JP2012168923A - Integration system - Google Patents

Integration system Download PDF

Info

Publication number
JP2012168923A
JP2012168923A JP2011226332A JP2011226332A JP2012168923A JP 2012168923 A JP2012168923 A JP 2012168923A JP 2011226332 A JP2011226332 A JP 2011226332A JP 2011226332 A JP2011226332 A JP 2011226332A JP 2012168923 A JP2012168923 A JP 2012168923A
Authority
JP
Japan
Prior art keywords
input
cost data
cost
output device
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2011226332A
Other languages
Japanese (ja)
Other versions
JP5552103B2 (en
Inventor
Hitoshi Katayanagi
仁 片柳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sekisui Chemical Co Ltd
Original Assignee
Sekisui Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sekisui Chemical Co Ltd filed Critical Sekisui Chemical Co Ltd
Priority to JP2011226332A priority Critical patent/JP5552103B2/en
Publication of JP2012168923A publication Critical patent/JP2012168923A/en
Application granted granted Critical
Publication of JP5552103B2 publication Critical patent/JP5552103B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

PROBLEM TO BE SOLVED: To provide an integration system capable of correctly integrating a prime cost of construction work.SOLUTION: An integration system comprises: a first input-output device 21 installed at an orderer Or; a second input-output device 22 installed at an order receiver TY; and a storage part 31a provided in a cost management part 31 of a server 30 connected with both of the devices 21, 22 via a communication line 10 and storing cost data in association with a residence. The second input-output device 22 has a writing control part 223a for displaying ordered cost data input by the orderer in an order statement screen and making the storage part 31a store response cost data including a money amount of material and a scheduled date of delivery written by the order receiver TY in entry columns for writing at the time of determination of the scheduled date of delivery in association with the residence. The first input-output device 21 has a cost integration part 213c for integrating and displaying the response cost data stored in the storage part 31a in association with the residence.

Description

本発明は、費用の積算システムであって、特に、建物や外構の工事の原価管理に用いるのに好適な積算システムに関する。   The present invention relates to a cost accumulation system, and more particularly to a totalization system suitable for use in cost management of construction of buildings and exteriors.

従来、建物や外構などの工事を行なうのにあたり、精度の高い見積もりを求めるようにした積算システムが知られている(例えば、特許文献1)。
この特許文献1には、通信部を介して、各営業所に配置された端末コンピュータと、センターコンピュータと、仕入先のコンピュータとが、相互通信可能に接続されている。そして、センターコンピュータには、顧客の要望に応じた建物の設計に必要な情報が集約されている。
そして、見積もりを出す場合、顧客が建物を選択し、これをセンターコンピュータに入力すると、この建物の建築に必要な資材およびその量が求められ、あらかじめ入力されている資材の標準単価に基づいて、見積もりを求めることができる。また、各仕入先のコンピュータには、見積もり表に基づいて発注できることも記載されている。
また、工事の終了後に、工事原価を求める技術も知られている(例えば、特許文献2参照)。
2. Description of the Related Art Conventionally, there is known an integration system that obtains a highly accurate estimate when performing construction such as a building or exterior (for example, Patent Document 1).
In Patent Document 1, a terminal computer, a center computer, and a supplier computer arranged at each sales office are connected via a communication unit so as to be able to communicate with each other. The center computer collects information necessary for designing the building according to the customer's request.
Then, when making an estimate, when the customer selects a building and enters it into the center computer, the materials and quantity required for building the building are obtained. Based on the standard unit price of the materials that have been entered in advance, You can ask for an estimate. It is also described that each supplier computer can place an order based on an estimate sheet.
In addition, a technique for obtaining a construction cost after completion of construction is also known (see, for example, Patent Document 2).

特開2005−4528号公報JP 2005-4528 A 特開2005−32186号公報JP-A-2005-32186

ところで、建物の外構工事を請け負った工事管理会社は、必要な資材を問屋(受注者)などから購入する。
外構工事などの場合、資材の種類が雑多であり、資材の種類ごとに複数の問屋から購入する場合が多い。また、資材の単価は時価で変化するし、工事現場の状況によって数量が変動することが多い。
By the way, a construction management company that has contracted the exterior construction of a building purchases necessary materials from a wholesaler (ordering party).
In the case of exterior construction, etc., there are various types of materials, and purchases are often made from a plurality of wholesalers for each type of material. In addition, the unit price of the material varies with the market price, and the quantity often varies depending on the situation of the construction site.

通常、住宅建築に伴う外構工事は、依頼者に住宅を引き渡す時点で、「邸の締め」を行い、工事費用(原価)を算出する。
異なる受注者から、単価や数量などに変動要素のある製品を購入した場合の、「邸の締め」までの流れは次のようである。
(1)発注者が、受注者に発注する。
(2)受注者が、発注者に発注に対する見積もりを提出する。
(3)発注者が、見積もりを承諾して受注者に納品を依頼する。
(4)受注者は、発注者の指定場所に資材を納品する。
(5)受注者が発注者に請求する。
受注者ごとに、並行して上記の処理が行われた後、
(6)発注者は、各受注者からの請求書の請求金額を積算して、「邸の締め」とする。
Normally, exterior work associated with home construction is performed at the point of delivery of the house to the client, and the construction cost (cost) is calculated by “closing the house”.
The flow from the contractor to the closing of the mansion when purchasing products with variable factors such as unit price and quantity is as follows.
(1) The orderer places an order with the contractor.
(2) The contractor submits an estimate for the order to the orderer.
(3) The orderer accepts the estimate and requests delivery to the contractor.
(4) The contractor delivers the material to the place designated by the orderer.
(5) The contractor charges the orderer.
After the above processing is performed in parallel for each contractor,
(6) The orderer sums up the invoice amount of each invoice from each contractor and sets it as “closing the house”.

経理上は、納品後、直ちに請求されることが好ましいが、各受注者においては、各月ごとの「月締め」を経過してから、一括して請求書を発行することが習慣化していることから、納品から請求までに長い場合は、1ヶ月以上の遅れが生じることがあった。
よって、上記(6)の「邸の締め」を行った後に、上記(5)の請求書が送付されることがある。このような場合、上記(6)で求めた積算値には、この遅れて送付された請求書の金額は積算されておらず、邸の原価を正しく積算できない。
さらに、工事開始後に工事内容が変更となり、追加資材が必要になった場合などには、請求書の数が増えて、上記の問題がさらに複雑になっていた。
しかも、発注者は、受け取った請求書の内容を、積算のための自社側のシステムに転記しなければならず、これ手間を要していた。加えて、転記する際に転記ミスが生じ、積算値に間違いが生じるおそれもあった。
For accounting purposes, it is preferable to be billed immediately after delivery, but it is customary for each contractor to issue invoices in a lump after the “monthly closing” for each month. Therefore, when it was long from delivery to billing, a delay of one month or more may occur.
Therefore, the bill of (5) above may be sent after performing the above (6) “Shutting down the mansion”. In such a case, the amount of the bill sent late is not integrated into the integrated value obtained in (6) above, and the cost of the residence cannot be integrated correctly.
Furthermore, when the construction content has changed after the construction has started and additional materials are required, the number of invoices has increased and the above problem has become more complicated.
In addition, the orderer has to transfer the contents of the received invoice to the company's own system for accumulating, which is troublesome. In addition, there was a risk that a transcription error occurred during the transcription, and an error occurred in the integrated value.

本発明は、上述の課題を解決することを目的とするものであり、入力の手間を削減できかつ建設工事にかかる費用を正確に積算可能な積算システムを提供することを目的としている。   An object of the present invention is to solve the above-described problems, and an object of the present invention is to provide an integration system that can reduce the input effort and can accurately accumulate the cost of construction work.

上記目的を達成するために、請求項1に係る発明は、
積算対象である建設工事に必要な資材に関する費用データを、設定された工事単位に関連付けて保存する費用管理部と、
この費用管理部に通信回線を介してアクセス可能であり、前記積算対象を発注する発注者に設置された第1入出力装置と、
前記費用管理部に前記通信回線を介してアクセス可能であり、前記積算対象の発注を受ける受注者に設置された第2入出力装置と、
を備え、
前記費用管理部は、前記費用データを保存する保存部を備え、
前記第1入出力装置は、前記工事単位ごとに設定されて前記費用データを記入するための発注明細画面を表示するとともに、前記第1入出力装置により前記発注明細画面の記入欄に記入された前記発注者が発注する前記費用データである発注費用データを、前記通信回線を介して前記保存部に保存する第1の費用データ保存処理を行なう第1の記入制御部を備え、
前記第2入出力装置は、前記費用管理部にアクセスして、前記発注明細画面を表示させて前記発注費用データを表示する発注表示処理と、前記発注に応答して決定された前記費用データであって前記資材の金額、納品予定日を含む応答費用データを前記納品予定日が確定された時点で記入するための記入欄を有した前記発注明細画面において前記記入欄に前記応答費用データが記入された際に、前記応答費用データを前記保存部に保存させる第2の費用データ保存処理を実行する第2の記入制御部を備え、
前記第1入出力装置は、前記保存部に保存された前記応答費用データの金額を、前記工事単位に関連付けて積算して表示する費用積算部を備えていることを特徴とする積算システムとした。
In order to achieve the above object, the invention according to claim 1
A cost management unit that stores cost data related to materials necessary for construction work to be accumulated in association with a set construction unit;
A first input / output device that is accessible to the cost management unit via a communication line and is installed in an orderer who orders the accumulation target;
A second input / output device that is accessible to the cost management unit via the communication line and is installed in a contractor who receives an order for the accumulation;
With
The cost management unit includes a storage unit that stores the cost data.
The first input / output device displays an order detail screen for entering the cost data set for each construction unit, and is filled in the entry field of the order detail screen by the first input / output device. A first entry control unit that performs a first cost data storage process for storing order cost data, which is the cost data ordered by the orderer, in the storage unit via the communication line;
The second input / output device accesses the cost management unit, displays the order detail screen and displays the order cost data, and the cost data determined in response to the order. The response cost data is entered in the entry field in the order details screen having an entry field for filling the response cost data including the amount of the material and the scheduled delivery date when the scheduled delivery date is confirmed. A second entry control unit for executing a second cost data storage process for storing the response cost data in the storage unit when
The first input / output device includes an expense accumulation unit that accumulates and displays the amount of the response expense data stored in the storage unit in association with the construction unit. .

