーン部材圧縮装置150とコーン部材130とをこの順に装着させる(図4参照)。これらの各部材130,150,160は、適宜の支持手段によって電力ケーブル110に対して上下方向の所定位置で位置決めされる。コーン部材130を電力ケーブル110の終端部に装着させる工程が、本発明の「コーン部材装着ステップ」に相当する。   Subsequently, the protective hardware 160, the cone member compression device 150, and the cone member 130 are attached in this order to the terminal portion of the power cable 110 (see FIG. 4). These members 130, 150, 160 are positioned at predetermined positions in the vertical direction with respect to the power cable 110 by appropriate support means. The step of attaching the cone member 130 to the terminal portion of the power cable 110 corresponds to the “cone member attachment step” of the present invention.

つづいて、仮置き台1(図15乃至17参照)を各支持がいし210に設置する(図5参照)。具体的には、まず、仮置き台1(図15乃至17参照)の前端(切欠空間部12cの側)を電力ケーブル110に臨ませる。そして、仮置き台1を、電力ケーブル110が切欠空間部12c(図15,16参照)を通過して台部貫通孔12bに位置する所まで前進させる。この後、仮置き台1を下方へ下ろして、仮置き台1の各固定部30を各支持がいし210のピン210aに対して固定する(図6参照)。仮置き台1の各固定部30を各支持がいし210に対して固定する工程が、本発明の「仮置き台固定ステップ」に相当する。なお、図15はこの状態における仮置き台1の周囲の斜視図である。ただし、図15においてはコーン部材圧縮装置150と保護金物160とが省略されている。   Subsequently, the temporary table 1 (see FIGS. 15 to 17) is installed on each support insulator 210 (see FIG. 5). Specifically, first, the front end (the notch space 12c side) of the temporary placing table 1 (see FIGS. 15 to 17) is made to face the power cable 110. Then, the temporary table 1 is advanced to a position where the power cable 110 passes through the notch space 12c (see FIGS. 15 and 16) and is positioned in the table through hole 12b. Thereafter, the temporary table 1 is lowered, and the fixing portions 30 of the temporary table 1 are fixed to the pins 210a of the support insulators 210 (see FIG. 6). The step of fixing each fixing portion 30 of the temporary table 1 to each support wheel 210 corresponds to the “temporary table fixing step” of the present invention. FIG. 15 is a perspective view of the periphery of the temporary table 1 in this state. However, in FIG. 15, the cone member compression device 150 and the protective hardware 160 are omitted.

つづいて、コーン保持部材140をその保持部材貫通孔140aに電力ケーブル110が挿通されるように下方へ下ろし(図6参照)、電力ケーブル110の終端部にコーン保持部材140を装着させる(図7参照)。電力ケーブル110に装着されたコーン保持部材140は、仮置き台1の仮置き面12aに仮置きされる。コーン保持部材140は、そのフランジ部140bが仮置き面12aの各ガイド部G(図15,16参照)によって配置を位置決めされる。コーン部材130を装着した電力ケーブル110の外周にコーン保持部材140を装着させる工程が、本発明の「コーン保持部材装着ステップ」に相当する。電力ケーブル110の終端部に装着させたコーン保持部材140を仮置き台1の仮置き面12aに仮置きする工程が、本発明の「仮置きステップ」に相当する。   Subsequently, the cone holding member 140 is lowered downward so that the power cable 110 is inserted into the holding member through hole 140a (see FIG. 6), and the cone holding member 140 is attached to the terminal portion of the power cable 110 (FIG. 7). reference). The cone holding member 140 attached to the power cable 110 is temporarily placed on the temporary placement surface 12 a of the temporary placement table 1. The cone holding member 140 has its flange portion 140b positioned by each guide portion G (see FIGS. 15 and 16) of the temporary placement surface 12a. The step of attaching the cone holding member 140 to the outer periphery of the power cable 110 to which the cone member 130 is attached corresponds to the “cone holding member attaching step” of the present invention. The step of temporarily placing the cone holding member 140 attached to the terminal portion of the power cable 110 on the temporary placement surface 12a of the temporary placement table 1 corresponds to the “temporary placement step” of the present invention.

仮置き台1が無かった従来においては、図7に示す状態から図10に示す状態までの作業の間、作業者がコーン保持部材140を所定高さで保持していなければならなかったが、仮置き台1を用いる本願ではこれらの作業の間において作業者によるコーン保持部材140の保持が不要である。   In the prior art in which the temporary placement table 1 was not provided, the worker had to hold the cone holding member 140 at a predetermined height during the work from the state shown in FIG. 7 to the state shown in FIG. In the present application using the temporary table 1, it is not necessary to hold the cone holding member 140 by an operator during these operations.

コーン保持部材140を仮置き台1の仮置き面12aに仮置きした後、電力ケーブル110の導体112の先端に導体引出部材170を接続する(図7参照)。また、導体引出部材170の接続部170aを圧縮し、導体引出部材170を導体112の先端に固定する。そして、導体引出部材170の接続部170aから電力ケーブル110の絶縁層114の上端部にかけて、絶縁テープPを巻きつける(図8参照)。仮置き台1の仮置き面12aにコーン保持部材140を仮置きした状態で電力ケーブル100の導体112の先端に導体接続部材170を接続する工程が、本発明の「導体接続ステップ」に相当する。   After temporarily placing the cone holding member 140 on the temporary placement surface 12a of the temporary placement table 1, the conductor drawing member 170 is connected to the tip of the conductor 112 of the power cable 110 (see FIG. 7). Further, the connecting portion 170 a of the conductor drawing member 170 is compressed, and the conductor drawing member 170 is fixed to the tip of the conductor 112. Then, the insulating tape P is wound from the connecting portion 170a of the conductor drawing member 170 to the upper end portion of the insulating layer 114 of the power cable 110 (see FIG. 8). The step of connecting the conductor connection member 170 to the tip of the conductor 112 of the power cable 100 in a state where the cone holding member 140 is temporarily placed on the temporary placement surface 12a of the temporary placement table 1 corresponds to the “conductor connection step” of the present invention. .

