JP2011144495A - Scaffold fixing implement - Google Patents

Scaffold fixing implement Download PDF

Info

Publication number
JP2011144495A
JP2011144495A JP2010003582A JP2010003582A JP2011144495A JP 2011144495 A JP2011144495 A JP 2011144495A JP 2010003582 A JP2010003582 A JP 2010003582A JP 2010003582 A JP2010003582 A JP 2010003582A JP 2011144495 A JP2011144495 A JP 2011144495A
Authority
JP
Japan
Prior art keywords
scaffold
veranda
bracket
shaft
clamp
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2010003582A
Other languages
Japanese (ja)
Inventor
Takashi Fujimoto
隆 藤本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to JP2010003582A priority Critical patent/JP2011144495A/en
Publication of JP2011144495A publication Critical patent/JP2011144495A/en
Withdrawn legal-status Critical Current

Links

Images

Landscapes

  • Movable Scaffolding (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a scaffold fixing implement 2 which enables a scaffold to be readily fixed to a building. <P>SOLUTION: This scaffold fixing implement 2 includes a bracket 4 and a clamp 6. The bracket 4 is fixed to a sidewall of a veranda. The bracket 4 includes a main portion 8, first and second legs 10 and 12, a bolt 14, a nut 16 and a jaw 18. The main portion 8 includes first and second mounting portions 20 and 24. Nuts 22 and 24 are joined to the first and second mounting portions 20 and 24, respectively. The clamp 6 includes first and second claws 36 and 38, a shaft pin 40, a first shaft 42, first and second cylinders 46 and 48, and a through-hole 50. The second cylinder 48 includes a second shaft 62. A male screw is threaded on the external surface of the second shaft 62. The second shaft 62 can be screwed into the first mounting portion 20. The second shaft 62 can also be screwed into the second portion 24. <P>COPYRIGHT: (C)2011,JPO&INPIT

Description

本発明は、足場を建物に固定するための用具に関する。   The present invention relates to a tool for fixing a scaffold to a building.

建物に外壁塗装等の補修がなされるとき、足場が構築される。この足場は、縦パイプと横パイプとが組み合わされて構築される。足場を建物に固定する目的で、クランプが用いられている。このクランプは、一対の爪を備えている。これら爪によって、縦パイプが把持される。建物の外壁には、ドリルによって穴が開けられる。この穴に、クランプのシャフトが差し込まれる。シャフトは、接着剤や各種アンカーによって外壁に接合される。このクランプは、「壁つなぎ」と称されている。壁つなぎの一例が、実開平6−71760号公報に開示されている。   Scaffolding is built when the building is repaired, such as with exterior wall painting. This scaffold is constructed by combining vertical and horizontal pipes. Clamps are used to fix the scaffold to the building. This clamp is provided with a pair of claws. The vertical pipe is gripped by these claws. A hole is drilled in the outer wall of the building. The shaft of the clamp is inserted into this hole. The shaft is joined to the outer wall by an adhesive or various anchors. This clamp is referred to as a “wall tie”. An example of a wall connection is disclosed in Japanese Utility Model Laid-Open No. 6-71760.

実開平6−71760号公報Japanese Utility Model Publication No. 6-71760

従来の壁つなぎが用いられるとき、壁に穴が開けられるので、壁にダメージを与える。この穴を開ける作業には、労力を要する。穴開け時には、騒音が発生する。しかも、穴を埋め戻す作業が必要である。この作業にも労力を要する。   When a conventional wall splicer is used, a hole is drilled in the wall, causing damage to the wall. The work of opening this hole requires labor. Noise is generated when drilling holes. Moreover, it is necessary to refill the hole. This work also requires labor.

本発明の目的は、足場が簡便に建物に固定されうる足場固定具の提供にある。   An object of the present invention is to provide a scaffold fixture that allows the scaffold to be easily secured to a building.