また、請求項2に係る発明は、請求項1に記載の積算システムにおいて、
前記受注者は、前記資材調達のために資材販売業者に発注する問屋であり、
前記費用管理部は、前記費用データを、前記工事単位としての1軒の邸ごとに関連付けて保存し、
前記費用積算部は、前記保存部に保存された納品数量および納品価格を含む応答費用データを前記邸に関連付けて積算して表示することを特徴とする請求項1に記載の積算システムとした。
The invention according to claim 2 is the integration system according to claim 1,
The contractor is a wholesaler who places an order with a material distributor for the material procurement,
The cost management unit stores the cost data in association with each house as the construction unit,
2. The accumulation system according to claim 1, wherein the cost accumulation unit accumulates and displays response cost data including a delivery quantity and a delivery price stored in the storage unit in association with the residence.

また、請求項3に係る発明は、請求項2に記載の積算システムにおいて、
前記第1入出力装置は、顧客との契約のためにシステム外で作成された工事見積書に記載された前記費用データを、前記発注明細画面の前記記入欄に前記発注費用データとして変換して入力する変換部を備えていることを特徴とする積算システムとした。
The invention according to claim 3 is the integration system according to claim 2,
The first input / output device converts the cost data described in a construction estimate prepared outside the system for a contract with a customer into the entry column of the order details screen as the order cost data. The integrating system is characterized by having a conversion unit for input.

また、請求項4に係る発明は、請求項2または請求項3に記載の積算システムにおいて、前記第1入出力装置の制御部は、前記発注者が前記第2入出力装置により記入された前記応答費用データが適正であると判断したことを受けて、前記第2入出力装置に向けて納品を許可することを伝える承認処理を実行することを特徴とする積算システムとした。   According to a fourth aspect of the present invention, in the integrating system according to the second or third aspect, the controller of the first input / output device is configured such that the orderer is filled in by the second input / output device. In response to the determination that the response cost data is appropriate, an accumulating system is provided that performs an approval process for informing the second input / output device that delivery is permitted.

また、請求項5に係る発明は、請求項2〜請求項4のいずれか1項に記載の積算システムにおいて、
前記第1の記入制御部は、施工業者および工期の記入欄を有した工程管理画面を表示するとともに、この工程管理画面に記入された前記施工業者および前記工期を、前記保存部に保存する処理を実行することを特徴とする積算システムとした。
Further, the invention according to claim 5 is the integrating system according to any one of claims 2 to 4,
The first entry control unit displays a process management screen having a contractor and construction period entry field, and stores the construction contractor and the construction period entered in the process management screen in the storage unit. It was set as the integration system characterized by performing.

本願発明では、発注者側に第1入出力装置を設置する一方で、受注者側に第2入出力装置を設置する。
そして、第1入出力装置を用いて受注者(第2入出力装置)に発注を行う。また、受注者は、第2入出力装置により発注を受けたことを知ると、この発注に応答して決定された金額、納品予定日を含む応答費用データを、第2入出力装置を用いて、納品予定日が確定された時点で記入するための記入欄に記入する。
その後、発注者が費用データの積算を行う際には、第1入出力装置の費用積算部を用いて、受注者により入力されて保存部に保存された応答費用データを積算する。
このように、本発明では、積算に用いる応答費用データは、受注者が、納品日が確定された時点で入力した応答費用データを用いるようにしたため、発注者側で入力する手間が不要であり、かつ、転記ミスも生じない。また、応答費用データの入力は、納品日が確定された時点で受注者が行うことで、請求書の発行よりも前の時点で、予測値ではない正確な値の入力が可能であり、従来のように請求書が届いてから発注者が入力する場合と比較して、積算の際の計上漏れの発生の可能性が低くなり、その分、正確な積算が可能となる。
In the present invention, the first input / output device is installed on the orderer side, while the second input / output device is installed on the contractor side.
Then, an order is placed with the contractor (second input / output device) using the first input / output device. Further, when the contractor knows that the order has been received by the second input / output device, the response cost data including the amount determined in response to the order and the scheduled delivery date is obtained using the second input / output device. , Fill in the entry field to fill in when the expected delivery date is confirmed.
Thereafter, when the orderer integrates the cost data, the response cost data input by the contractor and stored in the storage unit is integrated using the cost integration unit of the first input / output device.
As described above, according to the present invention, the response cost data used for integration is the response cost data input by the contractor at the time when the delivery date is confirmed. And there are no transcription errors. In addition, response cost data can be entered by the contractor when the delivery date is confirmed, so that accurate values that are not predicted values can be entered before the invoice is issued. Thus, compared with the case where the orderer inputs after the invoice is received, the possibility of omission of accounting at the time of integration is reduced, and accurate integration is possible accordingly.

請求項2に記載の発明では、住宅建築の外構工事では、資材の種類が多岐に渡り、その納品の時期や、請求書の発行の時期が資材の種類により異なる可能性が高い。
それに対し、請求項2に係る発明では、第2入出力装置を、受注者としての問屋に設置することで、問屋が正確な資材の応答費用データを入力することになる。
したがって、上述した発注側の入力の手間の削減、転記ミスや計上漏れのない正確な費用の積算効果がより顕著となる。
In the invention described in claim 2, in the exterior construction of a residential building, there are various types of materials, and there is a high possibility that the time of delivery and the time of issuing an invoice differ depending on the type of materials.
On the other hand, in the invention according to claim 2, the second input / output device is installed in the wholesaler as the contractor so that the wholesaler inputs accurate response cost data of the material.
Therefore, the above-described reduction in inputting time on the ordering side, and the accurate effect of accumulating costs without any transfer mistakes or omissions become more prominent.

さらに、請求項3に係る発明は、工事を行う前に顧客との契約のためにシステム外で作成された工事見積書の費用データを、変換部により変換して、発注明細画面の記入欄に自動的に記入することができる。
したがって、工事見積書からの発注明細画面への転記入力の手間を省くことができるとともに、正確な変換が可能となる。
また、請求項4に係る発明は、受注者が第2入出力装置を用いて記入した応答費用データが適正であるか否かを、発注側で適正か否か判定し、適正である場合は、第1入出力装置から第2入出力装置へ向けて、納品を許可する承認処理を実行するようにしたため、発注者の外部の受注者が、積算の元となる応答費用データを入力するシステムにもかかわらず、不適正な価格が入力されるのを防止できる。
また、請求項5に係る発明は、工程管理画面により、施工業者と工事期間とを管理できるため、同じ工期に、同一の施工業者に間違えて発注する不具合を防止できる。
Further, in the invention according to claim 3, the cost data of the construction estimate prepared outside the system for the contract with the customer before the construction is performed is converted by the conversion unit, and is entered in the entry column of the order specification screen. Can be filled in automatically.
Therefore, it is possible to save the trouble of inputting the posting from the construction estimate to the order detail screen, and it is possible to perform accurate conversion.
The invention according to claim 4 determines whether or not the response cost data entered by the contractor using the second input / output device is appropriate on the ordering side. Since the approval process for permitting delivery is executed from the first input / output device to the second input / output device, the orderer outside the orderer inputs the response cost data to be accumulated Nevertheless, an inappropriate price can be prevented from being input.
Moreover, since the invention which concerns on Claim 5 can manage a construction contractor and a construction period with a process management screen, it can prevent the trouble which mistakes and orders to the same construction contractor in the same construction period.

図1は、本発明の実施の形態1の積算システムを示す全体図である。FIG. 1 is an overall view showing an integrating system according to Embodiment 1 of the present invention. 図2は、実施の形態1の積算システムの積算に適用する外構工事の発注状況を示す概念図である。FIG. 2 is a conceptual diagram showing an order status of exterior work applied to the integration of the integration system of the first embodiment. 図3は、実施の形態1の積算システムで用いる工程管理画面WSの一例を示す図である。FIG. 3 is a diagram illustrating an example of a process management screen WS used in the integration system according to the first embodiment. 図4は、実施の形態1の積算システムで用いる発注明細画面DTの一例を示す図である。FIG. 4 is a diagram showing an example of the order detail screen DT used in the integration system of the first embodiment. 図5は、実施の形態1の積算システムにおける外構工事の発生から邸に関連付けた資材データの積算(邸の締め)までの全体の作業の流れを示すフローチャートである。FIG. 5 is a flowchart showing an overall work flow from the occurrence of exterior construction to the accumulation of material data associated with a residence (closure of a residence) in the accumulation system of the first embodiment. 図6は、実施の形態1の積算システムにおいて、発注者Orに設置した第1入出力装置21を用いた第1費用データ保存処理を含む処理の流れを示すフローチャートである。FIG. 6 is a flowchart showing a process flow including a first expense data storage process using the first input / output device 21 installed in the orderer Or in the integrating system according to the first embodiment. 図7は、実施の形態1の積算システムにおいて、受注者(問屋)TYに設置した第2入出力装置22を用いた作業の流れを示すフローチャートである。FIG. 7 is a flowchart showing a work flow using the second input / output device 22 installed in the contractor (wholesaler) TY in the integrating system according to the first embodiment. 図8は、実施の形態1の積算システムにおいて、発注者Orに設置した第1入出力装置21を用い承認処理の作業の流れを示すフローチャートである。FIG. 8 is a flowchart showing the flow of the approval process using the first input / output device 21 installed in the orderer Or in the integrating system according to the first embodiment. 図9は、実施の形態1の積算システムにおいて、発注者Orに設置した第1入出力装置21を用いた積算処理の作業の流れを示すフローチャートである。FIG. 9 is a flowchart showing a work flow of integration processing using the first input / output device 21 installed in the orderer Or in the integration system of the first embodiment. 図10は、実施の形態1の積算システムにおける資材販売業者Deの経理の締め日Sm1と、邸の締め(費用データの積算)日Sm2との関係の一例を示す説明図である。FIG. 10 is an explanatory diagram showing an example of the relationship between the accounting date Sm1 of the material distributor De and the date of closing the house (accumulation of cost data) Sm2 in the integrating system of the first embodiment.

