JP2012170168A - Parameter estimation method for power system abridged model, and apparatus using the same - Google Patents

Parameter estimation method for power system abridged model, and apparatus using the same Download PDF

Info

Publication number
JP2012170168A
JP2012170168A JP2011026585A JP2011026585A JP2012170168A JP 2012170168 A JP2012170168 A JP 2012170168A JP 2011026585 A JP2011026585 A JP 2011026585A JP 2011026585 A JP2011026585 A JP 2011026585A JP 2012170168 A JP2012170168 A JP 2012170168A
Authority
JP
Japan
Prior art keywords
model
external system
contraction
external
equivalent
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2011026585A
Other languages
Japanese (ja)
Other versions
JP5710303B2 (en
Inventor
Toshiyuki Yamada
利之 山田
Katsuhiko Sasaki
克彦 佐々木
Masako Sato
雅子 佐藤
Takeshi Kaneko
武 金子
Yasuyuki Miyazaki
保幸 宮崎
Kazuya Komata
和也 小俣
Yuji Ishihara
祐二 石原
Kotaro Takasaki
耕太郎 高崎
Hideaki Nishiiri
秀明 西入
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toshiba Corp
Tohoku Electric Power Co Inc
Original Assignee
Toshiba Corp
Tohoku Electric Power Co Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toshiba Corp, Tohoku Electric Power Co Inc filed Critical Toshiba Corp
Priority to JP2011026585A priority Critical patent/JP5710303B2/en
Publication of JP2012170168A publication Critical patent/JP2012170168A/en
Application granted granted Critical
Publication of JP5710303B2 publication Critical patent/JP5710303B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Supply And Distribution Of Alternating Current (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a parameter estimation method for a power system abridged model, the method capable of updating parameters of an external system abridged model, when on-line data of the external system is limited, or even when an internal system and an external system which is the object of system abridgment are connected by a plurality of different interconnection point nodes; and to provide an apparatus using the method.SOLUTION: An estimation part 8 for estimating external system parameters is designed to adjust reactance X1, X2 of equivalent abridged branches 109a, 109b so that the tidal current P1, P2 of interconnection lines 105a, 105b and the tidal current of on-line data interconnection lines (the current tidal current P1on, P2on of the interconnection lines 105a, 105b) become equal.

Description

本発明は、外部系統の縮約モデルを生成する技術に係り、特に、縮約モデルのパラメータ推定方法及びその装置に関するものである。   The present invention relates to a technique for generating a reduced model of an external system, and more particularly to a parameter estimation method and apparatus for a reduced model.

[背景技術の概略]
本発明の技術的な背景として、まず、本発明を適用する事故波及防止リレーシステムに付いて説明する。次に、縮約モデルとなる解析モデルの構成と生成処理について説明し、その後、本発明に係る縮約モデルのパラメータ推定の従来技術について述べることにする。
[Outline of background technology]
As a technical background of the present invention, an accident ripple prevention relay system to which the present invention is applied will be described first. Next, the configuration and generation process of an analysis model that is a contracted model will be described, and then the prior art of parameter estimation of the contracted model according to the present invention will be described.

[事故波及防止リレーシステム]
一般に電力系統では、落雷等の事故が発生すると、その影響を受けて発電機が脱調するおそれがある。そこで、電力系統には事故波及防止リレーシステムが採用されている。このリレーシステムでは、事故の発生を検出し、事故発生時には系統安定化演算を実施して、電源制限等の制御内容を決定、実施することにより、発電機脱調を未然に防止することができる。
[Accident Ripple Prevention Relay System]
Generally, in an electric power system, when an accident such as a lightning strike occurs, there is a risk that the generator will step out due to the influence. Therefore, an accident ripple prevention relay system is adopted for the power system. In this relay system, generator out-of-step can be prevented beforehand by detecting the occurrence of an accident, performing system stabilization calculation when the accident occurs, and determining and implementing control details such as power limitation. .

[事故波及防止リレーシステムの方式]
以上の事故波及防止リレーシステムは、非特許文献1に記載の通り、事後演算型と、オフライン事前演算型と、オンライン事前演算型という、3つの方式に分類することができる。事後演算型は、事故が発生してから制御内容を決めるための系統安定化演算を行う方式である。
[Accident Ripple Prevention Relay System]
As described in Non-Patent Document 1, the accident propagation prevention relay system described above can be classified into three methods: a post-operation type, an offline pre-calculation type, and an online pre-calculation type. The post-calculation type is a system that performs system stabilization calculation to determine the control content after an accident occurs.

これに対してオフライン及びオンラインの事前演算型は、実際に事故が発生するよりも前に、事故を想定して系統安定化演算を実施しておく方式であり、事前演算部を有している。事前演算部は、基本的な機能として、状態推定及び系統縮約を実行する機能(以下、状態推定/系統縮約機能)、スクリーニング機能、安定度計算機能、安定度判定機能、電制機選択機能という5種類の機能を備えている。   On the other hand, the offline and online pre-calculation types are systems in which system stabilization calculation is performed assuming an accident before an accident actually occurs, and has a pre-calculation unit. . As a basic function, the pre-calculation unit has a function to execute state estimation and system contraction (hereinafter referred to as state estimation / system contraction function), screening function, stability calculation function, stability determination function, and electrical equipment selection. Five types of functions are provided.

また、事前演算部では、演算データとして事故発生前の系統情報を用いるが、このとき使用する演算データにより、オフライン事前演算型とオンライン事前演算型とを分類している。オフライン事前演算型では、計画系統・潮流から想定した系統情報を演算データとして使用する。一方、オンライン事前演算型では、系統の潮流状況や遮断器入切情報等のオンラインデータを演算データとして使用する。   The pre-computation unit uses system information before the occurrence of the accident as computation data. The offline pre-computation type and the online pre-computation type are classified according to the computation data used at this time. In the offline pre-computation type, system information assumed from the planned system / tidal current is used as computation data. On the other hand, in the online pre-calculation type, online data such as the power flow status of the system and the circuit breaker on / off information is used as the calculation data.

[事故波及防止リレーシステムにおける状態推定/系統縮約処理]
図8のフローチャートは、オンライン事前演算型の事故波及防止リレーシステムにおける事前演算部の概略制御フローを示している。図8に示すように、事前演算部では、最初に、解析モデルを生成するための状態推定/系統縮約処理を行う。以下、状態推定/系統縮約機能について、系統縮約を中心に説明する。なお、状態推定/系統縮約処理以降の処理であるスクリーニングや安定度計算等に関しては、図8の概略制御フローを示すだけに留め、詳しい説明を省略する。
[State estimation / system reduction processing in the accident prevention relay system]
The flowchart of FIG. 8 shows a schematic control flow of the pre-calculation unit in the online pre-calculation type accident spill prevention relay system. As shown in FIG. 8, the pre-calculation unit first performs state estimation / system reduction processing for generating an analysis model. Hereinafter, the state estimation / system contraction function will be described focusing on system contraction. Note that screening and stability calculation, which are processes after the state estimation / system reduction process, are only shown in the schematic control flow of FIG. 8, and detailed description thereof is omitted.

[解析モデルの構成]
オンライン事前演算型の事故波及防止リレーシステムにおいては、事前演算部が脱調防止に必要な電制機を決めるために安定度計算を実施するが、このとき、安定度計算のベースとなる解析モデルの生成が不可欠である。
[Structure of analysis model]
In the online pre-computation type accident prevention relay system, the pre-computation unit performs the stability calculation to determine the electric control equipment necessary to prevent step-out. The generation of is essential.

解析モデルは、事故波及防止リレーシステムの保護対象系統である内部系統モデルだけではなく、内部系統モデルと、内部系統以外の系統である外部系統モデルとを結合させることにより構成されることが多い。外部系統モデル及び内部系統モデルからなる解析モデルを、原系統モデルと呼んでいるが、実際の解析モデルは、この原系統モデルを基にした縮約系統モデルと呼ばれるモデルを採用している。   The analysis model is often configured by combining not only an internal system model that is a protection target system of the accident-prevention relay system but also an internal system model and an external system model that is a system other than the internal system. An analysis model composed of an external system model and an internal system model is called an original system model, but an actual analysis model employs a model called a reduced system model based on the original system model.

ここで、外部系統モデル及び内部系統モデルからなる原系統モデルと、外部系統縮約モデル及び内部系統モデルからなる縮約系統モデルについて、図9を用いて説明する。図9の(a)に示すように、原系統モデル1は、内部系統モデル101と、外部系統モデル102と、両者を接続(結合)する一つの連系線105とから構成される。また、符号103、104はそれぞれ、内部系統モデル101及び外部系統モデル102側の連系点ノードである。すなわち、内部系統モデル101と系統縮約対象である外部系統モデル102は、それぞれ1箇所の連系点ノード103、104で接続されている。   Here, the original system model composed of the external system model and the internal system model and the contracted system model composed of the external system contraction model and the internal system model will be described with reference to FIG. As shown in FIG. 9A, the original system model 1 includes an internal system model 101, an external system model 102, and a single interconnection line 105 that connects (couples) both. Reference numerals 103 and 104 denote interconnection point nodes on the internal system model 101 and external system model 102 side, respectively. That is, the internal system model 101 and the external system model 102 that is a system contraction target are connected by one interconnection point node 103, 104, respectively.

このような原系統モデル1において、外部系統モデル102を系統縮約対象とし、外部系統モデル102側の連系点ノード104を縮約起点ノードとする。また、図9の(a)中の符号Zsは、縮約起点ノードから系統縮約対象側つまり外部系統モデルをみた短絡インピーダンスを表している。系統縮約モデルの生成手法の従来技術としては、特許文献1にある通り、短絡容量法や二負荷法といった既存の系統縮約手法を用いて系統縮約対象を簡略化する方法が知られている。   In the original system model 1, the external system model 102 is a system contraction target, and the interconnection point node 104 on the external system model 102 side is a contraction start node. Further, a symbol Zs in FIG. 9A represents a short-circuit impedance when the system contraction target side, that is, the external system model is viewed from the contraction start node. As a conventional technique for generating a system contraction model, there is known a method for simplifying a system contraction target using an existing system contraction technique such as a short-circuit capacity method or a two-load method as disclosed in Patent Document 1. Yes.

図9の(b)は、短絡容量法を用いて外部系統モデル102を縮約モデルとした例を示している。図9の(b)に示すように、縮約系統モデル5は、内部系統モデル101と、外部系統縮約モデル106と、両者を接続(結合)する一つの連系線105とから構成される。縮約系統モデル5における内部系統モデル101は、上述した原系統モデル1のそれと同一であるが、外部系統縮約モデル106は等価縮約発電機107、等価縮約ブランチ109、等価縮約負荷108から構成されている。   FIG. 9B shows an example in which the external system model 102 is a reduced model using the short-circuit capacity method. As shown in FIG. 9B, the contracted system model 5 includes an internal system model 101, an external system contracted model 106, and a single interconnection line 105 that connects (couples) both. . The internal system model 101 in the contracted system model 5 is the same as that of the original system model 1 described above, but the external system contracted model 106 includes an equivalent contracted generator 107, an equivalent contracted branch 109, and an equivalent contracted load 108. It is composed of

[縮約系統モデルの生成]
以上のような縮約系統モデル5の生成は、事前演算部の状態推定/系統縮約機能によって実現される。このとき、縮約系統モデル5は、状態推定と系統縮約という2段階の処理を経て生成されている。状態推定とは、オンラインで内部系統の情報を収集し、内部系統モデル101の初期状態を決定する処理である。
[Generate reduced system model]
The generation of the reduced system model 5 as described above is realized by the state estimation / system reduction function of the pre-calculation unit. At this time, the contracted system model 5 is generated through a two-stage process of state estimation and system contraction. The state estimation is processing for collecting information on the internal system online and determining the initial state of the internal system model 101.

