JP2015139360A - Motor controller - Google Patents

Motor controller Download PDF

Info

Publication number
JP2015139360A
JP2015139360A JP2014011868A JP2014011868A JP2015139360A JP 2015139360 A JP2015139360 A JP 2015139360A JP 2014011868 A JP2014011868 A JP 2014011868A JP 2014011868 A JP2014011868 A JP 2014011868A JP 2015139360 A JP2015139360 A JP 2015139360A
Authority
JP
Japan
Prior art keywords
phase
current
carrier
period
timing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2014011868A
Other languages
Japanese (ja)
Other versions
JP6102768B2 (en
Inventor
聖仁 下野
Seiji Shimono
聖仁 下野
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujitsu General Ltd
Original Assignee
Fujitsu General Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujitsu General Ltd filed Critical Fujitsu General Ltd
Priority to JP2014011868A priority Critical patent/JP6102768B2/en
Publication of JP2015139360A publication Critical patent/JP2015139360A/en
Application granted granted Critical
Publication of JP6102768B2 publication Critical patent/JP6102768B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Control Of Ac Motors In General (AREA)
  • Control Of Motors That Do Not Use Commutators (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a motor controller that can reduce a time lag between a carrier period corresponding to calculated three-phase currents and a carrier period for performing control using the calculated three-phase currents.SOLUTION: In the motor controller, a calculating portion calculates, when a determining portion determines that a detectable phase of three-phase currents varies between a first carrier period and a second carrier period following the first carrier period, calculates first-phase and second-phase currents on the basis of a bus bar current detected in the first carrier period, and calculates approximately a third-phase current from the first-phase and the second-phase currents; calculates the first-phase and the third-phase currents on the basis of a bus bar current detected in the second carrier period; and calculates three-phase currents at boundary timing between the first carrier period and the second carrier period on the basis the first-phase and the third-phase currents in the first carrier period and the first-phase and the third-phase currents in the second carrier period.

Description

本発明は、モータの制御装置に関する。   The present invention relates to a motor control device.

ブラシレスDCモータの制御を精度良く行うには、ステータ(固定子)巻線に流れる相電流を正確に把握する必要がある。各相に流れる電流が把握できれば、モータの回転子の位置を推定したり、モータの回転速度を制御したりすることができる。   In order to accurately control the brushless DC motor, it is necessary to accurately grasp the phase current flowing through the stator (stator) winding. If the current flowing through each phase can be grasped, the position of the rotor of the motor can be estimated and the rotational speed of the motor can be controlled.

一般に、回路のあるノードを流れる電流の電流値を求める場合、2つの方法が挙げられる。1つ目の方法は、電流センサを用いる方法である。この方法では、電流検出用のトランスを備えたカレントトランス(CT)や、ホール素子を備えた電流センサなどを用いて、電流を検出する。2つ目の方法は、シャント抵抗を用いる方法である。あらかじめ求めたいノードにシャント抵抗を接続しておき、そのシャント抵抗の両端における電圧値を測定し、その電圧値と抵抗値とから電流値を求めることが行われている。   Generally, there are two methods for obtaining a current value of a current flowing through a node of a circuit. The first method is a method using a current sensor. In this method, a current is detected using a current transformer (CT) having a current detection transformer, a current sensor having a Hall element, or the like. The second method uses a shunt resistor. A shunt resistor is connected to a node to be obtained in advance, a voltage value at both ends of the shunt resistor is measured, and a current value is obtained from the voltage value and the resistance value.

一方、位置センサレス駆動を行うモータの駆動方式としては、180度通電方式(正弦波通電方式)があり、3相モータの場合モータの3相電流値を用いてモータの回転数が目標回転数になるようにPWM制御を行う。モータの各相の電流を検出する方法の1つとしては、インバータ回路の直流部に挿入した1つのシャント抵抗を用いた方法がある。1つのシャント抵抗を用いた場合、シャント抵抗で検出される2相分の相電流値の検出タイミングは同一でない。これにより、3相の電流の総和がゼロになるという3相条件により2相の相電流から残りの1相の電流を推定する場合、検出タイミングの異なる2相の相電流を用いるので、推定における誤差が増大する可能性がある。   On the other hand, there is a 180-degree energization method (sine wave energization method) as a motor driving method that performs position sensorless driving. In the case of a three-phase motor, the motor rotation speed is set to the target rotation speed using the motor three-phase current value. PWM control is performed so that One method for detecting the current of each phase of the motor is to use a single shunt resistor inserted in the DC section of the inverter circuit. When one shunt resistor is used, the detection timings of the phase current values for two phases detected by the shunt resistor are not the same. As a result, when estimating the remaining one-phase current from the two-phase phase current based on the three-phase condition that the sum of the three-phase currents becomes zero, the two-phase phase currents with different detection timings are used. The error can increase.

これに対して、特許文献1には、電動機の相電流推定装置において、PWM制御の三角波キャリア信号の1周期中でのキャリア頂点に対して対称なタイミングで推定した2相の相電流をそれぞれ平均してキャリア頂点での2相の相電流を算出し、求められた2相の相電流から残りの1相の相電流を算出することが記載されている。これにより、特許文献1によれば、3相の相電流を同一のタイミングで精度よく推定することができるとされている。   On the other hand, in Patent Document 1, in a phase current estimation device for an electric motor, two-phase phase currents estimated at symmetrical timings with respect to the carrier vertex in one period of a PWM-controlled triangular wave carrier signal are averaged. It is described that the two-phase phase current at the carrier apex is calculated, and the remaining one-phase current is calculated from the obtained two-phase phase current. Thereby, according to patent document 1, it is supposed that the three-phase phase current can be accurately estimated at the same timing.

特開2010−88260号公報JP 2010-88260 A

特許文献1に記載の相電流推定装置では、現在のキャリア周期内で2相の電流を推定した後に2相の電流値を基に他の1相の電流値を算出するために、算出された3相の相電流を現在の次のキャリア周期での制御に用いようとしてもマイコンの演算速度やインバータ回路の応答特性等の制約により間に合わない。すなわち、特許文献1に記載の相電流推定装置では、3相の電流を算出する処理が現在の次のキャリア周期に行われ、算出された3相の相電流を用いることができるのは現在の次のさらに次のキャリア周期になる。そのため、算出された3相の相電流に対応した期間(現在のキャリア周期)とその相電流を用いる制御の期間(次の次のキャリア周期)とのタイムラグが大きくなる。算出された3相の相電流に対応した周期とその相電流を用いて制御を行なう周期とのタイムラグが大きくなると、モータの制御の精度が低下する可能性がある。   In the phase current estimation device described in Patent Document 1, after calculating the current of two phases within the current carrier cycle, the current value of the other phase is calculated based on the current value of the two phases. Even if an attempt is made to use the three-phase current for the control in the current next carrier cycle, it is not in time due to restrictions such as the calculation speed of the microcomputer and the response characteristics of the inverter circuit. That is, in the phase current estimation device described in Patent Document 1, the process of calculating the three-phase current is performed in the current next carrier cycle, and the calculated three-phase phase current can be used. The next and next carrier cycle. Therefore, the time lag between the period corresponding to the calculated three-phase phase current (current carrier cycle) and the control period using the phase current (next carrier cycle) increases. If the time lag between the cycle corresponding to the calculated three-phase phase current and the cycle in which control is performed using the phase current is increased, the accuracy of motor control may be reduced.

本発明は、上記に鑑みてなされたものであって、算出された3相の相電流に対応した期間(キャリア周期)とその相電流を用いて制御を行なう期間(キャリア周期)とのタイムラグを低減することでモータの制御の精度を上げることができるモータ制御装置を得ることを目的とする。   The present invention has been made in view of the above, and the time lag between the period corresponding to the calculated three-phase phase current (carrier cycle) and the period of control using the phase current (carrier period) is reduced. An object of the present invention is to obtain a motor control device capable of increasing the accuracy of motor control by reducing the motor.

上述した課題を解決し、目的を達成するために、本発明の第1の側面にかかるモータ制御装置は、直流電源から供給された直流電力をPWM制御により3相の交流電力に変換してモータヘ供給するインバータと、前記直流電源と前記インバータとの間に接続された1つのシャント抵抗を用いてインバータの母線電流を検出する電流検出部と、前記電流検出部により検出された母線電流に基づいて、前記モータに流れる3相の電流を算出する算出部と、前記算出部により算出された3相の電流に基づいて3相の電圧指令値を生成し、生成された3相の電圧指令値と所定の周期を有する三角波キャリア信号から3相のPWM信号を生成する生成部とを備え、前記算出部は、第1のキャリア周期の3相のPWM信号と前記第1のキャリア周期の後半に検出された母線電流とから前記第1のキャリア周期の後半における3相の電流のうち2相の電流を算出するとともに前記第1のキャリア周期に続く第2のキャリア周期の3相のPWM信号と前記第2のキャリア周期の前半に検出された母線電流とから前記第2のキャリア周期の前半における3相の電流のうち2相の電流を算出する第1算出部と、前記第1算出部で算出された前記第1のキャリア周期の後半における2相の電流から残りの1相を算出する第2算出部と、前記第1算出部と前記第2算出部により算出された前記第1のキャリア周期の後半の3相の電流と前記第2のキャリア周期の前半の2相の電流とに基づいて前記第1のキャリア周期と前記第2のキャリア周期との境界タイミングにおける3相の電流を算出する第3算出部と、前記第1のキャリア周期と前記第2のキャリア周期とで3相の電流のうち検出できる相が変化したか否か判定する判定部とを備え、前記第3算出部は、前記第1のキャリア周期と前記第2のキャリア周期とで3相の電流のうち検出できる相が変化しないと前記判定部が判定すると、前記第1算出部で算出された2相の電流を用いて3相の電流を算出し、検出できる相が変化したと前記判定部が判定すると、前記第1算出部で算出された電流と第2算出部で算出された相電流を用いて3相の電流を算出し、前記生成部は前記第2のキャリア周期に続く第3のキャリア周期で用いる3相のPWM信号を生成するための3相の電圧指令値を前記境界タイミングにおける3相の電流に基づいて生成することを特徴とする。   In order to solve the above-described problems and achieve the object, a motor control device according to a first aspect of the present invention converts DC power supplied from a DC power source into three-phase AC power by PWM control and supplies the motor power. Based on an inverter to be supplied, a current detector that detects a bus current of the inverter using one shunt resistor connected between the DC power source and the inverter, and a bus current detected by the current detector A three-phase voltage command value generated based on the three-phase current calculated by the calculation unit, a calculation unit that calculates a three-phase current flowing in the motor, and a generated three-phase voltage command value; A generating unit that generates a three-phase PWM signal from a triangular wave carrier signal having a predetermined period, and the calculation unit includes a three-phase PWM signal having a first carrier period and a latter half of the first carrier period. A two-phase current among the three-phase currents in the latter half of the first carrier period is calculated from the detected bus current, and a three-phase PWM signal of the second carrier period following the first carrier period A first calculator that calculates a two-phase current out of the three-phase currents in the first half of the second carrier cycle from the bus current detected in the first half of the second carrier cycle; and the first calculator A second calculation unit that calculates the remaining one phase from the two-phase current in the latter half of the calculated first carrier cycle; and the first carrier calculated by the first calculation unit and the second calculation unit. The three-phase current at the boundary timing between the first carrier period and the second carrier period is calculated based on the three-phase current in the second half of the period and the two-phase current in the first half of the second carrier period. And a third calculation unit A determination unit configured to determine whether or not a detectable phase of a three-phase current has changed between the first carrier cycle and the second carrier cycle, wherein the third calculation unit includes the first carrier If the determination unit determines that the detectable phase of the three-phase current does not change between the period and the second carrier period, the three-phase current is calculated using the two-phase current calculated by the first calculation unit. When the determination unit determines that the detectable phase has changed, the three-phase current is calculated using the current calculated by the first calculation unit and the phase current calculated by the second calculation unit, The generation unit generates a three-phase voltage command value for generating a three-phase PWM signal used in a third carrier period following the second carrier period based on the three-phase current at the boundary timing. It is characterized by.

本発明の第2の側面にかかるモータ制御装置は、本発明の第1の側面にかかるモータの制御装置において、前記第3算出部は、前記第1のキャリア周期の後半における2相の電流と前記第2のキャリア周期の前半における2相の電流とから線形補間により前記境界タイミングにおける2相の電流を算出する補間算出部と、前記補間算出部で算出された前記境界タイミングにおける2相の電流から前記3相の電流のうち残りの1相の電流を算出する算出処理部とを有することを特徴とする。   A motor control device according to a second aspect of the present invention is the motor control device according to the first aspect of the present invention, wherein the third calculation unit is configured to calculate a two-phase current in the latter half of the first carrier period. An interpolation calculation unit that calculates a two-phase current at the boundary timing by linear interpolation from a two-phase current in the first half of the second carrier cycle, and a two-phase current at the boundary timing calculated by the interpolation calculation unit To a calculation processing unit for calculating the remaining one-phase current among the three-phase currents.

本発明の第3の側面にかかるモータの制御装置は、本発明の第2の側面又は第3の側面にかかるモータの制御装置において、前記第1算出部は、前記第1のキャリア周期の後半における第1の相の電流に対応した第1の期間と第2の相の電流に対応した第2の期間とに区分したとき、前記第1の期間における中央より前記第2の期間の側の第1のタイミングで検出された母線電流に基づいて前記第1のタイミングにおける前記第1の相の電流を算出し、前記第2の期間における中央より前記第1の期間の側の第2のタイミングで検出された母線電流に基づいて前記第2のタイミングにおける前記第2の相の電流を算出し、前記第2算出部は、前記第1のタイミングにおける前記第1の相の電流と前記第2のタイミングにおける前記第2の相の電流とから、前記第1のタイミングと前記第2のタイミングとの間の第3のタイミングにおける前記第3の相の電流を近似的に算出することを特徴とする。   The motor control device according to the third aspect of the present invention is the motor control device according to the second aspect or the third aspect of the present invention, wherein the first calculation unit is the second half of the first carrier cycle. Are divided into a first period corresponding to the current of the first phase and a second period corresponding to the current of the second phase at the second period side from the center in the first period. Based on the bus current detected at the first timing, the current of the first phase at the first timing is calculated, and the second timing on the first period side from the center in the second period. The second phase current at the second timing is calculated based on the bus current detected at the second timing, and the second calculation unit calculates the second phase current and the second phase current at the first timing. Of the second phase at the timing of From the flow Prefecture, characterized by approximately calculating the current of the third phase in the third timing between the second timing and the first timing.

本発明によれば、算出された3相の相電流に対応した期間キャリア周期とその相電流を用いて制御するキャリア周期とのタイムラグを低減することでモータの制御精度を上げることができるという効果を奏する。また、第1のキャリア周期と第2のキャリア周期とで3相の電流のうち検出できる相が変化するか否かに関わらず同様の処理を行うことができる。   According to the present invention, the motor control accuracy can be improved by reducing the time lag between the period carrier period corresponding to the calculated three-phase phase current and the carrier period controlled using the phase current. Play. Further, the same processing can be performed regardless of whether or not the detectable phase of the three-phase current changes between the first carrier cycle and the second carrier cycle.