以下、本発明の実施の形態について、添付図面を参照しながら説明する。   Hereinafter, embodiments of the present invention will be described with reference to the accompanying drawings.

(実施の形態1)
実施の形態1の積算システムは、図1に示すように、発注者Orすなわち住宅建築販売業会社の外構工事部門に設置された第1入出力装置21と、受注者TYすなわち外構工事に用いる資材の問屋に設置された第2入出力装置22と、資材に関する費用データを保存するサーバ30と、これらを接続する通信回線10とを備えており、両入出力装置21,22は、それぞれ、サーバ30へアクセス可能となっている。
(Embodiment 1)
As shown in FIG. 1, the integrating system according to the first embodiment includes a first input / output device 21 installed in an outside construction department of an orderer Or, that is, a house building sales company, and a contractor TY, that is, outside construction. It is provided with a second input / output device 22 installed in a wholesale store of materials to be used, a server 30 for storing cost data relating to the material, and a communication line 10 connecting them, The server 30 can be accessed.

各入出力装置21,22は、本実施の形態1では、いわゆるパーソナルコンピュータが用いられており、それぞれ、キーボード21k,22kなどの入力手段からの信号を入力する入力部211,221と、視覚的な出力のためのモニタ21m,22mや音出力を行うオーディオ装置や通信回線10に対して送受信を行う出力部212,222と、入力部211,221からの入力に基づいて処理を行って出力部から出力を行う制御部213,223とを備えている。また、第1入出力装置21の制御部213は、後述する記入制御部213aと変換部213bと費用積算部213cとを備えている。一方、第2入出力装置22の制御部213は、後述する記入制御部223aを備えている。   In the first embodiment, so-called personal computers are used for the input / output devices 21 and 22, respectively, and input units 211 and 221 for inputting signals from input means such as keyboards 21k and 22k, and visual inputs, respectively. Monitors 21m and 22m for various outputs, output units 212 and 222 for transmitting and receiving to / from the audio device for outputting sound and the communication line 10, and processing based on inputs from the input units 211 and 221 for output unit Are provided with control units 213 and 223 for outputting from the control unit. The control unit 213 of the first input / output device 21 includes an entry control unit 213a, a conversion unit 213b, and a cost integration unit 213c, which will be described later. On the other hand, the control unit 213 of the second input / output device 22 includes an entry control unit 223a described later.

以下に、本実施の形態1の積算システムについて、発注者Orとしての住宅建築販売会社において住宅の外構工事を担当する部門で資材費用を積算するのに用いた場合を例に挙げて説明する。   In the following, the integration system according to the first embodiment will be described by taking as an example the case where it is used for integrating material costs in a department in charge of exterior construction of a house in a housing construction sales company as an orderer Or. .

図2は、外構工事の発注状況を示す概念図に基づいて、発注者Orと受注者TYとの関係を説明する。
発注者Orとしての外構工事部門では、図2に示す複数の顧客(邸)CU1,CU2,CU3,CU4に対して外構工事を行うのにあたり、その工事内容(工程)に応じて、複数の施工業者M1,M2,M3に工事を発注するとともに、その工事に使用する資材は、受注者TYとしての1または複数の問屋に発注するようにしている。また、受注者TYとしての問屋は、メーカーなどの資材販売業者De1,De2,De3に資材を発注する。そして、各資材販売業者De1,De2,De3は、顧客CU1,CU2,CU3,CU4の建築現場へ、直接あるいは受注者TYを介して納品する。
FIG. 2 explains the relationship between the orderer Or and the contractor TY based on a conceptual diagram showing the ordering situation of the external construction.
In the external construction department as the orderer Or, when performing external construction on a plurality of customers (houses) CU1, CU2, CU3, CU4 shown in FIG. The construction contractors M1, M2 and M3 are ordered, and materials used for the construction are ordered from one or more wholesalers as the contractor TY. Further, the wholesaler as the contractor TY orders materials from material dealers De1, De2, De3 such as manufacturers. Each material dealer De1, De2, De3 delivers the product directly to the construction site of the customers CU1, CU2, CU3, CU4 or via the contractor TY.

発注者Orは、外構工事の収益を求めるのにあたり、その原価(費用データの積算値)を求める。この原価には、施工業者に支払う工事原価と、受注者TYに支払う資材原価とがあり、本実施の形態1の積算システムは、この原価のうちで、資材原価を求めるのに用いる。   The orderer Or obtains the cost (accumulated value of cost data) when obtaining the profit of the external construction. This cost includes a construction cost to be paid to the contractor and a material cost to be paid to the contractor TY, and the integrating system of the first embodiment is used to obtain the material cost among these costs.

図1に戻り、サーバ30は、費用データを管理するデータベースであり、資材原価に関する費用データ(資材の種類(名称)、数量、価格、納品日など)を、1邸ごとに関連付けて保存する費用管理部31を備えている。すなわち、第1入出力装置21および第2入出力装置22は、それぞれ、制御部213,223に第1の記入制御部に相当する記入制御部213aおよび第2の記入制御部に相当する記入制御部223aを備えている。   Returning to FIG. 1, the server 30 is a database for managing cost data, and cost data related to material costs (material type (name), quantity, price, delivery date, etc.) is stored in association with each house. A management unit 31 is provided. That is, the first input / output device 21 and the second input / output device 22 have the control units 213 and 223, respectively, the entry control unit 213a corresponding to the first entry control unit and the entry control corresponding to the second entry control unit. A portion 223a is provided.

すなわち、各制御部213,223により通信回線10を介して費用管理部31にアクセスした際に、各記入制御部213a,223aは、それぞれ、モニタ21m,22mに入力用の画面を提示し、さらに、この画面の記入欄に費用データを入力した際に、これらの費用データを、費用管理部31の保存部31aに保存する。なお、このような通信およびモニタ21m,22mへの表示は、一般的に使用されているブラウザを使用する。   That is, when the cost control unit 31 is accessed by the control units 213 and 223 via the communication line 10, the entry control units 213a and 223a present input screens on the monitors 21m and 22m, respectively. When the cost data is input in the entry field of this screen, the cost data is stored in the storage unit 31a of the cost management unit 31. Note that such communication and display on the monitors 21m and 22m use a commonly used browser.

上述の入力用の画面としては、図3に示す工程管理画面WSと、図4に示す発注明細画面DTとが設定されている。
工程管理画面WSは、外構工事の日程管理を行うとともに、資材に関するデータを、工事日程に関連付けるのに用いる。
この工程管理画面WSには、図3に示すように、行ごとに施工業者M1,M2,M3を記入する業者列Mrと、行ごとに顧客CU1,CU2,CU3,CU4(それぞれ邸に相当する)を記入する顧客列CUrと、行ごとに工事の内容を記入する工程列Krと、行ごとに工期予定を記入する予定列PLrと、行ごとに営業担当者T1,T2,T3を記入する担当者列Trと、横軸に延びるカレンダーに沿って工期および邸の住所が表示されるカレンダー欄CLrとを備えている。
As the above input screen, a process management screen WS shown in FIG. 3 and an order detail screen DT shown in FIG. 4 are set.
The process management screen WS is used for managing the schedule of the external construction and associating material-related data with the construction schedule.
In this process management screen WS, as shown in FIG. 3, a contractor column Mr in which the contractors M1, M2, and M3 are entered for each row, and customers CU1, CU2, CU3, and CU4 (each corresponding to a residence). ) To fill in the customer column CUr, the process column Kr to fill in the construction contents for each row, the planned column PLr to fill in the construction schedule for each row, and the sales persons T1, T2, T3 for each row. A person-in-charge column Tr and a calendar column CLr in which the work period and the address of the residence are displayed along a calendar extending in the horizontal axis are provided.

発注明細画面DTは、図4に示すように、行ごと発注する資材SZ1,SZ2・・・SZ7の名称を記入する資材名称列SZrと、これら資材名称列SZrに記入された名称に対応して行ごとに資材の型番およびメーカー名を記入する仕様列SYrと、資材名称列SZrに記入された名称に対応して発注する資材の数量を記入する数量列AMrと、その資材の単価を記入する単価列UPrと、記入された数量と単価とを掛け合わせた金額を表示する金額列MOrと、発注日を記入する発注日列Odrと、納品日を記入し表示する納品日列DLrとを備えている。   As shown in FIG. 4, the order specification screen DT corresponds to the material name column SZr in which the names of the materials SZ1, SZ2,... SZ7 to be ordered for each row are entered, and the names entered in these material name columns SZr. A specification column SYr for entering the model number and manufacturer name of the material for each row, a quantity column AMr for entering the quantity of the material to be ordered corresponding to the name entered in the material name column SZr, and the unit price of the material are entered. A unit price column UPr, an amount column MOr for displaying the amount obtained by multiplying the entered quantity and unit price, an order date column Odr for entering the order date, and a delivery date column DLr for entering and displaying the delivery date are provided. ing.

なお、費用管理部31の設定に基づいて、発注者Orに設置された第1入出力装置21は、工程管理画面WSと発注明細画面DTとの両方を表示可能であり、かつ、両画面WS,DTの各記入欄に発注費用データを入力可能に設定されている。一方、受注者(問屋)TYに設置された第2入出力装置22は、費用管理部31に保存された工程管理画面WSにアクセスすることはできず発注明細画面DTのみを表示可能となっており、かつ、この発注明細画面DTにおいて、数量列AMr、単価列UPr、金額列MOr、納品日列DLrの各欄に応答費用データを入力可能となっている。   Note that the first input / output device 21 installed in the orderer Or can display both the process management screen WS and the order detail screen DT based on the setting of the expense management unit 31 and the both screens WS. , DT is set so that ordering cost data can be entered in each entry field. On the other hand, the second input / output device 22 installed in the contractor (wholesaler) TY cannot access the process management screen WS stored in the expense management unit 31 and can display only the order detail screen DT. In addition, in this order detail screen DT, response cost data can be input in each column of the quantity column AMr, the unit price column UPr, the amount column MOr, and the delivery date column DLr.

