JP2011186743A - Material operation management system - Google Patents

Material operation management system Download PDF

Info

Publication number
JP2011186743A
JP2011186743A JP2010050772A JP2010050772A JP2011186743A JP 2011186743 A JP2011186743 A JP 2011186743A JP 2010050772 A JP2010050772 A JP 2010050772A JP 2010050772 A JP2010050772 A JP 2010050772A JP 2011186743 A JP2011186743 A JP 2011186743A
Authority
JP
Japan
Prior art keywords
equipment
reservation
information
lending
manager
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2010050772A
Other languages
Japanese (ja)
Other versions
JP5562072B2 (en
Inventor
Yasuo Ueda
靖夫 上田
Yoshinobu Koyama
良信 小山
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
TAIYOKENKI RENTAL CO Ltd
Takasago Thermal Engineering Co Ltd
Original Assignee
TAIYOKENKI RENTAL CO Ltd
Takasago Thermal Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by TAIYOKENKI RENTAL CO Ltd, Takasago Thermal Engineering Co Ltd filed Critical TAIYOKENKI RENTAL CO Ltd
Priority to JP2010050772A priority Critical patent/JP5562072B2/en
Publication of JP2011186743A publication Critical patent/JP2011186743A/en
Application granted granted Critical
Publication of JP5562072B2 publication Critical patent/JP5562072B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To efficiently operate materials managed by a manager at a work site by obtaining immediately the materials required by a user in advance and by obtaining reliably the operation state of the materials at the work site. <P>SOLUTION: A material operation management system includes: a reservation accept means 12 which accepts use reservation of the materials based on reservation information containing the item name, use construction section, use period and number of used materials regarding the materials to be used; a lending management means 16 which manages lending of the materials by reading an ID card 32 owned by a dealer and a barcode 34 of a key 33 for using the materials upon lending the materials; a return management means 17 which manages return of the materials by reading the ID card 32 of the dealer and the barcode 34 of the key 33 for using the materials upon returning the materials; and a general control means 13 which automatically allocates the materials managed by the manager for the reservation of the dealer at least based on the reservation information of the reservation accept means 12, the lending information of the lending management means 16, and the return information of the return management means 17. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

この発明は、作業に必要な機材を貸出す機材運用管理システムに関し、とくに機材管理者が管理する機材の作業現場での運用を効率的に行うことが可能な機材運用管理システムに関する。   The present invention relates to a equipment operation management system that lends equipment necessary for work, and more particularly, to an equipment operation management system capable of efficiently operating equipment managed by a equipment manager at a work site.

工事期間が長期にわたる規模の大きな作業現場においては、作業に必要な機材のオペレータ業者などへの貸出や返却業務は人手に頼っており、機材管理者の業務は多忙で煩雑化するという問題があった。例えば、作業現場で使用する機材は、機材管理者がレンタル業者からレンタルした機材を使用しており、これらの機材をオペレータ業者に貸し出して効率的に運用することは、コストの低減からも機材管理者にとって重要なことである。   In large-scale work sites where the construction period is long, lending and returning work of equipment required for work to operator contractors, etc. rely on human resources, and the work of equipment managers is busy and complicated. It was. For example, the equipment used at the work site is equipment that has been rented from the rental company by the equipment manager, and renting these equipment to the operator company and operating it efficiently is equipment management from the viewpoint of cost reduction. It is important for a person.

そこで、建設工事の機材に関する技術として、機材センターなどのストック施設と建設工事現場との間で情報の収集や交換を円滑かつ速やかに行い、機材の配送効率を高めるようにした建設工事用資機材の管理システムが知られている(例えば、特許文献1参照。)。また、貸出した物品を制限時間内に確実に返却させるために、物品にICタグを添付して物品を管理する物品管理システムも知られている(例えば、特許文献2参照。)。さらに、鍵を利用してホテルのフロント業務や自動車の共同利用を行う予約管理システムが知られている(例えば、特許文献3、4参照。)。   Therefore, as a technology related to construction equipment, construction materials and equipment that facilitates the collection and exchange of information between stock facilities such as the equipment center and the construction work site smoothly and promptly to increase the delivery efficiency of the equipment. (For example, refer to Patent Document 1). Also, an article management system that manages an article by attaching an IC tag to the article in order to reliably return the lent article within a time limit is known (for example, see Patent Document 2). Furthermore, a reservation management system is known that uses a key for a hotel front desk service or a shared use of a car (see, for example, Patent Documents 3 and 4).

特開2003−203103号公報JP 2003-203103 A 特開2007−45592号公報JP 2007-45592 A 特開平11−324427号公報JP-A-11-324427 特開2006−11891号公報JP 2006-11891 A

しかしながら、工事期間が長期にわたる規模の大きな作業現場においては、管理する機材の対象が増加するのに伴い管理が煩雑化し、機材の適正な割り振りをするために多くの時間を必要とするという問題がある。機材管理者は、レンタル業者からの機材の調達を円滑に行うために、翌日に使用する機材についてオペレータ業者と前日に打ち合わせを行い、機材の使用予定(誰が、どこで、いつから、何を、何台使いたい)を正確に把握しているが、この打ち合わせに多くの時間を必要とするという問題がある。したがって、事前打ち合わせを必要とすることなく、オペレータ業者などの機材使用者に対して機材を適正に割り振ることが可能なシステムの開発が望まれる。   However, in a large work site with a long construction period, management becomes complicated as the number of equipment to be managed increases, and there is a problem that it takes a lot of time to properly allocate the equipment. is there. In order to smoothly procure equipment from rental companies, the equipment manager will discuss the equipment to be used the next day with the operator contractor on the previous day, and plan to use the equipment (who, where, from what, what, how many However, there is a problem that it takes a lot of time for this meeting. Therefore, it is desired to develop a system capable of appropriately allocating equipment to equipment users such as operator contractors without requiring prior meetings.

特許文献1の管理システムは、工事用資機材の配送効率を高めるためものであり、作業現場における機材の運用効率を高めることはできない。特許文献2の物品管理システムは、物品の返却のみを目的としたものであり、特許文献1と同様に機材の運用効率を高めることはできない。特許文献3、4は、鍵を利用する管理システムであり、ホテルのフロント業務の無人化や車の鍵の受け渡しを確実に行うことが可能であるが、管理者が管理する機材の運用効率を高めることはできない。   The management system of Patent Document 1 is intended to increase the delivery efficiency of construction materials and equipment, and cannot improve the operation efficiency of equipment at the work site. The article management system of Patent Document 2 is intended only for the return of goods, and cannot improve the operational efficiency of equipment as in Patent Document 1. Patent documents 3 and 4 are management systems that use keys, which can unmanned hotel front desk operations and deliver car keys reliably. It cannot be increased.

そこでこの発明は、機材使用者の必要とする機材を予め迅速に把握するとともに、作業現場での機材の運用状況を確実に把握し、機材管理者が管理する機材の作業現場での運用を効率的に行うことが可能な機材運用管理システムを提供することを目的とする。   Therefore, the present invention quickly grasps the equipment required by the equipment user in advance, and reliably grasps the operation status of the equipment at the work site, thereby efficiently operating the equipment managed by the equipment manager at the work site. The purpose is to provide an equipment operation management system that can be carried out automatically.

上記目的を達成するために請求項1に記載の発明は、使用予定の機材に関する少なくとも品名と使用工区と使用期間と使用台数とを含む機材使用者からの予約情報に基づき前記機材の使用予約を受付ける予約受付手段と、前記機材使用者が所有する認証手段の情報と前記機材を使用するための鍵に取付けられる機材認識コードの情報とを前記機材の貸出し時に読取ることで機材管理者から前記機材使用者への前記機材の貸出しを管理する貸出管理手段と、前記機材使用者の前記認証手段の情報と前記機材を使用するための鍵に取付けられる機材認識コードの情報とを前記機材の返却時に読取ることで前記機材使用者からの前記機材管理者への前記機材の返却を管理する返却管理手段と、前記予約受付手段の予約情報と前記貸出管理手段の貸出情報と前記返却管理手段の返却情報とに基づき、少なくとも前記機材使用者の予約に対する前記機材管理者が管理する前記機材の自動割り振りを行う統括制御手段と、を備えたことを特徴とする機材運用管理システムである。   In order to achieve the above-mentioned object, the invention according to claim 1 makes the use reservation of the equipment based on reservation information from the equipment user including at least the product name, the working area, the use period, and the number of the equipment to be used. The equipment manager reads the reservation accepting means, the information of the authentication means owned by the equipment user and the information of the equipment recognition code attached to the key for using the equipment at the time of renting the equipment. Lending management means for managing the lending of the equipment to the user, information on the authentication means of the equipment user and information on the equipment recognition code attached to the key for using the equipment when returning the equipment Read management means for managing return of the equipment from the equipment user to the equipment manager by reading, reservation information of the reservation receiving means, and rental of the rental management means And an overall control means for automatically allocating the equipment managed by the equipment manager for the reservation of the equipment user based on the information and the return information of the return management means. It is a management system.

この発明によれば、認証手段と機材認識コードの組み合わせを利用して機材使用者に対する機材の貸出しおよび返却を管理するので、作業現場での機材の運用状況を確実に把握することができ、機材管理者が管理する機材の機材使用者への適正な割り振りが可能となる。   According to the present invention, since the rental and return of the equipment to the equipment user is managed using a combination of the authentication means and the equipment recognition code, it is possible to reliably grasp the operation status of the equipment at the work site. Appropriate allocation of the equipment managed by the administrator to the equipment users becomes possible.

