JP2012048743A - サプライチェーンマネージメントのためのマトリクス方法およびシステム - Google Patents
サプライチェーンマネージメントのためのマトリクス方法およびシステム Download PDFInfo
- Publication number
- JP2012048743A JP2012048743A JP2011253665A JP2011253665A JP2012048743A JP 2012048743 A JP2012048743 A JP 2012048743A JP 2011253665 A JP2011253665 A JP 2011253665A JP 2011253665 A JP2011253665 A JP 2011253665A JP 2012048743 A JP2012048743 A JP 2012048743A
- Authority
- JP
- Japan
- Prior art keywords
- order
- matrix
- restriction
- vector
- bit vector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 239000011159 matrix material Substances 0.000 title claims abstract description 187
- 238000000034 method Methods 0.000 title claims abstract description 74
- 238000013068 supply chain management Methods 0.000 title description 10
- 238000004519 manufacturing process Methods 0.000 claims abstract description 129
- 239000013598 vector Substances 0.000 claims description 135
- 238000011156 evaluation Methods 0.000 claims description 43
- 239000000463 material Substances 0.000 abstract description 33
- 230000008569 process Effects 0.000 description 44
- 230000006870 function Effects 0.000 description 24
- 230000002776 aggregation Effects 0.000 description 12
- 238000004220 aggregation Methods 0.000 description 12
- 238000003860 storage Methods 0.000 description 10
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 9
- 229910052782 aluminium Inorganic materials 0.000 description 9
- 230000008859 change Effects 0.000 description 9
- 238000000354 decomposition reaction Methods 0.000 description 8
- 238000013439 planning Methods 0.000 description 8
- 230000005540 biological transmission Effects 0.000 description 5
- 238000004364 calculation method Methods 0.000 description 5
- 238000004891 communication Methods 0.000 description 5
- 238000009795 derivation Methods 0.000 description 5
- 230000015654 memory Effects 0.000 description 5
- 238000012545 processing Methods 0.000 description 5
- 239000003086 colorant Substances 0.000 description 4
- 238000004458 analytical method Methods 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000003491 array Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 238000004422 calculation algorithm Methods 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 238000007405 data analysis Methods 0.000 description 1
- 238000013480 data collection Methods 0.000 description 1
- 238000013479 data entry Methods 0.000 description 1
- 238000013500 data storage Methods 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 229910052736 halogen Inorganic materials 0.000 description 1
- 150000002367 halogens Chemical class 0.000 description 1
- 239000010985 leather Substances 0.000 description 1
- 239000002994 raw material Substances 0.000 description 1
- 230000004044 response Effects 0.000 description 1
- 238000012502 risk assessment Methods 0.000 description 1
- 238000012384 transportation and delivery Methods 0.000 description 1
- 238000012800 visualization Methods 0.000 description 1
Images
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/08—Logistics, e.g. warehousing, loading or distribution; Inventory or stock management
- G06Q10/087—Inventory or stock management, e.g. order filling, procurement or balancing against orders
- G06Q10/0875—Itemisation or classification of parts, supplies or services, e.g. bill of materials
Landscapes
- Business, Economics & Management (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Human Resources & Organizations (AREA)
- Strategic Management (AREA)
- Entrepreneurship & Innovation (AREA)
- Operations Research (AREA)
- Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Marketing (AREA)
- Development Economics (AREA)
- Quality & Reliability (AREA)
- Tourism & Hospitality (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Accounting & Taxation (AREA)
- Finance (AREA)
- Game Theory and Decision Science (AREA)
- Educational Administration (AREA)
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
【解決手段】オーダーを受け取り、オーダーをオーダーマトリクスに配列し、オーダーに対する潜在的製造期間を検出し、オーダーを再スケジュールし、そして資材集計を生成するシステムおよび方法。この方法は、一群の可能なトークンからの1つまたは複数のトークンを有するオーダーを受け取る。各トークンは特性とこの特性の値との組合せである。オーダーに対するオーダー制限マトリクスが所定の選択基準に基づいて生成される。次のこの方法は、オーダーにて移用される制限を検査し、オーダー導出製造制限マトリクスをオーダーに対して導出する。このオーダー導出製造制限マトリクスはオーダーに対する可能な製造期間を検出するために評価される。オーダーマトリクスはまた資材集計を生成するために使用される。
【選択図】図1
Description
オーダー導出製造制限マトリクスを評価して、製造に対する潜在的期間を検出する。
結果を結果ビットベクトルに配列するステップ;そして結果ビットベクトルを分析し、結果ビットベクトル内に1のエントリーを有する製造期間を検出するステップを有し、ここで1は潜在的製造期間を指定する。
結果を結果ビットベクトルに配列し;そして結果ビットベクトルを分析し、結果ビットベクトル内に1のエントリーを有する製造期間を検出する。ここで1は潜在的製造期間を指定する。
図2は、本発明の実施例によるオーダーマトリクスを示す。図2に示されているように一群のオーダーがマトリクス形式でオーダーマトリクス200に表される。各列210a〜210nはオーダーを表す。各行220a〜220nはトークンを表す。例えば行220aのトークンはトークン(色=赤)を表す。オーダーが列210により表されるようにトークンを含むことを指示するため、「1」が列の適切な行に配列される。オーダーがトークンを含んでいなければ、「0」が列の適切な行に配列される。オーダーをオーダーマトリクスに記憶することによりマトリクスアルゴリズムを実行することができ、このアルゴリズムは1つまたは複数のオーダーを同時に演算する。従って全てのオーダーをマトリクスまたはビットベクトルにより表される一連のオーダーとしてコンパクトに記憶することを促進する。付加的に、オーダーマトリクスへの追加が簡素化される。なぜなら、付加的オーダーは単純に列をマトリクスの最後に追加することにより表され、付加的トークンは行の追加によりマトリクスに付加することができるからである。マトリクスは従来のデータ構造により記憶することができる。またはオブジェクト指向様式でも記憶することができる。
有効な発送期日を顧客オーダーに対して検出できることも有益である。有効な発送期日を発見するために、次に適切な製造日を付加的安全および搬送日により計算しなければならない。このことにより発送日が確認される。顧客オーダーに対する製造日を検出するために、顧客オーダーは選択基準についてチェックされ、存在する場合どのような制限がオーダーに適用されるかを検出される。制限は、特定の期間、例えばシフトまたは日に対するリソースの有効能力またはボトルネック要素を表す。
・チェックすべきオーダーに対して、相応の列をテーブル1040から読み出す;
・各「1」エントリーに対して、2つの相応する評価ビットを制限マトリクス1050から選択し、ビットマスクベクトルをマトリクス1060から選択し、それらをOR NOT関数により結合して介在的結果ビットベクトルを得る;
・介在的結果ビットベクトルの全てを論理積演算し、結果ビットベクトルをマトリクス1070に算出する;そして・各オーダーに対して繰り返す。
110 顧客が商品またはサービスのオーダーを要求するステップ
120 オーダーがシステムに入力されるか、または出荷日に対する要求が入力されるステップ
130 約束に対する有効性(ATP)プロセスがその商品に対する潜在的出荷日を検出するステップ
140 サプライチェーン計画を行うステップ
142 計画プロセス
144 再スケジュールプロセス
150 供給者および在庫管理に対する製造プロセス
160 商品が顧客に出荷されるステップ
Claims (1)
- オーダーに対して製造期間をスケジュールする、コンピュータで実施される方法であって、
一群の可能なトークンからの1つまたは複数のトークンを有するオーダーを受け取るステップを具備し、
トークンは、特性と、該特性の値との組合せであり、
各トークンは、トークンビットベクトル(220)によって表されるとともに、
前記トークンビットベクトル(220)における0または1は、前記オーダーがトークンを含んでいることを示すために使用され、
前記方法は、
該オーダーに適用される制限を検出するステップを具備し、
前記制限は、制限ビットベクトル(320)によって表されるとともに、
各制限ビットベクトル(320)は、1つまたは複数のトークンビットベクトル(220)を評価するための関連する機能を有し、
前記方法は、
前記オーダーに対する潜在的製造期間を検出するために、該制限を製造制限マトリクス(400)に適用するステップを具備し、
前記製造制限マトリクス(400)は、前記制限ビットベクトル(320)に相応する制限ベクトル行(420)と、各制限ベクトル行(420)に対する評価ビットベクトル行(430)とを有し、
前記方法は、
結果ビットベクトルを生成するために、前記オーダーに相応する評価ビットベクトル(430)に関する論理演算を行うステップを具備することを特徴とする方法。
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US19369300P | 2000-03-31 | 2000-03-31 | |
US60/193,693 | 2000-03-31 |
Related Parent Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001571268A Division JP2003529159A (ja) | 2000-03-31 | 2001-03-29 | サプライチェーンマネージメントのためのマトリクス方法およびシステム |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2012048743A true JP2012048743A (ja) | 2012-03-08 |
Family
ID=22714634
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001571268A Pending JP2003529159A (ja) | 2000-03-31 | 2001-03-29 | サプライチェーンマネージメントのためのマトリクス方法およびシステム |
JP2011253665A Pending JP2012048743A (ja) | 2000-03-31 | 2011-11-21 | サプライチェーンマネージメントのためのマトリクス方法およびシステム |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001571268A Pending JP2003529159A (ja) | 2000-03-31 | 2001-03-29 | サプライチェーンマネージメントのためのマトリクス方法およびシステム |
Country Status (6)
Country | Link |
