JP2012167510A - Jig for fixing seismic isolation baseplate and fixing method - Google Patents

Jig for fixing seismic isolation baseplate and fixing method Download PDF

Info

Publication number
JP2012167510A
JP2012167510A JP2011030673A JP2011030673A JP2012167510A JP 2012167510 A JP2012167510 A JP 2012167510A JP 2011030673 A JP2011030673 A JP 2011030673A JP 2011030673 A JP2011030673 A JP 2011030673A JP 2012167510 A JP2012167510 A JP 2012167510A
Authority
JP
Japan
Prior art keywords
base plate
seismic isolation
baseplate
jig
base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2011030673A
Other languages
Japanese (ja)
Other versions
JP5706182B2 (en
Inventor
Kenji Yoshida
建司 吉田
Hajime Ichimura
元 市村
Yuji Katada
祐二 片田
Yasuaki Maruhashi
靖明 丸橋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Toda Corp
Original Assignee
Toda Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Toda Corp filed Critical Toda Corp
Priority to JP2011030673A priority Critical patent/JP5706182B2/en
Publication of JP2012167510A publication Critical patent/JP2012167510A/en
Application granted granted Critical
Publication of JP5706182B2 publication Critical patent/JP5706182B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a jig for fixing a seismic isolation baseplate, capable of positioning the baseplate in a period after placing concrete and before curing the concrete, which has not been achieved with conventional jigs for fixing the seismic isolation baseplate.SOLUTION: A jig 1 for fixing a seismic isolation baseplate which allows a portal body 4 striding over the baseplate 14 to suspend the baseplate 14, enables the vertical (z) direction and the right-left (x) direction to be adjusted with a suspending bolt 5 which suspends the baseplate 14 from a beam 2 of the portal body 4, and enables the front-rear (y) direction to be adjusted at a lower part of a column 3 of the portal body 4.

Description

本発明は、免震装置を建物の基礎に取り付ける際に、ベースプレートをコンクリート硬化まで位置調整可能にする免震ベースプレート取付治具と免震ベースプレートの取付方法に関するものである。   The present invention relates to a base-isolated base plate mounting jig and a base-isolated base plate mounting method that can adjust the position of a base plate until the concrete is hardened when mounting the base isolation device to the foundation of a building.

従来、免震装置を建物に設置する場合、図5に示すように、建物の基礎上に耐圧スラブの配筋を施工し、ベースプレート用のアンカーを打ち込んでそのアンカーの高さを調整してベースプレート14を取付け、その後、前記ベースプレート14の周囲に図中の破線で示す型枠15を組み込み、その型枠15内に先行コンクリートをポンプ圧送装置で打設する。このようなベースプレート14の免震基礎構築におけるコンクリート充填方法が特許文献1に記載されて公知となって知られている。   Conventionally, when installing a seismic isolation device in a building, as shown in FIG. 5, a base plate is constructed by installing a pressure slab reinforcement on the foundation of the building, driving an anchor for the base plate, and adjusting the height of the anchor. 14, and then, a mold 15 shown by a broken line in the drawing is assembled around the base plate 14, and the preceding concrete is placed in the mold 15 by a pumping device. A concrete filling method in such a base-isolated base construction of the base plate 14 is described in Patent Document 1 and is known.

特開2010−127035号公報JP 2010-127035 A

しかし、図5に示すように、従来の免震ベースプレート取付治具は、基礎スラブ11に打ち込んだアンカー12と鉄筋棒13等とを溶接して固定し、この鉄筋棒13とベースプレート14のアンカー14aとを溶接して固定している。よって、ベースプレート14のセット時は当該ベースプレートのレベル調整は容易であるが、溶接して固定完了した後のベースプレート14のレベル調整は、X,Y,Z方向の3方向とも不可能である。コンクリート打設に伴うベースプレートの位置に変位があった場合に、前記ベースプレート14を適宜に対応させることができないという課題がある。本発明に係る免震ベースプレート取付治具は、このような課題を解決するために提案されたものである。   However, as shown in FIG. 5, the conventional base-isolated base plate mounting jig welds and fixes the anchor 12 driven into the foundation slab 11 and the reinforcing bar 13, and the anchor 14 a of the reinforcing bar 13 and the base plate 14. And are fixed by welding. Therefore, when the base plate 14 is set, it is easy to adjust the level of the base plate. However, the level adjustment of the base plate 14 after welding and fixing is impossible in the three directions of the X, Y, and Z directions. There is a problem that the base plate 14 cannot be appropriately handled when the position of the base plate is displaced due to the concrete placement. The seismic isolation base plate mounting jig according to the present invention has been proposed in order to solve such problems.