つづいて、がい管120を電力ケーブル110の終端部を被うように被せる(図9参照)。そして、がい管120を所定高さに保持した状態で、コーン保持部材140を仮置き台10から持ち上げてがい管120のがい管貫通孔120aに進入させる(図10参照)。がい管120の下端部外縁にコーン保持部材140のフランジ部140bが接触したところで、両者120,140をボルトによって固定する。がい管120を電力ケーブル100の終端部を被うように被せる工程が、本発明の「がい管装着ステップ」に相当する。   Subsequently, the insulation tube 120 is covered so as to cover the terminal portion of the power cable 110 (see FIG. 9). Then, the cone holding member 140 is lifted from the temporary table 10 with the garment tube 120 held at a predetermined height, and enters the garment tube through hole 120a of the garment tube 120 (see FIG. 10). When the flange portion 140b of the cone holding member 140 comes into contact with the outer edge of the lower end portion of the insulator tube 120, both the members 120 and 140 are fixed with bolts. The step of covering the insulator tube 120 so as to cover the terminal portion of the power cable 100 corresponds to the “insulator tube attaching step” of the present invention.

がい管120が持ち上げられている間に、仮置き台1の撤去作業を行う。まず、仮置き台1の各固定部30を各支持がいし210のピン210aから取外す。そして、電力ケーブル110が仮置き台1の切欠空間部12c(図15,16参照)を通じて仮置き台1から外れた位置にくるように仮置き台1を後退させる(図10参照)。電力ケーブル100にがい管120を被せた状態で、仮置き台1の各固定部30を各支持がいし210から取外す工程が、本発明の「仮置き台取外しステップ」に相当する。   While the insulator tube 120 is being lifted, the temporary table 1 is removed. First, each fixing part 30 of the temporary placing table 1 is removed from the pin 210 a of each support insulator 210. Then, the temporary placing table 1 is moved backward so that the power cable 110 is positioned away from the temporary placing table 1 through the notch space portion 12c (see FIGS. 15 and 16) of the temporary placing table 1 (see FIG. 10). The process of removing the fixing portions 30 of the temporary placing table 1 from the supporting insulators 210 in a state where the power cable 100 is covered with the insulator tube 120 corresponds to the “temporary placing table removing step” of the present invention.

この後、がい管120を各支持がいし210に支持される位置まで降ろしてそのまま各支持がいし210のピン210aによって立設状態に固定する(図11参照)。なお、コーン部材130は、コーン保持部材140の保持部材貫通孔140aに配置される。電力ケーブル100にがい管120を被せた状態でがい管120を基台200に対して立設状態となるように各支持がいし210に対して固定する工程が、本発明の「がい管固定ステップ」に相当する。   Thereafter, the insulator tube 120 is lowered to a position where it is supported by the respective support insulators 210 and is fixed in an upright state by the pins 210a of the respective support insulators 210 (see FIG. 11). The cone member 130 is disposed in the holding member through hole 140a of the cone holding member 140. The process of fixing the support pipes 120 to the support insulators 210 such that the power cables 100 are covered with the support pipes 120 so as to stand upright with respect to the base 200 is the “powder pipe fixing step” of the present invention. It corresponds to.

がい管120の立設後においては、電力ケーブル110の終端部を上方に押し上げる(図12参照)。そして、上部金物180,185を介して、導体引出部材170をがい管120の上端部に固定する。その後、電力ケーブル110を下方へ引っ張り、電力ケーブル110を引張状態とする。   After the erection pipe 120 is erected, the terminal end of the power cable 110 is pushed upward (see FIG. 12). Then, the conductor lead-out member 170 is fixed to the upper end portion of the insulator tube 120 via the upper hardware 180 and 185. Thereafter, the power cable 110 is pulled downward to bring the power cable 110 into a tensioned state.

つぎに、コーン部材圧縮装置150をコーン保持部材140のフランジ部140bに対してボルトで締め上げる(図12参照)。これによって、コーン押圧装置150の弾性手段(例えばスプリング)がコーン部材130を上方に押し付けるように作用して、コーン部材130がコーン保持部材140の保持部材貫通孔140aの内面に対して適切な圧力で押し付けられる。コーン部材圧縮装置150を締め上げた後、電力ケーブル110のシールド線116をコーン部材圧縮装置150に接続する。   Next, the cone member compression device 150 is tightened with a bolt against the flange portion 140b of the cone holding member 140 (see FIG. 12). Accordingly, the elastic means (for example, a spring) of the cone pressing device 150 acts so as to press the cone member 130 upward, and the cone member 130 has an appropriate pressure against the inner surface of the holding member through hole 140a of the cone holding member 140. Pressed with. After the cone member compression device 150 is tightened, the shield wire 116 of the power cable 110 is connected to the cone member compression device 150.

つづいて、保護金具160を上方に押し上げてコーン部材圧縮装置150を被うように配置させる(図13参照)。保護金具160の下端部から電力ケーブル110のシース118にかけては防水テープVを巻きつける(図14参照)。がい管120の上端部においては、一旦、上部金物180,185を取外す。そして、がい管120の上端部からがい管貫通孔120aに絶縁油Fを充填する。   Subsequently, the protective metal fitting 160 is pushed up to be disposed so as to cover the cone member compression device 150 (see FIG. 13). A waterproof tape V is wound from the lower end of the protective metal fitting 160 to the sheath 118 of the power cable 110 (see FIG. 14). At the upper end portion of the insulator tube 120, the upper hardware 180, 185 is once removed. Then, the insulating oil F is filled from the upper end portion of the insulator tube 120 into the insulator tube through hole 120a.