---|---|
US (1) | US6823226B2 (ja) |
EP (1) | EP1299832A2 (ja) |
JP (2) | JP2003529159A (ja) |
AU (1) | AU771415B2 (ja) |
CA (1) | CA2373913C (ja) |
WO (1) | WO2001073620A2 (ja) |
Families Citing this family (31)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE4427377A1 (de) * | 1994-08-03 | 1996-02-08 | Hoechst Ag | Orientierte Folie aus thermoplastischem Polymer mit partikelförmigen Hohlkörpern, Verfahren zu ihrer Herstellung und ihre Verwendung |
JP3327235B2 (ja) * | 1998-12-22 | 2002-09-24 | トヨタ自動車株式会社 | 受注品納期管理システム |
US6983278B1 (en) | 2001-04-10 | 2006-01-03 | Arena Solutions, Inc. | System and method for access control and for supply chain management via a shared bill of material |
US7558793B1 (en) | 2000-04-10 | 2009-07-07 | Arena Solutions, Inc. | System and method for managing data in multiple bills of material over a network |
JP2002287329A (ja) * | 2001-03-28 | 2002-10-03 | Mitsubishi Electric Corp | フォトマスクの製造者を選定する選定装置、フォトマスクの製造者を選定する選定方法、およびフォトマスクの製造者を選定するためのプログラム |
US6999965B1 (en) | 2001-04-10 | 2006-02-14 | Arena Solutions, Inc. | Method, apparatus, and product to associate computer aided design data and bill of materials data |
US7299203B1 (en) * | 2001-04-19 | 2007-11-20 | Xilinx, Inc. | Method for storing and shipping programmable ASSP devices |
US20030037034A1 (en) * | 2001-08-16 | 2003-02-20 | Tim Daniels | System and method for lubricants supply chain management |
AU2003233483A1 (en) * | 2002-04-04 | 2003-10-20 | Arrow Electronics, Inc. | Computer-implemented system and method for assessing supply chain solutions |
US7505927B2 (en) * | 2003-07-14 | 2009-03-17 | Price Edward R | Extended manufacturing environment |
US20050171875A1 (en) * | 2004-01-30 | 2005-08-04 | Michael Seitz | System and method for synchronizing commitment updates |
US20050262453A1 (en) * | 2004-05-21 | 2005-11-24 | Luca Massasso | Modular data management system |
US7877301B2 (en) * | 2005-04-04 | 2011-01-25 | Balancedflow Supply Chain Solutions, Llc | System and method for managing manufacturing, ordering, and distribution in a supply chain |
US20070021992A1 (en) * | 2005-07-19 | 2007-01-25 | Srinivas Konakalla | Method and system for generating a business intelligence system based on individual life cycles within a business process |
US7841516B2 (en) * | 2005-12-30 | 2010-11-30 | Sap Ag | Delivery data objects in enterprise computing systems |
US20070174145A1 (en) * | 2005-12-30 | 2007-07-26 | Stephan Hetzer | Controlling logistics execution in a computer application |
US8402426B2 (en) * | 2005-12-30 | 2013-03-19 | Sap Ag | Architectural design for make to stock application software |
US20080033846A1 (en) * | 2006-08-03 | 2008-02-07 | International Business Machines Corporation | Audited Builds as an Extension to Build Tools |
US20080082346A1 (en) * | 2006-09-29 | 2008-04-03 | Hoopes John M | System and method for automated processing of returns |
US8126731B2 (en) * | 2006-10-24 | 2012-02-28 | Medapps, Inc. | Systems and methods for medical data interchange activation |
JP2008204082A (ja) * | 2007-02-19 | 2008-09-04 | Hitachi Ltd | 生産計画案の算出装置、プログラム、算出システム及び算出方法 |
US20090216615A1 (en) * | 2008-02-26 | 2009-08-27 | Sap Ag | Availability Check for a Ware |
US9767495B2 (en) * | 2008-12-19 | 2017-09-19 | Sap Se | Different sales and planning product options |
US20100161366A1 (en) * | 2008-12-19 | 2010-06-24 | Achim Clemens | Product requirement specification in production model |
US8086337B1 (en) * | 2009-08-21 | 2011-12-27 | Honda Motor Co., Ltd. | Computerized system and method for generating a delivery bill of materials |