そこで、本実施例1では、各列AMr、UPr、MOr、Odrなどにおいて、発注者Orが第1入出力装置21により記入したものが発注費用データに相当し、受注者TYが第2入出力装置22によりこれに上書きして記入したものが応答費用データとなる。すなわち、第1入出力装置21により最初に記入された値は、推定値や希望値であり、第2入出力装置22により記入された値が、実価格となる。また、納品日列DLrにあっては、第1入出力装置21により記入される日付は納入希望日であり、第2入出力装置22により記入された日付は納品予定日となる。   Therefore, in the first embodiment, in each column AMr, UPr, MOr, Odr, etc., the data entered by the orderer Or by the first input / output device 21 corresponds to the ordering cost data, and the contractor TY receives the second input / output. The response cost data is overwritten by the device 22. That is, the value first entered by the first input / output device 21 is an estimated value or a desired value, and the value entered by the second input / output device 22 is the actual price. In the delivery date column DLr, the date entered by the first input / output device 21 is the desired delivery date, and the date entered by the second input / output device 22 is the scheduled delivery date.

次に、図5〜図9に示すフローチャートに基づいて、費用データ積算処理の流れ、ならびに各入力装置21、22による表示および入力作業の流れについて説明する。
なお、図5は外構工事の発生から、工事単位としての邸に対応した資材費用データの積算に必要な費用データを保存するまでの全体の作業の流れを示している。
Next, based on the flowcharts shown in FIGS. 5 to 9, the flow of cost data integration processing and the flow of display and input work by the input devices 21 and 22 will be described.
FIG. 5 shows the overall flow of work from the occurrence of external construction to the storage of cost data necessary for integrating material cost data corresponding to a residence as a construction unit.

この図5に基づいて全体の作業の流れを説明すると、外構工事は、各邸の建築に伴って発生する。
この外構工事を行なう場合、まず、住宅建築販売会社の営業担当者Tは、顧客CU(顧客についても、CU1〜CU4の何れかに特定しない場合、符号としてCUと表記する)と打ち合わせを行い、顧客CUの要望に沿って工事内容を決定し(ステップS1)、その見積もりを作成する(ステップS2)。この見積もりは、第1入出力装置21を用いて作製してもよいが、本実施の形態1では、この積算システムには含まれない第3入出力装置23により作成するものとする。なお、第3入出力装置23は、モニタ23mおよびキーボード23kを備えている。
The overall work flow will be described with reference to FIG. 5. The external work is generated along with the construction of each house.
When carrying out this external construction work, first, the sales representative T of the housing construction sales company makes a meeting with the customer CU (if the customer is not specified as one of CU1 to CU4, the customer is indicated as CU). Then, the construction content is determined according to the request of the customer CU (step S1), and an estimate is created (step S2). This estimate may be created using the first input / output device 21, but in the first embodiment, it is assumed that the estimate is created by the third input / output device 23 that is not included in this integration system. The third input / output device 23 includes a monitor 23m and a keyboard 23k.

そして、営業部所などにおいてこの見積もりの内部承認を得ると(ステップS3)、その後、顧客CUと契約を取り交わす(ステップS4)。そして、この契約が成立すると、発注者Orは、工事に取りかかるために、施工業者M(施工業者についても、M1〜M3の何れかに特定しない場合、符号としてMと表記する)への工事の発注を行うとともに、その工事に必要な資材の発注を行なう(ステップS5)。   And when the internal approval of this estimate is obtained in a sales department etc. (step S3), after that, a contract is exchanged with the customer CU (step S4). When this contract is established, the orderer Or starts the construction work to the construction contractor M (the construction contractor is also denoted as M if it is not specified as any of M1 to M3). An order is placed and materials necessary for the construction are ordered (step S5).

この発注の段階から、実施の形態1の積算システムを使用する。
この発注時における実施例1の積算システムによる処理の流れを図6のフローチャートにより説明する。
営業担当者Tは、まず、第1入出力装置21によりサーバ30にアクセスし(ステップS200)、メニュー画面(図示省略)を表示する(ステップS201)。この場合、フローの表示は省略するが、パスワードを設定しアクセス権を持たないもののアクセスを禁止する。このメニュー画面では、工程管理画面WSと発注明細画面DTのいずれか一方を選択する選択部(図示省略)を備えており、選択された画面を表示する(ステップS202,S206)。なお、両画面WS,DTを同時に表示するようにしてもよい。
From this ordering stage, the integration system of the first embodiment is used.
The flow of processing by the integrating system of the first embodiment at the time of ordering will be described with reference to the flowchart of FIG.
The sales representative T first accesses the server 30 by the first input / output device 21 (step S200), and displays a menu screen (not shown) (step S201). In this case, although the flow display is omitted, a password is set and access is prohibited even though the user does not have access rights. This menu screen includes a selection unit (not shown) for selecting one of the process management screen WS and the order detail screen DT, and displays the selected screen (steps S202 and S206). Note that both the screens WS and DT may be displayed simultaneously.

次に、営業担当者Tは、図3に示す工程管理画面WSを用いて、工程(工事内容)および工事期間を設定し、これを記入する。工程管理画面WSでは、複数存在する業者のそれぞれについて、各顧客CU(邸)に対応して既に入力された工程と工期とが表示されているため、新たな工事を発注する場合には、対象となる工期が空いている施工業者Mを選択することができ、効率的な施工業者の設定が可能となる。   Next, the sales staff T sets a process (construction content) and a construction period using the process management screen WS shown in FIG. In the process management screen WS, for each of a plurality of contractors, the process and work period that have already been input corresponding to each customer CU (house) are displayed. Therefore, it is possible to select a construction contractor M that has a vacant construction period, and an efficient construction contractor setting is possible.

上記の記入後に、第1入出力装置21により保存操作を行うか、あるいは自動的に工程管理画面WSの記入内容が通信回線10を介してサーバ30の費用管理部31の保存部31aに保存される(ステップS204)。   After the above entry, the save operation is performed by the first input / output device 21, or the entry contents of the process management screen WS are automatically saved in the saving unit 31a of the cost management unit 31 of the server 30 via the communication line 10. (Step S204).

さらに、営業担当者Tは、施工業者に向けて工程および工事期間を送信する(ステップS205)。この送信は、積算システムを用いて行うようにしてもよいし、あるいは、積算システムを用いることなく、電話、メール、FAXなどの他の手段により行なうようにしてもよい。   Furthermore, the sales representative T transmits the process and the construction period to the contractor (step S205). This transmission may be performed using an integration system, or may be performed by other means such as a telephone, e-mail, and FAX without using the integration system.

また、営業担当者Tは、発注明細画面DTを選択し(ステップS206)、これを表示させる(ステップS207)。そして、契約内容に応じ、邸の名前、必要な資材の名称、型番およびメーカー名、数量、単価、金額、発注日などの発注費用データを、各列SZr、SYr、AMr、UPr、MOr、Odrなどに入力する。なお、発注明細画面DTは、工事単位としての邸ごとに作成されるもので、最初の表示の際には、対象となる邸用の発注明細画面DTを新規に作成する。   The sales person T selects the order detail screen DT (step S206) and displays it (step S207). Depending on the contents of the contract, the order cost data such as the name of the residence, the name of the necessary material, the model number and the manufacturer name, the quantity, the unit price, the amount of money, the order date, etc. Enter in etc. Note that the order detail screen DT is created for each residence as a construction unit, and at the time of initial display, an order detail screen DT for the target residence is newly created.

この新規の邸に関係づけられた発注明細画面DTの作成の際に、本実施の形態1では、記入制御部213aは、変換部213bの変換処理に基づいて、第3入出力装置23などにより既に作成された見積書のデータを取り込んで発注明細画面DTの発注費用データに変換する。この変換により、邸の名前に関連付けて、費用データとしての資材の名称、型番およびメーカー名、数量、単価および数量と単価とを掛け合わせた金額が、それぞれ、資材名称列SZr、仕様列SYr、数量列AMr、単価列UPr、金額列MOrに自動的に入力される。   In the creation of the order details screen DT related to the new residence, in the first embodiment, the entry control unit 213a uses the third input / output device 23 or the like based on the conversion processing of the conversion unit 213b. The estimate data already created is taken in and converted into order cost data on the order detail screen DT. By this conversion, the name of the material as the cost data, the model number and the manufacturer name, the quantity, the unit price, and the amount obtained by multiplying the quantity and the unit price are associated with the name of the residence, respectively, the material name column SZr, the specification column SYr, The quantity column AMr, the unit price column UPr, and the amount column MOr are automatically input.