図1は、実施形態にかかるモータ制御装置の構成を示す図である。FIG. 1 is a diagram illustrating a configuration of a motor control device according to the embodiment. 図2は、実施形態における3φ電流算出器の構成を示す図である。FIG. 2 is a diagram illustrating a configuration of the 3φ current calculator in the embodiment. 図3は、実施形態における3相の電圧指令の大小関係を示す図である。FIG. 3 is a diagram illustrating a magnitude relationship between three-phase voltage commands in the embodiment. 図4は、実施形態にかかるモータ制御装置の動作を示す図である。FIG. 4 is a diagram illustrating the operation of the motor control device according to the embodiment. 図5は、実施形態における補間算出部の動作を示す図である。FIG. 5 is a diagram illustrating the operation of the interpolation calculation unit in the embodiment. 図6は、実施形態にかかるモータ制御装置の動作を示す図である。FIG. 6 is a diagram illustrating the operation of the motor control device according to the embodiment. 図7は、実施形態にかかるモータ制御装置の動作を示す図である。FIG. 7 is a diagram illustrating the operation of the motor control device according to the embodiment. 図8は、実施形態にかかるモータ制御装置の動作を示す図である。FIG. 8 is a diagram illustrating the operation of the motor control device according to the embodiment. 図9は、実施形態にかかるモータ制御装置の動作を示す図である。FIG. 9 is a diagram illustrating the operation of the motor control device according to the embodiment. 図10は、実施形態にかかるモータ制御装置の動作を示す図である。FIG. 10 is a diagram illustrating an operation of the motor control device according to the embodiment. 図11は、実施形態にかかるモータ制御装置の動作を示す図である。FIG. 11 is a diagram illustrating the operation of the motor control device according to the embodiment. 図12は、比較例にかかるモータ制御装置の動作を示す図である。FIG. 12 is a diagram illustrating the operation of the motor control device according to the comparative example. 図13は、他の比較例にかかるモータ制御装置の動作を示す図である。FIG. 13 is a diagram illustrating an operation of a motor control device according to another comparative example. 図14は、他の比較例にかかるモータ制御装置の動作を示す図である。FIG. 14 is a diagram illustrating an operation of a motor control device according to another comparative example.

以下に、本発明にかかるモータ制御装置の実施の形態を図面に基づいて詳細に説明する。なお、この実施の形態によりこの発明が限定されるものではない。   Embodiments of a motor control device according to the present invention will be described below in detail with reference to the drawings. Note that the present invention is not limited to the embodiments.

実施形態にかかるモータ制御装置100について、図1を用いて説明する。図1は、モータMの制御装置100の構成を示す図である。   A motor control apparatus 100 according to an embodiment will be described with reference to FIG. FIG. 1 is a diagram illustrating a configuration of a control device 100 for the motor M.

モータ制御装置100は、PWM変調による制御信号を生成しセンサレス同期モータMを制御する。モータMは、例えば、PMSM(永久磁石同期モータ)である。PMSMの駆動においては、ロータの回転とステータコイルが発生する回転磁界を同期させる必要があるため、ロータの位置(回転位置)を検出することが必要である。上記のように、モータMが位置検出用のセンサを持たないセンサレス同期モータの場合は、モータMを駆動させる位置センサレス駆動が必要である。   The motor control device 100 generates a control signal by PWM modulation and controls the sensorless synchronous motor M. The motor M is, for example, PMSM (permanent magnet synchronous motor). In driving the PMSM, since it is necessary to synchronize the rotation of the rotor and the rotating magnetic field generated by the stator coil, it is necessary to detect the position of the rotor (rotational position). As described above, when the motor M is a sensorless synchronous motor that does not have a position detection sensor, position sensorless driving for driving the motor M is required.

正弦波駆動によりセンサレス同期モータを駆動する場合は、モータのステータ巻線の各相に流れる相電流を検出する必要があり、そのモータ電流を検出することによって、ロータの位置を推定してモータの回転を制御する。   When driving a sensorless synchronous motor by sinusoidal drive, it is necessary to detect the phase current flowing in each phase of the stator winding of the motor. By detecting the motor current, the position of the rotor is estimated and the motor Control the rotation.

このとき、電流センサで3相モータのモータ電流を検出するには、少なくとも2相のモータ電流の検出が必要となる。モータ電流を検出するための電流センサは、制御回路全体に占めるコスト割合が大きく、さらに2つ必要となるとコスト面で大きな負担となる。   At this time, in order to detect the motor current of the three-phase motor with the current sensor, it is necessary to detect at least the two-phase motor current. The current sensor for detecting the motor current has a large cost ratio in the entire control circuit, and if two more sensors are required, a large burden is imposed on the cost.

本実施形態では、2相のモータ電流を検出する2つの電流センサに替えて、モータ制御装置100のインバータの母線部に接続したシャント抵抗にて電流を検出する。そして、インバータのスイッチング状態の情報とともに電流を検出することにより、モータ電流を再現する。   In this embodiment, instead of the two current sensors that detect the two-phase motor current, the current is detected by a shunt resistor connected to the bus portion of the inverter of the motor control device 100. The motor current is reproduced by detecting the current together with information on the switching state of the inverter.

なお、この1つのシャント抵抗によるモータ電流の検出(再現・推定)方法は1シャント電流検出と呼ばれることが多い。   Note that this motor current detection (reproduction / estimation) method using one shunt resistor is often referred to as one shunt current detection.

実施形態にかかるモータ制御装置100は、制御方式として、180度通電方式(正弦波通電方式)、位置センサレス方式、1シャント電流検出方式を採用する。例えば、モータ制御装置100は、モータMを制御するにあたり、1つのシャント抵抗Rsを用いて母線電流Isを検出し、その検出した母線電流Isに応じて、PWM変調による制御信号を生成しモータMを制御する。具体的には、モータ制御装置100は、インバータ10、電流検出部20、算出部60、電圧検出部30、及び生成部40を備える。   The motor control device 100 according to the embodiment employs a 180-degree energization method (sine wave energization method), a position sensorless method, and a shunt current detection method as a control method. For example, when controlling the motor M, the motor control device 100 detects the bus current Is using one shunt resistor Rs, generates a control signal by PWM modulation according to the detected bus current Is, and generates the motor M. To control. Specifically, the motor control device 100 includes an inverter 10, a current detection unit 20, a calculation unit 60, a voltage detection unit 30, and a generation unit 40.

インバータ10は、直流電力を直流電源EDCから受け、3相(U相、V相、W相)のPWM信号Up,Un,Vp,Vn,Wp,Wnを生成部40から受ける。インバータ10は、3相のPWM信号Up〜Wnに従って、直流電力を3相の交流電力に変換する。インバータ10は、変換された3相の交流電力をモータMへ出力することにより、モータMを駆動する。 The inverter 10 receives direct-current power from the direct-current power supply EDC, and receives three-phase (U-phase, V-phase, W-phase) PWM signals Up, Un, Vp, Vn, Wp, Wn from the generation unit 40. The inverter 10 converts DC power into three-phase AC power in accordance with the three-phase PWM signals Up to Wn. The inverter 10 drives the motor M by outputting the converted three-phase AC power to the motor M.

具体的には、インバータ10は、上アームのスイッチング素子SWup、SWvp、SWwp及び下アームのスイッチング素子SWun、SWvn、SWwnを有する。インバータ10では、3相のPWM信号Up〜Wnに従って各スイッチング素子SWup〜SWwnをオン・オフすることにより、直流電力を3相の交流電力に変換する。なお、各スイッチング素子SWup〜SWwnの両端には、さらに還流ダイオードDupd〜Dwndが接続されている。   Specifically, the inverter 10 includes upper arm switching elements SWup, SWvp, and SWwp and lower arm switching elements SWun, SWvn, and SWwn. The inverter 10 converts the DC power into three-phase AC power by turning on / off the switching elements SWup to SWwn according to the three-phase PWM signals Up to Wn. Note that free-wheeling diodes Dupd to Dwnd are further connected to both ends of each of the switching elements SWup to SWwn.

電流検出部20は、1つのシャント抵抗Rsを用いて母線電流Isを検出する。具体的には、電流検出部20は、シャント抵抗Rs及び電流検出回路21を有する。   The current detection unit 20 detects the bus current Is using one shunt resistor Rs. Specifically, the current detection unit 20 includes a shunt resistor Rs and a current detection circuit 21.

シャント抵抗Rsは、直流電源EDCとインバータ10との間に接続されている。シャント抵抗Rsは、例えば、直流電源EDCにおけるN側の端子とインバータ10との間のDCラインであるNラインL上に挿入されている。なお、シャント抵抗Rsは、例えば、直流電源EDCにおけるP側の端子とインバータ10との間のDCラインであるPラインL上に挿入されていてもよい。 The shunt resistor Rs is connected between the DC power supply EDC and the inverter 10. The shunt resistor Rs, for example, is inserted in the N on the line L N is a DC line between the terminals and the inverter 10 of the N side of the DC power source E DC. Incidentally, the shunt resistor Rs, for example, may be inserted into the P line L P is a DC line between the terminals and the inverter 10 of the P side of the DC power source E DC.

1つのシャント抵抗Rsには、インバータ10におけるU相電流、V相電流、W相電流に応じて母線電流Isが流れる。このとき、シャント抵抗Rsの両端に電圧降下が生じる。電流検出回路21は、この電圧降下の大きさとシャント抵抗Rsの抵抗値とから、シャント抵抗Rsに流れる母線電流Isを検出し、検出結果を算出部60へ出力する。   A bus current Is flows through one shunt resistor Rs according to the U-phase current, V-phase current, and W-phase current in the inverter 10. At this time, a voltage drop occurs across the shunt resistor Rs. The current detection circuit 21 detects the bus current Is flowing through the shunt resistor Rs from the magnitude of the voltage drop and the resistance value of the shunt resistor Rs, and outputs the detection result to the calculation unit 60.

算出部60は、電流検出部20により検出された母線電流Isと生成部40により生成された3相のPWM信号Up〜Wnとに基づいて、3相の電流iu,iv,iwを算出する。   The calculation unit 60 calculates the three-phase currents iu, iv, and iw based on the bus current Is detected by the current detection unit 20 and the three-phase PWM signals Up to Wn generated by the generation unit 40.

具体的には、算出部60は、3φ電流算出器61を有する。3φ電流算出器61は、検出された母線電流を電流検出回路21から受け、3相のPWM信号Up〜Wnを受ける。3φ電流算出器61は、母線電流の値と3相のPWM信号Up〜Wnとに基づいて、3相の電流iu,iv,iwを算出する。3φ電流算出器61は、算出された3相の電流iu,iv,iwを生成部40へ出力する。3φ電流算出器61の構成及び動作の詳細は後述する。   Specifically, the calculation unit 60 includes a 3φ current calculator 61. The 3φ current calculator 61 receives the detected bus current from the current detection circuit 21 and receives three-phase PWM signals Up to Wn. The 3φ current calculator 61 calculates a three-phase current iu, iv, iw based on the value of the bus current and the three-phase PWM signals Up to Wn. The 3φ current calculator 61 outputs the calculated three-phase currents iu, iv, iw to the generation unit 40. Details of the configuration and operation of the 3φ current calculator 61 will be described later.

電圧検出部30は、母線電圧を検出する。具体的には、電圧検出部30は、DC電圧検出回路31及びDC電圧算出器32を有する。DC電圧検出回路31は、PラインLとNラインLとの間の母線電圧を検出し、検出結果をDC電圧算出器32へ出力する。DC電圧算出器32は、検出結果をDC電圧Vdcへ変換し、変換されたDC電圧Vdcを生成部40へ出力する。 The voltage detection unit 30 detects a bus voltage. Specifically, the voltage detection unit 30 includes a DC voltage detection circuit 31 and a DC voltage calculator 32. The DC voltage detection circuit 31 detects a bus voltage between the P line L P and the N line L N and outputs the detection result to the DC voltage calculator 32. The DC voltage calculator 32 converts the detection result into a DC voltage Vdc and outputs the converted DC voltage Vdc to the generation unit 40.

生成部40は、速度指令ωm*を外部(例えば、上位のコントローラ)から受け、3相の電流iu,iv,iwを算出部60から受け、DC電圧Vdcを電圧検出部30から受ける。生成部40は、速度指令ωm*、3相の電流iu,iv,iw、及びDC電圧Vdcに基づいて、3相のPWM信号Up〜Wnを生成する。例えば、生成部40は、モータMにおけるロータが速度指令ωm*に従って回転するように、3相のPWM信号Up〜Wnを生成する。   The generation unit 40 receives a speed command ωm * from the outside (for example, a host controller), receives three-phase currents iu, iv, and iw from the calculation unit 60, and receives a DC voltage Vdc from the voltage detection unit 30. The generating unit 40 generates the three-phase PWM signals Up to Wn based on the speed command ωm *, the three-phase currents iu, iv, iw, and the DC voltage Vdc. For example, the generation unit 40 generates the three-phase PWM signals Up to Wn so that the rotor in the motor M rotates according to the speed command ωm *.

このとき、生成部40は、モータ電流を永久磁石トルクに比例する「トルク電流成分」(q軸成分)、及び、磁束の大きさを変える「励磁電流成分」(d軸成分)に分離して扱うことで、制御性の向上(高効率、高速応答など)を実現可能にする。   At this time, the generator 40 separates the motor current into a “torque current component” (q-axis component) proportional to the permanent magnet torque and an “excitation current component” (d-axis component) that changes the magnitude of the magnetic flux. By handling, it is possible to improve controllability (high efficiency, high speed response, etc.).

交流の場合、3相固定座標系で取り扱うと各相の電圧や電流は定常状態であっても常に変化するので、制御器によって対象物を指令値に追従させるのは難しい。例えば、一般的に電流制御器はPI(比例積分)制御器が用いられるが、比例制御ゲインを大きくして追従を良くさせようとすると制御が不安定になったりしてしまう。   In the case of alternating current, if handled in a three-phase fixed coordinate system, the voltage and current of each phase always change even in a steady state, so it is difficult for the controller to follow the command value. For example, a PI (proportional integral) controller is generally used as the current controller, but if the proportional control gain is increased to improve tracking, the control becomes unstable.

このような場合に広く用いられている座標系として、dq座標系がある。これは、ロータの磁石方向を基準としており、ロータの回転に合わせて座標系も回転する回転座標系の軸である。固定座標系で交流量であってもこの座標軸では直流量として扱うことができ、定常状態では一定値となる。また、PI制御器を用いたとしても、定常偏差のない電流制御が実現できる。例えば、磁石のS→N極方向へd軸、d軸から回転方向へ電気角90[deg]ずらしてq軸を取ったものを用いる。   As a coordinate system widely used in such a case, there is a dq coordinate system. This is based on the magnet direction of the rotor, and is the axis of the rotating coordinate system in which the coordinate system rotates as the rotor rotates. Even in the fixed coordinate system, the amount of alternating current can be treated as the amount of direct current on this coordinate axis, and becomes a constant value in a steady state. Moreover, even if a PI controller is used, current control without steady deviation can be realized. For example, a magnet having a d-axis in the S → N pole direction and a q-axis shifted from the d-axis in the rotation direction by 90 [deg] is used.

具体的には、生成部40は、3φ/dq座標変換器42、位置・速度推定器44、1/Pn変換器51、減算器52、d軸電流設定器48、減算器46、速度制御器49、減算器47、d軸q軸電圧設定器45、dq/3φ座標変換器43、及びPWM生成器41を有する。   Specifically, the generation unit 40 includes a 3φ / dq coordinate converter 42, a position / speed estimator 44, a 1 / Pn converter 51, a subtractor 52, a d-axis current setting unit 48, a subtractor 46, and a speed controller. 49, a subtracter 47, a d-axis q-axis voltage setting unit 45, a dq / 3φ coordinate converter 43, and a PWM generator 41.

3φ/dq座標変換器42は、3相の電流iu,iv,iwを3φ電流算出器61から受け、固定座標系(UVW座標系)に対する回転座標系(dq座標系)の位相角θdqを位置・速度推定器44から受ける。3φ/dq座標変換器42は、位相角θdqを用いて、固定座標系の電流ベクトル(iu,iv,iw)を回転座標系の電流ベクトル(id,iq)へ座標変換する。3φ/dq座標変換器42は、変換されたd軸電流idを位置・速度推定器44、d軸q軸電圧設定器45、及び減算器46へ出力し、変換されたq軸電流iqを位置・速度推定器44、d軸q軸電圧設定器45、及び減算器47へ出力する。   The 3φ / dq coordinate converter 42 receives the three-phase currents iu, iv and iw from the 3φ current calculator 61 and positions the phase angle θdq of the rotating coordinate system (dq coordinate system) relative to the fixed coordinate system (UVW coordinate system). Receive from speed estimator 44. The 3φ / dq coordinate converter 42 converts the current vector (iu, iv, iw) in the fixed coordinate system into the current vector (id, iq) in the rotational coordinate system using the phase angle θdq. The 3φ / dq coordinate converter 42 outputs the converted d-axis current id to the position / speed estimator 44, the d-axis q-axis voltage setter 45, and the subtractor 46, and the converted q-axis current iq is output to the position. Output to the speed estimator 44, the d-axis q-axis voltage setter 45, and the subtractor 47.

