JP2011168996A - Equipment for controlling excavation direction of shield machine for jacking shield tunneling method - Google Patents

Equipment for controlling excavation direction of shield machine for jacking shield tunneling method Download PDF

Info

Publication number
JP2011168996A
JP2011168996A JP2010032327A JP2010032327A JP2011168996A JP 2011168996 A JP2011168996 A JP 2011168996A JP 2010032327 A JP2010032327 A JP 2010032327A JP 2010032327 A JP2010032327 A JP 2010032327A JP 2011168996 A JP2011168996 A JP 2011168996A
Authority
JP
Japan
Prior art keywords
shield machine
shield
electromagnetic wave
propulsion
electromagnetic waves
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2010032327A
Other languages
Japanese (ja)
Other versions
JP4909422B2 (en
Inventor
Juro Hamada
十郎 濱田
Akira Shiromori
明 城森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
NEOSCIENCE CO Ltd
YASUDA ENGINEERING KK
Original Assignee
NEOSCIENCE CO Ltd
YASUDA ENGINEERING KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by NEOSCIENCE CO Ltd, YASUDA ENGINEERING KK filed Critical NEOSCIENCE CO Ltd
Priority to JP2010032327A priority Critical patent/JP4909422B2/en
Publication of JP2011168996A publication Critical patent/JP2011168996A/en
Application granted granted Critical
Publication of JP4909422B2 publication Critical patent/JP4909422B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

<P>PROBLEM TO BE SOLVED: To provide equipment for controlling an excavation direction of a shield machine for a jacking shield tunneling method, which can accurately guide the shield machine to an arrival target position by checking the position and attitude of the shield machine by means of electromagnetic waves. <P>SOLUTION: This equipment includes: an oscillator for oscillating the electromagnetic waves with a predetermined phase; a synthesizor for generating synthetic electromagnetic waves by synthesizing a code signal from a code generator with the above electromagnetic waves; a transmission which is provided in the shield machine and which forms and transmits a magnetic field corresponding to the synthetic electromagnetic waves; a reception mechanism which is provided in the arrival target position of the shield machine and which receive the synthetic electromagnetic waves by detecting the magnetic field; a computer for performing waveform inversion computing of the received synthetic electromagnetic waves by means of the code signal synchronized with the code signal, so as to take out the electromagnetic waves identical in phase to the electromagnetic waves with the predetermined phase; and a controller for guiding the shield machine to the arrival target position depending on the intensity of the electromagnetic waves taken out by the computer. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

この発明は、推進シールド工法におけるシールド掘進機の掘進方向制御装置に関するものである。   The present invention relates to a digging direction control device for a shield machine in a propulsion shield method.

地中に埋設管を敷設する場合、シールド掘進機によって地中を掘削しながら上記シールド掘進機に接続された複数の埋設管を推し進めて管路を形成する推進工法、あるいはシールド掘進機による掘削部にセグメントと呼ばれる壁面形成部材を掘削部内壁に連続的に装着して管路を形成するシールド工法が採用されることが多い。   When laying underground pipes in the ground, a propulsion method that forms a pipeline by pushing a plurality of underground pipes connected to the shield machine while excavating the underground with a shield machine, or an excavation part using a shield machine In many cases, a shield method is used in which a wall surface forming member called a segment is continuously attached to the inner wall of the excavation part to form a pipe line.

図5は、従来の推進シールド工法で使用されているシールド掘進機及びこれに列状に接続された複数の埋設管から構成される推進体の一例及び推進体が直線状のトンネルを掘削する場合の一例を示す概略図で、(a)は推進体を上方から見た状態を示す平面図、(b)は同じく推進体を側方から見た状態を示す縦断面図であり、埋設管の図示は省略している。   FIG. 5 shows an example of a propulsion unit composed of a shield machine used in a conventional propulsion shield method and a plurality of buried pipes connected in a row, and a case where the propulsion unit excavates a straight tunnel. It is the schematic which shows an example, (a) is a top view which shows the state which looked at the propulsion body from the upper part, (b) is a longitudinal cross-sectional view which similarly shows the state which looked at the propulsion body from the side, Illustration is omitted.

地中に埋設管を敷設する場合、掘削開始位置に形成された立抗からシールド掘進機によって地中を掘削しながらシールド掘進機に接続した埋設管を立抗から押し出しながら埋設管を所定の推進計画線に沿って敷設する推進工法が採用されている。   When laying buried pipes in the ground, the buried pipe connected to the shield machine is pushed out from the standing wall while excavating the ground with a shield machine from the ground formed at the excavation start position. A propulsion method that lays along the planned line is adopted.

この工法は周知のように、カッタヘッド1Aに図示しないパイプによって例えば泥水を供給しながら掘削を進め、掘削した泥を泥水と共に別のパイプで排出しながら掘削を行なうと共に、シールド掘進機の位置及び推進方向を計測して推進計画線に沿うよう制御するものである。   As is well known, this method proceeds with excavation while supplying muddy water, for example, to the cutter head 1A through a pipe (not shown), and excavates while excavating the excavated mud with another pipe along with the position of the shield machine. The propulsion direction is measured and controlled along the propulsion plan line.

シールド掘進機1は地中3を掘削するカッタヘッド1A及びカッタヘッドの位置と推進方向を計測するための例えばLEDからなる面光源を有するターゲット1Bと、シールド掘進機のカッタヘッド回転方向または埋設管の延長方向の傾斜角を計測する傾斜計1Cと、計測結果にもとづいてカッタヘッド1Aの推進方向を制御するジャッキ1D、1Eとを備えた掘進機本体1Fから構成されている。なお、ターゲット1BはLED等の発光体を縦横に複数配設して面光源を形成するようにされている。   The shield machine 1 includes a cutter head 1A for excavating the underground 3 and a target 1B having a surface light source made of, for example, an LED for measuring the position and propulsion direction of the cutter head, and the cutter head rotating direction or buried pipe of the shield machine. An inclining machine main body 1F provided with an inclinometer 1C for measuring the inclination angle in the extending direction of the slab and jacks 1D and 1E for controlling the propulsion direction of the cutter head 1A based on the measurement result. The target 1B is configured to form a surface light source by arranging a plurality of light emitters such as LEDs vertically and horizontally.