なお、この時点の数量、単価、金額などの発注費用データは、それぞれ見積もりの段階で予測された値であり、数量は、設計図などから求められた予測数量であり、単価は、あらかじめ把握している予測単価であり、金額も両者を掛け合わせた予測金額である。
さらに、営業担当者Tは、発注日を入力するのに加え、工程管理画面WSに基づいて設定した日程に応じて、納品希望日を設定して納品日列DLrに入力する。これらの発注明細画面DTに記入されたデータは、第1入出力装置21による保存操作、あるいは入力に伴い自動的に、通信回線10を介してサーバ30の費用管理部31の保存部31aに保存される(ステップS208:第1の費用データ保存処理)。
また、この保存の際に、数量計測用図面のデータを、発注明細画面DTに関連付けて保存する。この数量計測用図面は、必要な資材の数量を確認するのに用いる図面であって、例えば、設計図面である。
そして、受注者(問屋)TYに対して、通信回線10を介し第2入出力装置22に向けて、発注を行ったことを送信する(ステップS209)。
Note that the ordering cost data such as quantity, unit price, and amount at this time are the values predicted at the estimation stage, the quantity is the predicted quantity obtained from the design drawing, etc., and the unit price is grasped in advance. Predicted amount, and the amount is also a predicted amount obtained by multiplying the two.
Furthermore, in addition to inputting the order date, the sales representative T sets a desired delivery date according to the schedule set based on the process management screen WS and inputs it to the delivery date column DLr. The data entered on the order details screen DT is automatically saved in the saving unit 31a of the cost management unit 31 of the server 30 via the communication line 10 according to the saving operation by the first input / output device 21 or input. (Step S208: first expense data storage process).
At the time of saving, the quantity measurement drawing data is saved in association with the order detail screen DT. This quantity measurement drawing is a drawing used to confirm the quantity of necessary materials, for example, a design drawing.
Then, to the contractor (wholesaler) TY, the fact that the order has been placed is transmitted to the second input / output device 22 via the communication line 10 (step S209).

図5に戻り、発注者Or(営業担当者T)によりステップS5の発注が実行されると、受注者TYは、必要な資材の数量の最終確認を行い(ステップS6)、さらに、必要な資材の納品の可否や、単価、納品予定日などの確認を行い(ステップS7)、その後、これらの応答費用データを、第2入出力装置22を用いて発注明細画面DTに入力し保存する(第2の費用データ保存処理)。   Returning to FIG. 5, when the orderer Or (salesperson T) executes the order in step S5, the contractor TY performs final confirmation of the quantity of necessary materials (step S6), and further, the necessary materials. Confirmation of delivery availability, unit price, scheduled delivery date, and the like (step S7), and thereafter, these response cost data are input to the ordering details screen DT using the second input / output device 22 and stored (first). (2) Cost data storage process).

このステップS6〜S8における受注者TYが行う処理の詳細を、図7のフローチャートにより説明する。
受注者(問屋)TYは、まず、サーバ30にアクセスし(ステップS301)、発注明細画面DTを開き(ステップS302)、発注の有無を確認する(ステップS303)。そして、発注があった場合は、受注者TYは、発注内容(資材名称および仕様、資材の数量、単価、納品希望時)を確認する(ステップS304)。次に、添付された数量計測用図面に基づいて資材名称、仕様、数量に問題がないか確認する(ステップS305)。すなわち、発注者Orからの発注が、添付の数量計測用図面に応じたものであるか否かを確認する。
Details of the processing performed by the contractor TY in steps S6 to S8 will be described with reference to the flowchart of FIG.
The contractor (wholesaler) TY first accesses the server 30 (step S301), opens the order detail screen DT (step S302), and confirms whether there is an order (step S303). If there is an order, the contractor TY confirms the order contents (material name and specification, quantity of material, unit price, delivery desired) (step S304). Next, based on the attached quantity measurement drawing, it is confirmed whether there is any problem in the material name, specifications, and quantity (step S305). That is, it is confirmed whether or not the order from the orderer Or is in accordance with the attached quantity measurement drawing.

さらに、受注者TYは、施工を担当する施工業者Mに対し、電話、メール、FAX、郵便などの通信手段を用いて、資材名称、仕様、数量に変更が無いか最終確認する(ステップS305)。
すなわち、外構工事においては、実際に施工する土地の傾斜や凹凸などの影響により、設計どおりに施工ができず、必要な資材の種類が変更になったり、資材の必要数量が変更になったりすることがある。このため、施工業者Mに直接連絡して、資材名称、仕様、数量などに変更がないか最終確認を行う。ここで、変更があった場合、発注者Orにその旨連絡を入れてもよいし、後述のステップS307,S8において記入する際に、その変更理由を記載するようにしてもよい。本実施の形態1では、発注明細画面DTに、そのような連絡を行う備考欄BRが設定されているものとする。
Further, the contractor TY finally confirms whether or not there is a change in the material name, specification, and quantity, using a communication means such as telephone, e-mail, FAX, and mail, to the contractor M in charge of the construction (step S305). .
In other words, in external construction work, construction cannot be performed as designed due to the influence of the slope or unevenness of the actual construction site, and the type of necessary materials may change, or the required quantity of materials may change. There are things to do. For this reason, the contractor M is contacted directly and a final confirmation is made whether there is any change in the material name, specifications, quantity, or the like. Here, when there is a change, the orderer Or may be notified of the change, or the reason for the change may be described when filling in in steps S307 and S8 described later. In the first embodiment, it is assumed that a remarks column BR for performing such communication is set on the order detail screen DT.

次に、受注者(問屋)TYは、資材販売業者Deに対し、電話、メール、FAX、郵便などの通信手段を用いて、発注予定資材について、その数量を納品可能であるか、単価、納品予定日などの確認を行う(ステップS306)。そして、受注者(問屋)TYは、資材販売業者Deからこれらの回答を得て、注文した資材の数量、単価、納品予定日が確定した時点で、第2入出力装置22を用いてこれらの値を応答費用データとして各記入欄の上書き入力を行うとともに、これを保存部31aに保存する(ステップS307)。なお、この保存も第2入出力装置22の保存操作により行ってもよいし、記入に連動して自動的に行ってもよい。   Next, the contractor (wholesaler) TY can use the communication means such as telephone, e-mail, FAX, and mail to deliver the quantity of the materials to be ordered, whether the quantity can be delivered, the unit price, and the delivery. The scheduled date and the like are confirmed (step S306). The contractor (wholesaler) TY obtains these answers from the material distributor De, and uses the second input / output device 22 when the quantity, unit price, and scheduled delivery date of the ordered material are confirmed. The value is overwritten in each entry field as response cost data, and stored in the storage unit 31a (step S307). This storage may be performed by a storage operation of the second input / output device 22, or may be automatically performed in conjunction with the entry.

図5に戻り、受注者(問屋)TYによる入力が行われたら(ステップS8)、発注者Orは、この入力値の承認判断を行う(ステップS9)。
この承認判断に伴い、制御部213において承認処理が実行される。この承認処理の流れを図8のフローチャートにより説明すると、発注者Orは、サーバ30にアクセスし(ステップS221)、受注者TYによる発注明細画面DTへの応答費用データの入力の有無を確認し(ステップS222)、入力があった場合には、この応答費用データに対する承認の可否判断を行う(ステップS223)。
すなわち、受注者TYにより入力された資材の最終的な名称、仕様、数量、単価、金額、納品予定日に問題がないか確認し、大きな変更がないかあるいは変更があっても納得できる変更であれば、発注者Or(営業担当者T)は承認、すなわち、納品を許可する。この承認を行う場合、発注者Orは、発注明細画面DTに隣り合って設定された承認ボタンab(図4参照)をクリックする。このように、通信回線10を介して発注者Orの外部の受注者TYが資材原価に関するデータを入力しているが、このような承認を得るステップを介在させることにより、不適正な名称、仕様、数量、単価、金額、納品予定日などのデータが入力されるのを防止できる。
Returning to FIG. 5, when an input is made by the contractor (wholesaler) TY (step S8), the orderer Or makes an approval judgment of the input value (step S9).
Accompanying this approval determination, the controller 213 executes an approval process. The flow of this approval process will be described with reference to the flowchart of FIG. 8. The orderer Or accesses the server 30 (step S221), and confirms whether or not response cost data is input to the order detail screen DT by the orderer TY ( In step S222), if there is an input, it is determined whether or not the response cost data can be approved (step S223).
In other words, the final name, specifications, quantity, unit price, amount of money, and the expected date of delivery of the material entered by the contractor TY are checked for any problems. If there is, the orderer Or (salesperson T) approves the approval, that is, the delivery. When performing this approval, the orderer Or clicks the approval button ab (see FIG. 4) set adjacent to the order detail screen DT. As described above, the ordering party TY outside the orderer Or inputs data related to the material cost via the communication line 10, but an inappropriate name and specification are obtained by interposing a step of obtaining such approval. It is possible to prevent data such as quantity, unit price, amount of money, and scheduled delivery date from being input.

そして、発注者Orによる承認が得られたら、受注者(問屋)TYは、資材販売業者Deに対して発注を行う(図5のS10、図7のS309)。これにより、資材が、図2の資材販売業者De2,De3から顧客(邸)CUへ直接、あるいは資材販売業者De1から受注者TYを経由して納品される(図5のS11)。   When the approval from the orderer Or is obtained, the contractor (wholesaler) TY places an order with the material distributor De (S10 in FIG. 5, S309 in FIG. 7). Thereby, the material is delivered from the material dealers De2 and De3 in FIG. 2 directly to the customer (house) CU or from the material dealer De1 via the contractor TY (S11 in FIG. 5).

なお、発注者Orによる承認が得られた場合は、既にステップS307において受注者(問屋)TYにより発注明細画面DTに入力された各応答費用データが確定することになる。これら数量、単価、納品日は、推定価格や予定日ではなく、それぞれ確定した正確な値であり、これらが納品よりも前の時点であって、当然のことながら請求書が発行される前の時点で記入される。
また、資材に関し、発注者Orが、資材販売業者Deに直接発注するのではなく、受注者(問屋)TYを介し、受注者(問屋)TYが一元管理することで、発注者Orによる記入の手間や、確認などの手間を削減できる。
If the approval by the orderer Or is obtained, the response cost data already entered in the order detail screen DT by the contractor (wholesaler) TY in step S307 is confirmed. These quantities, unit prices, and delivery dates are not estimated prices or planned dates, but are accurate values that have been confirmed. These are before the delivery date, and of course before the invoice is issued. Filled in at the time.
In addition, regarding the materials, the orderer Or does not directly place an order with the material distributor De, but the orderer (wholesaler) TY centrally manages the orderer (wholesaler) TY via the orderer (wholesaler) TY, so Time and effort such as confirmation can be reduced.

