JP2012021390A - Method of constructing steel pipe pile foundation, and head of drilling insertion apparatus - Google Patents

Method of constructing steel pipe pile foundation, and head of drilling insertion apparatus Download PDF

Info

Publication number
JP2012021390A
JP2012021390A JP2011055274A JP2011055274A JP2012021390A JP 2012021390 A JP2012021390 A JP 2012021390A JP 2011055274 A JP2011055274 A JP 2011055274A JP 2011055274 A JP2011055274 A JP 2011055274A JP 2012021390 A JP2012021390 A JP 2012021390A
Authority
JP
Japan
Prior art keywords
steel pipe
construction method
construction
foundation pile
head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2011055274A
Other languages
Japanese (ja)
Inventor
Eiji Harada
英治 原田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2011055274A priority Critical patent/JP2012021390A/en
Publication of JP2012021390A publication Critical patent/JP2012021390A/en
Withdrawn legal-status Critical Current

Links

Images

Abstract

PROBLEM TO BE SOLVED: To provide a construction method capable of well adapting to conditions such as ground and enabling short construction time and low environmental load, while complementing a conventional construction method in which a structure foundation pile works by installing an steel pipe is difficult in a location with a narrow delivery road or workspace due to intended use of large construction vehicles and machines.SOLUTION: The construction method comprises the steps of: using a compact boring machine which can be carried by man power as a main insertion drilling apparatus; fixing a steel pipe equipped with a drill bit on its tip into intimate contact with a rubber gasket in a head part (a steel pipe pile head) capable of supplying water from a hollow upper rod by pressurization; inserting the steel pipe by drilling with itself to a prescribed depth; and leaving the steel pipe in place to form a foundation pile of a structure. The construction method enables effective use of a location where construction or reconstruction of a structure is difficult due to the impossibility of structure foundation pile works.

Description

本発明は、従来工法では施工が困難な搬入路の幅員や作業スペースが狭い場所でも、鋼管を構造物の基礎杭として打設することを、人力でも搬入可能な小型のボーリングマシンを主たる装置とすることで可能とした工法、並びに当該工法に用いる掘削挿入装置のヘッド部分の構造に関するものである。   The present invention mainly employs a small boring machine that can be carried in manually even if the width of the loading path and the work space that are difficult to construct by the conventional method are narrow and the working space is narrow, and the steel pipe is driven as the foundation pile of the structure. The present invention relates to a construction method made possible by this, and the structure of the head portion of the excavation and insertion device used in the construction method.

鋼管を構造物の基礎杭として打設する工法は、オーガー、ケーシング、コアチューブヘッド等で掘削した孔に鋼管を打ち込む方法、あるいはバイブロハンマーや建柱車を用いて鋼管を直接打ち込む方法の二種類に大別できる。   There are two methods for driving steel pipes as foundation piles of structures: a method of driving steel pipes into holes drilled with augers, casings, core tube heads, etc., or a method of driving steel pipes directly using a vibro hammer or building pole car. Can be broadly divided.

しかし、掘削孔に鋼管杭を挿入する方法は二段階の工程となり使用機材及び作業スペースも多く工期も長くなる。加えて、掘削した残土や泥水の処理にも相応の労力を必要とする。他方、直接打ち込む工法においてもバイブロハンマーでは騒音と振動の問題が避けられず、建柱車を用いる場合は相応の作業スペースを必要とする。加えて、直接打ち込む工法においては転石等がある地盤では十分な深度まで鋼管杭を打ち込めない弱点がある。   However, the method of inserting the steel pipe pile into the excavation hole is a two-stage process, which requires a lot of equipment and work space and requires a long construction period. In addition, a considerable amount of labor is required for disposal of excavated soil and muddy water. On the other hand, even in the direct driving method, the vibro hammer cannot avoid the problems of noise and vibration, and when using a construction car, a corresponding work space is required. In addition, in the direct driving method, there is a weak point that steel pipe piles cannot be driven to a sufficient depth on the ground where there is a boulder or the like.