位置・速度推定器44は、d軸電流id、q軸電流iqを3φ/dq座標変換器42から受け、d軸電圧指令Vd*、q軸電圧指令Vq*をd軸q軸電圧設定器45から受ける。位置・速度推定器44は、d軸電流id、q軸電流iq、d軸電圧指令Vd*、q軸電圧指令Vq*に基づいて、電圧ベクトルの電気的な推定角速度ωe及び回転座標系の位相角θdqをそれぞれ推定する。位置・速度推定器44は、電気的な推定角速度ωeを1/Pn変換器51へ出力し、位相角θdqを3φ/dq座標変換器42及びdq/3φ座標変換器43へ出力する。   The position / speed estimator 44 receives the d-axis current id and the q-axis current iq from the 3φ / dq coordinate converter 42, and receives the d-axis voltage command Vd * and the q-axis voltage command Vq * as the d-axis q-axis voltage setting unit 45. Receive from. The position / velocity estimator 44 determines the electrical estimated angular velocity ωe of the voltage vector and the phase of the rotating coordinate system based on the d-axis current id, the q-axis current iq, the d-axis voltage command Vd *, and the q-axis voltage command Vq *. Each angle θdq is estimated. The position / velocity estimator 44 outputs the electrical estimated angular velocity ωe to the 1 / Pn converter 51 and outputs the phase angle θdq to the 3φ / dq coordinate converter 42 and the dq / 3φ coordinate converter 43.

1/Pn変換器51は、電気的な推定角速度ωeを位置・速度推定器44から受ける。1/Pn変換器51は、例えば電気的な推定角速度ωeに1/Pn(Pnは極対数)を乗算することにより、電気的な推定角速度ωeをモータMにおけるロータの機械的な推定角速度ωmに変換する。1/Pn変換器51は、機械的な推定角速度ωmを減算器52へ出力する。   The 1 / Pn converter 51 receives the electrical estimated angular velocity ωe from the position / velocity estimator 44. The 1 / Pn converter 51 multiplies, for example, the electrical estimated angular velocity ωe by 1 / Pn (Pn is the number of pole pairs), thereby converting the electrical estimated angular velocity ωe into the mechanical estimated angular velocity ωm of the rotor in the motor M. Convert. The 1 / Pn converter 51 outputs the mechanical estimated angular velocity ωm to the subtractor 52.

減算器52は、機械的な推定角速度ωmを1/Pn変換器51から受け、速度指令ωm*を外部(例えば、上位のコントローラ)から受ける。減算器52は、速度指令ωm*から推定角速度ωmを減算して速度偏差Δωを求め、求められた速度偏差Δωを速度制御器49へ出力する。   The subtractor 52 receives the mechanical estimated angular velocity ωm from the 1 / Pn converter 51 and receives the velocity command ωm * from the outside (for example, a host controller). The subtractor 52 subtracts the estimated angular speed ωm from the speed command ωm * to obtain a speed deviation Δω, and outputs the obtained speed deviation Δω to the speed controller 49.

d軸電流設定器48は、d軸電流指令id*を予め定められた値(例えば、固定値)で生成して減算器46へ出力する。   The d-axis current setting unit 48 generates a d-axis current command id * with a predetermined value (for example, a fixed value) and outputs it to the subtractor 46.

減算器46は、d軸電流指令id*をd軸電流設定器48から受け、d軸電流idを3φ/dq座標変換器42から受ける。減算器46は、d軸電流指令id*からd軸電流idを減算してd軸電流偏差Δidを求め、求められたd軸電流偏差Δidをd軸q軸電圧設定器45へ出力する。   The subtractor 46 receives the d-axis current command id * from the d-axis current setter 48 and receives the d-axis current id from the 3φ / dq coordinate converter 42. The subtractor 46 subtracts the d-axis current id from the d-axis current command id * to obtain a d-axis current deviation Δid, and outputs the obtained d-axis current deviation Δid to the d-axis q-axis voltage setting unit 45.

速度制御器49は、速度偏差Δωを減算器52から受ける。速度制御器49は、速度偏差Δωがゼロに近づくように、q軸電流指令iq*を求める。速度制御器49は、求められたq軸電流指令iq*を減算器47へ出力する。   Speed controller 49 receives speed deviation Δω from subtractor 52. The speed controller 49 obtains the q-axis current command iq * so that the speed deviation Δω approaches zero. The speed controller 49 outputs the obtained q-axis current command iq * to the subtractor 47.

減算器47は、q軸電流指令iq*を速度制御器49から受け、q軸電流iqを3φ/dq座標変換器42から受ける。減算器47は、q軸電流指令iq*からq軸電流iqを減算してq軸電流偏差Δiqを求め、求められたq軸電流偏差Δiqをd軸q軸電圧設定器45へ出力する。   Subtractor 47 receives q-axis current command iq * from speed controller 49 and q-axis current iq from 3φ / dq coordinate converter 42. The subtractor 47 subtracts the q-axis current iq from the q-axis current command iq * to obtain the q-axis current deviation Δiq, and outputs the obtained q-axis current deviation Δiq to the d-axis q-axis voltage setting unit 45.

d軸q軸電圧設定器45は、d軸電流偏差Δidを減算器46から受け、q軸電流偏差Δiqを減算器47から受ける。d軸q軸電圧設定器45は、d軸電流偏差Δid及びq軸電流偏差Δiqに応じて(例えば、d軸電流偏差Δid及びq軸電流偏差Δiqがそれぞれゼロに近づくように)、d軸電圧指令Vd*及びq軸電圧指令Vq*をそれぞれ求める。d軸q軸電圧設定器45は、求められたd軸電圧指令Vd*及びq軸電圧指令Vq*を位置・速度推定器44及びdq/3φ座標変換器43へ出力する。   The d-axis q-axis voltage setting unit 45 receives the d-axis current deviation Δid from the subtractor 46 and receives the q-axis current deviation Δiq from the subtractor 47. The d-axis q-axis voltage setting unit 45 determines the d-axis voltage according to the d-axis current deviation Δid and the q-axis current deviation Δiq (for example, the d-axis current deviation Δid and the q-axis current deviation Δiq approach zero). A command Vd * and a q-axis voltage command Vq * are obtained. The d-axis q-axis voltage setting unit 45 outputs the obtained d-axis voltage command Vd * and q-axis voltage command Vq * to the position / speed estimator 44 and the dq / 3φ coordinate converter 43.

dq/3φ座標変換器43は、d軸電圧指令Vd*及びq軸電圧指令Vq*をd軸q軸電圧設定器45から受け、固定座標系(U−V−W座標系)に対する回転座標系(d−q座標系)の位相角θdqを位置・速度推定器44から受ける。dq/3φ座標変換器43は、位相角θdqを用いて、回転座標系の電圧ベクトル(Vd*,Vq*)を固定座標系の電圧ベクトル(Vu*,Vv*,Vw*)へ座標変換する。   The dq / 3φ coordinate converter 43 receives the d-axis voltage command Vd * and the q-axis voltage command Vq * from the d-axis q-axis voltage setting unit 45, and is a rotating coordinate system with respect to the fixed coordinate system (UVVW coordinate system). The phase angle θdq of (dq coordinate system) is received from the position / speed estimator 44. The dq / 3φ coordinate converter 43 converts the voltage vector (Vd *, Vq *) of the rotating coordinate system into the voltage vector (Vu *, Vv *, Vw *) of the fixed coordinate system using the phase angle θdq. .

すなわち、dq/3φ座標変換器43は、3φ電流算出器61により生成された3相の電流iu,iv,iwに応じたd軸電圧指令Vd*及びq軸電圧指令Vq*を座標変換して3相の電圧指令Vu*,Vv*,Vw*を生成する。dq/3φ座標変換器43は、生成された3相の電圧指令Vu*,Vv*,Vw*をPWM生成器41へ出力する。   That is, the dq / 3φ coordinate converter 43 performs coordinate conversion of the d-axis voltage command Vd * and the q-axis voltage command Vq * corresponding to the three-phase currents iu, iv, iw generated by the 3φ current calculator 61. Three-phase voltage commands Vu *, Vv *, and Vw * are generated. The dq / 3φ coordinate converter 43 outputs the generated three-phase voltage commands Vu *, Vv *, Vw * to the PWM generator 41.

PWM生成器41は、3相の電圧指令Vu*,Vv*,Vw*をdq/3φ座標変換器43から受け、DC電圧VdcをDC電圧算出器32から受ける。PWM生成器41は、3相の電圧指令Vu*,Vv*,Vw*及びDC電圧Vdcに応じて、3相のPWM信号Up〜Wnを生成する。   The PWM generator 41 receives the three-phase voltage commands Vu *, Vv *, and Vw * from the dq / 3φ coordinate converter 43 and receives the DC voltage Vdc from the DC voltage calculator 32. The PWM generator 41 generates three-phase PWM signals Up to Wn according to the three-phase voltage commands Vu *, Vv *, Vw * and the DC voltage Vdc.

例えば、PWM生成器41は、規格化器41a、キャリア発生器41b及び3つの比較器41cを有する。規格化器41aは、DC電圧Vdcを用いて3相の電圧指令Vu*,Vv*,Vw*の振幅の絶対値を例えば1に規格化して、規格化された3相の電圧指令Vu*’,Vv*’,Vw*’をそれぞれ比較器41cに出力する。なお、比較器41cは、3相用に3つ設けられている。   For example, the PWM generator 41 includes a normalizer 41a, a carrier generator 41b, and three comparators 41c. The normalizer 41a normalizes the absolute value of the amplitude of the three-phase voltage commands Vu *, Vv *, and Vw * to, for example, 1 using the DC voltage Vdc, and standardizes the three-phase voltage command Vu * ′. , Vv * ′ and Vw * ′ are output to the comparator 41c. Three comparators 41c are provided for three phases.

キャリア発生器41bは、例えば振幅の絶対値が1である三角波信号をキャリア信号として発生し(図4参照)、発生されたキャリア信号を3つの比較器41cにそれぞれ出力する。   The carrier generator 41b generates, for example, a triangular wave signal whose amplitude has an absolute value of 1 as a carrier signal (see FIG. 4), and outputs the generated carrier signals to the three comparators 41c.

3つの比較器41cのそれぞれは、電圧指令Vu*’,Vv*’,Vw*’とキャリア信号とを比較することで、3相のPWM信号Up〜Wnを生成する。例えば、U相用の比較器41cは、電圧指令Vu*’とキャリア信号とを比較し、キャリア信号のレベルが電圧指令Vu*’より大きいとき、U相のPWM信号Upをオン,Unをオフとして生成し、キャリア信号のレベルが電圧指令Vu*’より小さいとき、U相のPWM信号Upをオフ,Unをオンとして生成してスイッチング素子SWup,SWunの制御端子にそれぞれ供給する。同様にV相用の比較器41cは、電圧指令Vv*’とキャリア信号とを比較した結果、V相のPWM信号Vp,Vnを生成してスイッチング素子SWvp,SWvnの制御端子にそれぞれ供給する。また、W相用の比較器41cも同様に、電圧指令Vw*’とキャリア信号とを比較した結果、W相のPWM信号Wp,Wnを生成してスイッチング素子SWwp,SWwnの制御端子にそれぞれ供給する。   Each of the three comparators 41c generates three-phase PWM signals Up to Wn by comparing the voltage commands Vu * ', Vv *', and Vw * 'with the carrier signal. For example, the U-phase comparator 41c compares the voltage command Vu * ′ with the carrier signal, and when the carrier signal level is higher than the voltage command Vu * ′, the U-phase PWM signal Up is turned on and the Un is turned off. When the level of the carrier signal is smaller than the voltage command Vu * ′, the U-phase PWM signal Up is turned off and Un is turned on and supplied to the control terminals of the switching elements SWup and SWun, respectively. Similarly, as a result of comparing the voltage command Vv * ′ and the carrier signal, the V-phase comparator 41c generates V-phase PWM signals Vp and Vn and supplies them to the control terminals of the switching elements SWvp and SWvn, respectively. Similarly, the W-phase comparator 41c compares the voltage command Vw * ′ with the carrier signal, and as a result, generates W-phase PWM signals Wp and Wn and supplies them to the control terminals of the switching elements SWwp and SWwn, respectively. To do.

例えば、キャリアの山を基準に比較動作を行う場合(キャリア信号が山基準である場合)、キャリアの山がキャリア周期の中央になるように各キャリア周期を設定する。そして、そのキャリア周期内でレベルが一定の電圧指令Vu*’,Vv*’,Vw*’のレベルを与え、各比較器41cは、キャリア信号のレベルが電圧指令Vu*’,Vv*’,Vw*’を超えた時点でP側のPWM信号Up,Vp,WpをオンレベルでN側のPWM信号Un,Vn,Wnはオフレベル(P側のスイッチング素子がオンのときN側のスイッチング素子はオフとなり、P側がオフのときN側はオンになる)にし、キャリア信号のレベルが電圧指令Vu*’,Vv*’,Vw*’以下になった時点でP側のPWM信号Up,Vp,Wpをオフレベル(N側のPWM信号Un,Vn,Wnはオンレベル)にする。このとき、各キャリア周期において、PWM信号Up,Vp,Wpは、キャリアの山に対して対称なパターンになる(図4参照)。このとき、キャリア周期ごとに電圧指令Vu*,Vv*,Vw*のレベルが変わり得るので、隣り合うキャリア周期で見た場合、PWM信号Up,Vp,Wpは、キャリアの谷に対して非対称なパターンになる(図4参照)。   For example, when the comparison operation is performed based on the carrier peak (when the carrier signal is a peak reference), each carrier cycle is set so that the carrier peak is at the center of the carrier cycle. Then, levels of voltage commands Vu * ′, Vv * ′, and Vw * ′ that are constant within the carrier cycle are given, and each comparator 41c has a level of the carrier signal of voltage commands Vu * ′, Vv * ′, When Vw * 'is exceeded, the P-side PWM signals Up, Vp, Wp are on level and the N-side PWM signals Un, Vn, Wn are off-level (when the P-side switching element is on, the N-side switching element Is turned off, and when the P side is off, the N side is turned on.) When the carrier signal level becomes lower than the voltage commands Vu * ', Vv *', Vw * ', the P side PWM signals Up, Vp , Wp are turned off (the N-side PWM signals Un, Vn, Wn are turned on). At this time, in each carrier cycle, the PWM signals Up, Vp, and Wp have a symmetrical pattern with respect to the peak of the carrier (see FIG. 4). At this time, the level of the voltage commands Vu *, Vv *, and Vw * can be changed for each carrier period. Therefore, when viewed in adjacent carrier periods, the PWM signals Up, Vp, and Wp are asymmetric with respect to the carrier valleys. It becomes a pattern (see FIG. 4).

あるいは、例えば、キャリアの谷を基準に比較動作を行う場合(キャリア信号が谷基準である場合)、キャリアの谷がキャリア周期の中央になるように各キャリア周期を設定する。そして、そのキャリア周期内でレベルが一定の電圧指令Vu*’,Vv*’,Vw*’を与え、各比較器41cは、キャリア信号のレベルが電圧指令Vu*’,Vv*’,Vw*’を超えた時点でP側のPWM信号Up,Vp,Wpをオンレベル(N側のPWM信号Un,Vn,Wnはオフレベル)にし、キャリア信号のレベルが電圧指令Vu*’,Vv*’,Vw*’以下になった時点でP側のPWM信号Up,Vp,Wpをオフレベル(N側のPWM信号Un,Vn,Wnはオンレベル)にする。このとき、各キャリア周期において、PWM信号Up,Vp,Wpは、キャリアの谷に対して対称なパターンになる(図示せず)。このとき、キャリア周期ごとに電圧指令Vu*,Vv*,Vw*のレベルが変わり得るので、隣り合うキャリア周期で見た場合、PWM信号Up,Vp,Wpは、キャリアの山に対して非対称なパターンになる(図示せず)。   Alternatively, for example, when the comparison operation is performed based on the carrier valley (when the carrier signal is a valley reference), each carrier cycle is set so that the carrier valley is at the center of the carrier cycle. Then, voltage commands Vu * ′, Vv * ′, and Vw * ′ whose levels are constant within the carrier cycle are given, and each comparator 41c has carrier signal levels of voltage commands Vu * ′, Vv * ′, and Vw * ′. P 'PWM signals Up, Vp, Wp are turned on (when the N side PWM signals Un, Vn, Wn are turned off), and the carrier signal level is a voltage command Vu *', Vv * '. , Vw * ′ or less, the P-side PWM signals Up, Vp, Wp are turned off (the N-side PWM signals Un, Vn, Wn are on-level). At this time, in each carrier period, the PWM signals Up, Vp, and Wp have a symmetric pattern with respect to the carrier valley (not shown). At this time, the level of the voltage commands Vu *, Vv *, and Vw * can be changed for each carrier cycle. Therefore, when viewed in adjacent carrier cycles, the PWM signals Up, Vp, and Wp are asymmetric with respect to the carrier peak. It becomes a pattern (not shown).

