JP2013200536A - シミュレーション装置、シミュレーション方法および連係プログラム - Google Patents
シミュレーション装置、シミュレーション方法および連係プログラム Download PDFInfo
- Publication number
- JP2013200536A JP2013200536A JP2012070370A JP2012070370A JP2013200536A JP 2013200536 A JP2013200536 A JP 2013200536A JP 2012070370 A JP2012070370 A JP 2012070370A JP 2012070370 A JP2012070370 A JP 2012070370A JP 2013200536 A JP2013200536 A JP 2013200536A
- Authority
- JP
- Japan
- Prior art keywords
- parameter
- value
- simulation
- weight
- model
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E30/00—Energy generation of nuclear origin
- Y02E30/30—Nuclear fission reactors
Landscapes
- Monitoring And Testing Of Nuclear Reactors (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
【解決手段】1つの態様において、原子力プラントの状態をシミュレートするシミュレーション装置10は、重み決定部17cと、表示制御部17dとを備える。重み決定部17cは、第1のモデルに基づくシミュレーション結果に含まれるパラメータの値と第2のモデルに基づくシミュレーション結果に含まれるパラメータの値との重み付き平均値を算出するための重みを、パラメータ毎に定められる方式に基づいて決定する。表示制御部17dは、重み決定部17cによって決定される重みを用いて算出される重み付き平均値を原子力プラントの状態として表示する。
【選択図】図1
Description
11 操作部
12 表示部
13 制御部
14 記憶部
15 汎用シミュレーションプログラム
16 重度障害シミュレーションプログラム
17 連係プログラム
17a 起動制御部
17b 操作反映部
17c 重み決定部
17d 表示制御部
21 操作パラメータ
22 モデルデータ
22a 共通パラメータ
22b 固有パラメータ
23 表示データ
24 モデルデータ
Claims (10)
- 原子力プラントの状態をシミュレートするシミュレーション装置であって、
第1のモデルに基づくシミュレーション結果に含まれるパラメータの値と第2のモデルに基づくシミュレーション結果に含まれるパラメータの値との重み付き平均値を算出するための重みを、パラメータ毎に定められる方式に基づいて決定する重み決定部と、
前記重み決定部によって決定される前記重みを用いて算出される前記重み付き平均値を前記原子力プラントの状態として表示する表示制御部と
を備えるシミュレーション装置。 - 前記重み決定部は、所定のパラメータの値が第1の閾値を超過していない場合には、前記重み付き平均値が前記第1のモデルに基づくシミュレーション結果に含まれるパラメータの値と等しくなり、前記所定のパラメータの値が前記第1の閾値よりも高く設定される第2の閾値を超過している場合には、前記重み付き平均値が前記第2のモデルに基づくシミュレーション結果に含まれるパラメータの値と等しくなるように、前記重みを決定する請求項1に記載のシミュレーション装置。
- 前記パラメータ毎に定められる方式には、前記所定のパラメータの値が前記第1の閾値を超過し、かつ、前記所定のパラメータの値が前記第2の閾値を超過していない場合には、前記所定のパラメータの値が高くなるほど前記重み付き平均値が前記第2のモデルに基づくシミュレーション結果に含まれるパラメータの値に近くなるように、前記重みを決定する方式が含まれる請求項2に記載のシミュレーション装置。
- 前記パラメータ毎に定められる方式には、前記所定のパラメータの値が前記第1の閾値を超過した場合には、前記重み付き平均値が前記第2のモデルに基づくシミュレーション結果に含まれるパラメータの値と等しくなるように、前記重みを決定する方式が含まれる請求項2または3に記載のシミュレーション装置。
- 前記パラメータ毎に定められる方式には、前記所定のパラメータの値が前記第2の閾値を超過していない場合には、前記重み付き平均値が前記第1のモデルに基づくシミュレーション結果に含まれるパラメータの値と等しくなるように、前記重みを決定する方式が含まれる請求項2から4のいずれか1つに記載のシミュレーション装置。
- 前記パラメータ毎に定められる方式には、前記所定のパラメータの値が前記第1の閾値を超過し、かつ、前記所定のパラメータの値が前記第2の閾値を超過していない場合には、前記第1のモデルに基づくシミュレーション結果に含まれるパラメータの値と前記第2のモデルに基づくシミュレーション結果に含まれるパラメータの値とが、前記重み付き平均値に均等に反映されるように、前記重みを決定する方式が含まれる請求項2から5のいずれか1つに記載のシミュレーション装置。
- 前記所定のパラメータは、前記重み付き平均値を算出するパラメータによって異なる請求項2から6のいずれか1つに記載のシミュレーション装置。
- 前記所定のパラメータは、前記重み付き平均値を算出するパラメータと同一のループに関するパラメータである請求項2から7のいずれか1つに記載のシミュレーション装置。
- 原子力プラントの状態をシミュレートするシミュレーション方法であって、
第1のモデルに基づくシミュレーション結果に含まれるパラメータの値と第2のモデルに基づくシミュレーション結果に含まれるパラメータの値との重み付き平均値を算出するための重みを、パラメータ毎に定められる方式に基づいて決定するステップと、