本発明に係る足場固定具は、建物に固定されるブラケットと、この建物の周囲に構築される足場のパイプを把持するクランプとを備える。このブラケットは、長尺の主部を備える。この主部は、その一端に第一装着部を有し、かつその他端に第二装着部を有する。クランプは、第一装着部及び第二装着部のいずれにも装着されうる。   The scaffold fixture according to the present invention includes a bracket that is secured to a building, and a clamp that grips a pipe of the scaffold constructed around the building. The bracket includes a long main part. The main portion has a first mounting portion at one end and a second mounting portion at the other end. The clamp can be mounted on either the first mounting portion or the second mounting portion.

本発明に係る足場構造体は、建物のベランダの側壁を挟持することでこのベランダに固定されるブラケットと、このブラケットに装着されるクランプと、このクランプに把持されるパイプとを備える。   The scaffold structure according to the present invention includes a bracket fixed to the veranda by sandwiching the side wall of the veranda of the building, a clamp attached to the bracket, and a pipe held by the clamp.

本発明に係る足場固定具は、2つの装着部を備えている。従って、建物の外からでも内からでも、ブラケットを建物に固定する作業がなされうる。   The scaffold fixture according to the present invention includes two mounting portions. Therefore, the work of fixing the bracket to the building can be performed from outside or inside the building.

他の観点によれば、本発明に係る足場固定具は、建物に固定されるブラケットと、この建物の周囲に構築される足場のパイプを把持するクランプとを備える。このブラケットは、建物に固定されるための固定手段を備える。この固定手段の操作は、足場に立つ作業者によってなされうる。   According to another aspect, the scaffold fixture according to the present invention includes a bracket that is secured to a building, and a clamp that grips a pipe of the scaffold constructed around the building. The bracket includes fixing means for fixing to the building. The fixing means can be operated by an operator standing on the scaffold.

本発明に係る足場構造体は、ベランダの側壁を挟持することでブラケットがベランダに取り付けられうる。この足場構造体では、外壁への穿孔は不要である。この足場構造体は、構築及び解体が容易になされうる。   In the scaffold structure according to the present invention, the bracket can be attached to the veranda by sandwiching the side wall of the veranda. In this scaffold structure, it is not necessary to perforate the outer wall. This scaffold structure can be easily constructed and disassembled.

図1は、本発明の一実施形態に係る足場固定具が示された分解正面図である。FIG. 1 is an exploded front view showing a scaffold fixture according to an embodiment of the present invention. 図2は、図1の足場固定具のクランプが示された分解平面図トである。FIG. 2 is an exploded plan view showing a clamp of the scaffold fixture of FIG. 図3は、図1の足場固定具が用いられた足場構造体が示された正面図である。FIG. 3 is a front view showing a scaffold structure in which the scaffold fixture of FIG. 1 is used. 図4は、図1の足場固定具が用いられた他の足場構造体が示された正面図である。FIG. 4 is a front view showing another scaffold structure in which the scaffold fixture of FIG. 1 is used. 図5は、図1の足場固定具が用いられた他の足場構造体が示された平面図である。FIG. 5 is a plan view showing another scaffold structure in which the scaffold fixture of FIG. 1 is used. 図6は、本発明の他の実施形態に係る足場固定具が示された分解正面図である。FIG. 6 is an exploded front view illustrating a scaffold fixture according to another embodiment of the present invention.

以下、適宜図面が参照されつつ、好ましい実施形態に基づいて本発明が詳細に説明される。   Hereinafter, the present invention will be described in detail based on preferred embodiments with appropriate reference to the drawings.

図1に示された足場固定具2は、ブラケット4とクランプ6とを備えている。   The scaffold fixture 2 shown in FIG. 1 includes a bracket 4 and a clamp 6.

ブラケット4は、主部8、第一レッグ10、第二レッグ12、ボルト14、ナット16及びジョー18を有している。   The bracket 4 includes a main portion 8, a first leg 10, a second leg 12, a bolt 14, a nut 16, and a jaw 18.