最後に、上部金物180,185を介して、導体引出部材170をがい管120の上端部に固定する(図1参照)。また、上部シールド190でがい管120の上端部を被う。がい管120の上端部に導体引出部材170を固定する工程が、本発明の「導体固定ステップ」に相当する。   Finally, the conductor lead-out member 170 is fixed to the upper end portion of the insulator tube 120 via the upper hardware 180 and 185 (see FIG. 1). Further, the upper shield 190 covers the upper end portion of the garment tube 120. The process of fixing the conductor drawing member 170 to the upper end portion of the insulator tube 120 corresponds to the “conductor fixing step” of the present invention.

<仮置き台の構成(図15乃至21)>
前述の電力ケーブル終端部工事方法で用いた仮置き台1を図15乃至21によって説明する。仮置き台1は、電力ケーブル終端部工事において、コーン保持部材140を一時的に仮置きするための台である。図15乃至17に示すように、仮置き台1は、各支持がいし210に対して固定される複数の固定部30と、コーン保持部材140を仮置きするための仮置き台部10と、固定部30に対して仮置き台部10を所定高さに保持する脚部20とを有している。
<Configuration of temporary table (FIGS. 15 to 21)>
The temporary stand 1 used in the above-described power cable terminal construction method will be described with reference to FIGS. The temporary placement table 1 is a table for temporarily placing the cone holding member 140 temporarily in the construction of the power cable terminal portion. As shown in FIGS. 15 to 17, the temporary placement table 1 includes a plurality of fixed portions 30 fixed to the support insulators 210, a temporary placement table portion 10 for temporarily placing the cone holding member 140, and a fixed position. It has the leg part 20 which hold | maintains the temporary placing stand part 10 with respect to the part 30 at predetermined height.

仮置き台部10は、矩形状の平板部12と、平板部12の両側部から下方へ延びた側板部14と、平板部12の後端から下方へ延びた後板部16と、によって構成されている(図15乃至17参照)。平板部12の中心は、固定部30が支持がいし210に固定された状態で、電力ケーブル110および電力ケーブル110に装着されたコーン部材130の軸心上に位置している。なお、平板部12の形状は矩形に限定されるものではなく、側板部14、後板部16は省略してもよい。   The temporary mounting table 10 includes a rectangular flat plate portion 12, side plate portions 14 extending downward from both side portions of the flat plate portion 12, and a rear plate portion 16 extending downward from the rear end of the flat plate portion 12. (See FIGS. 15 to 17). The center of the flat plate portion 12 is located on the axis of the power cable 110 and the cone member 130 attached to the power cable 110 in a state where the fixing portion 30 is fixed to the support insulator 210. In addition, the shape of the flat plate part 12 is not limited to a rectangle, and the side plate part 14 and the rear plate part 16 may be omitted.

平板部12の上面は、コーン保持部材140を仮置き可能な仮置き面12aとなっている(図15乃至17参照)。仮置き面12a全体にはゴムシートが張られている。仮置き面12aの4隅近傍には、仮置きされるコーン保持部材140の配置位置を規制するためのガイド部Gが設けられている。各ガイド部Gは、上方に突出した板状に形成され、仮置き面12aの中心から所定半径の円弧に沿うように配置されている。そして、ガイド部Gは、仮置きされるコーン保持部材140の軸心が仮置き面12aの中心に位置するようにコーン保持部材140のフランジ部140bの外周位置を規制する。   The upper surface of the flat plate portion 12 serves as a temporary placement surface 12a on which the cone holding member 140 can be temporarily placed (see FIGS. 15 to 17). A rubber sheet is stretched over the temporary placement surface 12a. In the vicinity of the four corners of the temporary placement surface 12a, guide portions G for restricting the arrangement position of the temporarily placed cone holding member 140 are provided. Each guide part G is formed in a plate shape protruding upward, and is arranged along an arc having a predetermined radius from the center of the temporary placement surface 12a. And the guide part G regulates the outer peripheral position of the flange part 140b of the cone holding member 140 so that the axial center of the cone holding member 140 temporarily placed may be located in the center of the temporary placing surface 12a.

平板部12において、平面視でコーン部材130に対応する箇所には、該平板部12を厚み方向に貫通した台部貫通孔12bが設けられている(図15,16参照)。台部貫通孔12bの内径は、平面視されたコーン部材130の外径よりも大きい寸法に設定されている。   In the flat plate portion 12, a base portion through hole 12b penetrating the flat plate portion 12 in the thickness direction is provided at a position corresponding to the cone member 130 in plan view (see FIGS. 15 and 16). The inner diameter of the base through hole 12b is set to be larger than the outer diameter of the cone member 130 in plan view.

平板部12において、その前縁から台部貫通孔12bに至る部分には、該平板部12を厚み方向に貫通した切欠空間部12cが設けられている(図15,16参照)。切欠空間部12cの通路幅Hは、電力ケーブル110のシース118の直径よりも大きい寸法に設定されている(図16参照)。   In the flat plate portion 12, a notch space portion 12 c penetrating the flat plate portion 12 in the thickness direction is provided in a portion from the front edge to the base portion through hole 12 b (see FIGS. 15 and 16). The passage width H of the notch space portion 12c is set to be larger than the diameter of the sheath 118 of the power cable 110 (see FIG. 16).