本発明に係る免震ベースプレート取付治具の上記課題を解決して目的を達成するための要旨は、免震装置のベースプレートを位置決めする治具であって、前記ベースプレートの上を跨いで門型筐体で前記ベースプレートを吊持し、前記門型筐体の梁から前記ベースプレートを吊持する吊持ボルトによって上下のZ方向と左右のX方向の調整が可能にされ、前記門型筐体における支柱の下部で前後のY方向の調整が可能であることである。   The gist for solving the above-mentioned problems of the seismic isolation base plate mounting jig according to the present invention is to provide a jig for positioning the base plate of the seismic isolation device, straddling the base plate. The base plate is suspended by a body, and the vertical bolt and the horizontal X direction can be adjusted by a suspension bolt that suspends the base plate from a beam of the gate-shaped housing. It is possible to adjust the front and rear in the Y direction at the lower part of.

前記梁は、コ字型チャンネルバーを背中合わせに適宜間隙をおいて背向させてなり、前記間隙に吊持ボルトが上下方向に挿通され、該吊持ボルトの上部に調整ナットが螺合されていること、;
前記門型筐体は、一つのベースプレートに対して1対装備され、この一対の支柱においてY方向の調整が可能であること、;
を含むものである。
The beam has a U-shaped channel bar turned back to back with an appropriate gap, and a suspension bolt is inserted vertically into the gap, and an adjustment nut is screwed onto the suspension bolt. Being;
A pair of the gate-type housings are provided for one base plate, and Y-direction adjustment is possible with the pair of support columns;
Is included.

本発明に係る免震ベースプレートの取付方法の上記課題を解決して目的を達成するための要旨は、前記本発明に係る免震ベースプレート取付治具を使用して、免震ベースプレートを門型筐体で吊持しながら免震基礎のコンクリートを免震基礎用型枠内に打設し、その打設したコンクリートが硬化する前において前記免震ベースプレートの前後,左右,上下の3方向の位置調整をすることである。   The gist for solving the above-described problems of the method of mounting the base isolation base plate according to the present invention is to achieve the purpose by using the base isolation base plate mounting jig according to the present invention and attaching the base isolation base plate to the portal housing. The concrete of the base isolation base is placed in the base isolation base form while being suspended at the base, and the position of the base isolation base plate in the front, rear, left and right is adjusted before the cast concrete is cured. It is to be.

本発明の免震ベースプレート取付治具によれば、ベースプレートの下にコンクリートを打設した後で該コンクリートの硬化する前であれば、容易に左右(X),前後(Y),上下(Z)の3方向にベースプレートの位置を微調整させることができると言う優れた効果を奏するものである。
前記取付治具を形成するときに、コ字型チャンネルバーを背中合わせに適宜間隙をおいて背向させることで、吊持ボルトによる前後、上下の2方向の位置調整が容易にできるようになる。1対の門型筐体により、治具を容易に形成することができる。
According to the seismic isolation base plate mounting jig of the present invention, the concrete can be easily left and right (X), front and back (Y), and top and bottom (Z) after the concrete is placed under the base plate and before the concrete is hardened. This produces an excellent effect that the position of the base plate can be finely adjusted in the three directions.
When the mounting jig is formed, the U-shaped channel bar is turned back to back with an appropriate gap, so that it is possible to easily adjust the position in two directions, front and rear, and up and down by the suspension bolt. A jig can be easily formed by a pair of portal housings.

本発明に係る取付方法によれば、前記免震ベースプレート取付治具により、打設したコンクリートが硬化する前において前記免震ベースプレートの前後,左右,上下の3方向の位置調整が可能となる。   According to the mounting method according to the present invention, the seismic isolation base plate mounting jig can adjust the position of the seismic isolation base plate in three directions, front, rear, left and right, before the placed concrete is hardened.