前記重みを用いて算出される前記重み付き平均値を前記原子力プラントの状態として表示するステップと
を含むシミュレーション方法。 - 原子力プラントの状態をシミュレートする第1のモデルと前記原子力プラントの状態をシミュレートする第2のモデルとを連係させる連係プログラムであって、
前記第1のモデルに基づくシミュレーション結果に含まれるパラメータの値と前記第2のモデルに基づくシミュレーション結果に含まれるパラメータの値との重み付き平均値を算出するための重みを、パラメータ毎に定められる方式に基づいて決定するステップと、
前記重みを用いて算出される前記重み付き平均値を前記原子力プラントの状態として表示するステップと
をコンピュータに実行させる連係プログラム。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012070370A JP6091765B2 (ja) | 2012-03-26 | 2012-03-26 | シミュレーション装置、シミュレーション方法および連係プログラム |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012070370A JP6091765B2 (ja) | 2012-03-26 | 2012-03-26 | シミュレーション装置、シミュレーション方法および連係プログラム |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2013200536A true JP2013200536A (ja) | 2013-10-03 |
JP6091765B2 JP6091765B2 (ja) | 2017-03-08 |
Family
ID=49520799
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2012070370A Active JP6091765B2 (ja) | 2012-03-26 | 2012-03-26 | シミュレーション装置、シミュレーション方法および連係プログラム |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP6091765B2 (ja) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015102798A (ja) * | 2013-11-27 | 2015-06-04 | 株式会社東芝 | プラント模擬装置 |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3936885A (en) * | 1973-02-23 | 1976-02-03 | Westinghouse Electric Corporation | Training simulator and method for nuclear power plant heater and non-linear modeling |
JPS62285172A (ja) * | 1986-06-04 | 1987-12-11 | Hitachi Ltd | オンライン高速推論方法 |
JP2000338854A (ja) * | 1999-05-27 | 2000-12-08 | Toshiba Corp | 原子力発電プラントの運転訓練支援方法 |
JP2007010375A (ja) * | 2005-06-28 | 2007-01-18 | Mitsubishi Heavy Ind Ltd | 原子力緊急事態計算システム及びプログラム |
JP2007017153A (ja) * | 2005-07-05 | 2007-01-25 | Denso Corp | 排出ガスセンサの温度制御装置 |
JP2009031186A (ja) * | 2007-07-30 | 2009-02-12 | Nuclear Fuel Ind Ltd | ドップラー反応度係数の測定方法 |
JP2011141475A (ja) * | 2010-01-08 | 2011-07-21 | Mitsubishi Electric Corp | 初期値生成装置及び初期値生成方法 |
-
2012
- 2012-03-26 JP JP2012070370A patent/JP6091765B2/ja active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3936885A (en) * | 1973-02-23 | 1976-02-03 | Westinghouse Electric Corporation | Training simulator and method for nuclear power plant heater and non-linear modeling |
JPS62285172A (ja) * | 1986-06-04 | 1987-12-11 | Hitachi Ltd | オンライン高速推論方法 |
JP2000338854A (ja) * | 1999-05-27 | 2000-12-08 | Toshiba Corp | 原子力発電プラントの運転訓練支援方法 |
JP2007010375A (ja) * | 2005-06-28 | 2007-01-18 | Mitsubishi Heavy Ind Ltd | 原子力緊急事態計算システム及びプログラム |
JP2007017153A (ja) * | 2005-07-05 | 2007-01-25 | Denso Corp | 排出ガスセンサの温度制御装置 |
JP2009031186A (ja) * | 2007-07-30 | 2009-02-12 | Nuclear Fuel Ind Ltd | ドップラー反応度係数の測定方法 |