請求項2に記載の発明は、請求項1に記載の機材運用管理システムにおいて、前記統括制御手段は、同一の機材が継続して同一の機材使用者によって使用される予約の場合は最優先で前記同一の機材使用者に前記同一の機材を割り当てる機能と、同一の工区における空き機材を優先的に同一の工区で作業を行う機材使用者に割り当てる機能と、予約した機材が前記機材管理者側に存在しない場合は代替の機材を割り当てる機能とを有することを特徴としている。   According to a second aspect of the present invention, in the equipment operation management system according to the first aspect, the overall control means has the highest priority in the case of reservation in which the same equipment is continuously used by the same equipment user. The function of assigning the same equipment to the same equipment user, the function of allocating empty equipment in the same work area to the equipment user who works preferentially in the same work area, and the reserved equipment is the equipment manager side If it does not exist, it has a function of assigning alternative equipment.

請求項3に記載の発明は、請求項1または2に記載の機材運用管理システムにおいて、前記貸出管理手段は、前記機材使用者への機材の貸出時には、貸出される機材の場所が表示された貸出票を作成することを特徴としている。   According to a third aspect of the present invention, in the equipment operation management system according to the first or second aspect, the rental management means displays the location of the equipment to be rented when renting the equipment to the equipment user. It is characterized by creating a loan slip.

請求項4に記載の発明は、請求項1ないし3のいずれか1項に記載の機材運用管理システムにおいて、前記機材使用者による前記機材の予約は、前記予約受付手段と通信可能な前記機材使用者の端末機によって行われることを特徴としている。   According to a fourth aspect of the present invention, in the equipment operation management system according to any one of the first to third aspects, reservation of the equipment by the equipment user uses the equipment that can communicate with the reservation receiving means. It is characterized by being performed by a person's terminal.

請求項1に記載の発明によれば、機材使用者の必要とする機材を予め迅速に把握するとともに、作業現場での機材の運用状況を確実に把握することができるので、機材使用者の予約に対する機材管理者が管理する機材の自動割り振り適正なものとすることができ、機材管理者が管理する機材の作業現場での運用を効率的に行うことが可能となる。これにより、機材管理者が管理する機材を高稼働率で運用することができ、機材調達に要する費用を削減することができる。また、従来必要とされた機材管理者と機材使用者との事前打ち合わせが不要となるので、機材管理者および機材使用者の双方の作業効率を高めることができる。   According to the first aspect of the present invention, since the equipment required by the equipment user can be quickly grasped in advance and the operation status of the equipment at the work site can be surely grasped. Therefore, it is possible to appropriately allocate the equipment managed by the equipment manager to the work site, and to efficiently operate the equipment managed by the equipment manager at the work site. As a result, the equipment managed by the equipment manager can be operated at a high operating rate, and the cost required for equipment procurement can be reduced. In addition, since it is not necessary to make a prior meeting between the equipment manager and the equipment user, which has been required in the past, the work efficiency of both the equipment manager and the equipment user can be improved.

請求項2に記載の発明によれば、最優先で同一の機材使用者に同一の機材を割り当てるようにしているので、同一の場所で作業する機材使用者にとって機材の移動が不要となり、作業効率を高めることができる。また、同一の工区における空き機材を優先的に同一の工区で作業を行う機材使用者に割り当てることができるので、機材の移動に要する労力を軽減することができる。さらに、予約した機材が機材管理者側に存在しない場合は、代替の機材を割り当てることができるので、機材使用者は代替の機材によって作業を予定通り行うことが可能となり、工期の短縮が図れる。   According to the invention described in claim 2, since the same equipment is assigned to the same equipment user with the highest priority, the equipment users who work in the same place do not need to move the equipment, and work efficiency is improved. Can be increased. In addition, since empty equipment in the same work area can be preferentially assigned to equipment users who work in the same work area, the labor required for moving the equipment can be reduced. Furthermore, when the reserved equipment does not exist on the equipment manager side, an alternative equipment can be allocated, so that the equipment user can perform the work with the alternative equipment as scheduled, and the construction period can be shortened.

請求項3に記載の発明によれば、貸出される機材の場所が表示された貸出票を作成するようにしているので、使用する機材の場所を事前に把握することができ、規模の大きな作業現場の場合でも使用する機材を容易に特定することができる。   According to the invention described in claim 3, since the lending slip displaying the location of the equipment to be rented is created, the location of the equipment to be used can be grasped in advance, and a large-scale work is performed. The equipment to be used can be easily identified even in the field.

請求項4に記載の発明によれば、機材使用者による機材の予約は、予約受付手段と通信可能な機材使用者の端末機によって行うことができるので、機材使用者と機材管理者が離れた場所にいる場合でも、機材使用者から機材管理者側への予約手続きが容易となり、予約手続きの効率化を図ることができる。   According to the invention described in claim 4, since the reservation of the equipment by the equipment user can be performed by the equipment user's terminal that can communicate with the reservation receiving means, the equipment user and the equipment manager are separated. Even when you are in the place, the reservation procedure from the equipment user to the equipment manager side becomes easy, and the reservation procedure can be made more efficient.

本発明の実施の形態に係わる機材運用管理システムの概要を示すブロック図である。It is a block diagram which shows the outline | summary of the equipment operation management system concerning embodiment of this invention. 図1の機材運用管理システムにおける機材および情報の流れを示すブロック図である。It is a block diagram which shows the flow of the equipment and information in the equipment operation management system of FIG. 図1の機材運用管理システムにおける機材担当者によるオペレータ業者への機材の貸出し手順を示すフローチャートである。It is a flowchart which shows the rental procedure of the equipment to the operator contractor by the equipment person in charge in the equipment management system of FIG. 図1の機材運用管理システムにおける予約にない機材の貸出し手順を示すフローチャートである。It is a flowchart which shows the rental procedure of the equipment which is not in the reservation in the equipment operation management system of FIG. 図1の機材運用管理システムにおける機材の返却手順を示すフローチャートである。It is a flowchart which shows the return procedure of the equipment in the equipment operation management system of FIG. 図1の機材運用管理システムにおける各手段の相互関係を示すブロック図である。It is a block diagram which shows the mutual relationship of each means in the equipment operation management system of FIG. 図1の機材運用管理システムにおける機材の予約手順を示す概要図である。It is a schematic diagram which shows the reservation procedure of the apparatus in the apparatus operation management system of FIG. 図1の機材運用管理システムにおける機材の割当て手順を示す概要図である。It is a schematic diagram which shows the allocation procedure of the apparatus in the apparatus operation management system of FIG. 図2における機材管理者からレンタル業者への機材の発注および入庫の手順を示す概要図である。FIG. 3 is a schematic diagram showing a procedure for ordering and warehousing equipment from the equipment manager in FIG. 2 to a rental company. 図2の機材管理者側における貸出前準備作業の手順を示す概要図である。It is a schematic diagram which shows the procedure of the preparatory preparation work in the equipment manager side of FIG. 図2の機材管理者からオペレータ業者への機材の貸出し手順を示す概要図である。FIG. 3 is a schematic diagram showing a procedure for lending equipment from an equipment manager in FIG. 2 to an operator. 図2の機材管理者からオペレータ業者への予約にない機材の貸出し手順を示す概要図である。FIG. 3 is a schematic diagram showing a rental procedure for equipment that is not in the reservation from the equipment manager in FIG. 2 to the operator. 図2のオペレータ業者から機材管理者への機材の返却手順を示す概要図である。It is a schematic diagram which shows the return procedure of the equipment from the operator supplier of FIG. 2 to an equipment manager. 図2の機材管理者からレンタル業者への機材の出庫手順を示す概要図である。It is a schematic diagram which shows the delivery procedure of the equipment from the equipment manager of FIG. 2 to a rental agent. 図1の機材運用管理システムにおける機材の稼動実績の管理内容を示す概要図である。It is a schematic diagram which shows the management content of the operation result of the equipment in the equipment operation management system of FIG. 図2の機材管理者からレンタル業者への機材発注に用いられる手配依頼書の平面図である。FIG. 3 is a plan view of an arrangement request form used for ordering equipment from the equipment manager of FIG. 2 to a rental company. 図2の機材管理者からレンタル業者へ送られる機材の入庫確認表の平面図である。FIG. 3 is a plan view of a warehousing confirmation table of equipment sent from the equipment manager to the rental company in FIG. 2. 図2の機材管理者からオペレータ業者に発行される貸出票の平面図である。FIG. 3 is a plan view of a loan slip issued from the equipment manager of FIG. 2 to an operator company. 図2の機材管理者からオペレータ業者に発行される返却票の平面図である。FIG. 3 is a plan view of a return ticket issued from the equipment manager of FIG. 2 to an operator company.

つぎに、この発明の実施の形態について図面を用いて詳しく説明する。   Next, embodiments of the present invention will be described in detail with reference to the drawings.

図1ないし図19は、この発明の実施の形態を示しており、例えば大規模な施設に関する空調設備の施工作業現場における機材の運用管理に適用した場合を示している。図2は、施工作業に関する機材の流れと情報の流れを示している。空調設備の施工作業に必要な機材には多くの種類があり、図9に示すように、機材30の一例として高所で安全に作業を行うための高所作業車がある。この実施の形態においては、機材管理者36は、高所作業車などの機材30をレンタル業者38からレンタルし、この機材30を機材使用者としてのオペレータ業者37に貸出すようにしている。   FIGS. 1 to 19 show an embodiment of the present invention, for example, a case where the present invention is applied to equipment operation management at a construction work site of an air conditioning equipment concerning a large-scale facility. FIG. 2 shows the flow of equipment and information regarding construction work. There are many types of equipment necessary for the construction work of the air conditioning equipment. As shown in FIG. 9, there is an aerial work vehicle for safely performing work at a high place as an example of the equipment 30. In this embodiment, the equipment manager 36 rents equipment 30 such as an aerial work vehicle from a rental dealer 38 and rents the equipment 30 to an operator dealer 37 as a equipment user.