本発明に係る免震ベースプレート取付治具1を基礎スラブ11上に設置した状態の正面図である。It is a front view of the state which installed seismic isolation baseplate attachment jig 1 concerning the present invention on foundation slab 11. FIG. 同本発明の免震ベースプレート取付治具1を、図1におけるA−A線視した平面図である。It is the top view which looked at the seismic isolation baseplate attachment jig 1 of the same invention in the AA line in FIG. 同本発明の免震ベースプレート取付治具1における支柱3の正面図(A)とB−B線に沿った断面図(B)とである。It is the front view (A) of the support | pillar 3 in the seismic isolation baseplate attachment jig 1 of the same invention, and sectional drawing (B) along the BB line. 本発明の免震ベースプレート取付治具1によるベースプレート14の設置工程を順に示す説明図(A),(B),(C)である。It is explanatory drawing (A), (B), (C) which shows the installation process of the baseplate 14 by the seismic isolation baseplate attachment jig 1 of this invention in order. 同従来例に係るベースプレート取付治具による、ベースプレート14を基礎スラブ11上に設置し固定した状態の正面図である。It is a front view of the state which installed and fixed the base plate 14 on the basic | foundation slab 11 by the base plate attachment jig concerning the prior art example.

本発明に係る免震ベースプレート取付治具1は、図1に示すように、門型筐体4を形成してベースプレート14を上から吊持するようにしたものである。   As shown in FIG. 1, the seismic isolation base plate mounting jig 1 according to the present invention forms a portal housing 4 and suspends a base plate 14 from above.

本発明に係る免震ベースプレート取付治具1は、図1に示すように、免震装置のベースプレート14を位置決めする治具であって、前記ベースプレート14の上を跨いで門型筐体4で前記ベースプレート14を吊持し、前記門型筐体4を構成する梁2から前記ベースプレート14を吊持する吊持ボルト5によって上下のZ方向と左右のX方向の調整が可能にされ、前記門型筐体4を構成する両側の支柱3のそれぞれの下部で前後のY方向の調整が可能である。   As shown in FIG. 1, the seismic isolation base plate mounting jig 1 according to the present invention is a jig for positioning the base plate 14 of the seismic isolation device. The base plate 14 is suspended, and the vertical bolts 5 and the left and right X directions can be adjusted by the suspension bolts 5 that suspend the base plate 14 from the beams 2 constituting the portal housing 4. Front and rear Y-direction adjustments are possible at the lower portions of the support columns 3 on both sides of the housing 4.

前記門型筐体4における梁2は、鋼製コ字型チャンネルバー2a,2aを背中合わせに適宜間隙6をおいて背向させてなり、該コ字型チャンネルバー2aの長手方向の端部で連結ブラケット7によって固定されている。なお、梁2の断面形状は、上記コ字型に限らず、L字型等でもよい。   The beam 2 in the gate-shaped housing 4 is formed by turning steel U-shaped channel bars 2a, 2a back to back with a gap 6 as appropriate, and at the end in the longitudinal direction of the U-shaped channel bar 2a. It is fixed by a connecting bracket 7. The cross-sectional shape of the beam 2 is not limited to the U-shape, but may be an L-shape.

図1乃至図2に示すように、前記間隙6に、全ネジタイプの吊持ボルト5が上下方向に挿通され、該吊持ボルト5の上部に調整ナット8と、下側に定着ナット9とが螺合されている。ナット10は、ベースプレート14に吊持ボルト5を螺着させた後の固定ナットである。この吊持ボルト5は、前記調整ナット8で上下方向の調整を行い、定着ナット9でその位置に定着させるものである。なお、X方向の位置は、予め間隙6の間を前記吊持ボルト5をベースプレート14とともに移動させるものである。   As shown in FIGS. 1 and 2, a full screw type suspension bolt 5 is vertically inserted into the gap 6, an adjustment nut 8 is provided above the suspension bolt 5, and a fixing nut 9 is provided below the suspension bolt 5. Are screwed together. The nut 10 is a fixing nut after the suspension bolt 5 is screwed onto the base plate 14. The suspension bolt 5 is adjusted in the vertical direction by the adjusting nut 8 and fixed at the position by the fixing nut 9. Note that the position in the X direction is a position where the suspension bolt 5 is moved together with the base plate 14 between the gaps 6 in advance.