一方、承認が得られない場合、すなわち、発注者Orが、入力された価格や納品日に納得できない場合は、この発注をキャンセルして、他の受注者(問屋)TYに発注を行うなどの処理を行うことができる。なお、再発注した場合の処理の流れは、以上説明した流れと同じ流れを繰り返すことになる。   On the other hand, if approval is not obtained, that is, if the orderer Or is not satisfied with the entered price or delivery date, the order is canceled and an order is placed with another contractor (wholesaler) TY. Processing can be performed. Note that the flow of processing in the case of reordering repeats the same flow as described above.

その後、工事が完全あるいはほぼ完了し、邸を顧客CUに引き渡す際には、契約の完了に伴って、いわゆる「邸の締め」を行い、この際に、外構工事の原価を算出する。
この「邸の締め」の際には、図9に示すように、営業担当者Tが、第1入出力装置21によりサーバ30にアクセスし(ステップS231)、該当する邸の発注明細画面DTを呼び出し(ステップS232)、制御部213の費用積算部213cにより金額列MOrの積算を行う(ステップS233)。なお、この積算値は、この時点で行うものに限られず、常時、それまで入力された金額の積算値を演算して表示するようにしてもよい。
ここで、外構工事の原価としては、前述のように資材原価と工事原価とが存在するが、本実施の形態1の積算システムは、資材原価を求めるために資材費用データを積算するのに使用する。そして、この得られた積算値を、積算システムの外部の、例えば経理部門に設置された第3入出力装置23などにおいて、工事原価と足し合わせて最終的な外構工事原価を演算するものとし、その詳細な説明は省略する。また、この経理部門の積算において、変換部213bにより、本積算システムで演算された資材原価を、経理部門で用いるデータとして変換するようにしてもよい。
Thereafter, when the work is completely or almost completed and the house is handed over to the customer CU, the so-called “house closing” is performed upon completion of the contract, and the cost of the external work is calculated at this time.
At the time of “closing the house”, as shown in FIG. 9, the salesperson T accesses the server 30 by the first input / output device 21 (step S231), and displays the order details screen DT of the corresponding house. Calling (step S232), the expense column MOr is integrated by the cost integration unit 213c of the control unit 213 (step S233). Note that the integrated value is not limited to that performed at this time, and the integrated value of the amount that has been input so far may be calculated and displayed.
Here, as the cost of the external construction, there are the material cost and the construction cost as described above. However, the integrating system of the first embodiment adds the material cost data to obtain the material cost. use. The final integrated construction cost is calculated by adding the obtained integrated value to the construction cost, for example, at the third input / output device 23 installed in the accounting department outside the integration system. Detailed description thereof will be omitted. In addition, in this accounting department integration, the conversion unit 213b may convert the material cost calculated by the present integration system as data used in the accounting department.

次に、資材の発注、納品、積算の関係について説明を加える。
図10は、発注と納品の一例を示している。図において11月25日は、資材販売業者Deの毎月の営業締め日Sm1とする。発注者Orは、この営業締め日Sm1の前に、3種類の資材SZ1〜SZ6を発注し、2種類の資材SZ1〜SZ5については営業締め日Sm1の前に納品され、資材SZ6は営業締め日Sm1を過ぎて納品されたとする。
このような場合、原価計算の元となる請求書は、資材SZ1〜SZ5については、11月25日の営業締め日Sm1に発行されるが、残りの1種類の資材Sz6については、次の締め日である12月25日に発行されることになる。
Next, a description will be given of the relationship between ordering of materials, delivery, and integration.
FIG. 10 shows an example of ordering and delivery. In the figure, November 25 is the monthly business closing date Sm1 of the material distributor De. The orderer Or orders three types of materials SZ1 to SZ6 before the closing date Sm1, and the two types of materials SZ1 to SZ5 are delivered before the closing date Sm1, and the material SZ6 passes the closing date Sm1. And delivered.
In such a case, invoices that are the basis of cost calculation are issued on the business closing date Sm1 on November 25 for materials SZ1 to SZ5, but the next closing date for the remaining one type of material Sz6 It will be issued on December 25th.

このような状況において、対象となる邸の外構工事が完工し、11月30日に顧客CUに邸を引き渡すのに伴って、この日を邸の締め日Sm2とした場合、従来は、2資材SZ1〜SZ5については請求書に基づいて資材原価として積算されるが、資材SZ6については、請求書の発行日が、翌月の営業締め日となり、邸の締め日Sm2の時点では発注者Orに届いておらず資材原価の漏れとなる可能性が高かった。   In such a situation, when the exterior construction of the target residence has been completed and the residence has been handed over to the customer CU on November 30, when this date is set as the closing date Sm2, the two materials have conventionally been used. SZ1 to SZ5 are accumulated as material costs based on the invoice, but for material SZ6, the invoice issuance date is the closing date of the next month, and it has not reached the ordering party Or at the time of the house closing date Sm2. There was a high possibility of leaking material costs.

それに対して、本実施の形態1では、発注者Orではなく受注者(問屋)TYが、資材原価に関するデータである数量、単価、金額、納品予定日などの応答費用データを、第2入出力装置22を用いて、資材販売業者Deに対して納品予定日を確認した時点(ステップS7)に記入する。このため、納品日が翌月の営業締め日Sm1の後になる資材SZ6についても、邸の締め日Sm2の前に記入されて原価漏れを防止することができる。   On the other hand, in the first embodiment, not the orderer Or but the contractor (wholesaler) TY receives the response cost data such as the quantity, unit price, amount of money, and scheduled delivery date, which is data related to the material cost, in the second input / output Using the device 22, it is filled in when the delivery date is confirmed with respect to the material dealer De (step S 7). For this reason, the material SZ6 whose delivery date is after the business closing date Sm1 of the following month is also entered before the mansion closing date Sm2, thereby preventing cost omission.

また、受注者(問屋)TYが、納品の際に入力するため、発注者Orの営業担当者Tが、納品後に受注者(問屋)TYから送られてきた請求書を見て、入力するのと比較して、転記ミスなどが生じることなく正確に早期に入力することができる。   Further, since the contractor (wholesaler) TY inputs at the time of delivery, the sales person T of the orderer Or sees and inputs the invoice sent from the contractor (wholesaler) TY after delivery. Compared with, it is possible to input accurately and early without causing a transcription mistake or the like.

次に、図10に示すように、「邸の締め」の直前に追加工事が発生した場合について説明する。
このような追加工事が発生した場合も、この追加工事に対して、上述のステップS1〜S11の処理を行う。
この追加工事を行なう場合、まず、営業担当者Tは、工事内容の決定後、見積もりを作成する(ステップS1,S2)。そして、見積もりの内部承認を得て(ステップS3)、その後、顧客CUとの契約が成立すると(ステップS4)、工事に取りかかるために、工程管理画面WSを用いて施工業者Mへの工事の発注を行うとともに、発注明細画面DTを用いて受注者TYに対して工事に必要な資材SZ7の発注を行なう(ステップS5)。
Next, as shown in FIG. 10, a case where an additional work occurs immediately before “house closing” will be described.
Even when such additional work occurs, the above-described steps S1 to S11 are performed for this additional work.
When performing this additional work, first, the sales person T creates an estimate after determining the work contents (steps S1 and S2). Then, when an internal approval of the estimate is obtained (step S3) and then a contract with the customer CU is established (step S4), in order to start the construction, the construction order is ordered from the contractor M using the process management screen WS. At the same time, an order for the material SZ7 necessary for the construction work is made to the contractor TY using the order detail screen DT (step S5).

受注者(問屋)TYは、発注された内容(品目(資材名称および仕様)、資材SZ7の数量、単価、納品希望時)を確認し、施工業者Mに対し、品目、数量に変更が無いか確認する(ステップS6)。   The contractor (wholesaler) TY confirms the contents ordered (item (material name and specification), quantity of the material SZ7, unit price, when delivery is desired), and confirms that there is no change in the item and quantity to the contractor M. Confirm (step S6).

次に、受注者(問屋)TYは、資材販売業者Deに対し、発注予定の資材SZ7についてその数量を納品可能であるか、単価に変更はないか、納品希望日に納品が可能であるかの確認を行い(ステップS7)、その後、資材販売業者Deから、これらの回答を得て、注文した資材SZ7の数量、単価、納品日が確定した時点で、第2入出力装置22を用いて、これらの応答費用データの入力を行う(ステップS8)。   Next, the contractor (wholesaler) TY can deliver the quantity of the material SZ7 to be ordered to the material dealer De, whether the unit price has been changed, or can be delivered on the desired delivery date. (Step S7), and after obtaining these answers from the material distributor De and confirming the quantity, unit price and delivery date of the ordered material SZ7, the second input / output device 22 is used. These response cost data are input (step S8).

この受注者(問屋)TYによる入力が行われたら、発注者Or(営業担当者T)は、承認を行う(ステップS9)。そして、承認が得られたら、受注者(問屋)TYは、資材販
売業者Deに対して発注を行う(ステップS11)。
When the input is made by the contractor (wholesaler) TY, the orderer Or (salesperson T) approves (step S9). When the approval is obtained, the contractor (wholesaler) TY places an order with the material distributor De (step S11).

以上のように、追加工事があった場合も、その対象となる邸に関連付けられた発注明細画面DTに、資材SZ7の名称、型番およびメーカー名、数量、単価が入力される。したがって、後から追加された工事の資材SZ7に関しても、受注者TYが販売業者に発注し、その納品予定日が確定した時点で、邸に正しく関連付けられる。   As described above, even when additional work is performed, the name, model number, manufacturer name, quantity, and unit price of the material SZ7 are input to the ordering details screen DT associated with the target residence. Therefore, the construction material SZ7 added later is correctly associated with the residence when the contractor TY places an order with the seller and the scheduled delivery date is determined.