従来工法の最大の問題点は、大型の工事車両及び機材の使用を前提としているため、搬入路の幅員や作業スペースが狭い場所では鋼管打設による構造物基礎杭工事が困難なことである。比較的小型の機材でも100キログラム単位の重量があり、搬入手段が人力に限定される場所では施工できない。   The biggest problem of the conventional method is that it is premised on the use of large construction vehicles and equipment, so it is difficult to construct the structural foundation pile by casting steel pipes in places where the width of the carry-in route and the work space are narrow. Even relatively small equipment has a weight of 100 kilograms and cannot be installed in places where the means of transportation is limited to human power.

従来工法を補うものとして、人力でも運搬可能な小型のボーリングマシンを主たる掘削挿入装置とし、中空の上部ロッドから加圧送水ができるヘッド部分(鋼管杭ヘッド)に、掘削用ビットを先端に装着した鋼管を固定し、所定の深度まで鋼管そのもので掘削挿入し、そのまま埋め殺しにして構造物の基礎杭とする方法がある。図1はこの方法に関する全体図であり、図2は鋼管杭ヘッドの概略図である。   As a supplement to the conventional method, a small boring machine that can be transported by human power is the main excavation and insertion device, and a drilling bit is attached to the tip of the head part (steel pipe pile head) that can supply pressurized water from the hollow upper rod. There is a method of fixing a steel pipe, excavating and inserting the steel pipe itself up to a predetermined depth, and burying it as it is to make a foundation pile of a structure. FIG. 1 is a general view of this method, and FIG. 2 is a schematic view of a steel pipe pile head.

解決しようとする問題点は、従来工法では大型の工事車両及び機材の使用を前提としているため、搬入路の幅員や作業スペースが狭い場所では鋼管打設による構造物基礎杭工事が困難な点である。加えて、従来の掘削孔に鋼管を挿入する工法では残土と泥水処理の問題、鋼管を直接打ち込む工法では騒音と振動及び地盤の条件などの制約が多い点である。   The problem to be solved is that the conventional construction method assumes the use of large construction vehicles and equipment, so it is difficult to construct foundation piles by placing steel pipes in places where the width of the carry-in route and the work space are small. is there. In addition, the conventional method of inserting a steel pipe into a drilling hole has many problems such as residual soil and muddy water treatment, and the method of direct driving a steel pipe has many restrictions such as noise, vibration and ground conditions.

本発明は、人力でも運搬可能な小型のボーリングマシンを主たる挿入掘削装置とし、中空の上部ロッドから加圧送水ができるヘッド部分(鋼管杭ヘッド)に、掘削用ビットを先端に装着した鋼管を固定し、所定の深度まで鋼管そのもので掘削挿入し、そのまま埋め殺しにして構造物の基礎杭とすることを最も主要な特徴とする。   The present invention uses a small boring machine that can be transported by manpower as the main insertion drilling device, and fixes a steel pipe with a drilling bit attached to the head part (steel pipe pile head) that can supply pressurized water from a hollow upper rod. The most important feature is that the steel pipe itself is excavated and inserted to a predetermined depth and buried as it is to make the foundation pile of the structure.

本発明は、人力でも運搬可能な小型簡素な鋼管杭の掘削挿入装置を用いることで、搬入路の幅員や作業スペースが狭いなどにより、従来工法では対応できずに構造物を建てる(建て替える)ことが困難な場所が有効活用できるようになる。加えて、本発明は基礎杭として用いる鋼管そのもので掘削挿入するため、従来工法に比べ工期が短く低環境負荷(残土及び泥水処理大幅に軽減される)であり、転石等の多い地盤でも施工が可能である。   The present invention uses a small and simple steel pipe pile excavation and insertion device that can be transported by human power, so that the construction method can be built (rebuilt) that cannot be handled by the conventional method due to the narrow width of the loading path and the work space. This makes it possible to effectively use difficult places. In addition, because the present invention is excavated and inserted with the steel pipe itself used as the foundation pile, the construction period is short compared to the conventional method, and it has a low environmental load (significantly reduces residual soil and muddy water treatment). Is possible.