前記門型筐体4は、一つのベースプレート14に対して1対装備され、この一対の支柱3においてY方向の調整が可能である。この支柱3は、図3(A),(B)に示すように、断面コ字型の鋼製チャンネルバーであり、前記梁2とは前記連結ブラケット7の基部7aを介してプレート16によってボルト21及びナット21aで固定され、下部は、プレート17が設けられ、基礎スラブ11に打ち込まれたアンカー18aにネジ止めされるボルト18によって位置固定される。   A pair of the gate-shaped housings 4 are provided for one base plate 14, and the pair of support columns 3 can be adjusted in the Y direction. As shown in FIGS. 3A and 3B, the column 3 is a steel channel bar having a U-shaped cross section, and the beam 2 is bolted by a plate 16 via a base portion 7a of the connection bracket 7. 21 and a nut 21a, and a lower portion is provided with a plate 17 and is fixed in position by a bolt 18 screwed to an anchor 18a driven into the foundation slab 11.

前記プレート17の中央部には、図3(B),(C)に示すように、ネジ孔17bが設けられ、このネジ孔17bにレベル調整ボルト19が貫通して螺着される。レベル調整ボルト19と定着ナット19aで高さ(Z方向)が調整される。このレベル調整ボルト19の下に、ボルトが基礎スラブ11にめり込まないように調整用プレート20が敷設してある。また、Y方向の位置調整には、前記プレート17におけるボルト18挿通用の長孔17aがY方向に長孔となっていて、Y方向へ調整できるようになっている。   As shown in FIGS. 3B and 3C, a screw hole 17b is provided in the center of the plate 17, and a level adjusting bolt 19 is threaded through the screw hole 17b. The height (Z direction) is adjusted by the level adjusting bolt 19 and the fixing nut 19a. An adjustment plate 20 is laid under the level adjustment bolt 19 so that the bolt does not sink into the foundation slab 11. Further, for the position adjustment in the Y direction, a long hole 17a for inserting the bolt 18 in the plate 17 is a long hole in the Y direction so that it can be adjusted in the Y direction.

本発明に係る免震ベースプレート取付治具1は、1対の門型筐体4,4を使用するので、これらを長手方向の端部位置で鋼製バーで溶接・固定して一体に連結して、井桁状に構成しても良い。   Since the seismic isolation base plate mounting jig 1 according to the present invention uses a pair of gate-shaped housings 4 and 4, these are welded and fixed with a steel bar at the end position in the longitudinal direction and integrally connected. In addition, it may be configured in a cross-beam shape.

本発明に係る免震ベースプレート取付治具1の使用方法は、図1に示すように、木製等の介い物15aの上にベースプレート14を載置し、図1及び図2に示すように、アンカー18aを基礎スラブ11へ所定の位置に打ち込む。門型筐体4,4を前記ベースプレート14に跨らせて、ボルト18をプレート17の長孔17aに挿通させて前記アンカー18aにねじ込み取り付けることで、当該門型筐体4,4を起立させる。   As shown in FIG. 1, a base plate 14 is placed on a wooden object 15a as shown in FIG. Anchor 18a is driven into base slab 11 at a predetermined position. The portal housings 4 and 4 are straddled over the base plate 14, and bolts 18 are inserted into the long holes 17 a of the plate 17 and screwed into the anchors 18 a to attach the portal housings 4 and 4. .

そして、前記門型筐体4における間隙6に吊持ボルト15を挿通させる。この吊持ボルト5には、予めナット9,10を装着しておく。前記吊持ボルト5の下端部をベースプレート14のアンカー14aにおけるメネジ部14bに螺着する。   Then, the suspension bolt 15 is inserted through the gap 6 in the portal housing 4. Nuts 9 and 10 are attached to the suspension bolt 5 in advance. The lower end portion of the suspension bolt 5 is screwed to the female screw portion 14 b of the anchor 14 a of the base plate 14.