図2は、レンタル業者38と機材管理者36とオペレータ業者37との間での機材30および情報の流れを示している。図2に示すように、機材30のオペレータ業者37への貸出しは、原則としてオペレータ業者(ここでは、機材を借り受けてその操作により作業を行う業者)37が機材管理者36に予約をすることにより行われる。機材管理者36は、オペレータ業者37からの予約情報に基づき、必要に応じてレンタル業者38へ機材30の発注を行い、レンタル業者38は、これに基づき機材管理者36へオペレータ業者37が予約した機材30を入庫(納入)するようになっている。機材管理者36は、入庫した機材30を予約したオペレータ業者37に貸出し、機材30の使用後には、オペレータ業者37は使用した機材30を機材管理者36に返却するようになっている。機材管理者36は、作業現場で使用しなくなった機材30について、レンタル業者38に出庫(返納)するようにしている。機材管理者36は、レンタル業者38からの機材30の調達をできる限り少なく抑えるために、管理する機材30の効率的な運用を図っている。   FIG. 2 shows the flow of equipment 30 and information among the rental trader 38, the equipment manager 36, and the operator trader 37. As shown in FIG. 2, the rental of the equipment 30 to the operator dealer 37 is made in principle by the operator dealer (a trader who borrows the equipment and works by the operation) 37 makes a reservation with the equipment manager 36. Done. The equipment manager 36 orders the equipment 30 from the rental dealer 38 as necessary based on the reservation information from the operator dealer 37, and the rental dealer 38 makes a reservation to the equipment manager 36 based on the order. The equipment 30 is received (delivered). The equipment manager 36 lends the received equipment 30 to the reserved operator 37, and after the equipment 30 is used, the operator 37 returns the used equipment 30 to the equipment manager 36. The equipment manager 36 issues (returns) the equipment 30 that is no longer used at the work site to the rental company 38. The equipment manager 36 attempts to efficiently operate the equipment 30 to be managed in order to minimize the procurement of the equipment 30 from the rental company 38 as much as possible.

この実施の形態においては、機材管理者36による機材30のオペレータ業者37への貸出しは、1日を区切りとして行われる。すなわち、機材管理者36による機材30の管理は、午前中に機材30が機材管理者36からオペレータ業者37に貸出され、同じ日の午後にオペレータ業者37から機材管理者36に機材30を返却することが前提となっている。つまり、同じ機材30を用いた作業が次の日も継続される場合であっても、機材30は一旦オペレータ業者38から機材管理者36に返却される。オペレータ業者37による機材30の予約は、例えば機材30貸出し日の前日の午後0時で締め切られる。   In this embodiment, the equipment manager 36 lends the equipment 30 to the operator dealer 37 every day. That is, in the management of the equipment 30 by the equipment manager 36, the equipment 30 is rented from the equipment manager 36 to the operator contractor 37 in the morning, and the equipment 30 is returned from the operator contractor 37 to the equipment manager 36 in the afternoon of the same day. It is assumed that. That is, even if the work using the same equipment 30 is continued on the next day, the equipment 30 is once returned from the operator 38 to the equipment manager 36. The reservation of the equipment 30 by the operator 37 is closed, for example, at 0:00 on the day before the equipment 30 rental date.

図1は、図2の機材管理者36が運用する機材運用管理システム1を示している。機材運用管理システム1は、例えばコンピュータ11から構成されている。機材運用管理システム1は、図1に示すように、予約受付手段12、統括制御手段13、入庫管理手段14、出庫管理手段15、貸出管理手段16、返却管理手段17、稼動実績管理手段19、稼動履歴管理手段20、入力手段21、出力手段22と、を有している。   FIG. 1 shows the equipment operation management system 1 operated by the equipment manager 36 of FIG. The equipment operation management system 1 is composed of, for example, a computer 11. As shown in FIG. 1, the equipment operation management system 1 includes a reservation receiving means 12, an overall control means 13, a warehousing management means 14, a warehousing management means 15, a lending management means 16, a return management means 17, an operation result management means 19, An operation history management unit 20, an input unit 21, and an output unit 22 are included.

図1の予約受付手段12は、機材使用者としてのオペレータ業者37からの予約情報に基づき機材30の使用予約を受付ける機能を有している。オペレータ業者37からの予約情報には、少なくとも使用を予定する機材30に関する「品名」と「工区」と「使用期間」と「使用台数」とを含まれる。「品名」には、機材30の種類名およびサイズなども含まれる。「工区」は、工事区分と呼ばれるもので、工事現場における特定の作業領域を意味する。   The reservation receiving means 12 in FIG. 1 has a function of receiving a reservation for use of the equipment 30 based on reservation information from an operator dealer 37 as a equipment user. The reservation information from the operator contractor 37 includes at least “article name”, “work zone”, “use period”, and “use number” regarding the equipment 30 to be used. The “product name” includes the type name and size of the equipment 30. The “work zone” is called a construction category, and means a specific work area on the construction site.

図6に示すように、予約受付手段12が受け付けるオペレータ業者37からの情報は、「予約」だけでなく「変更」も含まれる。オペレータ業者37からの予約は、2週間先まで可能となっている。「変更」には、空き機材30の当日予約の入力、返却済み機材の追加貸出し、予約情報の変更、予約情報の取消しなどが含まれる。オペレータ業者37からの情報は、図1に示すオペレータ37が所有する端末機としてパーソナルコンピュータ(PC)31から情報通信網35を介して予約受付手段12に送られる構成となっている。この実施の形態においては、情報通信網35として無線LAN(Local Area Network)が用いられている。   As shown in FIG. 6, the information from the operator agent 37 received by the reservation receiving unit 12 includes not only “reservation” but also “change”. Reservation from the operator 37 is possible up to two weeks ahead. “Change” includes input of a reservation for the empty equipment 30 on the day, additional rental of returned equipment, change of reservation information, cancellation of reservation information, and the like. Information from the operator 37 is sent from the personal computer (PC) 31 to the reservation receiving means 12 via the information communication network 35 as a terminal owned by the operator 37 shown in FIG. In this embodiment, a wireless LAN (Local Area Network) is used as the information communication network 35.

図1の入庫管理手段14は、レンタル業者38から機材管理者36へ入庫(納入)される機材30の入庫管理を行う機能を有している。図6に示すように、入庫管理手段14は、レンタル業者38から入庫される機材30の機材データの自動登録、鍵用バーコードと機材30とを連携させる機能を有している。また、入庫管理手段14は、図17に示すように、レンタル業者38からレンタルした機材30の一覧を表示する入庫確認表42を作成する機能を有している。   The warehousing management means 14 of FIG. 1 has a function of performing warehousing management of the equipment 30 that is received (delivered) from the rental agent 38 to the equipment manager 36. As shown in FIG. 6, the warehousing management means 14 has a function of automatically registering the equipment data of the equipment 30 received from the rental company 38 and linking the key barcode with the equipment 30. Further, the warehousing management means 14 has a function of creating a warehousing confirmation table 42 for displaying a list of equipment 30 rented from the rental agent 38 as shown in FIG.

図1の出庫管理手段15は、機材管理者36からレンタル業者38へ出庫(返納)される機材30の出庫管理を行う機能を有している。図6に示すように、出庫管理手段15は、例えばレンタル業者38への機材30の引取依頼書(図16の手配依頼書41が相当する)を作成する機能を有している。また、出庫管理手段15は、特定の機材30が貸出し中である場合は、その機材30の予約をNGとする機能を有している。さらに、出庫管理手段15は、返却後の鍵33の番号(キーNo.)を再利用することができる機能を有している。   The delivery management means 15 in FIG. 1 has a function of performing delivery management of the equipment 30 delivered (returned) from the equipment manager 36 to the rental company 38. As shown in FIG. 6, the delivery management means 15 has a function of creating a request for taking the equipment 30 to the rental agent 38 (corresponding to the arrangement request 41 in FIG. 16). Further, when the specific equipment 30 is being rented, the delivery management means 15 has a function of setting the reservation of the equipment 30 to NG. Furthermore, the exit management means 15 has a function that can reuse the number (key No.) of the key 33 after the return.

図1の貸出管理手段16は、機材管理者36からオペレータ業者37への機材30の貸出しを管理する機能を有している。すなわち、貸出管理手段16は、機材30の貸出し時に、オペレータ業者37が所有する認証カードとしてのIDカード32の情報と、機材30を稼動させるための鍵(キー)33に取付けられる機材認識コードとしてのバーコード34の情報とを読取ることで、機材管理者36からオペレータ業者37への機材30の貸出しを管理する機能を有している。貸出管理手段16におけるIDカード32の情報およびバーコード34の情報の読み取りは、バーコードリーダ18を介して行われる。IDカード32は、バーコードが付与されたICカードであってもよいし、磁気カードなどから構成してもよい。   The lending management means 16 in FIG. 1 has a function of managing lending of the equipment 30 from the equipment manager 36 to the operator contractor 37. That is, the lending management means 16 provides information on the ID card 32 as an authentication card owned by the operator 37 and a device recognition code attached to a key 33 for operating the device 30 when the device 30 is rented. And the information on the bar code 34 are read, and the rental of the equipment 30 from the equipment manager 36 to the operator contractor 37 is managed. Reading of the information of the ID card 32 and the information of the barcode 34 in the lending management means 16 is performed via the barcode reader 18. The ID card 32 may be an IC card to which a barcode is attached, or may be constituted by a magnetic card or the like.