よって、図10に示す例のように、発注のタイミングが邸の締め日Sm2よりも前の資材SZ7に関する原価データは、従来では「邸の締め」に積算されることはなかったが、本実施の形態1では、納品の確定のタイミングによっては「邸の締め」に積算される可能性もある。   Therefore, as in the example shown in FIG. 10, the cost data regarding the material SZ7 whose ordering timing is earlier than the house closing date Sm2 has not been accumulated in the “house closing” in the past. In the first mode, there is a possibility that the “house closing” may be accumulated depending on the delivery confirmation timing.

また、この追加工事において、邸の締め日Sm2の後に追加工事が実施された場合も、その原価データの記入を、対象となる邸について既に作成されている発注明細画面DTに記入することで、邸に関連付けられるため、追加工事が終わった段階で、邸の施工原価を確認する際には、追加工事の原価を正確に知ることができる。   In addition, in this additional work, even if the additional work is performed after the closing date Sm2, the cost data is entered on the ordering details screen DT already created for the target house. Therefore, when the construction cost of the residence is confirmed at the stage where the additional construction is completed, the cost of the additional construction can be accurately known.

以上のように、本実施の形態1では、以下に列挙する効果を得ることができる。
a)原価管理を行うサーバ30にアクセス可能な第2入出力装置22を受注者(問屋)TYに設置し、受注者TYが請求書を発行するよりも前の時点であるとともに、資材販売業者Deが納品するよりも前の時点であって、資材の実際の価格や最終決定された数量および納品予定日が確定した時点で、受注者TYが、発注明細画面DTに、資材の数量、価格、納品予定日などの応答費用データを入力可能とした。
したがって、従来のように、受注者TYが発行した請求書が届いて、発注者Orが入力するのと比較して、早期に入力可能であるとともに、転記ミスが生じることが無く、入力の手間を削減できかつ資材原価を正確に積算可能となった。
しかも、受注者TYは、ほぼ同時期に各応答費用データの記入が可能であり、発注者Orが請求書に基づいて入力するのと比較して、データを得る期間のバラツキが少なく、入力作業が煩雑になりにくい。
As described above, in the first embodiment, the effects listed below can be obtained.
a) The second input / output device 22 that can access the server 30 that performs cost control is installed in the contractor (wholesaler) TY, and is a point in time before the contractor TY issues the invoice, and the material distributor Prior to De delivery, when the actual price of the material, the final determined quantity, and the scheduled delivery date are confirmed, the contractor TY displays the quantity and price of the material on the order details screen DT. Response cost data such as scheduled delivery date can be entered.
Therefore, as compared with the conventional case where the invoice issued by the contractor TY arrives and the orderer Or inputs it, it is possible to input it at an early stage, and there is no occurrence of a transcription error. And material costs can be accurately estimated.
In addition, the contractor TY can fill in each response cost data almost at the same time, and there is less variation in the period for obtaining the data than the orderer Or inputs based on the invoice. Is less complicated.

b)受注者(問屋)TYが入力した応答費用データについて、営業担当者Tが承認判断を行なうステップを設定したため(ステップS9,S223)、通信回線10を介して外部の受注者TYが費用データを入力するようになっていても、不適正な価格が入力されるのを防止できる。   b) For the response cost data input by the contractor (wholesaler) TY, the sales representative T sets a step for making an approval decision (steps S9 and S223), so that the external contractor TY receives the cost data via the communication line 10. It is possible to prevent an inappropriate price from being input even if the user inputs the.

c)邸の原価を算出するのにあたり、工事の原価とは別個に発注明細画面DTを用いて資材の原価を入力するようにしているため、例えば、施工業者Mが、工事と資材との両方を一括して受けるようにした、いわゆる材工一括処理と比較して、正しく原価を把握することができる。   c) Since the cost of the material is input using the ordering details screen DT separately from the cost of the construction in calculating the cost of the house, for example, the contractor M has both the construction and the material. Compared with the so-called batch processing of materials, which is received in a lump, the cost can be correctly grasped.

d)第1入出力装置21の制御部213に変換部213bを設け、積算システム外の第3入出力装置23で作成された見積書のデータを、発注明細画面DTの各記入列に自動的に変換して入力するようにしたため、営業担当者Tが、見積書に記載されたデータを手打ちで入力する必要が無くなり、入力作業性に優れる。   d) The conversion unit 213b is provided in the control unit 213 of the first input / output device 21 so that the estimate data created by the third input / output device 23 outside the integrating system is automatically displayed in each entry column of the ordering details screen DT. Therefore, it is not necessary for the sales representative T to manually input the data described in the estimate, and the input workability is excellent.

e)工程管理画面WSにより、施工業者Mと、工事期間とを管理するようにしたため、同じ工期に、同一の施工業者Mに間違えて発注するミスを防止できる。   e) Since the contractor M and the construction period are managed on the process management screen WS, mistakes in ordering the same contractor M during the same construction period can be prevented.

以上、本発明の実施の形態について説明したが、本発明はこうした実施の形態に限定されるものではなく、本発明の要旨を逸脱しない範囲内において種々の変形および置換を加えることができる。   As mentioned above, although embodiment of this invention was described, this invention is not limited to such embodiment, A various deformation | transformation and substitution can be added in the range which does not deviate from the summary of this invention.

例えば、実施の形態では、工事単位として、「邸」を示したが、これに限定されず、例えば、住宅建築以外の建設工事に適用した場合、その建設対象(例えば、ビル、橋、道路)を工事単位としてもよい。
さらに、発注者を住宅建築販売業者の外構部門とし、外構工事の原価を求める場合を例としてあげたが、発注者および原価計算の対象はこれに限定されない。例えば、発注者を住宅建築販売業者とし、住宅の建築にかかる費用全般の原価を積算するのに用いてもよい。あるいは、実施の形態で示した、発注者を施工業者Mとし、例えば、材工一括発注を受けた場合の、資材に関する原価を求めるのに使用してもよい。あるいは、工程管理画面WSに、さらに工事費用を、受注者としての施工業者が入力し、発注者側でこれを積算するようにしてもよい。
For example, in the embodiment, “house” is shown as a construction unit. However, the present invention is not limited to this. For example, when applied to construction work other than residential construction, the construction target (for example, building, bridge, road) May be used as a construction unit.
Furthermore, although the case where the orderer is the external department of the home construction dealer and the cost of the external work is calculated has been taken as an example, the orderer and the object of cost calculation are not limited to this. For example, the orderer may be a home construction dealer and may be used to add up the overall cost of the construction of the house. Alternatively, the orderer shown in the embodiment may be a contractor M, and may be used to obtain a cost related to materials when, for example, a material construction batch order is received. Alternatively, the construction contractor as the contractor may further input the construction cost on the process management screen WS, and the orderer may add the cost.

また、実施の形態では、発注者側が、発注明細画面において、第1入出力装置により記入された資材に関するデータ(数量、単価、納品希望日など)に対し、受注者が第2入出力装置により原価データを記入した場合、数量、単価、納品予定日などは、上書きされるようにした例を示したが、これに限定されず、発注者が記入した発注費用データと、受注者が記入した応答費用データとを、併記するようにしてもよい。
さらに、本発明のシステムを利用して、第2入出力装置で入力した応答費用データをそのまま請求書として出力可能としてもよい。その場合、従来と比較して、応答費用データの入力の手間を、請求書の入力の手間に完全に転嫁でき、トータルの手間を削減できる。
Also, in the embodiment, the orderer side uses the second input / output device for the data related to the material (quantity, unit price, desired delivery date, etc.) entered by the first input / output device on the order detail screen. In the case of entering cost data, the example shows that the quantity, unit price, scheduled delivery date, etc. are overwritten. However, the present invention is not limited to this. Order cost data entered by the orderer and the orderer entered it. You may make it write together response cost data.
Further, the response cost data input from the second input / output device may be output as a bill as it is by using the system of the present invention. In that case, compared with the conventional method, the effort of inputting the response cost data can be completely transferred to the trouble of inputting the bill, and the total labor can be reduced.

10 通信回線
21 第1入出力装置
22 第2入出力装置
31 費用管理部
31a 保存部
213a(第1の)記入制御部
213c費用積算部
223a(第2の)記入制御部
AMr 数量列(記入欄)
DLr 納品日列(記入欄)
DT 発注明細画面
MOr 金額列(記入欄)
Odr 発注日列
SYr 仕様列(記入欄)
SZr 資材名称列(記入欄)
TY 受注者
UPr 単価列(記入欄)
10 communication line 21 first input / output device 22 second input / output device 31 cost management unit 31a storage unit 213a (first) entry control unit 213c cost integration unit 223a (second) entry control unit AMr quantity column (entry column) )
DLr delivery date column (entry field)
DT order details screen MOr Amount of money (entry field)
Odr order date column SYr specification column (entry field)
SZr material name column (entry field)
TY Contractor UPr unit price column (entry field)

Claims (5)