次に、3φ電流算出器61の構成及び動作について図2〜図5を用いて説明する。図2は、3φ電流算出器61の構成を示す図である。図3は、3相の電圧指令Vu*,Vv*,Vw*の大小関係を示す1例である。図4は、モータ制御装置100の動作を示す図である。図5は、補間算出部61fの動作を示す図である。以下では、キャリア信号が山基準である場合について例示的に説明するが、以下の考え方は、キャリア信号が谷基準である場合についても同様に適用できる。   Next, the configuration and operation of the 3φ current calculator 61 will be described with reference to FIGS. FIG. 2 is a diagram showing the configuration of the 3φ current calculator 61. FIG. 3 is an example showing the magnitude relationship between the three-phase voltage commands Vu *, Vv *, and Vw *. FIG. 4 is a diagram illustrating the operation of the motor control device 100. FIG. 5 is a diagram illustrating the operation of the interpolation calculation unit 61f. In the following, the case where the carrier signal is a peak reference will be described by way of example, but the following concept can be similarly applied to the case where the carrier signal is a valley reference.

3φ電流算出器61は、電流検出部20により検出された母線電流Isと生成部40により生成されたPWM信号Up〜Wnとに基づいて、3相の電流iu,iv,iwを算出する。このとき、3φ電流算出器61は、PWM信号Up,Vp,Wpのパルス幅の大小(=3相の電圧指令Vu*,Vv*,Vw*の大小)関係に応じて母線電流から検出できる相電流を判別しながら、3相の電流iu,iv,iwを算出する。   The 3φ current calculator 61 calculates three-phase currents iu, iv, and iw based on the bus current Is detected by the current detector 20 and the PWM signals Up to Wn generated by the generator 40. At this time, the 3φ current calculator 61 is a phase that can be detected from the bus current according to the relationship between the pulse widths of the PWM signals Up, Vp, and Wp (= the magnitude of the three-phase voltage commands Vu *, Vv *, and Vw *). The three-phase currents iu, iv and iw are calculated while discriminating the currents.

3相の電圧指令Vu*,Vv*,Vw*の大小関係は、図3に示すように、各電圧指令の周期の1/6周期で変化する。例えば、1/6周期で現れるタイミングta,tb,tc,tdごとに3相の電圧指令Vu*,Vv*,Vw*の大小関係が変化する。1/6周期の期間における任意のタイミング(例えば、タイミングte)では、3相の電圧指令Vu*,Vv*,Vw*の大小関係が変化しない。   As shown in FIG. 3, the magnitude relationship between the three-phase voltage commands Vu *, Vv *, and Vw * changes in 1/6 period of each voltage command. For example, the magnitude relationship of the three-phase voltage commands Vu *, Vv *, and Vw * changes for each timing ta, tb, tc, and td that appears in a 1/6 cycle. At an arbitrary timing (for example, timing te) in the period of 1/6 cycle, the magnitude relationship between the three-phase voltage commands Vu *, Vv *, and Vw * does not change.

例えば、3φ電流算出器61は、任意のキャリア周期である第1のキャリア周期の3相のPWM信号Up〜Wnの状態と第1のキャリア周期の後半に検出された母線電流Isとに基づいてU相,V相,W相の3相のうちのU相(第1の相とする)及びV相(第2の相とする)の電流を算出するとともに、その算出された第1の相及び第2の相の電流に基づいて第1のキャリア周期の後半におけるW相(第3の相とする)の電流を近似的に算出する。第1のキャリア周期と第1のキャリア周期に続く第2のキャリア周期とで3相の電流のうち検出できる相が変化しない場合は、第2のキャリア周期の3相のPWM信号Up〜Wnの状態と第2のキャリア周期の前半に検出された母線電流Isとに基づいて第1の相(U相)及び第2の相(V相)の電流を算出する。3φ電流算出器61は、第1のキャリア周期の後半における第1の相及び第2の相の電流と第2のキャリア周期の前半における第1の相及び第2の相の電流とに基づいて、第1のキャリア周期と第2のキャリア周期との境界タイミングにおける3相の電流を算出する。また、第1のキャリア周期と第2のキャリア周期とで3相の電流のうち検出できる相が変化する場合は、即ち、第2のキャリア周期の3相のPWM信号Up〜Wnと第2のキャリア周期の前半に検出された母線電流Isとに基づいて第1の相(U相)及び第3の相(W相)の電流を算出すると、第1のキャリア周期の後半における第1の相及び第3の相の電流と第2のキャリア周期の前半における第1の相及び第3の相の電流とに基づいて、第1のキャリア周期と第2のキャリア周期との境界タイミングにおける3相の電流を算出する。このように第1のキャリア周期の後半における第3の相を算出することで、境界タイミングを跨いで3相の電流のうち検出できる相が変化しない場合と変化する場合それぞれにおいて3相の電流を算出することができる。   For example, the 3φ current calculator 61 is based on the state of the three-phase PWM signals Up to Wn of the first carrier cycle which is an arbitrary carrier cycle and the bus current Is detected in the second half of the first carrier cycle. The current of the U phase (assumed to be the first phase) and the V phase (assumed to be the second phase) of the three phases U phase, V phase, and W phase is calculated, and the calculated first phase And the current of the W phase (referred to as the third phase) in the second half of the first carrier cycle is approximately calculated based on the current of the second phase. If the detectable phase of the three-phase current does not change between the first carrier period and the second carrier period following the first carrier period, the three-phase PWM signals Up to Wn of the second carrier period Based on the state and the bus current Is detected in the first half of the second carrier cycle, the currents of the first phase (U phase) and the second phase (V phase) are calculated. The 3φ current calculator 61 is based on the currents of the first phase and the second phase in the second half of the first carrier cycle and the currents of the first phase and the second phase in the first half of the second carrier cycle. The three-phase current is calculated at the boundary timing between the first carrier period and the second carrier period. When the detectable phase of the three-phase current changes between the first carrier period and the second carrier period, that is, the three-phase PWM signals Up to Wn of the second carrier period and the second carrier period When the currents of the first phase (U phase) and the third phase (W phase) are calculated based on the bus current Is detected in the first half of the carrier cycle, the first phase in the second half of the first carrier cycle And the third phase at the boundary timing between the first carrier period and the second carrier period based on the current of the third phase and the current of the first phase and the third phase in the first half of the second carrier period. Is calculated. By calculating the third phase in the second half of the first carrier period in this way, the three-phase current is calculated in each of the cases where the detectable phase of the three-phase current does not change across the boundary timing. Can be calculated.

3φ電流算出器61は、算出された3相の電流を例えば第2のキャリア周期内に生成部40へ出力する。これに応じて、生成部40は、算出された3相の電流を2相の電流id,iqに変換し、変換した2相の電流と速度指令ωm*に基づいた2相の電流指令id*,iq*との電流偏差がゼロになるように2相の電圧指令Vd*,Vq*を生成し、2相の電圧指令Vd*,Vq*から3相の電圧指令Vu*,Vv*,Vw*に変換して、第2のキャリア周期に続く第3のキャリア周期に用いる3相の電圧指令Vu*,Vv*,Vw*を生成する。そして、生成部40は、生成された3相の電圧指令Vu*,Vv*,Vw*と検出されたDC電圧Vdcとに基づいて、3相のPWM信号Up〜Wnを生成する。   The 3φ current calculator 61 outputs the calculated three-phase current to the generation unit 40 within the second carrier period, for example. In response to this, the generation unit 40 converts the calculated three-phase current into a two-phase current id, iq, and a two-phase current command id * based on the converted two-phase current and the speed command ωm *. , Iq *, two-phase voltage commands Vd *, Vq * are generated so that the current deviation becomes zero, and the three-phase voltage commands Vu *, Vv *, Vw are generated from the two-phase voltage commands Vd *, Vq *. By converting to *, three-phase voltage commands Vu *, Vv *, and Vw * used for the third carrier period following the second carrier period are generated. Then, the generation unit 40 generates the three-phase PWM signals Up to Wn based on the generated three-phase voltage commands Vu *, Vv *, Vw * and the detected DC voltage Vdc.

例えば図4に示す場合、キャリア周期Tc1とキャリア周期Tc2とで3相の電流のうち検出できる相が変化する。例えば、キャリア周期Tc1とキャリア周期Tc2との境界タイミングtc12がタイミングtb(図3参照)に一致する場合、キャリア周期Tc1では、Vv*>Vw*>Vu*であるが、キャリア周期Tc2では、Vw*>Vv*>Vu*である。   For example, in the case shown in FIG. 4, the detectable phase of the three-phase current changes between the carrier cycle Tc1 and the carrier cycle Tc2. For example, when the boundary timing tc12 between the carrier period Tc1 and the carrier period Tc2 coincides with the timing tb (see FIG. 3), Vv *> Vw *> Vu * in the carrier period Tc1, but Vw * in the carrier period Tc2. *> Vv *> Vu *.

この場合、3φ電流算出器61は、キャリア周期Tc1の3相のPWM信号Up〜Wnのオン・オフのタイミングとキャリア周期Tc1の後半の期間Tc1bに検出された母線電流Isとに基づいて、キャリア周期Tc1の後半の期間Tc1bにU相及びV相の電流iu,ivを算出する。それとともに、3φ電流算出器61は、算出されたU相及びV相の電流iu,ivからキャリア周期Tc1の後半の期間Tc1bにおけるW相の電流iwを近似的に算出する。3φ電流算出器61は、キャリア周期Tc2の3相のPWM信号Up〜Wnとキャリア周期Tc2の前半の期間Tc2aに検出された母線電流Isとに基づいて、キャリア周期Tc2の前半の期間Tc2aにおけるU相及びW相の電流iu,iwを算出する。3φ電流算出器61は、この時キャリア周期Tc1とキャリア周期Tc2とで3相の電流のうち検出できる相が変化したことで、キャリア周期Tc1の後半の期間Tc1bにおけるU相及びW相の電流iu,iwとキャリア周期Tc2の前半の期間Tc2aにおけるU相及びW相の電流iu,iwとに基づいて、キャリア周期Tc1とキャリア周期Tc2との境界タイミングtc12における2相の電流iu,iwを算出する。3φ電流算出器61は、境界タイミングtc12におけるU相及びW相の電流iu,iwに基づいてV相の電流ivを算出する。   In this case, the 3φ current calculator 61 determines the carrier current Is based on the on / off timing of the three-phase PWM signals Up to Wn of the carrier cycle Tc1 and the bus current Is detected in the second half period Tc1b of the carrier cycle Tc1. The U-phase and V-phase currents iu and iv are calculated in the second half period Tc1b of the cycle Tc1. At the same time, the 3φ current calculator 61 approximately calculates the W-phase current iw in the second half period Tc1b of the carrier cycle Tc1 from the calculated U-phase and V-phase currents iu and iv. Based on the three-phase PWM signals Up to Wn of the carrier period Tc2 and the bus current Is detected in the first period Tc2a of the carrier period Tc2, the 3φ current calculator 61 calculates the U in the first period Tc2a of the carrier period Tc2. Phase and W phase currents iu and iw are calculated. At this time, the 3φ current calculator 61 changes the detectable phase of the three-phase current between the carrier cycle Tc1 and the carrier cycle Tc2, and thus the U-phase and W-phase currents iu in the second half period Tc1b of the carrier cycle Tc1. , Iw and currents iu, iw of the U phase and W phase in the first half period Tc2a of the carrier cycle Tc2, the two-phase currents iu, iw at the boundary timing tc12 between the carrier cycle Tc1 and the carrier cycle Tc2 are calculated. . The 3φ current calculator 61 calculates the V-phase current iv based on the U-phase and W-phase currents iu and iw at the boundary timing tc12.

3φ電流算出器61は、算出された境界タイミングtc12における3相の電流iu,iv,iwを例えばキャリア周期Tc2内に生成部40へ出力する。例えば、3φ電流算出器61は、算出された3相の境界タイミングtc12における電流iu,iv,iwを例えばキャリア周期Tc2の後半の期間Tc2b内に生成部40へ出力する。これに応じて、生成部40は、Tc2b期間でキャリア周期Tc2に続くキャリア周期Tc3用の3相の電圧指令Vu*,Vv*,Vw*を境界タイミングtc12における3相の電流iu,iv,iwに基づいて生成する。   The 3φ current calculator 61 outputs the three-phase currents iu, iv, iw at the calculated boundary timing tc12 to the generator 40, for example, within the carrier period Tc2. For example, the 3φ current calculator 61 outputs the calculated currents iu, iv, and iw at the three-phase boundary timing tc12 to the generation unit 40, for example, in the second half period Tc2b of the carrier cycle Tc2. In response to this, the generation unit 40 converts the three-phase voltage commands Vu *, Vv *, and Vw * for the carrier cycle Tc3 following the carrier cycle Tc2 in the Tc2b period into the three-phase currents iu, iv, and iw at the boundary timing tc12. Generate based on

すなわち、生成部40は、キャリア周期Tc3の開始タイミングまでに境界タイミングtc12における3相の電流iu,iv,iwを2相の電流id,iqに変換し、変換した2相の電流と速度指令ωm*に基づいた2相の電流指令id*,iq*との電流偏差がゼロになるように2相の電圧指令Vd*,Vq*を生成し、2相の電圧指令Vd*,Vq*から3相の電圧指令Vu*,Vv*,Vw*に変換して、キャリア周期Tc3に用いる3相の電圧指令Vu*,Vv*,Vw*を生成する。   That is, the generation unit 40 converts the three-phase currents iu, iv, and iw at the boundary timing tc12 into the two-phase currents id and iq by the start timing of the carrier cycle Tc3, and converts the converted two-phase current and the speed command ωm. The two-phase voltage commands Vd * and Vq * are generated so that the current deviation from the two-phase current commands id * and iq * based on * is zero, and 3 from the two-phase voltage commands Vd * and Vq * The three-phase voltage commands Vu *, Vv *, and Vw * used for the carrier cycle Tc3 are generated by converting into the phase voltage commands Vu *, Vv *, and Vw *.

3φ電流算出器61は、図2に示すようにAD変換部61a、判定部61b、第1算出部61c、第2算出部61d、第3算出部61eを有し、第3算出部61eには、補間算出部61fと算出処理部61gとを備える。   As shown in FIG. 2, the 3φ current calculator 61 includes an AD conversion unit 61a, a determination unit 61b, a first calculation unit 61c, a second calculation unit 61d, and a third calculation unit 61e. The third calculation unit 61e includes An interpolation calculation unit 61f and a calculation processing unit 61g.

AD変換部61aは、電流検出回路21で検出した母線電流Isを受ける。AD変換部61aは、母線電流Is(アナログ信号)をAD変換して母線電流Is(デジタル信号)を生成する。AD変換部61aは、母線電流Is(デジタル信号)を第1算出部61cへ出力する。母線電流Isを取得するタイミングは、3相のPWM信号Up〜Wnに基づいて行なわれ、詳細については後述する。   The AD conversion unit 61 a receives the bus current Is detected by the current detection circuit 21. The AD conversion unit 61a AD converts the bus current Is (analog signal) to generate the bus current Is (digital signal). The AD conversion unit 61a outputs the bus current Is (digital signal) to the first calculation unit 61c. The timing for acquiring the bus current Is is performed based on the three-phase PWM signals Up to Wn, details of which will be described later.