JP5852361B2 (ja) * | 2011-08-22 | 2016-02-03 | インターナショナル・ビジネス・マシーンズ・コーポレーションInternational Business Machines Corporation | 部品表を展開する装置及び方法 |
CN102663571B (zh) * | 2012-03-13 | 2014-12-10 | 浙江工商大学 | 一种电子商务智能分储系统的储位优化筛选方法 |
NO20161398A1 (en) * | 2016-09-02 | 2018-03-05 | Mestergruppen As | System and method for placing orders for items associated with respective phases of a project |
CN112308595A (zh) * | 2020-03-24 | 2021-02-02 | 北京沃东天骏信息技术有限公司 | 用于确定货品状态的方法和装置 |
JP7477397B2 (ja) | 2020-08-12 | 2024-05-01 | 株式会社日立製作所 | 需給計画装置および需給計画方法 |
EP4036827A1 (en) * | 2021-01-29 | 2022-08-03 | Quadient Technologies France | Method for localising an appropriate parcel locker bank having a suitable parcel locker available to store a parcel and associated computerized locker banks |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05155369A (ja) * | 1991-12-02 | 1993-06-22 | Mazda Motor Corp | 車両の生産システム |
JPH11301540A (ja) * | 1998-04-06 | 1999-11-02 | Hyundai Motor Co Ltd | 自動車組立ライン制御方法及び制御システム |
WO2000013115A1 (en) * | 1998-09-01 | 2000-03-09 | Daimlerchrysler Ag | Method and system for resource requirement planning and generating a production schedule using a uniform data model |
Family Cites Families (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4827423A (en) * | 1987-01-20 | 1989-05-02 | R. J. Reynolds Tobacco Company | Computer integrated manufacturing system |
US5212639A (en) * | 1990-04-05 | 1993-05-18 | Sampson Wesley C | Method and electronic apparatus for the classification of combinatorial data for the summarization and/or tabulation thereof |
US5481704A (en) * | 1991-09-27 | 1996-01-02 | Computer Concepts Corp. | Indexing/compression scheme for supporting graphics and data selection |
US5369570A (en) * | 1991-11-14 | 1994-11-29 | Parad; Harvey A. | Method and system for continuous integrated resource management |
JP2711204B2 (ja) * | 1992-03-09 | 1998-02-10 | インターナショナル・ビジネス・マシーンズ・コーポレイション | リレーショナルデータベースのユーザインターフェースを生成する方法 |
US5630070A (en) * | 1993-08-16 | 1997-05-13 | International Business Machines Corporation | Optimization of manufacturing resource planning |
US5544354A (en) * | 1994-07-18 | 1996-08-06 | Ikonic Interactive, Inc. | Multimedia matrix architecture user interface |
US6188989B1 (en) * | 1995-06-16 | 2001-02-13 | I2 Technologies, Inc. | System and method for managing available to promised product (ATP) |
EP0770967A3 (en) * | 1995-10-26 | 1998-12-30 | Koninklijke Philips Electronics N.V. | Decision support system for the management of an agile supply chain |
IE79445B1 (en) * | 1995-12-21 | 1998-05-06 | Portspring Limited | An order processing method |
US6272389B1 (en) * | 1998-02-13 | 2001-08-07 | International Business Machines Corporation | Method and system for capacity allocation in an assembly environment |
US6477660B1 (en) * | 1998-03-03 | 2002-11-05 | Sap Aktiengesellschaft | Data model for supply chain planning |
US6338097B1 (en) * | 1998-06-19 | 2002-01-08 | Sap Aktiengesellschaft | Cross application time sheet for communicating with one or more enterprise management applications during time data entry |
US6192370B1 (en) * | 1998-06-19 | 2001-02-20 | Sap Aktiengesellschaft | Method and system for rapid memory-resident processing of transactional data |
US6223094B1 (en) * | 1998-08-21 | 2001-04-24 | Sap Aktiengesellschaft | Multi-tiered structure for storing and displaying product and process variants |
US6434443B1 (en) * | 1999-05-17 | 2002-08-13 | Taiwan Semiconductor Manufacturing Company | Method for performing dynamic re-scheduling of fabrication plant |
-
2001
- 2001-03-29 US US09/819,658 patent/US6823226B2/en not_active Expired - Lifetime