図1は全体図Figure 1 is an overall view 図2は鋼管杭ヘッドの概略図Fig. 2 is a schematic view of a steel pipe pile head

1.ボーリングマシン
2.鋼管杭ヘッド
3.ロッド
4.加圧送水ポンプ
5.鋼管杭
6.先端ビット
1. 1. Boring machine 2. Steel pipe pile head Rod 4. 4. Pressurized water pump Steel pipe piles 6. Tip bit

人力でも運搬可能な小型ボーリングマシンを主たる掘削挿入装置とし、先端に掘削用ビットを装着した鋼管をヘッド部分に固定する。当該ヘッド部分(鋼管杭ヘッド)は、固定する鋼管の上端と接する部分に交換可能なゴム製パッキンを装着し、中空とした上部ロッドからの加圧送水ができる構造とする。   A small boring machine that can be transported by human power is the main excavation and insertion device, and a steel pipe with an excavation bit at the tip is fixed to the head. The head part (steel pipe pile head) has a structure in which a replaceable rubber packing is attached to a part in contact with the upper end of the steel pipe to be fixed so that pressurized water can be supplied from the hollow upper rod.

中空の上部ロッドを通して加圧送水しながら鋼管に回転を与え、溶接や端にネジ溝を切った鋼管を継ぎ足すなどして、所定の深度まで鋼管そのもので掘削挿入していく。所定の深度に到達した後、地表に残っている鋼管を所定の長さで切断し、そのまま埋め殺して構造物の基礎杭とする。   The steel pipe itself is drilled and inserted to a predetermined depth by applying rotation to the steel pipe while supplying water through a hollow upper rod, and welding or adding a steel pipe with a thread groove at the end. After reaching a predetermined depth, the steel pipe remaining on the ground surface is cut to a predetermined length, and buried as it is to form a foundation pile for the structure.

本発明は、人力でも運搬可能な小型簡素な鋼管杭の掘削挿入装置を用いることで、搬入路の幅員や作業スペースが狭いなどにより、従来工法では対応できずに構造物を建てる(建て替える)ことが困難な場所が有効活用できるようになる。加えて、本発明は基礎杭として用いる鋼管そのもので掘削挿入するため、従来工法に比べ工期が短く低環境負荷(残土及び泥水処理大幅に軽減される)であり、転石等の多い地盤でも施工が可能である。 The present invention uses a small and simple steel pipe pile excavation and insertion device that can be transported by human power, so that the construction method can be built (rebuilt) that cannot be handled by the conventional method due to the narrow width of the loading path and the work space. This makes it possible to effectively use difficult places. In addition, because the present invention is excavated and inserted with the steel pipe itself used as the foundation pile, the construction period is short compared to the conventional method, and it has a low environmental load (significantly reduces residual soil and muddy water treatment). Is possible.

Claims (2)

人力でも運搬可能な小型ボーリングマシンを主たる掘削挿入装置とし、加圧送水が可能なヘッド部分に、先端に掘削用ビットを装着した鋼管を固定し、所定の深度まで加圧送水掘りで掘削挿入し、そのまま埋め殺しとすることで構造物の基礎杭とする工法。   A small boring machine that can be transported by human power is the main excavation and insertion device, and a steel pipe with a drilling bit attached to the tip is fixed to the head part where pressurized water can be supplied, and excavated and inserted to a predetermined depth by pressurized water digging. The construction method is to make the foundation pile of the structure by burying it as it is. 前項の工法に用いる掘削挿入装置のヘッド部分で、固定する鋼管の上端と接する部分に交換可能なゴム製パッキンを装着し、中空とした上部ロッドからの加圧送水ができる構造。   The structure of the head part of the excavation and insertion device used in the construction method described in the previous section, in which a replaceable rubber packing is attached to the part in contact with the upper end of the steel pipe to be fixed, so that pressurized water can be supplied from the hollow upper rod.
JP2011055274A 2010-06-17 2011-03-14 Method of constructing steel pipe pile foundation, and head of drilling insertion apparatus Withdrawn JP2012021390A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2011055274A JP2012021390A (en) 2010-06-17 2011-03-14 Method of constructing steel pipe pile foundation, and head of drilling insertion apparatus