前記ナット10をベースプレート14に向かって締め込む。前記吊持ボルト5の上部に調整ナット8を装着させて、ベースプレート14の左右(X方向)の位置を合わせるとともに、前記調整ナット8でベースプレート14の下面の位置を免震基礎上端の位置に合わせる。前記ナット9を梁2に向かって締め込む。こうして、ベースプレート14の位置決めがなされた後に、前記介い物15aを撤去する。   The nut 10 is tightened toward the base plate 14. An adjustment nut 8 is attached to the upper part of the suspension bolt 5 to align the left and right (X direction) positions of the base plate 14, and the position of the lower surface of the base plate 14 is adjusted to the position of the upper end of the base isolation base with the adjustment nut 8. . The nut 9 is tightened toward the beam 2. Thus, after the base plate 14 is positioned, the interposition 15a is removed.

前記門型筐体4の支柱3におけるレベル調整ボルト19をネジ孔17bに装着して締め込み、その先端が調整用プレート20上面に当たったところで、定着ナット19aを締め込んで定着させ、更に、ボルト18を締め込んで、ベースプレート14の上下方向(Z)の位置決めをする。また、前後方向(Y)の位置調整を、図3(B),(C)に示すように、長孔17aによって門型筐体4を移動させて前記ボルト18を締め込んで行う。   The level adjustment bolt 19 in the column 3 of the portal housing 4 is attached to the screw hole 17b and tightened. When the tip of the level adjustment bolt 19 hits the upper surface of the adjustment plate 20, the fixing nut 19a is tightened and fixed. The bolt 18 is tightened to position the base plate 14 in the vertical direction (Z). Further, as shown in FIGS. 3B and 3C, the position adjustment in the front-rear direction (Y) is performed by moving the portal casing 4 through the long holes 17a and tightening the bolts 18.

こうして、図4(A)に示すように、ベースプレート14がX,Y,Z方向にそれぞれ位置決めされ、且つ、門型筐体4,4によって宙に浮いた状態で吊持される。その後、免震基礎部の配筋を完了させてその周囲を型枠15で囲う。そして、図4(B),(C)に示す手順でコンクリートを打設する。前記打設するコンクリートに気泡などが混入しないようにホッパー16aを使用してコンクリートを打設する場合には、図2に示すベースプレート14の中央の打設孔14bから流し込んで、オーバーフローさせるものである。   In this way, as shown in FIG. 4A, the base plate 14 is positioned in the X, Y, and Z directions, respectively, and is suspended in a suspended state by the portal housings 4 and 4. After that, the reinforcement of the seismic isolation base is completed and the periphery is surrounded by the mold 15. And concrete is laid in the procedure shown in Drawing 4 (B) and (C). When the concrete is placed using the hopper 16a so that air bubbles and the like are not mixed into the concrete to be placed, the concrete is poured from the center placement hole 14b of the base plate 14 shown in FIG. .

そして、前記型枠15内に打設したコンクリートがまだ硬化しないうちに、ベースプレート位置の計測を行い、前記ベースプレート14の位置調整が必要になった場合には、前記調整ナット8とレベル調整ボルト19と、ボルト18とで、左右(X),前後(Y),上下(Z)方向の位置調整を行う。   Then, the base plate position is measured before the concrete placed in the mold 15 is not yet hardened. If the position of the base plate 14 needs to be adjusted, the adjusting nut 8 and the level adjusting bolt 19 are used. And the position of the left-right (X), front-back (Y), and up-down (Z) directions is adjusted with the bolt 18.

左右(X)方向の調整は、ナット9を弛めて行い、前後(Y)方向には、ボルト18を弛めて行う。上下(Z)方向には、吊持ボルト5と調整ナット8及び定着ナット9とで行う場合と、レベル調整ボルト19及び定着ナット19aで行う場合との2通りがある。適宜にいずれか一方若しくは両方を調整して行う。このように、免震基礎用のコンクリートを打設した後でも、当該コンクリートの硬化前であれば、ベースプレート14の位置調整ができるようになったものである。   Adjustment in the left / right (X) direction is performed by loosening the nut 9 and loosening the bolt 18 in the front / rear (Y) direction. In the vertical (Z) direction, there are two cases, that is, the case of using the suspension bolt 5, the adjusting nut 8 and the fixing nut 9, and the case of using the level adjusting bolt 19 and the fixing nut 19a. Adjust either one or both as appropriate. As described above, even after the concrete for base isolation is placed, the position of the base plate 14 can be adjusted before the concrete is hardened.