シールド掘進機1の後方には立抗4から押し出された複数の埋設管2が接続され、シールド掘進機1と共に推進体を形成している。
立抗4内にはカメラまたはCCD等の撮像手段(以下、単にカメラという)5がセオドライトまたはトランシットに装着された形で設置され、複数の埋設管2の内部空間を介してシールド掘進機1のターゲット1Bからの光を撮像し、推進計画線に対応する基準位置からの変位量を計測し、このデータをコンピュータ6に伝送する。
A plurality of buried pipes 2 pushed out from the resister 4 are connected to the rear of the shield machine 1 and form a propelling body together with the shield machine 1.
An imaging means 5 (hereinafter simply referred to as a camera) 5 such as a camera or a CCD is installed in the resist 4 in a form attached to the theodolite or transit, and the shield machine 1 is installed through the internal space of the plurality of buried pipes 2. The light from the target 1B is imaged, the amount of displacement from the reference position corresponding to the propulsion plan line is measured, and this data is transmitted to the computer 6.

コンピュータ6ではターゲット1Bとカメラ5との間の距離Lを加味してターゲット1Bの推進計画線からの変位量△x、△yを演算する。この演算にもとづいて、自動ジャッキ制御装置7が掘進機本体1Fに制御信号を送り、ジャッキ1D、1Eの押し出し量を調整してカッタヘッド1Aの推進方向を制御し推進計画線に沿うように制御する。   The computer 6 calculates the displacements Δx and Δy of the target 1B from the propulsion plan line in consideration of the distance L between the target 1B and the camera 5. Based on this calculation, the automatic jack control device 7 sends a control signal to the excavator main body 1F, adjusts the push-out amount of the jacks 1D and 1E, controls the propulsion direction of the cutter head 1A, and controls it along the propulsion plan line. To do.

距離Lの計測方法としては、立抗4に設置される埋設管押し出し用の元押しジャッキ(図示せず)のロータリーエンコーダ等による押し出し長さの累計によって算出する場合や、ターゲットのモニターに写る寸法によって計算する場合、あるいは押し出した埋設管の長さの累計によって求める場合等がある。   The distance L can be measured by calculating the total length of extrusion using a rotary encoder or the like of a main pushing jack (not shown) for embedding pipes installed in the counter 4 or the dimensions reflected on the target monitor. In some cases, it may be calculated by calculating the total length of the buried pipe that has been extruded.

図6は、シールド掘進機及びこれに接続された複数の埋設管から構成される推進体によって曲線トンネルの推進計画線に沿ったシールド掘削を行なう状況を示した概略図で、(a)は推進体を上方から見た状態を示す平面図、(b)は同じく推進体を側方から見た状態を示す縦断面図で、いずれの図もシールド掘進機に接続された複数の埋設管の図示を省略している。   FIG. 6 is a schematic diagram showing a situation where shield excavation is performed along a propulsion plan line of a curved tunnel by a propulsion body composed of a shield excavator and a plurality of buried pipes connected to the shield excavation machine. The top view which shows the state which looked at the body from the upper part, (b) is a longitudinal cross-sectional view which similarly shows the state which looked at the propulsion body from the side, and all figures are illustration of the several buried pipes connected to the shield machine Is omitted.

この図の場合には曲線トンネルの推進計画線に沿って掘削推進するシールド掘進機1のターゲット1Bの推進計画線からの水平方向のずれ△xと垂直方向のずれ△yを演算するデータを求めるために、複数の埋設管2内に所定の間隔で複数の中間計測機8A〜8Dを配設している。   In the case of this figure, data for calculating the horizontal deviation Δx and the vertical deviation Δy from the propulsion plan line of the target 1B of the shield machine 1 excavating and propelling along the propulsion plan line of the curved tunnel is obtained. For this purpose, a plurality of intermediate measuring machines 8A to 8D are arranged in the plurality of buried pipes 2 at a predetermined interval.

即ち、シールド掘進機1に設けられたターゲット1Bと、各中間計測機8A〜8Dと、立抗4内に設けられたカメラ5とから得られるデータにもとづいて△x、△yを演算しようとするものである。中間計測機8A〜8Dの具体的構成は後述することとし、ここでは中間計測機に搭載された計測手段についてのみ説明する。また、中間計測機8A〜8Dは、いずれも同じ構成とされているため、その中の一つ8Aについてのみ説明する。
なお、中間計測機の相互間隔は後述するように所定長さの連結杆によって予め設定した所定の長さに保持されている。
That is, an attempt is made to calculate Δx and Δy based on data obtained from the target 1B provided in the shield machine 1, the intermediate measuring machines 8A to 8D, and the camera 5 provided in the resister 4. To do. The specific configuration of the intermediate measuring machines 8A to 8D will be described later, and only the measuring means mounted on the intermediate measuring machine will be described here. Moreover, since all the intermediate measuring machines 8A to 8D have the same configuration, only one 8A will be described.
The interval between the intermediate measuring instruments is maintained at a predetermined length set in advance by a connecting rod having a predetermined length as will be described later.

中間計測機8Aは適宜の大きさを有する平板状の台車81を有し、その上に以下に述べる各装置が搭載されている。即ち、前方に向けて発光するLED等からなる面光源を有する前方用ターゲット82と、前方に向けて配設され、前方に位置するターゲットの発光を撮像する前方用カメラ83とを一体化して前方用装置84を構成し、台車81の前方寄りの位置に設置している。   The intermediate measuring machine 8A has a flat carriage 81 having an appropriate size, and each device described below is mounted thereon. That is, the front target 82 having a surface light source composed of an LED or the like that emits light forward and the front camera 83 that is disposed forward and captures the light emission of the target located in front are integrated into the front. Device 84 is configured and installed at a position near the front of the carriage 81.

また、後方に向けて発光するLED等からなる面光源を有する後方用ターゲット85と、後方に向けて配設され、後方に位置するターゲットの発光を撮像する後方用カメラ86とを一体化して後方用装置87を構成し、台車81の後方寄りの位置に設置している。   In addition, a rear target 85 having a surface light source composed of an LED or the like that emits light toward the rear and a rear camera 86 that is disposed rearward and captures light emission of the target located at the rear are integrated into the rear. Device 87 is installed at a position closer to the rear of the carriage 81.