[状態推定]
状態推定にてオンラインで内部系統から収集される情報としては、内部系統のテレメータ情報(以下、TM情報と呼ぶ)やスーパビジョン情報(以下、SV情報と呼ぶ)などがある。このうち、TM情報は各所線路の潮流値や母線電圧値を計測した潮流情報である。またSV情報は、遮断器の入切情報となる発電機や送電線の並解列情報である。このように、オンラインから様々な情報を収集して生成される内部系統モデル101は、詳細模擬のモデルとなり得る。
[State estimation]
Information collected from the internal system online in the state estimation includes internal system telemeter information (hereinafter referred to as TM information) and supervision information (hereinafter referred to as SV information). Among these, TM information is tidal current information obtained by measuring tidal current values and bus voltage values of each line. Moreover, SV information is parallel solution information of the generator and power transmission line used as breaker on / off information. Thus, the internal system model 101 generated by collecting various information from online can be a detailed simulation model.

[系統縮約]
これに対して、保護対象外である外部系統モデル102は、内部系統モデル101とは異なり、収集可能なオンラインデータに制約がある。その上、外部系統モデル102では、系統安定化演算に要する演算時間を短縮することが要求される。したがって、オンライン事前演算型システムの事前演算部では、外部系統モデル102に関して、着目する現象に関して計算精度が維持できる範囲で系統縮約を行い、簡略模擬である外部系統縮約モデル106を生成する。
[System reduction]
On the other hand, unlike the internal system model 101, the external system model 102 that is not subject to protection has restrictions on the collectable online data. In addition, the external system model 102 is required to reduce the calculation time required for the system stabilization calculation. Therefore, the pre-computation unit of the online pre-computation system performs system contraction in the range in which the calculation accuracy can be maintained with respect to the phenomenon of interest with respect to the external system model 102, and generates the external system contract model 106 that is a simplified simulation.

[外部系統縮約モデルのパラメータ]
ところで、事前演算部における系統縮約処理では、外部系統縮約モデル106を生成すると共に、生成した外部系統縮約モデル106のパラメータを更新する必要がある。ただし、外部系統からのオンラインデータは、収集に限定的なので、限られたデータを基にして、外部系統縮約モデル106の各パラメータを推定し、推定値に基づいて更新している。したがって、この推定値精度が縮約モデルの精度を大きく左右することになる。本発明に係る縮約モデルのパラメータ推定は、正にこの点に関する技術である。
[Parameters for external system reduction model]
By the way, in the system reduction process in the pre-operation unit, it is necessary to generate the external system reduction model 106 and update the parameters of the generated external system reduction model 106. However, since online data from the external system is limited to collection, each parameter of the external system contraction model 106 is estimated based on the limited data and updated based on the estimated value. Therefore, the accuracy of the estimated value greatly affects the accuracy of the reduced model. The parameter estimation of the contracted model according to the present invention is just a technique related to this point.

外部系統縮約モデル106のパラメータとは、具体的には、等価縮約発電機107の電気出力や発電機定数(定格容量や内部インピーダンス等)、等価縮約負荷108、等価縮約ブランチ109のインピーダンス等である。なお、等価縮約ブランチ109のインピーダンスとは、縮約起点ノードである連系点ノード104から系統縮約対象側をみた短絡インピーダンスから、等価縮約発電機107の内部インピーダンスを差し引いたものである。   Specifically, the parameters of the external system contraction model 106 include the electrical output of the equivalent contracted generator 107, the generator constant (rated capacity, internal impedance, etc.), the equivalent contracted load 108, and the equivalent contracted branch 109. Impedance and the like. The impedance of the equivalent contracted branch 109 is obtained by subtracting the internal impedance of the equivalent contracted generator 107 from the short-circuit impedance viewed from the interconnection point node 104 that is the contraction start node and viewed from the system contraction target side. .

[系統縮約処理の従来技術]
続いて、系統縮約処理の従来技術について、図10を参照し、非特許文献1に記載の系統縮約における外部系統モデル化の流れに則って説明する。図10は、系統縮約に関連する機能を実現する各手段に、処理フローを組み合わせて示した説明図である。図10に示す通り、外部系統モデル化を実施する場合、オフライン処理で実行する部分(オフライン処理部A)と、オンラインリアルタイム処理で実行する部分(オンラインリアルタイム処理部B)とに分けられる。
[Prior art of system reduction processing]
Next, the prior art of system reduction processing will be described with reference to FIG. 10 according to the flow of external system modeling in system reduction described in Non-Patent Document 1. FIG. 10 is an explanatory diagram showing a combination of processing flows to each means for realizing functions related to system contraction. As shown in FIG. 10, when external system modeling is performed, it is divided into a part executed in offline processing (offline processing part A) and a part executed in online real time processing (online real time processing part B).

オフライン処理部Aには、コヒーレンシー判定・グループ化処理部2、縮約起点サーチ部3、外部系統縮約部4、縮約モデル精度評価部6が設けられている。コヒーレンシー判定・グループ化処理部2では、コヒーレンシー判定を行うと共に、事故発生時に互いに一体となって動揺する発電機群のグループ化を実施する。   The offline processing unit A includes a coherency determination / grouping processing unit 2, a contraction start point search unit 3, an external system contraction unit 4, and a contraction model accuracy evaluation unit 6. The coherency determination / grouping processing unit 2 performs coherency determination and groups generator groups that are shaken together when an accident occurs.

縮約起点サーチ部3では、発電機群のグループ化に適した地点(縮約起点)をサーチする。さらに、外部系統縮約部4では、原系統モデル1(内部系統モデル101と外部系統モデル102を結合した解析モデル)を基にして、縮約系統モデル5(内部系統モデル101と外部系統縮約モデル106を結合した解析モデル)を生成する。外部系統縮約部4による縮約系統モデル5の生成手法としては、短絡容量法や二負荷法などの既存の縮約手法を用いている(非特許文献2参照)。   The contraction start point search unit 3 searches for a point (contraction start point) suitable for grouping the generator group. Further, the external system contraction unit 4 is based on the original system model 1 (an analysis model in which the internal system model 101 and the external system model 102 are combined), and the contracted system model 5 (the internal system model 101 and the external system contraction). An analysis model combining the model 106) is generated. As a generation method of the reduced system model 5 by the external system reduction unit 4, an existing reduction method such as a short-circuit capacity method or a two-load method is used (see Non-Patent Document 2).

縮約モデル精度評価部6は、外部系統縮約部4の生成した縮約系統モデル5に関して、着目する現象に対する計算精度を評価する。また、縮約モデル精度評価部6では、原系統モデル1と、生成した縮約系統モデル5について、所定の現象に関する計算精度を比較する。   The reduced model accuracy evaluation unit 6 evaluates the calculation accuracy for the phenomenon of interest with respect to the reduced system model 5 generated by the external system reduction unit 4. Further, the reduced model accuracy evaluation unit 6 compares the calculation accuracy for a predetermined phenomenon between the original system model 1 and the generated reduced system model 5.

そして、縮約モデル精度評価部6が縮約系統モデル5の計算精度が予め設定されたレベルを満たすと判断するまで、つまり満足する縮約モデルの計算精度が得られるまで、コヒーレンシー判定・グループ化処理部2によるコヒーレンシー判定と発電機群のグループ化、縮約起点サーチ部3による縮約起点サーチ、外部系統縮約部4による系統縮約といった処理を繰り返す。   Then, until the reduced model accuracy evaluation unit 6 determines that the calculation accuracy of the reduced system model 5 satisfies a preset level, that is, until the calculation accuracy of the reduced model is satisfied, the coherency determination / grouping is performed. Processing such as coherency determination by the processing unit 2 and grouping of generator groups, reduction start point search by the reduction start point search unit 3, and system reduction by the external system reduction unit 4 are repeated.

一方、オンラインリアルタイム処理部Bでは、収集が限定される外部系統のオンラインデータ7と、状態推定により初期状態を決定した内部系統モデル10とを、取り込んでいる。また、オンラインリアルタイム処理部Bには、外部系統パラメータ推定部8と、全系モデル生成部11が組み込まれている。   On the other hand, the online real-time processing unit B takes in the online data 7 of the external system whose collection is limited and the internal system model 10 whose initial state is determined by state estimation. The online real-time processing unit B includes an external system parameter estimation unit 8 and an entire system model generation unit 11.

外部系統パラメータ推定部8では、外部系統のオンラインデータ7を取り入れて外部系統縮約モデル106の各パラメータを推定し、各パラメータを推定値に更新して、更新モデル9を生成する。また、全系モデル生成部11では、外部系統パラメータ推定部8にて生成した更新モデル9と、前記内部系統モデル10(初期状態決定済み)を結合することで全系モデル12を生成する。   The external system parameter estimation unit 8 takes in the online data 7 of the external system, estimates each parameter of the external system contraction model 106, updates each parameter to an estimated value, and generates an update model 9. Further, the entire system model generation unit 11 generates the entire system model 12 by combining the update model 9 generated by the external system parameter estimation unit 8 and the internal system model 10 (initial state determined).

[外部系統縮約モデルのパラメータ推定]
外部系統縮約モデル106のパラメータ推定に関する従来技術としては、特許文献1等が提案されている。特許文献1のパラメータ推定手法では、外部系統の発電量や負荷量は、内部系統のそれと同じ傾向で変化するものとして想定している。そのため、等価縮約発電機107の電気出力や等価縮約負荷108といったパラメータに関しては、内部系統のオンラインデータ7を用いて推定している。
[Parameter estimation of external system reduction model]
As a prior art relating to parameter estimation of the external system reduction model 106, Patent Document 1 and the like have been proposed. In the parameter estimation method of Patent Document 1, it is assumed that the power generation amount and load amount of the external system change with the same tendency as that of the internal system. For this reason, parameters such as the electrical output of the equivalent reduced generator 107 and the equivalent reduced load 108 are estimated using the online data 7 of the internal system.

また、特許文献1のパラメータ推定手法では、等価縮約発電機107の発電機定数や等価縮約ブランチ109のインピーダンスといったパラメータに関しては、等価縮約負荷108等のように内部系統のオンラインデータ7を用いるのではなく、次のような推定を行っている。   Further, in the parameter estimation method of Patent Document 1, the online data 7 of the internal system is used for the parameters such as the generator constant of the equivalent contracted generator 107 and the impedance of the equivalent contracted branch 109 such as the equivalent contracted load 108. Instead of using it, the following estimation is performed.