両側板部14にはそれぞれ、下方へ延びる脚部20が取付けられている(図15乃至18参照)。各脚部20は互いに交差する第1支持脚22と第2支持脚24とが一対で構成されている。例えば、第1支持脚22は側板部14に対して仮置き台部10の内方側に、第2支持脚24は側板部14に対して仮置き台部10の外方側に、それぞれ配置されている。   A leg portion 20 extending downward is attached to each side plate portion 14 (see FIGS. 15 to 18). Each leg portion 20 includes a pair of first support legs 22 and second support legs 24 that intersect each other. For example, the first support leg 22 is disposed on the inner side of the temporary placement table 10 with respect to the side plate portion 14, and the second support leg 24 is disposed on the outer side of the temporary placement table 10 with respect to the side plate portion 14. Has been.

第1支持脚22の一方端には、第1支持脚22に対して仮置き台部10を回動可能に支持する回転接続機構が設けられている。例えば、回転接続機構は、ボルトB1が第1支持脚22の一方端と側板部14の後端部とに挿通されることで構成されている(図15乃至18参照)。   At one end of the first support leg 22, there is provided a rotation connection mechanism that supports the temporary placement table 10 so as to be rotatable with respect to the first support leg 22. For example, the rotation connection mechanism is configured by inserting the bolt B1 through one end of the first support leg 22 and the rear end portion of the side plate portion 14 (see FIGS. 15 to 18).

第2支持脚24の一方端には、第2支持脚24に対して仮置き台部10を係止状態あるいは係止解除状態とすることが可能な係止機構が設けられている。例えば、係止機構は、第2支持脚24が有する突出部24a(図16,18参照)と、側板部14が有する切り欠き部14a(図18参照)とによって構成されている。突出部24aは、第2支持脚24の一方端において仮置き台部10の内方側へ突出形成されている。切り欠き部14aは、側板部14の前端部において第2支持脚24の突出部24aに嵌る形状に形成されている。   At one end of the second support leg 24, there is provided a locking mechanism capable of bringing the temporary mounting base 10 into a locked state or a locked release state with respect to the second support leg 24. For example, the locking mechanism includes a protruding portion 24a (see FIGS. 16 and 18) included in the second support leg 24 and a notch portion 14a (see FIG. 18) included in the side plate portion 14. The protruding portion 24 a is formed so as to protrude toward the inner side of the temporary placing base portion 10 at one end of the second support leg 24. The notch portion 14 a is formed in a shape that fits into the protruding portion 24 a of the second support leg 24 at the front end portion of the side plate portion 14.

第2支持脚24の突出部24aに対して側板部14の切り欠き部14aが掛けられることで、図18に示すようにして第2支持脚24に対して仮置き台部10を係止状態とすることができる。この係止状態は、第1支持脚22あるいは仮置き台部10のいずれか一方を他方に対して回動させることで解除できる(図19参照)。   The notch portion 14a of the side plate portion 14 is hooked on the protruding portion 24a of the second support leg 24, whereby the temporary placement base portion 10 is locked to the second support leg 24 as shown in FIG. It can be. This locked state can be released by rotating either one of the first support leg 22 or the temporary placing base 10 with respect to the other (see FIG. 19).

図15乃至21に示すように、第1支持脚22および第2支持脚24は、これらの両支持脚22,24が交差する箇所でボルトB2によって互いに回動可能に支持されている。   As shown in FIGS. 15 to 21, the first support leg 22 and the second support leg 24 are supported by a bolt B <b> 2 so as to be rotatable with respect to each other at a place where the both support legs 22, 24 intersect.

第1支持脚22は、ボルトB1が設けられた側と反対側の端部に、ボルトB3によって固定された固定部30を有する(図15乃至18参照)。第2支持脚24は、突出部24aを有する側と反対側の端部に、ボルトB3によって固定された固定部30を有する。図17,18に示すように、各固定部30は、支持がいし210のピン210aを挿通可能なピン貫通孔30aを有する。各固定部30のピン貫通孔30aに支持がいし210のピン210aが挿通されることで、それぞれの支持脚22,24が支持がいし210に対して位置決めされ、かつ、固定される。なお、支持がいし210のピン210aにはねじが切られており、ピン貫通孔30aに挿通された支持がいし210のピン210aにナット(図示省略)を締めてもよい。   The 1st support leg 22 has the fixing | fixed part 30 fixed with the volt | bolt B3 in the edge part on the opposite side to the side in which the volt | bolt B1 was provided (refer FIG. 15 thru | or 18). The 2nd support leg 24 has the fixing | fixed part 30 fixed with the volt | bolt B3 in the edge part on the opposite side to the side which has the protrusion part 24a. As shown in FIGS. 17 and 18, each fixing portion 30 has a pin through hole 30 a into which the pin 210 a of the support insulator 210 can be inserted. By inserting the pin 210a of the support insulator 210 into the pin through hole 30a of each fixing portion 30, the support legs 22 and 24 are positioned and fixed with respect to the support insulator 210. The pin 210a of the support insulator 210 is threaded, and a nut (not shown) may be tightened to the pin 210a of the support insulator 210 inserted through the pin through hole 30a.