図6に示すように、貸出管理手段16は、読み取ったIDカード32の情報から機材30を貸出すオペレータ業者37を識別することが可能となっている。また、貸出管理手段16は、読み取ったバーコード34の情報から鍵33の番号(キーNo.)を確認することが可能となっている。貸出管理手段16は、IDカード32の情報およびバーコード34の情報の読み取りを行うことにより、機材30が貸出中(使用中)であることを把握することが可能となる。貸出管理手段16は、オペレータ業者37への機材30の貸出時には、鍵33に対応する機材30の保管位置が表示された貸出票43を作成する機能を有している。   As shown in FIG. 6, the lending management means 16 can identify the operator company 37 that lends the equipment 30 from the read information of the ID card 32. Further, the lending management means 16 can confirm the number (key No.) of the key 33 from the read bar code 34 information. The lending management means 16 can grasp that the equipment 30 is rented (in use) by reading the information on the ID card 32 and the information on the barcode 34. The lending management means 16 has a function of creating a lending slip 43 on which the storage position of the device 30 corresponding to the key 33 is displayed when lending the device 30 to the operator contractor 37.

図1の返却管理手段17は、オペレータ業者37からの機材管理者36への機材30の返却を管理する機能を有している。すなわち、返却管理手段17は、機材30の返却時に、オペレータ業者37が所有するIDカード32の情報と、機材30を稼動させるための鍵33に取付けられるバーコード34の情報とを読取ることで、オペレータ業者37からの機材管理者36への機材30の返却を管理する機能を有している。返却管理手段17におけるIDカード32の情報およびバーコード34の情報の読み取りは、貸出管理手段16と同様にバーコードリーダ18を介して行われる。   The return management means 17 in FIG. 1 has a function of managing the return of the equipment 30 from the operator contractor 37 to the equipment manager 36. That is, the return management means 17 reads the information on the ID card 32 owned by the operator 37 and the information on the barcode 34 attached to the key 33 for operating the equipment 30 when the equipment 30 is returned. It has a function of managing the return of the equipment 30 from the operator supplier 37 to the equipment manager 36. The information of the ID card 32 and the information of the barcode 34 in the return management means 17 are read via the barcode reader 18 as in the rental management means 16.

図6に示すように、返却管理手段17は、読み取ったIDカード32の情報から機材30を返却するオペレータ業者37を識別することが可能となっている。また、返却管理手段17は、読み取ったバーコード34の情報から鍵33の番号(キーNo.)を確認することが可能となっている。返却管理手段17は、IDカード32の情報およびバーコード34の情報の読み取りを行うことにより、機材30の返却が終了したことを把握することが可能となる。返却管理手段17には、機材30の返却時に、入力手段21を介して機材30の在庫(保管)場所を登録することが可能となっている。   As shown in FIG. 6, the return management means 17 can identify the operator contractor 37 that returns the equipment 30 from the read information of the ID card 32. Moreover, the return management means 17 can confirm the number (key No.) of the key 33 from the read information of the barcode 34. The return management means 17 can grasp that the return of the equipment 30 has been completed by reading the information of the ID card 32 and the information of the barcode 34. The return management means 17 can register the inventory (storage) location of the equipment 30 via the input means 21 when the equipment 30 is returned.

図1の統括制御手段13は、機材30の予約の締め切りを行い、翌日予約の確定および機材30の貸出予定に対する自動割振りを行う機能を有している。すなわち、統括制御手段13は、予約受付手段12の予約情報と、貸出管理手段16の貸出情報と、返却管理手段17の返却情報とに基づき、少なくとも機材管理者36が保有する機材30の予約に対するオペレータ業者37へ自動割り振りを行う機能を有している。   The overall control means 13 in FIG. 1 has a function of performing a deadline for reservation of the equipment 30, confirming the next day reservation, and automatically allocating the equipment 30 to the rental schedule. In other words, the overall control unit 13 responds to the reservation of the equipment 30 held by at least the equipment manager 36 based on the reservation information of the reservation receiving means 12, the rental information of the rental management means 16, and the return information of the return management means 17. It has a function of automatically allocating to the operator contractor 37.

図6に示すように、統括制御手段13は、同一の機材30が継続して同一のオペレータ37によって使用される場合は、同一の機材30を最優先で同一のオペレータ業者37に割り当てる機能を有している。また、統括制御手段13は、同一の工区における空き機材30を優先的に同一の工区での作業を行うオペレータ業者37に割り当てる機能を有している。さらに、統括制御手段13は、工区、機材別での機材30の不足台数を把握し、この台数を表示する機能を有している。   As shown in FIG. 6, the overall control means 13 has a function of assigning the same equipment 30 to the same operator contractor 37 with the highest priority when the same equipment 30 is continuously used by the same operator 37. is doing. The overall control means 13 has a function of preferentially assigning the empty equipment 30 in the same work area to the operator contractor 37 who performs work in the same work area. Furthermore, the overall control means 13 has a function of grasping the shortage of the equipment 30 by work zone and equipment, and displaying this number.

また、図6の統括制御手段13は、機材管理者36への管理支援を行う機能も有している。例えば、該当する機材30がない場合は、代替の機材30を割り当てることを可能とする機能を有している。また、別の工区から機材30を割り当てることも可能となっている。さらに、統括制御手段13は、予約から保有している機材30の過不足を工区別に把握することが可能となっており、これにより不足する機材30の発注および余剰となる機材30の返却を機材管理者36に指示し、工区間における機材30の移動を効率よく行う機能を有している。   Further, the overall control means 13 of FIG. 6 also has a function of providing management support to the equipment manager 36. For example, when there is no corresponding equipment 30, it has a function that makes it possible to assign an alternative equipment 30. It is also possible to allocate the equipment 30 from another work area. Furthermore, the overall control means 13 can grasp the excess or deficiency of the equipment 30 held from the reservation in terms of construction, thereby ordering the insufficient equipment 30 and returning the excess equipment 30. It has a function of instructing the manager 36 to efficiently move the equipment 30 in the construction section.

図1の稼動実績管理手段19は、貸出管理手段16と返却管理手段17と統括制御手段13とからの情報に基づき、少なくともオペレータ業者37に貸出している機材30の稼動実績を把握する機能を有している。図6に示すように、稼動実績管理手段19は、予約一覧を作成することが可能となっており、これにより工区別、オペレータ業者別の予約状況と機材30の過不足を把握し、予約入力の促進を図っている。また、稼動実績管理手段19は、当日貸出しまたは返却状況に対する問い合わせが可能となっており、これにより、予約に対する割当、貸出し、返却の漏れを確認し、オペレータ業者の指導による基本ルールの徹底を図っている。   The operation result management means 19 in FIG. 1 has a function of grasping at least the operation results of the equipment 30 rented to the operator contractor 37 based on information from the lending management means 16, the return management means 17, and the overall control means 13. is doing. As shown in FIG. 6, the operation result management means 19 can create a reservation list, which makes it possible to identify the construction, the reservation status for each operator and the excess or deficiency of the equipment 30, and input the reservation. We are trying to promote. In addition, the operation result management means 19 can inquire about the lending or return status on the day, thereby confirming the omission of allocation, lending and return for the reservation, and thorough the basic rules under the guidance of the operator contractor. ing.

稼動実績管理手段19は、図15に示す稼動実績表45〜47を作成する機能を有している。これにより、機材30、工区別の保有、稼動状況を日々把握することが可能となっており、機材30の保有数を適正化するようにしている。さらに、稼動実績管理手段19は、オペレータ業者別の実績も管理する機能を有している。すなわち、オペレータ業者37の月別の使用実態を把握するとともに、オペレータ業者37の機材30利用実態を管理し、レンタル料金は利用実態に即した費用按分としている。稼動実績管理手段19は、入庫した機材30の在庫一覧を作成することが可能となっている。これにより、機材30の置き場、使用場所を的確に把握することができ、効率的な機材30の在庫管理(在庫調査)が可能となる。ここで、オペレータ業者37の稼動実績において、同じ機材30を複数のオペレータ業者37が共有して使用した場合は、レンタル料金を共有者で按分することが可能となっている。   The operation result management means 19 has a function of creating operation result tables 45 to 47 shown in FIG. Thereby, it is possible to grasp the possession of the equipment 30 and the construction distinction and the operation status every day, and the number of possession of the equipment 30 is optimized. Further, the operation result management means 19 has a function of managing the results for each operator. In other words, the monthly usage status of the operator contractor 37 is grasped and the usage status of the equipment 30 of the operator contractor 37 is managed, and the rental fee is allocated to the cost according to the usage status. The operation result management means 19 can create an inventory list of the equipment 30 that has been received. This makes it possible to accurately grasp the place where the equipment 30 is used and where it is used, and enables efficient inventory management (inventory survey) of the equipment 30. Here, in the operation record of the operator dealer 37, when the same equipment 30 is shared and used by a plurality of operator dealers 37, the rental charge can be apportioned by the sharer.