すなわち、特許文献1の第11〜第15の実施形態にあるように、外部系統及び連系線の全ての設備の諸元を表す設備データ等の設備関連データと、外部系統のオンラインデータの発電機並解列情報(SV情報)を用いて、現時点の発電機並列状態に修正した外部系統モデル102を生成する。そして、この生成した外部系統モデル102を用いて、短絡容量法や二負荷法などの既存の系統縮約手法により、前記パラメータつまり等価縮約発電機107の発電機定数や等価縮約ブランチ109のインピーダンスを、周期ごとに算出している。   That is, as in the 11th to 15th embodiments of Patent Document 1, facility-related data such as facility data representing the specifications of all facilities of the external system and the interconnection line, and power generation of online data of the external system The external system model 102 corrected to the current generator parallel state is generated using the machine parallel solution sequence information (SV information). Then, using the generated external system model 102, the parameters, that is, the generator constants of the equivalent contracted generator 107 and the equivalent contracted branch 109 are determined by an existing system contraction method such as the short-circuit capacity method or the two-load method. Impedance is calculated for each period.

特開平10−56735号Japanese Patent Laid-Open No. 10-56735

電気学会技術報告 第801号、系統脱調・事故波及防止リレー技術、電気学会IEEJ Technical Report No.801, Relay Outage / Accident Ripple Relay Technology, IEEJ 電気協同研究 第34巻 第5号、電力系統の安定度、電気協同研究会Electric Cooperative Research Vol. 34, No. 5, Power System Stability, Electric Cooperative Research Group

しかしながら、上記の従来技術には、次のような課題が指摘されていた。すなわち、特許文献1に記載の手法では、第11〜15の実施形態に示されるように、等価縮約発電機107の発電機定数や、等価縮約ブランチ109のインピーダンス等のパラメータを推定する場合に、非常に多くのデータが必要であった。   However, the following problems have been pointed out in the above prior art. That is, in the method described in Patent Document 1, as shown in the 11th to 15th embodiments, parameters such as the generator constant of the equivalent contracted generator 107 and the impedance of the equivalent contracted branch 109 are estimated. And so much data was needed.

前述したように、パラメータ推定に必要なデータとしては、外部系統及び連系線の全ての設備の諸元を表す設備データ等の設備関連データ、外部系統のオンラインデータとして外部系統の全ての発電機の発電機並解列情報(SV情報)と連系線の潮流情報(TM情報)がある。   As described above, the data necessary for parameter estimation includes equipment related data such as equipment data representing the specifications of all equipment of the external system and interconnection lines, and all generators of the external system as online data of the external system. Generator parallel arrangement information (SV information) and tidal current information (TM information) of the interconnection line.

そのため、外部系統の規模が大きくなると、例えば1つの電力会社の電力系統を丸ごと外部系統の対象とするといったケースともなると、外部系統のパラメータ更新には、膨大な量の設備関連データ及びオンラインデータが必要となる。具体的には、縮約対象系統である外部系統に発電機が100機あれば、等価縮約発電機の発電機定数を更新するためには発電機並解列情報(SV情報)は100量必要である。また、送電線が1000回線あれば、等価縮約ブランチのインピーダンスを更新するためには1000個の設備関連データが必要となる。このような膨大なデータは、その管理に多大な労力を要することが問題となる。   Therefore, when the scale of the external system increases, for example, when the entire power system of one power company is the target of the external system, a large amount of facility-related data and online data are required for updating the parameters of the external system. Necessary. Specifically, if there are 100 generators in the external system that is the contracting target system, the generator parallel solution sequence information (SV information) is 100 quantities in order to update the generator constant of the equivalent contracted generator. is necessary. If there are 1000 power transmission lines, 1000 pieces of equipment-related data are required to update the impedance of the equivalent contract branch. Such a huge amount of data has a problem that it requires a lot of labor to manage it.

しかも、リレーシステムの保護対象外である外部系統のオンラインデータは、限定されることが多いので、思い通りにデータを取得できるかどうかは不確定である。必要なオンラインデータが取得できないと、外部系統縮約モデルのパラメータを更新することができないといった不具合が起きる。   Moreover, online data of external systems that are not protected by the relay system is often limited, and it is uncertain whether data can be acquired as intended. If the necessary online data cannot be acquired, there will be a problem that the parameters of the external system reduction model cannot be updated.

現実の電力系統では、時々刻々と需要が変化しており、それに応じて発電機の出力や運転台数、系統電圧が調整されている。したがって、現時点に即した外部系統縮約モデルを生成するためには、外部系統縮約モデルにおける各パラメータの更新は不可欠である。そこで、外部系統から入手するオンラインデータに頼ることなく、外部系統縮約モデルの各パラメータを適切に推定可能なパラメータ推定技術の開発が待たれていた。   In an actual power system, the demand changes from moment to moment, and the output of the generator, the number of operating units, and the system voltage are adjusted accordingly. Therefore, in order to generate an external system contraction model that matches the current time, it is essential to update each parameter in the external system contraction model. Therefore, development of a parameter estimation technique that can appropriately estimate each parameter of the external system contraction model without depending on online data obtained from the external system has been awaited.

また、特許文献1に記載されている通り、従来では、系統縮約対象である外部系統モデルと内部系統モデルを、それぞれ1箇所の連系点ノードで接続する電力系統を想定している(図9参照)。したがって、外部系統モデルと内部系統モデルとが複数の異なった連系点ノードによって接続される場合には対応することができず、外部系統縮約モデルのパラメータ更新が困難となる。   In addition, as described in Patent Document 1, conventionally, an electric power system is assumed in which an external system model and an internal system model that are subject to system contraction are connected to each other at one interconnection point node (see FIG. 9). Therefore, when the external system model and the internal system model are connected by a plurality of different interconnection point nodes, it is not possible to cope with it, and it is difficult to update the parameters of the external system contraction model.

近年では、電力系統の複雑化が進み、外部系統モデルと内部系統モデルとを複数の異なった連系点ノードで接続することも十分に予想される。したがって、複数の異なる連系点ノードによって外部系統モデルと内部系統モデルと接続された場合でも、これに対応して、外部系統縮約モデルのパラメータを確実に推定することが望まれていた。   In recent years, the power system has become more complex, and it is expected that the external system model and the internal system model are connected by a plurality of different interconnection point nodes. Therefore, even when the external system model and the internal system model are connected by a plurality of different interconnection point nodes, it has been desired to reliably estimate the parameters of the external system contraction model correspondingly.

本発明は、以上の課題を解決するために提案されたものであって、その目的は、外部系統のオンラインデータが限定される場合、あるいは内部系統と系統縮約対象である外部系統が複数の異なった連系点ノードで接続される場合であっても、外部系統縮約モデルのパラメータの推定が可能である電力系統の縮約モデルのパラメータ推定方法及びその装置を提供することにある。   The present invention has been proposed in order to solve the above-described problems. The object of the present invention is to limit the on-line data of the external system, or when the internal system and the external system to be reduced are a plurality of external systems. An object of the present invention is to provide a power system contraction model parameter estimation method and apparatus capable of estimating an external system contraction model parameter even when connected at different interconnection point nodes.

上記目的を達成するために、本発明は、オンライン事前演算型事故波及防止リレーシステムの安定度計算に用いる解析モデルが、詳細模擬の内部系統モデルと簡略模擬の外部系統縮約モデルで構成されるとき、外部系統縮約モデルのパラメータを、オンラインデータを用いて推定する電力系統の縮約モデルのパラメータ推定方法において、前記内部系統モデルと前記外部系統縮約モデルの連系点が複数あるときに、各連系点における連系線潮流と連系点から外部系統モデル側をみた短絡インピーダンスが、現時点の系統状態と一致するように、外部系統縮約モデルのパラメータである等価縮約ブランチのインピーダンスを調整することを特徴としている。   In order to achieve the above object, according to the present invention, the analysis model used for the stability calculation of the on-line pre-calculation type accident spill prevention relay system is composed of a detailed simulation internal system model and a simplified simulation external system reduction model. In the parameter estimation method of the power system contraction model for estimating the parameters of the external system contraction model using online data, when there are a plurality of interconnection points between the internal system model and the external system contraction model The impedance of the equivalent contracted branch, which is a parameter of the external system contraction model, so that the power line current at each connection point and the short-circuit impedance seen from the connection point on the external system model side coincide with the current system state It is characterized by adjusting.

本発明によれば、内部系統モデルと外部系統縮約モデルの連系点が複数ある場合でも、各連系点における連系線潮流と連系点から外部系統モデル側をみた短絡インピーダンスが、現時点の系統状態と一致するように、等価縮約ブランチのインピーダンスを調整することで、外部系統縮約モデルのパラメータの推定値を更新することができ、外部系統から収集されるオンラインデータが限定されたとしても、外部系統縮約モデルのパラメータを確実に更新して高精度の縮約モデルを生成することが可能である。   According to the present invention, even when there are a plurality of interconnection points of the internal system model and the external system reduction model, the short-circuit impedance when the external system model side is viewed from the interconnection point and the interconnection point at each interconnection point is By adjusting the impedance of the equivalent reduction branch so that it matches the system state of the system, the estimated values of the parameters of the external system reduction model can be updated, and the online data collected from the external system is limited However, it is possible to reliably update the parameters of the external system reduced model and generate a highly accurate reduced model.

事前演算部の系統縮約に関連する機能構成と入出力関係の一例を示す説明図。Explanatory drawing which shows an example of the function structure relevant to the system | strain reduction of a prior arithmetic part, and input / output relationship. (a)が原系統モデルの構成例、(b)が縮約系統モデルの構成例を示す図。(A) is a structural example of an original system model, (b) is a figure which shows the structural example of a reduction system model. 外部系統縮約部における縮約系統モデルの作成フローを示す図。The figure which shows the creation flow of the reduction system model in an external system reduction part. 1ブランチ・2ノードの単純2端子系統の系統図。The system diagram of the simple 2 terminal system | strain of 1 branch and 2 nodes. ΣMVAとZsの関係を表した一例を示すグラフ。The graph which shows an example showing the relationship between (SIGMA) MVA and Zs. ΣMVAとZsの関係式生成部の処理フローを示す図。The figure which shows the processing flow of the relational expression production | generation part of (SIGMA) MVA and Zs. 等価縮約ブランチのインピーダンスと等価縮約発電機の発電機定数を推定する処理フローを示す図。The figure which shows the process flow which estimates the impedance of an equivalent reduction branch, and the generator constant of an equivalent reduction generator. 非特許文献1に記載のオンライン事前演算型システムの事前演算部の概略制御フローを示す図。The figure which shows the general | schematic control flow of the precomputation part of the online precomputation type | system | group system of a nonpatent literature 1. (a)が原系統モデルの構成例、(b)が縮約系統モデルの構成例を示す図。(A) is a structural example of an original system model, (b) is a figure which shows the structural example of a reduction system model. 非特許文献1に記載の系統縮約における外部系統モデル化の流れを説明する説明図。Explanatory drawing explaining the flow of external system | strain modeling in the system | strain reduction of a nonpatent literature 1. FIG.

(1)代表的な実施形態
[構成]
以下、本発明の代表的な実施形態について、図1〜図7を参照して具体的に説明する。図1は本実施形態に係る事前演算部の系統縮約に関連する機能構成と入出力関係の一例を示す説明図であって、前記図10と同様、系統縮約に関連する機能を実現する各手段に、処理フローを組み合わせて示している。
(1) Representative embodiment [configuration]
Hereinafter, typical embodiments of the present invention will be specifically described with reference to FIGS. FIG. 1 is an explanatory diagram showing an example of the functional configuration and input / output relationship related to system contraction of the pre-calculation unit according to the present embodiment, and implements functions related to system contraction as in FIG. Each means is shown in combination with a processing flow.

