JP2015125665A - 水系計画装置及び方法 - Google Patents
水系計画装置及び方法 Download PDFInfo
- Publication number
- JP2015125665A JP2015125665A JP2013270805A JP2013270805A JP2015125665A JP 2015125665 A JP2015125665 A JP 2015125665A JP 2013270805 A JP2013270805 A JP 2013270805A JP 2013270805 A JP2013270805 A JP 2013270805A JP 2015125665 A JP2015125665 A JP 2015125665A
- Authority
- JP
- Japan
- Prior art keywords
- water system
- dam
- power generation
- plan
- river flow
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 title claims abstract description 132
- 238000000034 method Methods 0.000 title claims description 16
- 238000010248 power generation Methods 0.000 claims abstract description 77
- 238000004364 calculation method Methods 0.000 claims abstract description 11
- 238000006243 chemical reaction Methods 0.000 claims abstract description 8
- 239000000446 fuel Substances 0.000 claims description 7
- 238000005457 optimization Methods 0.000 claims description 6
- 238000011156 evaluation Methods 0.000 description 5
- 238000011144 upstream manufacturing Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 238000005259 measurement Methods 0.000 description 2
- 230000002411 adverse Effects 0.000 description 1
- 238000013528 artificial neural network Methods 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 239000004973 liquid crystal related substance Substances 0.000 description 1
- 230000003068 static effect Effects 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y04—INFORMATION OR COMMUNICATION TECHNOLOGIES HAVING AN IMPACT ON OTHER TECHNOLOGY AREAS
- Y04S—SYSTEMS INTEGRATING TECHNOLOGIES RELATED TO POWER NETWORK OPERATION, COMMUNICATION OR INFORMATION TECHNOLOGIES FOR IMPROVING THE ELECTRICAL POWER GENERATION, TRANSMISSION, DISTRIBUTION, MANAGEMENT OR USAGE, i.e. SMART GRIDS
- Y04S10/00—Systems supporting electrical power generation, transmission or distribution
- Y04S10/50—Systems or methods supporting the power network operation or management, involving a certain degree of interaction with the load-side end user applications
Landscapes
- Testing And Monitoring For Control Systems (AREA)
- Feedback Control In General (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
【解決手段】水力発電所の発電計画を作成する水系計画装置において、河川流量の実績値と予測値から河川流量の予測誤差を計算する予測誤差計算手段90と、河川流量の予測誤差の中から予測誤差が小さい時間間隔を選択する計画時間間隔選択手段100と、前記発電計画を作成する為の入力データを前記計画時間間隔選択手段で選択した時間間隔で変換する入力データ変換手段110と、変換した入力データに基づいて前記発電計画の作成を行う水系計画作成手段120とを備える。
【選択図】図1
Description
20…運用DB
30…水系DB
40…発電計画DB
50… 入力装置
60…出力装置
70…マンマシンインターフェ-ス
80…計画データ設定手段
90…予測誤差計算手段
100…計画時間間隔選択手段
110…入力データ変換手段
120…水系計画作成手段
Claims (11)
- 水力発電所の発電計画を作成する水系計画装置において、
河川流量の実績値と予測値から河川流量の予測誤差を計算する予測誤差計算手段と、河川流量の予測誤差の中から予測誤差が小さい時間間隔を選択する計画時間間隔選択手段と、前記発電計画を作成する為の入力データを前記計画時間間隔選択手段で選択した時間間隔で変換する入力データ変換手段と、変換した入力データに基づいて前記発電計画の作成を行う水系計画作成手段とを備えることを特徴とする水系計画装置。 - 請求項1に記載の水系計画装置において、
前記予測誤差計算手段は、時間間隔を可変させて河川流量の予測誤差を計算することを特徴とする水系計画装置。 - 請求項1に記載の水系計画装置において、
前記計画時間間隔選択手段は、24時点の河川流量予測誤差に対し複数時点を1つの時間帯として評価し、前記選択をすることを特徴とする水系計画装置。 - 請求項3に記載の水系計画装置において、
前記計画時間間隔選択手段は、複数の予測誤差の絶対値平均又は二乗平均平方根を含む複数の方法で評価することを特徴とする水系計画装置。 - 請求項1に記載の水系計画装置において、