主部8は、金属材料からなる。典型的には、主部8は鋼からなる。主部8は、長尺である。主部8は、筒状である。図1における左側端において、主部8は、第一装着部20を有している。この第一装着部20では、溶接によりナット22が接合されている。図示されていないが、ナット22には、雌ネジが螺刻されている。図1における右側端において、主部8は、第二装着部24を有している。この第二装着部24では、溶接によりナット26が接合されている。図示されていないが、ナット26の内周面26には、雌ネジが螺刻されている。図1では、ナット22が主部8の内部に位置しているが、ナット22が主部8の外部に位置してもよい。図1では、ナット26が主部8の内部に位置しているが、ナット26が主部8の外部に位置してもよい。   The main part 8 is made of a metal material. Typically, the main part 8 is made of steel. The main part 8 is long. The main part 8 is cylindrical. At the left end in FIG. 1, the main portion 8 has a first mounting portion 20. In the first mounting portion 20, a nut 22 is joined by welding. Although not shown, the nut 22 is threaded with a female screw. At the right end in FIG. 1, the main portion 8 has a second mounting portion 24. In the second mounting portion 24, the nut 26 is joined by welding. Although not shown, a female screw is threaded on the inner peripheral surface 26 of the nut 26. In FIG. 1, the nut 22 is located inside the main portion 8, but the nut 22 may be located outside the main portion 8. In FIG. 1, the nut 26 is located inside the main portion 8, but the nut 26 may be located outside the main portion 8.

第一レッグ10も、鋼からなる。第一レッグ10は、主部8と一体とされている。第一レッグ10は、主部8の左端近傍において、この主部8から下方に垂下している。   The first leg 10 is also made of steel. The first leg 10 is integrated with the main portion 8. The first leg 10 hangs downward from the main portion 8 in the vicinity of the left end of the main portion 8.

第二レッグ12も、鋼からなる。第二レッグ12は、第一レッグ10とは所定の間隔を隔てて、主部8に装着されている。第二レッグ12は、主部8から下方に垂下している。   The second leg 12 is also made of steel. The second leg 12 is attached to the main portion 8 at a predetermined interval from the first leg 10. The second leg 12 hangs downward from the main portion 8.

第二レッグ12の長さL2は、第一レッグ10の長さL1よりも小さい。第二レッグ12は、孔28を有している。孔28は、図1における左右方向において、第二レッグ12を貫通している。図示されていないが、孔28の内周面30には、雌ネジが螺刻されている。   The length L2 of the second leg 12 is smaller than the length L1 of the first leg 10. The second leg 12 has a hole 28. The hole 28 penetrates the second leg 12 in the left-right direction in FIG. Although not shown, a female screw is threaded on the inner peripheral surface 30 of the hole 28.

ボルト14は、孔28に螺入されている。ボルト14は、シャンク32とヘッド34とを有している。シャンク32には、雄ネジが螺刻されている。ヘッド34は、右側面視において、正六角形である。   The bolt 14 is screwed into the hole 28. The bolt 14 has a shank 32 and a head 34. A male screw is threaded on the shank 32. The head 34 is a regular hexagon when viewed from the right side.

ナット16の内主面には、雌ネジが螺刻されている。この雌ネジに、ボルト14が螺入されている。   A female thread is threaded on the inner main surface of the nut 16. Bolts 14 are screwed into the female screws.

ジョー18は、円盤状である。ジョー18は、ボルト14の先端に取り付けられている。ジョー18は、第一レッグ10と第二レッグ12との間に位置している。   The jaw 18 has a disk shape. The jaw 18 is attached to the tip of the bolt 14. The jaw 18 is located between the first leg 10 and the second leg 12.

レンチ等の工具がヘッド34にあてがわれ、ボルト14が回される。ボルト14の正回転によって、このボルト14は第二レッグ12に対して前進する。ボルト14の前進により、ジョー18が第一レッグ10に近づく。ボルト14の逆回転によって、このボルト14は第二レッグ12に対して後退する。ボルト14の後退により、ジョー18が第一レッグ10から離れる。ナット16が締められることにより、ボルト14の回転が阻止されうる。ボルト14が、ヘッド34に代えてアイナットを有してもよい。。   A tool such as a wrench is applied to the head 34, and the bolt 14 is turned. The bolt 14 advances with respect to the second leg 12 by the forward rotation of the bolt 14. As the bolt 14 advances, the jaw 18 approaches the first leg 10. The bolt 14 moves backward with respect to the second leg 12 by the reverse rotation of the bolt 14. Retraction of the bolt 14 causes the jaw 18 to move away from the first leg 10. By tightening the nut 16, the rotation of the bolt 14 can be prevented. The bolt 14 may have an eye nut instead of the head 34. .