図1の稼動履歴管理手段20は、出庫管理手段15と統括制御手段13とからの情報に基づき、オペレータ業者37の使用による機材30の稼動履歴を把握する機能を有している。図6に示すように、稼動履歴管理手段20は、利用責任者の把握と管理を行うものであり、機材30の利用者を限定し、機材30の故障、トラブル発生時の追跡を行うキーNo.による稼動履歴の問い合わせ、いつ、誰が、どこで使用したかを確認する機能を有している。また、稼動履歴管理手段20は、レンタル業者38へ出庫した機材30でも、オペレータ業者37の管理No.に基づき履歴検索が可能となっている。また、レンタル業者38からの修理請求に対し、使用者履歴を同様に確認することが可能となっている。   The operation history management unit 20 in FIG. 1 has a function of grasping the operation history of the equipment 30 by the use of the operator contractor 37 based on information from the delivery management unit 15 and the overall control unit 13. As shown in FIG. 6, the operation history management means 20 is for grasping and managing the person in charge of use, limiting the user of the equipment 30, and key No. for tracking when the equipment 30 is broken or trouble occurs. . It has the function of confirming the operation history by which and when and who used it. In addition, the operation history management means 20 is the management number of the operator dealer 37 even for the equipment 30 delivered to the rental dealer 38. Based on the history search is possible. In addition, it is possible to check the user history in response to a repair request from the rental company 38.

図1の入力手段21は、例えばコンピュータのキーボードから構成されており、統括制御手段13への情報の入力が可能となっている。例えば、レンタル業者38から機材管理者36へ入庫される機材30の登録は、入力手段21を介して行われる。図1の出力手段22は、例えばコンピュータのプリンターから構成されている。出力手段22は、図18に示す貸出票43および図19に示す返却票44をプリントアウトする機能を有している。   The input means 21 shown in FIG. 1 is composed of a computer keyboard, for example, and can input information to the overall control means 13. For example, registration of the equipment 30 that is received from the rental agent 38 to the equipment manager 36 is performed via the input means 21. The output means 22 in FIG. 1 is constituted by a computer printer, for example. The output means 22 has a function of printing out the loan slip 43 shown in FIG. 18 and the return slip 44 shown in FIG.

つぎに、機材運用管理システム1を用いた機材30の運用管理手順および作用について説明する。   Next, the operation management procedure and operation of the equipment 30 using the equipment operation management system 1 will be described.

図3は、機材管理者37によるオペレータ業者37への機材30の貸出し手順を示している。図3のステップS51で機材30の貸出しに関する処理が開始され、ステップS52においてはオペレータ業者37による機材30の予約が行われる。機材30の予約は、図7に示すように、オペレータ業者37が自分のIDカード32の情報をパーソナルコンピュータ31のバーコードリーダ31aを介して読み取り、つぎにパーソナルコンピュータ31のキーボードを介して必要な機材30に関する情報をパーソナルコンピュータ31に入力することにより行われる。この予約は、機材30を使用する前日の規定の時間(午後0時)までに行われる。すなわち、パーソナルコンピュータ31には図7の予約表が表示されるので、明日は「どこで」「何台」の機材30が必要になるかを予約表に入力する。   FIG. 3 shows a procedure for lending the equipment 30 to the operator contractor 37 by the equipment manager 37. In step S51 of FIG. 3, processing related to the rental of the equipment 30 is started, and in step S52, the operator 30 reserves the equipment 30. As shown in FIG. 7, the reservation of the equipment 30 is required by the operator contractor 37 reading the information on his / her ID card 32 through the bar code reader 31 a of the personal computer 31 and then using the keyboard of the personal computer 31. This is done by inputting information related to the equipment 30 to the personal computer 31. This reservation is made by a predetermined time (0:00 pm) the day before using the equipment 30. That is, since the reservation table of FIG. 7 is displayed on the personal computer 31, “where” and “how many” equipment 30 are input to the reservation table tomorrow.

つぎに、ステップS53において、すべてのオペレータ業者37からの機材30の予約が締め切られる。上述したように、オペレータ業者37による機材30の予約は、例えば機材30貸出し日の前日の午後0時で締め切られるが、先日付けの仮締め切りも可能となっている。すなわち、この実施の形態においては、翌々日(次の作業日)についてのオペレータ業者37からの予約の仮締め切りが可能であり、仮締め切りした予約一覧および機材割当表をオペレータ業者37に示すことで、予約内容の確認を促し、予約情報のより正確な入力を促すことが可能となっている。   Next, in step S53, reservations for the equipment 30 from all operator contractors 37 are closed. As described above, the reservation of the equipment 30 by the operator 37 is closed at, for example, 0:00 on the day before the rental date of the equipment 30, but a provisional deadline on the other day is also possible. That is, in this embodiment, the provisional deadline of the reservation from the operator contractor 37 for the next day (the next work day) is possible, and by displaying the provisional list of reservations and the equipment allocation table to the operator contractor 37, It is possible to prompt confirmation of reservation contents and to promptly input reservation information more accurately.

オペレータ業者37からの機材30の予約が締め切られると、ステップS54に進み、統括制御手段13により機材管理者37側における機材30の運用状況が把握される。すなわち、ステップS54においては、統括制御手段13は、機材30の予約情報、貸出情報、返却情報とから、機材管理者37が管理する機材30に過不足がないかを把握し、機材30の過不足数を表示する。機材管理者36は、統括制御手段13からの情報に基づき、レンタル業者38からの機材30の調達をできる限り少なく抑えることを前提に、必要に応じてレンタル業者38への機材30の見込み発注や、追加発注を行う。   When the reservation of the equipment 30 from the operator contractor 37 is closed, the process proceeds to step S54, and the overall control means 13 grasps the operation status of the equipment 30 on the equipment manager 37 side. That is, in step S54, the overall control means 13 grasps whether there is an excess or deficiency in the equipment 30 managed by the equipment manager 37 from the reservation information, rental information, and return information of the equipment 30, and Displays the shortage. Based on the information from the overall control means 13, the equipment manager 36 presupposes that the procurement of the equipment 30 from the rental dealer 38 is minimized as much as possible, Make additional orders.

図8は、統括制御手段13によって作成された予約一覧48および機材割当表49を示している。予約一覧48は、各オペレータ業者37の予約内容を集計して表示しており、機材割当表49は各オペレータ業者37に対する機材30の割当てを表示している。ここで、「何が」「どこで」「何台」不足するのを確認できるので、機材管理者36は、機材30の過不足を把握した後、各オペレータ業者37と台数の調整や、必要に応じてレンタル業者38への機材30の発注を行うことになる。   FIG. 8 shows the reservation list 48 and the equipment allocation table 49 created by the overall control means 13. The reservation list 48 totals and displays the reservation contents of each operator contractor 37, and the equipment allocation table 49 displays the allocation of the equipment 30 to each operator contractor 37. Here, since it is possible to confirm that “what”, “where”, and “how many” are insufficient, the equipment manager 36 grasps the excess or shortage of the equipment 30, adjusts the number of operators with each operator contractor 37, and needs it. Accordingly, the equipment 30 is ordered from the rental company 38.

ステップS54において、機材管理者37側における機材30の運用状況が把握されると、ステップS55に進み、統括制御手段13によって機材30の予約に対するオペレータ業者37への自動割り振りが行われる。上述したように、統括制御手段13は、同一の機材30が継続して同一のオペレータ37によって使用される場合は、同一の機材30を最優先で同一のオペレータ業者37に割り当てることや、同一の工区における空き機材30を優先的に同一の工区での作業を行うオペレータ業者37に割り当てを行う。このように、統括制御手段13は、機材30の予約情報および返却情報から保有している機材30の過不足を工区別に把握し、これにより不足する機材30の発注および余剰となる機材30の返却を機材管理者36に指示するので、工区間における機材30の移動を効率よく行うことが可能となる。   In step S54, when the operation status of the equipment 30 on the equipment manager 37 side is grasped, the operation proceeds to step S55, and the overall control means 13 automatically assigns the equipment 30 to the operator contractor 37 for reservation. As described above, when the same equipment 30 is continuously used by the same operator 37, the overall control means 13 assigns the same equipment 30 to the same operator contractor 37 with the highest priority, The empty equipment 30 in the work area is preferentially assigned to the operator contractor 37 who performs work in the same work area. In this way, the overall control means 13 grasps the excess or deficiency of the equipment 30 possessed from the reservation information and return information of the equipment 30 in terms of construction, thereby ordering the equipment 30 that is insufficient and returning the surplus equipment 30. To the equipment manager 36, it is possible to efficiently move the equipment 30 in the construction section.

図11は、機材管理者36からオペレータ業者37への機材の貸出し処理の概要を示している。機材管理者36からオペレータ業者37への機材の貸出しに際しては、図3のステップS56に示すように、IDカード32とバーコード34を読取ることが必要となる。IDカード32とバーコード34を読取りは、図11に示すように、バーコードリーダ18を介して行われる。IDカード32とバーコード34を読取りが完了すると、ステップS57に進み、読取り結果と予約内容が一致するか否かが判断される。ここで、読取り結果と予約内容が一致しないと判断された場合は、ステップS60に進み、貸出し不可と判断される。つまり、予約していないオペレータ業者37などが貸し出しを要請した場合は、貸出し不可と判断され、システムの信頼性を担保することが可能となる。   FIG. 11 shows an outline of the equipment lending process from the equipment manager 36 to the operator contractor 37. When renting equipment from the equipment manager 36 to the operator trader 37, it is necessary to read the ID card 32 and the barcode 34 as shown in step S56 of FIG. The ID card 32 and the barcode 34 are read via the barcode reader 18, as shown in FIG. When the reading of the ID card 32 and the barcode 34 is completed, the process proceeds to step S57, and it is determined whether or not the reading result matches the reservation content. If it is determined that the read result and the reservation content do not match, the process proceeds to step S60, and it is determined that the rental is not possible. That is, when an operator contractor 37 who has not made a reservation requests lending, it is determined that lending is not possible, and the reliability of the system can be ensured.