前記変換した入力データには、河川流量の予測誤差が小さい時間間隔及び前記時間間隔における河川流量予測値が含まれることを特徴とする水系計画装置。 - 請求項1に記載の水系計画装置において、
前記変換した入力データ、及びダム運用又は特性に関するデータに基づいて、前記発電計画における制約条件及び目的関数を生成する計画データ設定手段を備えることを特徴とする水系計画装置。 - 請求項6に記載の水系計画装置において、
前記制約条件には、発電使用水量上下限制約、ゲート放流量上下限制約又はダム水位上下限制約が含まれることを特徴とする水系計画装置。 - 請求項6に記載の水系計画装置において、
前記計画データ設定手段は、ダム運用に関するデータに含まれる総需要カーブ予想値又は火力増分燃料費データに基づいて、連接する水力発電所の発電価値を最大化する目的関数を生成することを特徴とする水系計画装置。 - 請求項6に記載の水系計画装置において、
前記ダム運用又は特性に関するデータは、各時刻の各ダムへ流入する河川流量、各ダムの運用に関係する初期水位、目標水位、ダム水位上下限値、ゲート放流量上下限値、発電使用水量上下限値、ダム水位変化上下限値、発電使用水量変化量上下限値、連接水系ダムモデルのダム接続データ、ダム数、ダム定数、発電機定数、ダム間の流下遅れ時間を利用して制約条件の作成、ダム定数、発電機定数、各時刻の総需要カーブ予想値又は火力増分燃料費データを含むことを特徴とする水系計画装置。 - 請求項6に記載の水系計画装置において、
前記水系計画作成手段は、前記計画データ設定手段で生成された制約条件及び目的関数のデータを格納する記憶装置と、最適化計画プログラムと、最適化計画プログラムを実行するCPUとを備え、前記制約条件を満たし、前記目的関数を最適化する発電計画を作成することを特徴とする水系計画装置。 - 水力発電所の発電計画を作成する水系計画方法において、
河川流量の実績値と予測値から河川流量の予測誤差を計算するステップと、河川流量の予測誤差の中から予測誤差が小さい時間間隔を選択するステップと、前記発電計画を作成する為の入力データを前記選択した時間間隔で変換するステップと、変換した入力データに基づいて前記発電計画の作成を行うステップと含むことを特徴とする水系計画方法。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013270805A JP2015125665A (ja) | 2013-12-27 | 2013-12-27 | 水系計画装置及び方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2013270805A JP2015125665A (ja) | 2013-12-27 | 2013-12-27 | 水系計画装置及び方法 |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2015125665A true JP2015125665A (ja) | 2015-07-06 |
Family
ID=53536316
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2013270805A Pending JP2015125665A (ja) | 2013-12-27 | 2013-12-27 | 水系計画装置及び方法 |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2015125665A (ja) |
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106438172A (zh) * | 2016-10-26 | 2017-02-22 | 杨长易 | 环保型水面水力发电站 |
CN106548269A (zh) * | 2016-09-27 | 2017-03-29 | 长江勘测规划设计研究有限责任公司 | 一种梯级水电站紧急切机情况下闸门快速操作方法 |
CN106801404A (zh) * | 2017-01-19 | 2017-06-06 | 贵州黔源电力股份有限公司 | 一种梯级电站水库错峰电量补偿方法 |
JP6330982B1 (ja) * | 2017-09-13 | 2018-05-30 | 中国電力株式会社 | 連接水系の運用支援システム |
CN109101687A (zh) * | 2018-07-05 | 2018-12-28 | 沈阳建筑大学 | 一种基于闸坝分区的生态需水量计算方法 |
CN109543887A (zh) * | 2018-11-07 | 2019-03-29 | 贵州黔源电力股份有限公司 | 一种日调节水库不同时期的水位动态控制方法 |
JP2019169064A (ja) * | 2018-03-26 | 2019-10-03 | 東芝エネルギーシステムズ株式会社 | 水力発電所の出力配分装置および水力発電システム |
CN111598757A (zh) * | 2020-05-15 | 2020-08-28 | 南昌工程学院 | 一种平原河网区城市水系流动确定方法 |
CN111832829A (zh) * | 2020-07-21 | 2020-10-27 | 河南郑大水利科技有限公司 | 一种基于大数据的水库水电站优化运行方法 |
CN112785151A (zh) * | 2021-01-22 | 2021-05-11 | 黄河勘测规划设计研究院有限公司 | 串联水库联合防凌补偿调度方法及其专用系统 |
CN113256005A (zh) * | 2021-05-28 | 2021-08-13 | 国能大渡河沙坪发电有限公司 | 一种基于神经网络模型的电站水位过程预测方法及设备 |
CN113361818A (zh) * | 2021-07-07 | 2021-09-07 | 西安热工研究院有限公司 | 一种水电机组中长期发电优化方法及系统 |
JP2023069903A (ja) * | 2021-11-08 | 2023-05-18 | 株式会社東芝 | 水力発電所運用支援装置および水力発電所運用支援方法 |
JP2023100054A (ja) * | 2022-01-05 | 2023-07-18 | 東芝エネルギーシステムズ株式会社 | 水力発電所運用計画生成装置および水力発電所運用計画生成方法 |
CN117391316A (zh) * | 2023-12-13 | 2024-01-12 | 长江水资源保护科学研究所 | 一种蓄洪区水质净化能力的预评估方法 |
JP7467315B2 (ja) | 2020-11-11 | 2024-04-15 | 株式会社東芝 | 水系運用計画方法および水系運用計画システム |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000257140A (ja) * | 1999-03-09 | 2000-09-19 | Toshiba Corp | 雨水流入量予測装置及び雨水流入量予測方法 |