積算対象である建設工事に必要な資材に関する費用データを、設定された工事単位に関連付けて保存する費用管理部と、
この費用管理部に通信回線を介してアクセス可能であり、前記積算対象を発注する発注者に設置された第1入出力装置と、
前記費用管理部に前記通信回線を介してアクセス可能であり、前記積算対象の発注を受ける受注者に設置された第2入出力装置と、
を備え、
前記費用管理部は、前記費用データを保存する保存部を備え、
前記第1入出力装置は、前記工事単位ごとに設定されて前記費用データを記入するための発注明細画面を表示するとともに、前記第1入出力装置により前記発注明細画面の記入欄に記入された前記発注者が発注する前記費用データである発注費用データを、前記通信回線を介して前記保存部に保存する第1の費用データ保存処理を行なう第1の記入制御部を備え、
前記第2入出力装置は、前記費用管理部にアクセスして、前記発注明細画面を表示させて前記発注費用データを表示する発注表示処理と、前記発注に応答して決定された前記費用データであって前記資材の金額、納品予定日を含む応答費用データを前記納品予定日が確定された時点で記入するための記入欄を有した前記発注明細画面において前記記入欄に前記応答費用データが記入された際に、前記応答費用データを前記保存部に保存させる第2の費用データ保存処理を実行する第2の記入制御部を備え、
前記第1入出力装置は、前記保存部に保存された前記応答費用データの金額を、前記工事単位に関連付けて積算して表示する費用積算部を備えていることを特徴とする積算システム。
A cost management unit that stores cost data related to materials necessary for construction work to be accumulated in association with a set construction unit;
A first input / output device that is accessible to the cost management unit via a communication line and is installed in an orderer who orders the accumulation target;
A second input / output device that is accessible to the cost management unit via the communication line and is installed in a contractor who receives an order for the accumulation;
With
The cost management unit includes a storage unit that stores the cost data.
The first input / output device displays an order detail screen for entering the cost data set for each construction unit, and is filled in the entry field of the order detail screen by the first input / output device. A first entry control unit that performs a first cost data storage process for storing order cost data, which is the cost data ordered by the orderer, in the storage unit via the communication line;
The second input / output device accesses the cost management unit, displays the order detail screen and displays the order cost data, and the cost data determined in response to the order. The response cost data is entered in the entry field in the order details screen having an entry field for filling the response cost data including the amount of the material and the scheduled delivery date when the scheduled delivery date is confirmed. A second entry control unit for executing a second cost data storage process for storing the response cost data in the storage unit when
The first input / output device includes an expense accumulating unit that accumulates and displays the amount of the response cost data stored in the storage unit in association with the construction unit.
前記受注者は、前記資材調達のために資材販売業者に発注する問屋であり、
前記費用管理部は、前記費用データを、前記工事単位としての1軒の邸ごとに関連付けて保存し、
前記費用積算部は、前記保存部に保存された納品数量および納品価格を含む応答費用データを前記邸に関連付けて積算して表示することを特徴とする請求項1に記載の積算システム。
The contractor is a wholesaler who places an order with a material distributor for the material procurement,
The cost management unit stores the cost data in association with each house as the construction unit,
The accumulation system according to claim 1, wherein the cost accumulation unit accumulates and displays response cost data including a delivery quantity and a delivery price stored in the storage unit in association with the residence.
前記第1入出力装置は、顧客との契約のためにシステム外で作成された工事見積書に記載された前記費用データを、前記発注明細画面の前記記入欄に前記発注費用データとして変換して入力する変換部を備えていることを特徴とする請求項2に記載の積算システム。   The first input / output device converts the cost data described in a construction estimate prepared outside the system for a contract with a customer into the entry column of the order details screen as the order cost data. The integrating system according to claim 2, further comprising a conversion unit for inputting. 前記第1入出力装置の制御部は、前記発注者が前記第2入出力装置により記入された前記応答費用データが適正であると判断したことを受けて、前記第2入出力装置に向けて納品を許可することを伝える承認処理を実行することを特徴とする請求項2または請求項3に記載の積算システム。   The control unit of the first input / output device is directed to the second input / output device when the orderer determines that the response cost data entered by the second input / output device is appropriate. 4. The accumulating system according to claim 2, wherein an approval process is performed to notify that delivery is permitted. 前記第1の記入制御部は、施工業者および工期の記入欄を有した工程管理画面を表示するとともに、この工程管理画面に記入された前記施工業者および前記工期を、前記保存部に保存する処理を実行することを特徴とする請求項2〜請求項4のいずれか1項に記載の積算システム。   The first entry control unit displays a process management screen having a contractor and construction period entry field, and stores the construction contractor and the construction period entered in the process management screen in the storage unit. The integration system according to any one of claims 2 to 4, wherein the integration system is executed.
JP2011226332A 2011-10-14 2011-10-14 Integration system Active JP5552103B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011226332A JP5552103B2 (en) 2011-10-14 2011-10-14 Integration system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011226332A JP5552103B2 (en) 2011-10-14 2011-10-14 Integration system

Related Parent Applications (1)

Application Number Title Priority Date Filing Date
JP2011026728A Division JP4850310B1 (en) 2011-02-10 2011-02-10 Integration system

Publications (2)

Publication Number Publication Date
JP2012168923A true JP2012168923A (en) 2012-09-06
JP5552103B2 JP5552103B2 (en) 2014-07-16

Family

ID=46972982

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011226332A Active JP5552103B2 (en) 2011-10-14 2011-10-14 Integration system

Country Status (1)

Country Link
JP (1) JP5552103B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017174419A (en) * 2016-03-22 2017-09-28 株式会社オービック Accounting processing apparatus, accounting processing method, and accounting processing program

Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1139389A (en) * 1997-07-24 1999-02-12 Ohbayashi Corp Electronic purchase system
JP2001188813A (en) * 1999-12-28 2001-07-10 Asahi Kasei Corp Method and system for ordering house material
JP2002150175A (en) * 2000-11-06 2002-05-24 Nikkei Engineering Kk Order receiving and placing method
JP2002167966A (en) * 2000-11-30 2002-06-11 Ibiken Kk Process control support system, computer readable storage medium for the process control support program
JP2002244896A (en) * 2001-02-19 2002-08-30 Fujitsu Ltd Translation program, translation method and translation system
JP2002342620A (en) * 2001-05-14 2002-11-29 Koichiro Hirata Support system for order receiving and ordering for house construction material operated by utilizing internet
JP2003016119A (en) * 2001-06-29 2003-01-17 Oki Electric Ind Co Ltd System for procuring member
JP2003036377A (en) * 2001-07-24 2003-02-07 Dainippon Screen Mfg Co Ltd Electoronic procurement and dealing method
JP2003288507A (en) * 2002-03-28 2003-10-10 Sanyo Electric Co Ltd Automatic article ordering system
JP2004164045A (en) * 2002-11-11 2004-06-10 Hitachi Ltd Material order management system and method thereof
JP2005011106A (en) * 2003-06-19 2005-01-13 Taisei Corp Procurement management system
JP2005267488A (en) * 2004-03-22 2005-09-29 Asahi Kasei Homes Kk Process management system
JP2007179321A (en) * 2005-12-28 2007-07-12 Takeshi Nakagawa Market system and its method

Patent Citations (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH1139389A (en) * 1997-07-24 1999-02-12 Ohbayashi Corp Electronic purchase system
JP2001188813A (en) * 1999-12-28 2001-07-10 Asahi Kasei Corp Method and system for ordering house material
JP2002150175A (en) * 2000-11-06 2002-05-24 Nikkei Engineering Kk Order receiving and placing method
JP2002167966A (en) * 2000-11-30 2002-06-11 Ibiken Kk Process control support system, computer readable storage medium for the process control support program
JP2002244896A (en) * 2001-02-19 2002-08-30 Fujitsu Ltd Translation program, translation method and translation system
JP2002342620A (en) * 2001-05-14 2002-11-29 Koichiro Hirata Support system for order receiving and ordering for house construction material operated by utilizing internet
JP2003016119A (en) * 2001-06-29 2003-01-17 Oki Electric Ind Co Ltd System for procuring member
JP2003036377A (en) * 2001-07-24 2003-02-07 Dainippon Screen Mfg Co Ltd Electoronic procurement and dealing method
JP2003288507A (en) * 2002-03-28 2003-10-10 Sanyo Electric Co Ltd Automatic article ordering system
JP2004164045A (en) * 2002-11-11 2004-06-10 Hitachi Ltd Material order management system and method thereof
JP2005011106A (en) * 2003-06-19 2005-01-13 Taisei Corp Procurement management system
JP2005267488A (en) * 2004-03-22 2005-09-29 Asahi Kasei Homes Kk Process management system
JP2007179321A (en) * 2005-12-28 2007-07-12 Takeshi Nakagawa Market system and its method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2017174419A (en) * 2016-03-22 2017-09-28 株式会社オービック Accounting processing apparatus, accounting processing method, and accounting processing program
JP2021073630A (en) * 2016-03-22 2021-05-13 株式会社オービック Accounting processing apparatus, accounting processing method, and accounting processing program
JP7093434B2 (en) 2016-03-22 2022-06-29 株式会社オービック Accounting equipment, accounting methods, and accounting programs

Also Published As

Publication number Publication date
JP5552103B2 (en) 2014-07-16

Similar Documents

Publication Publication Date Title
KR102280362B1 (en) System and method for interior mediation
US20070050230A1 (en) Computer facilitated ordering, tracking, and reporting system
KR20140005452U (en) Online order system on the mount funiture and intergrated management method
US20120116983A1 (en) System and method for real estate inventory management
JP2006277362A (en) Lunch order system, method, and program
JP5552103B2 (en) Integration system
US20200372984A1 (en) Methods and systems for providing improved mechanism for updating healthcare information systems
US20140095262A1 (en) Sales system and business method including computer apparatus and product for and method of determining price
JP4850310B1 (en) Integration system
KR101715814B1 (en) Method Of Directly Purchasing An Electronic Book
KR101261982B1 (en) System and method for trading sales information using open market
JP2019008488A (en) Computer system for offering service associated with condominium, and method and program implemented in that computer system
US20080126142A1 (en) Promotional in-store demonstration coordination system and method
US20210390493A1 (en) Intelligent work performance transaction engine
JP2009087198A (en) Evaluation system and method
JP2019211956A (en) Unit price estimation device, unit price estimation method, and unit price estimation program
JP7461683B1 (en) Maintenance record book management system, server device, maintenance record book management method, and program
JP2018045379A (en) Transaction mediation device, transaction mediation method, and computer program
JP7223452B2 (en) Information processing system, information processing method, and program
TWM549916U (en) Electronic equipment procurement platform
JP6720457B2 (en) In-house management system
JP2001344440A (en) System and method for network order of home elevator
JP6966210B2 (en) Lifetime Profit and Loss Management Device, Lifetime Profit and Loss Management Method, and Lifetime Profit and Loss Management Program
JP2005302003A (en) Real estate dealing mediation processing system, real estate dealing mediation processing method
JP6637729B2 (en) Program, system and information processing device

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20131004

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20140422

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140430

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140523

R151 Written notification of patent or utility model registration

Ref document number: 5552103

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R151