なお図1において、図10に示した従来例と同一の部分、すなわちオフライン処理部A側のコヒーレンシー判定・グループ化処理部2、縮約起点サーチ部3、縮約モデル精度評価部6、オンラインリアルタイム処理部B側のオンラインデータ7や全系モデル12については、同一符号を付して説明は省略する。   In FIG. 1, the same part as the conventional example shown in FIG. 10, that is, the coherency determination / grouping processing unit 2 on the offline processing unit A side, the contraction starting point search unit 3, the contracted model accuracy evaluation unit 6, online real-time About the online data 7 and the whole system model 12 by the side of the process part B, the same code | symbol is attached | subjected and description is abbreviate | omitted.

[構成の概要]
本実施形態は、オンライン事前演算型の事故波及防止リレーシステムに適用されるもので、電力系統の縮約モデルのパラメータ推定方法及びその装置である。本実施形態は、内部系統モデルと外部系統縮約モデルの連系点が複数ある場合に対応可能な構成である。
[Configuration overview]
The present embodiment is applied to an on-line pre-calculation type accident spill prevention relay system, and is a parameter estimation method and apparatus for a power system contraction model. This embodiment is a configuration that can cope with a case where there are a plurality of interconnection points of the internal system model and the external system contraction model.

そして、本実施形態の特徴は、外部系統縮約モデルのパラメータである等価縮約ブランチのインピーダンスに関して、各連系点における連系線潮流と連系点から外部系統モデル側をみた短絡インピーダンスが現時点の系統状態と一致するように調整することにより、当該パラメータの推定値を更新するようにした点に特徴がある。   The feature of the present embodiment is that the impedance of the equivalent reduction branch, which is a parameter of the external system reduction model, is the current of the interconnection line at each interconnection point and the short-circuit impedance viewed from the interconnection point toward the external system model. There is a feature in that the estimated value of the parameter is updated by adjusting it so as to match the system state.

具体的には本実施形態では、外部系統縮約部4(オフライン処理部A側)による縮約系統モデルの作成処理と、外部系統パラメータ推定部8(オンラインリアルタイム処理部B側)によるパラメータ推定処理に特徴がある。外部系統縮約部4の処理に関しては図3を参照して、外部系統パラメータ推定部8の処理に関しては図7を参照して、後段にて説明する。   Specifically, in the present embodiment, a reduced system model creation process by the external system reduction unit 4 (offline processing unit A side) and a parameter estimation process by the external system parameter estimation unit 8 (online real-time processing unit B side) There is a feature. The processing of the external system reduction unit 4 will be described later with reference to FIG. 3, and the processing of the external system parameter estimation unit 8 will be described with reference to FIG.

また、本実施形態は、図10に示した従来のオフライン処理部A側の機能構成に加えて、次のような機能構成を有している。すなわち、本実施形態におけるオフライン処理部Aには、3つのデータベース13、15、17と、関係式生成部14と、算出部16が設けられている。   Further, this embodiment has the following functional configuration in addition to the conventional functional configuration on the offline processing unit A side shown in FIG. That is, the offline processing unit A in the present embodiment is provided with three databases 13, 15, 17, a relational expression generation unit 14, and a calculation unit 16.

関係式生成部14は、外部系統の発電機定格容量総計ΣMVAと短絡インピーダンスZsの関係を示す関数式の生成処理を行う手段である(関数式の生成処理については図5、図6を参照して後述)。また、算出部16は、内部系統の発電機定格容量総計ΣMVAofを算出する手段である。   The relational expression generation unit 14 is means for performing a process for generating a functional expression indicating the relationship between the generator rated capacity total ΣMVA of the external system and the short-circuit impedance Zs (refer to FIGS. 5 and 6 for the process of generating the functional expression). Later). The calculation unit 16 is a means for calculating the generator rated capacity total ΣMVAof of the internal system.

上記3つのデータベース13、15、17のうち、データベース13は、発電機運転状態や負荷量、外部系統の設備停止パターンなどの実系統の運用実績を保存する部分、データベース15は、関係式生成部14の生成した関係式を保存する部分、データベース17は算出部16の算出結果を保存する部分である。   Of the above three databases 13, 15, and 17, the database 13 is a part that stores the operation results of the actual system such as the generator operating state and load, and the facility stop pattern of the external system, and the database 15 is a relational expression generating unit. 14 is a part for storing the relational expression generated, and the database 17 is a part for storing the calculation result of the calculation unit 16.

[原系統モデル及び縮約系統モデルの構成例]
各構成部分による処理について説明する前に、本実施形態における原系統モデル及び縮約系統モデルの構成例について図2を用いて説明する。先に述べたように本実施形態は、内部系統と系統縮約対象である外部系統が複数の異なった連系点ノードで接続される場合にも対応可能である。このため、図2の(a)に示すような原系統モデル1から、図2の(b)に示すような縮約系統モデル5を生成した場合を例にとって説明する。
[Configuration example of original system model and reduced system model]
Before describing the processing by each component, a configuration example of the original system model and the reduced system model in the present embodiment will be described with reference to FIG. As described above, the present embodiment is also applicable to a case where the internal system and the external system that is the target of system contraction are connected by a plurality of different interconnection point nodes. Therefore, a case where a reduced system model 5 as shown in FIG. 2B is generated from the original system model 1 as shown in FIG. 2A will be described as an example.

図2(a)に示す原系統モデル1は、内部系統モデル101、外部系統モデル102、内部系統モデル101と外部系統モデル102を接続(結合)する2つの連系線105a、105bで構成し、外部系統モデル102を系統縮約対象とする。Zsは内部系統モデル101内のノード110から外部系統モデル102側をみた短絡インピーダンスを表し、ノード110と連系点ノード103a、103b間の分岐線113a、113b、113cは開放した状態の短絡インピーダンスとする(短絡インピーダンスを求めるときのみ開放扱いとする)。   The original system model 1 shown in FIG. 2A includes an internal system model 101, an external system model 102, and two interconnection lines 105a and 105b that connect (couple) the internal system model 101 and the external system model 102. The external system model 102 is a system contraction target. Zs represents a short-circuit impedance when the external system model 102 side is viewed from the node 110 in the internal system model 101, and the branch lines 113a, 113b, and 113c between the node 110 and the connection point nodes 103a and 103b are open-circuit impedances. (Open only when the short-circuit impedance is obtained).

図2(b)の縮約系統モデル5は、内部系統モデル101に関しては原系統モデル1と同一であるが、外部系統縮約モデル106に関しては、等価縮約発電機107、等価縮約負荷108、等価縮約ブランチ109a、109b、109cで構成されている。なお、図2では、各系統の連系点が2箇所である例を示しているが、2箇所以上、あるいは、1箇所でもよい。   The reduced system model 5 of FIG. 2B is the same as the original system model 1 with respect to the internal system model 101, but the equivalent reduced generator 107 and the equivalent reduced load 108 with respect to the external system reduced model 106. , Equivalent reduction branches 109a, 109b, and 109c. In addition, in FIG. 2, although the example which has two connection points of each system | strain is shown, two or more places or one place may be sufficient.

[外部系統縮約部4]
続いて、外部系統縮約部4による縮約系統モデル5の作成処理について図3のフローチャートを参照して説明する。外部系統縮約部4では、初めに、原系統モデル1を用いて潮流計算を行う(4Step1)。
[External system reduction unit 4]
Next, the creation process of the reduced system model 5 by the external system reduction unit 4 will be described with reference to the flowchart of FIG. First, the external system contracting unit 4 performs a power flow calculation using the original system model 1 (4 Step 1).

この潮流計算結果と原系統モデル1を用いて、短絡容量法や二負荷法といった既存の系統縮約手法により、等価縮約発電機107の定格容量や内部インピーダンス等の発電機定数、等価縮約負荷108を算出する(4Step2)。なお、等価縮約負荷108が接続されるノードの電圧V0は、原系統モデル1の外部系統モデル102内の全負荷ノード電圧の加重平均値とし、(1)式で算出する。添字のiは外部系統モデル102内の各負荷ノードを表すものである。

Figure 2012170168
Using this power flow calculation result and the original system model 1, the existing system contraction methods such as the short-circuit capacity method and the two-load method, the generator constants such as the rated capacity and internal impedance of the equivalent contracted generator 107, and the equivalent contraction The load 108 is calculated (4 Step 2). Note that the voltage V0 of the node to which the equivalent reduced load 108 is connected is a weighted average value of all load node voltages in the external system model 102 of the original system model 1, and is calculated by the equation (1). The subscript i represents each load node in the external system model 102.
Figure 2012170168

次に、外部系統縮約部4は、原系統モデル1とその潮流計算結果を用いて、等価縮約発電機107の内部電圧Eq∠θq、端子電圧VG、電気出力有効分PGを、次の通りに算出する(4Step3)。内部電圧Eq∠θqは、外部系統モデル102内の各発電機の内部電圧を(2)式で算出し、それを基にして全発電機の容量加重平均値を(3)、(4)式で算出し、これを等価縮約発電機107の内部電圧Eq∠θqとする。   Next, the external system reduction unit 4 uses the original system model 1 and its power flow calculation result to calculate the internal voltage Eq∠θq, the terminal voltage VG, and the electrical output effective component PG of the equivalent reduction generator 107 as follows. It calculates as follows (4Step3). For the internal voltage Eq∠θq, the internal voltage of each generator in the external system model 102 is calculated by equation (2), and based on this, the capacity weighted average value of all the generators is calculated by equations (3) and (4). This is used as the internal voltage Eq∠θq of the equivalent contracted generator 107.

Figure 2012170168
Figure 2012170168
Figure 2012170168
Figure 2012170168
Figure 2012170168
Figure 2012170168

また、端子電圧VG、電気出力有効分PGについては、次の(5)式、(6)式によって求める。なお、(2)式〜(6)式において、Ra、Xqは発電機内部インピーダンス、VGは端子電圧(ベクトル値)、IGは端子電流(ベクトル値)、GMVAは定格容量、PGは電気出力有効分である。なお、添字iは外部系統モデル102内の各発電機を表す。   Further, the terminal voltage VG and the effective electrical output PG are obtained by the following equations (5) and (6). In equations (2) to (6), Ra and Xq are generator internal impedances, VG is a terminal voltage (vector value), IG is a terminal current (vector value), GMVA is a rated capacity, and PG is an electric output effective. Minutes. Note that the subscript i represents each generator in the external system model 102.