判定部61bは、3相のPWM信号Up〜Wnのパルス幅の大小の関係が第1のキャリア周期と第2のキャリア周期とで変化すると、母線電流Isから3相の電流のうち検出できる相が変化すると判定する。その判定結果を第3算出部61eへ出力される。   The determination unit 61b can detect the phase of the three-phase current from the bus current Is when the magnitude relationship of the pulse widths of the three-phase PWM signals Up to Wn changes between the first carrier period and the second carrier period. Is determined to change. The determination result is output to the third calculator 61e.

第1算出部61cは、母線電流Is(デジタル信号)をAD変換部61aから受ける。第1算出部61cは、そのPWM信号と第1のキャリア周期の後半に検出された母線電流Isとから第1のキャリア周期の後半における2相の電流を算出する。また、第1算出部61bは、第1のキャリア周期に続く第2のキャリア周期の3相のPWM信号と第2のキャリア周期の前半に検出された母線電流Isとから第2のキャリア周期の前半における2相の電流を算出する。第1のキャリア周期の後半に算出した2相の電流を第2算出部61dへ出力するとともに、第1のキャリア周期の後半と第2のキャリア周期の前半に算出した各2相の電流を第3算出部61eにも出力する。   The first calculator 61c receives the bus current Is (digital signal) from the AD converter 61a. The first calculator 61c calculates a two-phase current in the second half of the first carrier cycle from the PWM signal and the bus current Is detected in the second half of the first carrier cycle. The first calculation unit 61b also calculates the second carrier period from the three-phase PWM signal of the second carrier period following the first carrier period and the bus current Is detected in the first half of the second carrier period. The two-phase current in the first half is calculated. The two-phase current calculated in the second half of the first carrier cycle is output to the second calculator 61d, and the two-phase currents calculated in the second half of the first carrier cycle and the first half of the second carrier cycle are 3 is also output to the calculation unit 61e.

第1算出部61cによる相電流の算出について、図4のキャリア周期Tc1とキャリア周期Tc2とで3相の電流のうち検出できる相が変化する場合を説明する。   Regarding the calculation of the phase current by the first calculation unit 61c, a case will be described in which the detectable phase of the three-phase current changes between the carrier period Tc1 and the carrier period Tc2 in FIG.

図4に示すように、キャリア周期Tc1の後半の期間Tc1bにおいて、期間TP1では、PWM信号Up,Vp,Wpがいずれもオンレベルなので、スイッチング素子SWup,SWvp,SWwpがいずれもオンし他のスイッチング素子はオフしている(図1参照)。このとき、いずれの相電流も流れないので、母線電流Isはゼロになる。   As shown in FIG. 4, in the period Tc1b of the second half of the carrier cycle Tc1, since the PWM signals Up, Vp, Wp are all on in the period TP1, the switching elements SWup, SWvp, SWwp are all on and other switching is performed. The element is off (see FIG. 1). At this time, since no phase current flows, the bus current Is becomes zero.

期間Tc1bにおける期間TP1に続く期間TP2では、PWM信号Upがオフレベル(PWM信号Unがオンレベル)であり、PWM信号Vp,Wpがいずれもオンレベルなので、スイッチング素子SWun,SWvp,SWwpがいずれもオンし他のスイッチング素子はオフしている(図1参照)。このとき、インバータ10からモータMに向かう向きを電流の正の向きとすると、U相電流−Iu=Iv+Iwが母線電流Isとして流れる。第1算出部61cは、例えば、期間TP2に検出された母線電流Isを、期間TP2の中央のタイミングtu1におけるU相電流−Iuとして算出する。   In the period TP2 following the period TP1 in the period Tc1b, the PWM signal Up is at the off level (the PWM signal Un is at the on level), and the PWM signals Vp, Wp are both at the on level, so that the switching elements SWun, SWvp, SWwp are all It is turned on and the other switching elements are turned off (see FIG. 1). At this time, if the direction from the inverter 10 toward the motor M is the positive direction of the current, the U-phase current −Iu = Iv + Iw flows as the bus current Is. For example, the first calculator 61c calculates the bus current Is detected in the period TP2 as the U-phase current −Iu at the timing tu1 at the center of the period TP2.

期間Tc1bにおける期間TP2に続く期間TP3では、PWM信号Up,Wpがオフレベル(PWM信号Un,Wnがオンレベル)であり、PWM信号Vpがオンレベルなので、スイッチング素子SWun,SWvp,SWwnがいずれもオンし他のスイッチング素子はオフしている(図1参照)。このとき、インバータ10からモータMに向かう向きを電流の正の向きとすると、V相電流Iv=−Iu−Iwが母線電流Isとして流れる。第1算出部61cは、例えば、期間TP3に検出された母線電流Isを、期間TP3の中央のタイミングtv1におけるV相電流Ivとして算出する。   In the period TP3 following the period TP2 in the period Tc1b, the PWM signals Up and Wp are in the off level (the PWM signals Un and Wn are in the on level), and the PWM signal Vp is in the on level, so that the switching elements SWun, SWvp, and SWwn are all It is turned on and other switching elements are turned off (see FIG. 1). At this time, if the direction from the inverter 10 toward the motor M is the positive direction of the current, the V-phase current Iv = −Iu−Iw flows as the bus current Is. For example, the first calculator 61c calculates the bus current Is detected in the period TP3 as the V-phase current Iv at the timing tv1 at the center of the period TP3.

また、第1算出部61cは、キャリア周期Tc1に続くキャリア周期Tc2の3相のPWM信号Up〜Wnとキャリア周期Tc2の前半の期間Tc2aに検出された母線電流Isとからキャリア周期Tc2の前半の期間Tc2aにおける2相の電流iu,iwを算出する。   Further, the first calculation unit 61c calculates the first half of the carrier cycle Tc2 from the three-phase PWM signals Up to Wn of the carrier cycle Tc2 following the carrier cycle Tc1 and the bus current Is detected in the first half period Tc2a of the carrier cycle Tc2. Two-phase currents iu and iw in the period Tc2a are calculated.

図4に示すように、キャリア周期Tc2の前半の期間Tc2aにおいて、期間TP4では、PWM信号Up,Vpがオフレベル(PWM信号Un,Vnがオンレベル)であり、PWM信号Wpがオンレベルなので、スイッチング素子SWun,SWvn,SWwpがいずれもオンし他のスイッチング素子はオフしている(図1参照)。このとき、インバータ10からモータMに向かう向きを電流の正の向きとするとき、W相電流Iw=−Iu−Ivが母線電流Isとして流れる。第1算出部61cは、例えば、期間TP4に検出された母線電流Isを、期間TP4の中央のタイミングtw2におけるW相電流Iwとして算出する。   As shown in FIG. 4, in the first half period Tc2a of the carrier cycle Tc2, in the period TP4, the PWM signals Up and Vp are off level (PWM signals Un and Vn are on level), and the PWM signal Wp is on level. The switching elements SWun, SWvn, and SWwp are all turned on and the other switching elements are turned off (see FIG. 1). At this time, when the direction from the inverter 10 toward the motor M is the positive direction of the current, the W-phase current Iw = −Iu−Iv flows as the bus current Is. For example, the first calculation unit 61c calculates the bus current Is detected in the period TP4 as the W-phase current Iw at the timing tw2 at the center of the period TP4.

期間Tc2aにおける期間TP4に続く期間TP5では、PWM信号Upがオフレベル(PWM信号Unがオンレベル)であり、PWM信号Vp,Wpがいずれもオンレベルなので、スイッチング素子SWun,SWvp,SWwpがいずれもオンし他のスイッチング素子はオフしている(図1参照)。このとき、インバータ10からモータMに向かう向きを電流の正の向きとするとき、U相電流−Iu=Iv+Iwが母線電流Isとして流れる。第1算出部61cは、例えば、期間TP5に検出された母線電流Isを、期間TP5の中央のタイミングtu2におけるU相電流−Iuとして算出する。   In the period TP5 following the period TP4 in the period Tc2a, the PWM signal Up is in the off level (the PWM signal Un is in the on level), and the PWM signals Vp and Wp are both in the on level. Therefore, the switching elements SWun, SWvp, and SWwp are all It is turned on and the other switching elements are turned off (see FIG. 1). At this time, when the direction from the inverter 10 toward the motor M is the positive direction of the current, the U-phase current −Iu = Iv + Iw flows as the bus current Is. For example, the first calculator 61c calculates the bus current Is detected in the period TP5 as the U-phase current −Iu at the timing tu2 at the center of the period TP5.

期間Tc2aにおける期間TP5に続く期間TP6では、PWM信号Up,Vp,Wpがいずれもオンレベルなので、スイッチング素子SWup,SWvp,SWwpがいずれもオンし他のスイッチング素子はオフしている(図1参照)。このとき、いずれの相電流も母線電流として流れず、母線電流Isはゼロになる。   In the period TP6 following the period TP5 in the period Tc2a, since the PWM signals Up, Vp, Wp are all on level, the switching elements SWup, SWvp, SWwp are all on and the other switching elements are off (see FIG. 1). ). At this time, no phase current flows as a bus current, and the bus current Is becomes zero.

第1算出部61cは、第1のキャリア周期の後半における第1の相及び第2の相の電流と第2のキャリア周期の前半における第1の相及び第3の相の電流とを補間算出部61fへ出力する。例えば、第1算出部61cは、タイミングtu1におけるU相電流−Iu、タイミングtv1におけるV相電流Iv、タイミングtw2におけるW相電流Iw、タイミングtu2におけるU相電流−Iuをそれぞれ補間算出部61fへ出力する。   The first calculation unit 61c interpolates and calculates the currents of the first phase and the second phase in the second half of the first carrier cycle and the currents of the first phase and the third phase in the first half of the second carrier cycle. To the unit 61f. For example, the first calculation unit 61c outputs the U-phase current −Iu at timing tu1, the V-phase current Iv at timing tv1, the W-phase current Iw at timing tw2, and the U-phase current −Iu at timing tu2 to the interpolation calculation unit 61f. To do.

なお、図4では、第1のキャリア周期と第2のキャリア周期とで3相の電流のうち検出できる相が変化する場合について説明したが、検出できる相が変化しない場合、第1算出部61cは、第1のキャリア周期の3相のPWM信号と第1のキャリア周期の後半に検出された母線電流とから第1のキャリア周期の後半における2相の電流で、ここでは第1の相及び第2の相の電流を算出する。また、第1算出部61cは、第2のキャリア周期の3相のPWM信号と第2のキャリア周期の前半に検出された母線電流とから第2のキャリア周期の前半における第1の相及び第2の相の電流を算出して、算出したそれぞれの相電流を補間算出部61fへ出力する。   FIG. 4 illustrates the case where the detectable phase of the three-phase current changes between the first carrier cycle and the second carrier cycle. However, when the detectable phase does not change, the first calculation unit 61c Is a two-phase current in the second half of the first carrier cycle from the three-phase PWM signal of the first carrier cycle and the bus current detected in the second half of the first carrier cycle, where the first phase and Calculate the current of the second phase. In addition, the first calculation unit 61c calculates the first phase and the first phase in the first half of the second carrier period from the three-phase PWM signal of the second carrier period and the bus current detected in the first half of the second carrier period. The currents of the two phases are calculated, and the calculated phase currents are output to the interpolation calculation unit 61f.

また、第1算出部61cは、第1のキャリア周期の後半における算出した第1の相及び第2の相の電流を第2算出部61dへ出力する。例えば、第1算出部61cは、タイミングtu1におけるU相電流−Iu、タイミングtv1におけるV相電流Ivをそれぞれ第2算出部61dへ出力する。   The first calculation unit 61c outputs the calculated currents of the first phase and the second phase in the second half of the first carrier cycle to the second calculation unit 61d. For example, the first calculation unit 61c outputs the U-phase current −Iu at the timing tu1 and the V-phase current Iv at the timing tv1 to the second calculation unit 61d.

なお、第1算出部61cは、第1のキャリア周期と第2のキャリア周期とで3相の電流のうち検出できる相が変化するか否かに関わらず、算出した第1のキャリア周期の後半における2相の電流を第2算出部61dへ出力する。   Note that the first calculation unit 61c determines the second half of the calculated first carrier period regardless of whether or not the detectable phase of the three-phase current changes between the first carrier period and the second carrier period. Is output to the second calculator 61d.

第2算出部61dは、第1のキャリア周期の後半における第1の相及び第2の相の電流を第1算出部61cから受ける。例えば、第2算出部61dは、タイミングtu1におけるU相電流−Iu、タイミングtv1におけるV相電流Ivを第1算出部61cから受ける。第2算出部61dは、第1算出部61cから受けた第1の相及び第2の相の電流から残りの第3の相の電流であるW相電流−Iwを近似的に算出する。   The second calculation unit 61d receives the currents of the first phase and the second phase in the second half of the first carrier cycle from the first calculation unit 61c. For example, the second calculation unit 61d receives the U-phase current −Iu at the timing tu1 and the V-phase current Iv at the timing tv1 from the first calculation unit 61c. The second calculator 61d approximately calculates the W-phase current -Iw, which is the remaining current of the third phase, from the currents of the first phase and the second phase received from the first calculator 61c.

なお、第2算出部61dは、第1のキャリア周期と第2のキャリア周期とで3相の電流のうち検出できる相が変化するか否かに関わらず、3相の電流のうち算出された2相の電流から残りの1相の電流を近似的に算出する。   The second calculation unit 61d calculates the three-phase current regardless of whether or not the detectable phase of the three-phase current changes between the first carrier period and the second carrier period. The remaining one-phase current is approximately calculated from the two-phase current.

例えば図4に示す場合、第2算出部61dは、タイミングtu1におけるU相電流−Iu及びタイミングtv1におけるV相電流Ivから、3相条件Iu+Iv+Iw=0を用いてタイミングtu1及びタイミングtv1の間(例えば中央)のタイミングtw1におけるW相電流Iw1を近似的に算出する。すなわち、第2算出部61dは、タイミングtw1におけるW相電流Iw1を、次の数式1で近似的に求めることができる。なお、第2算出部61dは、タイミングtw1におけるW相電流Iw1(電流符号:+)を算出する処理を、キャリア周期Tc2の前半の期間Tc2a内に行うことができる。   For example, in the case illustrated in FIG. 4, the second calculation unit 61d uses the three-phase condition Iu + Iv + Iw = 0 from the U-phase current −Iu at the timing tu1 and the V-phase current Iv at the timing tv1 (for example, between the timing tu1 and the timing tv1). The W-phase current Iw1 at the center (timing) tw1 is approximately calculated. That is, the second calculation unit 61d can approximately obtain the W-phase current Iw1 at the timing tw1 using the following formula 1. The second calculator 61d can perform the process of calculating the W-phase current Iw1 (current code: +) at the timing tw1 within the first half period Tc2a of the carrier cycle Tc2.

Iw1=−{(−Iu1)+(+Iv1)}・・・数式1       Iw1 = − {(− Iu1) + (+ Iv1)} Equation 1

第2算出部61dは、算出された第3の相の電流(例えば、タイミングtw1におけるW相電流Iw1)を第1のキャリア周期の後半における第3の相の電流として補間算出部61fへ出力する。   The second calculation unit 61d outputs the calculated third-phase current (for example, the W-phase current Iw1 at the timing tw1) to the interpolation calculation unit 61f as the third-phase current in the second half of the first carrier cycle. .

補間算出部61fは、第1算出部61cからの第1のキャリア周期の後半における第1の相及び第2の相の電流と第2のキャリア周期の前半における第1の相及び第3の相の電流と、第2算出部61dからの第1のキャリア周期の後半における第3の相の電流を受ける。   The interpolation calculation unit 61f includes the currents of the first phase and the second phase in the second half of the first carrier cycle from the first calculation unit 61c, and the first phase and the third phase in the first half of the second carrier cycle. And the current of the third phase in the second half of the first carrier cycle from the second calculator 61d.

補間算出部61fは、判定部61bから第1のキャリア周期と第2のキャリア周期とで3相の電流のうち検出できる相が変化しないと判定を受けた場合、第1算出部61cからの第1のキャリア周期の後半における第1の相及び第2の相の電流と第2のキャリア周期の前半における第1の相及び第2の相の電流に基づいて、第1のキャリア周期と第2のキャリア周期との境界タイミングにおける第1の相及び第2の相の電流を線形補間により算出する。   When the interpolation calculation unit 61f receives the determination from the determination unit 61b that the detectable phase of the three-phase current does not change between the first carrier cycle and the second carrier cycle, the interpolation calculation unit 61f receives the first calculation from the first calculation unit 61c. Based on the first phase and second phase currents in the second half of one carrier cycle and the first and second phase currents in the first half of the second carrier cycle, The currents of the first phase and the second phase at the boundary timing with the carrier cycle are calculated by linear interpolation.