図2に示されるように、クランプ6は、第一爪36、第二爪38、軸ピン40、第一シャフト42、ボルト44、第一シリンダー46、第二シリンダー48及び通しボルト50を有している。   As shown in FIG. 2, the clamp 6 has a first claw 36, a second claw 38, a shaft pin 40, a first shaft 42, a bolt 44, a first cylinder 46, a second cylinder 48, and a through bolt 50. ing.

第一爪36には、軸ピン40が貫通している。第一爪36は、軸ピン40を中心として、第一シャフト42に対して回動しうる。第二爪38にも、軸ピン40が貫通している。第一爪36は、軸ピン40を中心として、第一シャフト42に対して回動しうる。   A shaft pin 40 passes through the first claw 36. The first claw 36 can rotate with respect to the first shaft 42 around the shaft pin 40. The shaft pin 40 also penetrates through the second claw 38. The first claw 36 can rotate with respect to the first shaft 42 around the shaft pin 40.

ボルトの一端は、第一爪36に固定されている。ボルトは、第二爪38を貫通している。ナット52が回されることにより、第一爪36に対する第二爪38の間隔が調整されうる。   One end of the bolt is fixed to the first claw 36. The bolt penetrates the second claw 38. By turning the nut 52, the distance between the second claw 38 and the first claw 36 can be adjusted.

第一シャフト42は、鋼からなる。第一シャフト42の外周面には、雄ネジが螺刻されている。第一シリンダー46は、鋼からなる。図2に示されるように、第一シリンダー46は左に向かって先細りである。第一シリンダー46は、その左端近傍に、第三装着部54を有している。図示されていないが、第三装着部54の内周面56には、雌ネジが螺刻されている。この第三装着部54に第一シャフト42が螺入されうる。第一シリンダー46は、位置決め用の穴58を有している。   The first shaft 42 is made of steel. A male screw is threaded on the outer peripheral surface of the first shaft 42. The first cylinder 46 is made of steel. As shown in FIG. 2, the first cylinder 46 tapers to the left. The first cylinder 46 has a third mounting portion 54 in the vicinity of the left end thereof. Although not shown, a female screw is threaded on the inner peripheral surface 56 of the third mounting portion 54. The first shaft 42 can be screwed into the third mounting portion 54. The first cylinder 46 has a positioning hole 58.

第二シリンダー48は、鋼からなる。第二シリンダー48は、ボディ60と第二シャフト62とを備えている。第二シャフト62は、溶接により、ボディ60と一体化されている。ボディ60は、前側位置決め穴64及び後側位置決め穴66を有している。前側位置決め穴64及び後側位置決め穴66のいずれかが選択されて、これに通しボルト50が通される。通しボルト50は同時に、第一シリンダー46の穴58にも通される。この通しボルト50が、ナット68に螺入される。前側位置決め穴64が選択された場合、クランプ6の全長は長い。後側位置決め穴66が選択された場合、クランプ6の全長は短い。第二シリンダー48が、軸方向に沿って3以上の位置決め穴を備えてもよい。   The second cylinder 48 is made of steel. The second cylinder 48 includes a body 60 and a second shaft 62. The second shaft 62 is integrated with the body 60 by welding. The body 60 has a front positioning hole 64 and a rear positioning hole 66. Either the front positioning hole 64 or the rear positioning hole 66 is selected, and the through bolt 50 is passed therethrough. The through bolt 50 is simultaneously passed through the hole 58 of the first cylinder 46. The through bolt 50 is screwed into the nut 68. When the front positioning hole 64 is selected, the entire length of the clamp 6 is long. When the rear positioning hole 66 is selected, the overall length of the clamp 6 is short. The second cylinder 48 may include three or more positioning holes along the axial direction.