Figure 2012170168
Figure 2012170168
Figure 2012170168
Figure 2012170168

さらに、外部系統縮約部4では、等価縮約ブランチ109a、109b、109cのリアクタンスX1、X2、X0について算出する(4Step4)。ここで算出に必要なデータは、原系統モデル1の潮流計算結果(縮約起点ノード104a、104bの電圧絶対値と位相)、等価縮約発電機107の内部電圧Eq∠θq、端子電圧絶対値VG、電気出力有効分PG、内部インピーダンスXq、等価縮約負荷ノードの電圧V0∠θ0で、下記(7)式を基にして算出する。

Figure 2012170168
Further, the external system reduction unit 4 calculates the reactances X1, X2, and X0 of the equivalent reduction branches 109a, 109b, and 109c (4 Step 4). The data necessary for the calculation are the power flow calculation result of the original system model 1 (the voltage absolute value and phase of the contracting start nodes 104a and 104b), the internal voltage Eq∠θq of the equivalent contracted generator 107, and the terminal voltage absolute value. VG, effective electrical output PG, internal impedance Xq, and equivalent reduced load node voltage V0∠θ0 are calculated based on the following equation (7).
Figure 2012170168

上記(7)式は、図4に示す1ブランチ・2ノードの単純2端子系統における有効電力Pの算出式であって、Xはブランチのリアクタンス、Va、Vbは両端ノードの電圧絶対値、δは両端ノード間の相差角(=θa−θb)を示している。なお、リアクタンスX1、X2、X0の抵抗分ついては簡単化のため省略する。   The above equation (7) is a formula for calculating the active power P in the one-branch / two-node simple two-terminal system shown in FIG. 4, where X is the reactance of the branch, Va and Vb are the absolute voltage values of the nodes at both ends, δ Indicates a phase difference angle (= θa−θb) between both end nodes. Note that the resistances of the reactances X1, X2, and X0 are omitted for simplification.

まず、等価縮約ブランチ109aのリアクタンスX1に初期値X1(0)を設定し、潮流計算結果の縮約起点ノード104aの電圧V1∠θ1、連系線105aの有効電力P1、等価縮約負荷ノードの電圧絶対値V0を用いて、等価縮約負荷ノードの電圧位相θ0を(8)式から算出する。等価縮約ブランチ109aのリアクタンス初期値X1(0)は、(9)式(δ=30度と仮定した場合)のように設定してもよい。   First, an initial value X1 (0) is set to the reactance X1 of the equivalent contraction branch 109a, the voltage V1 縮 θ1 of the contraction start node 104a of the power flow calculation result, the active power P1 of the interconnection line 105a, the equivalent contraction load node The voltage phase θ0 of the equivalent reduced load node is calculated from the equation (8) using the voltage absolute value V0. The reactance initial value X1 (0) of the equivalent contraction branch 109a may be set as shown in equation (9) (assuming that δ = 30 degrees).

Figure 2012170168
Figure 2012170168
Figure 2012170168
Figure 2012170168

また、等価縮約ブランチ109bのリアクタンスX2は、縮約起点ノード104bの電圧V2∠θ2、連系線105bの有効電力P2、等価縮約負荷ノードの電圧V0∠θ0、縮約起点ノード104bと等価縮約負荷ノード間の相差角δ2(=θ2−θ0)を用いて、下記の(10)式から算出する。このようにX1、X2を算出することで、連系線109a、109bに流れる潮流が原系統モデル1と縮約系統モデル5で一致する。

Figure 2012170168
The reactance X2 of the equivalent reduction branch 109b is equivalent to the voltage V2∠θ2 of the reduction origin node 104b, the effective power P2 of the interconnection line 105b, the voltage V0∠θ0 of the equivalent reduction load node, and the reduction origin node 104b. Using the phase difference angle δ2 (= θ2−θ0) between contracted load nodes, the calculation is performed from the following equation (10). By calculating X1 and X2 in this way, the tidal currents flowing through the interconnection lines 109a and 109b match between the original system model 1 and the reduced system model 5.
Figure 2012170168

さらに、等価縮約ブランチ109cのリアクタンスX0に関しては、等価縮約発電機107の内部電圧Eq∠θq、端子電圧絶対値VG、電気出力有効分PG、内部インピーダンスXqから、端子電圧位相θGを(11)式で算出し、その上で、(12)式に基づいて算出する。以上のような算出により、外部系統縮約モデル106の各パラメータが仮設定されたことになり、内部系統モデル101と外部系統縮約モデル106を結合した縮約系統モデル5が生成される。   Further, regarding the reactance X0 of the equivalent contracted branch 109c, the terminal voltage phase θG is calculated from the internal voltage Eq∠θq of the equivalent contracted generator 107, the terminal voltage absolute value VG, the effective electrical output PG, and the internal impedance Xq as (11 ) And then based on equation (12). As a result of the above calculation, the parameters of the external system contraction model 106 are provisionally set, and the contracted system model 5 in which the internal system model 101 and the external system contraction model 106 are combined is generated.

Figure 2012170168
Figure 2012170168
Figure 2012170168
Figure 2012170168

次に、外部系統縮約部4では、縮約系統モデル5の短絡インピーダンスZs’が原系統モデル1の短絡インピーダンスZsと一致しているか確認する。すなわち、原系統モデル1を用いて、内部系統モデル101から外部系統モデル102側(系統縮約対象側)をみた短絡インピーダンスZsを算出し(4Step5)、縮約系統モデル5を用いて、内部系統モデル101から外部系統縮約モデル106側をみた短絡インピーダンスZs’を算出する(4Step6)。   Next, the external system reduction unit 4 confirms whether the short-circuit impedance Zs ′ of the reduced system model 5 matches the short-circuit impedance Zs of the original system model 1. That is, using the original system model 1, the short-circuit impedance Zs of the external system model 102 side (system reduction target side) is calculated from the internal system model 101 (4Step 5), and the internal system model 5 is used to calculate the internal system The short-circuit impedance Zs ′ when the external system contraction model 106 side is viewed from the model 101 is calculated (4 Step 6).

そして、原系統モデル1の短絡インピーダンスZsと、縮約系統モデル5の短絡インピーダンスZs’を比較して(4Step7)、両者が一致しない場合には(4Step8のNo)、4Step4に戻り、等価縮約ブランチ109a、109b、109cのリアクタンスX1、X2、X0を再計算する。また、原系統モデル1の短絡インピーダンスZsと、縮約系統モデル5の短絡インピーダンスZs’が一致した場合に(4Step8のYes)、処理が終了する。   Then, the short-circuit impedance Zs of the original system model 1 is compared with the short-circuit impedance Zs ′ of the contracted system model 5 (4Step 7). If they do not match (No in 4Step 8), the process returns to 4Step 4 and equivalent contraction is performed. The reactances X1, X2, and X0 of the branches 109a, 109b, and 109c are recalculated. Further, when the short-circuit impedance Zs of the original system model 1 and the short-circuit impedance Zs ′ of the contracted system model 5 match (Yes in 4Step 8), the processing ends.

つまり、外部系統縮約部4においては、原系統モデル1と縮約系統モデル5の連系線105a、105bの潮流P1、P2、短絡インピーダンスZs(Zs’)が一致するリアクタンスX1、X2、X0が求まるまで、4Step4〜4Step7を繰り返す。なお、前記(8)式を用いる算出方法の場合は、等価縮約ブランチ109aのリアクタンスX1を修正して(例えば、ΔX1=0.001PU程度)、再度、リアクタンスX2、X0を計算し直すことになる。   That is, in the external system reduction unit 4, reactances X1, X2, and X0 in which the power flows P1 and P2 and the short-circuit impedance Zs (Zs ′) of the interconnection lines 105a and 105b of the original system model 1 and the reduced system model 5 match. 4Step 4 to 4Step 7 are repeated until is obtained. In the case of the calculation method using the equation (8), the reactance X1 of the equivalent contraction branch 109a is corrected (for example, about ΔX1 = 0.001PU), and the reactances X2 and X0 are calculated again. Become.

上述したように、外部系統縮約部4では、潮流計算(4Step1)、発電機定数・等価縮約負荷の算出(4Step2)、電気出力有効分算出(4Step3)、等価縮約ブランチのリアクタンス算出(4Step4)といった複数の計算を行うことにより、外部系統縮約モデル5の各パラメータを仮設定する。そして、短絡インピーダンスZs、Zs’の算出・比較(4Step5〜7)を繰り返すことで、最終的に二つのインピーダンスを一致させる。   As described above, the external system contracting unit 4 calculates the power flow (4 Step 1), calculates the generator constant / equivalent contracted load (4 Step 2), calculates the electrical output effective component (4 Step 3), and calculates the reactance of the equivalent contracted branch ( Each parameter of the external system contraction model 5 is provisionally set by performing a plurality of calculations such as 4Step4). Then, the calculation and comparison (4 Steps 5 to 7) of the short-circuit impedances Zs and Zs ′ are repeated to finally match the two impedances.

[関数式生成部14]
次に、オフライン処理部AのΣMVAとZsの関数式生成部14の処理フローについて、図5、図6を用いて説明する。ΣMVAとZsの関数式生成部14では、図5のグラフに示すような外部系統モデル102の運転発電機の定格容量総計ΣMVAと外部系統モデル102の短絡インピーダンスZsの関係を求め、その関係を示す関数式を算出する。具体的な算出手順は以下の通りである。
[Function Expression Generation Unit 14]
Next, the processing flow of the ΣMVA and Zs function expression generation unit 14 of the offline processing unit A will be described with reference to FIGS. 5 and 6. In the functional expression generation unit 14 of ΣMVA and Zs, the relationship between the rated capacity total ΣMVA of the operating generator of the external system model 102 and the short-circuit impedance Zs of the external system model 102 as shown in the graph of FIG. Calculate the function expression. The specific calculation procedure is as follows.

図6は、ΣMVAとZsの関係式生成部14の処理フローを示している。ΣMVAとZsの関係式生成部14では、発電機運転状態や負荷量などの実系統の運用実績13を基にして、発電機の運転状態や負荷などを変えた複数の原系統モデル1を生成する(14Step1)。   FIG. 6 shows a processing flow of the relational expression generation unit 14 of ΣMVA and Zs. The relational expression generation unit 14 of ΣMVA and Zs generates a plurality of original system models 1 in which the operation state and load of the generator are changed based on the actual operation results 13 such as the generator operation state and the load amount. (14 Step 1).

続いて、各原系統モデル1における外部系統モデル102内の運転発電機の定格容量総計ΣMVA(14Step2)と、連系点ノード104a、104bから外部系統モデル102側(系統縮約対象側)をみた短絡インピーダンスZs(14Step3)を算出する。さらに、想定されるパターンが全て終了したかどうかを確認し(14Step4)、想定パターンが全て終了すれば(14Step4のYes)、各原系統モデル1におけるΣMVAとZs(図5の○印)を基に関数式を求める(14Step5)。   Subsequently, the rated capacity total ΣMVA (14 Step 2) of the operating generator in the external system model 102 in each original system model 1 and the external system model 102 side (system contraction target side) from the connection point nodes 104a and 104b. The short-circuit impedance Zs (14 Step 3) is calculated. Further, it is confirmed whether all the assumed patterns are completed (14 Step 4). If all the assumed patterns are completed (Yes in 14 Step 4), the ΣMVA and Zs (circles in FIG. 5) in each original system model 1 are used. (14 Step 5).

なお、外部系統において設備停止(同一発電所の複数発電機停止や送電線ルート停止など)があると、ΣMVAとZsの関係が大きく変化し(図5の□印)、関数式の係数や関数式自体が変わる場合がある。このような事態を受けて、本実施形態では想定される全ての外部系統の設備停止パターンにおけるΣMVAとZsの関係や関数式を求めるようになっている。   Note that if there is an equipment outage in the external system (multiple generators at the same power plant, transmission line route, etc.), the relationship between ΣMVA and Zs changes significantly (marked with □ in FIG. 5). The expression itself may change. In response to such a situation, in the present embodiment, the relationship between ΣMVA and Zs and the functional expression in all the external system equipment stop patterns assumed are obtained.