- 2001-03-29 JP JP2001571268A patent/JP2003529159A/ja active Pending
- 2001-03-29 WO PCT/EP2001/003600 patent/WO2001073620A2/en active Search and Examination
- 2001-03-29 CA CA2373913A patent/CA2373913C/en not_active Expired - Lifetime
- 2001-03-29 EP EP01929472A patent/EP1299832A2/en not_active Ceased
- 2001-03-29 AU AU56234/01A patent/AU771415B2/en not_active Ceased
-
2011
- 2011-11-21 JP JP2011253665A patent/JP2012048743A/ja active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH05155369A (ja) * | 1991-12-02 | 1993-06-22 | Mazda Motor Corp | 車両の生産システム |
JPH11301540A (ja) * | 1998-04-06 | 1999-11-02 | Hyundai Motor Co Ltd | 自動車組立ライン制御方法及び制御システム |
WO2000013115A1 (en) * | 1998-09-01 | 2000-03-09 | Daimlerchrysler Ag | Method and system for resource requirement planning and generating a production schedule using a uniform data model |
Also Published As
Publication number | Publication date |
---|---|
WO2001073620A8 (en) | 2003-02-06 |
CA2373913C (en) | 2015-12-29 |
CA2373913A1 (en) | 2001-10-04 |
AU771415B2 (en) | 2004-03-18 |
EP1299832A2 (en) | 2003-04-09 |
US6823226B2 (en) | 2004-11-23 |
JP2003529159A (ja) | 2003-09-30 |
AU5623401A (en) | 2001-10-08 |
US20020007293A1 (en) | 2002-01-17 |
WO2001073620A2 (en) | 2001-10-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2012048743A (ja) | サプライチェーンマネージメントのためのマトリクス方法およびシステム | |
US6609100B2 (en) | Program planning management system | |
Beamon | Supply chain design and analysis:: Models and methods | |
US4887207A (en) | Automated system for evaluating the sensitivity of inventory costs due to fluctuations in customer demand | |
US7813949B2 (en) | Method and system for flexible budgeting in a purchase order system | |
Kurbel | Enterprise resource planning and supply chain management | |
Stoneman | Technological diffusion and the computer revolution: the UK experience | |
US6119102A (en) | MRP system with viewable master production schedule | |
Raffish | How much does that product really cost? | |
US7921027B2 (en) | Constraint-based production planning and scheduling | |
US20030229550A1 (en) | System and method for planning and ordering components for a configure-to-order manufacturing process | |
US20070150332A1 (en) | Heuristic supply chain modeling method and system | |
Stenger | Information systems in logistics management: past, present, and future | |
Aytug ̄ et al. | A framework and a simulation generator for kanban-controlled manufacturing systems | |
US20100153382A1 (en) | Systems and methods for the matching of materials data to parts data | |
Jagdev et al. | Verification and validation issues in manufacturing models | |
US7917379B1 (en) | Large-scale supply chain planning system and method | |
Pasaribu | An Analysis and Survey of Polishing Dents Warehouse Inventory Development | |
EP0514231A2 (en) | Work management computer system | |
JPH0934955A (ja) | 在庫管理診断支援方法およびシステム | |
Kastritis | An object-oriented model for a manufacturing resource planning system | |
Grant et al. | The user's role in a simulation based scheduling system | |
Trybula | Static simulation: a new method of facility automation analysis | |
Kottke | A prototype for a project management system in NIAL | |
Hubbert | Auditing a Manufacturing Control System |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20111221 |
|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20111221 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20130122 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20130419 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20130903 |