図18乃至21に示すように、仮置き台1は、図18に示す使用可能状態から、図21に示す折りたたみ状態へと態様を変更可能である。この変更過程について説明する。まず、使用可能状態にある仮置き台1の仮置き台部10を、第1支持脚22に対して上方へ回動させ(図19参照)、第2支持脚24と仮置き台部10との係止状態を解除する。両者24,10の係止状態を解除するために、第1支持脚22を仮置き台部10に対して下方へ回動させてもよい。つぎに、第1支持脚22および第2支持脚24をボルトB2を支点に回動させて、第1支持脚22の固定部30と、第2支持脚24の突出部24aとを近づける(図20参照)。そして、両支持脚22,24を略平行に配置させる。最後に、両支持脚22,24を略平行に配置したまま、仮置き台部10を第1支持脚22に対して下方へ回動させる、あるいは、第1支持脚22を仮置き台部10に対して上方へ回動させて、仮台置き部10と両支持脚22,24とを互いに近づける。これによって、仮置き台1は、平板部12に沿って両支持脚22,24が配置された図21に示す折りたたみ状態となる。なお、作業者は後板部16に設けられた取手部Tをつかんで、折りたたみ状態の仮置き台1を持ち運ぶことがでできる。   As shown in FIGS. 18 to 21, the temporary placing table 1 can be changed from the usable state shown in FIG. 18 to the folded state shown in FIG. 21. This changing process will be described. First, the temporary table 10 of the temporary table 1 in a usable state is rotated upward with respect to the first support leg 22 (see FIG. 19), and the second support leg 24 and the temporary table 10 Release the locked state. In order to release the locked state of the both 24 and 10, the first support leg 22 may be rotated downward with respect to the temporary placing base 10. Next, the first support leg 22 and the second support leg 24 are rotated around the bolt B2 as a fulcrum, so that the fixed portion 30 of the first support leg 22 and the protruding portion 24a of the second support leg 24 are brought closer (see FIG. 20). And both the support legs 22 and 24 are arrange | positioned substantially parallel. Finally, with the two support legs 22 and 24 disposed substantially in parallel, the temporary placement table 10 is rotated downward relative to the first support legs 22, or the first support legs 22 are moved to the temporary placement table 10. , The temporary table holder 10 and the support legs 22 and 24 are brought close to each other. As a result, the temporary placing table 1 is in a folded state shown in FIG. 21 in which both support legs 22 and 24 are arranged along the flat plate portion 12. The operator can carry the folded temporary table 1 by grasping the handle portion T provided on the rear plate portion 16.

<発明の効果>
本発明の仮置き台1では、固定部30に対して、コーン保持部材140を一時的に仮置きするための仮置き台部10が所定高さに保持される(図6乃至9,図17参照)。このことから、電力ケーブル110が大径である場合に要求される、電力ケーブル110にコーン保持部材140を装着させた後に電力ケーブル110の導体112に導体引出部材170を接続しその接続部170aを圧縮する作業や、その後、電力ケーブル110にがい管120を被せる作業において、コーン保持部材140を仮置き台部10で所定高さに保持できる。そのため、電力ケーブル終端部工事においてコーン保持部材140を所定高さで保持することが必要な間、作業者がコーン保持部材140を所定の高さで保持することが不要とされ、その分、作業者はコーン保持部材140を保持する負担が軽減されるとともに他の作業に専念することができ、工事の施工効率が上がる。
<Effect of the invention>
In the temporary placing table 1 of the present invention, the temporary placing table 10 for temporarily placing the cone holding member 140 with respect to the fixed portion 30 is held at a predetermined height (FIGS. 6 to 9 and FIG. 17). reference). Therefore, the conductor drawing member 170 is connected to the conductor 112 of the power cable 110 after the cone holding member 140 is attached to the power cable 110, which is required when the power cable 110 has a large diameter. The cone holding member 140 can be held at a predetermined height by the temporary placing table 10 in the operation of compressing and then the operation of covering the power cable 110 with the stub tube 120. Therefore, it is not necessary for the operator to hold the cone holding member 140 at a predetermined height while it is necessary to hold the cone holding member 140 at a predetermined height in power cable terminal construction. The worker can reduce the burden of holding the cone holding member 140 and can concentrate on other work, thereby improving the construction efficiency.

本発明の仮置き台1では、各固定部30が、がい管120を固定するための各支持がいし210を利用して位置きめされる(図15乃至17参照)ことから、仮置き台1専用の位置決め部材を基台200側に新たに設ける必要がない。そのため、電力ケーブル終端工事の設備コストが抑えられる。また、本発明の仮置き台1では、支持がいし210を介して仮置き台1を確実に基台200に固定することができる。   In the temporary table 1 according to the present invention, each fixing portion 30 is positioned using each support insulator 210 for fixing the insulator tube 120 (see FIGS. 15 to 17). This positioning member need not be newly provided on the base 200 side. Therefore, the equipment cost for power cable termination work can be reduced. Further, in the temporary table 1 according to the present invention, the temporary table 1 can be reliably fixed to the base 200 via the support insulator 210.

本発明の仮置き台1では、第1支持脚22と仮置き台部10とが回動接続機構にて接続され、第2支持脚24と仮置き台部10とが係止機構にて係止状態あるいは係止解除状態となるように構成され、第1支持脚22と第2支持脚24とが互いに回転可能に支持されている(図18乃至21参照)。これによって、仮置き台1は、各支持がいし210から取外された際コンパクトに折りたたむことができる(図21参照)ので、収納時や持ち運び時に便利である。   In the temporary table 1 of the present invention, the first support leg 22 and the temporary table 10 are connected by a rotation connection mechanism, and the second support leg 24 and the temporary table 10 are engaged by a locking mechanism. The first support leg 22 and the second support leg 24 are rotatably supported with respect to each other (see FIGS. 18 to 21). As a result, the temporary table 1 can be folded compactly (see FIG. 21) when each support is removed from the chair 210, which is convenient for storage and carrying.