US20100128832A1 (en) * | 2007-07-30 | 2010-05-27 | Nuclear Fuel Industries, Limited | Doppler reactivity coefficient measuring method |
JP2011141475A (ja) * | 2010-01-08 | 2011-07-21 | Mitsubishi Electric Corp | 初期値生成装置及び初期値生成方法 |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2015102798A (ja) * | 2013-11-27 | 2015-06-04 | 株式会社東芝 | プラント模擬装置 |
Also Published As
Publication number | Publication date |
---|---|
JP6091765B2 (ja) | 2017-03-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR20130122853A (ko) | 원자력발전소 훈련용 시뮬레이터의 실시간 중대사고 모의 시스템 및 그 방법 | |
JP6203449B2 (ja) | 系統安定度推定装置および系統安定度推定方法 | |
JP2023086678A (ja) | 深層学習フレームワークに基づいて深層学習モデルを生成して適用する方法及び装置 | |
CN111934908A (zh) | 一种物联网模拟方法、装置、系统及存储介质 | |
CA2775820C (en) | Thermodynamic process control based on pseudo-density root for equation of state | |
US20220358269A1 (en) | Simulation execution system, simulation execution method, and computer readable medium | |
JP6091764B2 (ja) | シミュレーション装置、シミュレーション方法および連係プログラム | |
JP6091765B2 (ja) | シミュレーション装置、シミュレーション方法および連係プログラム | |
JP2009213328A (ja) | 電力系統シミュレータにおける負荷曲線モデルの生成方法 | |
EP3340088A1 (en) | Product design validation by automatic determination of simulation analysis types based on design parameters | |
CN113868899B (zh) | 一种分支指令处理方法、系统、设备及计算机存储介质 | |
US9239893B2 (en) | Method and process computer for computation of the state variables of a hybrid differential-algebraic process model | |
JP6366811B2 (ja) | 検査装置、検査方法、及び、プログラム | |
CN109446642A (zh) | 一种电网设备启动方案智能编写方法及装置 | |
CN114462710A (zh) | 一种风机发电功率的短期预测方法、装置及介质 | |
JP6723483B2 (ja) | テストケース生成装置、テストケース生成方法およびテストケース生成プログラム | |
CN112463602A (zh) | 用户界面测试方法及系统 | |
CN111062141A (zh) | 一种计算机部件的振动程度预测方法、装置及介质 | |
JP6150553B2 (ja) | 運転操作評価装置、運転操作評価方法および運転操作評価プログラム | |
KR102338616B1 (ko) | 재난 확산 예측 모델을 검증하기 위한 전자 장치 | |
US8521502B2 (en) | Passing non-architected registers via a callback/advance mechanism in a simulator environment | |
US20220067236A1 (en) | Physical system simulation | |
JP6620653B2 (ja) | プラント監視制御システム用エミュレータ | |
JP5530417B2 (ja) | コントローラ開発ツール | |
Heo et al. | The HUNTER Dynamic Human Reliability Analysis Tool: Coupling an External Plant Code |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20150317 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20160422 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20160531 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20160801 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20170110 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20170208 |
|
R150 | Certificate of patent or registration of utility model |
Ref document number: 6091765 Country of ref document: JP Free format text: JAPANESE INTERMEDIATE CODE: R150 |