前方用装置84と後方用装置87とは電気的には接続されているが両者間には十分なスペースが設けられ、そのスペースに傾斜計88が設置されている。この傾斜計は台車81の水平方向または埋設管の延長方向の傾斜角を計測し得るようにされている。上記スペースにはまた、図示していないが、データ伝送ユニットやポンプなども設置されている。   The front device 84 and the rear device 87 are electrically connected, but a sufficient space is provided between them, and an inclinometer 88 is installed in the space. This inclinometer can measure the inclination angle of the carriage 81 in the horizontal direction or in the extension direction of the buried pipe. Although not shown, a data transmission unit and a pump are also installed in the space.

計測に際しては、立抗4内のカメラ5によって最後部の中間計測機8Dの後方用ターゲット85の発光を撮像して後方用ターゲット85の変位データを採取すると共に、中間計測機8Dの後方用カメラ86によって立抗4内のターゲットの発光を撮像し、その相対的変位データを採取する。また、傾斜計88による角度データも採取する。   At the time of measurement, the camera 5 in the resist 4 captures the light emission of the rear target 85 of the rear intermediate measuring device 8D to collect displacement data of the rear target 85, and the rear camera of the intermediate measuring device 8D. The light emission of the target in the resist 4 is imaged by 86 and its relative displacement data is collected. Also, angle data from the inclinometer 88 is collected.

次いで、最後部の中間計測機8Dの前方用カメラ83によって、その前方に位置する中間計測機8Cの後方用ターゲット85の発光を撮像して変位データを採取し、傾斜計88の角度データを採取すると共に、中間計測機8Cの前方用カメラ83によって更にその前方に位置する中間計測機8Bの後方用ターゲット85の発光を撮像して変位データを採取する。   Next, the front camera 83 of the intermediate measuring machine 8D at the rearmost part captures the light emission of the rear target 85 of the intermediate measuring machine 8C located in front of the intermediate measuring machine 8D, collects displacement data, and collects angle data of the inclinometer 88. At the same time, the front camera 83 of the intermediate measuring device 8C captures the light emission of the rear target 85 of the intermediate measuring device 8B positioned further forward to collect displacement data.

このような計測を各中間計測機8A〜8D間及びシールド掘進機1との間で繰り返し、それぞれから採取されたデータをコンピュータ6に伝送して△x及び△yを演算し、シールド掘進機1の掘進方向を修正するようにしている。
この結果、シールド掘進機1及び複数の埋設管2からなる推進体は曲線トンネルの推進計画線に沿って推進することになる。
Such measurement is repeated between the intermediate measuring machines 8A to 8D and between the shield machine 1 and the data collected from each is transmitted to the computer 6 to calculate Δx and Δy. The direction of digging is corrected.
As a result, the propulsion body composed of the shield machine 1 and the plurality of buried pipes 2 is propelled along the curved tunnel's propulsion plan line.

図7は、中間計測機の構成及び埋設管内での移動状況を示す概略図で、(a)は埋設管内での配設状況を示す側面図、(b)は同じく平面図である。また、図8は、埋設管内での配設状況を埋設管の延長方向から見た状況を示す正面図である。   FIG. 7 is a schematic view showing the configuration of the intermediate measuring machine and the movement state in the buried pipe, (a) is a side view showing the arrangement situation in the buried pipe, and (b) is a plan view of the same. Further, FIG. 8 is a front view showing a state in which the arrangement state in the buried pipe is viewed from the extending direction of the buried pipe.

埋設管2内では図8に示すように、パイプ支持機構10が底部に設けられ、送泥管11と排泥管12とが支承されると共に、車輪13によって埋設管2の延長方向に移動可能に構成されている。パイプ支持機構10の上部には床材14が支承され、その上面に3個のローラ15A、15B、15Cが回転可能に支持されている。   As shown in FIG. 8, the pipe support mechanism 10 is provided at the bottom in the buried pipe 2, and the mud pipe 11 and the mud pipe 12 are supported and can be moved in the extending direction of the buried pipe 2 by the wheels 13. It is configured. A flooring 14 is supported on the upper part of the pipe support mechanism 10, and three rollers 15A, 15B, 15C are rotatably supported on the upper surface thereof.

ローラ15A、15B、15C上には上述した中間計測機8Aを構成する台車81が載置され、埋設管2の延長方向に移動し得るようにされている。なお、台車81の移動に際してその両側部が埋設管2の内壁と接触して移動に支障を来たす場合が考えられるため、台車の両側には前後に1個ずつ側方ローラ16A、16Bが設けられ、スムースな移動ができるようにされている。なお、上述したローラ15A、15B、15Cと側方ローラ16A、16Bは省略される場合もある。   On the rollers 15A, 15B, and 15C, a carriage 81 that constitutes the above-described intermediate measuring machine 8A is placed so as to be movable in the extending direction of the buried pipe 2. Note that when the carriage 81 is moved, both sides thereof may come into contact with the inner wall of the buried pipe 2 to hinder the movement. Therefore, side rollers 16A and 16B are provided on the both sides of the carriage one by one on the front and rear sides. Smooth movement is made possible. The rollers 15A, 15B, and 15C and the side rollers 16A and 16B described above may be omitted.

また、台車81には2個の回転台17が前後に離隔して設けられ、それぞれに上述した前方用装置84及び後方用装置87が載置されて回転可能とされている。
図中、89はデータ伝送ユニット、90は台車上の各装置を覆うカバーである。(例えば特許文献1参照)。
Further, the carriage 81 is provided with two turntables 17 that are separated from each other in the front-rear direction, and the front device 84 and the rear device 87 described above are placed on the carriage 81 and are rotatable.
In the figure, 89 is a data transmission unit, and 90 is a cover covering each device on the carriage. (For example, refer to Patent Document 1).

図9は、従来のシールド工法によって曲線トンネルの推進計画線に沿ったシールド掘削を行なう状況を示した概略図で、(a)は掘削の状況を上方から見た状態を示す平面図、(b)は同じく側方から見た状態を示す縦断面図である。   FIG. 9 is a schematic view showing a situation where shield excavation is performed along a curved tunnel propulsion plan line by a conventional shield construction method, and (a) is a plan view showing the state of excavation viewed from above; ) Is a longitudinal sectional view showing the state as seen from the side.