関数式生成部14の求めた関数式はデータベース15に保存し、オンラインリアルタイム処理部Bで使用できるようにしておく。図5のΣMVAとZsの関係や関数式は一例であり、図5の例ではΣMVAとZsの関係を直線近似(y=ax+b、y=cx+d)した場合を記載しているが、この関数式は、多項式近似(2次など)、折れ線近似などでもよく、対象系統の特徴に合った近似式を用いてもよい。   The function formula obtained by the function formula generation unit 14 is stored in the database 15 so that it can be used by the online real-time processing unit B. The relationship between ΣMVA and Zs and the function equation in FIG. 5 are examples, and the example in FIG. 5 describes the case where the relationship between ΣMVA and Zs is linearly approximated (y = ax + b, y = cx + d). May be polynomial approximation (such as quadratic), polygonal line approximation, or the like, or an approximation formula that matches the characteristics of the target system.

[算出部16]
次に、オフライン処理部Aの内部系統ΣMVAof算出部16について説明する。ΣMVAof算出部16では、原系統モデル1(ベースモデル)から、内部系統モデル101内の運転発電機の定格容量総計ΣMVAofを算出し、データベース17に保存しておく。このため、データベース17に保存したΣMVAofは、オンラインリアルタイム処理部Bにて使用可能である。
[Calculation unit 16]
Next, the internal system ΣMVAof calculation unit 16 of the offline processing unit A will be described. The ΣMVAof calculation unit 16 calculates the rated capacity total ΣMVAof of the operating generator in the internal system model 101 from the original system model 1 (base model) and stores it in the database 17. Therefore, the ΣMVAof stored in the database 17 can be used in the online real-time processing unit B.

[外部系統パラメータ推定部8]
次に、オンラインリアルタイム処理部Bの外部系統パラメータ推定部8について説明する。前述したように、図2の(b)に示した外部系統縮約モデル106において、外部系統パラメータである等価縮約発電機の発電機定数や等価縮約ブランチのインピーダンスを推定、更新する場合に、従来技術である特許文献1の第11〜第15の実施形態にある方法では、外部系統のオンラインデータとして全ての発電機並解列情報(SV情報)と連系線の潮流情報(TM情報)を用いていた。
[External system parameter estimation unit 8]
Next, the external system parameter estimation unit 8 of the online real-time processing unit B will be described. As described above, in the external system contraction model 106 shown in FIG. 2B, when estimating or updating the impedance of the equivalent contracted generator and the impedance of the equivalent contracted branch, which are external system parameters. In the methods in the 11th to 15th embodiments of Patent Document 1, which is a conventional technology, all generator parallel solution sequence information (SV information) and interconnection current information (TM information) as online data of the external system ) Was used.

また、外部系統及び連系線の全ての諸元を表す設備データ等の設備関連データが必要であった。しかも、事故波及防止リレーシステムの保護対象外である外部系統のオンラインデータは限定されることが多く、前記オンラインデータが入手できない場合には、パラメータの更新を行えないといった不具合が生じた。さらに、外部系統として1つの電力会社の電力系統全てを捉える等、外部系統の規模が極めて大きい場合、設備関連データの管理に多大な労力を割くことになった。   In addition, equipment-related data such as equipment data representing all the specifications of the external system and the interconnection line was necessary. Moreover, the online data of external systems that are not protected by the accident transmission relay system is often limited, and when the online data is not available, there is a problem that parameters cannot be updated. Furthermore, if the scale of the external system is extremely large, such as capturing the entire power system of one electric power company as the external system, a great deal of effort will be devoted to managing equipment-related data.

そこで、本実施形態における外部系統パラメータ推定部8では、図7の処理フローに示すように、等価縮約発電機の発電機定数や等価縮約ブランチのインピーダンスの推定を行うことで、上記の課題を解消している。図7は、外部系統パラメータ推定部8において、等価縮約ブランチ109a、109b、109cのインピーダンス、等価縮約発電機107の発電機定数を推定する処理フローを示している。   Therefore, the external system parameter estimation unit 8 in this embodiment estimates the generator constant of the equivalent contracted generator and the impedance of the equivalent contracted branch as shown in the processing flow of FIG. Has been eliminated. FIG. 7 shows a processing flow in which the external system parameter estimation unit 8 estimates the impedance of the equivalent contracted branches 109a, 109b, 109c and the generator constant of the equivalent contracted generator 107.

なお、外部系統縮約モデル106のうち、等価縮約発電機107の電気出力、等価縮約負荷106といったパラメータの推定に関しては、特許文献1と同様である。このため、等価縮約発電機107の電気出力や等価縮約負荷106の推定処理に関しては、説明を省略する。   In addition, estimation of parameters such as the electrical output of the equivalent reduced generator 107 and the equivalent reduced load 106 in the external system reduction model 106 is the same as in Patent Document 1. For this reason, the description of the estimation process of the electrical output of the equivalent reduced generator 107 and the equivalent reduced load 106 is omitted.

外部系統パラメータ推定部8では、現時点の外部系統の発電機定格容量総計ΣMVAseを次のように推定する(8Step1)。すなわち、内部系統のオンラインデータを用いて、現時点の内部系統の発電機定格容量総計ΣMVAonを算出する。このΣMVAonと、データベース17に保存したΣMVAof(算出部16の算出結果)を用いて、ΣMVAofを基準にしたときのΣMVAonの増減率αを算出する。そして、縮約系統モデル5(ベースモデル)の等価縮約発電機107の定格容量に増減率αを掛け合わせた値を、現時点の外部系統の発電機定格容量総計ΣMVAseとして推定する。   The external system parameter estimation unit 8 estimates the current generator rated capacity total ΣMVAse of the external system as follows (8 Step 1). That is, the current generator rated capacity total ΣMVAon of the internal system is calculated using the online data of the internal system. Using this ΣMVAon and ΣMVAof (calculation result of the calculation unit 16) stored in the database 17, the increase / decrease rate α of ΣMVAon when ΣMVAof is used as a reference is calculated. Then, a value obtained by multiplying the rated capacity of the equivalent contracted generator 107 of the contracted system model 5 (base model) by the increase / decrease rate α is estimated as the current generator rated capacity total ΣMVAse of the external system.

次に、外部系統パラメータ推定部8では、等価縮約発電機107の発電機定数を調整する(8Step2)。ここでは、等価縮約発電機107の内部インピーダンス等の発電機定数について、発電機自己容量ベースのPU値を設定し、発電機定数である定格容量を前記8Step1にて推定したΣMVAseとする。そして、ベース容量を変更することにより内部インピーダンス等の発電機定数を調整する。   Next, the external system parameter estimation unit 8 adjusts the generator constant of the equivalent contracted generator 107 (8 Step 2). Here, the generator self-capacitance-based PU value is set for the generator constant such as the internal impedance of the equivalent contracted generator 107, and the rated capacity that is the generator constant is set to ΣMVAse estimated in 8Step1. And generator constants, such as internal impedance, are adjusted by changing base capacity.

さらに、外部系統パラメータ推定部8では、等価縮約ブランチを調整する(8Step3)。この処理では、連系線105a、105bの潮流P1、P2が、オンラインデータの連系線潮流(連系線105a、105bの現時点の潮流P1on、P2on)と一致するように、等価縮約ブランチ109a、109bのリアクタンスX1、X2を調整する。なお、等価縮約ブランチ109cのリアクタンスX0は固定値とする。   Further, the external system parameter estimation unit 8 adjusts the equivalent contracted branch (8 Step 3). In this process, the equivalent contracted branch 109a so that the tides P1 and P2 of the interconnection lines 105a and 105b coincide with the interconnection line tides of the online data (current tides P1on and P2on of the interconnection lines 105a and 105b). , 109b reactances X1 and X2 are adjusted. The reactance X0 of the equivalent contract branch 109c is a fixed value.

等価縮約ブランチ109a、109bのリアクタンスX1、X2については、前記(8)式、(10)式と内部系統モデル101の状態推定計算結果(縮約起点ノード104a、104bの電圧絶対値と位相)、オンラインデータの連系線潮流P1on、P2on、等価縮約負荷ノードの電圧V0を用いることで算出している。   Regarding the reactances X1 and X2 of the equivalent contracted branches 109a and 109b, the above formulas (8) and (10) and the state estimation calculation result of the internal system model 101 (absolute voltage values and phases of the contraction start nodes 104a and 104b) In addition, the calculation is performed by using the interconnected power flow P1on and P2on of the online data and the voltage V0 of the equivalent reduced load node.

等価縮約ブランチ109aのリアクタンスX1は、縮約系統モデル5(ベースモデル)の値を仮値として設定し、等価縮約起点ノード104aの電圧V1∠θ1、連系線潮流P1on、等価縮約負荷ノードの電圧絶対値V0を用いて、上記(8)式から縮約起点ノード104aと等価縮約負荷ノード間の相差角δ1を算出する。これにより、等価縮約負荷ノードの電圧位相θ0を得ることができる。   The reactance X1 of the equivalent contracted branch 109a is set by using the value of the contracted system model 5 (base model) as a provisional value, the voltage V1∠θ1 of the equivalent contraction start node 104a, the interconnection power flow P1on, and the equivalent contracted load. Using the voltage absolute value V0 of the node, the phase difference angle δ1 between the contracting start node 104a and the equivalent contracted load node is calculated from the above equation (8). Thereby, the voltage phase θ0 of the equivalent reduced load node can be obtained.

また、等価縮約ブランチ109bのリアクタンスX2については、縮約起点ノード104bの電圧V2∠θ2、等価縮約負荷ノードの電圧V0∠θ0、連系線潮流P2on、縮約起点ノード104bと等価縮約負荷ノード間の相差角δ2を用いて、上記(10)式から、算出する。   The reactance X2 of the equivalent contraction branch 109b is equivalent to the voltage V2∠θ2 of the contraction start node 104b, the voltage V0∠θ0 of the equivalent contraction load node, the interconnection line power flow P2on, and the contraction start node 104b. Using the phase difference angle δ2 between the load nodes, calculation is made from the above equation (10).

さらに、外部系統パラメータ推定部8では、8Step4において、外部系統の短絡インピーダンスを推定する。すなわち、8Sstep1で推定した現時点の外部系統の発電機定格容量総計ΣMVAseと、データベース15に保存した外部系統モデル102の運転発電機の定格容量総計ΣMVAと外部系統モデル102の短絡インピーダンスZsの関数式を用いて、外部系統の短絡インピーダンス推定値Zseを算出する。   Further, the external system parameter estimation unit 8 estimates the short-circuit impedance of the external system in 8 Step 4. That is, the function formulas of the current generator rated capacity total ΣMVAse estimated at 8 Step 1 and the rated capacity total ΣMVA of the operating generator stored in the database 15 and the short-circuit impedance Zs of the external system model 102 are The short-circuit impedance estimated value Zse of the external system is calculated using this.