図1に示されるように、第二シャフト62の外主面には、雄ネジが螺刻されている。この第二シャフト62は、第一装着部20(図1参照)のナット22に螺入されうる。螺入により、ブラケット4にクランプ6が装着される。第二シャフト62はさらに、第二装着部24のナット26にも螺入されうる。螺入により、ブラケット4にクランプ6が装着される。   As shown in FIG. 1, a male screw is threaded on the outer main surface of the second shaft 62. The second shaft 62 can be screwed into the nut 22 of the first mounting portion 20 (see FIG. 1). The clamp 6 is attached to the bracket 4 by screwing. The second shaft 62 can be further screwed into the nut 26 of the second mounting portion 24. The clamp 6 is attached to the bracket 4 by screwing.

図3には、図1の足場固定具2が用いられた足場構造体が、ベランダ70と共に示されている。図3には、1つのベランダ70aと、このベランダ70aのあるフロアよりも1階上のフロアのベランダ70bとが示されている。ベランダ70は、コンクリート製である。ベランダ70は、床72と側壁74とを有している。側壁74の高さH1は、小さい。このタイプのベランダ70では、側壁74に手すりが立てられる。   In FIG. 3, a scaffold structure using the scaffold fixture 2 of FIG. 1 is shown together with a veranda 70. FIG. 3 shows one veranda 70a and a veranda 70b on the first floor above the floor on which the veranda 70a is located. The veranda 70 is made of concrete. The veranda 70 has a floor 72 and side walls 74. The height H1 of the side wall 74 is small. In this type of veranda 70, handrails are raised on the side walls 74.

図3では、第二シャフト62は、第一装着部20のナット22に螺入されている。第一爪36及び第二爪38(図2参照)は、縦パイプ76を把持している。この縦パイプ76は、足場の一部である。図示されていないが、この縦パイプ76に横パイプが組まれている。   In FIG. 3, the second shaft 62 is screwed into the nut 22 of the first mounting portion 20. The first claw 36 and the second claw 38 (see FIG. 2) hold the vertical pipe 76. The vertical pipe 76 is a part of the scaffold. Although not shown, a horizontal pipe is assembled to the vertical pipe 76.

図3において、左側がベランダ70の外側であり、右側がベランダ70の内側である。第一レッグ10は、ベランダ70の側壁74の外側面に当接している。ジョー18は、この側壁74の内側面に当接している。ボルト14が締められることにより、第一レッグ10とジョー18とによって、側壁74が挟持される。この挟持により、ブラケット4がベランダ70に固定されている。第一レッグ10と側壁74との間に、クッションが設けられてもよい。ジョー18と側壁74との間に、クッションが設けられてもよい。クッションにより、側壁74の傷つきが防止される。クッションとしては、ボムパッド及び樹脂パッドが例示される。   In FIG. 3, the left side is the outside of the veranda 70 and the right side is the inside of the veranda 70. The first leg 10 is in contact with the outer surface of the side wall 74 of the veranda 70. The jaw 18 is in contact with the inner surface of the side wall 74. By tightening the bolt 14, the side wall 74 is sandwiched between the first leg 10 and the jaw 18. The bracket 4 is fixed to the veranda 70 by this clamping. A cushion may be provided between the first leg 10 and the side wall 74. A cushion may be provided between the jaw 18 and the side wall 74. The cushion prevents the side wall 74 from being damaged. Examples of the cushion include a bomb pad and a resin pad.

側壁74の高さH1は、第二レッグ12の長さL2(図1参照)よりも十分に大きい。従って、ボルト14の締め付け作業及び緩め作業は、容易になされうる。この作業は、ベランダ70の床72の上にいる作業者によってなされる。   The height H1 of the side wall 74 is sufficiently larger than the length L2 of the second leg 12 (see FIG. 1). Therefore, the tightening operation and the loosening operation of the bolt 14 can be easily performed. This operation is performed by an operator who is on the floor 72 of the veranda 70.