本発明に係る免震ベースプレート取付治具1は、適宜大きさの吊持用治具として広く適用することができる。   The seismic isolation base plate mounting jig 1 according to the present invention can be widely applied as an appropriately sized lifting jig.

1 免震ベースプレート取付治具、
2 梁、
2a コ字型チャンネルバー、
3 支柱、
4 門型筐体、
5 吊持ボルト、
6 間隙、
7 連結ブラケット、 7a 基部、
8 調整ナット、
9 定着ナット、
10 ナット、
11 基礎スラブ、
12 アンカー、
13 鉄筋棒、
14 ベースプレート、
14a アンカー、 14b メネジ部、
15 型枠、 15a 介い物、
16 プレート、 16a ホッパー、
17 プレート、 17a 長孔
18 ボルト、 18a アンカー、
19 レベル調整ボルト、 19a 定着ナット、
20 調整用プレート、
21 ボルト、 21a ナット。
1 Seismic isolation base plate mounting jig,
2 beams,
2a U-shaped channel bar,
3 struts,
4 portal housing,
5 Suspension bolt,
6 gap,
7 Connecting bracket, 7a Base,
8 Adjustment nut,
9 Fixing nut,
10 nuts,
11 Basic slab,
12 anchors,
13 Rebar,
14 base plate,
14a anchor, 14b female thread part,
15 formwork, 15a
16 plates, 16a hopper,
17 plate, 17a oblong hole
18 bolt, 18a anchor,
19 level adjustment bolt, 19a fixing nut,
20 Adjustment plate,
21 bolts, 21a nuts.

Claims (4)

免震装置のベースプレートを位置決めする治具であって、
前記ベースプレートの上を跨いで門型筐体で前記ベースプレートを吊持し、前記門型筐体の梁から前記ベースプレートを吊持する吊持ボルトによって上下のZ方向と左右のX方向の調整が可能にされ、前記門型筐体における支柱の下部で前後のY方向の調整が可能であること、
を特徴とする免震ベースプレート取付治具。
A jig for positioning the base plate of the seismic isolation device,
The base plate is suspended by a gate-type housing across the base plate, and the vertical Z direction and the left-right X direction can be adjusted by a suspension bolt that suspends the base plate from the beam of the gate-type housing. It is possible to adjust the front and rear Y direction at the lower part of the support column in the gate-type housing,
Seismic isolation base plate mounting jig.
梁は、コ字型チャンネルバーを背中合わせに適宜間隙をおいて背向させてなり、前記間隙に吊持ボルトが上下方向に挿通され、該吊持ボルトの上部に調整ナットが螺合されていること、
を特徴とする請求項1に記載の免震ベースプレート取付治具。
The beam is formed by turning the U-shaped channel bar back to back with an appropriate gap, and a suspension bolt is inserted vertically into the gap, and an adjustment nut is screwed onto the suspension bolt. thing,
The seismic isolation base plate mounting jig according to claim 1.
門型筐体は、一つのベースプレートに対して1対装備され、この一対の支柱においてY方向の調整が可能であること、
を特徴とする請求項1乃至2のいずれかに記載の免震ベースプレート取付治具。
A pair of gate-type housings are provided for one base plate, and Y-direction adjustment is possible with this pair of support columns.
The seismic isolation base plate mounting jig according to claim 1, wherein
請求項1〜3に記載の免震ベースプレート取付治具を使用して、免震ベースプレートを門型筐体で吊持しながら免震基礎のコンクリートを免震基礎用型枠内に打設し、その打設したコンクリートが硬化する前において前記免震ベースプレートの前後,左右,上下の3方向の位置調整をすること、
を特徴とする免震ベースプレートの取付方法。
Using the seismic isolation base plate mounting jig according to claims 1 to 3, the concrete of the seismic isolation foundation is placed in the base isolation foundation mold while the seismic isolation base plate is suspended in the gate-type housing, Adjusting the position of the base-isolated base plate in the three directions of front, back, left and right, before and after the placed concrete hardens;
The installation method of the seismic isolation base plate characterized by this.
JP2011030673A 2011-02-16 2011-02-16 Seismic isolation base plate mounting jig and mounting method Active JP5706182B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011030673A JP5706182B2 (en) 2011-02-16 2011-02-16 Seismic isolation base plate mounting jig and mounting method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2011030673A JP5706182B2 (en) 2011-02-16 2011-02-16 Seismic isolation base plate mounting jig and mounting method