JP2001167078A (ja) * | 1999-12-13 | 2001-06-22 | Fuji Electric Co Ltd | ダムまたは河川における流量予測方法 |
JP2005285032A (ja) * | 2004-03-31 | 2005-10-13 | Ffc Ltd | 水力発電所群の日間発電計画立案システム |
JP2007226450A (ja) * | 2006-02-22 | 2007-09-06 | Fuji Electric Systems Co Ltd | 流量予測装置、流量予測方法および流量予測プログラム |
-
2013
- 2013-12-27 JP JP2013270805A patent/JP2015125665A/ja active Pending
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2000257140A (ja) * | 1999-03-09 | 2000-09-19 | Toshiba Corp | 雨水流入量予測装置及び雨水流入量予測方法 |
JP2001167078A (ja) * | 1999-12-13 | 2001-06-22 | Fuji Electric Co Ltd | ダムまたは河川における流量予測方法 |
JP2005285032A (ja) * | 2004-03-31 | 2005-10-13 | Ffc Ltd | 水力発電所群の日間発電計画立案システム |
JP2007226450A (ja) * | 2006-02-22 | 2007-09-06 | Fuji Electric Systems Co Ltd | 流量予測装置、流量予測方法および流量予測プログラム |
Non-Patent Citations (1)
Title |
---|
井本 文雄 外1名: "可変サンプリングモデルを用いたダム流入量の数日先行予測法", 電気学会論文誌B, vol. 114, no. 3, JPN6017008444, 20 March 1994 (1994-03-20), JP, pages 257 - 264, ISSN: 0003516347 * |
Cited By (25)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106548269A (zh) * | 2016-09-27 | 2017-03-29 | 长江勘测规划设计研究有限责任公司 | 一种梯级水电站紧急切机情况下闸门快速操作方法 |
CN106548269B (zh) * | 2016-09-27 | 2020-06-12 | 长江勘测规划设计研究有限责任公司 | 一种梯级水电站紧急切机情况下闸门快速操作方法 |
CN106438172B (zh) * | 2016-10-26 | 2019-01-15 | 杨长易 | 环保型水面水力发电站 |
CN106438172A (zh) * | 2016-10-26 | 2017-02-22 | 杨长易 | 环保型水面水力发电站 |
CN106801404A (zh) * | 2017-01-19 | 2017-06-06 | 贵州黔源电力股份有限公司 | 一种梯级电站水库错峰电量补偿方法 |
JP6330982B1 (ja) * | 2017-09-13 | 2018-05-30 | 中国電力株式会社 | 連接水系の運用支援システム |
WO2019053832A1 (ja) * | 2017-09-13 | 2019-03-21 | 中国電力株式会社 | 連接水系の運用支援システム |
JP2019169064A (ja) * | 2018-03-26 | 2019-10-03 | 東芝エネルギーシステムズ株式会社 | 水力発電所の出力配分装置および水力発電システム |
JP7023766B2 (ja) | 2018-03-26 | 2022-02-22 | 東芝エネルギーシステムズ株式会社 | 水力発電所の出力配分装置および水力発電システム |
CN109101687A (zh) * | 2018-07-05 | 2018-12-28 | 沈阳建筑大学 | 一种基于闸坝分区的生态需水量计算方法 |
CN109543887A (zh) * | 2018-11-07 | 2019-03-29 | 贵州黔源电力股份有限公司 | 一种日调节水库不同时期的水位动态控制方法 |
CN111598757A (zh) * | 2020-05-15 | 2020-08-28 | 南昌工程学院 | 一种平原河网区城市水系流动确定方法 |
CN111832829A (zh) * | 2020-07-21 | 2020-10-27 | 河南郑大水利科技有限公司 | 一种基于大数据的水库水电站优化运行方法 |
JP7467315B2 (ja) | 2020-11-11 | 2024-04-15 | 株式会社東芝 | 水系運用計画方法および水系運用計画システム |
CN112785151A (zh) * | 2021-01-22 | 2021-05-11 | 黄河勘测规划设计研究院有限公司 | 串联水库联合防凌补偿调度方法及其专用系统 |
CN112785151B (zh) * | 2021-01-22 | 2023-11-07 | 黄河勘测规划设计研究院有限公司 | 串联水库联合防凌补偿调度方法及其专用系统 |
CN113256005A (zh) * | 2021-05-28 | 2021-08-13 | 国能大渡河沙坪发电有限公司 | 一种基于神经网络模型的电站水位过程预测方法及设备 |
CN113361818A (zh) * | 2021-07-07 | 2021-09-07 | 西安热工研究院有限公司 | 一种水电机组中长期发电优化方法及系统 |
CN113361818B (zh) * | 2021-07-07 | 2023-09-22 | 西安热工研究院有限公司 | 一种水电机组中长期发电优化方法及系统 |
JP2023069903A (ja) * | 2021-11-08 | 2023-05-18 | 株式会社東芝 | 水力発電所運用支援装置および水力発電所運用支援方法 |
JP7330249B2 (ja) | 2021-11-08 | 2023-08-21 | 株式会社東芝 | 水力発電所運用支援装置および水力発電所運用支援方法 |
JP2023100054A (ja) * | 2022-01-05 | 2023-07-18 | 東芝エネルギーシステムズ株式会社 | 水力発電所運用計画生成装置および水力発電所運用計画生成方法 |
JP7362793B2 (ja) | 2022-01-05 | 2023-10-17 | 東芝エネルギーシステムズ株式会社 | 水力発電所運用計画生成装置および水力発電所運用計画生成方法 |
CN117391316A (zh) * | 2023-12-13 | 2024-01-12 | 长江水资源保护科学研究所 | 一种蓄洪区水质净化能力的预评估方法 |