図4には、図1の足場固定具2が用いられた他の足場構造体が、ベランダ78と共に示されている。図3には、1つのベランダ78aと、このベランダ78aのあるフロアよりも1階上のフロアのベランダ78bとが示されている。ベランダ78は、コンクリート製である。ベランダ78は、側壁74を有している。側壁74の高さH2は、十分に大きい。このタイプのベランダ78では、側壁74が腰板の役割を果たす。   FIG. 4 shows another scaffold structure using the scaffold fixture 2 of FIG. FIG. 3 shows one veranda 78a and a veranda 78b on a floor one floor higher than the floor on which the veranda 78a is located. The veranda 78 is made of concrete. The veranda 78 has a side wall 74. The height H2 of the side wall 74 is sufficiently large. In this type of veranda 78, the side walls 74 serve as waist plates.

図4では、第二シャフト62は、第二装着部24のナット26に螺入されている。第一爪36及び第二爪38(図2参照)は、縦パイプ76を把持している。図4において、左側がベランダ78の外側であり、右側がベランダ78の内側である。側壁74の高さH2が第一レッグ10の長さL1(図1参照)よりも大きいので、第一レッグ10は、側壁74の内側面に当接しうる。ジョー18は、この側壁74の外側面に当接している。ボルト14が締められることにより、第一レッグ10とジョー18とによって、側壁74が挟持される。この挟持により、ブラケット4がベランダ78に固定されている。   In FIG. 4, the second shaft 62 is screwed into the nut 26 of the second mounting portion 24. The first claw 36 and the second claw 38 (see FIG. 2) hold the vertical pipe 76. In FIG. 4, the left side is the outside of the veranda 78 and the right side is the inside of the veranda 78. Since the height H <b> 2 of the side wall 74 is larger than the length L <b> 1 of the first leg 10 (see FIG. 1), the first leg 10 can abut on the inner surface of the side wall 74. The jaw 18 is in contact with the outer surface of the side wall 74. By tightening the bolt 14, the side wall 74 is sandwiched between the first leg 10 and the jaw 18. The bracket 4 is fixed to the veranda 78 by this clamping.

図4では、ボルト14は側壁74よりも外側に位置している。このボルト14の締め付け作業及び緩め作業は、足場の上にいる作業者によってなされる。従って、足場の上の作業者がベランダ78に乗り移る必要がない。   In FIG. 4, the bolt 14 is located outside the side wall 74. The bolt 14 is tightened and loosened by an operator on the scaffold. Therefore, it is not necessary for the worker on the scaffold to transfer to the veranda 78.

ベランダ78の側壁74が十分高い場合には、この足場固定具2は、図4に示された状態で使用される。この状態では、足場とベランダ78との間を作業者が行き来する必要がない。ベランダ78の側壁74が低い場合には、この足場固定具2は、図3に示された状態で使用される。この状態では、足場とベランダ78との間を作業者が行き来する必要がある。   When the side wall 74 of the veranda 78 is sufficiently high, the scaffold fixture 2 is used in the state shown in FIG. In this state, the operator does not need to go back and forth between the scaffold and the veranda 78. When the side wall 74 of the veranda 78 is low, the scaffold fixture 2 is used in the state shown in FIG. In this state, an operator needs to go back and forth between the scaffold and the veranda 78.

この足場固定具2は、1つのボルト14及び1つのジョー18を備えている。側壁74の締め付けを確実にするため、足場固定具が、ボルト14及び1つのジョー18を2以上備えてもよい。   The scaffold fixture 2 includes one bolt 14 and one jaw 18. In order to ensure tightening of the side wall 74, the scaffold fixture may include two or more bolts 14 and one jaw 18.

このブラケット4、クランプ6及びパイプ76を備えた足場構造体が用いられる場合、建物の外壁に穴が開けられる必要がない。従って、穴を開けるときの騒音は生じず、また、穴を埋め戻す必要もない。穴による外壁の損傷も生じない。この足場構造体は、容易に組み立てることができ、容易に解体することができる。   When the scaffold structure including the bracket 4, the clamp 6 and the pipe 76 is used, it is not necessary to make a hole in the outer wall of the building. Therefore, no noise is generated when a hole is made, and there is no need to refill the hole. The outer wall is not damaged by the hole. This scaffold structure can be easily assembled and disassembled easily.