なお、特定の発電機(同一発電所の複数発電機)停止や特定の送電線ルート停止により、使用する関数式の切り替えが必要な場合には、外部系統のオンラインデータ7として前記設備の開閉情報(SV情報)を入手し、停止条件に対応した関係式を用いるようにする。このとき、切り替えが必要な設備停止は、連系点に近い発電機や送電線に限定されるため、関係式の切換に伴って増えるSV情報は、限られたものであり、従来のように膨大なデータを取り扱うものではない。   In addition, when it is necessary to switch the function formula to be used due to a specific generator (multiple generators at the same power plant) stoppage or a specific transmission line route stoppage, the opening / closing information of the equipment is stored as online data 7 of the external system. (SV information) is obtained and a relational expression corresponding to the stop condition is used. At this time, the facility stop that needs to be switched is limited to the generator and the transmission line close to the interconnection point. Therefore, the SV information that increases with the switching of the relational expression is limited. It does not handle huge amounts of data.

次に、外部系統パラメータ推定部8においては、外部系統縮約モデル106の更新モデル9を用いて、外部系統縮約モデル106の短絡インピーダンスZs’を算出する(8Step5)。そして、8Step5で求めた短絡インピーダンスZs’と、8Step4で求めた外部系統の短絡インピーダンス推定値Zseとを比較する(8Step6)。   Next, the external system parameter estimation unit 8 calculates the short-circuit impedance Zs ′ of the external system contraction model 106 using the update model 9 of the external system contraction model 106 (8 Step 5). Then, the short-circuit impedance Zs ′ obtained in 8 Step 5 is compared with the short-circuit impedance estimated value Zse of the external system obtained in 8 Step 4 (8 Step 6).

このとき、外部系統縮約モデル106の短絡インピーダンスZs’が、外部系統の短絡インピーダンス推定値Zseと一致しない場合には(8Step7のNo)、8Step3に戻り、等価縮約ブランチ109a、109bのリアクタンスX1、X2を再計算する。また、外部系統縮約モデル106の短絡インピーダンスZs’が、外部系統の短絡インピーダンス推定値Zseと一致した場合に(8Step7のYes)、処理を終了する。   At this time, when the short-circuit impedance Zs ′ of the external system contraction model 106 does not coincide with the short-circuit impedance estimated value Zse of the external system (No in 8Step7), the process returns to 8Step3, and the reactance X1 of the equivalent contraction branches 109a and 109b , X2 is recalculated. If the short-circuit impedance Zs ′ of the external system contraction model 106 matches the short-circuit impedance estimated value Zse of the external system (Yes in 8Step 7), the process is terminated.

つまり、外部系統パラメータ推定部8においては、オンラインデータの連系線潮流P1on、P2onと連系線105a、105bの潮流P1、P2、短絡インピーダンスZseと推定値Zs’が一致するリアクタンスX1、X2が得られるまで、8Step3〜8Step6を繰り返す。なお、前記(8)式を用いる算出方法の場合は、等価縮約ブランチ109aのリアクタンスX1を修正して(例えば、ΔX1=0.001PU程度)、再度、リアクタンスX2を計算し直す。   In other words, in the external system parameter estimation unit 8, the reactances X1 and X2 in which the online data interconnection currents P1on and P2on and the currents P1 and P2 of the interconnection lines 105a and 105b, the short-circuit impedance Zse and the estimated value Zs ′ coincide with each other Repeat 8Step3-8Step6 until obtained. In the case of the calculation method using the equation (8), the reactance X1 of the equivalent contraction branch 109a is corrected (for example, about ΔX1 = 0.001PU), and the reactance X2 is calculated again.

また、上記の説明では、現時点の外部系統の発電機定格容量総計ΣMVAを推定しているが、外部系統のオンラインデータとして入手可能であれば、それを用いて、等価縮約発電機の発電機定数調整(8Step2)と、等価縮約ブランチ調整(8Step3)を行うようにしても良い。   Further, in the above description, the current total rated capacity ΣMVA of the external system is estimated, but if available as online data of the external system, it can be used to generate the generator of the equivalent contracted generator. Constant adjustment (8 Step 2) and equivalent contracted branch adjustment (8 Step 3) may be performed.

この場合、等価縮約発電機107の定格容量や発電機定数が現時点の系統状態に、より一致し、かつ、外部系統の短絡インピーダンス推定値Zseの精度が向上する。したがって、外部系統のオンラインデータの増加は1量で済むだけで、現時点の系統状態により一致する、高精度の外部系統縮約モデル106を生成することが可能である。   In this case, the rated capacity and generator constant of the equivalent reduced generator 107 more closely match the current system state, and the accuracy of the short-circuit impedance estimated value Zse of the external system is improved. Therefore, it is possible to generate a highly accurate external system contraction model 106 that matches the current system state only by increasing the amount of online data of the external system by only one amount.

[作用効果]
以上説明した通り、本実施形態によれば、内部系統モデル101と系統縮約対象である外部系統モデル102が複数の異なった連系点105a、105bにより接続される場合であっても、各連系点105a、105bにおける連系線潮流と連系点105a、105bから外部系統モデル102側をみた短絡インピーダンスが、現時点の系統状態と一致する、高精度な外部系統縮約モデル106を生成することができる。
[Function and effect]
As described above, according to this embodiment, even if the internal system model 101 and the external system model 102 that is the target of system contraction are connected by a plurality of different connection points 105a and 105b, To generate a highly accurate external system contraction model 106 in which the interconnection line flow at the system points 105a and 105b and the short-circuit impedance when the external system model 102 side is viewed from the connection points 105a and 105b match the current system state. Can do.

しかも、本実施形態においては、発電機の運用状態に応じて外部系統縮約モデル106の短絡インピーダンスが調整可能である。このため、短絡インピーダンスが未調整である場合に比べて、事故中の縮約点の電圧低下が、外部系統を系統縮約しない詳細モデルの電圧低下と一致することになる。したがって、外部系統縮約モデルの精度がいっそう向上する。   Moreover, in the present embodiment, the short-circuit impedance of the external system contraction model 106 can be adjusted according to the operating state of the generator. For this reason, compared with the case where the short-circuit impedance is not adjusted, the voltage drop at the contraction point during the accident coincides with the voltage drop of the detailed model that does not contract the external system. Therefore, the accuracy of the external system reduction model is further improved.

また、外部系統のオンラインデータが限定される場合であっても、外部系統縮約モデルのパラメータ更新が可能である。その上、外部系統及び連系線の全ての諸元を表す設備データ等の設備関連データが不要であり、データ管理に要する多大な労力を省くことが可能である。   Further, even when the online data of the external system is limited, it is possible to update the parameters of the external system contraction model. In addition, equipment-related data such as equipment data representing all the specifications of the external system and interconnection lines is unnecessary, and a great amount of labor required for data management can be saved.

さらには、外部系統のオンラインデータとして発電機定格容量総計ΣMVAを入手することができれば、等価縮約発電機107の定格容量や発電機定数が現時点の系統状態に、より一致し、かつ、外部系統の短絡インピーダンス推定値Zseの精度を向上することができる。つまり、外部系統のオンラインデータの最小限の増加で、外部系統縮約モデルの精度を大幅に向上させることができる。   Furthermore, if the generator rated capacity total ΣMVA can be obtained as online data of the external system, the rated capacity and generator constant of the equivalent reduced generator 107 more closely match the current system state, and the external system The accuracy of the short-circuit impedance estimated value Zse can be improved. That is, the accuracy of the external system contraction model can be greatly improved with a minimum increase in the online data of the external system.

(2)他の実施形態
なお、本発明は上記の実施形態に限定されるものではなく、例えば、等価縮約ブランチ109a、109b、109cのリアクタンスX1、X2、X0の別の算出方法として、次のような方法を実施する形態も包含する。
(2) Other Embodiments The present invention is not limited to the above-described embodiments. For example, as another method for calculating the reactances X1, X2, and X0 of the equivalent contracted branches 109a, 109b, and 109c, The embodiment which implements such a method is also included.

すなちわ、等価縮約ブランチ109a、109b、109cと、各ブランチの両端子までの小規模系統の電力方程式(連立2次方程式)を立て、リアクタンスX1、X2、X0以外は既知の定数として与えて電力方程式を解き、リアクタンスX1、X2、X0を得てもよい。   In other words, the power equations (simultaneous quadratic equations) of the small scale system up to the equivalent contracted branches 109a, 109b, and 109c and both terminals of each branch are established, and the known constants other than the reactances X1, X2, and X0 are set. It is also possible to solve the power equation and obtain reactances X1, X2, and X0.

既知の定数としては、外部系統縮約部4においては、原系統モデルの潮流計算結果として得られる連系線105a、105bの潮流P1、P2と縮約起点ノード104a、104bの電圧V1∠θ1、V2∠θ2、等価縮約発電機107の端子電圧VG∠θG、等価縮約負荷106、等価縮約負荷ノードの電圧絶対値V0を与える。外部系統パラメータ推定部8においては、内部系統モデルの状態推定計算結果として得られる縮約起点ノード104a、104bの電圧V1∠θ1、V2∠θ2、オンラインデータの連系線潮流P1on、P2on、等価縮約負荷ノードの電圧絶対値V0を与える。   As a known constant, in the external system contracting unit 4, the power flows P1 and P2 of the interconnection lines 105a and 105b obtained as the power flow calculation result of the original system model and the voltages V1Vθ1 of the contracting start nodes 104a and 104b, V2∠θ2, the terminal voltage VG∠θG of the equivalent contracted generator 107, the equivalent contracted load 106, and the voltage absolute value V0 of the equivalent contracted load node are given. In the external system parameter estimation unit 8, the voltages V1∠θ1 and V2∠θ2 of the contraction start nodes 104a and 104b obtained as the result of the state estimation calculation of the internal system model, the online data interconnection line flows P1on and P2on, equivalent reduction About the voltage absolute value V0 of the load node is given.