ステップS57において、読取り結果と予約内容が一致すると判断された場合は、ステップS58に進み、予約した機材30がオペレータ業者37に貸出される。そして、ステップS59において、図18に示す貸出票43がプリンターから構成される出力手段22によってプリントアウトされる。貸出票43には、機材30が建物の何階のどの工区にあるかが明記されているので、容易に機材30が保管されている場所を把握することが可能となる。貸出票43がプリントアウトされると、ステップS61に進み、機材30の予約から貸出しまでの処理が終了する。   If it is determined in step S57 that the read result matches the reservation content, the process proceeds to step S58, and the reserved equipment 30 is lent to the operator contractor 37. In step S59, the loan slip 43 shown in FIG. 18 is printed out by the output means 22 including a printer. Since the rental slip 43 clearly indicates in which work area of the building the equipment 30 is located, the location where the equipment 30 is stored can be easily grasped. When the rental slip 43 is printed out, the process proceeds to step S61, and the processing from the reservation of the equipment 30 to the rental is completed.

図4および図12は、予約にない機材の貸出しの手順を示している。図4のステップS71によって処理が開始され、ステップS72においてオペレータ業者37が機材管理者36に対してIDカード32の提示を行う。つぎに、ステップ73に進み、機材30の空き情報が機材管理者36側のコンピュータ11の画面に表示される。つぎに、ステップS74に進み、オペレータ業者37が使用したい機材30の空きがあるか否かが統括制御手段13によって判断される。ここで、機材30の空きがないと判断された場合は、ステップS77に進み、機材30の代替となる機材が存在する否かの検討が行われる。そして、代替の機材30があれば、その機材30をオペレータ業者37に貸出す。   FIG. 4 and FIG. 12 show a procedure for lending equipment that is not in the reservation. The process is started in step S71 of FIG. 4, and the operator company 37 presents the ID card 32 to the equipment manager 36 in step S72. Next, the process proceeds to step 73, where the availability information of the equipment 30 is displayed on the screen of the computer 11 on the equipment manager 36 side. Next, the process proceeds to step S74, and the overall control means 13 determines whether or not the equipment 30 that the operator contractor 37 wants to use is available. Here, if it is determined that the equipment 30 is not available, the process proceeds to step S77, where it is examined whether or not there is a substitute equipment for the equipment 30. If there is an alternative equipment 30, the equipment 30 is rented out to an operator 37.

ステップS74において、オペレータ業者37が使用したい機材30の空きがあると統括制御手段13によって判断された場合は、ステップS75に進み、IDカード32の情報と機材30の鍵33に取付けられたバーコード34の情報がバーコードリーダ18によって読み取られる。そして、図18に示す貸出票43が出力手段22によってプリントアウトされ、機材30の貸出しが行われる。貸出票43がプリントアウトされると、ステップS78に進み、予約にない機材30の貸出しの処理が終了する。   In step S74, if it is determined by the overall control means 13 that the operator 30 wants to use the equipment 30 to be used, the overall control means 13 proceeds to step S75, and the bar code attached to the information on the ID card 32 and the key 33 of the equipment 30. The information 34 is read by the barcode reader 18. 18 is printed out by the output means 22, and the equipment 30 is lent out. When the lending form 43 is printed out, the process proceeds to step S78, and the lending process for the equipment 30 that is not reserved is completed.

図5および図13は、機材30の返却処理の手順を示している。図5に示すように、ステップS81で機材30の返却処理が開始され、ステップS82において鍵33に取付けたバーコード34の情報がバーコードリーダ18を介して読み取られる。つぎに、コンピュータ11の機材の返却メニューが起動し、機材30の使用場所を変更した否かのメニューがコンピュータ11の画面に表示される。つぎにステップS83に進み、機材30の使用場所を変更した否かの選択が行われる。ここで、機材30の使用場所を変更しなかった旨を選択した場合は、ステップS85に進む。ステップS83において、機材30の使用場所を変更した旨を選択した場合は、ステップS84に進み、入力手段22を介して使用場所の入力が行われる。   5 and 13 show the procedure for returning the equipment 30. FIG. As shown in FIG. 5, the return process of the equipment 30 is started in step S <b> 81, and the information of the barcode 34 attached to the key 33 is read via the barcode reader 18 in step S <b> 82. Next, the equipment return menu of the computer 11 is activated, and a menu as to whether or not the place where the equipment 30 is used is changed is displayed on the screen of the computer 11. Next, proceeding to step S83, a selection is made as to whether or not the location where the equipment 30 is used has been changed. Here, if it is selected that the use location of the equipment 30 has not been changed, the process proceeds to step S85. If it is selected in step S83 that the location of use of the equipment 30 has been changed, the process proceeds to step S84, where the location of use is input via the input means 22.

つぎに、ステップS85に進み、鍵33がオペレータ業者37から機材管理者36に返却される。そして、ステップS86においては、オペレータ業者37に貸出した鍵33のすべてが返却されているか否かが返却管理手段17によって判断される。ここで、オペレータ業者37に貸出した鍵33のすべてが返却されていると返却管理手段17によって判断された場合は、ステップS87に進む。ステップS87においては、機材30の使用場所を変更した旨の情報は、翌日の機材30の割り振りを検討する際に反映される。鍵33の返却に際しては、図19に示す返却票44が出力手段22によってプリントアウトされ、返却票44はオペレータ業者37に渡される。ステップS87における処理が終了すると、ステップS89に進み、機材30の返却に関する一連の処理が終了する。   Next, proceeding to step S85, the key 33 is returned from the operator contractor 37 to the equipment manager 36. In step S86, the return management means 17 determines whether or not all the keys 33 lent to the operator contractor 37 have been returned. If the return management means 17 determines that all the keys 33 lent to the operator contractor 37 have been returned, the process proceeds to step S87. In step S87, information indicating that the use location of the equipment 30 has been changed is reflected when considering allocation of the equipment 30 on the next day. When returning the key 33, the return slip 44 shown in FIG. 19 is printed out by the output means 22, and the return slip 44 is handed over to the operator dealer 37. When the process in step S87 ends, the process proceeds to step S89, and a series of processes relating to the return of the equipment 30 ends.

図9は、機材管理者36によるレンタル業者38への機材発注の概要を示している。図9に示すように、機材30の発注は、機材管理者36からレンタル業者38へ情報を送ることにより行われる。具体的には、図16に示す手配依頼書41を機材管理者36からファクシミリを介してレンタル業者38へ送ることにより行われる。   FIG. 9 shows an outline of the ordering of equipment to the rental company 38 by the equipment manager 36. As shown in FIG. 9, the ordering of the equipment 30 is performed by sending information from the equipment manager 36 to the rental company 38. Specifically, the arrangement request form 41 shown in FIG. 16 is sent from the equipment manager 36 to the rental company 38 via a facsimile.

機材管理者36からレンタル業者38に手配依頼書41が送られると、レンタル業者38による機材30の手配が行われる。図9に示すように、機材30の手配は、レンタル業者38側の担当者によって行われる。すなわち、レンタル業者38側の担当者は、自社内に保管されている機材30をチェックし、該当する機材30を機材管理者36側に送るよう関係部署に指示をする。つぎに、レンタル業者38から機材管理者36側に機材30が入庫(納入)される。ここで、機材管理者36側に機材30が入庫される機材30には、機材30を稼動させるための鍵33が添付されている。   When the arrangement request form 41 is sent from the equipment manager 36 to the rental company 38, the rental company 38 arranges the equipment 30. As shown in FIG. 9, the equipment 30 is arranged by a person in charge on the rental trader 38 side. That is, the person in charge on the rental dealer 38 checks the equipment 30 stored in the company, and instructs the related departments to send the equipment 30 to the equipment manager 36 side. Next, the equipment 30 is received (delivered) from the rental company 38 to the equipment manager 36 side. Here, a key 33 for operating the equipment 30 is attached to the equipment 30 in which the equipment 30 is stored on the equipment manager 36 side.

図9に示すように、機材30が機材管理者36側に入庫されると、機材管理者36によって入庫された機材30の登録が行われる。機材30の登録は、キーボードから構成される入力手段21を介して行われる。機材30の登録に必要な機材データは、機材30のメーカ、型番などのデータであり、この機材データが記憶されたUSBメモリは、予めレンタル業者38から機材管理者36側に提供されている。機材管理者36は、レンタル業者38から提供された機材データを参照しながら、入庫された機材30の属性データの登録を行う。   As shown in FIG. 9, when the equipment 30 is stored on the equipment manager 36 side, the equipment 30 received by the equipment manager 36 is registered. The registration of the equipment 30 is performed via the input means 21 composed of a keyboard. The equipment data necessary for registration of the equipment 30 is data such as the manufacturer and model number of the equipment 30, and the USB memory storing the equipment data is provided in advance from the rental company 38 to the equipment manager 36 side. The equipment manager 36 registers the attribute data of the equipment 30 received while referring to the equipment data provided from the rental company 38.