この図に示すように、シールド工法は、シールド掘進機1に反射プリズムからなるターゲット1Hを前後の2個所に間隔を介して設けると共に、立抗4内にトランシットを含むトータルステーション50を架台51上に設置する形で設け、トータルステーション50から赤外線をターゲット1Hに向けて照射することにより、シールド掘進機1との距離及び推進角度を計測し、これらをコンピュータ6に入力して推進計画線に対するずれ△x、△yを演算し、自動ジャッキ制御装置7によってジャッキ1D、1Eの押し出し量を調整することによりシールド掘進機1を推進計画線に沿って導くようにしている。   As shown in this figure, in the shield method, the shield machine 1 is provided with targets 1H made of reflecting prisms at two positions on the front and rear sides, and a total station 50 including a transition in the resist 4 is placed on a pedestal 51. The distance from the shield machine 1 and the propulsion angle are measured by irradiating infrared rays from the total station 50 toward the target 1H, and these are input to the computer 6 to input the deviation Δx from the propulsion plan line. , Δy are calculated, and the automatic jack control device 7 adjusts the push-out amounts of the jacks 1D and 1E, thereby guiding the shield machine 1 along the propulsion plan line.

シールド掘進機1が前進すると、掘削された部分の内面にセグメントと呼ばれる幅約60cm〜100cmの円弧状に湾曲した壁面板52を複数枚貼り付けて全体として短いパイプ状の空間を形成する。パイプ状の空間は円周方向に3枚以上のセグメントを貼り付けて形成されるように各セグメントの円周方向の寸法が設定されている。   When the shield machine 1 moves forward, a plurality of wall plates 52 curved in an arc shape having a width of about 60 cm to 100 cm, called segments, are attached to the inner surface of the excavated portion to form a short pipe-like space as a whole. The circumferential dimension of each segment is set so that the pipe-shaped space is formed by pasting three or more segments in the circumferential direction.

1つのパイプ状の空間が形成されると、その空間の立抗側に隣接して掘削部分の内面に更に別のセグメント52を複数枚貼り付けて次の空間を形成しパイプ状空間を延長する作業をシールド掘進機1の前進に合わせて繰り返すことによりシールド掘進機1の後方に管路を形成することができる。   When one pipe-like space is formed, a plurality of other segments 52 are pasted on the inner surface of the excavation portion adjacent to the resisting side of the space to form the next space and extend the pipe-like space. A pipe line can be formed behind the shield machine 1 by repeating the work in accordance with the advance of the shield machine 1.

シールド掘進機1が更に前進して立抗4内のトータルステーション50とシールド掘進機1との間隔が所定値を超えると、その中間部に追加のトータルステーション50Bを架台51Bと共に設置し、トータルステーション50とシールド掘進機1との間及びトータルステーション50と50Bとの間で上述した方法による計測を行なうことによりシールド掘進機1を推進計画線に沿って推進させる。   When the shield machine 1 further moves forward and the distance between the total station 50 and the shield machine 1 in the rifle 4 exceeds a predetermined value, an additional total station 50B is installed in the middle of the shield station 1B together with the gantry 51B. The shield excavator 1 is propelled along the propulsion plan line by performing measurement by the method described above between the excavator 1 and between the total stations 50 and 50B.

シールド掘進機1が更に前進すると、追加したトータルステーション50Bとシールド掘進機1との中間部に更にトータルステーション50Cを追加設置し、以後、シールド掘進機1の前進に応じて同様に対応する。トータルステーション50等からの赤外線照射を含む計測は自動的に行なわれるように構成される場合もあるが、手動的に行なわれる場合もある。   When the shield machine 1 further advances, a total station 50C is additionally installed at an intermediate portion between the added total station 50B and the shield machine 1, and thereafter, the shield machine 1 responds similarly according to the advance of the shield machine 1. The measurement including the infrared irradiation from the total station 50 or the like may be automatically performed, but may be manually performed.

特開2007−113385号公報JP 2007-113385 A

従来の推進シールド工法におけるシールド掘進機の掘進方向制御装置は上記のように構成され、距離の計測とシールド掘進機の位置及び姿勢を光学的手段によって確認し制御していたが、距離が大きくなると計測誤差が大きくなるため距離や位置及び姿勢の演算誤差が大きくなるという問題点があった。   The conventional shield shield machine digging direction control device in the propulsion shield construction method is configured as described above, and the distance measurement and the position and orientation of the shield machine are confirmed and controlled by optical means. There is a problem that the calculation error of the distance, the position and the posture becomes large because the measurement error becomes large.

この発明は、上記のような問題点を解消するためになされたもので、電磁波を用いてシールド掘進機の位置や姿勢の確認を行ない、到達予定位置まで正確に誘導することができる推進シールド工法におけるシールド掘進機の掘進方向制御装置を提供することを目的とする。   The present invention has been made to solve the above problems, and confirms the position and orientation of the shield machine using electromagnetic waves, and can accurately guide to the expected arrival position. An object of the present invention is to provide a digging direction control device for a shield machine.

この発明に係る推進シールド工法におけるシールド掘進機の掘進方向制御装置は、シールド掘進機の後方に埋設管を結合した推進体を立抗から掘削しながら推進させ、上記埋設管によって形成される管路を敷設する推進シールド工法において、所定位相の電磁波を発振する発振手段と、符号発生手段からの符号信号と上記電磁波とを合成し、合成電磁波を生ずる合成手段と、上記シールド掘進機に設けられ、上記合成電磁波に対応した磁場を形成して送出する送信手段と、上記シールド掘進機の到達予定位置に設けられ、上記磁場を検出して上記合成電磁波を受信する受信手段と、受信された合成電磁波を上記符号信号と同期した符号信号を用いて波形反転演算を行ない、上記所定位相の電磁波と同位相の電磁波を取り出す演算手段と、上記演算手段によって取り出された電磁波の強度に応じて上記シールド掘進機を上記到達予定位置に誘導する制御手段とを備えたものである。   The digging direction control device for the shield machine in the propulsion shield method according to the present invention is configured to propel a propulsion body coupled with a buried pipe behind the shield machine while excavating from a stand and formed by the buried pipe. In the propulsion shield construction method, the oscillation means for oscillating the electromagnetic wave of a predetermined phase, the code signal from the code generation means and the electromagnetic wave, the synthesis means for generating a synthetic electromagnetic wave, and the shield machine, Transmitting means for forming and transmitting a magnetic field corresponding to the synthetic electromagnetic wave, receiving means for detecting the magnetic field and receiving the synthetic electromagnetic wave provided at a position to reach the shield machine, and received synthetic electromagnetic wave Calculating means for performing waveform inversion using a code signal synchronized with the code signal, and extracting an electromagnetic wave having the same phase as the electromagnetic wave having the predetermined phase; The shield machine according to the electromagnetic wave intensity of the taken out by calculation means is obtained and a control means for directing to the scheduled arrival position.