また、補間算出部61fは、判定部61bから第1のキャリア周期と第2のキャリア周期とで3相の電流のうち検出できる相が変化すると判定を受けた場合、第1算出部61cからの第1のキャリア周期の後半における第1の相の電流と第2のキャリア周期の前半における第1の相及び第3の相の電流と、第1のキャリア周期の後半における第3の相の電流に基づいて、第1のキャリア周期と第2のキャリア周期との境界タイミングにおける第1の相及び第3の相の電流を線形補間により算出する。   In addition, when the interpolation calculation unit 61f receives a determination from the determination unit 61b that the detectable phase of the three-phase current is changed between the first carrier period and the second carrier period, the interpolation calculation unit 61f outputs a signal from the first calculation unit 61c. First phase current in the second half of the first carrier period, first phase and third phase current in the first half of the second carrier period, and third phase current in the second half of the first carrier period Based on the above, the currents of the first phase and the third phase at the boundary timing between the first carrier period and the second carrier period are calculated by linear interpolation.

このように、補間算出部61fは、第1のキャリア周期と第2のキャリア周期とで3相の電流のうち検出できる相が変化するか否かに関わらず、境界タイミングにおける3相のうちの2相の電流を得ることができる。   As described above, the interpolation calculation unit 61f is configured to detect one of the three phases at the boundary timing regardless of whether or not the detectable phase of the three-phase current changes between the first carrier period and the second carrier period. A two-phase current can be obtained.

例えば図4に示すように、補間算出部61fは、キャリア周期Tc1の後半の期間Tc1bにおける2相の電流iu,iwとキャリア周期Tc2の前半の期間Tc2aにおける2相の電流iu,iwとから、境界タイミングtc12における2相の電流iu,iwを線形補間により算出する。このとき、補間算出部61fは、3相のPWM信号Up〜Wnを用いて、タイミングtu1,tw1,tw2,tu2及び境界タイミングtc12の時間軸上の位置を認識することができる。例えば、補間算出部61fは、タイミングtu1におけるU相電流−Iuとタイミングtu2におけるU相電流−Iuとから境界タイミングtc12におけるU相電流−Iuを線形補間により算出する。補間算出部61fは、タイミングtw1におけるW相電流Iwとタイミングtw2におけるW相電流Iwとから境界タイミングtc12におけるW相電流Iwを線形補間により算出する。なお、補間算出部61fは、境界タイミングtc12における2相の電流iu,iwを線形補間により算出する処理を、キャリア周期Tc2の後半の期間Tc2b内に行うことができる。   For example, as illustrated in FIG. 4, the interpolation calculation unit 61f calculates the two-phase currents iu and iw in the second half period Tc1b of the carrier cycle Tc1 and the two-phase currents iu and iw in the first half period Tc2a of the carrier cycle Tc2. Two-phase currents iu and iw at the boundary timing tc12 are calculated by linear interpolation. At this time, the interpolation calculation unit 61f can recognize the positions on the time axis of the timings tu1, tw1, tw2, tu2, and the boundary timing tc12 using the three-phase PWM signals Up to Wn. For example, the interpolation calculation unit 61f calculates the U-phase current -Iu at the boundary timing tc12 by linear interpolation from the U-phase current -Iu at the timing tu1 and the U-phase current -Iu at the timing tu2. The interpolation calculating unit 61f calculates the W-phase current Iw at the boundary timing tc12 from the W-phase current Iw at the timing tw1 and the W-phase current Iw at the timing tw2 by linear interpolation. The interpolation calculation unit 61f can perform the process of calculating the two-phase currents iu and iw at the boundary timing tc12 by linear interpolation in the second half period Tc2b of the carrier cycle Tc2.

このとき、上記のように、キャリア周期ごとに電圧指令Vu*,Vv*,Vw*のレベルが変わり得るので、隣り合うキャリア周期で見た場合、PWM信号Up,Vp,Wpは、キャリアの谷(境界タイミング)に対して非対称なパターンになる。例えば、図4に示すように、キャリア周期Tc1の後半の期間Tc1bにおけるPWM信号Up,Vp,Wpと、キャリア周期Tc2の前半の期間Tc2aにおけるPWM信号Up,Vp,Wpとは、境界タイミングtc12に対して非対称なパターンになっている。   At this time, as described above, the level of the voltage commands Vu *, Vv *, and Vw * can be changed for each carrier period. Therefore, when viewed in adjacent carrier periods, the PWM signals Up, Vp, and Wp The pattern is asymmetric with respect to (boundary timing). For example, as shown in FIG. 4, the PWM signals Up, Vp, Wp in the second half period Tc1b of the carrier cycle Tc1 and the PWM signals Up, Vp, Wp in the first half period Tc2a of the carrier cycle Tc2 are at the boundary timing tc12. The pattern is asymmetric.

仮に、補間算出部61fが、タイミングtu1におけるU相電流−Iuとタイミングtu2におけるU相電流−Iuとを単純平均すると、求められたU相電流は、境界タイミングtc12からずれたタイミングのU相電流になってしまう。あるいは、補間算出部61fが、タイミングtw1におけるW相電流Iwとタイミングtw2におけるW相電流Iwとを単純平均すると、求められたW相電流は、境界タイミングtc12からずれたタイミングのW相電流になってしまう。すなわち、第1のキャリア周期の後半における2相の電流と第2のキャリア周期の前半における2相の電流とを単純平均により算出した場合、求められた2相の電流は、互いに異なるタイミングの電流になる(図4、図5参照)ので、算出における誤差が増大する可能性がある。   If the interpolation calculation unit 61f simply averages the U-phase current -Iu at the timing tu1 and the U-phase current -Iu at the timing tu2, the obtained U-phase current is the U-phase current at a timing shifted from the boundary timing tc12. Become. Alternatively, when the interpolation calculation unit 61f simply averages the W-phase current Iw at the timing tw1 and the W-phase current Iw at the timing tw2, the obtained W-phase current becomes the W-phase current at a timing shifted from the boundary timing tic12. End up. That is, when the two-phase current in the second half of the first carrier cycle and the two-phase current in the first half of the second carrier cycle are calculated by a simple average, the obtained two-phase currents are currents having different timings. (See FIGS. 4 and 5), the calculation error may increase.

本実施形態では、補間算出部61fが、求める相電流を単純平均で算出せずに線形補間により算出する。すなわち、補間算出部61fは、第1のキャリア周期の後半における2相の電流と第2のキャリア周期の前半における2相の電流との間で境界タイミングにおける2相の電流を算出するために線形補間を用いる。   In the present embodiment, the interpolation calculation unit 61f calculates the phase current to be obtained by linear interpolation without calculating it with a simple average. That is, the interpolation calculation unit 61f is linear in order to calculate the two-phase current at the boundary timing between the two-phase current in the second half of the first carrier cycle and the two-phase current in the first half of the second carrier cycle. Use interpolation.

例えば図4に示すように、補間算出部61fは、キャリア周期Tc1の後半の期間Tc1bにおける2相の電流iu,iwとキャリア周期Tc2の前半の期間Tc2aにおける2相の電流iu,iwとから、境界タイミングtc12における2相の電流iu,iwを線形補間により算出する。このとき、補間算出部61fは、3相のPWM信号Up〜Wnを用いて、タイミングtu1,tw1,tw2,tu2及び境界タイミングtc12の時間軸上の位置を認識することができる。例えば、補間算出部61fは、タイミングtu1におけるU相電流−Iuとタイミングtu2におけるU相電流−Iuとから境界タイミングtc12におけるU相電流−Iuを線形補間により算出する。補間算出部61fは、タイミングtw1におけるW相電流Iwとタイミングtw2におけるW相電流Iwとから境界タイミングtc12におけるW相電流Iwを線形補間により算出する。なお、補間算出部61fは、境界タイミングtc12における2相の電流iu,iwを線形補間により算出する処理を、キャリア周期Tc2の後半の期間Tc2b内に行うことができる。   For example, as illustrated in FIG. 4, the interpolation calculation unit 61f calculates the two-phase currents iu and iw in the second half period Tc1b of the carrier cycle Tc1 and the two-phase currents iu and iw in the first half period Tc2a of the carrier cycle Tc2. Two-phase currents iu and iw at the boundary timing tc12 are calculated by linear interpolation. At this time, the interpolation calculation unit 61f can recognize the positions on the time axis of the timings tu1, tw1, tw2, tu2, and the boundary timing tc12 using the three-phase PWM signals Up to Wn. For example, the interpolation calculation unit 61f calculates the U-phase current -Iu at the boundary timing tc12 by linear interpolation from the U-phase current -Iu at the timing tu1 and the U-phase current -Iu at the timing tu2. The interpolation calculating unit 61f calculates the W-phase current Iw at the boundary timing tc12 from the W-phase current Iw at the timing tw1 and the W-phase current Iw at the timing tw2 by linear interpolation. The interpolation calculation unit 61f can perform the process of calculating the two-phase currents iu and iw at the boundary timing tc12 by linear interpolation in the second half period Tc2b of the carrier cycle Tc2.

例えば、図5に示すように、タイミングtu1におけるU相電流が−Iu1であり、タイミングtu2におけるU相電流が−Iu2である場合、タイミングtu1〜tc12の期間の長さをTi、タイミングtc12〜tu2の期間の長さをTivとすると、境界タイミングtc12におけるU相電流Iu12は、次の数式2で求めることができる。   For example, as illustrated in FIG. 5, when the U-phase current at the timing tu1 is −Iu1 and the U-phase current at the timing tu2 is −Iu2, the length of the period from the timings tu1 to tc12 is Ti, and the timings tc12 to tu2 Assuming that the length of the period is Tiv, the U-phase current Iu12 at the boundary timing tc12 can be obtained by the following Equation 2.

Iu12={(−Iu2)−(−Iu1)}×Ti/(Tiv+Ti)+(−Iu1)・・・数式2       Iu12 = {(− Iu2) − (− Iu1)} × Ti / (Tiv + Ti) + (− Iu1) Equation 2

同様に、タイミングtw1におけるW相電流がIw1であり、タイミングtw2におけるW相電流がIw2である場合、タイミングtw1〜tc12の期間の長さをTii、タイミングtc12〜tw2の期間の長さをTiiiとすると、境界タイミングtc12におけるW相電流Iw12は、次の数式3で求めることができる。   Similarly, when the W-phase current at timing tw1 is Iw1 and the W-phase current at timing tw2 is Iw2, the length of the period from timing tw1 to tw12 is Tii, and the length of the period from timing tw12 to tw2 is Tiii. Then, the W-phase current Iw12 at the boundary timing tc12 can be obtained by the following Equation 3.

Iw12={(+Iw2)−(+Iw1)}×Tii/(Tiii+Tii)+(+Iw1)・・・数式3       Iw12 = {(+ Iw2) − (+ Iw1)} × Tii / (Tiii + Tii) + (+ Iw1) Equation 3

補間算出部61fは、境界タイミングにおける第1の相及び第3の相の電流を算出処理部61gへ出力する。例えば、補間算出部61fは、境界タイミングtc12におけるU相電流Iu12及びW相電流Iw12を算出処理部61gへ出力する。   The interpolation calculation unit 61f outputs the currents of the first phase and the third phase at the boundary timing to the calculation processing unit 61g. For example, the interpolation calculation unit 61f outputs the U-phase current Iu12 and the W-phase current Iw12 at the boundary timing tc12 to the calculation processing unit 61g.

算出処理部61gは、境界タイミングにおける第1の相及び第3の相の電流を補間算出部61fから受ける。例えば、算出処理部61gは、境界タイミングtc12におけるU相電流Iu12及びW相電流Iw12を補間算出部61fから受ける。算出処理部61gは、3相の電流のうち線形補間により算出された第1の相及び第3の相の電流から残りの第2の相の電流を算出する。   The calculation processing unit 61g receives the currents of the first phase and the third phase at the boundary timing from the interpolation calculation unit 61f. For example, the calculation processing unit 61g receives the U-phase current Iu12 and the W-phase current Iw12 at the boundary timing tc12 from the interpolation calculation unit 61f. The calculation processing unit 61g calculates the remaining second-phase current from the first-phase and third-phase currents calculated by linear interpolation among the three-phase currents.

例えば図4に示すように、算出処理部61gは、境界タイミングtc12におけるU相電流Iu12及びW相電流Iw12から、3相条件Iu+Iv+Iw=0を用いて境界タイミングtc12におけるV相電流Iv12を算出する。すなわち、算出処理部61gは、境界タイミングtc12におけるV相電流Iv12を、次の数式4で求めることができる。なお、算出処理部61gは、境界タイミングtc12におけるV相電流Iv12を算出する処理を、キャリア周期Tc2の後半の期間Tc2b内に行うことができる。   For example, as illustrated in FIG. 4, the calculation processing unit 61g calculates the V-phase current Iv12 at the boundary timing tc12 from the U-phase current Iu12 and the W-phase current Iw12 at the boundary timing tc12 using the three-phase condition Iu + Iv + Iw = 0. That is, the calculation processing unit 61g can obtain the V-phase current Iv12 at the boundary timing tc12 by the following formula 4. The calculation processing unit 61g can perform the process of calculating the V-phase current Iv12 at the boundary timing tc12 within the latter half period Tc2b of the carrier cycle Tc2.

Iv12=−Iu12−Iw12・・・数式4       Iv12 = −Iu12−Iw12 Equation 4

算出処理部61gは、算出されたIv12とともにIu12,Iw12の3相の電流を生成部40の3φ/dq座標変換器42(図1参照)へ出力する。   The calculation processing unit 61g outputs the three-phase currents of Iu12 and Iw12 together with the calculated Iv12 to the 3φ / dq coordinate converter 42 (see FIG. 1) of the generation unit 40.

次に、モータ制御装置100における3相の電流を推定する動作の流れについて図6〜図9を用いて説明する。図6〜図9は、モータ制御装置100の動作を示す図である。   Next, the flow of operations for estimating the three-phase current in the motor control device 100 will be described with reference to FIGS. 6 to 9 are diagrams illustrating the operation of the motor control device 100.

モータ制御装置100では、キャリア谷(境界タイミング)に対して前のキャリア周期の後半の期間内に2点、後のキャリア周期の前半の期間内に2点サンプリングする。モータ制御装置100は、これらの各サンプリング点について、時間、検出値、検出相、電流符号を関連付けしておく。そして、モータ制御装置100は、そのサンプリングデータから、キャリア谷タイミング(境界タイミング)での電流値(2相分)を線形補間によって算出する。そして、モータ制御装置100は、キャリア谷タイミングにおける2相分の電流値から、残り1相分の電流値を算出する。   In the motor control apparatus 100, two points are sampled in the second half of the previous carrier cycle and two points are sampled in the first half of the subsequent carrier cycle with respect to the carrier valley (boundary timing). The motor control device 100 associates the time, the detected value, the detected phase, and the current code for each of these sampling points. Then, the motor control device 100 calculates the current value (for two phases) at the carrier valley timing (boundary timing) from the sampling data by linear interpolation. The motor control device 100 calculates the current value for the remaining one phase from the current value for the two phases at the carrier valley timing.

より具体的には、図6に示すように、境界タイミングより前のキャリア周期の後半に発生する母線電流は、
0[A]

負の最小電圧相(図の例ではU相)

正の最大電圧相(図の例ではV相)

0[A]
となる。
More specifically, as shown in FIG. 6, the bus current generated in the second half of the carrier cycle before the boundary timing is
0 [A]

Negative minimum voltage phase (U phase in the figure)

Positive maximum voltage phase (V phase in the figure)

0 [A]
It becomes.

このうち、負の最小電圧相電流(図6の場合、U相電流)と正の最大電圧相電流(図6の場合、V相電流)が発生する区間にそれぞれサンプリングを実施する。   Among these, sampling is performed in a section where a negative minimum voltage phase current (U-phase current in the case of FIG. 6) and a positive maximum voltage phase current (V-phase current in the case of FIG. 6) are generated.