本発明の仮置き台1では、仮置き面12aの縁部の一部から台部貫通孔12bに至る切欠空間部12cが形成されている(図15,16参照)。このことから、仮置き台1は、電力ケーブル110が切欠空間部12cを通じて台部貫通孔12bに位置するように前進させることができ(図5,6参照)、また、電力ケーブル110が切欠空間部12cを通じて仮置き台1から外れた位置にくるように後退させることができる(図9,10参照)。そのため、電力ケーブル終端工事において仮置き台1を利用しても電力ケーブル110を動かす必要はなく、工事の各作業工程に影響がない。   In the temporary placing table 1 of the present invention, a notch space portion 12c is formed from a part of the edge of the temporary placing surface 12a to the through hole 12b (see FIGS. 15 and 16). From this, the temporary placing stand 1 can be advanced so that the power cable 110 is positioned in the base through hole 12b through the notch space portion 12c (see FIGS. 5 and 6), and the power cable 110 is notch space. It can be retracted so as to come to a position off the temporary table 1 through the portion 12c (see FIGS. 9 and 10). Therefore, even if the temporary stand 1 is used in the power cable termination work, there is no need to move the power cable 110, and each work process of the work is not affected.

本発明の仮置き台1では、台部貫通孔12bの内径が、コーン部材130の外形よりも大きい寸法に設定されている(図16参照)。このことから、例えば上述の実施形態の電力ケーブル終端部工事方法から手順を変更し、仮置き面12aにコーン保持部材140を仮置きした状態で、台部貫通孔12bを通じてコーン部材130を下からコーン保持部材140の保持部材貫通孔140aに配置させることができる。この作業の間、作業者はコーン保持部材140を所定の高さで保持することが不要であり、その分、他の作業に専念することができる。そのため、電力ケーブル終端工事の施工効率が上がる。   In the temporary mounting base 1 of the present invention, the inner diameter of the base portion through hole 12b is set to be larger than the outer shape of the cone member 130 (see FIG. 16). From this, for example, the procedure is changed from the power cable terminal portion construction method of the above-described embodiment, and the cone member 130 is moved from below through the base through hole 12b in a state where the cone holding member 140 is temporarily placed on the temporary placement surface 12a. The cone holding member 140 can be disposed in the holding member through hole 140a. During this operation, the operator does not need to hold the cone holding member 140 at a predetermined height, and can concentrate on other operations accordingly. Therefore, the construction efficiency of the power cable termination work is increased.

本発明の仮置き台1では、仮置き面12aにゴムシートが張られている。そのため、仮置き面12aに仮置きされたコーン保持部材140の損傷を防止できる。   In the temporary placement table 1 of the present invention, a rubber sheet is stretched on the temporary placement surface 12a. Therefore, damage to the cone holding member 140 temporarily placed on the temporary placement surface 12a can be prevented.

本発明の電力ケーブル終端部工事方法では、コーン保持部材140を電力ケーブル110に装着した後、コーン保持部材140を仮置き面12aに仮置きした状態で電力ケーブル110の導体112に導体引出部材170を接続し、また、がい管120を電力ケーブル110に被せる(図8,9参照)。そのため、これらの作業の間、作業者がコーン保持部材140を所定の高さで保持することが不要とされ、その分、作業者は他の作業に専念することができ、工事の施工効率が上がる。   In the power cable terminal portion construction method of the present invention, after the cone holding member 140 is attached to the power cable 110, the conductor drawing member 170 is placed on the conductor 112 of the power cable 110 with the cone holding member 140 temporarily placed on the temporary placement surface 12a. And the insulation tube 120 is put on the power cable 110 (see FIGS. 8 and 9). Therefore, during these operations, it is unnecessary for the operator to hold the cone holding member 140 at a predetermined height, and accordingly, the operator can concentrate on other operations, and the construction efficiency of the construction is improved. Go up.

1 仮置き台
10 仮置き台部
12a 仮置き面
12b 台部貫通孔
20 脚部
30 固定部
110 電力ケーブル
112 導体
114 絶縁層
120 がい管
120a がい管貫通孔
130 コーン部材
130a コーン貫通孔
140 コーン保持部材
140a 保持部材貫通孔
170 導体引出部材
200 基台

DESCRIPTION OF SYMBOLS 1 Temporary placing stand 10 Temporary placing stand part 12a Temporary placing surface 12b Stand part through-hole 20 Leg part 30 Fixing part 110 Power cable 112 Conductor 114 Insulating layer 120 Insulating pipe 120a Insulating pipe through-hole 130 Cone member 130a Cone through-hole 140 Cone holding Member 140a Holding member through hole 170 Conductor extraction member 200 Base

Claims (7)