この発明に係る推進シールド工法におけるシールド掘進機の掘進方向制御装置は、また、上記受信手段がほぼ90度の角度でV字形に保持された2つのコイルを有するものである。   In the propulsion shield construction method according to the present invention, the shield direction machine excavation direction control device has two coils in which the receiving means is held in a V shape at an angle of approximately 90 degrees.

この発明に係る推進シールド工法におけるシールド掘進機の掘進方向制御装置は、また、上記受信手段がほぼ90度の角度で十字形に保持された2つのコイルを有するものである。   In the propulsion shield construction method according to the present invention, the shield excavation direction control device for the shield machine has two coils in which the receiving means is held in a cross shape at an angle of approximately 90 degrees.

この発明に係る推進シールド工法におけるシールド掘進機の掘進方向制御装置は、また、上記送信手段がシールド掘進機の外周に形成された溝内に巻回された送信コイルを有し、上記溝内の上記送信コイルの外周側に樹脂を充填して構成されたものである。   In the propulsion shield method according to the invention, the shield direction machine digging direction control device has a transmission coil in which the transmission means is wound in a groove formed on the outer periphery of the shield machine, The outer peripheral side of the transmission coil is filled with resin.

この発明に係る推進シールド工法におけるシールド掘進機の掘進方向制御装置は上記のように構成され、発振手段から発振される所定位相の電磁波と、符号発生手段からの符号信号とを合成して合成電磁波を形成し、この合成電磁波に対応した磁場をシールド掘進機から送出すると共に、到達予定位置に設けられた受信手段によって上記磁場を検出して上記合成電磁波を受信し、上記符号信号と同期した符号信号を用いて波形反転演算を行うことにより、上記所定位相の電磁波と同位相の電磁波を取り出し、この取り出された電磁波の強度に応じてシールド掘進機を誘導するようにしているため、シールド掘進機を精度よく到達予定位置に誘導することができる。   The digging direction control device of the shield machine in the propulsion shield method according to the present invention is configured as described above, and combines the electromagnetic wave having a predetermined phase oscillated from the oscillating means and the code signal from the code generating means to synthesize the electromagnetic wave. The magnetic field corresponding to the synthetic electromagnetic wave is transmitted from the shield machine, and the magnetic field is detected by the receiving means provided at the intended arrival position to receive the synthetic electromagnetic wave, and the code synchronized with the code signal By performing the waveform inversion operation using the signal, the electromagnetic wave having the same phase as the electromagnetic wave having the predetermined phase is extracted, and the shield machine is guided according to the intensity of the extracted electromagnetic wave. Can be accurately guided to the expected arrival position.

また、送信コイルから出力された磁場によって周辺の金属等に誘導される誘導電流に起因する位相の異なる二次磁場による悪影響を小さくすることができ、他のシステムに与えるあるいは他のシステムから受ける磁場による悪影響も小さくすることができ、秘匿性に優れた制御装置を得ることができる。   In addition, it is possible to reduce the adverse effects of secondary magnetic fields with different phases caused by induced currents induced in the surrounding metal etc. by the magnetic field output from the transmitting coil, and to give to other systems or to receive from other systems As a result, it is possible to reduce the adverse effect of the control device, and it is possible to obtain a control device excellent in secrecy.

この発明の実施の形態1によるシールド掘進機の誘導方式を示す概略図で、(a)は電磁波による誘導方式の原理を説明するための説明図、(b)は地中での誘導方式を説明する概略断面図である。BRIEF DESCRIPTION OF THE DRAWINGS It is the schematic which shows the guidance system of the shield machine by Embodiment 1 of this invention, (a) is explanatory drawing for demonstrating the principle of the guidance system by electromagnetic waves, (b) demonstrates the guidance system in the ground. It is a schematic sectional drawing to do. 実施の形態1における送信コイルの装着例を示す概略図である。FIG. 3 is a schematic diagram illustrating an example of mounting of a transmission coil in the first embodiment. 実施の形態1による推進シールド工法の全体構成を示すブロック図である。It is a block diagram which shows the whole structure of the propulsion shield construction method by Embodiment 1. FIG. 実施の形態1において、送信側から送出される電磁波の波形及び受信側において取り出される電磁波の波形を示す波形図である。In Embodiment 1, it is a wave form diagram which shows the waveform of the electromagnetic wave sent out from the transmission side, and the waveform of the electromagnetic wave taken out on the reception side. 従来の推進工法における推進体の構成の一例及び直線状のトンネルを掘削する場合の状況を説明する概略図で、(a)は推進体を上方から見た状態を示す平面図、(b)は同じく推進体を側方から見た状態を示す縦断面図である。It is the schematic explaining the example of the structure of the propulsion body in the conventional propulsion method, and the situation in the case of excavating a linear tunnel, (a) is a plan view showing the state seen from above the propulsion body, (b) It is a longitudinal cross-sectional view which similarly shows the state which looked at the propulsion body from the side. 従来の推進工法によって曲線トンネルを掘削する場合の状況を説明する概略図で、(a)は推進体を上方から見た状態を示す平面図、(b)は同じく推進体を側方から見た状態を示す縦断面図である。It is the schematic explaining the situation in the case of excavating a curved tunnel by the conventional propulsion construction method, (a) is a plan view showing the state of seeing the propulsion body from above, (b) is also seen from the side of the propulsion body It is a longitudinal cross-sectional view which shows a state. 従来の推進工法における中間計測機の構成の一例及び埋設管内での移動状況を示す概略図で、(a)は埋設管内での配設状況を示す側面図、(b)は同じく平面図である。It is the schematic which shows an example of a structure of the intermediate measuring machine in the conventional propulsion method, and the movement condition in an embedded pipe, (a) is a side view which shows the arrangement | positioning condition in an embedded pipe, (b) is a top view similarly. . 従来の推進工法における埋設管内での中間計測機の配設状況を埋設管の延長方向から見た状況を示す正面図である。It is a front view which shows the condition which looked at the arrangement | positioning condition of the intermediate measuring machine in the buried pipe in the conventional propulsion method from the extension direction of the buried pipe. 従来のシールド工法による掘削状況を示す概略図で、(a)は上方から見た状態を示す平面図、(b)は側方から見た状態を示す縦断面図である。It is the schematic which shows the excavation condition by the conventional shield method, (a) is a top view which shows the state seen from upper direction, (b) is a longitudinal cross-sectional view which shows the state seen from the side.