図9に示すように、入庫された機材30の登録が完了すると、機材30の鍵33にバーコード34が取付けられる。鍵33へのバーコード34の取付けは、連結具33aによって行われる。これによって、機材30のオペレータ業者37への貸出しが可能となる。   As shown in FIG. 9, when the registration of the received equipment 30 is completed, the barcode 34 is attached to the key 33 of the equipment 30. Attachment of the bar code 34 to the key 33 is performed by a connector 33a. As a result, the equipment 30 can be rented to the operator 37.

図10は、機材管理者36による機材30の貸出し前の準備作業の概要を示している。機材管理者36は、機材30を使用するオペレータ業者37毎に機材30の鍵33を用意する。図10に示すように、バーコード34が取付けられた鍵33は、例えば、A社使用分、B社使用分、C社使用分といった具合にオペレータ業者37毎に区分けされる。   FIG. 10 shows an outline of the preparation work before the rental of the equipment 30 by the equipment manager 36. The equipment manager 36 prepares a key 33 for the equipment 30 for each operator contractor 37 who uses the equipment 30. As shown in FIG. 10, the key 33 to which the bar code 34 is attached is classified for each operator contractor 37, for example, the usage for the A company, the usage for the B company, and the usage for the C company.

図14は、機材30の返却手順を示している。図14に示すように、使用しなくなった機材30を返却する際には、図16に示す手配依頼書41に所定の事項を記載し、これを機材管理者36がレンタル業者38に送付する。そして、レンタル業者38側の担当者により機材30の引取手配が行われる。レンタル業者38が機材管理者36側に機材30を引取りに来た際は、バーコード34は鍵33からが取外され、取外されたバーコード34は機材管理者36によって保管される。   FIG. 14 shows a procedure for returning the equipment 30. As shown in FIG. 14, when returning the equipment 30 that is no longer used, predetermined items are described in the arrangement request form 41 shown in FIG. 16, and the equipment manager 36 sends it to the rental company 38. Then, the person in charge on the rental trader 38 side arranges for the equipment 30 to be picked up. When the rental company 38 picks up the equipment 30 to the equipment manager 36 side, the barcode 34 is removed from the key 33, and the removed barcode 34 is stored by the equipment manager 36.

このように、機材運用管理システム1においては、オペレータ業者37の必要とする機材30を予め迅速に把握するとともに、作業現場での機材30の運用状況を確実に把握することができるので、オペレータ業者37の予約に対する機材管理者36が管理する機材30の自動割り振りを適正なものとすることができ、機材管理者36が管理する機材30の作業現場での運用を効率的に行うことが可能となる。これにより、機材管理者36が管理する機材30を高稼働率で運用することができ、機材調達に要する費用を削減することができる。つまり、できる限り作業現場に入庫している機材30を効率的に使用することにより、レンタル業者38からの機材30の調達を少なくすることでき、機材調達に要する費用を削減すること可能となる。そして、従来必要とされていた機材管理者36とオペレータ業者37との事前打ち合わせが不要となるので、機材管理者36およびオペレータ業者37の双方の作業効率を高めることができる。   In this way, in the equipment operation management system 1, it is possible to quickly grasp the equipment 30 required by the operator contractor 37 in advance and to reliably grasp the operating status of the equipment 30 at the work site. The automatic allocation of the equipment 30 managed by the equipment manager 36 for the 37 reservations can be made appropriate, and the equipment 30 managed by the equipment manager 36 can be efficiently operated at the work site. Become. As a result, the equipment 30 managed by the equipment manager 36 can be operated at a high operating rate, and the cost required for equipment procurement can be reduced. That is, by efficiently using the equipment 30 stored at the work site as much as possible, the procurement of the equipment 30 from the rental agent 38 can be reduced, and the cost required for equipment procurement can be reduced. In addition, since the prior meeting between the equipment manager 36 and the operator dealer 37, which has been conventionally required, becomes unnecessary, the working efficiency of both the equipment manager 36 and the operator dealer 37 can be improved.

また、同一の機材30が継続して同一のオペレータ業者37により使用される場合は、最優先で同一のオペレータ業者37に同一の機材30を割り当てるので、同一の場所で作業するオペレータ業者37にとって機材30の移動が不要となる。さらに、同一の工区における空き機材30を優先的に同一の工区で作業を行うオペレータ業者37に割り当てるようにしているので、機材30の移動労力を軽減することができ、オペレータ業者37の作業効率を高めることができる。   Further, when the same equipment 30 is continuously used by the same operator dealer 37, the same equipment 30 is assigned to the same operator dealer 37 with the highest priority. 30 movements are not required. Furthermore, since the empty equipment 30 in the same work area is preferentially assigned to the operator contractor 37 who works in the same work area, the labor for moving the equipment 30 can be reduced, and the work efficiency of the operator contractor 37 can be reduced. Can be increased.

オペレータ業者37による機材30の予約は、予約受付手段12と通信可能なオペレータ業者37のパーソナルコンピュータ31によって行うようにしているので、機材管理者36がいる管理事務所とオペレータ業者37がいる現場事務所が離れている場合でも、オペレータ業者37から機材管理者36への予約手続きが容易となり、予約手続きの効率化を図ることができる。また、オペレータ業者37への機材30の貸出時には、貸出される機材30の場所が表示された貸出票43を作成するようにしているので、使用する機材30の場所を事前に把握することができ、規模の大きな作業現場の場合でも、使用する機材30を容易に特定することができる。   The reservation of the equipment 30 by the operator trader 37 is performed by the personal computer 31 of the operator trader 37 communicable with the reservation acceptance means 12, so that the management office where the equipment trader 36 is located and the office work where the operator trader 37 is located. Even if the location is far away, the reservation procedure from the operator 37 to the equipment manager 36 is facilitated, and the efficiency of the reservation procedure can be improved. In addition, when lending the equipment 30 to the operator contractor 37, the lending slip 43 displaying the location of the equipment 30 to be rented is created, so that the location of the equipment 30 to be used can be grasped in advance. Even in the case of a large-scale work site, the equipment 30 to be used can be easily specified.

以上、この発明の実施の形態を詳述してきたが、具体的な構成は上記の実施の形態に限られるものではなく、この発明の要旨を逸脱しない範囲の設計の変更等があっても、この発明に含まれる。例えば、この実施の形態においては、機材管理者36側で鍵33にバーコード34を取付ける構成としているが、鍵33にバーコード34を取付ける作業はレンタル業者38側で行い、鍵33とバーコード34を機材30と一緒に機材管理者36側に入庫する構成としてもよい。また、オペレータ業者37から予約受付手段12への予約情報は、図1に示すオペレータ37が所有する端末機としてのパーソナルコンピュータ31から情報通信網35を介して送る構成としているが、その他の通信手段を介して送る構成としてもよい。さらに、オペレータ業者37は機材使用者の一例であり、機材使用者は業者でなくともよく、機材管理者36が属する会社の社員などであってもよい。   The embodiment of the present invention has been described in detail above, but the specific configuration is not limited to the above-described embodiment, and even if there is a design change or the like without departing from the gist of the present invention, It is included in this invention. For example, in this embodiment, the bar code 34 is attached to the key 33 on the equipment manager 36 side, but the operation of attaching the bar code 34 to the key 33 is performed on the rental agent 38 side. 34 may be stored together with the equipment 30 on the equipment manager 36 side. The reservation information from the operator 37 to the reservation receiving means 12 is sent from the personal computer 31 as a terminal owned by the operator 37 shown in FIG. 1 via the information communication network 35, but other communication means. It is good also as a structure sent via. Furthermore, the operator trader 37 is an example of a equipment user, and the equipment user may not be a trader, but may be an employee of a company to which the equipment manager 36 belongs.

この実施の形態においては、予約の締め切りを機材30の貸出し前日の午後0時としているが、予約の締め切りを他の時間帯に設定してもよい。さらに、一日の内で予約の締め切りを複数回設定し、例えば同一の機材30を午前と午後で異なるオペレータ業者37が使用する構成としてもよい。また、実施の形態においては、機材30の一例として高所作業車を示したが、機材30は高所作業車に限定されることはなく、機材30にはフォークリフトや発電機なども含まれる。また、本発明の機材運用管理システム1は、大規模な施設についての空調設備の施工作業に限定されることはなく、機材を用いる作業現場であれば種類を問わず適用可能である。   In this embodiment, the deadline for reservation is 0:00 on the day before the rental of the equipment 30, but the deadline for reservation may be set at another time zone. Furthermore, the reservation deadline may be set a plurality of times during the day, and for example, the same equipment 30 may be used by different operator contractors 37 in the morning and afternoon. In the embodiment, an aerial work vehicle is shown as an example of the equipment 30, but the equipment 30 is not limited to the aerial work vehicle, and the equipment 30 includes a forklift, a generator, and the like. Moreover, the equipment operation management system 1 of the present invention is not limited to the construction work of air conditioning equipment for a large-scale facility, and can be applied to any work site using equipment.

