JP2011518278A5 - - Google Patents

Download PDF

Info

Publication number
JP2011518278A5
JP2011518278A5 JP2011504487A JP2011504487A JP2011518278A5 JP 2011518278 A5 JP2011518278 A5 JP 2011518278A5 JP 2011504487 A JP2011504487 A JP 2011504487A JP 2011504487 A JP2011504487 A JP 2011504487A JP 2011518278 A5 JP2011518278 A5 JP 2011518278A5
Authority
JP
Japan
Prior art keywords
wind turbine
configuration
management system
data
processing unit
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2011504487A
Other languages
English (en)
Japanese (ja)
Other versions
JP5431454B2 (ja
JP2011518278A (ja
Filing date
Publication date
Priority claimed from EP08011961A external-priority patent/EP2141359A1/en
Application filed filed Critical
Publication of JP2011518278A publication Critical patent/JP2011518278A/ja
Publication of JP2011518278A5 publication Critical patent/JP2011518278A5/ja
Application granted granted Critical
Publication of JP5431454B2 publication Critical patent/JP5431454B2/ja
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

JP2011504487A 2008-07-02 2009-06-08 風力タービンの構成管理システムおよびその中央コンピュータシステム Expired - Fee Related JP5431454B2 (ja)

Applications Claiming Priority (3)

Application Number Priority Date Filing Date Title
EP08011961A EP2141359A1 (en) 2008-07-02 2008-07-02 Wind turbine configuration management system, and central computer system therefor
EP08011961.3 2008-07-02
PCT/EP2009/057044 WO2010000570A2 (en) 2008-07-02 2009-06-08 Wind turbine configuration management system, and central computer system therefor

Publications (3)

Publication Number Publication Date
JP2011518278A JP2011518278A (ja) 2011-06-23
JP2011518278A5 true JP2011518278A5 (https=) 2012-12-13
JP5431454B2 JP5431454B2 (ja) 2014-03-05

Family

ID=40352370

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2011504487A Expired - Fee Related JP5431454B2 (ja) 2008-07-02 2009-06-08 風力タービンの構成管理システムおよびその中央コンピュータシステム

Country Status (7)

Country Link
US (1) US8509956B2 (https=)
EP (1) EP2141359A1 (https=)
JP (1) JP5431454B2 (https=)
CN (1) CN102016298B (https=)
CA (1) CA2729702C (https=)
NZ (1) NZ588302A (https=)
WO (1) WO2010000570A2 (https=)

Families Citing this family (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US10761526B2 (en) * 2017-11-06 2020-09-01 General Electric Company Systems and method for robotic industrial inspection system
BRPI0715737A2 (pt) * 2006-09-01 2013-05-07 Vestas Wind Sys As sistema de pelo menos duas turbinas eàlicas distribuÍdas, turbina eàlica compreendendo pelo menos um ponto de interseÇço uso da prioridade, e acionador de dispositivo de um ponto de interseÇço de uma turbina eàlica em uma rede de comunicaÇço de dados
EP2057519B1 (en) * 2006-09-01 2019-12-04 Vestas Wind Systems A/S System and method of controlling a wind turbine in a wind powerplant
ES2320401B1 (es) * 2007-11-20 2010-02-26 Acciona Windpower S.A. Parque eolico.
US20090212563A1 (en) * 2008-02-21 2009-08-27 General Electric Company System and method for improving performance of power constrained wind power plant
DE102008028568A1 (de) * 2008-06-16 2009-12-31 Nordex Energy Gmbh Verfahren zur Steuerung einer Windenergieanlage
DE102009037237A1 (de) * 2009-08-12 2011-02-17 Repower Systems Ag Verfahren und Anordnung zur automatischen Konfigurationsparameterkontrolle bei Windenergieanlagen
US8162788B2 (en) * 2009-08-27 2012-04-24 General Electric Company System, device and method for wind turbine control based on operating profiles
WO2011099147A1 (ja) * 2010-02-12 2011-08-18 三菱重工業株式会社 風力発電装置用ハンディ端末及び風力発電装置、並びに風力発電サイト
KR101156245B1 (ko) * 2010-02-18 2012-06-13 미츠비시 쥬고교 가부시키가이샤 풍력 발전 장치용 핸디 단말
DE102011000823A1 (de) * 2011-02-18 2012-08-23 Dewind Europe Gmbh Wartungsdatenspeicherung von Energieumwandlungsanlagen
EP2515507A1 (en) * 2011-04-19 2012-10-24 Siemens Aktiengesellschaft Auto-configuration of network devices
EP2515506A1 (en) * 2011-04-19 2012-10-24 Siemens Aktiengesellschaft Auto-configuration of network devices
WO2013021049A1 (de) 2011-08-11 2013-02-14 Peter Karl Verfahren zum betreiben, insbesondere zum kalibrieren von windkrafträdern, und windenergiepark mit mehreren windkrafträdern
DE102012204446A1 (de) * 2012-03-20 2013-09-26 Wobben Properties Gmbh Verfahren zum Konfigurieren einer Windenergieanlage, sowie Windenergieanlage
DE102012006259A1 (de) * 2012-03-29 2013-10-02 Repower Systems Se Chopperverstärkter Umrichter für Windenergieanlagen
DK201200260A (en) * 2012-04-13 2013-10-14 Electronic As Kk A configuration system for a wind turbine control system
WO2013182197A1 (en) 2012-06-04 2013-12-12 Vestas Wind Systems A/S Control system for a wind turbine
DK2940295T3 (en) 2014-04-29 2018-05-22 Gen Electric SYSTEM AND PROCEDURE FOR MANAGING A WINDOW PARK
US10352299B2 (en) * 2016-08-05 2019-07-16 General Electric Company System and method for automatically updating wind turbine data based on component self-identification
CN106523268B (zh) * 2016-11-04 2019-06-04 京电能源科技有限公司 扇叶可转向的风力发电风车
DE102018009549A1 (de) * 2018-12-10 2020-06-10 Senvion Gmbh Verfahren und System zum Parametrieren eines Reglers einer Windenergieanlage und/oder Betreiben einer Windenergieanlage
CN110259636B (zh) * 2019-06-24 2020-12-15 华润新能源(忻州)风能有限公司 一种风机控制方法
EP4036401A1 (en) * 2021-01-27 2022-08-03 Vestas Wind Systems A/S A method for transferring data from a wind farm to a data centre