実施の形態1.
以下、この発明の実施の形態1を図にもとづいて説明する。図1は、実施の形態1による電磁波を用いたシールド掘進機の誘導方式を示す概略図で、(a)は電磁波による誘導方式の原理を説明するための説明図、(b)は地中での誘導方式を説明する概略断面図である。
Embodiment 1 FIG.
Embodiment 1 of the present invention will be described below with reference to the drawings. 1A and 1B are schematic diagrams showing a guiding method of a shield machine using electromagnetic waves according to Embodiment 1, wherein FIG. 1A is an explanatory diagram for explaining the principle of the electromagnetic guiding method, and FIG. It is a schematic sectional drawing explaining the induction | guidance | derivation system.

推進シールド工法において、シールド掘進機を所定の推進計画線に沿って掘削しながら推進させ、到達予定位置に正確に到達させるのは容易ではない。このため、実施の形態1は電磁波の磁力線による吸引原理を利用してシールド掘進機を到達予定位置に誘導しようとするものである。   In the propulsion shield method, it is not easy to propel the shield machine while excavating it along a predetermined propulsion plan line so as to accurately reach the planned arrival position. For this reason, Embodiment 1 tries to guide the shield machine to the intended arrival position using the principle of attraction by the magnetic field lines of electromagnetic waves.

先ず、この方式の原理について説明する。図1(a)に示すように、シールド掘進機1に送信コイル20を巻回し、この送信コイル20に図1(b)に示す送信機19から電流を供給すると、シールド掘進機1が鉄心の作用をして強力な磁場が形成され電磁波が発生される。
シールド掘進機1に巻回する送信コイル20は、例えば図2に示すように、カッタヘッド1Aの外周に深さ10mmから30mm程度の溝1Gを1個または複数個形成し、その溝1G内に例えばエナメル線からなる送信コイル20を数10回、巻回し、送信コイル20の外周側にエポキシ樹脂1Hを充填して溝1Gを塞ぐようにしている。
First, the principle of this method will be described. As shown in FIG. 1 (a), when a transmission coil 20 is wound around the shield machine 1 and current is supplied to the transmission coil 20 from the transmitter 19 shown in FIG. 1 (b), the shield machine 1 is made of an iron core. By acting, a strong magnetic field is formed and electromagnetic waves are generated.
For example, as shown in FIG. 2, the transmission coil 20 wound around the shield machine 1 is formed with one or a plurality of grooves 1G having a depth of about 10 mm to 30 mm on the outer periphery of the cutter head 1A. For example, the transmitting coil 20 made of enameled wire is wound several tens of times, and the outer peripheral side of the transmitting coil 20 is filled with epoxy resin 1H so as to close the groove 1G.

一方、図1(b)に示すように、シールド掘進機1の到達予定位置に形成された到達立抗22に受信コイル21を設けると、この受信コイル21が送信コイル20から発せられた電磁波の磁場センサーとして機能し、磁力線に対応した出力を得ることができるため、磁力線の方向にシールド掘進機1を誘導することにより到達予定位置に到達させることができる。   On the other hand, as shown in FIG. 1 (b), when the receiving coil 21 is provided on the arrival resistance 22 formed at the expected arrival position of the shield machine 1, the receiving coil 21 generates electromagnetic waves emitted from the transmitting coil 20. Since it functions as a magnetic field sensor and an output corresponding to the lines of magnetic force can be obtained, it is possible to reach the planned arrival position by guiding the shield machine 1 in the direction of the lines of magnetic force.

図3は、シールド掘進機を誘導するためのシールド工法における実施の形態1の全体構成を示すブロック図、図4は、実施の形態1において送信側から送出される電磁波の波形及び受信側において取り出される電磁波の波形を示すものである。   FIG. 3 is a block diagram showing the overall configuration of the first embodiment in the shield method for guiding the shield machine, and FIG. 4 shows the waveform of the electromagnetic wave transmitted from the transmission side and the extraction side on the reception side in the first embodiment. It shows the waveform of the electromagnetic wave.

シールド工法では、シールド掘進機の送信コイル20から送出される磁場を地球磁場(直流磁場)と区別するために送信側では交流磁場が用いられ、図4(a)にW1で示すような一定波長(一定周波数)のサイン(sin)波が図3に示す信号発振器31から出力される。一方、図3に示す符号発生装置(コンピュータ)32から図4(b)にW2で示すような符号信号が発生される。 In the shield method, an AC magnetic field is used on the transmission side to distinguish the magnetic field transmitted from the transmission coil 20 of the shield machine from the earth magnetic field (DC magnetic field), and is constant as indicated by W 1 in FIG. A sine wave having a wavelength (constant frequency) is output from the signal oscillator 31 shown in FIG. On the other hand, a code signal as indicated by W 2 in FIG. 4B is generated from the code generator (computer) 32 shown in FIG.

Sin波W1と符号信号W2とは図3のスイッチ回路(波形反転回路)33で合成され、図4(c)にW3で示す合成電磁波を形成し、図3に示す増幅器38で増幅した後、シールド掘進機1の発信コイル20に供給される。発信コイル20からは合成電磁波W3に対応する磁場が送出される。 The sine wave W 1 and the sign signal W 2 are synthesized by the switch circuit (waveform inversion circuit) 33 shown in FIG. 3 to form a synthesized electromagnetic wave indicated by W 3 in FIG. 4C and amplified by the amplifier 38 shown in FIG. After that, it is supplied to the transmission coil 20 of the shield machine 1. A magnetic field corresponding to the synthetic electromagnetic wave W 3 is transmitted from the transmission coil 20.