図7に示すように、境界タイミングより後のキャリア周期の前半に発生する母線電流は、
0[A]

正の最大電圧相(図の例ではW相)

負の最小電圧相(図の例ではU相)

0[A]
となる。
As shown in FIG. 7, the bus current generated in the first half of the carrier cycle after the boundary timing is
0 [A]

Positive maximum voltage phase (W phase in the figure)

Negative minimum voltage phase (U phase in the figure)

0 [A]
It becomes.

このうち、正の最大電圧相電流(図7の場合、W相電流)と負の最小電圧相電流(図7の場合、U相電流)が発生する区間にそれぞれサンプリングを実施する。   Among these, sampling is performed in a section where a positive maximum voltage phase current (W-phase current in the case of FIG. 7) and a negative minimum voltage phase current (U-phase current in the case of FIG. 7) are generated.

このとき、図8に示すサンプリング点に対して、順にi、ii、iii、ivと記号を振って(図5参照)、図9に示すサンプリング点のデータをとして、各サンプリング点の時間、検出値、検出相、電流符号を関連付けて図示しない記憶部に記憶する。   At this time, the symbols i, ii, iii, and iv are assigned to the sampling points shown in FIG. 8 in order (see FIG. 5), and the sampling point data shown in FIG. The value, the detection phase, and the current code are associated and stored in a storage unit (not shown).

そして、モータ制御装置100は、そのサンプリングデータから、キャリア谷タイミング(境界タイミング)での電流値(2相分)を線形補間によって算出する。関連付けて記憶したデータから、同じ検出相のデータを検索する。   Then, the motor control device 100 calculates the current value (for two phases) at the carrier valley timing (boundary timing) from the sampling data by linear interpolation. Data of the same detection phase is retrieved from the data stored in association.

図8及び図9の例では、iとivとがU相としてピックアップされる。キャリア谷での値を線形補間によって算出する。   8 and 9, i and iv are picked up as the U phase. The value at the carrier valley is calculated by linear interpolation.

例えば、キャリア谷タイミングにおけるU相の電流値は、図示しない記憶部に記憶した上記の数式2で算出される。数式2において、Tiは、タイミングi(tu1)〜キャリア谷(tc12)までの時間を表している。Tivは、キャリア谷(tc12)〜タイミングiv(tu2)までの時間を表している。   For example, the current value of the U phase at the carrier valley timing is calculated by the above mathematical formula 2 stored in a storage unit (not shown). In Equation 2, Ti represents the time from timing i (tu1) to carrier valley (tc12). Tiv represents the time from carrier valley (tc12) to timing iv (tu2).

一方、iiとvとは検出相がV相とW相とで互いに異なるので、このままではキャリア谷タイミングでの電流値を補間できない。そこで、キャリア後半(ダウンカウント)のi(U相)とv(V相)のデータを用いて、i及びvの間(例えば中央)のサンプリング点iiにおけるW相の電流値を近似的に算出する。   On the other hand, since the detection phases of ii and v are different between the V phase and the W phase, the current value at the carrier valley timing cannot be interpolated as it is. Therefore, using the i (U phase) and v (V phase) data in the second half of the carrier (down count), the current value of the W phase at the sampling point ii between i and v (for example, the center) is approximately calculated. To do.

例えば、サンプリング点iiにおけるW相の電流値は、上記の数式1で算出される。そして、キャリア谷タイミングにおけるW相の電流値は、図示しない記憶部に記憶した上記の数式3で算出される。数式3において、Tiiは、タイミングii(tw1)〜キャリア谷(tc12)までの時間を表している。Tiiiは、キャリア谷(tc12)〜タイミングiii(tw2)までの時間を表している。なお、図9に示すTvは、タイミングv(tv1)〜キャリア谷(tc12)までの時間を表しているが、電流値の算出には用いられない。   For example, the current value of the W phase at the sampling point ii is calculated by Equation 1 above. Then, the current value of the W phase at the carrier valley timing is calculated by Equation 3 stored in a storage unit (not shown). In Equation 3, Tii represents the time from timing ii (tw1) to carrier valley (tc12). Tiii represents the time from the carrier valley (tc12) to the timing iii (tw2). Note that Tv shown in FIG. 9 represents the time from timing v (tv1) to carrier valley (tc12), but is not used for calculation of the current value.

制御装置100は、キャリア谷タイミング(境界タイミング)における2相分の電流値から、残り1相分の電流値を算出する。例えば、制御装置100は、数式2,3で算出した2相分の電流値から、残りのV相電流値を算出する。数式2,3で算出した2相分の電流のデータは近似的に時間的整合が取れているために、Iu+Iv+Iw≒0が成立する。したがって、残りのV相電流値は、図示しない記憶部に記憶した上記の数式4で算出される。   The control device 100 calculates the current value for the remaining one phase from the current value for the two phases at the carrier valley timing (boundary timing). For example, the control device 100 calculates the remaining V-phase current value from the current values for the two phases calculated by Equations 2 and 3. Since the current data for the two phases calculated by Equations 2 and 3 are approximately time-matched, Iu + Iv + Iw≈0 holds. Therefore, the remaining V-phase current value is calculated by the above mathematical formula 4 stored in a storage unit (not shown).

ここで、仮に、図12に示すように、現在のキャリア周期Tc902内で2相の電流を算出した後に2相の電流値を基に他の1相の電流値を算出する場合を考える。この場合、算出された3相の相電流を現在の次のキャリア周期Tc903での制御に用いようとしても間に合わない。すなわち、図12に示すモータの制御装置では、3相の電流を算出し、その電流値から電圧指令を生成する処理が現在の次のキャリア周期Tc903に行われ、生成された3相の電流指令を用いるのは現在の次のさらに次のキャリア周期Tc904になる。そのため、算出された3相の相電流に対応した周期(現在のキャリア周期Tc902)と制御の周期(次の次のキャリア周期Tc904)とのタイムラグが大きくなる。算出された3相の相電流に対応した周期と制御の周期とのタイムラグが大きくなると、モータの制御の精度が低下する。   Here, suppose that, as shown in FIG. 12, the current value of another phase is calculated based on the current value of two phases after calculating the current of two phases within the current carrier cycle Tc902. In this case, it is not in time to use the calculated three-phase current for control in the current next carrier cycle Tc 903. That is, in the motor control device shown in FIG. 12, a process for calculating a three-phase current and generating a voltage command from the current value is performed in the current next carrier cycle Tc903, and the generated three-phase current command is generated. Is used for the current next further carrier cycle Tc904. Therefore, the time lag between the cycle corresponding to the calculated three-phase phase current (current carrier cycle Tc902) and the control cycle (next carrier cycle Tc904) is increased. When the time lag between the cycle corresponding to the calculated three-phase phase current and the control cycle becomes large, the accuracy of motor control decreases.

また仮に、算出部60において、第1のキャリア周期の後半における推定された2相の電流から残りの1相の電流を近似的に算出する処理を行わない場合を考える。この場合、第1のキャリア周期の後半における算出された2相の電流と第2のキャリア周期の前半における算出された2相の電流とを常に用いて第1のキャリア周期と第2のキャリア周期との境界タイミングにおける2相の電流を算出する必要がある。第1のキャリア周期と第2のキャリア周期とで3相の電流のうち検出できる相が変化しない場合であれば、図13に示すように、2相の電流を算出することができる。図13に示すように、キャリア周期Tc801とキャリア周期Tc802とで3相の電流のうち検出できる相が変化しないので、境界タイミングtc812の前後で共通の2相(U相、W相)の電流を推定でき両者の間の電流値を算出できる。   Further, suppose that the calculation unit 60 does not perform a process of approximately calculating the remaining one-phase current from the estimated two-phase current in the second half of the first carrier cycle. In this case, the first carrier period and the second carrier period are always used by using the two-phase current calculated in the second half of the first carrier period and the two-phase current calculated in the first half of the second carrier period. It is necessary to calculate a two-phase current at the boundary timing between the two. If the detectable phase of the three-phase current does not change between the first carrier period and the second carrier period, a two-phase current can be calculated as shown in FIG. As shown in FIG. 13, since the detectable phase of the three-phase current does not change between the carrier period Tc801 and the carrier period Tc802, the common two-phase (U-phase, W-phase) current before and after the boundary timing tc812 is obtained. The current value between the two can be calculated.

しかし、第1のキャリア周期と第2のキャリア周期とで3相の電流のうち検出できる相が変化する場合、図14に示すように、2相の電流を算出することが不可能になる。図14に示すように、キャリア周期Tc701とキャリア周期Tc702とで3相の電流のうち検出できる相が変化するので、境界タイミングtc712の前後で共通の相として1相の電流しか算出できない。すなわち、キャリア周期Tc701について推定される2相(U相、V相)とキャリア周期Tc701について算出される2相(U相、W相)とで共通なのは1相(U相)だけである。これにより、2相の電流を算出することが不可能になり、当然、3相の相電流を算出することも不可能になる。   However, when the detectable phase of the three-phase current changes between the first carrier period and the second carrier period, it is impossible to calculate the two-phase current as shown in FIG. As shown in FIG. 14, the detectable phase of the three-phase current changes depending on the carrier cycle Tc 701 and the carrier cycle Tc 702, so that only one phase current can be calculated as a common phase before and after the boundary timing tc 712. That is, only one phase (U phase) is common to the two phases (U phase and V phase) estimated for the carrier cycle Tc 701 and the two phases (U phase and W phase) calculated for the carrier cycle Tc 701. This makes it impossible to calculate a two-phase current, and naturally, it is also impossible to calculate a three-phase current.

それに対して、実施形態では、モータ制御装置100の算出部60おいて、第1算出部は、第1のキャリア周期の3相のPWM信号と第1のキャリア周期の後半に検出された母線電流とから第1のキャリア周期の後半における3相の電流のうち2相の電流を算出するとともに第1のキャリア周期に続く第2のキャリア周期の3相のPWM信号と第2のキャリア周期の前半に検出された母線電流とから前記第2のキャリア周期の前半における3相の電流のうち2相の電流を算出する。第2算出部は、第1算出部で算出された第1のキャリア周期の後半における2相の電流から残りの1相を算出する。第3算出部は、第1のキャリア周期の後半に算出された相電流と前記第2のキャリア周期の前半に算出された相電流に基づいて第1のキャリア周期と第2のキャリア周期との境界タイミングにおける3相の電流を算出する。判定部は、第1のキャリア周期と前記第2のキャリア周期との各相のPWMの大小の関係で中間電圧相が変化した場合、3相の電流のうち検出できる相が変化したか否か判定する。そして、第3算出部は、検出できる相が変化しないと判定部が判定すると、第1算出部で算出された電流を用いて3相の電流を算出し、検出できる相が変化したと判定部が判定すると、前記第1算出部で算出された電流と第2算出部で算出された相電流を用いて3相の電流を算出する。生成部40は第2のキャリア周期に続く第3のキャリア周期で用いる3相のPWM信号を生成するための3相の電圧指令値を前記境界タイミングにおける3相の電流に基づいて生成する。これにより、算出された3相の相電流に対応した周期である現在のキャリア周期を次のキャリア周期の電圧指令に用いることができる。この結果、算出された3相の相電流に対応したキャリア周期とその相電流を用いて制御を行なうキャリア周期とのタイムラグを低減できる。また、判定部61bと第2算出部61dにより、第1のキャリア周期と第2のキャリア周期とで3相の電流のうち検出できる相が変化した場合においても、第1のキャリア周期と第2のキャリア周期との境界タイミングにおける3相の電流を算出することができる。すなわち、第1のキャリア周期と第2のキャリア周期とで3相の電流のうち検出できる相が変化するか否かに関わらず同様の処理を行うことができる。   On the other hand, in the embodiment, in the calculation unit 60 of the motor control device 100, the first calculation unit includes the three-phase PWM signal of the first carrier cycle and the bus current detected in the second half of the first carrier cycle. The two-phase current among the three-phase currents in the second half of the first carrier period is calculated from the above and the three-phase PWM signal of the second carrier period following the first carrier period and the first half of the second carrier period The two-phase current is calculated from the three-phase current in the first half of the second carrier cycle from the bus current detected in step (b). The second calculation unit calculates the remaining one phase from the two-phase current in the second half of the first carrier cycle calculated by the first calculation unit. The third calculation unit calculates the first carrier cycle and the second carrier cycle based on the phase current calculated in the second half of the first carrier cycle and the phase current calculated in the first half of the second carrier cycle. The three-phase current at the boundary timing is calculated. The determination unit determines whether or not the detectable phase of the three-phase current has changed when the intermediate voltage phase has changed due to the magnitude of the PWM of each phase between the first carrier period and the second carrier period. judge. When the determination unit determines that the detectable phase does not change, the third calculation unit calculates a three-phase current using the current calculated by the first calculation unit, and determines that the detectable phase has changed. Is determined, a three-phase current is calculated using the current calculated by the first calculation unit and the phase current calculated by the second calculation unit. The generation unit 40 generates a three-phase voltage command value for generating a three-phase PWM signal used in a third carrier period following the second carrier period based on the three-phase current at the boundary timing. As a result, the current carrier cycle, which is the cycle corresponding to the calculated three-phase phase current, can be used for the voltage command of the next carrier cycle. As a result, it is possible to reduce the time lag between the carrier period corresponding to the calculated three-phase phase current and the carrier period in which control is performed using the phase current. Further, even when the phase that can be detected in the three-phase current is changed between the first carrier cycle and the second carrier cycle by the determination unit 61b and the second calculation unit 61d, the first carrier cycle and the second calculation unit 61d The three-phase current at the boundary timing with the carrier cycle can be calculated. That is, the same processing can be performed regardless of whether or not the detectable phase of the three-phase current changes between the first carrier cycle and the second carrier cycle.

また、実施形態では、モータの制御装置100の算出部60において、補間算出部61fが、第1のキャリア周期の後半における第1の相及び第3の相の電流と第2のキャリア周期の前半における第1の相及び第3の相の電流との間で境界タイミングにおける第1の相及び第3の相の電流を線形補間により算出する。これにより、境界タイミングにおける前後のPWM信号が境界タイミングに対して非対称なパターンである場合に、第1のキャリア周期の後半における2相の電流と第2のキャリア周期の前半における2相の電流とから、境界タイミングにおける2相の電流を精度よく算出することができる。   In the embodiment, in the calculation unit 60 of the motor control device 100, the interpolation calculation unit 61f performs the first phase and third phase currents in the second half of the first carrier cycle and the first half of the second carrier cycle. The first phase and third phase currents at the boundary timing are calculated by linear interpolation between the first phase and third phase currents. As a result, when the PWM signals before and after the boundary timing have an asymmetric pattern with respect to the boundary timing, the two-phase current in the second half of the first carrier period and the two-phase current in the first half of the second carrier period Thus, the two-phase current at the boundary timing can be accurately calculated.

なお、実施形態では、サンプリング点i(タイミングtu1)及びサンプリング点v(タイミングtv1)を相電流の検出される各期間TP2,TP3の中央のタイミングにする場合について例示的に説明しているが、第2算出部61dで近似的に算出される電流値の時間的整合性を向上させるためには、図10に示すサンプリング点iとvとの時間的なズレが少ない方が好ましい。   In the embodiment, the case where the sampling point i (timing tu1) and the sampling point v (timing tv1) are set to the central timing of the periods TP2 and TP3 in which the phase current is detected is described as an example. In order to improve the temporal consistency of the current value approximately calculated by the second calculator 61d, it is preferable that the temporal deviation between the sampling points i and v shown in FIG. 10 is small.

そこで、3φ電流算出器61において、第1算出部61cは、第1のキャリア周期の後半を第1の相の電流に対応した第1の期間と第2の相の電流に対応した第2の期間とに区分したとき、第1の期間における中央より第2の期間の側の第1のタイミングで検出された母線電流に基づいて第1のタイミングにおける前記第1の相の電流を算出してもよい。第1算出部61cは、第2の期間における中央より第1の期間の側の第2のタイミングで検出された母線電流に基づいて第2のタイミングにおける前記第2の相の電流を算出してもよい。   Therefore, in the 3φ current calculator 61, the first calculator 61c includes a second period corresponding to the first period corresponding to the first phase current and the second phase current in the second half of the first carrier cycle. When divided into periods, the current of the first phase at the first timing is calculated based on the bus current detected at the first timing on the second period side from the center in the first period. Also good. The first calculation unit 61c calculates the current of the second phase at the second timing based on the bus current detected at the second timing on the first period side from the center in the second period. Also good.