基台の下から引き上げられて少なくとも導体の周囲が絶縁層にて被われた電力ケーブルの終端部において、
前記電力ケーブルの終端部の外周に、絶縁体で形成されて前記電力ケーブルを挿通可能なコーン貫通孔を有するコーン部材と、絶縁体で形成されて前記電力ケーブルを挿通可能な貫通孔であって前記コーン部材を収容可能な形状を有する貫通孔である保持部材貫通孔を有するコーン保持部材と、が装着され、
前記コーン部材と前記コーン保持部材とが装着された前記電力ケーブルの終端部における前記導体の先端に、導電体で形成された導体引出部材が接続され、
前記コーン部材と前記コーン保持部材とが装着され、かつ、前記導体引出部材が接続された前記電力ケーブルの終端部の外周を被うように、絶縁体で形成されて前記電力ケーブルを挿通可能な貫通孔であって前記コーン保持部材を収容可能な形状を有する貫通孔であるがい管貫通孔を有するがい管が被せられ、
少なくとも前記がい管が、前記基台に固定された複数の支持がいしに対して固定されて前記基台に対して立った状態である立設状態となるように固定され、かつ、前記がい管の先端部に、前記導体の先端に接続された前記導体引出部材が固定された状態とする、電力ケーブル終端部工事において、前記コーン保持部材を一時的に仮置きするための仮置き台であって、
複数の前記支持がいしに対して固定される複数の固定部と、
前記電力ケーブルを挿通可能な台部貫通孔を有して前記コーン保持部材を一時的に仮置きするための仮置き面を有する仮置き台部と、
前記固定部に対して前記仮置き台部を所定高さに保持する脚部と、を有する、
仮置き台。
At the end of the power cable that has been pulled up from under the base and covered at least around the conductor with an insulating layer,
A cone member formed on an outer periphery of a terminal portion of the power cable and having a cone through hole through which the power cable can be inserted; and a through hole formed of an insulator and into which the power cable can be inserted. A cone holding member having a holding member through hole, which is a through hole having a shape capable of accommodating the cone member,
A conductor lead member formed of a conductor is connected to a tip of the conductor at a terminal portion of the power cable on which the cone member and the cone holding member are mounted,
The cone member and the cone holding member are mounted, and formed of an insulator so as to cover the outer periphery of the end portion of the power cable to which the conductor drawing member is connected, and the power cable can be inserted. A through-hole is a through-hole having a shape capable of accommodating the cone holding member, and a pipe having a pipe through-hole is covered,
At least the insulator pipe is fixed to a plurality of support insulators fixed to the base so as to be in a standing state that stands on the base; and In the power cable terminal construction, the temporary holding table for temporarily placing the cone holding member in a state where the conductor drawing member connected to the tip of the conductor is fixed to the tip. ,
A plurality of fixing portions fixed to the plurality of support insulators;
A temporary placement table portion having a temporary placement surface for temporarily placing the cone holding member, having a base portion through-hole through which the power cable can be inserted;
A leg portion that holds the temporary placement table portion at a predetermined height with respect to the fixed portion,
Temporary table.
請求項1に記載の仮置き台であって、
複数の前記支持がいしのそれぞれは、上方に突出するピンを有し、
前記固定部のそれぞれは、前記ピンを挿通可能なピン貫通孔を有し、当該ピン貫通孔に前記ピンが挿通されることで、前記支持がいしに対して位置決めされて固定される、
仮置き台。
The temporary table according to claim 1,
Each of the plurality of support insulators has a pin protruding upward,
Each of the fixing portions has a pin through-hole through which the pin can be inserted, and the pin is inserted into the pin through-hole so that the pin is positioned and fixed with respect to the support insulator.
Temporary table.
請求項1または2に記載の仮置き台であって、
前記脚部は、互いに交差する第1支持脚と第2支持脚とが一対で構成され、
前記第1支持脚の一方端には、前記第1支持脚に対して前記仮置き台部を回動可能に支持する回動接続機構が設けられ、
前記第2支持脚の一方端には、前記第2支持脚に対して前記仮置き台部を係止状態あるいは係止解除状態とすることが可能な係止機構が設けられ、
前記第1支持脚と前記第2支持脚とはこれらの両支持脚が交差する箇所を支点として互いに回動可能に支持されている仮置き台。
The temporary table according to claim 1 or 2,
The leg portion includes a pair of a first support leg and a second support leg that intersect each other,
At one end of the first support leg, there is provided a rotation connection mechanism that rotatably supports the temporary placing table with respect to the first support leg,
The one end of the second support leg is provided with a locking mechanism capable of bringing the temporary placing table portion into a locked state or a locked release state with respect to the second support leg,
The first support leg and the second support leg are temporarily placed on each other so that the first support leg and the second support leg can be rotated with respect to each other at a point where the two support legs intersect.
請求項1〜3のいずれか一項に記載の仮置き台であって、
前記仮置き台部には、前記仮置き面の縁部の一部から前記台部貫通孔に至る切欠空間部が形成されている仮置き台。
The temporary table according to any one of claims 1 to 3,
The temporary placement table is provided with a notch space portion formed from a part of an edge of the temporary placement surface to the through hole of the table.
請求項1〜4のいずれか一項に記載の仮置き台であって、
前記台部貫通孔の内径は、前記コーン部材の外形よりも大きい寸法に設定されている仮置き台。
It is the temporary placing stand as described in any one of Claims 1-4,
The inner diameter of the said base part through-hole is a temporary placing stand currently set to the dimension larger than the external shape of the said cone member.
請求項1〜5のいずれか一項に記載の仮置き台であって、前記仮置き面にはゴムシートが張られている仮置き台。   The temporary placement table according to any one of claims 1 to 5, wherein a rubber sheet is stretched on the temporary placement surface. 請求項1〜6のいずれか一項に記載の仮置き台を用いた電力ケーブル終端部工事方法であって、
前記電力ケーブルの終端部を加工して、先端側から前記導体と前記絶縁層とを所定の寸法で露出させるケーブル加工ステップと、
前記電力ケーブルの終端部の外周に前記コーン部材を装着するコーン部材装着ステップと、
前記仮置き台の前記固定部を前記支持がいしに対して固定する仮置き台固定ステップと、
前記コーン部材を装着した前記電力ケーブルの終端部の外周に前記コーン保持部材を装着するコーン保持部材装着ステップと、
前記電力ケーブルの終端部に装着した前記コーン保持部材を前記仮置き台の前記仮置き面上に仮置きする仮置きステップと、
前記コーン保持部材を前記仮置き台の前記仮置き面上に仮置きした状態で、前記電力ケーブルの終端部における前記導体の先端に前記導体引出部材を接続する導体接続ステップと、
前記導体の先端に前記導体引出部材を接続した前記電力ケーブルの終端部の外周を被うように前記がい管を被せるがい管装着ステップと、
前記電力ケーブルの終端部に前記がい管を被せた状態で、前記仮置き台の前記固定部を前記支持がいしから取外す仮置き台取外しステップと、
前記電力ケーブルの終端部に前記がい管を被せた状態で前記がい管を基台に対して立設状態となるように支持がいしに対して固定するがい管固定ステップと、
前記支持がいしに対して固定した前記がい管の先端部に、前記導体引出部材を固定する導体固定ステップと、を有する電力ケーブル終端部工事方法。