到達予定位置の到達立抗22に設けられた図3の受信コイル21によって図4(d)に示す上記合成電磁波W3に対応した磁場を受信し、増幅器34によって増幅した後、図3のAD変換器35によってアナログ信号をデジタル信号に変換する。
変換されたデジタル信号は図3の波形反転演算装置(コンピュータ)36に入力され、ここで符号発生装置32Bから与えられる図4(e)に示す符号信号W5を用いて波形反転演算を行ない、図4(f)に示すように送信側の信号発振器31から出力されたsin波W1と同位相のsin波W6を分離する。なお、符号発生装置32と32BとはケーブルまたはGPSで図示のように接続され、符号信号W2とW5とが同位相となるように設定されている。
Receiving a magnetic field corresponding to the synthesized wave W 3 shown in FIG. 4 (d) by the receiving coil 21 of Figure 3 provided to the arrival elevation anti 22 of scheduled arrival position, after being amplified by the amplifier 34, AD of Figure 3 The converter 35 converts the analog signal into a digital signal.
The converted digital signal is input to the waveform inversion operation device (computer) 36 of FIG. 3, where the waveform inversion operation is performed using the code signal W 5 shown in FIG. 4 (e) given from the code generation device 32B. As shown in FIG. 4F, a sin wave W 6 having the same phase as that of the sin wave W 1 output from the signal oscillator 31 on the transmission side is separated. The code generators 32 and 32B are connected by a cable or GPS as shown in the figure, and the code signals W 2 and W 5 are set to have the same phase.

波形反転演算装置36で分離されたsin波W6は表示装置37に表示される一方、図示しない制御装置に入力され、その強度に対応してシールド掘進機1の到達予定位置への誘導が行なわれる。 The sin wave W 6 separated by the waveform reversal calculation device 36 is displayed on the display device 37, and is input to a control device (not shown), and guidance to the intended arrival position of the shield machine 1 is performed in accordance with the intensity. It is.

具体的には、送信コイル20と受信コイル21とが共に推進計画線上にあれば、受信コイル21の2つのコイルの強度(出力)は同じ大きさとなるが、シールド掘進機1の送信コイル20が推進計画線上にない場合は2つのコイルの出力が異なる。出力の異なり方はシールド掘進機1の推進計画線に対するずれ方向によって一方のコイルの出力が他方のコイルの出力より小さくなるため、2つのコイルの出力の違いに応じて自動ジャッキ制御装置7(図5)を動作させ、上述のように、シールド掘進機1の推進方向を制御することにより到達予定位置に容易に誘導することができる。   Specifically, if both the transmission coil 20 and the reception coil 21 are on the propulsion plan line, the strength (output) of the two coils of the reception coil 21 are the same, but the transmission coil 20 of the shield machine 1 is When it is not on the propulsion plan line, the outputs of the two coils are different. The difference in the output is that the output of one coil is smaller than the output of the other coil depending on the deviation direction of the shield machine 1 from the propulsion plan line, so that the automatic jack control device 7 (see FIG. By operating 5) and controlling the propulsion direction of the shield machine 1 as described above, it can be easily guided to the intended arrival position.

なお、受信コイル21は図1に示すようなV字形の配置のみでなく、2つのコイルをコイル相互の角度がほぼ90°となるように十字形に配置しても同様な効果を期待することができる。   The receiving coil 21 is not only arranged in a V shape as shown in FIG. 1, but the same effect can be expected even if two coils are arranged in a cross shape so that the angle between the coils is approximately 90 °. Can do.

1 シールド掘進機、
2 埋設管
3 地面
4 立抗
5 カメラ
6 コンピュータ
7 自動ジャッキ制御装置
8A〜8D 中間計測機
10 パイプ支持機構
11 送泥管
12 排泥管
13 車輪
14 床材
15A、15B、15C ローラ
16A、16B 側方ローラ
17 回転台
18 連結杆
19 送信機
20 送信コイル
21 受信コイル
22 到達立抗
23 坑口
24 パイプ
25 受信機
26 コンピュータ
31 信号発振器
32 符号発生装置(コンピュータ)
32B 符号発生装置
33 スイッチ回路(波形反転回路)
34 増幅器
35 AD変換器
36 波形反転演算装置(コンピュータ)
37 表示装置
38 増幅器
50、50B、50C トータルステーション
51、51B、51C 架台
52 セグメント。
1 shield machine,
2 buried pipe 3 ground 4 resistance 5 camera 6 computer 7 automatic jack control device 8A to 8D intermediate measuring machine 10 pipe support mechanism 11 mud pipe 12 mud pipe 13 wheel 14 flooring 15A, 15B, 15C roller 16A, 16B side Direction roller 17 Turntable 18 Connecting rod 19 Transmitter 20 Transmitting coil 21 Receiving coil 22 Reaching resistance 23 Wellhead 24 Pipe 25 Receiver 26 Computer 31 Signal oscillator 32 Code generator (computer)
32B Code generator 33 Switch circuit (waveform inversion circuit)
34 Amplifier 35 AD Converter 36 Waveform Inversion Operation Device (Computer)
37 Display device 38 Amplifier 50, 50B, 50C Total station 51, 51B, 51C Mount 52 Segment.

Claims (4)