CN117391316B (zh) * | 2023-12-13 | 2024-03-19 | 长江水资源保护科学研究所 | 一种蓄洪区水质净化能力的预评估方法 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2015125665A (ja) | 水系計画装置及び方法 | |
Shrestha et al. | Impact of climate change on river flow and hydropower production in Kulekhani hydropower project of Nepal | |
Li et al. | Dynamic control of flood limited water level for reservoir operation by considering inflow uncertainty | |
Borghetti et al. | An MILP approach for short-term hydro scheduling and unit commitment with head-dependent reservoir | |
Delarue et al. | The actual effect of wind power on overall electricity generation costs and CO2 emissions | |
Pérez-Díaz et al. | Optimal short-term operation schedule of a hydropower plant in a competitive electricity market | |
Li et al. | Optimizing environmental flow operations based on explicit quantification of IHA parameters | |
Babel et al. | Operation of a hydropower system considering environmental flow requirements: A case study in La Nga river basin, Vietnam | |
Cai et al. | Optimized reservoir operation to balance human and environmental requirements: a case study for the Three Gorges and Gezhouba Dams, Yangtze River basin, China | |
CN107506909A (zh) | 鱼类栖息地保护的梯级水库水电站群调度控制系统及方法 | |
Mousavi et al. | Capacity optimization of hydropower storage projects using particle swarm optimization algorithm | |
CN101714186B (zh) | 兼顾人类和生态需求的供水型水库调度图优化确定方法 | |
CN101899820B (zh) | 面向河流生态系统保护的流域地表水可利用量确定方法 | |
Sitzenfrei et al. | Optimizing small hydropower systems in water distribution systems based on long-time-series simulation and future scenarios | |
Chen et al. | Research on a layered coupling optimal operation model of the Three Gorges and Gezhouba cascade hydropower stations | |
JP5908506B2 (ja) | 予測システム、予測システムの動作方法 | |
Sitzenfrei et al. | Design and optimization of small hydropower systems in water distribution networks under consideration of rehabilitation measures | |
Olofintoye et al. | Real-time optimal water allocation for daily hydropower generation from the Vanderkloof dam, South Africa | |
CN109345080A (zh) | 天然气管道系统供气可靠性评价方法及系统 | |
Ramos et al. | Are digital twins improving urban-water systems efficiency and sustainable development goals? | |
Efstratiadis et al. | Generalized storage-reliability-yield framework for hydroelectric reservoirs | |
Davidsen et al. | The cost of ending groundwater overdraft on the North China Plain | |
CN107330538A (zh) | 一种气候变化条件下水库适应性调度规则编制的方法 | |
McCollor et al. | Hydrometeorological short-range ensemble forecasts in complex terrain. Part II: Economic evaluation | |
CN105260789B (zh) | 一种面向风电功率超短期预测的风电数据时间尺度优选方法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20160621 |
|
RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20170110 |
|
RD04 | Notification of resignation of power of attorney |
Free format text: JAPANESE INTERMEDIATE CODE: A7424 Effective date: 20170112 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20170223 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20170314 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20170912 |