It is a power cable termination part construction method using the temporary placing stand according to any one of claims 1 to 6,
A cable processing step of processing the terminal portion of the power cable to expose the conductor and the insulating layer from a tip side with a predetermined dimension;
A cone member mounting step of mounting the cone member on the outer periphery of the terminal portion of the power cable;
A temporary table fixing step for fixing the fixing portion of the temporary table to the support insulator;
A cone holding member mounting step of mounting the cone holding member on the outer periphery of the terminal portion of the power cable mounted with the cone member;
A temporary placement step of temporarily placing the cone holding member attached to the terminal portion of the power cable on the temporary placement surface of the temporary placement table;
A conductor connection step of connecting the conductor lead-out member to the tip of the conductor at the terminal end of the power cable in a state where the cone holding member is temporarily placed on the temporary placement surface of the temporary placement table;
A garment tube mounting step of covering the garment tube so as to cover an outer periphery of a terminal portion of the power cable in which the conductor drawing member is connected to a tip of the conductor;
A temporary stand removing step for removing the fixing portion of the temporary stand from the support insulator in a state where the end portion of the power cable is covered with the insulator tube;
An insulator tube fixing step for fixing the insulator tube to a support insulator so that the insulator tube is in a standing state with respect to a base in a state where the insulator tube is covered with the end portion of the power cable;
A power cable terminal portion construction method comprising: a conductor fixing step of fixing the conductor lead-out member to a distal end portion of the insulator pipe fixed to the support insulator.

JP2014131081A 2014-06-26 2014-06-26 Temporary table and power cable terminal construction method Active JP6313135B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014131081A JP6313135B2 (en) 2014-06-26 2014-06-26 Temporary table and power cable terminal construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014131081A JP6313135B2 (en) 2014-06-26 2014-06-26 Temporary table and power cable terminal construction method

Publications (2)

Publication Number Publication Date
JP2016010282A true JP2016010282A (en) 2016-01-18
JP6313135B2 JP6313135B2 (en) 2018-04-18

Family

ID=55227488

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014131081A Active JP6313135B2 (en) 2014-06-26 2014-06-26 Temporary table and power cable terminal construction method

Country Status (1)

Country Link
JP (1) JP6313135B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018210688A1 (en) * 2017-05-15 2018-11-22 Tyco Electronics Raychem Gmbh Dry termination for a high-voltage electric cable

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS492082A (en) * 1972-04-25 1974-01-09
JPH09215138A (en) * 1996-02-01 1997-08-15 Mitsubishi Cable Ind Ltd Jig and method for lifting bushing and cable

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS492082A (en) * 1972-04-25 1974-01-09
JPH09215138A (en) * 1996-02-01 1997-08-15 Mitsubishi Cable Ind Ltd Jig and method for lifting bushing and cable

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2018210688A1 (en) * 2017-05-15 2018-11-22 Tyco Electronics Raychem Gmbh Dry termination for a high-voltage electric cable
CN110622377A (en) * 2017-05-15 2019-12-27 泰科电子瑞侃有限责任公司 Dry termination of high voltage cable
US10742015B2 (en) 2017-05-15 2020-08-11 Tyco Electronics Raychem Gmbh Dry termination for a high-voltage electric cable

Also Published As

Publication number Publication date
JP6313135B2 (en) 2018-04-18

Similar Documents

Publication Publication Date Title
KR102365477B1 (en) Fixing equipment for overhead power distribution line with lightning protection structure
KR102381232B1 (en) Fixing equipment for overhead power distribution line with lightning protection structure
CN103797672A (en) Cable retaining apparatus
US20120007298A1 (en) Adjustable bicycle workstand
KR101926365B1 (en) Lead-in pole for extra high voltage distribution line
CN107039919A (en) A kind of wire-binding device
JP5822220B1 (en) Electrical device mounting device
JP6313135B2 (en) Temporary table and power cable terminal construction method
CN204947411U (en) The special aerial device of Transformer Bushing Overhaul
JP2012190751A (en) Bindless pin insulator for high voltage
KR102342807B1 (en) Cable clamp for connecting high-voltage wires
CN111029811A (en) Universal clamping plate type ground wire operating rod
CN102944705A (en) Tool for alternating current-direct current high voltage holding test
KR102140543B1 (en) Support device for low pressure overhead line connection
JP2008245343A (en) Supporting tool for superconducting cable
CN103208757B (en) Insulated conductor supporter
JP5897927B2 (en) Electric wire cutting / connection auxiliary tool
KR20160094822A (en) Electric cable fixing device for a suspension insulators
CN110277753B (en) Support frame suitable for temporary cable support of electric power foundation construction site and method thereof
KR102289231B1 (en) Auxiliary device for live wire work for maintenance of overhead distribution lines
JP4531999B2 (en) Safety belt mounting device
CN210007289U (en) Support frame suitable for electric power capital construction job site interim cable supports
US9978539B1 (en) Extractor of a bushing conductor from a bushing insulator for a dead tank circuit breaker
CN107528261A (en) One kind connects reliable electric power overhaul aid
JP2016134940A (en) Core wire exposure device for power cable, and core wire exposure method for power cable

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20170331

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20180222

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20180306

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20180322

R150 Certificate of patent or registration of utility model

Ref document number: 6313135

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250