シールド掘進機の後方に埋設管を結合した推進体を立抗から掘削しながら推進させ、上記埋設管によって形成される管路を敷設する推進シールド工法において、所定位相の電磁波を発振する発振手段と、符号発生手段からの符号信号と上記電磁波とを合成し、合成電磁波を生ずる合成手段と、上記シールド掘進機に設けられ、上記合成電磁波に対応した磁場を形成して送出する送信手段と、上記シールド掘進機の到達予定位置に設けられ、上記磁場を検出して上記合成電磁波を受信する受信手段と、受信された合成電磁波を上記符号信号と同期した符号信号を用いて波形反転演算を行ない、上記所定位相の電磁波と同位相の電磁波を取り出す演算手段と、上記演算手段によって取り出された電磁波の強度に応じて上記シールド掘進機を上記到達予定位置に誘導する制御手段とを備えた推進シールド工法におけるシールド掘進機の掘進方向制御装置。   In the propulsion shield method for propelling a propulsion body coupled with a buried pipe behind the shield machine while excavating from a stand and laying a pipe formed by the buried pipe, an oscillation means for oscillating an electromagnetic wave of a predetermined phase; Synthesizes the code signal from the code generation means and the electromagnetic wave, generates a synthetic electromagnetic wave, a transmission means provided in the shield machine, forms a magnetic field corresponding to the synthetic electromagnetic wave, and transmits the magnetic field, and A receiving means for detecting the magnetic field and receiving the synthetic electromagnetic wave provided at a planned arrival position of a shield machine, and performing a waveform inversion operation using a code signal that synchronizes the received synthetic electromagnetic wave with the code signal, Calculation means for extracting the electromagnetic wave having the same phase as the electromagnetic wave of the predetermined phase, and the shield machine according to the intensity of the electromagnetic wave extracted by the calculation means. Excavation direction control device of the shield machine in promoting shield method and control means for inducing a predetermined position. 上記受信手段はほぼ90度の角度でV字形に保持された2つのコイルを有することを特徴とする請求項1記載の推進シールド工法におけるシールド掘進機の掘進方向制御装置。   2. The shield direction control device for a shield machine in the propulsion shield method according to claim 1, wherein the receiving means has two coils held in a V shape at an angle of approximately 90 degrees. 上記受信手段はほぼ90度の角度で十字形に保持された2つのコイルを有することを特徴とする請求項1記載の推進シールド工法におけるシールド掘進機の掘進方向制御装置。   2. The shield direction control device for a shield machine in the propulsion shield method according to claim 1, wherein the receiving means has two coils held in a cross shape at an angle of approximately 90 degrees. 上記送信手段はシールド掘進機の外周に形成された溝内に巻回された送信コイルを有し、上記溝内の上記送信コイルの外周側に樹脂を充填して構成されたことを特徴とする請求項1〜請求項3のいずれか1項記載の推進シールド工法におけるシールド掘進機の掘進方向制御装置。   The transmission means has a transmission coil wound in a groove formed on the outer periphery of the shield machine, and is configured by filling the outer peripheral side of the transmission coil in the groove with resin. The digging direction control device of the shield machine in the propulsion shield method according to any one of claims 1 to 3.
JP2010032327A 2010-02-17 2010-02-17 Drilling direction control device for shield machine in propulsion shield method Active JP4909422B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010032327A JP4909422B2 (en) 2010-02-17 2010-02-17 Drilling direction control device for shield machine in propulsion shield method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010032327A JP4909422B2 (en) 2010-02-17 2010-02-17 Drilling direction control device for shield machine in propulsion shield method

Publications (2)

Publication Number Publication Date
JP2011168996A true JP2011168996A (en) 2011-09-01
JP4909422B2 JP4909422B2 (en) 2012-04-04

Family

ID=44683385

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010032327A Active JP4909422B2 (en) 2010-02-17 2010-02-17 Drilling direction control device for shield machine in propulsion shield method

Country Status (1)

Country Link
JP (1) JP4909422B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195592A (en) * 2019-04-30 2019-09-03 华中科技大学 Shield driving pose intelligent Forecasting and system based on interacting depth study

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003328682A (en) * 2002-05-16 2003-11-19 San Shield Kk Adit construction method and adit construction apparatus
JP2006145302A (en) * 2004-11-17 2006-06-08 Kajima Corp Method and system for measuring underground position
JP2007113385A (en) * 2005-09-22 2007-05-10 Juro Hamada Excavating direction control device of shield machine in jacking shield method
JP2009047641A (en) * 2007-08-22 2009-03-05 Nippon Telegr & Teleph Corp <Ntt> Spectrometric apparatus

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003328682A (en) * 2002-05-16 2003-11-19 San Shield Kk Adit construction method and adit construction apparatus
JP2006145302A (en) * 2004-11-17 2006-06-08 Kajima Corp Method and system for measuring underground position
JP2007113385A (en) * 2005-09-22 2007-05-10 Juro Hamada Excavating direction control device of shield machine in jacking shield method
JP2009047641A (en) * 2007-08-22 2009-03-05 Nippon Telegr & Teleph Corp <Ntt> Spectrometric apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110195592A (en) * 2019-04-30 2019-09-03 华中科技大学 Shield driving pose intelligent Forecasting and system based on interacting depth study

Also Published As

Publication number Publication date
JP4909422B2 (en) 2012-04-04

Similar Documents

Publication Publication Date Title
CN102439261B (en) Method for determining the position or situation of installation components in mineral mining installations
JP2819042B2 (en) Underground excavator position detector
JP4573815B2 (en) Drilling direction control device for shield machine in propulsion shield method
JPH0772472B2 (en) Horizontal deviation measuring device for underground excavator
JP4909422B2 (en) Drilling direction control device for shield machine in propulsion shield method
JP4909421B2 (en) Drilling direction control device for shield machine in propulsion shield method
JP4909420B2 (en) Drilling direction control device for shield machine in propulsion shield method
JP3383857B2 (en) Pipe body construction method
US7579962B1 (en) Duct mapping device using sonde
KR101637219B1 (en) Terminal controlling apparatus for boring machine
JP3911167B2 (en) Automatic tracking system for propellers in music propulsion
JP3069034B2 (en) Surveying device and surveying method in propulsion method
JP6669590B2 (en) Positioning method of shield machine
JP3989624B2 (en) Position measuring device for submarine or submarine civil engineering machinery or cable burying machine
JP2819043B2 (en) Underground excavator position detector
JP3268387B2 (en) Pipe body construction method
JP2003254750A (en) Coordinate measurement method for excavation route in pipe jacking excavation method
JP3797394B2 (en) Surveying method, surveying device, and surveying instrument for propulsion method
JP2006118906A (en) Device for exploring underground conduit and method for exploring underground conduit using the device
JP4164429B2 (en) Propulsion excavator and excavator position calculation method
JP4388882B2 (en) Curved survey cylinder
JPH03257321A (en) Relative position detecting apparatus of underground excavator
JP2016224047A (en) Buried object exploratory device and buried object exploratory method
JP2819044B2 (en) Underground excavator position detector
JP2004346585A (en) Excavating method and excavating apparatus

Legal Events

Date Code Title Description
A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20111207

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20111227

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20120113

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20150120

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4909422

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250