Publications (2)

Publication Number Publication Date
JP2012167510A true JP2012167510A (en) 2012-09-06
JP5706182B2 JP5706182B2 (en) 2015-04-22

Family

ID=46971904

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011030673A Active JP5706182B2 (en) 2011-02-16 2011-02-16 Seismic isolation base plate mounting jig and mounting method

Country Status (1)

Country Link
JP (1) JP5706182B2 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015040420A (en) * 2013-08-22 2015-03-02 大成建設株式会社 Base plate positioning system
JP2017222979A (en) * 2016-06-13 2017-12-21 戸田建設株式会社 Method for casting concrete underneath seismic isolator and mold device for casting concrete

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10292668A (en) * 1997-04-14 1998-11-04 Shimizu Corp Construction method for fitting base isolation device
JP2001164792A (en) * 1999-12-09 2001-06-19 Shimizu Corp Construction method for base isolation device installation trestle, and installation trestle installation frame

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH10292668A (en) * 1997-04-14 1998-11-04 Shimizu Corp Construction method for fitting base isolation device
JP2001164792A (en) * 1999-12-09 2001-06-19 Shimizu Corp Construction method for base isolation device installation trestle, and installation trestle installation frame

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2015040420A (en) * 2013-08-22 2015-03-02 大成建設株式会社 Base plate positioning system
JP2017222979A (en) * 2016-06-13 2017-12-21 戸田建設株式会社 Method for casting concrete underneath seismic isolator and mold device for casting concrete

Also Published As

Publication number Publication date
JP5706182B2 (en) 2015-04-22

Similar Documents

Publication Publication Date Title
KR101164451B1 (en) Girder with fixing apparatus for vertical tendon and structure construction method using the same
JP5706182B2 (en) Seismic isolation base plate mounting jig and mounting method
JP6255220B2 (en) Positioning member and construction method
KR20110010248A (en) Multi u-head bracket apparatus for bridge construction
JP2008081980A (en) Positioning tool for anchor bolt
JP2006291550A (en) Method and apparatus for installing column fixing member in steel pipe foundation pile
JP6134231B2 (en) Base plate position adjustment system
JP3165719U (en) Infrastructure for facilities
JP6734156B2 (en) Anchor fixing structure and anchor fixing method
JP4416141B2 (en) How to install seismic isolation devices
JP2006322154A (en) Foundation construction method of building
JP2017020312A (en) Steel column leg
JP2012067441A (en) Installation method for anchor bolt
KR101627159B1 (en) Concrete placing leveler and installing jig thereof
JP4225861B2 (en) Rising block construction method and rising block structure
JP2009150067A (en) Method of and structure for renewing existing bearing apparatus
JP5165139B1 (en) Seismic isolation device mounting method and mounting structure
JP6914028B2 (en) Formwork fixing device, formwork, formwork fixing method and joint construction method
JP2007270443A (en) Base isolation lower part structure construction method and base plate
KR100840279B1 (en) Suspension hanger for slab form
JP7371315B2 (en) Precast floor slab construction method
JP3844480B2 (en) Construction method for beam-to-column joints of precast concrete columns with X-type reinforcements
JP2004036103A (en) Anchor frame and method for fixing the same
KR101429752B1 (en) A support jig of concrete trust anchor module
JP4949438B2 (en) Concrete foundation formation method

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20140115

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20141023

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20141028

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20141030

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20150129

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20150226

R150 Certificate of patent or registration of utility model

Ref document number: 5706182

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250