Family Cites Families (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4534216A (en) * 1983-05-31 1985-08-13 United Technologies Corporation Method and apparatus for determining the accuracy of wind tunnel test data
US6035423A (en) 1997-12-31 2000-03-07 Network Associates, Inc. Method and system for providing automated updating and upgrading of antivirus applications using a computer network
US20020029097A1 (en) 2000-04-07 2002-03-07 Pionzio Dino J. Wind farm control system
DE10115267C2 (de) * 2001-03-28 2003-06-18 Aloys Wobben Verfahren zur Überwachung einer Windenergieanlage
JP4177759B2 (ja) * 2001-07-17 2008-11-05 株式会社アドバンテスト 入出力回路、及び試験装置
EP1438501B1 (en) * 2001-09-28 2009-08-19 Vestas Wind Systems A/S A method and a computer system for handling operational data of wind power plants
FI114170B (fi) 2002-03-14 2004-08-31 Metso Automation Oy Kunnonvalvontajärjestelmä koneenohjausjärjestelmällä varustettuja pyöriviä kone-elimiä sisältäviä koneita varten
US6975925B1 (en) * 2002-03-19 2005-12-13 Windlynx Systems, B.V. Forecasting an energy output of a wind farm
US6925385B2 (en) * 2003-05-16 2005-08-02 Seawest Holdings, Inc. Wind power management system and method
US7318154B2 (en) * 2003-09-29 2008-01-08 General Electric Company Various methods and apparatuses to provide remote access to a wind turbine generator system
US7013203B2 (en) 2003-10-22 2006-03-14 General Electric Company Wind turbine system control
EP1571746B1 (en) * 2004-03-05 2018-09-12 Gamesa Innovation & Technology, S.L. Active power regulating system of a wind farm
DE102005017054B4 (de) * 2004-07-28 2012-01-05 Igus - Innovative Technische Systeme Gmbh Verfahren und Vorrichtung zur Überwachung des Zustandes von Rotorblättern an Windkraftanlagen
US7298059B2 (en) * 2004-12-17 2007-11-20 General Electric Company System and method for operating a wind farm under high wind speed conditions
US7363808B2 (en) * 2005-12-05 2008-04-29 General Electric Company Method, system and computer program product for nacelle wind speed correction
BRPI0715737A2 (pt) * 2006-09-01 2013-05-07 Vestas Wind Sys As sistema de pelo menos duas turbinas eàlicas distribuÍdas, turbina eàlica compreendendo pelo menos um ponto de interseÇço uso da prioridade, e acionador de dispositivo de um ponto de interseÇço de uma turbina eàlica em uma rede de comunicaÇço de dados
US7895016B2 (en) * 2009-08-31 2011-02-22 General Electric Company System and method for wind turbine health management

Similar Documents

Publication Publication Date Title
JP2011518278A5 (https=)
JP5431454B2 (ja) 風力タービンの構成管理システムおよびその中央コンピュータシステム
US9529588B2 (en) Information processing apparatus and network system for updating firmware modules
JP2018106686A5 (https=)
US12213042B2 (en) System of actions for IOT devices
US9921882B2 (en) Information processing system, deployment method, processing device, and deployment device
US9432244B2 (en) Management device, information processing device and control method that use updated flags to configure network switches
US10567476B2 (en) Rule-based action triggering in a provider network
EP3133538A1 (en) Workflow management apparatus, workflow management method, and workflow management program
US9519537B2 (en) Apparatus, system and method for application log data processing
JP7274438B2 (ja) 資産情報管理システム、及び資産情報管理方法
US8266178B2 (en) Management apparatus, information processing apparatus, and method therefor
CN104394201A (zh) 分布式web应用监控方法
JP2011159011A (ja) ジョブ監視システム及びジョブ監視プログラム
CN103577200A (zh) 更新服务器的方法
US20120246497A1 (en) Controlling and minimizing electrical power consumed by electrical components connected to a networked computing environment
JP5936901B2 (ja) データ収集システム、及びデータ収集方法
US10528338B2 (en) Firmware distribution system, distribution apparatus, firmware distribution method and program recording medium
JP2008097498A5 (https=)
JP5283970B2 (ja) 耐障害業務情報システム
JP5669970B1 (ja) 情報管理システム及び配信装置及び情報管理方法
JP5331562B2 (ja) メタライフログ情報配信装置およびプログラム
JP5435103B2 (ja) 機器管理システム、機器管理装置及びプログラム
JP5835090B2 (ja) 複数装置の誤動作防止装置及び複数装置の誤動作防止方法
US20170060564A1 (en) Electronic device and method