さらに、リアクタンスX1、X2、X0に適当な値を設定し、交流法や直流法などの潮流計算を実行して、連系線105a、105bの潮流P1、P2が原系統モデル1と一致するか、あるいは、オンラインデータの連系線潮流P1on、P2onと一致するか確認し、不一致の場合にはリアクタンスX1、X2、X0を修正して、再度、潮流計算により確認して一致するまで試行錯誤的に算出する方法でもよい。   Furthermore, set appropriate values for reactances X1, X2, and X0, and execute tidal current calculations such as the alternating current method and the direct current method, so that the tidal currents P1 and P2 of the interconnection lines 105a and 105b match the original system model 1. Or, check whether it matches the online power flow P1on, P2on of the online data, and if it does not match, correct the reactance X1, X2, X0 and check again by power flow calculation until trial and error The method of calculating to

1…原系統モデル(ベースモデル)
2…コヒーレンシー判定・グループ化処理部
3…縮約起点サーチ部
4…外部系統縮約部
5…縮約系統モデル(ベースモデル)
6…縮約モデル精度評価部
7…オンラインデータ
8…外部系統パラメータ推定部
9…外部系統縮約モデルの更新モデル
10…内部系統モデル
11…全系モデル生成部
12…全系モデル
13、15、17…データベース
14…ΣMVAとZsの関係式生成部
16…内部系統ΣMVAof算出部
101…内部系統モデル
102…外部系統モデル
103、103a、103b…内部系統モデルの連系点ノード
104、104a、104b…外部系統モデルの連系点ノード(縮約起点ノード)
105、105a、105b…連系線
106…外部系統縮約モデル
107…等価縮約発電機
108…等価縮約負荷
109、109a、109b、109c…等価縮約ブランチ
1 ... Original system model (base model)
2 ... Coherency judgment / grouping processing unit 3 ... Reduction starting point search unit 4 ... External system reduction unit 5 ... Reduction system model (base model)
6 ... Reduced model accuracy evaluation unit 7 ... Online data 8 ... External system parameter estimation unit 9 ... Update model 10 of external system contraction model ... Internal system model 11 ... Entire system model generation unit 12 ... Entire system models 13, 15 17 ... Database 14 ... ΣMVA and Zs relational expression generation unit 16 ... Internal system ΣMVAof calculation unit 101 ... Internal system model 102 ... External system model 103, 103a, 103b ... Link point nodes 104, 104a, 104b of the internal system model Connection point node of external system model (contraction start node)
105, 105a, 105b ... interconnection line 106 ... external system reduction model 107 ... equivalent reduction generator 108 ... equivalent reduction load 109, 109a, 109b, 109c ... equivalent reduction branch

Claims (5)

オンライン事前演算型事故波及防止リレーシステムの安定度計算に用いる解析モデルが、詳細模擬の内部系統モデルと簡略模擬の外部系統縮約モデルで構成されるとき、外部系統縮約モデルのパラメータを、オンラインデータを用いて推定する電力系統の縮約モデルのパラメータ推定方法において、
内部系統モデルと外部系統縮約モデルの連系点が複数あるときに、各連系点における連系線潮流と連系点から外部系統モデル側をみた短絡インピーダンスが、現時点の系統状態と一致するように、外部系統縮約モデルのパラメータである等価縮約ブランチのインピーダンスを調整することを特徴とする電力系統の縮約モデルのパラメータ推定方法。
When the analysis model used to calculate the stability of the online precomputed accident prevention relay system is composed of a detailed simulated internal system model and a simplified simulated external system reduced model, the parameters of the external system reduced model are In the parameter estimation method of the reduced model of the power system estimated using data,
When there are multiple interconnection points of the internal system model and the external system contraction model, the interconnection current at each interconnection point and the short-circuit impedance of the external system model side from the interconnection point match the current system state Thus, the parameter estimation method for the power system contraction model is characterized by adjusting the impedance of the equivalent contract branch that is a parameter of the external system contraction model.
オンラインデータを用いて求めた現時点の外部系統の発電機定格容量総和と、予め設定しておいた外部系統の発電機定格容量総和と連系点から外部系統側をみた短絡インピーダンスの関係を近似した関数式とを用いて、現時点の外部系統の短絡インピーダンスを推定して与えることを特徴とする請求項1に記載の電力系統の縮約モデルのパラメータ推定方法。   Approximate the relationship between the current total rated capacity of the external system using online data and the preset rated total capacity of the external system and the short-circuit impedance of the external system from the connection point. 2. The method for estimating a parameter of a contracted model of an electric power system according to claim 1, wherein the short-circuit impedance of the external system at the present time is estimated and given using a function equation. 外部系統の発電機定格容量総和と連系点から外部系統側をみた短絡インピーダンスの関係を近似した前記関数式について、外部系統の設備停止を考慮した関数式を複数設定しておき、外部系統のオンラインデータにより使用する関数式を切り替えることを特徴とする請求項2に記載の電力系統の縮約モデルのパラメータ推定方法。   For the above function formula that approximates the relationship between the total rated power generator capacity of the external system and the short-circuit impedance seen from the connection point to the external system side, multiple function formulas that take into account the facility shutdown of the external system are set in advance. 3. The method for estimating a parameter of a contracted model of an electric power system according to claim 2, wherein a function formula to be used is switched according to online data. 現時点の外部系統の発電機定格容量総和について、外部系統のオンラインデータとして入手して用いることを特徴とする請求項2又は3に記載の電力系統の縮約モデルのパラメータ推定方法。   4. The method for estimating a parameter of a contracted model of an electric power system according to claim 2, wherein the current total rated capacity of the generator of the external system is obtained and used as online data of the external system. オンライン事前演算型事故波及防止リレーシステムの安定度計算に用いる解析モデルが、詳細模擬の内部系統モデルと簡略模擬の外部系統縮約モデルで構成されるとき、外部系統縮約モデルのパラメータを、オンラインデータを用いて推定する電力系統の縮約モデルのパラメータ推定装置において、
内部系統モデルと外部系統縮約モデルの連系点が複数あるときに、各連系点における連系線潮流と連系点から外部系統モデル側をみた短絡インピーダンスが、現時点の系統状態と一致するように、外部系統縮約モデルの等価縮約ブランチのインピーダンスを調整するように構成されたことを特徴とする電力系統の縮約モデルのパラメータ推定装置。
When the analysis model used to calculate the stability of the online precomputed accident prevention relay system is composed of a detailed simulated internal system model and a simplified simulated external system reduced model, the parameters of the external system reduced model are In a parameter estimation device for a reduced model of a power system that is estimated using data,
When there are multiple interconnection points of the internal system model and the external system contraction model, the interconnection current at each interconnection point and the short-circuit impedance of the external system model side from the interconnection point match the current system state As described above, a parameter estimation device for a power system contraction model, characterized in that the impedance of the equivalent contraction branch of the external system contraction model is adjusted.
JP2011026585A 2011-02-09 2011-02-09 Parameter estimation method and apparatus for power system contraction model Active JP5710303B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011026585A JP5710303B2 (en) 2011-02-09 2011-02-09 Parameter estimation method and apparatus for power system contraction model

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011026585A JP5710303B2 (en) 2011-02-09 2011-02-09 Parameter estimation method and apparatus for power system contraction model

Publications (2)

Publication Number Publication Date
JP2012170168A true JP2012170168A (en) 2012-09-06
JP5710303B2 JP5710303B2 (en) 2015-04-30

Family

ID=46973732

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011026585A Active JP5710303B2 (en) 2011-02-09 2011-02-09 Parameter estimation method and apparatus for power system contraction model

Country Status (1)

Country Link
JP (1) JP5710303B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015053847A (en) * 2013-08-06 2015-03-19 一般財団法人電力中央研究所 Contraction model determination device, contraction model determination method, and contraction model determination program
WO2015115325A1 (en) * 2014-02-03 2015-08-06 株式会社日立製作所 Power system monitoring device and power system monitoring method
CN105119273A (en) * 2015-08-13 2015-12-02 国电南瑞科技股份有限公司 Grid equivalent simplification method considering system grid strength and generator effective transmission capacity
WO2017126260A1 (en) * 2016-01-19 2017-07-27 株式会社日立製作所 Power grid model analysis device and method
WO2018061422A1 (en) * 2016-09-28 2018-04-05 株式会社日立製作所 Power system aggregation device and method, and power system stabilization device
JP2021033881A (en) * 2019-08-28 2021-03-01 株式会社日立製作所 Electric power load prediction device and electric power load prediction method

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1056735A (en) * 1996-08-06 1998-02-24 Chugoku Electric Power Co Inc:The Device for generating model of electric power system
JP2003143756A (en) * 2001-10-30 2003-05-16 Toshiba Corp Power system contraction method and process program recording medium

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1056735A (en) * 1996-08-06 1998-02-24 Chugoku Electric Power Co Inc:The Device for generating model of electric power system
JP2003143756A (en) * 2001-10-30 2003-05-16 Toshiba Corp Power system contraction method and process program recording medium

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015053847A (en) * 2013-08-06 2015-03-19 一般財団法人電力中央研究所 Contraction model determination device, contraction model determination method, and contraction model determination program
WO2015115325A1 (en) * 2014-02-03 2015-08-06 株式会社日立製作所 Power system monitoring device and power system monitoring method
JP2015146679A (en) * 2014-02-03 2015-08-13 株式会社日立製作所 Power system monitoring device and method
CN105119273A (en) * 2015-08-13 2015-12-02 国电南瑞科技股份有限公司 Grid equivalent simplification method considering system grid strength and generator effective transmission capacity
WO2017126260A1 (en) * 2016-01-19 2017-07-27 株式会社日立製作所 Power grid model analysis device and method
JPWO2017126260A1 (en) * 2016-01-19 2018-08-23 株式会社日立製作所 Power system model analysis apparatus and method
TWI657405B (en) * 2016-01-19 2019-04-21 日立製作所股份有限公司 Power system model making device and method
WO2018061422A1 (en) * 2016-09-28 2018-04-05 株式会社日立製作所 Power system aggregation device and method, and power system stabilization device
JP2018057118A (en) * 2016-09-28 2018-04-05 株式会社日立製作所 Electric power system contraction device, method, and electric power system stabilizer
JP2021033881A (en) * 2019-08-28 2021-03-01 株式会社日立製作所 Electric power load prediction device and electric power load prediction method
JP7220133B2 (en) 2019-08-28 2023-02-09 株式会社日立製作所 Power load prediction device and power load prediction method

Also Published As

Publication number Publication date
JP5710303B2 (en) 2015-04-30

Similar Documents

Publication Publication Date Title
JP5710303B2 (en) Parameter estimation method and apparatus for power system contraction model
Bai et al. A novel parameter identification approach via hybrid learning for aggregate load modeling
CN103928914B (en) Relay protection device setting method and device
CN107093895B (en) online transient state safety and stability assessment method based on automatic screening of expected fault set
CN114006413B (en) Power system transient stability control method and system based on graph neural network
Atanackovic et al. Deployment of real-time state estimator and load flow in BC Hydro DMS-challenges and opportunities
CN109256970B (en) MMC-MTDC transmission system monopolar grounding fault current calculation method
CN105703364A (en) Equivalent modeling method for photovoltaic power station
Gupta et al. Performance assessment of linearized opf-based distributed real-time predictive control
CN115811047A (en) Distributed power supply-based power distribution network control method and device and storage medium
CN115392141A (en) Self-adaptive current transformer error evaluation method
Vosgerau et al. Power system state and topology coestimation
CN104617575A (en) Method for using static security analysis to assess flow insolubility of anticipated faults
Zhao et al. Power system dynamic state and parameter estimation-transition to power electronics-dominated clean energy systems: Ieee task force on power system dynamic state and parameter estimation
JP2011024374A (en) System stabilization system
JP6305256B2 (en) Power system stabilization system and power system stabilization method
CN103823140B (en) Power network topology misidentification system and method thereof based on road-loop equation
CN110108981A (en) The method for diagnosing faults and system of route in a kind of active power distribution network
CN106856334B (en) A kind of power system state estimation method considering flexible direct current control characteristic
JP5665670B2 (en) Power system state estimation calculation device, power system monitoring control system, and power system state estimation calculation method
CN112332420A (en) Device and method for determining hierarchical load reduction in power system risk assessment
CN103514363B (en) A kind of electric power networks back-up protection on-line tuning method based on increment factor
CN102136105A (en) Phase measurement unit-based power grid information graph parameter estimation method
Silva et al. Hierarchical state estimation based on state & topology coestimation at substation level
KR101639861B1 (en) Energy Management System

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140131

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20141006

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20141021

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20141219

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150203

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150304

R150 Certificate of patent or registration of utility model

Ref document number: 5710303

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

S111 Request for change of ownership or part of ownership

Free format text: JAPANESE INTERMEDIATE CODE: R313115

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350