例えば図11に示す場合、第1算出部61cは、期間TP2(図4参照)における中央より期間TP3の側のタイミングである第1のタイミングtu1’で検出された母線電流に応じてタイミングtu1’におけるU相の電流を算出してもよい。第1算出部61cは、期間TP3(図4参照)における中央より期間TP2の側のタイミングである第2のタイミングtv1’で検出された母線電流に基づいてタイミングtv1’におけるV相の電流を算出してもよい。   For example, in the case illustrated in FIG. 11, the first calculation unit 61c determines the timing tu1 ′ according to the bus current detected at the first timing tu1 ′ that is the timing of the period TP3 from the center in the period TP2 (see FIG. 4). The U-phase current at may be calculated. The first calculator 61c calculates the V-phase current at the timing tv1 ′ based on the bus current detected at the second timing tv1 ′ that is the timing on the side of the period TP2 from the center in the period TP3 (see FIG. 4). May be.

このとき、第2算出部61dは、第1のタイミングにおける第1の相の電流と第2のタイミングにおける第2の相の電流とから、第1のタイミングと第2のタイミングとの間の第3のタイミングにおける第3の相の電流を近似的に算出する。   At this time, the second calculation unit 61d calculates the first phase between the first timing and the second timing from the first phase current at the first timing and the second phase current at the second timing. The current of the third phase at the timing of 3 is approximately calculated.

例えば図11に示す場合、第2算出部61dは、第1のタイミングtu1’(サンプリング点i’)におけるU相の電流とタイミングtv1’におけるV相の電流とから、タイミングtu1’と第2のタイミングtv1’との間のタイミングtw1におけるW相の電流を近似的に算出する。   For example, in the case illustrated in FIG. 11, the second calculation unit 61d calculates the timing tu1 ′ and the second phase from the U-phase current at the first timing tu1 ′ (sampling point i ′) and the V-phase current at the timing tv1 ′. The current of the W phase at the timing tw1 between the timing tv1 ′ and the timing tv1 ′ is approximately calculated.

これにより、図11に示すように、サンプリング点i’とサンプリング点iiとの時間的距離を互いに近づけることができ、サンプリング点iiとサンプリング点v’との時間的距離を互いに近づけることができる。この結果、サンプリング点i’,v’とサンプリング点iiとの時間的整合性を向上させることができ、第3の相の電流を近似的に算出する際の近似精度を向上できる。例えば、使用するスイッチング素子SWup〜SWwnや電流検出回路21の応答速度を考慮して、両者のサンプリング点iとvとを可能な限り近づけることができる。   As a result, as shown in FIG. 11, the temporal distance between the sampling point i 'and the sampling point ii can be made closer to each other, and the temporal distance between the sampling point ii and the sampling point v' can be made closer to each other. As a result, the temporal consistency between the sampling points i ′ and v ′ and the sampling point ii can be improved, and the approximation accuracy when the current of the third phase is approximately calculated can be improved. For example, the sampling points i and v can be made as close as possible in consideration of the switching elements SWup to SWwn to be used and the response speed of the current detection circuit 21.

以上のように、本発明にかかるモータ制御装置は、モータの制御に有用である。   As described above, the motor control device according to the present invention is useful for controlling the motor.

10 インバータ
20 電流検出部
21 電流検出回路
30 検出部
31 DC電圧検出回路
32 DC電圧算出器
40 生成部
41a 規格化器
41b キャリア発生器
41c 比較器
42 3φ/dq座標変換器
43 dq/3φ座標変換器
44 位置・速度推定器
45 d軸q軸電圧設定器
46 減算器
47 減算器
48 d軸電流設定器
49 速度制御器
51 1/Pn変換器
52 減算器
60 算出部
61 3φ電流算出器
61a AD変換部
61b 判定部
61c 第1算出部
61d 第2算出部
61e 第3算出部
61f 補間算出部
61g 算出処理部
100 制御装置
DESCRIPTION OF SYMBOLS 10 Inverter 20 Current detection part 21 Current detection circuit 30 Detection part 31 DC voltage detection circuit 32 DC voltage calculator 40 Generation part 41a Normalizer 41b Carrier generator 41c Comparator 42 3φ / dq coordinate converter 43 dq / 3φ coordinate conversion 44 Position / speed estimator 45 d-axis q-axis voltage setter 46 Subtractor 47 Subtractor 48 d-axis current setter 49 Speed controller 51 1 / Pn converter 52 Subtractor 60 Calculation unit 61 3φ current calculator 61a AD Conversion unit 61b Determination unit 61c First calculation unit 61d Second calculation unit 61e Third calculation unit 61f Interpolation calculation unit 61g Calculation processing unit 100 Control device

Claims (3)

直流電源から供給された直流電力をPWM制御により3相の交流電力に変換してモータヘ供給するインバータと、
前記直流電源と前記インバータとの間に接続された1つのシャント抵抗を用いてインバータの母線電流を検出する電流検出部と、
前記電流検出部により検出された母線電流に基づいて、前記モータに流れる3相の電流を算出する算出部と、
前記算出部により算出された3相の電流に基づいて3相の電圧指令値を生成し、生成された3相の電圧指令値と所定の周期を有する三角波キャリア信号から3相のPWM信号を生成する生成部とを備え、
前記算出部は、
第1のキャリア周期の3相のPWM信号と前記第1のキャリア周期の後半に検出された母線電流とから前記第1のキャリア周期の後半における3相の電流のうち2相の電流を算出するとともに前記第1のキャリア周期に続く第2のキャリア周期の3相のPWM信号と前記第2のキャリア周期の前半に検出された母線電流とから前記第2のキャリア周期の前半における3相の電流のうち2相の電流を算出する第1算出部と、
前記第1算出部で算出された前記第1のキャリア周期の後半における2相の電流から残りの1相を算出する第2算出部と、
前記第1算出部と前記第2算出部により算出された前記第1のキャリア周期の後半の3相の電流と前記第2のキャリア周期の前半の2相の電流に基づいて前記第1のキャリア周期と前記第2のキャリア周期との境界タイミングにおける3相の電流を算出する第3算出部と、
前記第1のキャリア周期と前記第2のキャリア周期とで3相の電流のうち検出できる相が変化したか否か判定する判定部とを備え、
前記第3算出部は、
前記第1のキャリア周期と前記第2のキャリア周期とで3相の電流のうち検出できる相が変化しないと前記判定部が判定すると、前記第1算出部で算出された2相の電流を用いて3相の電流を算出し、
検出できる相が変化したと前記判定部が判定すると、前記第1算出部で算出された電流と第2算出部で算出された相電流を用いて3相の電流を算出し、
前記生成部は、前記第2のキャリア周期に続く第3のキャリア周期で用いる3相のPWM信号を生成するための3相の電圧指令値を前記境界タイミングにおける3相の電流に基づいて生成することを特徴とするモータ制御装置。
An inverter for converting DC power supplied from a DC power source into three-phase AC power by PWM control and supplying the motor to the motor;
A current detector for detecting a bus current of the inverter using one shunt resistor connected between the DC power source and the inverter;
A calculation unit that calculates a three-phase current flowing through the motor based on the bus current detected by the current detection unit;
A three-phase voltage command value is generated based on the three-phase current calculated by the calculation unit, and a three-phase PWM signal is generated from the generated three-phase voltage command value and a triangular wave carrier signal having a predetermined cycle. And a generation unit
The calculation unit includes:
A two-phase current among the three-phase currents in the second half of the first carrier cycle is calculated from the three-phase PWM signal of the first carrier cycle and the bus current detected in the second half of the first carrier cycle. And a three-phase current in the first half of the second carrier period from a three-phase PWM signal of the second carrier period following the first carrier period and a bus current detected in the first half of the second carrier period. A first calculation unit for calculating a two-phase current,
A second calculation unit that calculates the remaining one phase from the two-phase current in the second half of the first carrier period calculated by the first calculation unit;
The first carrier based on the three-phase current in the second half of the first carrier cycle and the two-phase current in the first half of the second carrier cycle calculated by the first calculator and the second calculator. A third calculation unit for calculating a three-phase current at a boundary timing between a cycle and the second carrier cycle;
A determination unit that determines whether or not the detectable phase of the three-phase current has changed between the first carrier period and the second carrier period;
The third calculator is
When the determination unit determines that the detectable phase of the three-phase current does not change between the first carrier cycle and the second carrier cycle, the two-phase current calculated by the first calculation unit is used. To calculate the current of three phases,
When the determination unit determines that a detectable phase has changed, a current of three phases is calculated using the current calculated by the first calculation unit and the phase current calculated by the second calculation unit,
The generation unit generates a three-phase voltage command value for generating a three-phase PWM signal used in a third carrier period following the second carrier period based on the three-phase current at the boundary timing. The motor control apparatus characterized by the above-mentioned.
前記第3算出部は、前記第1のキャリア周期の後半における2相の電流と前記第2のキャリア周期の前半における2相の電流とから線形補間により前記境界タイミングにおける2相の電流を算出する補間算出部と、
前記補間算出部で算出された前記境界タイミングにおける2相の電流から前記3相の電流のうち残りの1相の電流を算出する算出処理部とを有することを特徴とする請求項1に記載のモータ制御装置。
The third calculation unit calculates a two-phase current at the boundary timing by linear interpolation from a two-phase current in the second half of the first carrier cycle and a two-phase current in the first half of the second carrier cycle. An interpolation calculator;
The calculation processing unit that calculates a remaining one-phase current among the three-phase currents from the two-phase currents at the boundary timing calculated by the interpolation calculation unit. Motor control device.
前記第1算出部は、前記第1のキャリア周期の後半における第1の相の電流に対応した第1の期間と第2の相の電流に対応した第2の期間とに区分したとき、前記第1の期間における中央より前記第2の期間の側の第1のタイミングで検出された母線電流に基づいて前記第1のタイミングにおける前記第1の相の電流を算出し、前記第2の期間における中央より前記第1の期間の側の第2のタイミングで検出された母線電流に基づいて前記第2のタイミングにおける前記第2の相の電流を算出し、
前記第2算出部は、前記第1のタイミングにおける前記第1の相の電流と前記第2のタイミングにおける前記第2の相の電流とから、前記第1のタイミングと前記第2のタイミングとの間の第3のタイミングにおける前記第3の相の電流を近似的に算出する
ことを特徴とする請求項1又は2に記載のモータ制御装置。
When the first calculation unit divides into a first period corresponding to a first phase current and a second period corresponding to a second phase current in the second half of the first carrier period, A current of the first phase at the first timing is calculated based on a bus current detected at a first timing on the second period side from the center in the first period, and the second period Calculating the current of the second phase at the second timing based on the bus current detected at the second timing on the first period side from the center at
The second calculation unit calculates the first timing and the second timing from the current of the first phase at the first timing and the current of the second phase at the second timing. The motor control device according to claim 1, wherein the current of the third phase at a third timing is approximately calculated.
JP2014011868A 2014-01-24 2014-01-24 Motor control device Active JP6102768B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2014011868A JP6102768B2 (en) 2014-01-24 2014-01-24 Motor control device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2014011868A JP6102768B2 (en) 2014-01-24 2014-01-24 Motor control device

Publications (2)

Publication Number Publication Date
JP2015139360A true JP2015139360A (en) 2015-07-30
JP6102768B2 JP6102768B2 (en) 2017-03-29

Family

ID=53770018

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2014011868A Active JP6102768B2 (en) 2014-01-24 2014-01-24 Motor control device

Country Status (1)

Country Link
JP (1) JP6102768B2 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109533014A (en) * 2018-12-19 2019-03-29 杭州湘滨电子科技有限公司 A kind of electric boosting steering system overcurrent suppressing method and device
JP2019075964A (en) * 2017-10-19 2019-05-16 アイシン精機株式会社 Motor controller
CN113655266A (en) * 2021-09-26 2021-11-16 合肥美的暖通设备有限公司 Single-bus current detection method and device, motor controller and storage medium
US20220294377A1 (en) * 2019-08-23 2022-09-15 Mitsubishi Electric Corporation Estimation device and ac motor drive device

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008253128A (en) * 2007-03-05 2008-10-16 Matsushita Electric Ind Co Ltd Inverter apparatus
JP2010088262A (en) * 2008-10-02 2010-04-15 Honda Motor Co Ltd Apparatus for estimating phase current in motor
JP2010119227A (en) * 2008-11-13 2010-05-27 Honda Motor Co Ltd Phase current estimation apparatus of electric motor, and magnetic pole position estimation apparatus of electric motor
JP2011109848A (en) * 2009-11-19 2011-06-02 Ricoh Co Ltd Motor drive control device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2008253128A (en) * 2007-03-05 2008-10-16 Matsushita Electric Ind Co Ltd Inverter apparatus
JP2010088262A (en) * 2008-10-02 2010-04-15 Honda Motor Co Ltd Apparatus for estimating phase current in motor
JP2010119227A (en) * 2008-11-13 2010-05-27 Honda Motor Co Ltd Phase current estimation apparatus of electric motor, and magnetic pole position estimation apparatus of electric motor
JP2011109848A (en) * 2009-11-19 2011-06-02 Ricoh Co Ltd Motor drive control device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2019075964A (en) * 2017-10-19 2019-05-16 アイシン精機株式会社 Motor controller
CN109533014A (en) * 2018-12-19 2019-03-29 杭州湘滨电子科技有限公司 A kind of electric boosting steering system overcurrent suppressing method and device
US20220294377A1 (en) * 2019-08-23 2022-09-15 Mitsubishi Electric Corporation Estimation device and ac motor drive device
US11705841B2 (en) * 2019-08-23 2023-07-18 Mitsubishi Electric Corporation Estimation device and AC motor drive device
CN113655266A (en) * 2021-09-26 2021-11-16 合肥美的暖通设备有限公司 Single-bus current detection method and device, motor controller and storage medium
CN113655266B (en) * 2021-09-26 2024-01-26 合肥美的暖通设备有限公司 Single bus current detection method and device, motor controller and storage medium

Also Published As

Publication number Publication date
JP6102768B2 (en) 2017-03-29

Similar Documents

Publication Publication Date Title
JP4067949B2 (en) Motor control device
JP2003204694A (en) Motor controller
JP6091446B2 (en) Electric motor control device
CN112204873B (en) Permanent magnet synchronous motor control device, electric vehicle and magnetic pole polarity distinguishing method
JP6102768B2 (en) Motor control device
JP4771998B2 (en) Electric motor drive
JP6156162B2 (en) Motor control device
JP7361924B2 (en) Motor control device, motor control method
JP2000175483A (en) Sensorless control method for synchronous motor and its apparatus
WO2021200389A1 (en) Motor control device, motor system, and motor control method
JP6318653B2 (en) Motor control device
JP6116449B2 (en) Electric motor drive control device
JP2019057981A (en) Motor control integrated circuit
JP2010028981A (en) Rotor position estimating method for synchronous motor, and controller for the synchronous motor
JP5798513B2 (en) Method and apparatus for detecting initial magnetic pole position of permanent magnet synchronous motor, and control apparatus for permanent magnet synchronous motor
JP4735287B2 (en) Synchronous motor control device and control method using the synchronous motor control device
WO2021200845A1 (en) Motor control device, motor system, and motor control method
JP7452200B2 (en) motor control device
JP7267457B2 (en) power converter
WO2019031157A1 (en) Three-phase synchronous electric motor control device and electric power steering device using same
JP2019134624A (en) Three-phase synchronous motor controller
JP7382885B2 (en) Motor control device, motor system and motor control method
JP7172910B2 (en) electric motor controller
WO2021200209A1 (en) Motor control device, motor system, and motor control method
JP2024027357A (en) Motor controller

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20160325

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20170131

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20170131

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20170213

R151 Written notification of patent or utility model registration

Ref document number: 6102768

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151