図5は、図1の足場固定具2が用いられた他の足場構造体が示された平面図である。図5において矢印Aで示されているのは、水平方向である。第一爪36及び第二爪38(図2参照)は、横パイプ80を把持している。この横パイプ80は、足場の一部である。図示されていないが、この横パイプ80に縦パイプが組まれている。   FIG. 5 is a plan view showing another scaffold structure in which the scaffold fixture 2 of FIG. 1 is used. What is indicated by an arrow A in FIG. 5 is the horizontal direction. The first claw 36 and the second claw 38 (see FIG. 2) hold the horizontal pipe 80. The horizontal pipe 80 is a part of the scaffold. Although not shown, a vertical pipe is assembled to the horizontal pipe 80.

図5には、ベランダ78の上面が示されている。第二レッグ10は、ベランダ78の側面と当接している。ジョー18も、ベランダ78の側面と当接している。ベランダ78に塗装が施された場合、第二レッグ10に当接している部分及びジョー18に当接している部分は、いわゆる塗り残しとなる。塗料が乾燥した後、図5において二点鎖線で示されている位置に足場固定具2が移動させられる。この移動は、水平移動である。この移動は、横パイプ80に沿ってなされうる。この移動により、塗り残し部分が露出する。この塗り残し部分に、塗装が施される。   FIG. 5 shows the upper surface of the veranda 78. The second leg 10 is in contact with the side surface of the veranda 78. The jaw 18 is also in contact with the side surface of the veranda 78. When the veranda 78 is painted, the portion in contact with the second leg 10 and the portion in contact with the jaw 18 become so-called unpainted portions. After the paint dries, the scaffold fixture 2 is moved to the position indicated by the two-dot chain line in FIG. This movement is a horizontal movement. This movement can be made along the lateral pipe 80. By this movement, the unpainted portion is exposed. The unpainted portion is painted.

図6は、本発明の他の実施形態に係る足場固定具102が示された分解正面図である。この足場固定具102の構造は、図1に示された足場固定具の構造とほぼ同一である。但し、この足場固定具102は、ナット22(図1参照)を有していない。換言すれば、この足場固定具102は、第一装着部20(図1参照)を有していない。この足場固定具102は、図3に示されたベランダ70には取り付けられ得ない。この足場固定具102は、図4に示されたベランダ78には取り付けられうる。図4に示されたベランダ78に取り付けられた場合、固定手段(この例ではボルト14)の操作が足場に立つ作業者によってなされうる。従って、足場の上の作業者がベランダ78に乗り移る必要がない。   FIG. 6 is an exploded front view showing a scaffold fixture 102 according to another embodiment of the present invention. The structure of the scaffold fixture 102 is substantially the same as the structure of the scaffold fixture shown in FIG. However, the scaffold fixture 102 does not have the nut 22 (see FIG. 1). In other words, the scaffold fixture 102 does not have the first mounting portion 20 (see FIG. 1). This scaffold fixture 102 cannot be attached to the veranda 70 shown in FIG. The scaffold fixture 102 can be attached to the veranda 78 shown in FIG. When attached to the veranda 78 shown in FIG. 4, the fixing means (bolt 14 in this example) can be operated by an operator standing on the scaffold. Therefore, it is not necessary for the worker on the scaffold to transfer to the veranda 78.

以上説明された足場固定具は、補修時のみならず、建物の新築時や解体時にも用いられうる。   The scaffold fixture described above can be used not only during repairs, but also when building new buildings or dismantling.

2・・・足場固定具
4・・・ブラケット
6・・・クランプ
8・・・主部
10・・・第一レッグ
12・・・第二レッグ
14・・・ボルト
18・・・ジョー
20・・・第一装着部
24・・・第二装着部
36・・・第一爪
38・・・第二爪
40・・・軸ピン
42・・・第一シャフト
44・・・ボルト
46・・・第一シリンダー
48・・・第二シリンダー
50・・・通しボルト
54・・・第三装着部
60・・・ボディ
62・・・第二シャフト
70、78・・・ベランダ
2 ... scaffolding fixture 4 ... bracket 6 ... clamp 8 ... main part 10 ... first leg 12 ... second leg 14 ... bolt 18 ... jaw 20 ... First mounting part 24 ... second mounting part 36 ... first claw 38 ... second claw 40 ... axial pin 42 ... first shaft 44 ... bolt 46 ... first One cylinder 48 ... Second cylinder 50 ... Through bolt 54 ... Third mounting part 60 ... Body 62 ... Second shaft 70, 78 ... Veranda