1 機材運用管理システム
11 コンピュータ
12 予約受付手段
13 統括制御手段
14 入庫管理手段
15 出庫管理手段
16 貸出管理手段
17 返却管理手段
18 バーコードリーダ
19 稼動実績管理手段
20 稼動履歴管理手段
21 入力手段
22 出力手段
30 機材
31 パーソナルコンピュータ(端末機)
32 IDカード(認証手段)
33 鍵
34 バーコード(機材認識コード)
36 機材管理者
37 オペレータ業者(機材使用者)
38 レンタル業者
43 貸出票
DESCRIPTION OF SYMBOLS 1 Equipment operation management system 11 Computer 12 Reservation reception means 13 Overall control means 14 Warehousing management means 15 Outgoing management means 16 Lending management means 17 Return management means 18 Bar code reader 19 Operation result management means 20 Operation history management means 21 Input means 22 Output Means 30 Equipment 31 Personal computer (terminal)
32 ID card (authentication means)
33 keys 34 barcode (equipment recognition code)
36 Equipment manager 37 Operator (equipment user)
38 Rental companies 43 Lending slips

Claims (4)

使用予定の機材に関する少なくとも品名と使用工区と使用期間と使用台数とを含む機材使用者からの予約情報に基づき前記機材の使用予約を受付ける予約受付手段と、
前記機材使用者が所有する認証手段の情報と前記機材を使用するための鍵に取付けられる機材認識コードの情報とを前記機材の貸出し時に読取ることで機材管理者から前記機材使用者への前記機材の貸出しを管理する貸出管理手段と、
前記機材使用者の前記認証手段の情報と前記機材を使用するための鍵に取付けられる機材認識コードの情報とを前記機材の返却時に読取ることで前記機材使用者からの前記機材管理者への前記機材の返却を管理する返却管理手段と、
前記予約受付手段の予約情報と前記貸出管理手段の貸出情報と前記返却管理手段の返却情報とに基づき、少なくとも前記機材使用者の予約に対する前記機材管理者が管理する前記機材の自動割り振りを行う統括制御手段と、
を備えたことを特徴とする機材運用管理システム。
Reservation accepting means for accepting a reservation for the use of the equipment based on reservation information from the equipment user including at least the product name, the working area, the usage period, and the number of the equipment to be used;
The equipment from the equipment manager to the equipment user by reading the information of the authentication means owned by the equipment user and the information of the equipment recognition code attached to the key for using the equipment when renting the equipment Lending management means to manage lending of
By reading the information of the authentication means of the equipment user and the information of the equipment recognition code attached to the key for using the equipment when returning the equipment, the equipment user to the equipment manager Return management means to manage the return of equipment,
Based on the reservation information of the reservation accepting means, the lending information of the lending management means, and the return information of the return management means, the overall management for automatically allocating the equipment managed by the equipment manager for the reservation of the equipment user Control means;
Equipment operation management system characterized by comprising
前記統括制御手段は、同一の機材が継続して同一の機材使用者によって使用される予約の場合は最優先で前記同一の機材使用者に前記同一の機材を割り当てる機能と、同一の工区における空き機材を優先的に同一の工区で作業を行う機材使用者に割り当てる機能と、予約した機材が前記機材管理者側に存在しない場合は代替の機材を割り当てる機能とを有することを特徴とする請求項1に記載の機材運用管理システム。   The overall control means has a function of assigning the same equipment to the same equipment user with the highest priority in the case of reservations where the same equipment is continuously used by the same equipment user, and a free space in the same work area. The apparatus has a function of preferentially assigning equipment to equipment users who work in the same work area, and a function of assigning alternative equipment if the reserved equipment does not exist on the equipment manager side. The equipment operation management system according to 1. 前記貸出管理手段は、前記機材使用者への機材の貸出時には、貸出される機材の場所が表示された貸出票を作成することを特徴とする請求項1または2に記載の機材運用管理システム。   3. The equipment operation management system according to claim 1, wherein the lending management unit creates a lending slip displaying a location of a lending equipment when lending the equipment to the equipment user. 前記機材使用者による前記機材の予約は、前記予約受付手段と通信可能な前記機材使用者の端末機によって行われることを特徴とする請求項1ないし3のいずれか1項に記載の機材運用管理システム。   The equipment operation management according to any one of claims 1 to 3, wherein the reservation of the equipment by the equipment user is performed by a terminal of the equipment user that can communicate with the reservation receiving means. system.
JP2010050772A 2010-03-08 2010-03-08 Equipment operation management system Active JP5562072B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010050772A JP5562072B2 (en) 2010-03-08 2010-03-08 Equipment operation management system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010050772A JP5562072B2 (en) 2010-03-08 2010-03-08 Equipment operation management system

Publications (2)

Publication Number Publication Date
JP2011186743A true JP2011186743A (en) 2011-09-22
JP5562072B2 JP5562072B2 (en) 2014-07-30

Family

ID=44792934

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010050772A Active JP5562072B2 (en) 2010-03-08 2010-03-08 Equipment operation management system

Country Status (1)

Country Link
JP (1) JP5562072B2 (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014086055A (en) * 2012-10-26 2014-05-12 Identity Kk Lease object management system and management server
JP2016081069A (en) * 2014-10-09 2016-05-16 鹿島建設株式会社 Rental equipment/materials borrower management system
JP2017138754A (en) * 2016-02-03 2017-08-10 清水建設株式会社 Lending return management system
JP2019175224A (en) * 2018-03-29 2019-10-10 高砂熱学工業株式会社 Architectural equipment reservation management system and program
JP2020004026A (en) * 2018-06-27 2020-01-09 中島建工株式会社 Equipment/material management device

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001351029A (en) * 2000-06-07 2001-12-21 Kobelco Contstruction Machinery Ltd Method and system for renting construction machinery
JP2001351028A (en) * 2000-06-05 2001-12-21 Hitachi Eng Co Ltd Method and device for supporting rental reservation acceptance
JP2004013252A (en) * 2002-06-04 2004-01-15 Toyota Motor Corp Vehicle rental system
JP2005166064A (en) * 2002-10-25 2005-06-23 Masabumi Kawama Vehicle lending and returning machine, system and method thereof
JP2006079199A (en) * 2004-09-07 2006-03-23 Mitsubishi Electric Corp Joint use object lending/return management system using key box
JP2006178845A (en) * 2004-12-24 2006-07-06 Hitachi Constr Mach Co Ltd Rental management system and rental management program
JP2007058809A (en) * 2005-08-26 2007-03-08 Hitachi Constr Mach Co Ltd Management apparatus of rental equipment and material

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2001351028A (en) * 2000-06-05 2001-12-21 Hitachi Eng Co Ltd Method and device for supporting rental reservation acceptance
JP2001351029A (en) * 2000-06-07 2001-12-21 Kobelco Contstruction Machinery Ltd Method and system for renting construction machinery
JP2004013252A (en) * 2002-06-04 2004-01-15 Toyota Motor Corp Vehicle rental system
JP2005166064A (en) * 2002-10-25 2005-06-23 Masabumi Kawama Vehicle lending and returning machine, system and method thereof
JP2006079199A (en) * 2004-09-07 2006-03-23 Mitsubishi Electric Corp Joint use object lending/return management system using key box
JP2006178845A (en) * 2004-12-24 2006-07-06 Hitachi Constr Mach Co Ltd Rental management system and rental management program
JP2007058809A (en) * 2005-08-26 2007-03-08 Hitachi Constr Mach Co Ltd Management apparatus of rental equipment and material

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2014086055A (en) * 2012-10-26 2014-05-12 Identity Kk Lease object management system and management server
JP2016081069A (en) * 2014-10-09 2016-05-16 鹿島建設株式会社 Rental equipment/materials borrower management system
JP2017138754A (en) * 2016-02-03 2017-08-10 清水建設株式会社 Lending return management system
JP2019175224A (en) * 2018-03-29 2019-10-10 高砂熱学工業株式会社 Architectural equipment reservation management system and program
JP2020004026A (en) * 2018-06-27 2020-01-09 中島建工株式会社 Equipment/material management device
JP7205857B2 (en) 2018-06-27 2023-01-17 中島建工株式会社 Material and equipment management device

Also Published As

Publication number Publication date
JP5562072B2 (en) 2014-07-30

Similar Documents

Publication Publication Date Title
JP5562072B2 (en) Equipment operation management system
CN105139151A (en) Information management system based on two-dimensional code technology
KR20120017262A (en) Apparatus and method of controlling the quantity of inventory
JP2018081704A (en) Delivery management device and delivery management system
JP2006178845A (en) Rental management system and rental management program
JP2017162254A (en) Delivery management device and delivery management system
JP5409943B1 (en) Gas container management server, gas container management system, gas container management program
KR20070098141A (en) System for network-based delivery service and method thereof
WO2011092839A1 (en) Production management device, production management system, production management program, and production management method
JP2015221200A (en) Delivery system, locker device and delivery management method
JP4668601B2 (en) Cart with IC tag and logistics management system using this truck
JP2005234911A (en) Locker delivery system
JP7360250B2 (en) Transportation planning support device, transportation planning support system, and transportation planning support method
JP2008123469A (en) Management system of object management information, person management information and real estate information
JP7205857B2 (en) Material and equipment management device
TWI261765B (en) Virtual operation center system
JP2002259770A (en) Material order and delivery system
JP7383187B1 (en) Asset management systems, methods and programs
JP7061321B2 (en) A system and program that consistently manages everything from ordering parts to parts manufacturers to delivering them to the site.
KR20140122469A (en) System and method for integrated business supporting service
US11176501B2 (en) Methods and systems to track relocation status
JP6942877B1 (en) Information processing system, information processing device, information processing method and program
JPH10187859A (en) Business processing method, system and device, and storage medium storing business processing program
JP7399484B2 (en) Work support system and work support method
KR20130017903A (en) Method for providing inventory information

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20130110

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20131023

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20131112

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20140110

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20140610

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20140610

R150 Certificate of patent or registration of utility model

Ref document number: 5562072

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150