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
JP2010138134 2010-06-17
JP2010138134 2010-06-17
JP2011055274A JP2012021390A (en) 2010-06-17 2011-03-14 Method of constructing steel pipe pile foundation, and head of drilling insertion apparatus

Publications (1)

Publication Number Publication Date
JP2012021390A true JP2012021390A (en) 2012-02-02

Family

ID=45775863

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011055274A Withdrawn JP2012021390A (en) 2010-06-17 2011-03-14 Method of constructing steel pipe pile foundation, and head of drilling insertion apparatus

Country Status (1)

Country Link
JP (1) JP2012021390A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669347A (en) * 2013-12-31 2014-03-26 葛洲坝集团试验检测有限公司 Underwater anchor rod construction method
CN103898909A (en) * 2014-03-10 2014-07-02 中交一航局第三工程有限公司 Steel trestle pile foundation ring cutting method pile implanting process in bare rock area
CN104863151A (en) * 2015-06-11 2015-08-26 中国铁建大桥工程局集团有限公司 Method for sinking and positioning large-diameter steel pile casing in sea
CN106498945A (en) * 2016-11-25 2017-03-15 中铁大桥局集团有限公司 A kind of taper pile construction system, pile feeding device and taper pile construction method under water

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103669347A (en) * 2013-12-31 2014-03-26 葛洲坝集团试验检测有限公司 Underwater anchor rod construction method
CN103898909A (en) * 2014-03-10 2014-07-02 中交一航局第三工程有限公司 Steel trestle pile foundation ring cutting method pile implanting process in bare rock area
CN103898909B (en) * 2014-03-10 2016-01-27 中交一航局第三工程有限公司 Naked petrographic province steel trestle pile foundation ring cutting method plants a technique
CN104863151A (en) * 2015-06-11 2015-08-26 中国铁建大桥工程局集团有限公司 Method for sinking and positioning large-diameter steel pile casing in sea
CN106498945A (en) * 2016-11-25 2017-03-15 中铁大桥局集团有限公司 A kind of taper pile construction system, pile feeding device and taper pile construction method under water

Similar Documents

Publication Publication Date Title
JP2007146446A (en) Excavating device, rotary excavating machine having excavating device, rotatingly driving device, and underground excavating method
CN102912791B (en) Construction method of bored pile
CN101173517A (en) Pile-pulling construction method
JP6774132B1 (en) Construction method of steel pipe pile
CN104775433A (en) Pile extracting construction method
JP2012021390A (en) Method of constructing steel pipe pile foundation, and head of drilling insertion apparatus
KR100949606B1 (en) Hole-boring and hammering-vibration working method and device for integrated construction with sheet-pile fixed to outside of hole-boring auger casing
CN101982614A (en) Method for drilling rocks into pile by utilizing all casing drill
KR20080027481A (en) Ground boring method using multi-point rock boring
JP5981792B2 (en) Construction method of press-fit continuous wall
KR101309774B1 (en) A methode for constructing
KR101018889B1 (en) Construction method for non-excavation type under-pass tunel using horizontal drilling machine
JP2007332559A (en) Removal method for existing underground pile
CN109594563A (en) A kind of full-sleeve obstacle cleaning machine and its construction method
JP2009287326A (en) Pulling out method of existing pile
JP5809790B2 (en) Rock bolt forming method and drilling device
CN110273413A (en) A kind of efficient construction method of prefabricated pile
KR20150140073A (en) Excavating bit having air-hammer and screw for excavating ground composed by earth, sand, soft rock and boulder
JP2016047998A (en) Down-the-hole hammer, weight adjustment method of down-the-hole hammer and excavation method
KR100655761B1 (en) Drilling machine for anchor and soil nailing with an outlet for sludge
JP2005180112A (en) Ground improvement structure and ground improvement method
KR101385399B1 (en) Excavating Agitation rod for piling with backfilling soil and Method of piling thereof
JP2011252319A (en) Reinforcement material for natural ground reinforcement earth method and natural ground reinforcement earth method
CN112681296A (en) Full-casing construction method for rotary digging cast-in-place pile
JP2003082663A (en) Pile driving equipment

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20140603