Claims (3)

建物に固定されるブラケットと、この建物の周囲に構築される足場のパイプを把持するクランプとを備えており、
上記ブラケットが、長尺の主部を備えており、
上記主部が、その一端に第一装着部を有し、かつその他端に第二装着部を有しており、
上記クランプが、第一装着部及び第二装着部のいずれにも装着されうる足場固定具。
It has a bracket that is fixed to the building, and a clamp that holds the pipe of the scaffolding that is built around the building,
The bracket has a long main part,
The main part has a first mounting part at one end and a second mounting part at the other end,
A scaffold fixture in which the clamp can be mounted on either the first mounting portion or the second mounting portion.
建物に固定されるブラケットと、この建物の周囲に構築される足場のパイプを把持するクランプとを備えており、
上記ブラケットが、建物に固定されるための固定手段を備えており、
この固定手段の操作が足場に立つ作業者によってなされうる足場固定具。
It has a bracket that is fixed to the building, and a clamp that holds the pipe of the scaffolding that is built around the building,
The bracket includes a fixing means for fixing to the building,
A scaffold fixture that can be operated by an operator standing on the scaffold.
建物のベランダの側壁を挟持することでこのベランダに固定されるブラケットと、上記ブラケットに装着されるクランプと、このクランプに把持されるパイプとを備えた足場構造体。   A scaffold structure including a bracket fixed to the veranda by sandwiching a side wall of a veranda of a building, a clamp attached to the bracket, and a pipe held by the clamp.
JP2010003582A 2010-01-12 2010-01-12 Scaffold fixing implement Withdrawn JP2011144495A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2010003582A JP2011144495A (en) 2010-01-12 2010-01-12 Scaffold fixing implement

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2010003582A JP2011144495A (en) 2010-01-12 2010-01-12 Scaffold fixing implement

Publications (1)

Publication Number Publication Date
JP2011144495A true JP2011144495A (en) 2011-07-28

Family

ID=44459580

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2010003582A Withdrawn JP2011144495A (en) 2010-01-12 2010-01-12 Scaffold fixing implement

Country Status (1)

Country Link
JP (1) JP2011144495A (en)

Similar Documents

Publication Publication Date Title
JP6511513B2 (en) Connection nut and hole down method
JP2009196051A (en) Socket for socket wrench and fixing method of fastened member
JP3164320U (en) Scaffolding fixture
KR102353898B1 (en) Scaffold supporter
JP4807827B2 (en) Chain hanging tool
JP6120119B1 (en) Wall fittings
JP2011144495A (en) Scaffold fixing implement
JP3173584U (en) Camera fixture
KR200466760Y1 (en) Temporary installation fixing clamp
JP2011106126A (en) Working scaffold with supplementary panel
KR20090114055A (en) A wrench for pluming
JP2013217159A (en) Fastening fixture
JP2001355287A (en) Structure and method for jointing structural member for wooden building
JP2011236573A (en) Scaffold fixture
JP3061288U (en) Socket for manual torque wrench
JP2012041722A (en) Scaffold fixture
JP6360689B2 (en) spanner
KR101236751B1 (en) mounting structure of ship outfit
JP3185919U (en) Fastening jig
CN214247958U (en) Fastening type anti-loosening combined nut
CN212926971U (en) Adjustable overhanging scaffold upright rod anti-slip fixing device
JP3115524U (en) Scaffold assembly equipment
JP5925470B2 (en) Form lifting tool
CN208633486U (en) A kind of detachable steel pipe scaffold wall-connecting piece
JP3142726U (en) Bracket KS type for scaffolding for mounting concrete feed pipes.

Legal Events

Date Code Title Description
A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20130402